JPH09288191A - Reactor bellows installation method - Google Patents
Reactor bellows installation methodInfo
- Publication number
- JPH09288191A JPH09288191A JP8098413A JP9841396A JPH09288191A JP H09288191 A JPH09288191 A JP H09288191A JP 8098413 A JP8098413 A JP 8098413A JP 9841396 A JP9841396 A JP 9841396A JP H09288191 A JPH09288191 A JP H09288191A
- Authority
- JP
- Japan
- Prior art keywords
- bellows
- building
- containment vessel
- reactor
- divided
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 13
- 238000009434 installation Methods 0.000 title claims abstract description 11
- 238000007789 sealing Methods 0.000 claims abstract description 6
- 230000007246 mechanism Effects 0.000 description 11
- 229910000831 Steel Inorganic materials 0.000 description 7
- 239000000446 fuel Substances 0.000 description 7
- 239000010959 steel Substances 0.000 description 7
- 238000006073 displacement reaction Methods 0.000 description 4
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 4
- 238000010276 construction Methods 0.000 description 2
- 230000008602 contraction Effects 0.000 description 2
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 description 2
- 230000032683 aging Effects 0.000 description 1
- 238000005452 bending Methods 0.000 description 1
- 230000006866 deterioration Effects 0.000 description 1
- 238000002844 melting Methods 0.000 description 1
- 230000008018 melting Effects 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 238000000465 moulding Methods 0.000 description 1
- 230000005855 radiation Effects 0.000 description 1
- 239000002915 spent fuel radioactive waste Substances 0.000 description 1
- 230000001629 suppression Effects 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E30/00—Energy generation of nuclear origin
- Y02E30/30—Nuclear fission reactors
Landscapes
- Structure Of Emergency Protection For Nuclear Reactors (AREA)
Abstract
(57)【要約】
【課題】 本発明の課題は多大な労力を要するベローズ
の据付作業を大幅に省力化することができる新規な原子
炉用ベローズの据付工法を提供する。
【解決手段】 上記課題を解決するために本発明は、原
子炉建屋12の格納容器1内に収容される原子炉圧力容
器3の頂部と格納容器1間及び、この格納容器1と建屋
12間にそれぞれ形成されるリング状の隙間をシールす
るためのウェルシールのベローズ据付工法において、予
めリング状に形成されたベローズ18をその周方向に沿
って複数に分割した分割ベローズ19a…を形成し、こ
れら分割ベローズ19a…を個々に上記建屋12内の格
納容器1上部に搬入した後、ここでリング状に一体接合
した後、上記隙間に据え付ける。
(57) Abstract: An object of the present invention is to provide a novel method for installing a bellows for a nuclear reactor, which is capable of significantly saving labor for installing a bellows, which requires a lot of labor. In order to solve the above problems, the present invention is directed to a space between a top of a reactor pressure vessel 3 and a containment vessel 1 housed in a containment vessel 1 of a reactor building 12, and between the containment vessel 1 and a building 12. In the well seal bellows installation method for sealing the ring-shaped gaps respectively formed in the above, the bellows 18 formed in advance in a ring shape are divided into a plurality of divided bellows 19a ... These divided bellows 19a ... Are individually carried into the upper part of the storage container 1 in the building 12, and then integrally joined in a ring shape here, and then installed in the above gap.
Description
【0001】[0001]
【発明の属する技術分野】本発明は、原子炉圧力容器の
頂部と格納容器間等に形成されるリング状の隙間をシー
ルするための原子炉のベローズ据付工法に関するもので
ある。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a nuclear reactor bellows installation method for sealing a ring-shaped gap formed between the top of a reactor pressure vessel and a containment vessel.
【0002】[0002]
【従来の技術】図3は従来の鋼製の原子炉格納容器(P
CV)を示したものである。図示するように、この鋼製
の格納容器1は鋼板を略釣り鐘形状に繋ぎ合わせて耐圧
性を向上させたものであり、その内部にはペデスタル2
上に立設された原子炉圧力容器(RPV)3が収容され
ると共に、ペデスタル2とダイヤフラムフロア4によっ
て区画された上部ドライウェル5、下部ドライウェル
6、サプレッションチャンバー7及び生体遮蔽壁8、ベ
ント管9等が形成収容されている。また、この格納容器
1の頂部には開閉自在な上蓋10が設けられており、こ
の上蓋10の開閉により圧力容器3の上鏡11を開いて
燃料交換が行えるようになっている。2. Description of the Related Art FIG. 3 shows a conventional steel containment vessel (P
CV) is shown. As shown in the figure, the steel containment vessel 1 is made by connecting steel plates in a substantially bell shape to improve pressure resistance, and has a pedestal 2 inside.
A reactor pressure vessel (RPV) 3 standing upright is accommodated, and an upper dry well 5, a lower dry well 6, a suppression chamber 7 and a living body shielding wall 8, which are partitioned by a pedestal 2 and a diaphragm floor 4, a vent. A tube 9 and the like are formed and housed. Further, a top lid 10 that can be opened and closed is provided on the top of the storage container 1, and by opening and closing the top lid 10, the upper mirror 11 of the pressure vessel 3 can be opened for fuel exchange.
【0003】また、この格納容器1の周囲にはこれを囲
繞するように所定の間隔を隔ててコンクリート建屋12
が設けられており、格納容器1側からの放射線の遮蔽を
行うと共に、必要な機器類や配管系が付設されるように
なっている。さらに、この建屋12の天井部には、圧力
容器3の燃料交換を行う際、使用済み燃料などを一時的
に貯蔵するプール13、燃料交換等を行う天井クレーン
14、屋根部15等が形成されている。A concrete building 12 is provided around the storage container 1 at a predetermined interval so as to surround the storage container 1.
Is provided to shield radiation from the side of the storage container 1 and to be provided with necessary equipment and piping system. Further, on the ceiling of the building 12, a pool 13 for temporarily storing spent fuel and the like when the fuel of the pressure vessel 3 is exchanged, an overhead crane 14 for exchanging the fuel, a roof portion 15 and the like are formed. ing.
【0004】また、この圧力容器3と格納容器1との間
及びこの格納容器1とコンクリート建屋12との間には
それぞれウェルシール機構16が設けられており、圧力
容器3の上部開口部17に水を張った際に、圧力容器3
と格納容器1との間及び格納容器1とコンクリート建屋
12との間から水が漏れないようにこれら隙間をシール
するようになっている。また、このウェルシール機構1
6には、図2に示すように、高さ方向に蛇腹状をしたリ
ング状のベローズ18a,18bが2つ設けられてお
り、これらベローズ18a,18bが伸縮変形すること
により、コンクリート建屋12に対する鋼製の格納容器
1及び圧力容器3の熱変形による変位を許容して常に良
好なシール性が確保されるようになっている。Well seal mechanisms 16 are provided between the pressure vessel 3 and the containment vessel 1 and between the containment vessel 1 and the concrete building 12, respectively. Pressure vessel 3 when filled with water
These gaps are sealed to prevent water from leaking between the storage container 1 and the storage container 1 and between the storage container 1 and the concrete building 12. In addition, this well seal mechanism 1
As shown in FIG. 2, two ring-shaped bellows 18a and 18b, which are bellows-shaped in the height direction, are provided in the column 6, and the bellows 18a and 18b expand and contract to deform the concrete building 12. Displacement due to thermal deformation of the steel containment vessel 1 and the pressure vessel 3 is allowed to always ensure good sealability.
【0005】[0005]
【発明が解決しようとする課題】ところで、このウェル
シール機構16の一部を構成するベローズ18a,18
bは、SUSの薄板帯鋼を上述したように円形に曲げて
リング状に繋ぎ合わせた後、ベローズ成形を行うことで
形成されているため、図3に示すように、建設時には一
体リング状態で格納容器1の開口部17上方から図示し
ないクレーンなどによって据え付けられるようになって
いる。しかしながら、径年劣化により、そのシール性が
徐々に低下して取り替える必要が生じた際には、既に、
この格納容器1の上部には、天井クレーン14や建屋1
2の天井部15等が構築されていることから、このよう
な建設時の工法を用いるには、既に設置してある天井ク
レーン14等を除去すると共に、建屋12の天井部15
にリング状のベローズ18が通過できる程度(例えば、
直径約10m程度)の開口部を形成する必要があり、そ
の据付作業には多大な労力と時間を要するといった問題
がある。By the way, the bellows 18a, 18 forming a part of the well seal mechanism 16 are provided.
Since b is formed by bending the SUS thin strip steel into a circular shape and joining them in a ring shape as described above, and then performing bellows molding, as shown in FIG. It can be installed from above the opening 17 of the storage container 1 by a crane or the like not shown. However, when the sealing property gradually deteriorates due to aging deterioration and it becomes necessary to replace it,
The overhead crane 14 and the building 1
Since the second ceiling portion 15 and the like are constructed, in order to use such a construction method at the time of construction, the ceiling crane 14 and the like already installed are removed and the ceiling portion 15 of the building 12 is also removed.
To the extent that the ring-shaped bellows 18 can pass through (for example,
It is necessary to form an opening having a diameter of about 10 m), and there is a problem that the installation work requires a lot of labor and time.
【0006】そこで、本発明はこのような課題を有効に
解決するために案出されたものであり、その目的は多大
な労力を要するベローズの据付作業を大幅に省力化する
ことができる新規な原子炉用ベローズの据付工法を提供
するものである。Therefore, the present invention has been devised in order to effectively solve such a problem, and the purpose thereof is to newly install a bellows, which requires a great deal of labor, and can greatly save labor. It provides a method for installing bellows for a nuclear reactor.
【0007】[0007]
【課題を解決するための手段】上記課題を解決するため
に本発明は、原子炉建屋の格納容器内に収容される原子
炉圧力容器の頂部と格納容器間及び、この格納容器と建
屋間にそれぞれ形成されるリング状の隙間をシールする
ためのウェルシールのベローズ据付工法において、予め
リング状に形成されたベローズをその周方向に沿って複
数に分割した分割ベローズを形成し、これら分割ベロー
ズを個々に上記建屋内の格納容器上部に搬入した後、こ
こでリング状に一体接合し、しかる後これを上記隙間に
据え付けるようにしたものである。SUMMARY OF THE INVENTION In order to solve the above problems, the present invention provides a reactor pressure vessel housed in a containment vessel of a reactor building, between the top and the containment vessel, and between the containment vessel and the building. In the well seal bellows installation method for sealing the ring-shaped gaps formed respectively, the ring-shaped bellows are divided into a plurality of divided bellows along the circumferential direction, and these divided bellows are formed. After being individually carried into the upper part of the storage container in the building, they are integrally joined here in a ring shape, and then they are installed in the above-mentioned gap.
【0008】これによって、建屋内への分割ベローズの
搬入に際して、圧力容器上部の天井クレーンなどを除去
したり、建屋の天井部に大きな開口部を形成する必要が
なくなり、ベローズの据付作業の省力化を達成すること
ができる。尚、既に取り付けてある古いベローズを取り
外す際にも、溶断などによって同様に複数のパーツに分
割することにより、取り外し後の搬出も容易に達成でき
る。As a result, it is not necessary to remove the overhead crane or the like above the pressure vessel or to form a large opening in the ceiling of the building when carrying the split bellows into the building, which saves labor for installing the bellows. Can be achieved. Even when the old bellows that has already been attached is removed, it can be easily carried out after removal by dividing it into a plurality of parts by melting or the like.
【0009】[0009]
【発明の実施の形態】次に、本発明を実施する好適一形
態を説明する。Next, a preferred embodiment of the present invention will be described.
【0010】図2は図3で示したウェルシール機構16
を示す拡大断面図であり、図中12は上述したコンクリ
ート建屋、1は鋼製の格納容器、3は原子炉圧力容器の
それぞれの頂部付近を示したものである。FIG. 2 shows the well seal mechanism 16 shown in FIG.
Fig. 12 is an enlarged cross-sectional view showing the above-mentioned concrete building, 1 is a steel containment vessel, and 3 is the vicinity of the top of each reactor pressure vessel.
【0011】図示するように、このウェルシール機構1
6は、格納容器1から原子炉圧力容器3側に張り出した
プラットフォーム20と、原子炉圧力容器3から格納容
器1側に張り出したベイスンシール21との間に伸縮自
在なリング状をした燃料交換ベローズ18aを上下に架
け渡すと共に、原子炉格納容器1からコンクリート建屋
12側に張り出したプラットフォーム22と、コンクリ
ート建屋12から格納容器1側に張り出した建屋側プラ
ットフォーム23との間に同じく伸縮自在なリング状を
したウェルシールベローズ18bを上下に架け渡して構
成される。そして、熱膨張収縮に伴う原子炉圧力容器3
と原子炉格納容器1との相対変位を燃料交換ベローズ1
8a側で吸収すると共に、同じく熱膨張収縮に伴う原子
炉格納容器1とコンクリート建屋12との相対変位をウ
ェルシールベローズ18b側で吸収することで、良好な
シール性を維持しつつコンクリート建屋12に対する原
子炉格納容器1及び原子炉圧力容器3の熱変位が許容さ
れるようになっている。尚、図中24,25はウェルシ
ール機構16上部に張られたプール水を排水するための
排水管、10は原子炉格納容器1の上部開口部に着脱自
在な上蓋、26,27は、燃料交換ベローズ18a及び
ウェルシールベローズ18bに加わる水圧を低減すべく
上下にスライド自在なシール板である。As shown, this well seal mechanism 1
Reference numeral 6 denotes an expandable ring-shaped fuel exchange bellows between a platform 20 projecting from the containment vessel 1 to the reactor pressure vessel 3 side and a basin seal 21 projecting from the reactor pressure vessel 3 to the containment vessel 1 side. 18a is bridged up and down, and a ring-like expandable ring is also provided between a platform 22 projecting from the reactor containment vessel 1 to the concrete building 12 side and a building side platform 23 projecting from the concrete building 12 to the containment vessel 1 side. The well-sealed bellows 18b having the above-mentioned structure is bridged vertically. Then, the reactor pressure vessel 3 accompanying the thermal expansion and contraction
Of the relative displacement between the reactor containment vessel 1 and the fuel exchange bellows 1
By absorbing the relative displacement between the reactor containment vessel 1 and the concrete building 12 due to the thermal expansion and contraction on the well seal bellows 18b side as well as absorbing it on the 8a side, the concrete building 12 is maintained while maintaining good sealing performance. Thermal displacement of the reactor containment vessel 1 and the reactor pressure vessel 3 is allowed. In the figure, 24 and 25 are drain pipes for draining pool water stretched over the upper part of the well seal mechanism 16, 10 is a removable upper lid at the upper opening of the reactor containment vessel 1, and 26 and 27 are fuel. The seal plate is vertically slidable in order to reduce the water pressure applied to the exchange bellows 18a and the well seal bellows 18b.
【0012】次に、このウェルシール機構16の要部を
構成するウェルシールベローズ18bの据付工法の実施
の一形態を説明する。Next, an embodiment of a method of installing the well seal bellows 18b, which constitutes a main part of the well seal mechanism 16, will be described.
【0013】先ず、図1(A)に示すように、予め工場
などでリング状に形成されたウェルシールベローズ18
bをその周方向に沿って複数、例えば4つに分割したよ
うなた分割ベローズ19a,19a,19a,19aを
形成し、これら分割ベローズ19a,19a,19a,
19aを図3に示すコンクリート建屋12内の格納容器
1上部のオペレーティングフロア26上に搬入する。こ
の分割ベローズ19aの大きさは長さが数m〜10m、
幅数十cm、重さが数kg程度の小型軽量であることか
ら、オペレーティングフロア26側部の建屋12に形成
された既存の搬入孔27等を利用することでその搬入作
業は極めて容易に行うことができる。また、これら分割
ベローズ19a,19a,19a,19aは薄い金属板
からなるため、変形しやすいことから、図2(A)に示
すように、その形状を保持するための変形防止治具28
等によってその変形を防止するようにすることが好まし
い。First, as shown in FIG. 1 (A), a well seal bellows 18 formed in a ring shape in advance at a factory or the like.
Split bellows 19a, 19a, 19a, 19a are formed by dividing b into a plurality of, for example, four along the circumferential direction, and these split bellows 19a, 19a, 19a,
19a is carried in on the operating floor 26 above the storage container 1 in the concrete building 12 shown in FIG. The size of the split bellows 19a is several m to 10 m in length,
Since it is small and lightweight with a width of several tens of centimeters and a weight of several kilograms, it is extremely easy to carry it in by using the existing carry-in holes 27 and the like formed in the building 12 on the side of the operating floor 26. be able to. Further, since these divided bellows 19a, 19a, 19a, 19a are made of a thin metal plate and are easily deformed, as shown in FIG. 2 (A), the deformation preventing jig 28 for holding the shape thereof is used.
It is preferable to prevent the deformation by such means.
【0014】次に、このような分割ベローズ19a,1
9a,19a,19aをオペレーティングフロア26上
に搬入し終えたならば、このオペレーティングフロア2
6を利用して図1(B)に示すように、各分割ベローズ
19a,19a,19a,19aをリング状に配置し、
それらの端部同士を突合わせ溶接してリング状に一体接
合する。この際、各分割ベローズ19a同士の接合を重
ね合わせ溶接する場合には、予め、この重なり合う部分
だけ、各分割ベローズ19aの端部を長く形成しておく
ことはいうまでもない。Next, such divided bellows 19a, 1
When the loading of 9a, 19a, 19a onto the operating floor 26 is completed, the operating floor 2
As shown in FIG. 1 (B), the split bellows 19a, 19a, 19a, 19a are arranged in a ring shape by using 6,
The ends are butt-welded and integrally joined in a ring shape. In this case, when joining the divided bellows 19a to each other by superposition and welding, it goes without saying that the end portions of the divided bellows 19a are formed long only for the overlapping portions.
【0015】その後、このようなリング状のウェルシー
ルベローズ18bが形成されたなら、このウェルシール
ベローズ18bを図1(C)に示すように天井クレーン
14に吊り下げた後、格納容器1の上部開口部17上に
位置させると共に降下させて格納容器1と建屋12間の
ウェルシール機構16に据え付けることになる。尚、こ
の据付作業に際して、古いウェルシールベローズ18b
は溶断分割等してウェルシール16から予め取り外して
おくことは勿論である。After that, if such a ring-shaped well seal bellows 18b is formed, the well seal bellows 18b is hung on the overhead crane 14 as shown in FIG. It will be installed on the well seal mechanism 16 between the storage container 1 and the building 12 after being positioned on the opening 17 and lowered. During this installation work, the old well seal bellows 18b
Needless to say, is removed from the well seal 16 in advance by fusing and dividing.
【0016】そして、圧力容器3と格納容器1間のウェ
ルシール機構16の燃料交換ベローズ18aもこれと同
様な作業によって据え付けられることになる。The fuel exchange bellows 18a of the well seal mechanism 16 between the pressure vessel 3 and the storage vessel 1 is also installed by the same work.
【0017】このように本発明工法はリング状をした大
型のベローズを予め複数に分割した分割ブロックで形成
するようにしたため、建屋内への搬入作業を極めて容易
に行うことが可能となる。従って、ベローズの据付作業
に際して、建屋上部の天井クレーンなどの既設設備を取
り外したり、建屋天井部に大きな開口部を形成する必要
がなくなり、その据付作業に伴う労力を大幅に低減する
ことができる。尚、本実施の形態では、4つの分割ブロ
ックを用いた場合で説明したが、本発明は本実施の形態
に限定されるものではなく、2分割あるいは3分割ある
いは5分割以上の複数に分割しても良いことは勿論であ
る。そして、このように2分割あるいは3分割にすれ
ば、建屋内での組立作業がさらに省力化され、反対に5
分割以上の複数に分割すれば、搬入作業がさらに容易と
なる。As described above, according to the method of the present invention, since the large ring-shaped bellows is formed in advance by the plurality of divided blocks, it is possible to carry out the work into the building extremely easily. Therefore, when installing the bellows, it is not necessary to remove the existing equipment such as an overhead crane at the upper part of the building or to form a large opening in the ceiling of the building, and the labor required for the installation work can be significantly reduced. It should be noted that although the present embodiment has been described using four divided blocks, the present invention is not limited to this embodiment, and the present invention is not limited to this, and it may be divided into a plurality of two or three or five or more. Of course, it is okay. Then, by dividing into two or three in this way, the assembling work in the building is further labor-saving, and conversely
If it is divided into a plurality of pieces, the carrying-in work becomes easier.
【0018】[0018]
【発明の効果】以上要するに本発明によれば、大型のベ
ローズを予め複数に分割した分割ブロックで形成するこ
とにより、建屋内への搬入作業を極めて容易に行うこと
が可能となるため、ベローズの据付作業に際して、建屋
上部の天井クレーンなどの既設設備を取り外したり、建
屋天井部に大きな開口部を形成する必要がなくなり、そ
の据付作業に伴う労力を大幅に低減することができる。In summary, according to the present invention, by forming a large bellows into a plurality of divided blocks in advance, it is possible to extremely easily carry the work into the building. At the time of installation work, it is not necessary to remove existing equipment such as an overhead crane at the top of the building or to form a large opening in the building ceiling, and the labor required for the installation work can be greatly reduced.
【図1】本発明工法の実施の一形態を示す工程図であ
る。FIG. 1 is a process drawing showing an embodiment of a method of the present invention.
【図2】本発明工法に係るウェルシール機構を示す部分
拡大縦断面図である。FIG. 2 is a partially enlarged vertical sectional view showing a well seal mechanism according to the method of the present invention.
【図3】従来の鋼製の原子炉格納容器(PCV)及びそ
の建屋を示す縦断面図である。FIG. 3 is a vertical cross-sectional view showing a conventional steel containment vessel (PCV) and its building.
1 原子炉格納容器 3 原子炉圧力容器 14 天井クレーン 16 ウェルシール機構 18 ベローズ 18b ウェルシールベローズ 19a 分割ベローズ 1 Reactor containment vessel 3 Reactor pressure vessel 14 Ceiling crane 16 Well seal mechanism 18 Bellows 18b Well seal bellows 19a Divided bellows
Claims (1)
子炉圧力容器の頂部と格納容器間及び、この格納容器と
建屋間にそれぞれ形成されるリング状の隙間をシールす
るためのウェルシールのベローズ据付工法において、予
めリング状に形成されたベローズをその周方向に沿って
複数に分割した分割ベローズを形成し、これら分割ベロ
ーズを個々に上記建屋内の格納容器上部に搬入した後、
ここでリング状に一体接合した後、上記隙間に据え付け
るようにしたことを特徴とする原子炉のベローズ据付工
法。1. A well seal for sealing ring-shaped gaps formed between the top and the containment vessel of the reactor pressure vessel housed in the containment vessel of the reactor building and between the containment vessel and the building. In the bellows installation method of, in order to form a divided bellows divided into a plurality of ring-shaped bellows along the circumferential direction in advance, after carrying these divided bellows individually into the upper part of the containment vessel in the building,
Here, the bellows installation method for a nuclear reactor is characterized in that it is integrally joined in a ring shape and then installed in the above-mentioned gap.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP8098413A JPH09288191A (en) | 1996-04-19 | 1996-04-19 | Reactor bellows installation method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP8098413A JPH09288191A (en) | 1996-04-19 | 1996-04-19 | Reactor bellows installation method |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| JPH09288191A true JPH09288191A (en) | 1997-11-04 |
Family
ID=14219146
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP8098413A Pending JPH09288191A (en) | 1996-04-19 | 1996-04-19 | Reactor bellows installation method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH09288191A (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2015158235A (en) * | 2014-02-24 | 2015-09-03 | 三菱重工業株式会社 | Pipe seal structure and building |
-
1996
- 1996-04-19 JP JP8098413A patent/JPH09288191A/en active Pending
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2015158235A (en) * | 2014-02-24 | 2015-09-03 | 三菱重工業株式会社 | Pipe seal structure and building |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP2000206294A (en) | How to carry out large equipment | |
| JP4264646B2 (en) | Reactor containment vessel, reactor containment facility having the reactor containment vessel, and methods of construction thereof | |
| JP3565371B2 (en) | How to replace the reactor pressure vessel | |
| JPS5847293A (en) | Structure of the seal bellows unit on the diaphragm floor of the reactor containment vessel and its installation method | |
| JP4003758B2 (en) | Installation method of bellows | |
| JPS59192159A (en) | Construction of plant structure | |
| JP3462911B2 (en) | Reactor building | |
| JPH07218696A (en) | New Reactor Pressure Vessel Replacement Method | |
| JPH08152494A (en) | Reactor well seal structure | |
| US4643872A (en) | Process for the construction of a nuclear reactor with a reinforced concrete pressure vessel | |
| JP2011053084A (en) | Nuclear power plant | |
| JP2909350B2 (en) | Lining storage tank construction method | |
| JPS581037B2 (en) | Construction method of lining tank | |
| JP3601999B2 (en) | Construction method of reactor containment vessel and its diaphragm floor | |
| JPH08248169A (en) | Containment vessel | |
| JPS63755B2 (en) | ||
| JP2002131461A (en) | Containment vessel construction method | |
| JP2026076526A (en) | Construction method and bottom structure of a nuclear reactor building | |
| JPH0954183A (en) | Concrete containment container liner plate installation method | |
| Branchu et al. | Superphenix 1 reactor block fabrication | |
| JPS61271496A (en) | Reactor containment | |
| JPH07234296A (en) | Diaphragm floor structure of reactor containment vessel | |
| JPH0452594A (en) | Waterproof device of annulus part | |
| JPS6315832Y2 (en) | ||
| JPS5870196A (en) | Diaphragm floor of reactor container |