JPH10176329A - Temporary anchor and temporary anchor execution working method - Google Patents

Temporary anchor and temporary anchor execution working method

Info

Publication number
JPH10176329A
JPH10176329A JP35445096A JP35445096A JPH10176329A JP H10176329 A JPH10176329 A JP H10176329A JP 35445096 A JP35445096 A JP 35445096A JP 35445096 A JP35445096 A JP 35445096A JP H10176329 A JPH10176329 A JP H10176329A
Authority
JP
Japan
Prior art keywords
temporary anchor
inner tube
manhole
tip device
elastic sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP35445096A
Other languages
Japanese (ja)
Inventor
Toshio Miyaji
俊夫 宮地
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHIKEN KOGYO KK
Original Assignee
CHIKEN KOGYO KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHIKEN KOGYO KK filed Critical CHIKEN KOGYO KK
Priority to JP35445096A priority Critical patent/JPH10176329A/en
Publication of JPH10176329A publication Critical patent/JPH10176329A/en
Pending legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

PROBLEM TO BE SOLVED: To enable the simple working of an underground structure, and facilitate the working or the like of the underground structure at a narrow place. SOLUTION: An end device 2 is provided with an inner tube 3 in which a large number of holes 15 are perforated in its center part, and a gasket 4 is externally fitted to the upper end part thereof for fixing a joint head 9 and a rubber elastic tube 11 in a hermetically sealed condition, and a slider 20 provided with a low body 17 and packing 24a, 24b is slidably connected to the lower end of the elastic tube 11 in a hermetically sealed condition. A reducer 22 equipped with a diameter-reduced part 21 is provided to the lowest end of the inner tube 3, and a steel ball 25 whose diameter is passable in the inner tube is dropped inside the inner tube 3 to seat on the diameter-reduced part 21 so that the lower end of the inner tube 3 is closed, and Drilling can be performed by a metal crown 23 at the lower end of the reducer 22.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術の分野】本発明は、マンホールや地
下室等の地下構造物を築造するための仮設アンカー及び
仮設アンカー施工方法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a temporary anchor for constructing an underground structure such as a manhole or a basement and a method for constructing a temporary anchor.

【0002】[0002]

【従来の技術】従来、地下構造物の築造の例として、一
般的に、マンホール築造工事を施工するに当たり、立坑
を設け、鋼矢板工法、軽量鋼矢板工法、木矢板工法、H
鋼横矢板工法、ライナープレート工法等で土留工が施工
されており、掘削山留後、基礎コンクリートを打設し、
止水を目的とした薬液注入工事を行い坑口近くの土砂を
固めてその流入を防ぎ、次に推進工事を行い下水管路を
敷設してから、マンホールが据付られている。
2. Description of the Related Art Conventionally, as an example of the construction of an underground structure, a shaft is generally provided for constructing a manhole, and a steel sheet pile method, a lightweight steel sheet pile method, a wood sheet pile method, and a steel sheet pile method are generally used.
Earth retaining work is being carried out by the steel horizontal sheet pile method, liner plate method, etc.
The chemical injection work for stopping water is performed to solidify the earth and sand near the wellhead to prevent the inflow, then the propulsion work is performed and the sewer pipe is laid, and then the manhole is installed.

【0003】しかしながら、上記マンホール築造工法等
では、一旦、土留めを築造した上で、その内部にマンホ
ール等のマンホールを設置しなければないない等によ
り、工事で使用する専用範囲がどうしても広くなり、既
存家屋や既存施設に被害をもたらしたり、交通の妨げと
なり、付近住民に迷惑をかけることとなる。また、土留
め部材の築造・撤去・マンホール等の設置等、いろいろ
な繁雑な工程を踏まなければならないため、工期も長く
なり、工事費用も高額となる。小口径推進工事を行うに
際しても、土留め部材から発進するため、土砂の流入等
が課題である。
[0003] However, in the above-mentioned manhole construction method and the like, a dedicated area used for construction is inevitably broadened because a manhole such as a manhole must be installed after the earth retaining material is once constructed. Existing houses and facilities will be damaged and traffic will be interrupted, causing inconvenience to nearby residents. In addition, since various complicated processes such as construction and removal of earth retaining members, installation of manholes, and the like must be performed, the construction period becomes longer, and the construction cost becomes higher. Even when performing small-diameter propulsion work, inflow of earth and sand is a problem because the vehicle starts from the earth retaining member.

【0004】[0004]

【発明が解決しようとする課題】上記の課題を解決する
ため、本出願人は揺動圧入機あるいは旋回圧入機等によ
り、マンホール自体を圧入する工法を先に提案した。
In order to solve the above-mentioned problems, the present applicant has previously proposed a method of press-fitting a manhole itself by using a rocking press or a rotary press.

【0005】ところが、この工法において、例えば、径
の大きなマンホールを設置する場合、必然的に揺動圧入
機あるいは旋回圧入機等のスケールアップをしなければ
ならず、製造、運搬費用等のコストが大幅にアップして
しまう。また、狭小な工事場所では従来技術では、工事
が困難であるおそれがある。これら種々の事情により、
実際に施工されるマンホールの施工性が制限されるとい
う改善すべき課題があった。さらにマンホールに限ら
ず、地下室等の他の種類の地下構造物の築造についても
矢板等による施工性の悪さがある。さらに、角形ブロッ
クでは、揺動圧入、旋回圧入機が適用できないという問
題もある。
However, in this method, for example, when a manhole having a large diameter is installed, it is necessary to increase the scale of a swing press machine or a swivel press machine. Will be greatly up. Also, in a small construction site, there is a possibility that the construction is difficult with the conventional technology. Due to these various circumstances,
There is a problem to be improved that the workability of the manhole actually constructed is limited. Further, not only manholes but also other types of underground structures such as basements have poor workability by sheet piles or the like. Further, in the case of a rectangular block, there is a problem that the swing press-fit and the swivel press-fit cannot be applied.

【0006】[0006]

【課題を解決するための手段】そこで、本発明は、仮設
アンカーを利用した地下構造物の簡易な施工、狭小な場
所での地下構造物の施工を容易とすることを主な課題と
するものである。
SUMMARY OF THE INVENTION Accordingly, it is a main object of the present invention to simplify the construction of an underground structure using a temporary anchor and to facilitate the construction of an underground structure in a small place. It is.

【0007】以上の課題に鑑み、請求項1記載の発明は
なされたものであり、シールを上下両端に備えた弾性ス
リーブをインナーチューブに外嵌し、前記弾性スリーブ
の少なくとも一端に前記シールを備えたスライダを設
け、前記インナーチューブに孔を穿設し、前記インナー
チューブの上端にジョイントを設け下端に流体閉鎖装置
と削孔部材を設けた先端装置を含み構成されたことを特
徴とする仮設アンカーである。
In view of the above problems, the invention of claim 1 has been made, and elastic sleeves having seals at both upper and lower ends are externally fitted to an inner tube, and the seal is provided at least at one end of the elastic sleeve. A temporary anchor provided with a slider provided, a hole formed in the inner tube, a joint provided at an upper end of the inner tube, and a tip device provided with a fluid closing device and a drilling member at a lower end. It is.

【0008】請求項2記載の発明は、前記流体閉鎖装置
が止め弁を構成し、インナーチューブの下端に固定した
縮径部を設けたレジューサと、前記インナーチューブを
通過可能な径とされ、該レジューサの縮径部に着座する
ことができる鋼球とからなることを特徴とする請求項1
に記載の仮設アンカーである。
According to a second aspect of the present invention, the fluid closing device constitutes a stop valve, a reducer having a reduced diameter portion fixed to a lower end of the inner tube, and a diameter allowing passage through the inner tube. 2. A steel ball which can be seated on the reduced diameter portion of the reducer.
Is a temporary anchor according to (1).

【0009】請求項3記載の発明は、チューブ状の先端
装置の上部に複数のチューブ状のロッドを接続しつつ、
前記先端装置で削孔することにより、先端装置と前記複
数のロッドから構成された仮設アンカーを地中に埋設
し、前記仮設アンカーの下端を閉めるとともに上部から
加圧流体を注水して先端装置の弾性スリーブを膨張させ
て地中に固定し、前記仮設アンカーを利用して地中構造
物を築造し、前記加圧流体を抜くことで前記弾性スリー
ブを収縮させ、前記仮設アンカーを地中から抜き取るこ
とを特徴とするアンカー施工方法である。これにより請
求項1と同様に課題を達成できる。
According to a third aspect of the present invention, a plurality of tubular rods are connected to an upper portion of the tubular tip device,
By drilling with the tip device, a temporary anchor composed of the tip device and the plurality of rods is buried in the ground, the lower end of the temporary anchor is closed, and a pressurized fluid is injected from the upper portion of the tip device to cut the temporary anchor. The elastic sleeve is expanded and fixed in the ground, the underground structure is built using the temporary anchor, and the elastic sleeve is contracted by extracting the pressurized fluid, and the temporary anchor is removed from the ground. An anchor construction method characterized in that: Thus, the object can be achieved as in the first aspect.

【0010】[0010]

【発明の実施の形態】以下、実施の形態の仮設アンカ−
1を図面とともに説明する。仮設アンカ−1の特徴はそ
の先端装置2にある。まず図1は先端装置2の上半分を
示すものであり、先端装置2は中心部にインナーチュー
ブ3を備え、その上端部には、ガスケット4が外嵌され
て、ジョイントヘッド9と弾性スリーブ11とを密閉状
態で固定している。すなわち、ガスケット4は、Oリン
グ5a、外側に鋸歯溝が設けられたスリーブ状の竹の子
7a,下半分の内側に鋸歯溝が設けられたスリーブ状の
カシメリング13aからなるものである。Oリング5a
はジョイントヘッド9の最下端部の内周部に配設される
とともに竹の子7aに外嵌されている。竹の子7aはイ
ンナーチューブ3に外嵌されており、その外周部の下半
分には端部12aが嵌合され、カシメリング13aにて
カシメられている。さらにジョイントヘッド9の上端に
は、内側に雌ねじの切られたナット10が設けられてい
る。尚、インナーチューブ3の中央部付近には多数の孔
15が穿孔されている。弾性スリーブ11はラバー(弾
性ゴム)であるが、弾性であれば、ラバーが強化繊維、
ワイヤ等で補強されたもの等、種々の材質が採用可能で
あることは、当業者には了解される。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS A temporary anchor according to an embodiment will be described below.
1 will be described with reference to the drawings. The feature of the temporary anchor-1 lies in its tip device 2. First, FIG. 1 shows the upper half of the tip device 2. The tip device 2 is provided with an inner tube 3 in the center, and a gasket 4 is fitted on the upper end thereof to form a joint head 9 and an elastic sleeve 11. And are fixed in a sealed state. That is, the gasket 4 includes an O-ring 5a, a sleeve-shaped bamboo shoot 7a having a sawtooth groove on the outside, and a sleeve-shaped caulking ring 13a having a sawtooth groove on the inside of the lower half. O-ring 5a
Is disposed on the inner peripheral portion at the lowermost end of the joint head 9 and is fitted around the bamboo shoot 7a. The bamboo shoot 7a is fitted around the inner tube 3, and an end 12a is fitted to the lower half of the outer peripheral portion thereof, and is crimped by a caulking ring 13a. Further, a nut 10 internally threaded is provided at the upper end of the joint head 9. A number of holes 15 are formed near the center of the inner tube 3. The elastic sleeve 11 is made of rubber (elastic rubber).
It is understood by those skilled in the art that various materials such as a material reinforced with a wire or the like can be adopted.

【0011】次に図2は先端装置2の下半分を示すもの
であり、ロウボディ−17とパッキン24a,24bと
を備えたスライダ20が弾性スリーブ11の下端に密閉
状態で上下方向に(矢印参照)スライド可能に接続され
ている。パッキン24aは、Oリング5b、外側に鋸歯
溝が設けられたスリーブ状の竹の子7b,及び、下半分
の内側に鋸歯溝が設けられたスリーブ状のカシメリング
13bとからなるものである。パッキン24bは、Oリ
ング5c及びVパッキン19からなるものである。Oリ
ング5bはロウボディ−17の最上端部の内周部に配設
されるとともに竹の子7bに外嵌されている。竹の子7
bはインナーチューブ3に外嵌されており、その外周部
の上半分には端部12bが嵌合され、カシメリング13
bにてカシメられている。こうした構造は、弾性スリー
ブ11が膨張して圧力が加わることから、密閉性等を高
めるためである。Oリング5c、Vパッキン19はロウ
ボディ−17の内周面に内嵌されているものである。
Next, FIG. 2 shows the lower half of the tip device 2, in which a slider 20 having a row body 17 and packings 24a, 24b is vertically sealed in a closed state at the lower end of the elastic sleeve 11 (see arrows). ) Slidably connected. The packing 24a includes an O-ring 5b, a sleeve-shaped bamboo shoot 7b having a sawtooth groove on the outside, and a sleeve-shaped caulking ring 13b having a sawtooth groove on the inside of the lower half. The packing 24b includes the O-ring 5c and the V packing 19. The O-ring 5b is disposed on the inner peripheral portion of the uppermost end of the row body 17, and is fitted around the bamboo shoot 7b. Bamboo shoot 7
b is externally fitted to the inner tube 3, an end portion 12 b is fitted to the upper half of the outer peripheral portion thereof, and a caulking 13
It is caulked at b. Such a structure is to improve sealing performance and the like since the elastic sleeve 11 expands and pressure is applied. The O-ring 5c and the V-packing 19 are fitted inside the inner peripheral surface of the row body-17.

【0012】図2に示す通り、インナーチューブ3の最
下端には、縮径部21を備えたレジューサ22が設けら
れている。図1の点線で示す通りの鋼球25がインナー
チューブ3を通過可能な径とされており、インナーチュ
ーブ3の内部を落下して、縮径部21に着座して、イン
ナーチューブ3の下端を閉鎖できるようになっている。
したがって、縮径部21とレジューサ22と鋼球25が
止め弁を構成するものである。さらに、レジューサ22
の下端にはメタルクラウン23が設けられ削孔が可能と
されている。
As shown in FIG. 2, a reducer 22 having a reduced diameter portion 21 is provided at the lowermost end of the inner tube 3. The steel ball 25 as shown by the dotted line in FIG. 1 has a diameter capable of passing through the inner tube 3, falls inside the inner tube 3, sits on the reduced diameter portion 21, and lowers the lower end of the inner tube 3. It can be closed.
Therefore, the reduced diameter portion 21, the reducer 22, and the steel ball 25 constitute a stop valve. Furthermore, reducer 22
Is provided with a metal crown 23 at the lower end thereof so that drilling is possible.

【0013】図3及び図4に基づいて先端装置2の動作
を説明する。先端装置2をボーリングマシン27(図7
参照)で地中に打ち込む。そして、図3に示す通り、ジ
ョイントヘッド9の上部から鋼球25を落下させてイン
ナーチューブ3を通過させ、縮径部21に着座させる。
インナーチューブ3の上部から加圧水を圧送すると、イ
ンナーチューブ3の孔15から水が噴出して、図4に示
す通り、弾性スリーブ11が膨張し、これにより、スラ
イダ20、パッキン24a,24bが一体的に上方(矢
印参照)にスライドする。弾性スリーブ11の膨張力に
対して、地盤からは弾性スリーブ11が圧力(反力)を
受けるので、周囲から圧迫されて通常は太鼓状となる。
そして、圧力を下げて水を抜くと、弾性スリーブ11が
今度は弾性力で収縮し、スライダ20、パッキン24が
一体的に下方にスライドさせられて、仮設アンカ−1は
図3に示す状態に戻る。詳しい説明は、後で述べる。
The operation of the tip device 2 will be described with reference to FIGS. The tip device 2 is connected to a boring machine 27 (FIG. 7).
(See below). Then, as shown in FIG. 3, the steel ball 25 is dropped from above the joint head 9, passes through the inner tube 3, and is seated on the reduced diameter portion 21.
When pressurized water is pumped from the upper part of the inner tube 3, water spouts out of the hole 15 of the inner tube 3 and the elastic sleeve 11 expands as shown in FIG. 4, whereby the slider 20 and the packings 24 a and 24 b are integrally formed. Slide upward (see arrow). Since the elastic sleeve 11 receives a pressure (reaction force) from the ground with respect to the expansion force of the elastic sleeve 11, the elastic sleeve 11 is pressed from the surroundings and usually has a drum shape.
Then, when the pressure is reduced and water is drained, the elastic sleeve 11 is contracted by the elastic force, and the slider 20 and the packing 24 are slid integrally downward, and the temporary anchor-1 is brought into the state shown in FIG. Return. A detailed description will be given later.

【0014】次に図5〜図14に基づいて、先端装置2
を備えた仮設アンカ−1を適用したアンカー施工方法を
説明する。これはマンホール31(図14参照)の圧入
に適用されるものである。仮設アンカ−1は先端装置2
と複数のチューブ状のロッド28から構成されるもので
あり、先端装置2とロッド28とはねじにより直管状に
着脱自在に接続可能となっている。
Next, based on FIG. 5 to FIG.
An anchor construction method using the temporary anchor-1 provided with the anchor will be described. This is applied to press-fitting of the manhole 31 (see FIG. 14). Temporary anchor-1 is tip device 2.
And a plurality of tubular rods 28. The distal end device 2 and the rod 28 can be detachably connected to each other in a straight tubular shape by screws.

【0015】仮設アンカ−1を利用したマンホール31
の施工手順を説明する。 (1) 既設埋設物(ガス管、水道管等)の有無を確認
し、図5(a)に示す通り、架台26の上にボーリング
マシン27を設置し、ボーリングマシン27に先端装置
2を取り付ける。
Manhole 31 using temporary anchor-1
The construction procedure will be described. (1) Confirm the presence or absence of existing buried objects (gas pipes, water pipes, etc.), install a boring machine 27 on a gantry 26, and attach the tip device 2 to the boring machine 27 as shown in FIG. .

【0016】(2) 図5(b)に示す通り、先端装置
2にロッド28を接続し、さらにロッド28同士を接続
しつつ、油圧でボーリングマシン27を駆動して仮設ア
ンカ−1を回転させてメタルクラウン23で削孔しなが
ら、仮設アンカ−1に注水して先端装置2の先端から水
が噴き出るようにする。そうして図5(c)に示す通
り、設計深さまで到達したならば、削孔を完了する。
(2) As shown in FIG. 5 (b), while connecting the rods 28 to the tip device 2, and further connecting the rods 28, the boring machine 27 is driven by hydraulic pressure to rotate the temporary anchor-1. While drilling with the metal crown 23, water is injected into the temporary anchor 1 so that water spouts from the tip of the tip device 2. Then, as shown in FIG. 5C, when the hole reaches the design depth, the drilling is completed.

【0017】(3) (1)(2)の作業を繰り返して
図6に示す通り4本の仮設アンカ−1を設置する。図5
(d)に示す通り、鋼球25を仮設アンカ−1の上端部
から投入して落下させて、図1に示す縮径部21に着座
させる。さらに、仮設アンカ−1のそれぞれにキャップ
29を取付け、バルブ(図示せず)を開いてポンプ等で
加圧した水(加圧流体の一例)を注入する。そして、図
4及び図7に示す通り、鋼球25でインナーチューブ3
の端部が閉鎖されているため、弾性スリーブ11が膨張
し、これにより、先端装置2がアンカーとしての機能を
発揮し、仮設アンカ−1が地盤に仮固定(係留)され
る。そのようにしてから、バルブ(図示せず)を閉じ
て、アンカーの機能を維持させる。尚、空気等の圧縮性
流体も適用できなくもないが、水等の非圧縮性流体より
も固定力が劣る。この場合、水の圧力は仮設アンカ−1
の1本当り10〜30Kg/平方センチメートル程度で
ある。
(3) The operations of (1) and (2) are repeated to install four temporary anchors-1 as shown in FIG. FIG.
As shown in (d), the steel ball 25 is thrown in from the upper end of the temporary anchor-1, dropped, and seated on the reduced diameter portion 21 shown in FIG. Further, a cap 29 is attached to each of the temporary anchors 1, a valve (not shown) is opened, and water (an example of a pressurized fluid) pressurized by a pump or the like is injected. Then, as shown in FIG. 4 and FIG.
Is closed, the elastic sleeve 11 expands, whereby the tip device 2 functions as an anchor, and the temporary anchor-1 is temporarily fixed (anchored) to the ground. After doing so, the valve (not shown) is closed to maintain the function of the anchor. Although a compressible fluid such as air cannot be applied, the fixing force is inferior to that of an incompressible fluid such as water. In this case, the pressure of the water is
Is about 10 to 30 kg / square centimeter.

【0018】(4) 図6に示す通り、4本の仮設アン
カ−1の内側に中心が一致するように図9(a)〜
(c)に示す下部マンホール躯体32を設置する。つま
り、小型クレーン(図示せず)で後述の下部マンホール
躯体32を吊り上げて移動させ配置する。なお、下部マ
ンホール躯体32自体の構造については後述する。
(4) As shown in FIG. 6, FIG. 9A to FIG.
The lower manhole frame 32 shown in FIG. That is, the lower manhole frame 32 described later is lifted and moved by a small crane (not shown) and arranged. The structure of the lower manhole body 32 itself will be described later.

【0019】(5) 図6及び図7に示す通り、一対の
圧入装置80をロッド28の上端部に固定する。この圧
入装置80は一例であるが、これを説明すると、その横
架フレーム81が固定具82によりロッド28に固定さ
れており、また、横架フレーム81、横架フレーム83
の間に、油圧アクチュエータの一例としての4本のジャ
ッキ85が介装されたものである。図7に示す通り、ジ
ャッキ85の駆動により、下部マンホール躯体32が圧
入されてゆく(矢印参照)。ある程度、下部マンホール
躯体32が圧入されたら、圧入装置80を移動させて、
再び固定し、繰り返し押し下げる。この場合において、
先端装置2が図4に示す通り膨張状態であるので、仮設
アンカ−1が地中に固定されて、圧入力に対する反力が
発生して、圧入が有効に実行されるのである。また図8
で示す通り、掘削機30で掘削を行い土砂を排出する。
そして、下部マンホール躯体32を圧入した後、圧入装
置80をロッド28から抜く。
(5) As shown in FIGS. 6 and 7, a pair of press-fitting devices 80 are fixed to the upper end of the rod 28. The press-fitting device 80 is an example. To explain this, the horizontal frame 81 is fixed to the rod 28 by a fixture 82, and the horizontal frame 81, the horizontal frame 83
Between them, four jacks 85 as an example of a hydraulic actuator are interposed. As shown in FIG. 7, the lower manhole frame 32 is press-fitted by driving the jack 85 (see the arrow). When the lower manhole frame 32 is press-fitted to some extent, the press-fitting device 80 is moved,
Secure again and push down repeatedly. In this case,
Since the tip device 2 is in the inflated state as shown in FIG. 4, the temporary anchor-1 is fixed in the ground, a reaction force against the press-in force is generated, and the press-in is effectively performed. FIG.
As shown by, excavation is performed by the excavator 30 to discharge earth and sand.
Then, after press-fitting the lower manhole frame 32, the press-fitting device 80 is pulled out from the rod 28.

【0020】(6) 図9(a)〜(c)に示す下部マ
ンホール躯体32の上に、図10(a)〜(d)に示す
中間マンホール躯体35を接続する。なお、下部マンホ
ール躯体32の構造自体については後述する。即ち、円
筒部材42と円筒部材51とを溶接することにより、下
部マンホール躯体32と中間マンホール躯体35とを接
続する。(5)に示したと同様の要領で中間マンホール
躯体35を圧入する。中間マンホール躯体35を圧入し
た後、圧入装置80をロッド28から抜く。なお、中間
マンホール躯体35自体の構造については後述する。
(6) An intermediate manhole frame 35 shown in FIGS. 10A to 10D is connected to the lower manhole frame 32 shown in FIGS. 9A to 9C. The structure of the lower manhole body 32 will be described later. That is, by welding the cylindrical member 42 and the cylindrical member 51, the lower manhole frame 32 and the intermediate manhole frame 35 are connected. The intermediate manhole frame 35 is press-fitted in the same manner as shown in (5). After press-fitting the intermediate manhole frame 35, the press-fitting device 80 is removed from the rod 28. The structure of the intermediate manhole body 35 itself will be described later.

【0021】(7) 中間マンホール躯体35の上に、
図11(a)〜(c)に示す連結ケーシング100を接
続する。即ち、円筒部材52と連結ケーシング100を
接続する。(6)に示したと同様の要領で連結ケーシン
グ100を圧入する。なお、連結ケーシング100自体
の構造については後述する。
(7) On the intermediate manhole frame 35,
The connection casing 100 shown in FIGS. 11A to 11C is connected. That is, the cylindrical member 52 and the connection casing 100 are connected. The connection casing 100 is press-fitted in the same manner as shown in (6). The structure of the connection casing 100 itself will be described later.

【0022】(8) 図13に示す通り、設計の床掘深
さを確認しながら、基礎水中コンクリート37を打設す
る。基礎水中コンクリート37上に図示せぬ推進用機械
をセットして、横穴を穿孔しながら、本管の推進を施工
し、小口推進管34a,34bを取り付ける。小口推進
用機械を撤去して、高さ調整用のモルタルを打設し、イ
ンバート38を据え付ける。
(8) As shown in FIG. 13, the foundation underwater concrete 37 is poured while confirming the designed floor digging depth. A propulsion machine (not shown) is set on the basic underwater concrete 37, the main pipe is propelled while drilling a horizontal hole, and the small propulsion pipes 34a and 34b are attached. The small propulsion machine is removed, mortar for height adjustment is installed, and the invert 38 is installed.

【0023】(9) 中間マンホール躯体35の上に上
部マンホール躯体36を取り付ける。すなわち、調整部
61,側塊60,受枠62,蓋68,ステップ69を取
り付ける。
(9) The upper manhole frame 36 is mounted on the intermediate manhole frame 35. That is, the adjustment unit 61, the side mass 60, the receiving frame 62, the lid 68, and the step 69 are attached.

【0024】(10) 連結ケーシング100と中間マ
ンホール躯体35とのコッターによる連結を解除し、土
砂の埋め戻しを施工後、連結ケーシング100を中間マ
ンホール躯体35から分離し撤去して、さらに、図5
(e)に示す通り、バルブ(図示せず)を開いて仮設ア
ンカ−1を抜き取り、マンホール築造工事を完了すると
図14に示すものができあがる。
(10) The connection between the connecting casing 100 and the intermediate manhole frame 35 is released by the cotter, and the soil and sand are backfilled. After that, the connecting casing 100 is separated from the intermediate manhole frame 35 and removed.
As shown in (e), when the valve (not shown) is opened, the temporary anchor-1 is pulled out, and when the construction of the manhole is completed, the one shown in FIG. 14 is completed.

【0025】なお、中間マンホール躯体35を本実施形
態の構成要素として採用したものであるが、中間マンホ
ール躯体35を使用しない工法も可能であり、その代わ
りに、調整部61を長尺状とすることも可能である。ま
た、連結ケーシング100が一個増設されて連結される
ことも可能である。この場合には、マンホール躯体の構
造、工法ともに前述の例と同様であるので、説明を省略
する。
Although the intermediate manhole body 35 is employed as a component of the present embodiment, a construction method that does not use the intermediate manhole body 35 is also possible. Instead, the adjusting section 61 is made to be long. It is also possible. It is also possible to connect one additional connecting casing 100. In this case, since the structure and construction method of the manhole frame are the same as those in the above-described example, the description is omitted.

【0026】次にマンホール31を説明すると、図14
に示すマンホール31は、下部マンホール躯体32(こ
れは止水器33を介して小口推進管34a,34bと各
々接続し連通しているものである)と、この下部マンホ
ール躯体32の上に溶接で接続された中間マンホール躯
体35と、この中間マンホール躯体35の上部に溶接で
接続している上部マンホール躯体36とからなっている
ものである。
Next, the manhole 31 will be described with reference to FIG.
The manhole 31 shown in FIG. 1 is welded on the lower manhole frame 32 (which is connected to and communicates with the small-mouth propulsion pipes 34a and 34b via the water stop 33). The intermediate manhole body 35 is connected to the upper manhole body 36 and connected to the upper part of the intermediate manhole body 35 by welding.

【0027】図9(a)〜(c)に示す下部マンホール
躯体32は、円筒状のコンクリート40の下端に鋼製部
材41を嵌合し固着し、上端縁に鋼製の円筒部材42を
嵌合し固着しているものである。円筒状の鋼製部材41
上端の内周面に補強筋としての鉄筋48を所定間隔で縦
に固着(溶接)し、それらを円筒状のコンクリート40
の下端部の周縁に埋設し一体化している。同様に鋼製の
円筒部材42の内周面に補強筋としての鉄筋48を所定
間隔で縦に固着(溶接)し、それらをコンクリート40
の上端部の周縁に埋設し一体化している。コンクリート
40の下端は圧入の際の抵抗を軽減するために内周面が
テーパ状となっている。前記各要素がマンホール製造工
程において一体に製造され、下部マンホール躯体32と
なっている。また下部マンホール躯体32の壁に貫通孔
を二個穿設し、その貫通孔に止水器33を固着してい
る。止水器33をマンホール躯体32に取り付け予め組
み込んであるので、小口径推進工法の発進時の鏡切りの
際に、水や土砂がマンホール内に浸入することがなく、
スムーズな小口径推進工事ができる。
In the lower manhole frame 32 shown in FIGS. 9A to 9C, a steel member 41 is fitted and fixed to a lower end of a cylindrical concrete 40, and a steel cylindrical member 42 is fitted to an upper end edge. They are stuck together. Cylindrical steel member 41
Reinforcing bars 48 as reinforcing bars are vertically fixed (welded) to the inner peripheral surface of the upper end at predetermined intervals, and they are connected to a cylindrical concrete 40.
Embedded in the periphery of the lower end portion of Similarly, a reinforcing bar 48 as a reinforcing bar is vertically fixed (welded) to the inner peripheral surface of the steel cylindrical member 42 at a predetermined interval, and the reinforcing bars 48 are connected to the concrete 40.
Embedded in the periphery of the top end of The inner peripheral surface of the lower end of the concrete 40 is tapered in order to reduce the resistance at the time of press-fitting. The above elements are integrally manufactured in a manhole manufacturing process to form a lower manhole body 32. Further, two through holes are formed in the wall of the lower manhole frame 32, and a water stop 33 is fixed to the through holes. Since the water stop device 33 is attached to the manhole frame 32 and pre-installed, water and earth and sand do not enter the manhole at the time of mirror cutting at the start of the small-diameter propulsion construction method,
Smooth small-diameter propulsion work can be performed.

【0028】次に図10(a)〜(d)に示す中間マン
ホール躯体35では、コンクリート50の上端と下端に
鋼製の円筒部材51,52がそれぞれ嵌合し固着してな
り、中間マンホール躯体35は、下部マンホール躯体3
2と、上部マンホール躯体36とを縦に溶接により連結
するためのものである。前記溶接により前記各躯体の分
離が防止される。そして、鋼製の円筒部材51の下端の
内周面に所定間隔で補強筋としての鉄筋58を縦に固着
(溶接)し、それらを円筒状のコンクリート50の下端
部の周縁に埋設し一体化している。同様に鋼製の円筒部
材52の内周面に所定間隔で補強筋としての鉄筋58を
縦に固着(溶接)し、それらを円筒状のコンクリート5
0の上端部の周縁に埋設している。鉄鋼製の円筒部材5
2には、雄ガイドコッタ53,54、雌ガイドコッタ5
5,56は互い違いに配列されており、位置合わせに便
利である。それぞれにはボルト取付孔57が設けられて
おり、ボルト及びナットにより上記ガイドコッタのずれ
が防止できる。
Next, in the intermediate manhole frame 35 shown in FIGS. 10A to 10D, steel cylindrical members 51 and 52 are fitted and fixed to the upper and lower ends of the concrete 50, respectively. 35 is the lower manhole frame 3
2 and the upper manhole frame 36 are vertically connected by welding. The welding prevents the frames from being separated. Reinforcing bars 58 as reinforcing bars are vertically fixed (welded) at predetermined intervals to the inner peripheral surface at the lower end of the steel cylindrical member 51, and they are embedded and integrated into the peripheral edge of the lower end of the cylindrical concrete 50. ing. Similarly, a reinforcing bar 58 as a reinforcing bar is vertically fixed (welded) to the inner peripheral surface of the steel cylindrical member 52 at predetermined intervals, and these are connected to the cylindrical concrete 5.
It is buried in the periphery of the upper end of the zero. Steel cylindrical member 5
2 includes male guide cotters 53 and 54 and female guide cotters 5
5, 56 are arranged alternately, which is convenient for alignment. Each of them is provided with a bolt mounting hole 57, and the displacement of the guide cotter can be prevented by the bolt and the nut.

【0029】図12の鉄鋼製の連結ケーシング100
は、その下端部に、ボルト取付孔107を有する雄ガイ
ドコッター103,104、及び雌ガイドコッター10
5,106を設けたものである。連結ケーシング100
は、中間マンホール躯体ブロック5と着脱自在に接続さ
れるものである。即ち、前記両者は寸法的にぴったりと
接合できるようになっており、雄ガイドコッタ53、5
4と、雌ガイドコッタ105、106とを嵌合し、か
つ、雌ガイドコッタ55、56と、雄ガイドコッタ10
3、104とを嵌合し、さらにボルト取付孔57、10
7を介在させてボルトとナットで固定するようになって
いる。
FIG. 12 shows a steel connection casing 100.
Are male guide cotters 103 and 104 having bolt mounting holes 107 at their lower ends, and female guide cotters 10
5, 106 are provided. Connection casing 100
Is detachably connected to the intermediate manhole frame 5. That is, the two can be joined to each other exactly in dimension, and the male guide cotters 53, 5
4 and female guide cotters 105 and 106, and female guide cotters 55 and 56 and male guide cotters 10
3 and 104, and the bolt mounting holes 57 and 10
7 are fixed with bolts and nuts.

【0030】図13及び図14に示す上部マンホール躯
体36は、中間マンホール躯体35の上端に縦に連結さ
れる調整部61と、調整部61の上端に縦に連結される
側塊60と、側塊60の上端に図示せぬボルト、ナッ
ト、ワッシャで固着されている受枠62と、受枠62に
着脱自在な蓋68とからなっているものである。上部マ
ンホール躯体36内周面にはステップ69が設けられて
いる。ステップ69は、マンホール築造工事の最終過程
で取り付けられるものであり、上半部だけに取り付けら
れている。
The upper manhole frame 36 shown in FIGS. 13 and 14 includes an adjusting portion 61 vertically connected to the upper end of the intermediate manhole frame 35, a side mass 60 vertically connected to the upper end of the adjusting portion 61, It comprises a receiving frame 62 fixed to the upper end of the block 60 with bolts, nuts, and washers (not shown), and a lid 68 that is detachable from the receiving frame 62. A step 69 is provided on the inner peripheral surface of the upper manhole frame 36. Step 69 is attached in the final step of the manhole construction work, and is attached only to the upper half.

【0031】以上、本発明の好適な実施の形態を説明し
たが、本発明は上述の実施の形態に限定されるものでは
なく、本発明の技術的思想を逸脱しない範囲で多くの技
術的な変更を施し得ることができることは当然である。
一例として、マンホール躯体自体としては、コンクリー
ト製のみならず、ダクタイル、FRP、鋼製等、旋回圧
入に適する他の材質でも良く、実施の形態の材質に限定
されるものではない。また、貫通孔は二個に限定される
ものではなく、任意数のものが採用可能である。さらに
仮設アンカ−1がマンホールの施工に限定されることは
なく、地下構造物であれば、例えば、浄化槽や地下室の
築造(角形のコンクリートブロックを圧入する)等の他
の種類の地下構造物に適用することも当然可能である。
Although the preferred embodiments of the present invention have been described above, the present invention is not limited to the above-described embodiments, and many technical solutions may be provided without departing from the technical idea of the present invention. Of course, changes can be made.
As an example, the manhole frame itself is not limited to the material of the embodiment, and may be not only a material made of concrete, but also other materials suitable for swiveling press fitting, such as ductile, FRP, steel and the like. Further, the number of through holes is not limited to two, and any number of through holes can be employed. Further, the temporary anchor-1 is not limited to the construction of the manhole, but may be an underground structure, for example, a septic tank or another type of underground structure such as construction of a basement (press-fitting a square concrete block). It is of course possible to apply.

【0032】さらに、スライダ20を設けたが、これを
弾性スリーブ11の上下にそれぞれ取り付けて、上下端
部ともスライドするようにすることも可能である。また
一方、スライダ20を弾性スリーブ11の上端部に設け
て、弾性スリーブ11の下端はインナーチューブ3の下
端に固定するような構造も採用可能である。いずれにし
てもスライダ20が少なくとも1つ弾性スリーブ11に
取り付けられていれば良い。
Further, although the slider 20 is provided, it is also possible to mount the slider on the upper and lower sides of the elastic sleeve 11 so as to slide both the upper and lower ends. On the other hand, a structure in which the slider 20 is provided on the upper end of the elastic sleeve 11 and the lower end of the elastic sleeve 11 is fixed to the lower end of the inner tube 3 can also be adopted. In any case, at least one slider 20 may be attached to the elastic sleeve 11.

【0033】尚、実施形態では径の大きなマンホール3
1を主眼としたが、径の小さなマンホール31にも適用
可能であることは無論である。
In the embodiment, the manhole 3 having a large diameter is used.
Although the primary focus is 1, it is a matter of course that the present invention can be applied to a manhole 31 having a small diameter.

【0034】[0034]

【発明の効果】以上説明したように、請求項1〜3に記
載の発明は、大型の地下構造物の簡易な施工、又は狭小
な場所での地下構造物の施工を容易とする効果がある。
さらに、撤去が極めて簡単であり、かつ、仮設アンカー
を繰り返し使用できる効果がある。
As described above, the inventions according to the first to third aspects have the effect of simplifying the construction of a large underground structure or the construction of an underground structure in a narrow place. .
Further, there is an effect that the removal is extremely simple and the temporary anchor can be used repeatedly.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本実施形態の仮設アンカーの上半部の断面図で
ある。
FIG. 1 is a sectional view of an upper half part of a temporary anchor according to the present embodiment.

【図2】本実施形態の仮設アンカーの下半部の断面図で
ある。
FIG. 2 is a sectional view of a lower half of a temporary anchor according to the embodiment.

【図3】本実施形態の仮設アンカーの通常状態における
断面図である。
FIG. 3 is a cross-sectional view of the temporary anchor of the present embodiment in a normal state.

【図4】本実施形態の仮設アンカーの膨張状態における
断面図である。
FIG. 4 is a cross-sectional view of the temporary anchor of the present embodiment in an expanded state.

【図5】(a)は仮設アンカーがボーリングマシンにセ
ットされた施工状態を示す説明図、(b)は仮設アンカ
ーのロッドが接続されながら圧入されて施工状態を示す
説明図、(c)は仮設アンカーの圧入が完了した状態の
説明図、(d)は仮設アンカーにキャップを取付けそこ
から加圧水を注入する施工状態を示す説明図、(e)は
減圧してから仮設アンカーを引き抜く施工状態を示す説
明図である。
5A is an explanatory view showing a construction state in which a temporary anchor is set in a boring machine, FIG. 5B is an explanatory view showing a construction state in which a rod of the temporary anchor is pressed in while being connected, and FIG. Explanatory drawing of a state where the press-fitting of the temporary anchor is completed, (d) is an explanatory view showing a construction state in which a cap is attached to the temporary anchor, and pressurized water is injected therefrom, and (e) is a construction state in which the temporary anchor is pulled out after decompression. FIG.

【図6】マンホールを圧入する施工状態を示す平面図で
ある。
FIG. 6 is a plan view showing a construction state in which a manhole is press-fitted.

【図7】マンホールを圧入する施工状態を示す正面図で
ある。
FIG. 7 is a front view showing a construction state in which a manhole is press-fitted.

【図8】仮設アンカーを用いたマンホール圧入の工事状
態を示す正面説明図である。
FIG. 8 is an explanatory front view showing a construction state of manhole press-fitting using a temporary anchor.

【図9】(a)は下部マンホール躯体の平面図、(b)
は下部マンホール躯体の正面図、(c)は下部マンホー
ル躯体の部分縦断面図である。
9A is a plan view of a lower manhole frame, and FIG.
FIG. 3 is a front view of the lower manhole frame, and FIG. 3C is a partial longitudinal sectional view of the lower manhole frame.

【図10】(a)は中間マンホール躯体の平面図、
(b)はガイドコッターの正面図、(c)中間マンホー
ル躯体の正面図、(d)は中間マンホール躯体の部分縦
断面図である。
FIG. 10A is a plan view of an intermediate manhole frame,
(B) is a front view of the guide cotter, (c) is a front view of the intermediate manhole body, and (d) is a partial longitudinal sectional view of the intermediate manhole body.

【図11】(a)は連結ケーシングの平面図、(b)は
雄ガイドコッターの正面図、(c)は連結ケーシングの
正面図である。
11A is a plan view of a connecting casing, FIG. 11B is a front view of a male guide cotter, and FIG. 11C is a front view of the connecting casing.

【図12】連結ケーシングを除去する前の状態のマンホ
ール躯体の正面図である。
FIG. 12 is a front view of the manhole frame before the connection casing is removed.

【図13】図9の縦断面図である。FIG. 13 is a longitudinal sectional view of FIG.

【図14】マンホール躯体が連結され、地中に埋設され
た後の状態のマンホールの部分断面斜視図である。
FIG. 14 is a partial cross-sectional perspective view of the manhole in a state after the manhole frame is connected and buried in the ground.

【符号の説明】[Explanation of symbols]

1 仮設アンカー 2 先端装置 4 ガスケット 9 ジョイントヘッド 11 弾性スリーブ 15 孔 17 ロウボディー 20 スライダ 21 縮径部 22 レジューサ 23 メタルクラウン 24a,24b パッキン 25 鋼球 27 ボーリングマシン 31 マンホール 80 圧入装置80 DESCRIPTION OF SYMBOLS 1 Temporary anchor 2 Tip device 4 Gasket 9 Joint head 11 Elastic sleeve 15 Hole 17 Low body 20 Slider 21 Reduced diameter part 22 Reducer 23 Metal crown 24a, 24b Packing 25 Steel ball 27 Boring machine 31 Manhole 80 Press-in device 80

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 シールを上下両端に備えた弾性スリーブ
をインナーチューブに外嵌し、前記弾性スリーブの少な
くとも一端に前記シールを備えたスライダを設け、前記
インナーチューブに孔を穿設し、前記インナーチューブ
の上端にジョイントを設け下端に流体閉鎖装置と削孔部
材を設けた先端装置を含み構成されたことを特徴とする
仮設アンカー。
1. An elastic sleeve having seals at both upper and lower ends is fitted to an inner tube, a slider having the seal is provided at at least one end of the elastic sleeve, and a hole is formed in the inner tube. A temporary anchor comprising a joint at the upper end of a tube and a tip device having a fluid closing device and a drilling member at a lower end.
【請求項2】 前記流体閉鎖装置が止め弁を構成し、 インナーチューブの下端に固定した縮径部を設けたレジ
ューサと、 前記インナーチューブを通過可能な径とされ、該レジュ
ーサの縮径部に着座することができる鋼球とからなるこ
とを特徴とする請求項1に記載の仮設アンカー。
2. A reducer, wherein the fluid closing device constitutes a stop valve, and a reducer provided with a reduced diameter portion fixed to a lower end of an inner tube; and a diameter capable of passing through the inner tube. The temporary anchor according to claim 1, comprising a steel ball capable of being seated.
【請求項3】 チューブ状の先端装置の上部に複数のチ
ューブ状のロッドを接続しつつ、前記先端装置で削孔す
ることにより、先端装置と前記複数のロッドから構成さ
れた仮設アンカーを地中に埋設し、前記仮設アンカーの
下端部を閉めるとともに上部から加圧流体を注水して先
端装置の弾性スリーブを膨張させて地中に固定し、前記
仮設アンカーを利用して地中構造物を築造し、前記加圧
流体を抜くことで前記弾性スリーブを収縮させ、前記仮
設アンカーを地中から抜き取ることを特徴とするアンカ
ー施工方法。
3. A temporary anchor comprising the tip device and the plurality of rods is grounded by drilling the tip device while connecting a plurality of tubular rods to an upper portion of the tubular tip device. , The lower end of the temporary anchor is closed, and pressurized fluid is injected from above to expand the elastic sleeve of the tip device and fix it in the ground, and construct the underground structure using the temporary anchor. And removing the pressurized fluid, thereby contracting the elastic sleeve, and removing the temporary anchor from the ground.
JP35445096A 1996-12-18 1996-12-18 Temporary anchor and temporary anchor execution working method Pending JPH10176329A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP35445096A JPH10176329A (en) 1996-12-18 1996-12-18 Temporary anchor and temporary anchor execution working method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP35445096A JPH10176329A (en) 1996-12-18 1996-12-18 Temporary anchor and temporary anchor execution working method

Publications (1)

Publication Number Publication Date
JPH10176329A true JPH10176329A (en) 1998-06-30

Family

ID=18437651

Family Applications (1)

Application Number Title Priority Date Filing Date
JP35445096A Pending JPH10176329A (en) 1996-12-18 1996-12-18 Temporary anchor and temporary anchor execution working method

Country Status (1)

Country Link
JP (1) JPH10176329A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013117096A (en) * 2011-12-01 2013-06-13 Ohbayashi Corp Bag body for natural ground reinforcement
CN106284380A (en) * 2016-08-31 2017-01-04 杭州中艺生态环境工程有限公司 Domatic antiskid system
CN106368218A (en) * 2016-08-31 2017-02-01 杭州中艺生态环境工程有限公司 Slope surface outer layer anti-skid pile

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013117096A (en) * 2011-12-01 2013-06-13 Ohbayashi Corp Bag body for natural ground reinforcement
CN106284380A (en) * 2016-08-31 2017-01-04 杭州中艺生态环境工程有限公司 Domatic antiskid system
CN106368218A (en) * 2016-08-31 2017-02-01 杭州中艺生态环境工程有限公司 Slope surface outer layer anti-skid pile

Similar Documents

Publication Publication Date Title
JP6886717B2 (en) Construction method of steel pipe pile
CN101122130A (en) Construction method of drilling follow casting pile used for building or bridge foundation
CN114411745A (en) Post-grouting device for pile end of steel pipe pile and construction method thereof
JP2008248524A (en) Steel pipe pile construction method
JP4373824B2 (en) Joining method of cast-in-place pile and steel pipe column
JPH10176329A (en) Temporary anchor and temporary anchor execution working method
JP2000120080A (en) Hollow cylindrical body and its construction method
KR100758502B1 (en) Granule device for water and sewage pipe promotion and construction method
JP2002188157A (en) Seismic retrofitting method for existing structure foundation
JP3221895B2 (en) Construction method of large-diameter underground wall body and excavation equipment for burying pipes
KR100779988B1 (en) Construction method of small diameter pile
JP3776987B2 (en) Vertical shaft construction method using a manhole wall combined tubular body
JP4323075B2 (en) Shaft opening structure
JP2006194031A (en) Pillar construction method
WO2009139510A1 (en) Construction method for continuous cut-off wall using overlap casing
JPH10176483A (en) Reinforcement and reinforcing pipe, and reinforcing and repairing method for embedded body in underground by use of the pipe
KR200336229Y1 (en) Steel pipe pile of closing structure
JPH02240395A (en) Construction of shaft
JPH10114954A (en) Manhole body block applied to small-bore pipe jacking and method of manhole construction
JP2006063526A (en) Expanded rooting method using friction piles
JP2003082689A (en) Steel pipe pile foundation construction method
JPH10140603A (en) Manhole pit excavating device and construction method for manhole pit excavating
JP2005264500A (en) Cofferdam structure and cofferdam closure method for underwater existing structure
KR20090082881A (en) Base structure for casing installation
JPS6220334B2 (en)

Legal Events

Date Code Title Description
A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20051209

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20060403