JPH10140565A - Embedding method of steel pipe pile and steel pipe pile used for it - Google Patents
Embedding method of steel pipe pile and steel pipe pile used for itInfo
- Publication number
- JPH10140565A JPH10140565A JP31005196A JP31005196A JPH10140565A JP H10140565 A JPH10140565 A JP H10140565A JP 31005196 A JP31005196 A JP 31005196A JP 31005196 A JP31005196 A JP 31005196A JP H10140565 A JPH10140565 A JP H10140565A
- Authority
- JP
- Japan
- Prior art keywords
- steel pipe
- pipe pile
- drill bit
- intermediate layer
- obstacles
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Piles And Underground Anchors (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
(57)【要約】
【課題】 転石などの障害物が存在する地盤への鋼管杭
の埋設を経済的に行う。
【解決手段】 鋼管杭1の下端部に補強帯3を固着し
て、複数の切込溝5を設ける。この鋼管杭1の下端に
は、下面に工具8を有する基板6に係脱体7を突設した
掘削ビット5を、その係合片7aを切込溝4に係合して
取り付け、操作片7bにワイヤ10を結着する。上記の鋼
管杭1を回転圧入する。障害物のある中間層では、転石
などを掘削ビットで破碎しながら、鋼管杭1内に入った
障害物をハンマグラブなどで撤去して打設を進行する。
中間層を抜けたら、ワイヤ10を引いて掘削ビット5を鋼
管杭1より離脱させ、引き上げて回収する。
(57) [Abstract] [Problem] To economically bury steel pipe piles in the ground where obstacles such as boulders exist. SOLUTION: A reinforcing band 3 is fixed to a lower end portion of a steel pipe pile 1 and a plurality of cut grooves 5 are provided. At the lower end of the steel pipe pile 1, a drill bit 5, which is formed by projecting a disengagement body 7 from a base plate 6 having a tool 8 on the lower surface, is attached by engaging an engaging piece 7 a of the cutting groove 4. The wire 10 is bound to 7b. The steel pipe pile 1 is rotationally press-fitted. In the intermediate layer having obstacles, while the boulders and the like are crushed by a drill bit, the obstacles that have entered the steel pipe pile 1 are removed with a hammer club or the like, and the casting proceeds.
After passing through the intermediate layer, the wire 10 is pulled, the drill bit 5 is detached from the steel pipe pile 1, and the wire is lifted and collected.
Description
【0001】[0001]
【産業上の利用分野】本発明は、中間層に転石や礫等の
障害物が存在する地盤に鋼管杭を埋設する工法、及びこ
れに使用する鋼管杭に関するものである。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for burying steel pipe piles in the ground where obstacles such as boulders and gravel exist in an intermediate layer, and to a steel pipe pile used for the method.
【0002】[0002]
【従来の技術】鋼管杭の地盤への埋設において、その地
盤に転石や礫等の中間層が存在している場合には、鋼管
杭の施工に先立ち、転石や礫等の撤去作業が行われる。
この撤去作業には、従来、プレボーリング方式やオール
ケーシング方式等が用いられている。特に転石等の大き
な障害物を撤去するには、全旋回式の施工機械が使用さ
れることが多い。そして、これらの撤去作業後は、地盤
は砂などで置換され、その後に鋼管杭の埋設が行われる
ことになる。2. Description of the Related Art When burying steel pipe piles in the ground, if there is an intermediate layer such as boulders or gravel on the ground, removal work of boulders or gravel is performed prior to construction of the steel pipe piles. .
Conventionally, a pre-boring method, an all-casing method, or the like is used for this removal operation. In particular, in order to remove large obstacles such as boulders, all-turn construction machines are often used. After these removal operations, the ground is replaced with sand or the like, and then the steel pipe piles are buried.
【0003】また、既製杭とケーシングを同時に埋設す
る工法もあり、例えば特開昭56-81718号公報に記載され
ている。さらに、鋼管杭自身に掘削ビットを取り付けて
行う工法もありこの工法としては、例えば実開平04-776
32号公報に開示されている。There is also a construction method in which a ready-made pile and a casing are buried at the same time, which is described in, for example, JP-A-56-81718. Furthermore, there is also a construction method in which a drill bit is attached to the steel pipe pile itself.
No. 32 discloses this.
【0004】[0004]
【発明が解決しようとする課題】しかし、上記従来の中
間層の撤去作業をする工法では、杭の打設とは別の施工
機械による施工工程が介在することになり、工期、工費
とも増大し、極めて不経済であり、特に全旋回式の施工
機械を使用する場合は、掘削径が杭径よりも過大とな
り、撤去土量が多くなると共に、杭周辺地盤を必要以上
に乱し、地盤を緩めて周辺構造物へ悪影響を及ぼすとい
う欠点がある。However, in the above-mentioned conventional method of removing the intermediate layer, a construction process using a construction machine different from the pile driving is involved, and both the construction period and the construction cost are increased. However, it is extremely uneconomical, especially when using a full-rotation type construction machine, the excavation diameter becomes excessively larger than the pile diameter, the amount of removed soil increases, and the ground around the pile is disturbed more than necessary, There is a drawback that loosening has an adverse effect on surrounding structures.
【0005】また、オーガロッドを用いる工法では、転
石など大きな障害物ではオーガロッドの貫入が不可能で
ある。また、ケーシングを用いると、その引き抜きによ
る周辺地盤の緩みが発生するとともに、地盤との摩擦力
に対する十分な能力をもった施工機械が必要になる。ま
た、杭自身に掘削ビットを取り付けるものでは、高価な
ビットが埋め殺しとなり不経済である。In the method using an auger rod, it is impossible to penetrate the auger rod with a large obstacle such as a boulder. In addition, when the casing is used, the surrounding ground is loosened due to the pull-out, and a construction machine having a sufficient capacity for a frictional force with the ground is required. In addition, when a drill bit is attached to the pile itself, an expensive bit is buried and uneconomical.
【0006】本発明は、上記のような従来工法における
問題点を解決するためになされたもので、中間層の撤去
にともなう作業を、杭施工用の機械で鋼管杭を直接埋設
できるようにし、施工を経済的に行えるようにするとと
もに、杭周辺地盤の乱れ(ゆるみ)を最小限に抑えるこ
とのできるようにした、鋼管杭を埋設する工法及びこれ
に使用する鋼管杭を提供しようとするものである。SUMMARY OF THE INVENTION The present invention has been made to solve the above-mentioned problems in the conventional method, and the work involved in removing the intermediate layer can be directly buried in a steel pipe pile by a pile construction machine. To provide a method of burying steel pipe piles and a steel pipe pile to be used for this method, which enables economical construction and minimizes disturbance (looseness) of the ground around the piles It is.
【0007】[0007]
【課題を解決するための手段】上記の目的を達成するた
めの本発明の構成について、実施例に対応する図面を参
照して説明すると、請求項1の工法は、埋設する鋼管杭
1の先端部に、脱着及び回収可能とした掘削ビット5を
設けて、鋼管杭1を回転圧入して行き、転石や礫などの
障害物が存在する中間層(イ)においては、掘削ビット
5によリ障害物を破碎または側方へ押しやることで鋼管
杭1を回転圧入させ、中間層(イ)下端に達したなら
ば、鋼管杭内1に入った障害物を除去し、中間層(イ)
を掘進した後は、掘削ビット5を回収して、鋼管杭1を
所定の深度まで埋設することを特徴とするものである。The construction of the present invention for achieving the above object will be described with reference to the drawings corresponding to the embodiments. A drill bit 5 that can be attached and detached and collected is provided in the section, and the steel pipe pile 1 is rotationally pressed into the intermediate layer (a) where obstacles such as boulders and gravel are present. The steel pipe pile 1 is rotationally press-fitted by crushing or pushing the obstacle to the side, and when reaching the lower end of the intermediate layer (a), the obstacle entering the steel pipe pile 1 is removed, and the intermediate layer (a).
After excavation, the drill bit 5 is recovered and the steel pipe pile 1 is buried to a predetermined depth.
【0008】また、請求項2の鋼管杭は、鋼管杭本管2
の先端部に、所要深さにわたる切込溝4の複数を周方向
に間隔をおいて設け、他方、本管2の下端面に接合され
る、掘削工具8を備えた基板6に、上記切込溝4に係脱
できる係合片7aを有する操作片7を立設した掘削ビッ
ト5を形成し、該掘削ビット5に、切込溝4に係合した
掘削ビット5を引き上げるワイヤ10を結着したことを特
徴とするものである。Further, the steel pipe pile according to claim 2 is a steel pipe pile main pipe.
A plurality of cut grooves 4 each having a required depth are provided at intervals in the circumferential direction at the tip of the main pipe 2, and the cut grooves 4 are joined to the lower end face of the main pipe 2 and provided with the cutting tool 8. An excavation bit 5 having an operating piece 7 having an engaging piece 7a capable of engaging and disengaging from the notch groove 4 is formed, and a wire 10 for pulling up the excavation bit 5 engaged with the notch groove 4 is connected to the excavation bit 5. It is characterized by wearing.
【0009】[0009]
【発明の実施の形態】以下、本発明の実施の形態につい
て説明する。図1の(a)〜(e)は本発明工法の一実
施態様を工程順に示したものであり、図3〜図7は同工
法において使用する鋼管杭の一実施例を示したものであ
る。Embodiments of the present invention will be described below. 1A to 1E show an embodiment of the method of the present invention in the order of steps, and FIGS. 3 to 7 show examples of a steel pipe pile used in the method. .
【0010】まず、本発明工法において使用する鋼管杭
について説明すると、図3〜図7において、1は地盤に
埋設される鋼管杭で、その本管2下端部の外周には所要
の高さにわたる補強帯3が被着されている。そして、本
管2と補強帯3には、その下端から所要深さ(高さ)の
切込溝4が、管周方向に間隔をおいて複数設けられてい
るとともに、切込溝4の上端は外周側が高くなる傾斜面
4aに形成されている。First, a steel pipe pile used in the method of the present invention will be described. Referring to FIGS. 3 to 7, reference numeral 1 denotes a steel pipe pile buried in the ground, and the outer circumference of the lower end of the main pipe 2 has a required height. A reinforcement band 3 is applied. The main pipe 2 and the reinforcing band 3 are provided with a plurality of cut grooves 4 having a required depth (height) from the lower ends thereof at intervals in the circumferential direction of the pipe. Is formed on the inclined surface 4a whose outer peripheral side is higher.
【0011】上記の各切込溝4には、掘削ビット5が係
脱自在に装着されるようになっている。掘削ビット5
は、本管2の内周から補強帯3の外周より少し外側まで
の巾を有し、鋼管杭1の周方向に沿う所要長さの円弧状
に形成された基板6と、その中央部上面に、上記切込溝
4へ挿入される係合片7aと本管2の内周側に切込溝4
より上方突出する操作片7bとによりL形に形成された
係脱体7が立設されている。そして、基板6の下面には
チップ9を備えた工具8の複数が隔設されており、操作
片7bの上部内側には孔7cが設けられ、これに、鋼管
杭1の外部に至る操作用のワイヤ10が結着されている。A drill bit 5 is detachably mounted in each of the cut grooves 4. Drill bit 5
The base plate 6 has a width from the inner periphery of the main pipe 2 to slightly outside the outer periphery of the reinforcing band 3 and is formed in an arc shape having a required length along the circumferential direction of the steel pipe pile 1 and a central upper surface thereof. The engagement piece 7a inserted into the cut groove 4 and the cut groove 4
An engaging / disengaging body 7 formed in an L-shape with the operation piece 7b projecting upward is provided upright. A plurality of tools 8 each having a chip 9 are provided on the lower surface of the substrate 6, and a hole 7 c is provided inside an upper portion of the operation piece 7 b. Wire 10 is bound.
【0012】各掘削ビット5は、図3に示すように、係
脱体7の係合片7aを鋼管杭1の切込溝4に挿入し、操
作部7bを本管2の内周に添わせるとともに、基板6を
鋼管杭1の下端面に接して鋼管杭1に係合される。そし
て、ワイヤ10を引っ張ることによって、図7に示すよう
に、係号片7aが切込溝4より脱出し、掘削ビット5は
ワイヤ10によって鋼管杭内を引き上げられるようになっ
ている。なお、図示の例では、掘削ビット5は4個とな
っているが、例えば6個とか8個などのようにそれ以上
の数とすることができる。As shown in FIG. 3, each excavating bit 5 inserts the engaging piece 7a of the engaging and disengaging body 7 into the cut groove 4 of the steel pipe pile 1 and attaches the operating portion 7b to the inner periphery of the main pipe 2. At the same time, the substrate 6 is engaged with the steel pipe pile 1 by contacting the lower end surface of the steel pipe pile 1. Then, by pulling the wire 10, as shown in FIG. 7, the interlocking piece 7 a escapes from the cut groove 4, and the drill bit 5 can be pulled up inside the steel pipe pile by the wire 10. In the illustrated example, the number of the excavating bits 5 is four, but the number may be more than six, eight, or the like.
【0013】本発明の工法は、上記の鋼管杭1を使用し
て行われる。鋼管杭1は、その下端に図3、図4に示す
ように、掘削ビット5,5を係着した状態で地盤上の所
定の位置に立設し、従来の杭施工と同様にして鋼管杭1
を回転させながら地盤に圧入して行く。鋼管杭1はやが
て図1−(a)に示すように、転石や礫などの存在する
中間層(イ)1に達する。The method of the present invention is performed using the steel pipe pile 1 described above. As shown in FIGS. 3 and 4, the steel pipe pile 1 is erected at a predetermined position on the ground with the excavation bits 5 and 5 attached thereto, as shown in FIGS. 1
Press into the ground while rotating. The steel pipe pile 1 eventually reaches the intermediate layer (a) 1 in which boulders, gravel, and the like are present, as shown in FIG.
【0014】中間層(イ)1では、鋼管杭1の回転圧入
により、掘削ビット5,5が転石や礫などを破碎または
側方へ押しやりながら中間層(イ)下端まで施工が進む
ことになる。その際、鋼管杭1の圧入が困難な場合には
図1−(b)に示すように、ハンマグラブ11やロックオ
ーガなどを鋼管杭1内に挿入して、鋼管杭1内の転石、
礫などの障害物を除去して行く。この場合、掘削ビット
5より若干深い位置まで先行して障害物の撤去を行うの
がよい。In the intermediate layer (a) 1, the construction proceeds to the lower end of the intermediate layer (a) while the drill bits 5, 5 crush or push the boulders or the like to the side by the rotary press-fitting of the steel pipe pile 1. Become. At this time, if it is difficult to press-fit the steel pipe pile 1, as shown in FIG.
Remove obstacles such as gravel. In this case, it is preferable to remove the obstacle in advance to a position slightly deeper than the excavation bit 5.
【0015】鋼管杭1が中間層(イ)を抜けてその下の
下部層(ロ)に到達したなら、鋼管杭1内の障害物をハ
ンマーグラブやロックオーガなどにより除去し、その
後、図1−(c)に示すように、鋼管杭1の回転圧入を
一旦停止して、各掘削ビット5に結着したワイヤ10を地
上よりの操作で引っ張ってやる。それによって、図7に
示すように、掘削ビット5は、本管2の内側に回り込む
ようにして、結合片7aが切込溝4より抜けて、鋼管杭
1の下端部を離脱することになる。そして、ワイヤ10を
引き上げ、掘削ビット5を鋼管杭1の外へ回収する。When the steel pipe pile 1 has passed through the intermediate layer (a) and reached the lower layer (b) thereunder, obstacles in the steel pipe pile 1 are removed by a hammer grab, a rock auger, or the like. As shown in (c), the press-fitting of the steel pipe pile 1 is temporarily stopped, and the wire 10 attached to each excavation bit 5 is pulled by an operation from the ground. Thereby, as shown in FIG. 7, the excavation bit 5 goes around the inside of the main pipe 2, so that the connecting piece 7 a comes out of the cut groove 4 and separates the lower end of the steel pipe pile 1. . Then, the wire 10 is pulled up, and the drill bit 5 is collected out of the steel pipe pile 1.
【0016】掘削ビット5の回収後は、図1−(d)に
示すように、鋼管杭1の中に掘削オーガ12を挿入して行
う中掘工法あるいは打撃工法といった一般工法により、
図1−(b)に示すように、鋼管杭1を所定の深度、例
えば支持層(ハ)まで到達させ、最終打撃を加えて埋設
を終える。この場合、図2に示すように、鋼管杭1の下
端部に根固めの団塊13を設けることもある。After the excavation bit 5 is collected, as shown in FIG. 1- (d), the excavation auger 12 is inserted into the steel pipe pile 1 by a general excavation method or a percussion method.
As shown in FIG. 1- (b), the steel pipe pile 1 is made to reach a predetermined depth, for example, a support layer (C), and a final impact is applied to complete the embedding. In this case, as shown in FIG. 2, a solidified lump 13 may be provided at the lower end of the steel pipe pile 1.
【0017】[0017]
【発明の効果】以上説明したように、本発明によれば、
杭の打設と、地盤中にある転石や礫などの障害物の撤去
作業が同じ施工機械でできることになる。そのため、敷
地や工期、工費が減少するとともに、特殊な機械を必要
とせず、施工が極めて経済的に行えることになる。ま
た、地盤に接する鋼管杭を引き抜かないため、周辺地盤
の乱れ(ゆるみ)を最小限に抑えることができる。さら
に、掘削ビットは回収して複数回利用できるので経済的
であるとともに、その経済的な分、ビットの材料にはよ
り高価な高強度材料を使用することで、掘削性能を向上
させることができる。As described above, according to the present invention,
The same construction machine will be able to drive piles and remove obstacles such as boulders and gravel in the ground. Therefore, the site, the construction period, and the construction cost are reduced, and the construction can be performed extremely economically without requiring special machines. Further, since the steel pipe pile in contact with the ground is not pulled out, disturbance (looseness) of the surrounding ground can be minimized. Further, the drill bit is economical because it can be collected and used multiple times, and the cost can be improved by using a more expensive high-strength material for the bit. .
【0018】また、鋼管杭及び掘削ビットは構造が簡単
で製作が容易であり、掘削ビットの脱着及び回収作業が
容易に行える。Further, the steel pipe pile and the drill bit have a simple structure and are easy to manufacture, so that the work of removing and collecting the drill bit can be easily performed.
【図1】本発明の実施態様を(a)〜(e)に順次示し
た縦断面図である。FIG. 1 is a longitudinal sectional view sequentially showing an embodiment of the present invention in (a) to (e).
【図2】同最終工程の他の例を示した縦断面図である。FIG. 2 is a longitudinal sectional view showing another example of the final step.
【図3】本発明工法で使用する鋼管杭の一実施例を示す
要部縦断面図である。FIG. 3 is a longitudinal sectional view showing a main part of an embodiment of a steel pipe pile used in the method of the present invention.
【図4】同底面図である。FIG. 4 is a bottom view of the same.
【図5】鋼管杭の要部と掘削ビットを分離して示した縦
断面図である。FIG. 5 is a longitudinal sectional view showing a main part of a steel pipe pile and a drill bit separately.
【図6】同側面図である。FIG. 6 is a side view of the same.
【図7】掘削ビットの脱離、引き上げ時の状態説明図あ
る。FIG. 7 is an explanatory view showing a state in which a drill bit is detached and raised.
1 鋼管杭 2 本管 3 補強帯 4 切込溝 5 掘削ビット 6 基板 7 係脱体 7a 係合片 7b 操作片 8 工具 10 ワイヤ 11 ハンマグラブ 12 掘削オーガ DESCRIPTION OF SYMBOLS 1 Steel pipe pile 2 Main pipe 3 Reinforcement band 4 Cut groove 5 Drilling bit 6 Substrate 7 Disengagement body 7a Engagement piece 7b Operation piece 8 Tool 10 Wire 11 Hammaglab 12 Drilling auger
Claims (2)
収可能とした掘削ビットを設けて、鋼管杭を回転圧入し
て行き、転石や礫などの障害物が存在する中間層におい
ては、掘削ビットにより障害物を破碎または側方へ押し
やることで鋼管杭内を回転圧入させ、中間層の下端に達
したならば、鋼管杭内に入った障害物を除去し、中間層
を屈進した後は、掘削ビットを回収して、鋼管杭を所定
の深度まで埋設することを特徴とする、鋼管杭の埋設工
法。At the tip of a steel pipe pile to be buried, an excavation bit capable of being detached and collected is provided, and the steel pipe pile is rotationally press-fitted. In an intermediate layer where obstacles such as boulders and gravel are present, The obstacle was crushed or pushed to the side by the drill bit, and the inside of the steel pipe pile was rotationally press-fitted.When the bottom of the intermediate layer was reached, the obstacle inside the steel pipe pile was removed and the intermediate layer was bent. After that, the drilling bit is collected and the steel pipe pile is buried to a predetermined depth.
る切込溝の複数を周方向に間隔をおいて設け、他方、本
管の下端面に接合される、掘削工具を備えた基板に、上
記切込溝に係脱できる係合片を有する操作片を立設した
掘削ビットを形成し、該掘削ビットに、切込溝に係合し
た掘削ビットを引き上げるワイヤを結着したことを特徴
とする、鋼管杭。2. An excavating tool, which is provided with a plurality of cut grooves having a required depth at circumferential intervals at a tip end of a steel pipe pile main pipe, and is joined to a lower end face of the main pipe. A drill bit having an operating piece having an engaging piece capable of being disengaged from the cut groove is formed on the substrate, and a wire for pulling up the drill bit engaged with the cut groove is bound to the drill bit. Characterized by a steel pipe pile.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP31005196A JPH10140565A (en) | 1996-11-06 | 1996-11-06 | Embedding method of steel pipe pile and steel pipe pile used for it |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP31005196A JPH10140565A (en) | 1996-11-06 | 1996-11-06 | Embedding method of steel pipe pile and steel pipe pile used for it |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| JPH10140565A true JPH10140565A (en) | 1998-05-26 |
Family
ID=18000580
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP31005196A Pending JPH10140565A (en) | 1996-11-06 | 1996-11-06 | Embedding method of steel pipe pile and steel pipe pile used for it |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH10140565A (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110306552A (en) * | 2019-04-30 | 2019-10-08 | 中国一冶集团有限公司 | The broken method of underwater hard layer |
| JP2020037858A (en) * | 2018-08-30 | 2020-03-12 | Jfeスチール株式会社 | Construction method of steel pipe pile |
-
1996
- 1996-11-06 JP JP31005196A patent/JPH10140565A/en active Pending
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2020037858A (en) * | 2018-08-30 | 2020-03-12 | Jfeスチール株式会社 | Construction method of steel pipe pile |
| CN110306552A (en) * | 2019-04-30 | 2019-10-08 | 中国一冶集团有限公司 | The broken method of underwater hard layer |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP3806318B2 (en) | Foundation pile construction method and apparatus | |
| JP3165997B2 (en) | Casting method and equipment for sheet piles | |
| JPH11350473A (en) | Execution method for steel pipe pile | |
| JPH0428078B2 (en) | ||
| JP3581336B2 (en) | Extraction method of existing pile and drilling casing used for it | |
| JPH10140568A (en) | Burial method for burying steel pipe piles and drilling casing for burying steel pipe piles | |
| JP2005320811A (en) | First casing used in execution 0f cast-in-place pile | |
| JPH05287736A (en) | Construction method for high strength cast-in-place concrete pile | |
| JP2004162301A (en) | Method and apparatus for removing existing pile | |
| JP2002349171A (en) | Vertical hole drilling machine and vertical hole drilling method | |
| JPH05171654A (en) | Execution construction of landslid protection pile and execution method | |
| JP5584373B1 (en) | Sheet pile placing method | |
| JP3096678B2 (en) | Screw dropper | |
| JP3205279U (en) | Cut bucket | |
| JP2650539B2 (en) | Construction method of underground diaphragm wall | |
| JP3015842B2 (en) | Excavation method | |
| JP3019988B2 (en) | Auger for hard ground excavation | |
| JP2964406B1 (en) | Driving protection device for protective fence post | |
| JPH0724470Y2 (en) | Drilling tooth | |
| JP2004156381A (en) | Ground improvement method | |
| JP2002167759A (en) | Execution method of foundation pile | |
| KR102684324B1 (en) | an auxilary pile for constructing PHC pile | |
| JPS6153915A (en) | Lowering method of earthwork materials | |
| JPH0617590A (en) | Tunnel excavation method | |
| JP2023061669A (en) | Ground excavation method |