JPH09242084A - Form for underground beam and work method of foundation form - Google Patents
Form for underground beam and work method of foundation formInfo
- Publication number
- JPH09242084A JPH09242084A JP5216896A JP5216896A JPH09242084A JP H09242084 A JPH09242084 A JP H09242084A JP 5216896 A JP5216896 A JP 5216896A JP 5216896 A JP5216896 A JP 5216896A JP H09242084 A JPH09242084 A JP H09242084A
- Authority
- JP
- Japan
- Prior art keywords
- formwork
- underground beam
- reinforcement
- main
- reinforcing bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims description 27
- 230000002787 reinforcement Effects 0.000 claims abstract description 28
- 238000009415 formwork Methods 0.000 claims description 139
- 230000003014 reinforcing effect Effects 0.000 claims description 79
- 238000003466 welding Methods 0.000 abstract description 11
- 229910000831 Steel Inorganic materials 0.000 abstract description 8
- 239000010959 steel Substances 0.000 abstract description 8
- 238000000137 annealing Methods 0.000 abstract 1
- 238000010276 construction Methods 0.000 description 25
- 230000000694 effects Effects 0.000 description 12
- 210000003205 muscle Anatomy 0.000 description 8
- 125000006850 spacer group Chemical group 0.000 description 6
- 210000003489 abdominal muscle Anatomy 0.000 description 4
- 238000005452 bending Methods 0.000 description 4
- 238000009434 installation Methods 0.000 description 2
- 230000002452 interceptive effect Effects 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 239000002184 metal Substances 0.000 description 2
- 231100000989 no adverse effect Toxicity 0.000 description 2
- 239000002699 waste material Substances 0.000 description 2
Landscapes
- Foundations (AREA)
Abstract
Description
【0001】[0001]
【発明の属する技術分野】本発明は、地中梁用型枠およ
び基礎型枠の施工方法に関する。さらに詳しくは、地中
梁用型枠における鉄筋の配筋構造に係る改良と、この地
中梁用型枠を利用した新規な基礎型枠の施工方法にとに
関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for constructing a formwork for an underground beam and a foundation formwork. More specifically, the present invention relates to an improvement in the reinforcing bar reinforcing structure in an underground beam formwork, and a new method of constructing a basic formwork using this underground beam formwork.
【0002】[0002]
【従来の技術】従来、基礎型枠,基礎型枠の施工方法と
しては、例えば、本出願人が先に提案した特開平6−3
46463号に記載のものがある。2. Description of the Related Art Conventionally, as a basic formwork and a method of constructing a basic formwork, for example, Japanese Patent Application Laid-Open No. 6-3 has been previously proposed by the present applicant.
There is one described in No. 46463.
【0003】この本出願人の先提案に係る基礎型枠,基
礎型枠の施工方法は、根切り溝の余掘り量を減量するこ
と等を指向して埋め殺しにするユニット型の捨型枠に構
成してなるもので、根切り溝に建込まれた基礎型枠の上
方で鉄筋を組付けてそのまま基礎型枠の内部に落込み配
筋するものである。The basic formwork and the method of constructing the basic formwork proposed by the applicant of the present invention are a unit type waste formwork, which aims to reduce the amount of overcutting of the root cutting groove, etc. The above structure is one in which a reinforcing bar is assembled above the basic formwork built in the root cutting groove, and the steel is dropped inside the basic formwork as it is and arranged.
【0004】[0004]
【発明が解決しようとする課題】前述の従来の本出願人
の先提案に係る基礎型枠,基礎型枠の施工方法では、鉄
筋の落込み配筋の際に、鉄筋を基礎型枠の枠板等に位置
決め調整して固定する配筋補助作業が要求されるが、基
礎型枠が狭い地中梁用型枠である場合に配筋補助作業が
困難になるという問題点がある。さらに、鉄筋の組付け
作業によって長時間基礎型枠の上方空間を占拠してしま
うため、他の工事の邪魔になるという問題点がある。SUMMARY OF THE INVENTION In the above-mentioned conventional basic formwork and construction method of the basic formwork proposed by the applicant of the present invention, when the rebar is sunk, the reinforcing bar is used as the frame of the basic formwork. A reinforcement work for positioning and adjusting the plate and the like is required, but there is a problem that the reinforcement work becomes difficult when the base formwork is a narrow underground beam formwork. In addition, the work of assembling the reinforcing bars occupies the space above the foundation formwork for a long time, which causes a problem that it interferes with other works.
【0005】本発明は、このような問題点を考慮してな
されたもので、配筋,配筋補助作業を殆ど不要にし、上
方空間を長時間占拠することなく施工することができる
ようにした地中梁用型枠と、この地中梁用型枠を利用し
た基礎型枠の施工方法とを提供することを課題とする。The present invention has been made in consideration of the above problems, and almost eliminates the need for reinforcement work and reinforcement work, and enables construction without occupying the upper space for a long time. It is an object to provide a formwork for an underground beam and a method of constructing a base formwork using the formwork for an underground beam.
【0006】[0006]
【課題を解決するための手段】前述の課題を解決するた
め、本発明に係る地中梁用型枠は、請求項1に記載のよ
うに、少なくとも一定間隔を介して側面枠板が組付けら
れ内部にコンクリート打設間隙が設けられた型枠本体
と、型枠本体のコンクリート打設間隙に配筋固定され型
枠本体の端口から一定長突出した鉄筋とからなる手段を
採用する。In order to solve the above-mentioned problems, in the underground beam formwork according to the present invention, as described in claim 1, side frame plates are assembled at least at certain intervals. A means comprising a main frame body having a concrete pouring gap inside and a reinforcing bar fixed in the concrete pouring gap of the main frame body and projecting a certain length from the end opening of the main frame body is adopted.
【0007】また、本発明に係る基礎型枠の施工方法
は、請求項2に記載のように、独立基礎用型枠を建込ん
だ後に、請求項1の地中梁用型枠を地中梁用の根切り溝
に落込んで建込みし、地中梁用型枠の端口から突出した
鉄筋を独立基礎用型枠の内部に突入させ、独立基礎用型
枠の内部で地中梁用型枠の鉄筋を直接または間接に連結
することを特徴とする。According to a second aspect of the present invention, there is provided a method for constructing a foundation formwork, wherein after the independent foundation formwork is built, the underground beam formwork according to the first aspect is carried out. It is built by dropping it into the root cutting groove for the beam, and the reinforcing bars protruding from the end openings of the underground beam formwork are thrust into the inside of the independent foundation formwork, and inside the independent foundation formwork is used for the underground beam formwork. It is characterized in that the reinforcing bars of the frame are connected directly or indirectly.
【0008】前述の手段によると、請求項1では、型枠
本体に鉄筋が配筋固定されているため、型枠本体を建込
めば鉄筋の配筋も完了することになる。型枠本体,鉄筋
は、工場で一体的に製造して工事現場に搬入することが
できる。型枠本体の端口から突出した鉄筋は、他の型枠
本体の鉄筋との連結に供される。According to the above-mentioned means, according to the first aspect, since the reinforcing bars are fixed to the form body, the reinforcing bars are completed when the form body is installed. The formwork body and the rebar can be manufactured integrally at the factory and brought to the construction site. The reinforcing bar protruding from the end opening of the mold body is used for connection with the reinforcing bar of another mold body.
【0009】また、請求項2では、比較的広い独立基礎
用型枠の内部で比較的容易な作業の下で鉄筋が連結され
る。According to the second aspect of the present invention, the reinforcing bars are connected within the relatively wide independent foundation formwork under relatively easy work.
【0010】[0010]
【発明の実施の形態】以下、本発明に係る地中梁用型枠
および基礎型枠の施工方法の実施例を図面に基いて説明
する。BEST MODE FOR CARRYING OUT THE INVENTION Embodiments of a method for constructing a formwork for an underground beam and a base formwork according to the present invention will be described below with reference to the drawings.
【0011】この実施例の基礎型枠の一部を構成する地
中梁用型枠1は、図1,図2に示すように、型枠本体1
1,鉄筋12,スペーサ13とからなる。As shown in FIGS. 1 and 2, the underground beam formwork 1 which constitutes a part of the base formwork of this embodiment has a formwork body 1 as shown in FIGS.
1, a rebar 12, and a spacer 13.
【0012】型枠本体11は、図2に詳細に示されるよ
うに、天端フレ止板111,中央フレ止板112,下端
フレ止板113を介して一定間隔で相対して2枚の側面
枠板114が組付けられ、内部にコンクリート打設間隙
115が形成されている。側面枠板114は、薄性材の
波板を採用して、軽量化と一定の耐圧強度とが確保され
ている。この側面枠板114と天端フレ止板111,下
端フレ止板113とは、L字形のアングル116を介し
てボルト117で固定されている。また、この側面枠板
114と中央フレ止板112とは、溶接で固定されてい
る。さらに、この両側面枠板114の間には、座金11
8を介してセパレータ119が掛け渡されている。As shown in detail in FIG. 2, the formwork main body 11 has two side surfaces facing each other at regular intervals via a top end anti-rotation stop plate 111, a center anti-rotation stop plate 112, and a lower end anti-rotation stop plate 113. The frame plate 114 is assembled and a concrete pouring gap 115 is formed inside. The side frame plate 114 is made of a corrugated sheet made of a thin material, so that weight saving and constant pressure resistance are secured. The side surface frame plate 114, the top end anti-slipping plate 111, and the bottom end anti-slipping plate 113 are fixed by a bolt 117 via an L-shaped angle 116. The side frame plate 114 and the center anti-sway plate 112 are fixed by welding. Further, the washers 11 are provided between the frame plates 114 on both sides.
The separator 119 is bridged via the No. 8.
【0013】鉄筋12は、図2に詳細に示されるよう
に、型枠本体11の長さ方向へ複数段に配筋された主筋
121と、主筋121全体の周囲を囲むフープ筋122
と、中段部分の主筋121に掛け渡された腹筋123と
からなる。この主筋121,フープ筋122,腹筋12
3は、溶接,番線結束等によって組付けられている。ま
た、フープ筋122と型枠本体11のセパレータ119
とは、スポット溶接で固定されている。なお、この鉄筋
12は、図1に示すように、型枠本体11の端口から一
定長が突出している。ただし、突出した鉄筋12の各主
筋121の突出長は、不統一に設定され、後述の連結の
継目に応力が集中するのを避けている。As shown in detail in FIG. 2, the reinforcing bar 12 has main bars 121 arranged in a plurality of steps in the length direction of the form body 11, and hoop bars 122 surrounding the entire main bar 121.
And an abdominal muscle 123 stretched over the main muscle 121 in the middle section. This main muscle 121, hoop muscle 122, abdominal muscle 12
3 is assembled by welding, tie-up of wire, or the like. In addition, the hoop muscle 122 and the separator 119 of the mold body 11
And are fixed by spot welding. In addition, as shown in FIG. 1, the reinforcing bar 12 projects from the end opening of the mold body 11 by a certain length. However, the projecting length of each of the main bars 121 of the projecting reinforcing bar 12 is set to be non-uniform, so that stress is prevented from concentrating at joints of the connection described later.
【0014】スペーサ13は、山形に形成されてなるも
ので、型枠本体11の下端フレ止板113に固定されて
鉄筋12の全体を長さ方向に亘って支承している。又、
型枠本体11の下端内側壁には対のトラス筋14を長さ
方向に亘って添設することができる。これによって型枠
本体11と鉄筋12の撓みに対する補強を行なうことが
できる。The spacer 13 is formed in a chevron shape and is fixed to the lower end anti-flare plate 113 of the mold body 11 to support the entire reinforcing bar 12 in the longitudinal direction. or,
A pair of truss bars 14 can be attached to the inner wall of the lower end of the mold body 11 along the length direction. As a result, the bending of the form body 11 and the reinforcing bar 12 can be reinforced.
【0015】この実施例の地中梁用型枠1は、型枠本体
11のセパレータ119と鉄筋12のフープ筋122と
を介して、型枠本体11,鉄筋12,スペーサ13の全
体が強固に組付けられている。従って、全体を工場で製
造し、トラック等で工事現場まで損壊せずに搬送するこ
とができる。さらに、工事現場まで搬送した後には、ク
レーン等で吊持して、地中梁用の根切り溝2に落込んで
建込みすることができる。なお、この地中梁用型枠1の
建込みの完了は、型枠本体11,鉄筋12が一体化され
ていることにより、地中梁用型枠1のコンクリート打設
間隙115における鉄筋12の配筋の完了をも意味する
ことになる。In the underground beam formwork 1 of this embodiment, the whole of the formwork body 11, the rebar 12, and the spacer 13 is firmly fixed through the separator 119 of the form body 11 and the hoop reinforcement 122 of the rebar 12. It is assembled. Therefore, the whole can be manufactured in a factory and transported to a construction site by a truck or the like without being damaged. Further, after being transported to the construction site, it can be hung by a crane or the like and dropped into the root cutting groove 2 for the underground beam to be built. It should be noted that the completion of the building of the underground beam formwork 1 is completed because the frame body 11 and the reinforcing bar 12 are integrated so that the reinforcing bar 12 in the concrete placing gap 115 of the underground beam formwork 1 is removed. It also means the completion of bar arrangement.
【0016】このため、この実施例によると、狭い地中
梁用型枠1のコンクリート打設間隙115の内部での配
筋作業,配筋補助作業が不要となるため、型枠工事の施
工期間が短縮されることになる。また、地中梁用の根切
り溝2の上方空間を長時間占拠することがないため、他
の工事の邪魔になることがなく工事全体の施工期間が短
縮されることになる。For this reason, according to this embodiment, the rebar work and the rebar assist work inside the concrete pouring gap 115 of the narrow underground beam form 1 are unnecessary, so that the formwork construction period Will be shortened. Further, since the space above the root cutting groove 2 for the underground beam is not occupied for a long time, the construction period of the entire construction is shortened without interfering with other constructions.
【0017】この実施例の地中梁用型枠1は、地中梁用
の根切り溝2に建込まれることにより、鉄筋12の型枠
本体11の端口から突出した部分が基礎型枠の他の一部
を構成する独立基礎用型枠3の内部に突入することにな
る。The underground beam formwork 1 of this embodiment is installed in the root beam groove 2 for the underground beam, so that the portion of the reinforcing bar 12 protruding from the end opening of the formwork body 11 is the basic formwork. It will plunge into the inside of the independent foundation mold 3 that constitutes another part.
【0018】即ち、独立基礎用型枠3は、地中梁用の根
切り溝2に連通して掘溝された方形の独立基礎用の根切
り溝42に建込まれるもので、側面枠板31に地中梁用
型枠1を接続するための接続用窓32が開口されてい
る。That is, the independent foundation form 3 is built in the square root incision 42 for the independent foundation, which is communicated with the root-cutting groove 2 for the underground beam. A connection window 32 for connecting the underground beam formwork 1 is opened at 31.
【0019】独立基礎用型枠3の内部では、突入した鉄
筋12の主筋121の連結を行うことになる。Inside the independent foundation form 3, the main bars 121 of the intruded reinforcing bars 12 are connected.
【0020】この連結では、図3に示すように、上段の
主筋121に対してカプラジョイント(スリーブジョイ
ント)金具5を用いて突出端を突合せ、連結の継目がコ
ンクリート打設の障害となったり打設圧力で変形するこ
とがないように構成されている。なお、例えば、ガス圧
接により突合せることも可能である。また、下段の主筋
121に対しては、突出端を一定長重ね隣接させるラッ
プジョイントが選択される。In this connection, as shown in FIG. 3, the projecting end is abutted against the upper main bar 121 by using the coupler joint (sleeve joint) metal fitting 5, and the joint of the connection becomes an obstacle to the concrete pouring. It is configured so as not to be deformed by the set pressure. In addition, for example, it is also possible to abut by gas pressure welding. Further, for the lower main bar 121, a lap joint in which the protruding ends are overlapped and adjoined for a certain length is selected.
【0021】また、独立基礎用型枠3の4方向に地中梁
用型枠1が接続される場合には、先行する2方向の接続
側で前述の図3に示した構造とし、後行する2方向の接
続側で図4に示すような補助鉄筋6を利用した構造とす
る。即ち、後行する2方向の接続側の鉄筋12の突出長
を先行する2方向の接続側の鉄筋12の連結幅を避ける
長さに短くしておき、連結に足りない長さを別個の補助
鉄筋6で継続連結する。なお、図4には、上段の主筋1
21に対してガス圧接により突合せた例を示してある。When the underground beam formwork 1 is connected in four directions of the independent foundation formwork 3, the structure shown in FIG. The auxiliary reinforcing bar 6 as shown in FIG. 4 is used on the connecting side in two directions. That is, the projecting length of the reinforcing bar 12 on the connecting side in the following two directions is shortened to a length that avoids the connecting width of the reinforcing bar 12 on the connecting side in the preceding two directions, and the length that is insufficient for the connecting is separately assisted. Reinforcement 6 is used for continuous connection. In addition, in FIG.
21 shows an example in which they are abutted against each other by gas pressure welding.
【0022】さらに、この実施例の鉄筋12の主筋12
1が表面に凹凸部のある異形鋼棒ではなく丸鋼棒である
場合には、図5に示すように、定着性を備えるためのア
ンカ7を用いる。このアンカ7は、前述の図3,図4に
示したジョイント部分から主筋121を折り曲げ形成し
たり継ぎ足し延長したりして交差する主筋121等に係
止させる。Furthermore, the main bar 12 of the reinforcing bar 12 of this embodiment
When 1 is not a deformed steel bar having an uneven portion on the surface but a round steel bar, an anchor 7 for fixing is used as shown in FIG. The anchor 7 is formed by bending the main bar 121 from the joint portion shown in FIGS.
【0023】これ等の連結作業,定着作業は、比較的広
い独立基礎用型枠3の内部で行われ、作業自体も簡単な
ものであるため、容易に行うことができる。特に、独立
基礎用型枠3における柱筋建作業と連係,併行して行う
ことが可能であるため、特別な作業が追加されたような
弊害はない。These connecting work and fixing work are performed inside the relatively wide independent foundation form 3, and the work itself is simple, so that they can be easily performed. In particular, since it is possible to perform the work in parallel with and parallel with the column reinforcing work in the independent foundation form 3, there is no adverse effect that special work is added.
【0024】以上、図示した実施例の外に、枠板本体1
1を底面枠板に側面枠板114を溶接固定してコ字形に
形成して、天端フレ止板111,中央フレ止板112,
下端フレ止板113,セパレータ119を除去した実施
例とすることも可能である。この実施例によると、枠板
本体11の部材点数が削減され構造が簡素化される。As described above, in addition to the illustrated embodiment, the frame plate body 1
1, the side frame plate 114 is welded and fixed to the bottom frame plate to form a U-shape, and the top end stop plate 111, the center stop plate 112,
It is also possible to adopt an embodiment in which the lower end anti-flare plate 113 and the separator 119 are removed. According to this embodiment, the number of members of the frame plate body 11 is reduced and the structure is simplified.
【0025】さらに、地中梁用型枠1と独立基礎用型枠
3の接続用窓32との間に、両者を強固に固定する固定
構造を設ける実施例とすることも可能である。この実施
例によると、地中梁用型枠1と独立基礎用型枠3とのズ
レが防止され、鉄筋12に無用の応力が掛からなくな
る。Further, it is possible to provide an embodiment in which a fixing structure is provided between the underground beam form 1 and the connection window 32 of the independent foundation form 3 to firmly fix them. According to this embodiment, the gap between the underground beam formwork 1 and the independent foundation formwork 3 is prevented, and unnecessary stress is not applied to the reinforcing bar 12.
【0026】[0026]
【発明の効果】以上のように本発明に係る地中梁用型枠
および基礎型枠の施工方法は、地中梁用型枠の建込み完
了により鉄筋の配筋も完了することになるため、狭い地
中梁用型枠の内部での配筋作業,配筋補助作業が殆ど不
要となる効果がある。また、この効果により、型枠工事
の施工期間が短縮される効果が生ずる。As described above, in the method of constructing a formwork for an underground girder and a foundation formwork according to the present invention, the reinforcement of reinforcing bars is completed by the completion of the installation of the formwork for an underground beam. This has the effect that almost no reinforcement work or reinforcement work is required inside a narrow underground beam formwork. Further, due to this effect, there is an effect that the construction period of the formwork is shortened.
【0027】さらに、地中梁用型枠の上方の空間を長時
間占拠することがないため、他の工事の邪魔にならない
効果がある。このため、工事全体の施工期間が短縮され
る効果が生ずる。Further, since the space above the underground beam formwork is not occupied for a long time, there is an effect that it does not interfere with other works. Therefore, there is an effect that the construction period of the entire construction is shortened.
【0028】さらに、本発明に係る地中梁用型枠のみと
しては、地中梁用型枠の端口から鉄筋が突出しているた
め、簡単な工作で鉄筋の連結を行うことができる効果が
ある。Further, since only the underground beam formwork according to the present invention has the reinforcing bars protruding from the end openings of the underground beam formwork, there is an effect that the reinforcing bars can be connected by a simple work. .
【0029】さらに、本発明に係る基礎型枠の施工方法
のみとしては、比較的広い独立基礎用型枠の内部で鉄筋
の連結作業を行うため、鉄筋の連結作業が容易となる効
果がある。Further, as the method of constructing the base form according to the present invention only, since the connecting work of the reinforcing bar is performed inside the relatively wide independent formwork, the connecting work of the reinforcing bar is facilitated.
【図1】本発明に係る地中梁用型枠および基礎型枠の施
工方法の実施例を示す斜視図である。FIG. 1 is a perspective view showing an embodiment of a method for constructing a formwork for an underground beam and a base formwork according to the present invention.
【図2】本発明に係る地中梁用型枠の実施例を示す断面
図である。FIG. 2 is a cross-sectional view showing an embodiment of the underground beam formwork according to the present invention.
【図3】図1における鉄筋の連結例を示す要部の斜視図
である。FIG. 3 is a perspective view of a main part showing an example of connecting the reinforcing bars in FIG.
【図4】図3の変形例を示す斜視図である。FIG. 4 is a perspective view showing a modified example of FIG.
【図5】図1における鉄筋の定着例を示す要部の断面図
である。5 is a cross-sectional view of a main part showing an example of fixing the reinforcing bars in FIG.
【符号の説明】 1 地中梁用型枠 11 型枠本体 114 側面型板 115 コンクリート打設間隙 12 鉄筋 121 主筋 2 地中梁用の根切り溝 3 独立基礎用型枠[Explanation of symbols] 1 Formwork for underground beam 11 Formwork body 114 Side form plate 115 Concrete placing gap 12 Reinforcing bar 121 Main bar 2 Root cutting groove for underground beam 3 Formwork for independent foundation
─────────────────────────────────────────────────────
─────────────────────────────────────────────────── ───
【手続補正書】[Procedure amendment]
【提出日】平成8年3月13日[Submission date] March 13, 1996
【手続補正1】[Procedure amendment 1]
【補正対象書類名】明細書[Document name to be amended] Statement
【補正対象項目名】全文[Correction target item name] Full text
【補正方法】変更[Correction method] Change
【補正内容】[Correction contents]
【書類名】 明細書[Document Name] Statement
【発明の名称】 地中梁用型枠および基礎型枠の
施工方法[Title of Invention] Construction method for underground beam formwork and foundation formwork
【特許請求の範囲】[Claims]
【発明の詳細な説明】Detailed Description of the Invention
【0001】[0001]
【発明の属する技術分野】本発明は、地中梁用型枠およ
び基礎型枠の施工方法に関する。さらに詳しくは、地中
梁用型枠における鉄筋の配筋構造に係る改良と、この地
中梁用型枠を利用した新規な基礎型枠の施工方法とに関
する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for constructing a formwork for an underground beam and a foundation formwork. More specifically, the present invention relates to an improvement relating to the reinforcing bar reinforcing structure in an underground beam formwork, and a method for constructing a new foundation formwork using this underground beam formwork.
【0002】[0002]
【従来の技術】従来、基礎型枠,基礎型枠の施工方法と
しては、例えば、本出願人が先に提案した特開平6−3
4643号に記載のものがある。2. Description of the Related Art Conventionally, as a basic formwork and a method of constructing a basic formwork, for example, Japanese Patent Application Laid-Open No. 6-3 has been previously proposed by the present applicant.
There is one described in No. 4643.
【0003】この本出願人の先提案に係る基礎型枠,基
礎型枠の施工方法は、根切り溝の余掘り量を減量するこ
と等を指向して埋め殺しにするユニット型の捨型枠に構
成してなるもので、根切り溝に建込まれた基礎型枠の上
方で鉄筋を組付けてそのまま基礎型枠の内部に落込み配
筋するものである。The basic formwork and the method of constructing the basic formwork proposed by the applicant of the present invention are a unit type waste formwork, which aims to reduce the amount of overcutting of the root cutting groove, etc. The above structure is one in which a reinforcing bar is assembled above the basic formwork built in the root cutting groove, and the steel is dropped inside the basic formwork as it is and arranged.
【0004】[0004]
【発明が解決しようとする課題】前述の従来の本出願人
の先提案に係る基礎型枠,基礎型枠の施工方法では、鉄
筋の落込み配筋の際に、鉄筋を基礎型枠の枠板等に位置
決め調整して固定する配筋補助作業が要求されるが、基
礎型枠が狭い地中梁用型枠である場合に配筋補助作業が
困難になるという問題点がある。さらに、鉄筋の組付け
作業によって長時間基礎型枠の上方空間を占拠してしま
うため、他の工事の邪魔になるという問題点がある。SUMMARY OF THE INVENTION In the above-mentioned conventional basic formwork and construction method of the basic formwork proposed by the applicant of the present invention, when the rebar is sunk, the reinforcing bar is used as the frame of the basic formwork. A reinforcement work for positioning and adjusting the plate and the like is required, but there is a problem that the reinforcement work becomes difficult when the base formwork is a narrow underground beam formwork. In addition, the work of assembling the reinforcing bars occupies the space above the foundation formwork for a long time, which causes a problem that it interferes with other works.
【0005】本発明は、このような問題点を考慮してな
されたもので、配筋,配筋補助作業を殆ど不要にし、上
方空間を長時間占拠することなく施工することができる
ようにした地中梁用型枠と、この地中梁用型枠を利用し
た基礎型枠の施工方法とを提供することを課題とする。The present invention has been made in consideration of the above problems, and almost eliminates the need for reinforcement work and reinforcement work, and enables construction without occupying the upper space for a long time. It is an object to provide a formwork for an underground beam and a method of constructing a base formwork using the formwork for an underground beam.
【0006】[0006]
【課題を解決するための手段】前述の課題を解決するた
め、本発明に係る地中梁用型枠は、請求項1に記載のよ
うに、少なくとも一定間隔を介して側面枠板が組付けら
れ内部にコンクリート打設間隙が設けられた型枠本体
と、型枠本体のコンクリート打設間隙に配筋固定され型
枠本体の端口から一定長突出した鉄筋とからなる手段を
採用する。In order to solve the above-mentioned problems, in the underground beam formwork according to the present invention, as described in claim 1, side frame plates are assembled at least at certain intervals. A means comprising a main frame body having a concrete pouring gap inside and a reinforcing bar fixed in the concrete pouring gap of the main frame body and projecting a certain length from the end opening of the main frame body is adopted.
【0007】この手段によると、型枠本体に鉄筋が配筋
固定されているため、型枠本体を建込めば鉄筋の配筋も
完了することになる。型枠本体,鉄筋は、工場で一体的
に製造して工事現場に搬入することができる。型枠本体
の端口から突出した鉄筋は、他の型枠本体の鉄筋との連
結に供される。According to this means, the reinforcing bars are fixed to the form body, so that when the form body is built in, the reinforcing bar reinforcement is completed. The formwork body and the rebar can be manufactured integrally at the factory and brought to the construction site. The reinforcing bar protruding from the end opening of the mold body is used for connection with the reinforcing bar of another mold body.
【0008】また、本発明に係る基礎型枠の施工方法
は、請求項2に記載のように、独立基礎用型枠を建込ん
だ後に、請求項1の地中梁用型枠を地中梁用の根切り溝
に落込んで建込みし、地中梁用型枠の端口から突出した
鉄筋を独立基礎用型枠の内部に突入させ、独立基礎用型
枠の内部で地中梁用型枠の鉄筋を直接または間接に連結
することを特徴とする。Further, in the method for constructing a foundation formwork according to the present invention, as described in claim 2, after the independent foundation formwork is built, the underground beam formwork of claim 1 is underground. It is built by dropping it into the root cutting groove for the beam, and the reinforcing bars protruding from the end openings of the underground beam formwork are thrust into the independent foundation formwork, and the underground beam formwork is used inside the independent foundation formwork. It is characterized in that the reinforcing bars of the frame are connected directly or indirectly.
【0009】この手段によると、比較的広い独立基礎用
型枠の内部で比較的容易な作業の下で鉄筋が連結され
る。According to this means, the reinforcing bars are connected inside the relatively wide independent foundation formwork under relatively easy work.
【0010】[0010]
【発明の実施の形態】以下、本発明に係る地中梁用型枠
および基礎型枠の施工方法の実施の形態を図面に基いて
説明する。BEST MODE FOR CARRYING OUT THE INVENTION Embodiments of a method for constructing a formwork for an underground beam and a base formwork according to the present invention will be described below with reference to the drawings.
【0011】この実施の形態の基礎型枠の一部を構成す
る地中梁用型枠1は、図1,図2に示すように、型枠本
体11,鉄筋12,スペーサ13とからなる。As shown in FIGS. 1 and 2, the underground beam formwork 1 constituting a part of the basic formwork of this embodiment comprises a formwork body 11, reinforcing bars 12 and spacers 13.
【0012】型枠本体11は、図2に詳細に示されるよ
うに、天端フレ止板111,中央フレ止板112,下端
フレ止板113を介して一定間隔で相対して2枚の側面
枠板114が組付けられ、内部にコンクリート打設間隙
115が形成されている。側面枠板114は、薄性材の
波板を採用して、軽量化と一定の耐圧強度とが確保され
ている。この側面枠板114と天端フレ止板111,下
端フレ止板113とは、L字形のアングル116を介し
てボルト117で固定されている。また、この側面枠板
114と中央フレ止板112とは、溶接で固定されてい
る。さらに、この両側面枠板114の間には、座金11
8を介してセパレータ119が掛け渡されている。As shown in detail in FIG. 2, the formwork main body 11 has two side surfaces facing each other at regular intervals via a top end anti-rotation stop plate 111, a center anti-rotation stop plate 112, and a lower end anti-rotation stop plate 113. The frame plate 114 is assembled and a concrete pouring gap 115 is formed inside. The side frame plate 114 is made of a corrugated sheet made of a thin material, so that weight saving and constant pressure resistance are secured. The side surface frame plate 114, the top end anti-slipping plate 111, and the bottom end anti-slipping plate 113 are fixed by a bolt 117 via an L-shaped angle 116. The side frame plate 114 and the center anti-sway plate 112 are fixed by welding. Further, the washers 11 are provided between the frame plates 114 on both sides.
The separator 119 is bridged via the No. 8.
【0013】鉄筋12は、図2に詳細に示されるよう
に、型枠本体11の長さ方向へ複数段に配筋された主筋
121と、主筋121全体の周囲を囲むフープ筋122
と、中段部分の主筋121に掛け渡された腹筋123と
からなる。この主筋121,フープ筋122,腹筋12
3は、溶接,番線結束等によって組付けられている。ま
た、フープ筋122と型枠本体11のセパレータ119
とは、スポット溶接で固定されている。なお、この鉄筋
12は、図1に示すように、型枠本体11の端口から一
定長が突出している。ただし、突出した鉄筋12の各主
筋121の突出長は、不統一に設定され、後述の連結の
継目に応力が集中するのを避けている。As shown in detail in FIG. 2, the reinforcing bar 12 has main bars 121 arranged in a plurality of steps in the length direction of the form body 11, and hoop bars 122 surrounding the entire main bar 121.
And an abdominal muscle 123 stretched over the main muscle 121 in the middle section. This main muscle 121, hoop muscle 122, abdominal muscle 12
3 is assembled by welding, tie-up of wire, or the like. In addition, the hoop muscle 122 and the separator 119 of the mold body 11
And are fixed by spot welding. In addition, as shown in FIG. 1, the reinforcing bar 12 projects from the end opening of the mold body 11 by a certain length. However, the projecting length of each main bar 121 of the projecting reinforcing bar 12 is set to be non-uniform, and stress is prevented from concentrating on the joint of the connection to be described later.
【0014】スペーサ13は、山形に形成されてなるも
ので、型枠本体11の下端フレ止板113に固定されて
鉄筋12の全体を長さ方向に亘って支承している。又、
型枠本体11の下端内側壁には対のトラス筋14を長さ
方向に亘って添設することができる。これによって型枠
本体11と鉄筋12の撓みに対する補強を行うことがで
きる。The spacer 13 is formed in a chevron shape and is fixed to the lower end anti-flare plate 113 of the mold body 11 to support the entire reinforcing bar 12 in the longitudinal direction. or,
A pair of truss bars 14 can be attached to the inner wall of the lower end of the mold body 11 along the length direction. As a result, the bending of the form body 11 and the reinforcing bar 12 can be reinforced.
【0015】この実施の形態の地中梁用型枠1は、型枠
本体11のセパレータ119と鉄筋12のフープ筋12
2とを介して、型枠本体11,鉄筋12,スペーサ13
の全体が強固に組付けられている。従って、全体を工場
で製造し、トラック等で工事現場まで損壊せずに搬送す
ることができる。さらに、工事現場まで搬送した後に
は、クレーン等で吊持して、地中梁用の根切り溝2に落
込んで建込みすることができる。なお、この地中梁用型
枠1の建込みの完了は、型枠本体11,鉄筋12が一体
化されていることにより、地中梁用型枠1のコンクリー
ト打設間隙115における鉄筋12の配筋の完了をも意
味することになる。The underground beam formwork 1 of this embodiment includes a separator 119 of a formwork body 11 and a hoop reinforcement 12 of a reinforcing bar 12.
2 through the form body 11, rebar 12, spacer 13
The whole is firmly assembled. Therefore, the whole can be manufactured in a factory and transported to a construction site by a truck or the like without being damaged. Further, after being transported to the construction site, it can be hung by a crane or the like and dropped into the root cutting groove 2 for the underground beam to be built. It should be noted that the completion of the building of the underground beam formwork 1 is completed because the frame body 11 and the reinforcing bar 12 are integrated so that the reinforcing bar 12 in the concrete placing gap 115 of the underground beam formwork 1 is removed. It also means the completion of bar arrangement.
【0016】このため、この実施の形態によると、狭い
地中梁用型枠1のコンクリート打設間隙115の内部で
の配筋作業,配筋補助作業が不要となるため、型枠工事
の施工期間が短縮されることになる。また、地中梁用の
根切り溝2の上方空間を長時間占拠することがないた
め、他の工事の邪魔になることがなく工事全体の施工期
間が短縮されることになる。For this reason, according to this embodiment, since the work of reinforcing the bar and the assisting work of the reinforcing bar inside the concrete placing gap 115 of the narrow underground beam form 1 are unnecessary, the formwork construction is carried out. The period will be shortened. Further, since the space above the root cutting groove 2 for the underground beam is not occupied for a long time, the construction period of the entire construction is shortened without interfering with other constructions.
【0017】この実施の形態の地中梁用型枠1は、地中
梁用の根切り溝2に建込まれることにより、鉄筋12の
型枠本体11の端口から突出した部分が基礎型枠の他の
一部を構成する独立基礎用型枠3の内部に突入すること
になる。The underground beam form 1 of this embodiment is built in the root beam groove 2 for the underground beam, so that the portion of the reinforcing bar 12 protruding from the end opening of the form body 11 is the basic form. It will plunge into the inside of the independent foundation form 3 that constitutes another part of the.
【0018】即ち、独立基礎用型枠3は、地中梁用の根
切り溝2に連通して掘溝された方形の独立基礎用の根切
り溝42に建込まれるもので、側面枠板31に地中梁用
型枠1を接続するための接続用窓32が開口されてい
る。That is, the independent foundation form 3 is built in the square root incision 42 for the independent foundation, which is communicated with the root-cutting groove 2 for the underground beam. A connection window 32 for connecting the underground beam formwork 1 is opened at 31.
【0019】独立基礎用型枠3の内部では、突入した鉄
筋12の主筋121の連結を行うことになる。Inside the independent foundation form 3, the main bars 121 of the intruded reinforcing bars 12 are connected.
【0020】この連結では、図3に示すように、上段の
主筋121に対してカプラジョイント(スリーブジョイ
ント)金具5を用いて突出端を突合せ、連結の継目がコ
ンクリート打設の障害となったり打設圧力で変形するこ
とがないように構成されている。なお、例えば、ガス圧
接により突合せることも可能である。また、下段の主筋
121に対しては、突出端を一定長重ね隣接させるラッ
プジョイントが選択される。In this connection, as shown in FIG. 3, the projecting end is abutted against the upper main bar 121 by using the coupler joint (sleeve joint) metal fitting 5, and the joint of the connection becomes an obstacle to the concrete pouring. It is configured so as not to be deformed by the set pressure. In addition, for example, it is also possible to abut by gas pressure welding. Further, for the lower main bar 121, a lap joint in which the protruding ends are overlapped and adjoined for a certain length is selected.
【0021】また、独立基礎用型枠3の4方向に地中梁
用型枠1が接続される場合には、先行する2方向の接続
側で前述の図3に示した構造とし、後行する2方向の接
続側で図4に示すような補助鉄筋6を利用した構造とす
る。即ち、後行する2方向の接続側の鉄筋12の突出長
を先行する2方向の接続側の鉄筋12の連結幅を避ける
長さに短くしておき、連結に足りない長さを別個の補助
鉄筋6で継続連結する。なお、図4には、上段の主筋1
21に対してガス圧接により突合せた形態を示してあ
る。When the underground beam formwork 1 is connected in four directions of the independent foundation formwork 3, the structure shown in FIG. The auxiliary reinforcing bar 6 as shown in FIG. 4 is used on the connecting side in two directions. That is, the projecting length of the reinforcing bar 12 on the connecting side in the following two directions is shortened to a length that avoids the connecting width of the reinforcing bar 12 on the connecting side in the preceding two directions, and the length that is insufficient for the connecting is separately assisted. Reinforcement 6 is used for continuous connection. In addition, in FIG.
It is shown that 21 is abutted by gas pressure welding.
【0022】さらに、この実施の形態の鉄筋12の主筋
121が表面に凹凸部のある異形鋼棒ではなく丸鋼棒で
ある場合には、図5に示すように、定着性を備えるため
のアンカ7を用いる。このアンカ7は、前述の図3,図
4に示したジョイント部分から主筋121を折り曲げ形
成したり継ぎ足し延長したりして交差する主筋121等
に係止させる。Further, when the main bar 121 of the reinforcing bar 12 of this embodiment is a round steel bar instead of a deformed steel bar having an uneven surface, as shown in FIG. 7 is used. The anchor 7 is formed by bending the main bar 121 from the joint portion shown in FIGS.
【0023】これ等の連結作業,定着作業は、比較的広
い独立基礎用型枠3の内部で行われ、作業自体も簡単な
ものであるため、容易に行うことができる。特に、独立
基礎用型枠3における柱筋建作業と連係,併行して行う
ことが可能であるため、特別な作業が追加されたような
弊害はない。These connecting work and fixing work are performed inside the relatively wide independent foundation form 3, and the work itself is simple, so that they can be easily performed. In particular, since it is possible to perform the work in parallel with and parallel with the column reinforcing work in the independent foundation form 3, there is no adverse effect that special work is added.
【0024】以上、図示した実施の形態の外に、枠板本
体11を底面枠板に側面枠板114を溶接固定してコ字
形に形成して、天端フレ止板111,中央フレ止板11
2,下端フレ止板113,セパレータ119を除去した
実施の形態とすることも可能である。この実施の形態に
よると、枠板本体11の部材点数が削減され構造が簡素
化される。As described above, in addition to the embodiment shown in the drawings, the frame plate body 11 is welded and fixed to the bottom frame plate and the side frame plate 114 is formed into a U-shape to form the top end anti-flare plate 111 and the central anti-flare plate. 11
It is also possible to adopt an embodiment in which the second bottom anti-skid plate 113 and the separator 119 are removed. According to this embodiment, the number of members of the frame plate body 11 is reduced and the structure is simplified.
【0025】さらに、地中梁用型枠1と独立基礎用型枠
3の接続用窓32との間に、両者を強固に固定する固定
構造を設ける実施の形態とすることも可能である。この
実施の形態によると、地中梁用型枠1と独立基礎用型枠
3とのズレが防止され、鉄筋12に無用の応力が掛から
なくなる。Further, it is also possible to provide an embodiment in which a fixing structure for firmly fixing the underground beam form 1 and the connection window 32 of the independent foundation form 3 is provided between them. According to this embodiment, the gap between the underground beam formwork 1 and the independent foundation formwork 3 is prevented, and unnecessary stress is not applied to the reinforcing bar 12.
【0026】[0026]
【発明の効果】以上のように本発明に係る地中梁用型枠
および基礎型枠の施工方法は、地中梁用型枠の建込み完
了により鉄筋の配筋も完了することになるため、狭い地
中梁用型枠の内部での配筋作業,配筋補助作業が殆ど不
要となる効果がある。また、この効果により、型枠工事
の施工期間が短縮される効果が生ずる。As described above, in the method of constructing a formwork for an underground girder and a foundation formwork according to the present invention, the reinforcement of reinforcing bars is completed by the completion of the installation of the formwork for an underground beam. This has the effect that almost no reinforcement work or reinforcement work is required inside a narrow underground beam formwork. Further, due to this effect, there is an effect that the construction period of the formwork is shortened.
【0027】さらに、地中梁用型枠の上方の空間を長時
間占拠することがないため、他の工事の邪魔にならない
効果がある。このため、工事全体の施工期間が短縮され
る効果が生ずる。Further, since the space above the underground beam formwork is not occupied for a long time, there is an effect that it does not interfere with other works. Therefore, there is an effect that the construction period of the entire construction is shortened.
【0028】さらに、本発明に係る地中梁用型枠のみと
しては、地中梁用型枠の端口から鉄筋が突出しているた
め、簡単な工作で鉄筋の連結を行うことができる効果が
ある。Further, since only the underground beam formwork according to the present invention has the reinforcing bars protruding from the end openings of the underground beam formwork, there is an effect that the reinforcing bars can be connected by a simple work. .
【0029】さらに、本発明に係る基礎型枠の施工方法
のみとしては、比較的広い独立基礎用型枠の内部で鉄筋
の連結作業を行うため、鉄筋の連結作業が容易となる効
果がある。Further, as the method of constructing the base form according to the present invention only, since the connecting work of the reinforcing bar is performed inside the relatively wide independent formwork, the connecting work of the reinforcing bar is facilitated.
【図面の簡単な説明】[Brief description of drawings]
【図1】本発明に係る地中梁用型枠および基礎型枠の施
工方法の実施の形態を示す斜視図である。FIG. 1 is a perspective view showing an embodiment of a method of constructing a formwork for an underground beam and a base formwork according to the present invention.
【図2】本発明に係る地中梁用型枠の実施の形態を示す
断面図である。FIG. 2 is a cross-sectional view showing an embodiment of a formwork for an underground beam according to the present invention.
【図3】図1における鉄筋の連結例を示す要部の斜視図
である。FIG. 3 is a perspective view of a main part showing an example of connecting the reinforcing bars in FIG.
【図4】図3の変形例を示す斜視図である。FIG. 4 is a perspective view showing a modified example of FIG.
【図5】図1における鉄筋の定着例を示す要部の断面図
である。5 is a cross-sectional view of a main part showing an example of fixing the reinforcing bars in FIG.
【符号の説明】 1 地中梁用型枠 11 型枠本体 114 側面型板 115 コンクリート打設間隙 12 鉄筋 121 主筋 2 地中梁用の根切り溝 3 独立基礎用型枠[Explanation of symbols] 1 Formwork for underground beam 11 Formwork body 114 Side form plate 115 Concrete placing gap 12 Reinforcing bar 121 Main bar 2 Root cutting groove for underground beam 3 Formwork for independent foundation
【手続補正2】[Procedure amendment 2]
【補正対象書類名】図面[Document name to be amended] Drawing
【補正対象項目名】全図[Correction target item name] All figures
【補正方法】変更[Correction method] Change
【補正内容】[Correction contents]
【図3】 [Figure 3]
【図4】 FIG. 4
【図1】 FIG.
【図2】 [Fig. 2]
【図5】 [Figure 5]
Claims (2)
組付けられ内部にコンクリート打設間隙が設けられた型
枠本体と、型枠本体のコンクリート打設間隙に配筋固定
され型枠本体の端口から一定長突出した鉄筋とからなる
地中梁用型枠。1. A formwork main body in which side face frame plates are assembled at least at regular intervals and a concrete placing gap is provided inside, and a form main body fixed to the concrete placing gap of the formwork body by arranging reinforcement. Formwork for underground beams consisting of reinforcing bars protruding for a certain length from the end opening.
1の地中梁用型枠を地中梁用の根切り溝に落込んで建込
みし、地中梁用型枠の端口から突出した鉄筋を独立基礎
用型枠の内部に突入させ、独立基礎用型枠の内部で地中
梁用型枠の鉄筋を直接または間接に連結することを特徴
とする基礎型枠の施工方法。2. After building the independent foundation formwork, the underground beam formwork according to claim 1 is dropped into the root cutting groove for the underground beam and installed, and an end opening of the underground beam formwork is formed. A method of constructing a basic formwork, characterized in that the reinforcing bars projecting from the inside are rushed into the formwork for the independent foundation, and the reinforcing bars of the underground beam formwork are directly or indirectly connected inside the formwork for the independent foundation. .
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP05216896A JP3688052B2 (en) | 1996-03-08 | 1996-03-08 | Construction method for underground beam formwork and foundation formwork |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP05216896A JP3688052B2 (en) | 1996-03-08 | 1996-03-08 | Construction method for underground beam formwork and foundation formwork |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH09242084A true JPH09242084A (en) | 1997-09-16 |
| JP3688052B2 JP3688052B2 (en) | 2005-08-24 |
Family
ID=12907306
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP05216896A Expired - Lifetime JP3688052B2 (en) | 1996-03-08 | 1996-03-08 | Construction method for underground beam formwork and foundation formwork |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3688052B2 (en) |
-
1996
- 1996-03-08 JP JP05216896A patent/JP3688052B2/en not_active Expired - Lifetime
Also Published As
| Publication number | Publication date |
|---|---|
| JP3688052B2 (en) | 2005-08-24 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP4347500B2 (en) | Bridge girder | |
| US5596856A (en) | Metal girder element for constructing a hybrid elongate structure having a box-type cross section, method for employing this element, and elongate structure constructed by implementing this method | |
| JPH11336021A (en) | Bridge floor slab unit and execution of bridge floor slab using the unit | |
| JPH09221717A (en) | Steel-concrete composite slab bridge and its construction method | |
| JP2002188120A (en) | Joint structure of corrugated steel web girder | |
| JP3410368B2 (en) | Connection method of corrugated steel web girder | |
| JPH07292783A (en) | Connective structure of prestressed concrete members | |
| JP2000170285A (en) | Joint method and joint structure of steel plate concrete structure wall | |
| JP2001081729A (en) | Synthetic floor slab | |
| JP2927402B2 (en) | Column-beam joint structure of concrete building | |
| JPH08312061A (en) | Steel column member and its leg fixing structure | |
| JP2000345516A (en) | Joint method between concrete floor slab and corrugated steel plate in corrugated steel plate web bridge | |
| JPH09195444A (en) | Reinforced concrete member | |
| KR100308757B1 (en) | Development Devices and Methods of Precast Reinforced Concrete Beam Reinforcements in Beam-Column Joint | |
| JP3688052B2 (en) | Construction method for underground beam formwork and foundation formwork | |
| JP2725572B2 (en) | Small beam construction method in reinforced concrete construction | |
| JP2707966B2 (en) | Floor construction method using prestressed concrete plate as beam-side formwork | |
| JP4335412B2 (en) | Beam-column joint structure | |
| JPH08253912A (en) | Bridge structure | |
| JPH11107443A (en) | Execution of prestressed-concrete steel pipe beam | |
| JPH09279859A (en) | Connection structure between existing building and extension building | |
| JPS645142B2 (en) | ||
| JP2723011B2 (en) | Construction method of steel frame reinforced concrete structure | |
| JPH07119240A (en) | Precast concrete beam | |
| JPH08134841A (en) | Floor slab panel for bridge and method of floor slab construction of bridge by floor slab panel |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20050201 |
|
| A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20050404 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20050510 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20050607 |
|
| R150 | Certificate of patent (=grant) or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| S531 | Written request for registration of change of domicile |
Free format text: JAPANESE INTERMEDIATE CODE: R313531 |
|
| FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20080617 Year of fee payment: 3 |
|
| R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
| FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110617 Year of fee payment: 6 |
|
| FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110617 Year of fee payment: 6 |
|
| FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120617 Year of fee payment: 7 |
|
| FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20140617 Year of fee payment: 9 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| EXPY | Cancellation because of completion of term |