JPH09323154A - Hanging weir supply / recovery device with hanging weir cover attachment / detachment function - Google Patents

Hanging weir supply / recovery device with hanging weir cover attachment / detachment function

Info

Publication number
JPH09323154A
JPH09323154A JP14057196A JP14057196A JPH09323154A JP H09323154 A JPH09323154 A JP H09323154A JP 14057196 A JP14057196 A JP 14057196A JP 14057196 A JP14057196 A JP 14057196A JP H09323154 A JPH09323154 A JP H09323154A
Authority
JP
Japan
Prior art keywords
hanging
weir
mold
pouring
hanging weir
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP14057196A
Other languages
Japanese (ja)
Inventor
Yoshiki Yamada
良樹 山田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kubota Corp
Original Assignee
Kubota Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kubota Corp filed Critical Kubota Corp
Priority to JP14057196A priority Critical patent/JPH09323154A/en
Publication of JPH09323154A publication Critical patent/JPH09323154A/en
Pending legal-status Critical Current

Links

Landscapes

  • Casting Support Devices, Ladles, And Melt Control Thereby (AREA)

Abstract

(57)【要約】 【課題】 鋳型に対する掛堰および蓋体の取り付け、取
り外し作業を自動化、省力化するとともに、生産性の向
上を図る。 【解決手段】 鋳型の搬送方向に移動可能で、かつ昇降
可能な吊下基体26側のクランプ部36,36を介して
吊持した掛堰8を注湯位置Pに送られる鋳型5に所定の
セット位置Sで取り付けるとともに、注湯後に清掃箇所
からセット位置Sに戻された鋳型5から掛堰8を取り外
す掛堰吊持搬送装置9を具備し、この掛堰吊持搬送装置
9による掛堰8の取付時に該掛堰8の開口を注入部を除
いて閉塞する蓋体40を吊下基体26側に着脱自在に装
備させている。
(57) 【Abstract】 PROBLEM TO BE SOLVED: To improve productivity while automating and labor saving work of attaching and removing a hanging dam and a lid to a mold. SOLUTION: The weir 8 suspended by clamps 36, 36 on the side of a hanging base 26 that can move in the mold conveying direction and that can move up and down is used as a predetermined mold 5 to be sent to a pouring position P. A hook weir suspending and conveying device 9 is provided which is attached at the set position S and removes the weir 8 from the mold 5 returned to the set position S from the cleaning position after pouring. A lid 40 is attached to the suspension base 26 side so as to be detachable when closing the opening of the weir 8 except the injecting portion when attaching 8.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は取鍋から鋳型への注
湯時に溶湯の注入をガイドするように用いられる掛堰を
鋳型に対して着脱するとともに、掛堰に対して掛堰カバ
ーを着脱するための掛堰カバー着脱機能を有する掛堰供
給・回収装置に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention attaches and detaches a latch weir that is used to guide the injection of molten metal from a ladle to a mold and attaches and removes a latch weir cover to the latch weir. The present invention relates to a hanging weir supply / recovery device having a hanging weir cover attachment / detachment function.

【0002】[0002]

【従来の技術】従来では、取鍋から鋳型に注湯する前段
階で注湯位置に送られる鋳型に対して作業者が掛堰を取
り付け、注湯後に用済となった掛堰は再び作業者が鋳型
から取り外すといったように、掛堰の取り付け、取り外
し作業を人手によって行なっていた。また、注湯時に掛
堰から周囲に溶湯が飛散すると周囲の設備を損傷する危
険があるので、掛堰に注入部を除いて開口を覆う蓋体を
人的作業によって装着していた。
2. Description of the Related Art Conventionally, an operator attaches a hanging weir to a mold that is sent to a pouring position before pouring the molten metal from a ladle into the casting mold, and the hanging weir that has been used after pouring is re-worked. The work of attaching and removing the weir, such as the person removing it from the mold, was performed manually. Further, since there is a risk of damaging surrounding equipment if the molten metal is scattered from the hanging weir at the time of pouring, a lid for covering the opening except the pouring portion is attached to the hanging weir by manual work.

【0003】[0003]

【発明が解決しようとする課題】上記したように、鋳型
に対する掛堰の着脱作業および掛堰に対する蓋体の着脱
作業を全面的に人手に依存している従来の方法では、作
業性が非常に悪くて、自動注湯装置の導入にともなう能
率鋳造による生産性の向上を十分に活かすことができな
い。とくに、注湯後の掛堰は加熱され高温状態であるの
で、人手で直ぐに取り外しを行なうことは非常な危険を
伴う。
As described above, in the conventional method in which the work of attaching / detaching the weir to the mold and the work of attaching / detaching the lid to the weir are wholly dependent on manpower, workability is extremely high. Poorly, it is not possible to fully utilize the improvement in productivity due to the efficient casting that accompanies the introduction of the automatic pouring device. In particular, since the weir after pouring is heated and in a high temperature state, it is extremely dangerous to immediately remove it manually.

【0004】本発明は上記実情に鑑みてなされたもの
で、掛堰ならびに蓋体の取り付けおよび取り外し作業の
自動化を図り、安全性を確保しつつ生産性の向上を達成
することができる掛堰カバー着脱機能を有する掛堰供給
・回収装置を提供することを目的としている。
The present invention has been made in view of the above circumstances, and it is possible to achieve an improvement in productivity while ensuring safety by automating the work of attaching and detaching the latch and lid. It is an object of the present invention to provide a hanging weir supply / recovery device having a detachable function.

【0005】[0005]

【課題を解決するための手段】上記目的を達成するた
め、本発明の掛堰カバー着脱機能を有する掛堰供給・回
収装置は、鋳型搬送ラインの上方側に設けられた架台に
対して掛堰吊下用クランプ部をもった吊下基体を昇降可
能でかつ上記鋳型搬送方向に移動可能に装備していると
ともに、所定の吊下位置で上記クランプ部を介して吊持
させた掛堰を鋳型搬送方向の所定のセット位置まで搬送
して注湯位置に送られる鋳型に取り付け、かつ注湯完了
後に上記セット位置に戻された鋳型から掛堰を吊上げて
取り外して上記所定の吊下位置まで搬送する掛堰吊持搬
送装置を備え、この掛堰吊持搬送装置による掛堰の取付
時に該掛堰の開口を注入部を除いて閉塞する掛堰カバー
をなす蓋体を上記吊下基体側に着脱自在に装備したもの
である。
In order to achieve the above object, a latch weir supply / recovery device having a latch weir cover attachment / detachment function of the present invention is a latch weir for a gantry provided above a mold transfer line. A hanging base having a hanging clamp is provided so as to be able to move up and down and move in the mold conveying direction, and a hanging weir suspended at a predetermined hanging position via the clamp is used as a mold. It is transported to a predetermined set position in the transport direction and sent to the pouring position.It is attached to a mold, and after pouring is completed, the hanging weir is lifted and removed from the mold returned to the set position and transported to the predetermined hanging position. A hanging weir suspending / conveying device, and a lid forming a hanging weir cover that closes the opening of the hanging weir except the injection part when the hanging weir is conveyed by the hanging weir suspending / conveying device is provided on the hanging base side. It is equipped detachably.

【0006】上記のような構成の掛堰吊持搬送装置の導
入によって鋳型に対する掛堰の取り付け、取り外し作業
の自動化、省人化が図れる。また、取り外し時に人手に
よる作業では、安全性を確保しようとすれば、注湯後の
高温状態にある掛堰が冷めるまで待つ必要があるが、本
発明においては、掛堰を直ちに鋳型から取り外すことが
可能で、自動化と相まって生産性の著しい向上が図れ
る。また、上記掛堰吊持搬送装置による掛堰の取付時に
は、該掛堰の開口を上記吊下基体側の蓋体で注入部を除
いて閉塞させることによって、掛堰開口縁から溶湯の飛
散を防止し、設備の損傷を防止することが可能である。
By introducing the hanging weir suspending and conveying device having the above-described structure, it is possible to automate the work of attaching and removing the hanging weir to the mold, and save labor. Further, in the manual work at the time of removal, in order to ensure safety, it is necessary to wait until the hanging weir in the high temperature state after pouring has cooled, but in the present invention, the hanging weir should be immediately removed from the mold. It is possible to improve productivity significantly in combination with automation. Further, at the time of mounting the hanging weir by the hanging weir suspending and conveying device, the opening of the hanging weir is closed by the lid on the side of the hanging base except for the injection portion, so that the molten metal is scattered from the edge of the opening of the hanging weir. It is possible to prevent damage to the equipment.

【0007】ここで、好適な構成として、蓋体は、吊下
基体に設けたシリンダを介して吊下基体に着脱自在に装
備するものである。
Here, as a preferred structure, the lid is detachably attached to the hanging base through a cylinder provided in the hanging base.

【0008】[0008]

【発明の実施の形態】以下、本発明の実施の形態を図面
に基づいて説明する。図1は本発明に係る掛堰供給・回
収装置の平面図、図2は図1のA−A線に沿った断面
図、図3は図2の左側面図である。
Embodiments of the present invention will be described below with reference to the drawings. 1 is a plan view of a hanging weir supply / recovery device according to the present invention, FIG. 2 is a sectional view taken along the line AA of FIG. 1, and FIG. 3 is a left side view of FIG.

【0009】図1〜図3において、1は取鍋2を傾動可
能に装備した自走式台車3が走行する取鍋走行ラインで
あり、走行経路の所定位置で溶湯を受け取った取鍋2は
上記自走式台車3を介して所定の注湯位置Pまで移動さ
れる。4は上記取鍋走行ライン1の側方に並設された鋳
型搬送ラインであり、この鋳型搬送ライン4上において
鋳型5が搬送装置を構成する台車6により搬送される。
7は後述する掛堰のセット(リセット)位置で上記鋳型
5を注湯位置Pまで送り、注湯後の鋳型5を上記鋳型搬
送ライン4まで戻す鋳型供給装置である。
1 to 3, reference numeral 1 denotes a ladle traveling line on which a self-propelled trolley 3 having a ladle 2 tiltably mounted travels, and the ladle 2 which has received the molten metal at a predetermined position on the traveling route is It is moved to a predetermined pouring position P via the self-propelled carriage 3. Reference numeral 4 denotes a mold transfer line which is arranged side by side on the ladle traveling line 1, on which the mold 5 is transferred by a carriage 6 which constitutes a transfer device.
Reference numeral 7 denotes a mold supply device that sends the mold 5 to the pouring position P at a setting (reset) position of a weir, which will be described later, and returns the mold 5 after pouring to the mold conveying line 4.

【0010】上記鋳型搬送ライン4の上方には、後述す
る清掃処理装置で清掃処理された掛堰8を吊持してセッ
ト位置Sで鋳型5に取り付け、注湯完了後に上記セット
位置Sに戻った鋳型5から掛堰8を吊持して取り外す掛
堰吊持搬送装置9が配置されている。10は上記注湯時
に使用された掛堰8を清浄するための掛堰清掃処理装置
であり、掛堰8に対して使用する反転装置11や掛堰8
を上記反転装置11まで移動させる移動装置12などを
備えている。上記掛堰吊持搬送装置9と上記清掃処理装
置10との間には、掛堰8を所定の搬出側吊下位置D1
から掛堰清掃処理装置10に搬出する搬出部13Aと清
掃処理後の掛堰8を所定の搬入側吊下位置D2に搬入す
る搬入部13Bとを有する掛堰搬入出装置13が設けら
れている。
Above the mold conveying line 4, a hanging weir 8 cleaned by a cleaning device to be described later is hung and attached to the mold 5 at the set position S, and returned to the set position S after pouring is completed. A hanging weir suspending and conveying device 9 for suspending and removing the hanging weir 8 from the mold 5 is arranged. Reference numeral 10 is a latch weir cleaning processing device for cleaning the latch weir 8 used at the time of pouring, and the reversing device 11 and the latch weir 8 used for the latch weir 8.
It is provided with a moving device 12 and the like for moving the above to the reversing device 11. Between the hanging weir suspending and conveying device 9 and the cleaning processing device 10, a hanging weir 8 is provided at a predetermined unloading side hanging position D1.
There is provided a loading weir loading / unloading device 13 having an unloading portion 13A that unloads the loading weir cleaning processing device 10 from the loading weir and a loading portion 13B that loads the loading weir 8 after cleaning processing to a predetermined loading side hanging position D2. .

【0011】上記掛堰吊持搬送装置9は、図4および図
5に示すように、鋳型搬送ライン4の上方の架台21に
鋳型搬送方向に沿って固定されたレール22,22にガ
イドされる車輪23,23を有する台車24と、この台
車24に下向きに設置された昇降用シリンダ25と、こ
のシリンダ25のピストンロッド25aの先端に連結さ
れた吊下基体26とを備えている。上記台車24には、
自走用のモータ27が搭載されており、このモータ27
の回転力が台車24の下部に支持された駆動軸28にチ
ェーン伝動機構29を介して伝達され、上記駆動軸28
の両端側に設けられて架台21側のラック部30に噛合
するスプロケット31,31が回転することにより、上
記台車24が走行するようになっている。32,32は
上記吊下基体26に対するガイドユニットであり、上記
台車24に設けられて上記吊下基体26に立設されたガ
イドロッド33,33とこれらガイドロッド33,33
を摺動可能に保持する案内部材34,34とからなる。
As shown in FIGS. 4 and 5, the hanging weir suspending and conveying device 9 is guided by rails 22 and 22 fixed to a pedestal 21 above the mold conveying line 4 along the mold conveying direction. It is provided with a carriage 24 having wheels 23, 23, a lifting cylinder 25 installed downward on the carriage 24, and a suspension base 26 connected to the tip of a piston rod 25a of the cylinder 25. In the dolly 24,
A self-propelled motor 27 is installed.
Is transmitted to the drive shaft 28 supported on the lower portion of the carriage 24 via a chain transmission mechanism 29, and the drive shaft 28
By rotating the sprockets 31, 31 provided on both ends of the rack and meshing with the rack portion 30 on the gantry 21 side, the carriage 24 is adapted to travel. Reference numerals 32 and 32 denote guide units for the suspension base 26, and guide rods 33 and 33 provided on the carriage 24 and erected on the suspension base 26 and the guide rods 33 and 33.
And slidably holding the guide members 34, 34.

【0012】上記吊下基体26の両端には、クランプ保
持部材35,35がそれぞれ垂設されており、これらク
ランプ保持部材35,35の各下端には、掛堰8の上端
突部8a,8aの下面に係合するクランプ部36,36
が取り付けられている。このクランプ部36,36を図
4の実線で示すように、掛堰8の突部8a,8aの下側
に挿入させ、上記シリンダ25によりピストンロッド2
5aを収縮させると、上記クランプ部36,36が上記
突部8a,8aに係止した状態で上昇変位するので、上
記掛堰8が吊持される。そして、この吊持状態で上記台
車24を走行させることにより、上記掛堰8を鋳型搬送
方向の所定位置に搬送させるように構成されている。
Clamp holding members 35, 35 are vertically provided at both ends of the suspension base 26, and upper end projections 8a, 8a of the latch weir 8 are provided at lower ends of the clamp holding members 35, 35, respectively. 36, 36 engaging the lower surface of the
Is attached. As shown by the solid line in FIG. 4, the clamp portions 36, 36 are inserted below the protrusions 8a, 8a of the latch weir 8, and the piston rod 2 is moved by the cylinder 25.
When 5a is contracted, the clamps 36, 36 are displaced upward while being locked to the protrusions 8a, 8a, so that the latch weir 8 is suspended. Then, the carriage 24 is caused to travel in this suspended state so that the latch weir 8 is transported to a predetermined position in the mold transport direction.

【0013】上記吊下基体26の下側には、蓋体保持板
37が配設されており、この蓋体保持板37は上記吊下
基体26に下向きに固定された蓋体開閉用のシリンダ3
8のピストンロッド38aの先端に連結されている。3
9,39は上記吊下基体26に設けられて上記蓋体保持
板37の昇降変位を案内するガイドユニットである。4
0は上記蓋体保持板37の下面に把手40aを介して保
持された蓋体であり、上記ピストンロッド38aの伸張
による蓋体保持板37の下降位置で掛堰8の開口を注入
部を除いて閉塞するように構成されている。
A lid holding plate 37 is disposed below the hanging base 26, and the lid holding plate 37 is fixed to the hanging base 26 downward to open and close the lid. Three
8 is connected to the tip of the piston rod 38a. 3
Reference numerals 9 and 39 denote guide units which are provided on the hanging base body 26 and which guide the lifting / lowering displacement of the lid holding plate 37. Four
Reference numeral 0 denotes a lid body held on the lower surface of the lid body holding plate 37 via a handle 40a, and the opening of the latch weir 8 is removed at the lowered position of the lid body holding plate 37 by the extension of the piston rod 38a. It is configured to be closed.

【0014】つぎに、上記構成の装置の動作について説
明する。溶湯を受け取った取鍋2が自走式台車3を介し
て走行して所定の注湯位置Pに搬送される一方、鋳型5
が所定のセット位置Sに至ると、掛堰吊持搬送装置9が
搬入側吊下位置D2まで移動し、シリンダ25のピスト
ンロッド25aの伸張により上記吊下基体26を下降さ
せたのち、上記吊下位置D2に位置している清掃後の掛
堰8の両端突部8a,8aの下側にクランプ部36,3
6をそれぞれ挿入させる。そして、上記シリンダ25の
ピストンロッド25aの収縮により上記吊持基体26を
上昇変位させて上記クランプ部36,36を介して掛堰
8を吊持させる。
Next, the operation of the apparatus having the above configuration will be described. The ladle 2 that has received the molten metal travels through the self-propelled carriage 3 and is conveyed to a predetermined pouring position P, while the mold 5
When reaches the predetermined set position S, the hanging weir suspending and conveying device 9 moves to the carry-in side suspending position D2, lowers the suspending base 26 by extending the piston rod 25a of the cylinder 25, and then suspends the suspension. The clamp portions 36, 3 are provided below the both end projections 8a, 8a of the hanging weir 8 after cleaning located at the lower position D2.
Insert 6 respectively. Then, the suspension base 26 is displaced upward by contraction of the piston rod 25a of the cylinder 25 to suspend the latch weir 8 via the clamp portions 36, 36.

【0015】上記掛堰吊持搬送装置9により吊持された
掛堰8を上記セット位置Sまで搬送し、上記シリンダ2
5のピストンロッド25aを伸張させると、掛堰8が下
降変位し、その位置Sに待機している鋳型5上に取り付
けられる。この時、上記吊下基体26における蓋体開閉
用シリンダ38のピストンロッド38aを伸張させる
と、蓋体40が下降変位して、掛堰8の開口が該蓋体4
0により閉塞される。蓋体開閉用シリンダ38を設けな
い場合には、シリンダ25のピストンロッド25aをさ
らに伸張させることによって蓋体40を下降変位させて
蓋体40を掛堰8に装着する。
The hanging weir 8 suspended by the hanging weir suspending and conveying device 9 is conveyed to the set position S, and the cylinder 2
When the piston rod 25a of No. 5 is extended, the latch weir 8 is displaced downward and is mounted on the mold 5 waiting at the position S. At this time, when the piston rod 38a of the lid opening / closing cylinder 38 of the hanging base 26 is extended, the lid 40 is displaced downward, and the opening of the latch 8 is opened by the lid 4.
Blocked by 0. When the lid opening / closing cylinder 38 is not provided, the piston rod 25a of the cylinder 25 is further extended to displace the lid 40 downward, and the lid 40 is attached to the latch weir 8.

【0016】掛堰8および蓋体40が取り付けられた鋳
型5は注湯位置Pまで送られ、ここで取鍋2からの溶湯
が掛堰8を通して注湯される。このとき、蓋体40によ
って溶湯の飛散を防止する。
The mold 5 to which the latch 8 and the lid 40 are attached is sent to the pouring position P, where the molten metal from the ladle 2 is poured through the latch 8. At this time, the lid 40 prevents the molten metal from scattering.

【0017】鋳湯後の鋳型5が上記セット位置Sまで戻
されると、上記掛堰吊持搬送装置9が上記と同様の動作
でクランプ部36,36を介して鋳型5上の掛堰8を吊
り上げるとともに、蓋体保持板37を介して蓋体40を
持ち上げるので、掛堰8および蓋体40は上記鋳型5か
ら取り外され、この掛堰8が取り外された鋳型5は鋳型
搬送ライン4により後工程に送られる。
When the casting mold 5 after the molten metal is returned to the setting position S, the hanging weir suspending and conveying device 9 moves the hanging weir 8 on the casting mold 5 through the clamp portions 36, 36 in the same manner as described above. Since the lid body 40 is lifted and the lid body 40 is lifted via the lid body holding plate 37, the latch weir 8 and the lid body 40 are removed from the mold 5, and the mold 5 from which the latch weir 8 is removed is moved by the mold transport line 4 to the rear side. Sent to the process.

【0018】上記のように掛堰吊持搬送装置9により掛
堰8および蓋体40を吊持させて注湯前の鋳型5に自動
的に取り付けることができるので、人手が要らず、作業
の迅速化を図ることができる。さらに、注湯後において
も、鋳型5から掛堰8および蓋体40を自動的に取り外
すことができるので、注湯時に加熱された掛堰8が高温
状態でも、作業を安全に進めることが可能であるうえ、
掛堰8が冷めるのを待つ必要もなく、鋳型5から掛堰8
をただちに取り外すことができるので、生産性の向上を
図れる。
As described above, since the hanging weir suspending / conveying device 9 can suspend the hanging weir 8 and the lid 40 and automatically attach them to the mold 5 before pouring, no labor is required and the work can be performed quickly. Can be realized. Furthermore, even after the pouring, since the latch weir 8 and the lid 40 can be automatically removed from the mold 5, the work can be safely carried out even if the latch weir 8 heated at the time of pouring is in a high temperature state. Besides,
There is no need to wait for the weir 8 to cool, and
Can be removed immediately, improving productivity.

【0019】上記鋳型5から取り外された掛堰8は上記
掛堰吊持搬送装置9により搬出側吊下位置D1まで移送
されて掛堰搬入出装置13における搬出部13Aに移載
される。そして、その掛堰8は上記搬出側吊下位置D1
から掛堰清掃処理装置10側に送られ、そこで移動機構
12に保持されて反転装置11まで移動されて、反転装
置11上で内部に付着している溶湯などが除去されて清
浄化される。
The latch weir 8 removed from the mold 5 is transferred to the unloading side hanging position D1 by the latch weir suspending and conveying device 9 and transferred to the unloading portion 13A of the latch weir loading / unloading device 13. Then, the latch weir 8 is at the carry-out side hanging position D1.
Is sent to the weir cleaning processing device 10 side, where it is held by the moving mechanism 12 and moved to the reversing device 11, where the molten metal and the like adhering to the inside of the reversing device 11 is removed and cleaned.

【0020】上記清掃処理後の掛堰8は上記移動機構1
2に保持されて掛堰搬入出装置13の搬入部13Bに移
載された後、この搬入部13Bにより所定の搬入側吊下
位置D2に搬入され、次の鋳型5に対して待機すること
になる。
The weir 8 after the cleaning process is the moving mechanism 1
After being held by 2 and transferred to the carry-in section 13B of the lock weir carry-in / out apparatus 13, the carry-in section 13B carries the product to a predetermined carry-in side hanging position D2 and waits for the next mold 5. Become.

【0021】[0021]

【発明の効果】以上のように、本発明によれば、鋳型に
対する掛堰および蓋体の取り付け、取り外し作業の自動
化、省人化を図ることができる。また、取り外し時に人
手による作業では、安全性を確保しようとすれば、注湯
後の高温状態にある掛堰が冷めるまで待つ必要がある
が、本発明においては、掛堰を直ちに鋳型から取り外す
ことが可能で、自動化と相まって生産性の著しい向上を
図ることができる。
As described above, according to the present invention, it is possible to automate the work of attaching and removing the hanging weir and the lid to the mold and to save labor. Further, in the manual work at the time of removal, in order to ensure safety, it is necessary to wait until the hanging weir in a high temperature state after pouring has cooled, but in the present invention, the hanging weir should be immediately removed from the mold. It is possible to significantly improve productivity in combination with automation.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明に係る掛堰供給・回収装置の平面図であ
る。
FIG. 1 is a plan view of a hanging weir supply / recovery device according to the present invention.

【図2】図1のA−A線に沿った断面図である。FIG. 2 is a sectional view taken along line AA of FIG.

【図3】図2の左側面図である。FIG. 3 is a left side view of FIG. 2;

【図4】掛堰吊持搬送装置の拡大側面図である。FIG. 4 is an enlarged side view of a hanging weir suspending and conveying device.

【図5】同上掛堰吊持搬送装置の拡大正面図である。FIG. 5 is an enlarged front view of the above-mentioned hanging weir suspending and conveying device.

【符号の説明】[Explanation of symbols]

4 鋳型搬送ライン 5 鋳型 8 掛堰 9 掛堰吊持搬送装置 21 架台 26 吊下基体 36 クランプ部 38 蓋体用開閉シリンダ 40 蓋体 D1,D2 所定の吊下位置 P 注湯位置 S セット位置 4 Mold transfer line 5 Mold 8 Hanging weir 9 Hanging weir suspending and conveying device 21 Frame 26 Hanging base 36 Clamping part 38 Lid opening / closing cylinder 40 Lids D1, D2 Predetermined hanging position P Pouring position S Set position

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 鋳型搬送ラインの上方側に設けられた架
台に対して掛堰吊下用クランプ部をもった吊下基体を昇
降可能でかつ上記鋳型搬送方向に移動可能に装備してい
るとともに、所定の吊下位置で上記クランプ部を介して
吊持させた掛堰を鋳型搬送方向の所定のセット位置まで
搬送して注湯位置に送られる鋳型に取り付け、かつ注湯
完了後に上記セット位置に戻された鋳型から掛堰を吊上
げて取り外して上記所定の吊下位置まで搬送する掛堰吊
持搬送装置を備え、この掛堰吊持搬送装置による掛堰の
取付時に該掛堰の開口を注入部を除いて閉塞する掛堰カ
バーをなす蓋体を上記吊下基体側に着脱自在に装備した
ことを特徴とする掛堰カバー着脱機能を有する掛堰供給
・回収装置。
1. A suspension base having a hanging dam suspension clamp portion is vertically movable with respect to a gantry provided on the upper side of the mold transfer line, and is movable in the mold transfer direction. , The hanging weir suspended at the predetermined hanging position via the clamp part is conveyed to a predetermined setting position in the mold conveying direction and is attached to the mold which is sent to the pouring position, and the pouring position is set after the pouring is completed. It is equipped with a hanging weir suspending and conveying device that lifts the hanging weir from the mold returned to the mold and conveys it to the above-mentioned predetermined hanging position. A hanging weir supply / recovery device having a hanging weir cover attachment / detachment, characterized in that a lid forming a hanging weir cover that is closed except for an injection portion is detachably attached to the hanging base body side.
【請求項2】 蓋体は、吊下基体にシリンダを介して吊
下基体に着脱自在に装備したことを特徴とする請求項1
記載の掛堰カバー着脱機能を有する掛堰供給・回収装
置。
2. The lid body is detachably mounted on the hanging base body through a cylinder on the hanging base body.
A hanging weir supply / recovery device having a function of attaching and removing the hanging weir cover described.
JP14057196A 1996-06-04 1996-06-04 Hanging weir supply / recovery device with hanging weir cover attachment / detachment function Pending JPH09323154A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP14057196A JPH09323154A (en) 1996-06-04 1996-06-04 Hanging weir supply / recovery device with hanging weir cover attachment / detachment function

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP14057196A JPH09323154A (en) 1996-06-04 1996-06-04 Hanging weir supply / recovery device with hanging weir cover attachment / detachment function

Publications (1)

Publication Number Publication Date
JPH09323154A true JPH09323154A (en) 1997-12-16

Family

ID=15271791

Family Applications (1)

Application Number Title Priority Date Filing Date
JP14057196A Pending JPH09323154A (en) 1996-06-04 1996-06-04 Hanging weir supply / recovery device with hanging weir cover attachment / detachment function

Country Status (1)

Country Link
JP (1) JPH09323154A (en)

Similar Documents

Publication Publication Date Title
CN102271839B (en) Ladle conveyance carriage
JP2866593B2 (en) Casting equipment
JPH09323154A (en) Hanging weir supply / recovery device with hanging weir cover attachment / detachment function
CN215447387U (en) Casting piece smelting system with crucible moving function
JP3236252B2 (en) Unframer for casting line
JPH09295131A (en) Hanging weir supply / recovery device
JPH033572Y2 (en)
JP2000273523A (en) Attaching/detaching device of ladle cover for sealing and device for automatically exchanging lance
JP3062093B2 (en) Tundish maintenance equipment for continuous casting equipment
CN223704971U (en) A multi-functional casting transfer device
CN222504888U (en) High temperature hoistable inner tank well type vacuum atmosphere furnace
JP2764849B2 (en) Immersion nozzle and mortar transfer device for sealing
JPH0671420A (en) Device for positioning and locking casting die
JP3674331B2 (en) Heating furnace door replacement method and apparatus
CN215508973U (en) Iron removing device for casting die
JPH0123662Y2 (en)
JPH043723Y2 (en)
CN211028071U (en) Casting workbench
JPH1025510A (en) Molten steel treating equipment using ladle
JPH0648942U (en) Ladle changer
JP3072890U (en) Machine work cleaning equipment
JPS63264265A (en) Method for taking out casting
JPH05200504A (en) Equipment for supporting and fitting/separating stopper in tundish for continuous casting
JPH03151143A (en) Apparatus for automatically inserting jig for connecting cast slab in mold
JPS62151260A (en) Device for removing deposit from molten metal immersion pipe