JPH10102660A - Precast concrete board and manufacture thereof - Google Patents

Precast concrete board and manufacture thereof

Info

Publication number
JPH10102660A
JPH10102660A JP26162896A JP26162896A JPH10102660A JP H10102660 A JPH10102660 A JP H10102660A JP 26162896 A JP26162896 A JP 26162896A JP 26162896 A JP26162896 A JP 26162896A JP H10102660 A JPH10102660 A JP H10102660A
Authority
JP
Japan
Prior art keywords
concrete plate
truss
bar
precast concrete
steel wire
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP26162896A
Other languages
Japanese (ja)
Inventor
Shinichiro Sato
真一郎 佐藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nihon Kaiser Co Ltd
Original Assignee
Nihon Kaiser Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nihon Kaiser Co Ltd filed Critical Nihon Kaiser Co Ltd
Priority to JP26162896A priority Critical patent/JPH10102660A/en
Publication of JPH10102660A publication Critical patent/JPH10102660A/en
Pending legal-status Critical Current

Links

Landscapes

  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)

Abstract

PROBLEM TO BE SOLVED: To ensure that wiring is made reliably at a design position at the time of top concrete placement by leading both ends of a PC steel wire out from a concrete board in a manner of bending downward along the inside of a truss member. SOLUTION: A truss member 3 is formed by joining a single upper-end member 4 and two lower-end members 5, arranged in a triangular state, with a corrugated lattice member 6. The truss members 3 are arranged at an appropriate interval along the longitudinal direction in parallel. Both ends of a PC steel wire 7 which are generally bent downward, are fitted to the inside of the truss member by fixing with hooking hardware hooked to the lattice member 6. By placing concrete so that the center of the PC steel wire 7 and the lower part of the truss member 3, which are tensed with a prescribed tension, may be buried, a concrete plate is formed as a precast concrete board 1. The top concrete is placed astride beams to ensure that the position of burying the PC steel wire 7 will not change.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明はプレキャストコンク
リート板及びその製造方法に関するものである。
TECHNICAL FIELD The present invention relates to a precast concrete plate and a method for producing the same.

【0002】[0002]

【従来の技術】近年における極端な労働力不足の解消
や、労働力の集約化を目的としてプレキャストコンクリ
ート部材が多く使用されるようになっている。特に、床
スラブの構築には、ほとんどプレキャストコンクリート
板が使用されているが、このプレキャストコンクリート
板を大スパンの建物などに用いる場合は、曲げ抵抗を増
大させるためにPC鋼線などで圧縮力を付与している。
2. Description of the Related Art In recent years, precast concrete members have been widely used for the purpose of resolving extreme labor shortages and consolidating labor. In particular, most precast concrete plates are used to construct floor slabs.When this precast concrete plate is used in buildings with large spans, compressive force is applied to the steel plates to increase bending resistance. Has been granted.

【0003】このプレストレスが付与された床スラブ
は、図10に示すように、プレキャストコンクリート板
20を梁21間に掛け渡した後、その上にPC鋼線22
などの緊張材を配線してトップコンクリート23を打設
し、これが硬化した後に前記PC鋼線22を緊張して形
成していた。
[0003] The floor slab to which the prestress has been applied is, as shown in FIG.
The top concrete 23 is cast by wiring a tensioning material such as this, and after this hardens, the PC steel wire 22 is formed by tensioning.

【0004】[0004]

【発明が解決しようとする課題】しかし、従来のプレス
トレスが付与された床スラブは、プレキャストコンクリ
ート板の上にPC鋼線を単に置いただけでトップコンク
リートを打設しているため、この打設時にPC鋼線が移
動して所定の箇所、すなわち設計位置に配線できないと
いう問題があった。
However, in the conventional floor slab to which prestress has been applied, the top concrete is cast by simply placing a PC steel wire on a precast concrete plate. There has been a problem that the PC steel wire sometimes moves and cannot be wired to a predetermined location, that is, a design position.

【0005】本発明はこれらの問題に鑑みてなされたも
のであり、その目的はコンクリートの打設時にPC鋼線
が移動せずに、設計位置に確実に配線されたプレキャス
トコンクリート板及びその製造方法を提供することであ
る。
[0005] The present invention has been made in view of these problems, and an object of the present invention is to provide a precast concrete plate in which a PC steel wire does not move at the time of placing concrete, and which is securely wired at a design position, and a method of manufacturing the same. It is to provide.

【0006】[0006]

【課題を解決するための手段】以上の課題を解決するた
めの本発明のプレキャストコンクリート板は、三角形状
に配置された一本の上端筋と二本の下端筋とが波型のラ
チス筋で連結されたトラス筋が、その上部をコンクリー
ト板から突出させた状態で適宜間隔をもって並列状に配
筋されたプレキャストコンクリート板において、前記ト
ラス筋内に緊張材が配設され、該緊張材の端部がコンク
リート板から導出されたことを特徴とする。またプレキ
ャストコンクリート板の製造方法は、型枠内に配筋され
た格子状の補強筋の上に、三角形状に配置された一本の
上端筋と二本の下端筋とが波型のラチス筋で連結された
トラス筋を適宜間隔をもって並列状に配筋し、該トラス
筋の内側に緊張材を中央部が下側に撓むように配線した
後、前記型枠内にコンクリートを打設したことを特徴と
する。このことにより、プレキャストコンクリート板を
梁間に掛け渡してトップコンクリートを打設したとして
も、この打設によって前記緊張材の埋設位置が変化せ
ず、もちろん移動することもない。また、緊張材はトラ
ス筋内にそって配設されるため、設計位置に確実に配線
することができ、かつ前記PC鋼線が所定の箇所に容易
かつ確実に配線できる。
According to the precast concrete plate of the present invention for solving the above-mentioned problems, one upper and two lower streaks arranged in a triangular shape are corrugated lattice streaks. In a precast concrete plate in which connected truss bars are arranged side by side at appropriate intervals in a state where the upper part thereof protrudes from the concrete plate, a tension member is disposed in the truss bar, and an end of the tension member is provided. The part is derived from a concrete plate. In addition, the method of manufacturing a precast concrete plate is such that one upper and two lower streaks arranged in a triangular shape are lattice-shaped lattice streaks arranged on a grid-like reinforcing bar arranged in a formwork. After arranging the truss bars connected in parallel in parallel at appropriate intervals, wiring the tension members inside the truss bars so that the central portion bends downward, and then casting concrete in the formwork. Features. Thus, even if the precast concrete plate is laid between the beams and the top concrete is laid, the laying position of the tendon does not change and, of course, does not move. In addition, since the tendon is arranged along the truss bar, it can be securely wired at the design position, and the PC steel wire can be easily and reliably wired to a predetermined location.

【0007】[0007]

【発明の実施の形態】以下、本発明のプレキャストコン
クリート板及びその製造方法の実施形態を図面に基づい
て説明する。図1はプレキャストコンクリート板の断面
図、図2は図1のA−A線断面図、図3は図1のB−B
線断面図、図4は図1のC−C線断面図、図5は緊張材
を掛け止めしたトラス筋の斜視図である。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Embodiments of a precast concrete plate and a method of manufacturing the same according to the present invention will be described below with reference to the drawings. 1 is a cross-sectional view of a precast concrete plate, FIG. 2 is a cross-sectional view taken along line AA of FIG. 1, and FIG. 3 is BB of FIG.
FIG. 4 is a cross-sectional view taken along line CC of FIG. 1, and FIG. 5 is a perspective view of the truss bar with a tendon member hooked.

【0008】プレキャストコンクリート板1は、図1及
び図2に示すように、コンクリート板2の長さ方向にそ
ってトラス筋3が適宜間隔をもって並列状に配筋され、
その下部がコンクリート板2に埋設して形成されてい
る。
As shown in FIGS. 1 and 2, the precast concrete plate 1 has truss bars 3 arranged in parallel along the length direction of the concrete plate 2 at appropriate intervals.
The lower part is buried in the concrete plate 2 and formed.

【0009】このトラス筋3は、三角形状に配置された
一本の上端筋4と二本の下端筋5とが波形のラチス筋6
で接合して形成され、この中に緊張材であるPC鋼線7
が配線されている。
The truss bar 3 is composed of a lattice bar 6 whose one upper bar 4 and two lower bars 5 are arranged in a triangular shape.
PC steel wire 7 which is formed by joining
Are wired.

【0010】このPC鋼線7は下側に撓んだ中央部のみ
がコンクリート板2に埋設され、その両端部はコンクリ
ート板2から導出されて保持金具でトラス筋3に取り付
けられている。
Only the central portion of the PC steel wire 7 bent downward is buried in the concrete plate 2, and both ends thereof are led out of the concrete plate 2 and attached to the truss bars 3 by holding metal fittings.

【0011】この保持金具は掛止金具9が使用され、掛
止湾部9aがラチス筋6に引っ掛けられ、これをガイド
として上下動するようになっている。
As this holding metal, a locking metal 9 is used, and the locking bay portion 9a is hooked on the lattice streak 6, and is vertically moved by using this as a guide.

【0012】この掛止金具9は常時内側に付勢されて形
成されているため、ラチス筋6を上下動させても任意の
位置に固定できるようになっている。よって、PC鋼線
7は両端部が図3及び図4に示す箇所に固定されること
により全体として湾曲に配線される。
Since the latch 9 is always urged inward, it can be fixed at any position even if the lattice 6 is moved up and down. Therefore, the PC steel wire 7 is wired as a whole by fixing both ends to the locations shown in FIGS. 3 and 4.

【0013】尚、前記掛止金具9はPC鋼線7を配線す
る前にセットするが、セットした後又はPC鋼線7を配
線した後にラチス筋6に溶接することもできる。
Although the latch 9 is set before the PC steel wire 7 is wired, it can be welded to the lattice 6 after the setting or after the PC steel wire 7 is wired.

【0014】図8は、保持金具が吊下げ金具11の場合
を示したものであり、PC鋼線7を上端筋4に引っ掛け
て吊り下げ、前記吊下げ金具11の長さを変えることに
よりPC鋼線7が全体として任意の形に配線される。
FIG. 8 shows a case in which the holding fitting is a hanging fitting 11. The PC steel wire 7 is hung on the upper streak 4 and suspended, and the PC fitting is changed by changing the length of the hanging fitting 11. The steel wire 7 is wired in an arbitrary shape as a whole.

【0015】次に、このプレキャストコンクリート板の
製造方法について図9に基づいて説明する。まず、型枠
12に補強筋13を格子状に配筋し、この上にトラス筋
3を適宜間隔をもって並列状に配筋して固定する。
Next, a method for manufacturing the precast concrete plate will be described with reference to FIG. First, reinforcing bars 13 are arranged in a grid on the formwork 12, and truss bars 3 are arranged on the forming frames 12 in parallel at appropriate intervals and fixed.

【0016】次に、前記トラス筋3に掛止金具9をセッ
トして高さを調整した後に固定するが、これは予め所定
の高さに固定しておくこともできる。また、この掛止金
具9はトラス筋3の両端部にのみセットし、中央部には
セットしないものとする。
Next, the latch 9 is set on the truss bar 3 and the height thereof is adjusted and then fixed, but this can be fixed to a predetermined height in advance. The latch 9 is set only at both ends of the truss bar 3, but not at the center.

【0017】そして、前記掛止金具9をセットした後
に、トラス筋3内に端からPC鋼線7を挿入して前記掛
止金具9で掛け止めることにより、PC鋼線7がトラス
筋3内に固定された状態で配線される。
After the hook metal 9 is set, the PC steel wire 7 is inserted into the truss bar 3 from the end and is hooked by the hook metal 9 so that the PC steel wire 7 is inserted into the truss bar 3. Wired in a state fixed to

【0018】次に、前記PC鋼線7を所定の筋張力で緊
張して型枠12内にコンクリートを打設し、これが硬化
した後に脱型するとプレストレスが付与されたプレキャ
ストコンクリート板1が完成する。
Next, the PC steel wire 7 is tensioned with a predetermined muscle tension, and concrete is poured into the formwork 12. After the concrete is hardened, the concrete is released from the mold to complete the prestressed precast concrete plate 1. I do.

【0019】なお、このPC鋼線7は前記コンクリート
が硬化した後に緊張してプレストレスを付与するように
してもよい。
The PC steel wire 7 may be tensioned after the concrete is hardened to apply a prestress.

【0020】[0020]

【発明の効果】コンクリート板に適宜間隔をもって並列
状に配設されたトラス筋内に緊張材が配設され、該緊張
材の端部がコンクリート板から導出されたことにより、
プレキャストコンクリート板を梁間に掛け渡してトップ
コンクリートを打設したとしても、この打設によって緊
張材の埋設位置が変化せず、かつこれが移動することも
ない。
According to the present invention, the tension members are provided in the truss bars arranged in parallel with the concrete plate at appropriate intervals, and the ends of the tension members are led out of the concrete plate.
Even if the precast concrete plate is laid between the beams and the top concrete is laid, the laying position of the tendon does not change and does not move even when the top concrete is laid.

【0021】緊張材はトラス筋内にそって配設されるた
め、設計位置に確実に配線することができる。
Since the tension members are provided along the truss bars, they can be securely wired to the design position.

【0022】保持金具を掛止金具又は吊下げ金具とした
場合、前記掛止金具を上下させたり、或は前記吊下げ金
具の長さを場所によって変えることにより、緊張材を中
央部が下側に撓んだ湾曲形や、その他の任意の形状に配
線できる。
When the holding metal is a hanging metal or a hanging metal, the tension member is moved downward by moving the hanging metal up or down or by changing the length of the hanging metal depending on the location. Wiring can be made into a curved shape or any other shape.

【0023】三角形状に配置された一本の上端筋と二本
の下端筋とが波型のラチス筋で連結されたトラス筋を適
宜間隔をもって並列状に配筋し、該トラス筋内に差し通
した緊張材の高さを保持金具で調整して中央部が下側に
撓むような形状にした後にコンクリートを打設すると、
前記PC鋼線が所定の箇所に容易かつ確実に配線でき
る。
One upper muscle and two lower muscles, which are arranged in a triangular shape, are arranged in parallel at appropriate intervals with truss bars connected by corrugated lattice bars, and inserted into the truss bars. When the concrete is cast after adjusting the height of the passing tension material with the holding bracket to make the center part bend downward,
The PC steel wire can be easily and reliably wired to a predetermined location.

【0024】PC鋼線が所定の箇所に配線されたプレキ
ャストコンクリート板が製造できる。
[0024] A precast concrete plate in which PC steel wires are wired at predetermined positions can be manufactured.

【図面の簡単な説明】[Brief description of the drawings]

【図1】プレキャストコンクリート板の断面図である。FIG. 1 is a sectional view of a precast concrete plate.

【図2】図1のA−A線断面図である。FIG. 2 is a sectional view taken along line AA of FIG.

【図3】図1のB−B線断面図である。FIG. 3 is a sectional view taken along line BB of FIG. 1;

【図4】図1のC−C線断面図である。FIG. 4 is a sectional view taken along line CC of FIG. 1;

【図5】トラス筋の斜視図である。FIG. 5 is a perspective view of a truss bar.

【図6】プレキャストコンクリート板の要部の断面図で
ある。
FIG. 6 is a sectional view of a main part of a precast concrete plate.

【図7】掛止金具の斜視図である。FIG. 7 is a perspective view of a latch.

【図8】吊下げ金具を使用したプレキャストコンクリー
ト板の要部の断面図である。
FIG. 8 is a cross-sectional view of a main part of a precast concrete plate using hanging metal fittings.

【図9】プレキャストコンクリート板の製造方法を示す
断面図である。
FIG. 9 is a cross-sectional view illustrating a method for manufacturing a precast concrete plate.

【図10】従来のプレキャストコンクリート板の断面図
である。
FIG. 10 is a sectional view of a conventional precast concrete plate.

【符号の説明】[Explanation of symbols]

1 プレキャストコンクリート板 2 コンクリート板 3 トラス筋 4 上端筋 5 下端筋 6 ラチス筋 7 PC鋼線 9 掛止金具 11 吊下げ金具 12 型枠 13 補強筋 DESCRIPTION OF SYMBOLS 1 Precast concrete board 2 Concrete board 3 Truss bar 4 Upper bar 5 Lower bar 6 Lattice bar 7 PC steel wire 9 Hanging bracket 11 Hanging bracket 12 Formwork 13 Reinforcing bar

Claims (7)

【特許請求の範囲】[Claims] 【請求項1】 三角形状に配置された一本の上端筋と二
本の下端筋とが波型のラチス筋で連結されたトラス筋
が、その上部をコンクリート板から突出させた状態で適
宜間隔をもって並列状に配筋されたプレキャストコンク
リート板において、前記トラス筋内に緊張材が配設さ
れ、該緊張材の端部がコンクリート板から導出されたこ
とを特徴とするプレキャストコンクリート板。
1. A truss bar in which one upper bar and two lower bars arranged in a triangular shape are connected by a corrugated lattice bar, and a truss bar is appropriately spaced with its upper part protruding from a concrete plate. A precast concrete plate, wherein a tension member is provided in the truss bar, and an end of the tension member is led out of the concrete plate.
【請求項2】 前記緊張材はプレテンションまたはポス
トテンションで緊張されたことを特徴とする請求項1に
記載のプレキャストコンクリート板。
2. The precast concrete plate according to claim 1, wherein the tension member is tensioned by pretension or post tension.
【請求項3】 前記緊張材はトラス筋に取り付けた保持
金具で固定され、該保持金具の高さを可変可能としたこ
とを特徴とする請求項1に記載のプレキャストコンクリ
ート板。
3. The precast concrete plate according to claim 1, wherein the tension member is fixed by a holding bracket attached to a truss bar, and the height of the holding bracket is variable.
【請求項4】 前記保持金具が上端筋に取り付けた吊下
げ金具、またはラチ筋の間に掛け渡した掛止金具である
ことを特徴とする請求項3に記載のコンクリート板。
4. The concrete plate according to claim 3, wherein the holding fitting is a hanging fitting attached to an upper end streak or a hanging fitting hung between lattice streaks.
【請求項5】 型枠内に配筋された格子状の補強筋の上
に、三角形状に配置された一本の上端筋と二本の下端筋
とが波型のラチス筋で連結されたトラス筋を適宜間隔を
もって並列状に配筋し、該トラス筋の内側に緊張材を中
央部が下側に撓むように配線した後、前記型枠内にコン
クリートを打設したことを特徴とするプレキャストコン
クリート板の製造方法。
5. An upper end muscle and two lower end muscles arranged in a triangular shape are connected to a lattice-shaped reinforcing bar arranged in a formwork by a wavy lattice bar. Precast wherein truss bars are arranged in parallel at appropriate intervals, and a tension member is wired inside the truss bars so that the central portion bends downward, and then concrete is poured into the formwork. Manufacturing method of concrete board.
【請求項6】 前記緊張材はプレテンションまたはポス
トテンションで緊張されたことを特徴とする請求項5に
記載のプレキャストコンクリート板。
6. The precast concrete plate according to claim 5, wherein the tension member is tensioned by pretension or post tension.
【請求項7】 前記緊張材はトラス筋に取り付けた保持
金具で固定され、該保持金具の高さを可変可能としたこ
とを特徴とする請求項5に記載のプレキャストコンクリ
ート板。
7. The precast concrete plate according to claim 5, wherein the tension member is fixed by a holding bracket attached to a truss bar, and the height of the holding bracket is variable.
JP26162896A 1996-10-02 1996-10-02 Precast concrete board and manufacture thereof Pending JPH10102660A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP26162896A JPH10102660A (en) 1996-10-02 1996-10-02 Precast concrete board and manufacture thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP26162896A JPH10102660A (en) 1996-10-02 1996-10-02 Precast concrete board and manufacture thereof

Publications (1)

Publication Number Publication Date
JPH10102660A true JPH10102660A (en) 1998-04-21

Family

ID=17364544

Family Applications (1)

Application Number Title Priority Date Filing Date
JP26162896A Pending JPH10102660A (en) 1996-10-02 1996-10-02 Precast concrete board and manufacture thereof

Country Status (1)

Country Link
JP (1) JPH10102660A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20040018808A (en) * 2002-08-27 2004-03-04 전찬진 Deck panel of reinforced concrete slab
JP2008308977A (en) * 2007-05-15 2008-12-25 Kumagai Gumi Co Ltd Structure of floor slab
JP2009287211A (en) * 2008-05-27 2009-12-10 Maxstone Kk Flooring material for lining
CN104929292A (en) * 2015-06-04 2015-09-23 扬州大学 Combined plate adopting profiled steel plate without adhesive prestress and concrete
CN112227178A (en) * 2020-09-23 2021-01-15 同济大学 A folded toothed connecting piece composite beam
CN114086709A (en) * 2021-12-03 2022-02-25 扬州大学 Post-tensioned prestressed truss type reinforcement UHPC-foam concrete combined floor slab

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20040018808A (en) * 2002-08-27 2004-03-04 전찬진 Deck panel of reinforced concrete slab
JP2008308977A (en) * 2007-05-15 2008-12-25 Kumagai Gumi Co Ltd Structure of floor slab
JP2009287211A (en) * 2008-05-27 2009-12-10 Maxstone Kk Flooring material for lining
CN104929292A (en) * 2015-06-04 2015-09-23 扬州大学 Combined plate adopting profiled steel plate without adhesive prestress and concrete
CN112227178A (en) * 2020-09-23 2021-01-15 同济大学 A folded toothed connecting piece composite beam
CN114086709A (en) * 2021-12-03 2022-02-25 扬州大学 Post-tensioned prestressed truss type reinforcement UHPC-foam concrete combined floor slab

Similar Documents

Publication Publication Date Title
RU2135711C1 (en) Truss and device for its manufacture
US6629393B2 (en) Masonry reinforcing tie
US3577504A (en) Method of manufacturing a girder with a web of reinforced and/or prestressed concrete
KR101101208B1 (en) Precast deck plate for cantilever construction and bridge slab construction method
RU2012125629A (en) METHOD AND DEVICE FOR STRENGTHENING AND LIGHTENING OF LOADING CONSTRUCTIONS OF FLOOR AND ROOF
JP7021763B2 (en) Slab construction method
KR100722501B1 (en) Continuous multi-furniture precast PSC single slab girder bridge with precast PC single slab girder connected by single point structure or solid steel structure
KR101304335B1 (en) Precast concrete slab having variable horizontal shear connecting member, and method for the same
KR101181160B1 (en) Prestressed precast concrete beam having efficient prestressing anchorage structure
JP2002266457A (en) Concrete slab construction method and equipment
KR200238498Y1 (en) A Reinforcing Bar Device
KR100411706B1 (en) Easy muscles along the spine reinforcing rod spacer and method the construction
KR101994089B1 (en) Precast Concrete Slab With Pullout-Shear Resistance Elements Of Mesh Rib And Manufacturing Method Thereof
KR200407092Y1 (en) PC panel support structure of cantilever part
JP2004197472A (en) Frame body for forming slope frame and slope frame construction method using it
RU205762U1 (en) Building plank
JP2563887B2 (en) Precast concrete board manufacturing method
KR20000025054A (en) Synthetic deck plate using wire mesh and production method thereof
JP2648937B2 (en) Reinforcing bar for long span beams
KR200254870Y1 (en) Easy muscles along the spine reinforcing rod spacer
KR101340871B1 (en) Psc girder and psc girder making method using concrete saddle and psc girder thereof
JPH07286332A (en) Execution method of precast concrete foundation and installation spacer used therefor
JPH0725363Y2 (en) Concrete beam
JP3868336B2 (en) Molded floor board support member and stepped floor forming method
JPH01255507A (en) Manufacture of prestress introduction semi-precast concrete component for long span slab

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20060117

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20060508

A02 Decision of refusal

Effective date: 20060906

Free format text: JAPANESE INTERMEDIATE CODE: A02