JPH10183655A - Manhole replacement method and double casing used for the method - Google Patents
Manhole replacement method and double casing used for the methodInfo
- Publication number
- JPH10183655A JPH10183655A JP8354964A JP35496496A JPH10183655A JP H10183655 A JPH10183655 A JP H10183655A JP 8354964 A JP8354964 A JP 8354964A JP 35496496 A JP35496496 A JP 35496496A JP H10183655 A JPH10183655 A JP H10183655A
- Authority
- JP
- Japan
- Prior art keywords
- manhole
- casing
- ground
- double
- press
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims description 14
- 230000001050 lubricating effect Effects 0.000 claims description 2
- 238000010276 construction Methods 0.000 abstract description 6
- 238000000926 separation method Methods 0.000 abstract 1
- 238000009412 basement excavation Methods 0.000 description 2
- 239000004570 mortar (masonry) Substances 0.000 description 2
- 239000010426 asphalt Substances 0.000 description 1
- 238000007796 conventional method Methods 0.000 description 1
- 239000004519 grease Substances 0.000 description 1
- 239000003673 groundwater Substances 0.000 description 1
- 238000005096 rolling process Methods 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- 239000010865 sewage Substances 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Landscapes
- Earth Drilling (AREA)
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
Description
【0001】[0001]
【発明の属する技術分野】本発明は、既設のマンホー
ル、例えば、斜壁部分を迅速に短時間で交換する方法に
関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for quickly and quickly replacing an existing manhole, for example, a slope wall portion.
【0002】[0002]
【従来の技術】築造して年月の経過したマンホールは、
通過する車両の荷重、寒冷地における凍上現象、地下
水、また、下水道のマンホールであれば下水に含まれる
腐食成分によりコンクリートが傷み、補修、または、交
換を必要とする。2. Description of the Related Art Manholes that have been built and aged
Concrete is damaged by the load of passing vehicles, frost heave phenomenon in cold regions, groundwater, and corrosive components contained in sewage in the case of sewer manholes, requiring repair or replacement.
【0003】しかし、現状では、マンホールの周囲を掘
削し、土留を施してマンホールの交換部分を露出させて
から、傷んだ古い部分を撤去し、新たな部分と交換して
いた。この従来の施工法では、掘削とそれに続く土留を
必要とするためマンホールの交換工事が完了するまでに
2〜4日間を必要とし、その間工事部分の道路を通行制
限しなければならなかった。However, under the present circumstances, the surrounding area of the manhole was excavated, soil was applied to expose the replacement part of the manhole, and the damaged old part was removed and replaced with a new part. In this conventional construction method, excavation and subsequent earth retaining are required, so that it takes two to four days to complete the manhole replacement work, during which the road of the construction part has to be restricted.
【0004】[0004]
【発明が解決しようとする課題】従来のマンホールの交
換の施工方法では、交換工事に必要とする部分の道路を
占有し、通行を制限しなければならず、交通開放するま
でに時間を要し、不便であった。In the conventional method of replacing manholes, it is necessary to occupy a part of the road required for the replacement work and to restrict traffic, and it takes time to open the traffic. Was inconvenient.
【0005】本願発明は、この欠点を克服し、短時間で
マンホールを交換し、交通開放をできるだけ短時間とす
ることを目標として開発したものである。The present invention has been developed with the objective of overcoming this drawback, exchanging manholes in a short time, and opening the traffic as short as possible.
【0006】マンホールを包み込むようにケーシングを
圧入し、ケーシングの圧入によってマンホールの周辺地
盤とマンホールの縁を切ることにより、既設のマンホー
ル部材を簡単に撤去できるようにし、さらに、土中に圧
入したケーシングを土留部材として使用して新たなマン
ホール部材を組み立て施工することにより、マンホール
の交換を短時間で達成できるようにしたものである。[0006] The casing is press-fitted so as to enclose the manhole, and the surrounding ground of the manhole and the edge of the manhole are cut off by press-fitting the casing, so that the existing manhole member can be easily removed. Is used as a retaining member to assemble and construct a new manhole member so that replacement of the manhole can be achieved in a short time.
【0007】[0007]
【発明の実施の形態】図1に基づいて施工順序を説明す
る。この実施例は、マンホールが、斜壁3と直壁35か
ら構成されているものについて斜壁3部分の撤去・交換
を例として説明する。まず、Aに示すようにマンホール
の中心位置を測定して求める。DESCRIPTION OF THE PREFERRED EMBODIMENTS The construction sequence will be described with reference to FIG. In this embodiment, a manhole composed of a sloping wall 3 and a straight wall 35 will be described by taking removal and replacement of the sloping wall 3 as an example. First, as shown in A, the center position of the manhole is measured and obtained.
【0008】測定した中心位置に合わせて円形のカッタ
ー(図示しない)で路面をBに示すようにマンホールの
直壁部の直径よりやや大きい直径で切れ目を入れ、ケー
シング圧入のガイド1を設ける。この切れ目は舗装版を
深さ方向に切断する。切断深さは舗装版全体とするか、
または、ケーシングのガイドとなるだけの深さとするだ
けでもよい。また、ケーシング圧入機械の能力が強力な
場合には、このガイドとなる切れ目を入れるのを省略し
て直接ケーシングを圧入することもできる。[0008] A cut is made at a diameter slightly larger than the diameter of the straight wall portion of the manhole as shown in B by a circular cutter (not shown) in accordance with the measured center position, and a casing press-fitting guide 1 is provided. This cut cuts the pavement plate in the depth direction. The cutting depth should be the whole pavement plate,
Alternatively, the depth may be sufficient to serve as a guide for the casing. When the casing press-fitting machine has a strong ability, the casing can be directly press-fitted without forming the guide cut.
【0009】ガイド1の切削時に生じた切断屑などを清
掃する。次に、Cに示すように、マンホール蓋受枠4を
特公昭61−25844号公報、特公昭61−3393
8号公報に記載の方法を使用して、斜壁3と受枠4の間
に油圧式の破断機6を食い込ませ、受枠と斜壁を切り離
し、周辺の舗装版5と一緒にマンホール蓋受枠4を引き
上げ撤去する。受枠の撤去方法としては、他の手法、例
えば、受枠周辺を破砕又は破断しながら引き上げる方法
でもよい。[0009] The cutting chips and the like generated during the cutting of the guide 1 are cleaned. Next, as shown in C, the manhole cover receiving frame 4 is inserted into the Japanese Patent Publication No. 61-25844 and Japanese Patent Publication No. 61-3393.
No. 8, using a method described in Japanese Patent Laid-Open No. H8 (1994), a hydraulic breaker 6 is cut between the sloping wall 3 and the receiving frame 4, the receiving frame and the sloping wall are separated, and the manhole cover receiving frame 4 is joined together with the surrounding paving plate 5. And remove it. As a method of removing the receiving frame, another method, for example, a method of pulling up while crushing or breaking around the receiving frame may be used.
【0010】円形カッターで設けたガイド1に、Dに示
すように、ケーシング2を設置し、圧入する。圧入の反
力は圧入機(図示しない)の自重に重錘を加えたもので
取っても良いし、既設のマンホール自体をアンカーとし
て利用し、マンホール自体を反力部材とするなど適宜の
方法で反力を取る。[0010] As shown in D, a casing 2 is set in a guide 1 provided with a circular cutter and press-fitted. The reaction force of press-fitting may be obtained by adding a weight to the own weight of a press-fitting machine (not shown), or by using an existing manhole itself as an anchor and using the manhole itself as a reaction force member. Take the reaction force.
【0011】地盤が固くて反力が不足することが予測さ
れる場合に備えて、圧入機の基台に、予備の重錘を取り
付けられるようにしておき、ケーシングの圧入をスムー
ズに行えるようにする。地盤の性状に応じて、ケーシン
グに回転、揺動、振動のいずれかまたは組み合わせたも
のを加え、ケーシング2の圧入を促進する。In case that the ground is hard and the reaction force is expected to be insufficient, a spare weight is attached to the base of the press-fitting machine so that the casing can be press-fitted smoothly. I do. Depending on the properties of the ground, any one of rotation, swing and vibration or a combination thereof is added to the casing to promote the press-fitting of the casing 2.
【0012】この実施例は、ケーシングとして二重ケー
シングを使用する例である。二重ケーシング21は、図
2に示すように、外側ケーシング25とその内側に着脱
自在に固定されている内側ケーシング26とからなり、
外側ケーシングの下部には鋸歯状刃24を有する円形の
カッター23設けてある。外側ケーシング25の径をカ
ッター23の径より小さくし、カッター23が外側ケー
シング25の外側に張り出させ、フリクションカッター
27としてもよいし、外側ケーシング25の下端にカッ
ター23を同径で設けてもよい。This embodiment is an example in which a double casing is used as a casing. As shown in FIG. 2, the double casing 21 includes an outer casing 25 and an inner casing 26 detachably fixed inside the outer casing 25.
A circular cutter 23 having a serrated blade 24 is provided at a lower portion of the outer casing. The diameter of the outer casing 25 may be smaller than the diameter of the cutter 23, and the cutter 23 may protrude outside the outer casing 25 to serve as a friction cutter 27, or the cutter 23 may be provided at the lower end of the outer casing 25 with the same diameter. Good.
【0013】カッター23に設けた段部28の上には内
側ケーシング26が設けてあり、内側ケーシング26
は、アスファルト、グリースなどの潤滑層を介して外側
ケーシング25にボルト22で固定され、一体化されて
いる。内側ケーシング26は、カッター23が地盤を切
削して形成した地盤の空間を外側ケーシングと共に沈下
していくので地盤と接触しない。段部28を設けずに内
側ケーシング26の下端をフリーな状態としても、ケー
シングの圧入には特に大きな影響がない。An inner casing 26 is provided on a step 28 provided on the cutter 23.
Are fixed to the outer casing 25 with bolts 22 via a lubricating layer of asphalt, grease or the like, and are integrated. The inner casing 26 does not come into contact with the ground because the space of the ground formed by cutting the ground by the cutter 23 sinks together with the outer casing. Even if the lower end of the inner casing 26 is in a free state without providing the step portion 28, there is no particular influence on the press-fitting of the casing.
【0014】内側ケーシング26は、二重ケーシング2
1を沈設後、撤去すべきマンホール部材である斜壁と共
に引き上げられる。内側ケーシング26と斜壁3などの
撤去すべき部材を同時に引き上げることにより、撤去す
べき部材と地盤との縁切りが容易になり、撤去を円滑に
行うことができる。The inner casing 26 is a double casing 2
After laying down, 1 is lifted together with the slope, which is a manhole member to be removed. By simultaneously pulling up the members to be removed, such as the inner casing 26 and the sloping wall 3, it becomes easy to cut off the member to be removed and the ground, and the removal can be performed smoothly.
【0015】圧入したケーシング2は、既設のマンホー
ル部材を撤去した後は、土留として使用し、ケーシング
内部で作業をおこなうので、Eに示すように交換すべき
マンホールの部材の下端、本実施例では斜壁3の下端部
よりも深い位置までケーシング2を圧入し、既設の古い
斜壁3を撤去した後もケーシングが土圧等で移動するこ
とのないように根入れする。After the existing manhole member is removed, the press-fitted casing 2 is used as an earth retaining member and works inside the casing. Therefore, as shown in E, the lower end of the manhole member to be replaced, as shown in FIG. The casing 2 is press-fitted to a position deeper than the lower end of the sloping wall 3, and after the existing old sloping wall 3 is removed, the casing is inserted so as not to move due to earth pressure or the like.
【0016】Eに示すように、斜壁3と直壁35の継ぎ
目に、受枠4を撤去したのと同様に油圧破断機6を食い
込ませて接合を解除し、Fに示すように斜壁3部分を引
き上げ撤去し、Gに示すように撤去工程を完了する。As shown in E, the joint between the inclined wall 3 and the straight wall 35 is disengaged by engaging the hydraulic rupture machine 6 in the same manner as when the receiving frame 4 is removed, as shown in F. The part is pulled up and removed, and the removal process is completed as shown in G.
【0017】斜壁3を撤去するには、図3に示すよう
に、フレーム8をケーシングの上端に設けた凹部29に
嵌合し、移動しないように固定し、チェーンブロック9
をフレーム8から吊り下げる。斜壁3の壁の傾斜に合致
する端面を有する引き上げ補助部材10を、斜めにして
マンホール内に降下させ、水平にして補助部材10の端
面を斜壁部材の壁面に当てる。チェーンブロック9を使
用して斜壁3を引き上げ、内側ケーシング26と共に撤
去する。To remove the sloping wall 3, as shown in FIG. 3, the frame 8 is fitted into a concave portion 29 provided at the upper end of the casing and fixed so as not to move.
Is suspended from the frame 8. The lifting assisting member 10 having an end surface that matches the inclination of the wall of the sloping wall 3 is inclined and lowered into the manhole, and is leveled to bring the end surface of the auxiliary member 10 into contact with the wall surface of the sloping wall member. The slope wall 3 is pulled up using the chain block 9 and removed together with the inner casing 26.
【0018】Hに示すように、新しい斜壁31を直壁3
2上にセットして両者を接合し、水漏れが生じないよう
に接合部にシールを施し、外側ケーシング25を撤去す
る。As shown in FIG. 3H, the new slope wall 31 is connected to the straight wall 3.
Then, the outer casing 25 is removed by setting the upper part 2 and joining them together, sealing the joint so as not to cause water leakage.
【0019】最後に、Iに示すように、路床と路盤部分
の埋め戻しを行い、新しい斜壁31の上端に受枠41を
設置し、撤去された路盤部分にモルタル7を充填し周辺
を路面との段差が生じないように転圧して施工を完了す
る。Finally, as shown in I, the roadbed and the roadbed are backfilled, a receiving frame 41 is installed at the upper end of the new sloping wall 31, the mortar 7 is filled in the removed roadbed, and the surrounding area is covered with the road surface. Rolling is performed so that there is no step with the above, and the construction is completed.
【0020】[0020]
【発明の効果】ケーシングを使用してマンホールと周辺
地盤の縁切りと土留とを行うようにしたので、別途土留
工を必要とせず、また、掘削作業がないので施工がスピ
ードアップされ、マンホールの撤去、交換作業が短時間
で済み、道路を占有して交通を制限する時間が短くて済
むという利点がある。According to the present invention, the manhole and the surrounding ground are trimmed and soiled by using a casing, so no separate earthing work is required, and since there is no excavation work, the construction is speeded up and the manhole is removed. In addition, there is an advantage that the replacement work can be performed in a short time, and the time for occupying the road and limiting the traffic can be reduced.
【図1】斜壁交換の実施例の工程図。FIG. 1 is a process chart of an embodiment of sloping wall replacement.
【図2】斜壁の引き上げ時の詳細図。FIG. 2 is a detailed view when the slope is lifted.
【図3】二重ケーシングの一部破断面図。FIG. 3 is a partially broken sectional view of a double casing.
1 ガイド 2 ケーシング 21 二重ケーシング 22 ボルト 23 カッター 24 鋸歯状刃 25 外側ケーシング 26 内側ケーシング 29 凹部 3 斜壁 35 直壁 4 マンホール蓋受枠 5 舗装版 6 破断機 7 モルタル 8 フレーム 9 チェーンブロック 10 補助部材 DESCRIPTION OF SYMBOLS 1 Guide 2 Casing 21 Double casing 22 Bolt 23 Cutter 24 Serrated blade 25 Outer casing 26 Inner casing 29 Depression 3 Sloping wall 35 Straight wall 4 Manhole cover receiving frame 5 Paving plate 6 Breaker 7 Mortar 8 Frame 9 Chain block 10 Auxiliary member
───────────────────────────────────────────────────── フロントページの続き (72)発明者 佐藤 勝也 京都府宇治市広野町尖山2−88 (72)発明者 村瀬 優 東京都八王子市打越町345−2−2−401 ──────────────────────────────────────────────────続 き Continued on the front page (72) Katsuya Sato, Inventor 2-88, Hirono-cho, Uji-shi, Kyoto (72) Inventor, Yu Murase 345-2-401, Uchigochi-cho, Hachioji-shi, Tokyo
Claims (7)
を圧入し、マンホールと地盤との縁を切り、既設のマン
ホールを撤去することを特徴とするマンホールの交換方
法。1. A method for replacing a manhole, comprising press-fitting a casing so as to surround the manhole, cutting an edge between the manhole and the ground, and removing an existing manhole.
て、ケーシングに揺動、回転、振動のいずれかを加えて
圧入するマンホールの交換方法。2. The method according to claim 1, wherein the casing is press-fitted by applying any one of swing, rotation and vibration to the casing.
おいて、ケーシングが二重ケーシングであり、既設のマ
ンホールを内側ケーシングと共に引き上げ撤去するマン
ホールの交換方法。3. The method for replacing manholes according to claim 1, wherein the casing is a double casing, and the existing manhole is pulled up and removed together with the inner casing.
おいて、ケーシングは撤去部材の下方まで根入れしてあ
り、既設のマンホールを撤去した後は、土留部材として
使用するマンホールの交換方法。4. The method for replacing manholes according to claim 1, wherein the casing is deepened below the removing member, and after removing the existing manhole, the manhole is used as a retaining member.
おいて、マンホール蓋受枠を撤去してから、斜壁部分を
撤去するマンホールの交換方法。5. The manhole replacing method according to claim 1, wherein the manhole cover receiving frame is removed, and then the inclined wall portion is removed.
り、外側ケーシングとその内側に着脱自在に固定されて
いる内側ケーシングとからなり、外側ケーシングの下部
にはカッターが設けてあるマンホール交換用二重ケーシ
ング。6. A double casing for manhole replacement, comprising a double casing for manhole replacement, comprising an outer casing and an inner casing detachably fixed inside the outer casing, and a cutter provided at a lower portion of the outer casing. casing.
側ケーシングの間には潤滑層が設けてあるマンホール交
換用二重ケーシング。7. The double casing for manhole replacement according to claim 6, wherein a lubricating layer is provided between the inner casing and the outer casing.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP8354964A JPH10183655A (en) | 1996-12-20 | 1996-12-20 | Manhole replacement method and double casing used for the method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP8354964A JPH10183655A (en) | 1996-12-20 | 1996-12-20 | Manhole replacement method and double casing used for the method |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| JPH10183655A true JPH10183655A (en) | 1998-07-14 |
Family
ID=18441072
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP8354964A Pending JPH10183655A (en) | 1996-12-20 | 1996-12-20 | Manhole replacement method and double casing used for the method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH10183655A (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2014177806A (en) * | 2013-03-14 | 2014-09-25 | Copros Ltd | Manhole removal device and existing manhole removal method using the same |
| JP2015021230A (en) * | 2013-07-16 | 2015-02-02 | 株式会社コプロス | Removal method of existing manhole |
-
1996
- 1996-12-20 JP JP8354964A patent/JPH10183655A/en active Pending
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2014177806A (en) * | 2013-03-14 | 2014-09-25 | Copros Ltd | Manhole removal device and existing manhole removal method using the same |
| JP2015021230A (en) * | 2013-07-16 | 2015-02-02 | 株式会社コプロス | Removal method of existing manhole |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US4127990A (en) | Drainage structure forming method | |
| JPH10183655A (en) | Manhole replacement method and double casing used for the method | |
| JP2623491B2 (en) | Cutting overlay method | |
| JP4485006B2 (en) | Construction method for underground structures | |
| JP2000130096A (en) | Method for installing invert into batholith of existing mountain tunnel | |
| JP4317632B2 (en) | Caisson oversink prevention device and caisson settling method | |
| JP2004332522A (en) | Overlay construction method, cutting overlay construction method, and paving construction method | |
| JPH08319787A (en) | Drilling equipment for cylindrical holes | |
| JP3926429B2 (en) | Method for removing underground objects and apparatus used for the method | |
| JPH11241360A (en) | Underground buried structure removing method, and cutting blade | |
| JP2849360B2 (en) | Shaft casing in propulsion method | |
| JP3229565B2 (en) | Removal method of double casing auger and underground buried object | |
| JPH10121563A (en) | Water collecting basin for drainable pavement | |
| JP4639510B2 (en) | Manufacturing method for height adjustment ring of human lid | |
| JP3249636B2 (en) | Foundation structure and construction method | |
| JPH0121288B2 (en) | ||
| KR200315166Y1 (en) | height variable manhole | |
| JP4369443B2 (en) | Method for removing underground objects and apparatus used for the method | |
| JP2949623B1 (en) | How to build a tunnel | |
| JP3364613B2 (en) | Paving method around manhole | |
| JPH11141171A (en) | How to install an underground tank | |
| JP2003293681A (en) | Tunnel construction method | |
| JPH10159074A (en) | Construction method of underground structure in excavation method | |
| JPS5920818B2 (en) | Earth retention device for trench excavation | |
| JP3007146U (en) | Manhole cover level adjustment member |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| RD02 | Notification of acceptance of power of attorney |
Free format text: JAPANESE INTERMEDIATE CODE: A7422 Effective date: 20050623 |
|
| A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A821 Effective date: 20050623 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20060313 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20060328 |
|
| A02 | Decision of refusal |