JPH10232013A - Continuous waste supply equipment in waste treatment equipment - Google Patents

Continuous waste supply equipment in waste treatment equipment

Info

Publication number
JPH10232013A
JPH10232013A JP3455297A JP3455297A JPH10232013A JP H10232013 A JPH10232013 A JP H10232013A JP 3455297 A JP3455297 A JP 3455297A JP 3455297 A JP3455297 A JP 3455297A JP H10232013 A JPH10232013 A JP H10232013A
Authority
JP
Japan
Prior art keywords
crusher
waste
crushed
supply device
stop
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
JP3455297A
Other languages
Japanese (ja)
Inventor
Kimito Hirai
公人 平井
Hiroaki Harada
裕昭 原田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsui Engineering and Shipbuilding Co Ltd
Original Assignee
Mitsui Engineering and Shipbuilding Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsui Engineering and Shipbuilding Co Ltd filed Critical Mitsui Engineering and Shipbuilding Co Ltd
Priority to JP3455297A priority Critical patent/JPH10232013A/en
Publication of JPH10232013A publication Critical patent/JPH10232013A/en
Withdrawn legal-status Critical Current

Links

Abstract

(57)【要約】 【課題】 設備全体としての必要建設面積や体積が小さ
く、かつ建設費用が少なく、廃棄物処理装置の設置に際
し設計上および経済的な制約を受けない。 【解決手段】 廃棄物a1を所定の大きさに破砕する第
1及び第2の破砕機5a、5bと、これらによって破砕
された破砕廃棄物a2を熱処理装置近傍の投入装置に搬
送する定量供給装置6を有し、定量供給装置6の上流側
に第1及び第2の破砕機5a、5bを直結するよう配置
するとともに破砕機と投入装置との間に破砕廃棄物a2
の溜り部9を形成する。更に、第1の破砕機5aの運転
停止を検知する停止信号検知器14と、第2の破砕器5
bの起動信号を発信する起動信号発信器15を有し、停
止信号検知器14により第1の破砕機5aの運転停止を
検出したときに第2の破砕機5bを起動させる。
(57) [Summary] [PROBLEMS] The required construction area and volume of the entire equipment are small, the construction cost is low, and the installation of the waste treatment apparatus is not subject to design and economic restrictions. A first and second crusher 5a for crushing waste a 1 to a predetermined size, 5b and quantitative for conveying the been crushed waste a 2 crushing the closing device of a heat treatment apparatus near these A supply device 6 is provided, and first and second crushers 5a and 5b are disposed directly upstream of the fixed amount supply device 6 and crushed waste a 2 is provided between the crusher and the input device.
Is formed. Further, a stop signal detector 14 for detecting the stop of the operation of the first crusher 5a,
and a start signal transmitter 15 for transmitting a start signal for the first crusher 5a. When the stop signal detector 14 detects the stop of the operation of the first crusher 5a, the second crusher 5b is started.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、廃棄物(家庭やオ
フィスなどから出される都市ごみなどの一般廃棄物、廃
プラスチック、カ−シュレッダ−ダスト、廃オフィス機
器、化成品等の産業廃棄物、等可燃物を含むもの)を破
砕した破砕廃棄物を処理する廃棄物処理装置における廃
棄物連続供給装置に関するものである。
The present invention relates to industrial waste such as waste (general waste such as municipal waste from homes and offices, waste plastic, car shredder dust, waste office equipment, chemical products, etc.). The present invention relates to a continuous waste supply apparatus in a waste treatment apparatus for treating crushed waste obtained by crushing crushed waste (including flammable materials including the same combustible material).

【0002】[0002]

【従来の技術】一般に都市ごみ等の一般廃棄物や廃プラ
スチックなどの産業廃棄物等、可燃物を含む廃棄物処理
装置においては、熱分解工程や燃焼工程を行う熱処理装
置、例えば廃棄物を低酸素雰囲気で加熱し、熱分解によ
り、熱分解ガスと主として不揮発性成分からなる熱分解
残留物とを生成する熱分解反応器や、廃棄物を高温で燃
焼する流動床式やストーカー式の燃焼炉などにおける熱
処理効率の向上を図るため、収集された廃棄物を破砕機
で破砕し破砕廃棄物となし、この破砕廃棄物を、スクリ
ューフィーダやロータリーフィーダ等の投入装置を介し
て熱処理装置に供給することが行われている。
2. Description of the Related Art Generally, in a waste treatment apparatus containing combustible materials such as general waste such as municipal solid waste and industrial waste such as waste plastic, a heat treatment apparatus for performing a pyrolysis process or a combustion process, for example, a low waste material. A pyrolysis reactor that heats in an oxygen atmosphere and generates pyrolysis gas and pyrolysis residues mainly composed of non-volatile components by pyrolysis, and a fluidized bed or stalker combustion furnace that burns waste at high temperatures In order to improve the efficiency of heat treatment in, for example, the collected waste is crushed by a crusher and turned into crushed waste, and the crushed waste is supplied to the heat treatment device via an input device such as a screw feeder or a rotary feeder. That is being done.

【0003】そして、前記廃棄物処理装置においては、
破砕機が、保守点検や万一のごみの噛み込み等により、
その運転を停止する場合があるので、連続運転を行うた
めには、例えば、図5に示すものが実施されている。
[0003] In the waste disposal apparatus,
If the crusher is used for maintenance and inspection,
Since the operation may be stopped, for example, the operation shown in FIG. 5 is performed in order to perform the continuous operation.

【0004】すなわち、廃棄物搬送車101等で運び込
まれた廃棄物a1は、廃棄物受入れピット102に一旦
貯えられた後、廃棄物クレーン103によって廃棄物ホ
ッパ104に投入され、更に、廃棄物供給機105によ
って破砕機106に供給され、破砕廃棄物a2となって
破砕廃棄物ピット107に貯えられる。破砕廃棄物ピッ
ト107に貯えられた破砕廃棄物a2は、熱処理装置1
12の処理量に応じて、破砕廃棄物クレーン108によ
って破砕廃棄物ホッパ109に投入され、破砕廃棄物供
給機110を介して、搬送装置111及び定量供給装置
としてのスクリューフィーダ113により、熱処理装置
112に供給される。
That is, the waste a 1 carried by the waste transport vehicle 101 or the like is temporarily stored in a waste receiving pit 102, and then put into a waste hopper 104 by a waste crane 103, and The crusher 106 is supplied to the crusher 106 by the supply device 105 and stored in the crush waste pit 107 as crushed waste a 2 . The crushed waste a 2 stored in the crushed waste pit 107 is supplied to the heat treatment apparatus 1.
The crushed waste crane 108 supplies the crushed waste to the crushed waste hopper 109 in accordance with the throughput, and the crushed waste feeder 110 supplies the heat to the crushed waste hopper 109 by the transfer device 111 and the screw feeder 113 serving as a quantitative supply device. Supplied to

【0005】[0005]

【発明が解決しようとする課題】しかしながら、前記装
置では、ピットを二つ必要とするばかりでなく、クレー
ンや廃棄物を供給する供給機などの設備が必要となるた
め、設備全体としての必要建設面積や体積が大きくなる
とともに、建設費用が増大し、廃棄物処理装置の設置に
際し設計上および経済的な制約を受けるという問題点が
あった。
However, the above-mentioned apparatus requires not only two pits but also equipment such as a crane and a feeder for supplying waste, so that the necessary construction of the entire equipment is required. There is a problem that the area and the volume are increased, the construction cost is increased, and the installation of the waste disposal apparatus is restricted in terms of design and economy.

【0006】[0006]

【課題を解決するための手段】本発明は前記したような
従来技術の持つ問題点を解決するためになされたもので
あって、以下のようにして達成される。
SUMMARY OF THE INVENTION The present invention has been made to solve the above-mentioned problems of the prior art, and is achieved as follows.

【0007】請求項1記載発明は、廃棄物を所定の大き
さに破砕する破砕機と、該破砕機によって破砕された破
砕廃棄物を熱処理装置近傍に配置された投入装置に搬送
するための定量供給装置を有する廃棄物処理装置におい
て、前記定量供給装置の上流側に少なくとも2以上の前
記破砕機を直結するよう配置するとともに前記破砕機と
前記投入装置との間に前記破砕廃棄物の溜り部を形成す
るようにしたことを特徴とする廃棄物処理装置における
廃棄物連続供給装置である。
According to a first aspect of the present invention, there is provided a crusher for crushing waste into a predetermined size, and a fixed amount for transferring the crushed waste crushed by the crusher to a charging device disposed near a heat treatment apparatus. In a waste treatment device having a supply device, at least two or more of the crushers are disposed directly upstream of the quantitative supply device, and the crushed waste reservoir is provided between the crusher and the input device. Is a continuous waste supply apparatus in a waste treatment apparatus, characterized in that:

【0008】また、請求項2記載の発明は、請求項1記
載の溜り部を、破砕機と定量供給装置間または定量供給
装置自体もしくは定量供給装置と投入装置間の少なくと
もいずれか1箇所に形成したものである。
According to a second aspect of the present invention, the reservoir according to the first aspect is formed at at least one location between the crusher and the fixed-rate supply device, or between the fixed-rate supply device itself or the fixed-rate supply device and the charging device. It was done.

【0009】また、請求項3記載の発明は、請求項1に
記載の発明において、第1の破砕機の運転停止を検知す
る信号検知器と、第2の破砕機の起動信号を発信する起
動信号発信器を有し、前記信号検知器により前記第1の
破砕機の運転停止を検出したときに該第1の破砕機の運
転停止信号を前記起動信号発信器に入力し、該起動信号
発信器から第2の破砕機へ起動信号を発信し該第2の破
砕機を起動させることを特徴とする廃棄物処理装置であ
る。
According to a third aspect of the present invention, in the first aspect, a signal detector for detecting the stop of the operation of the first crusher and a start-up for transmitting a start signal of the second crusher. A signal transmitter, and when the signal detector detects an operation stop of the first crusher, a stop signal of the first crusher is input to the start signal transmitter, and the start signal is transmitted. A waste treatment apparatus characterized in that a start signal is transmitted from a vessel to a second crusher to start the second crusher.

【0010】この廃棄物処理装置によれば、第1の破砕
機が定期的に又は不測の事態により運転を停止しても、
直ちに第2の破砕機の運転を開始できる。このとき、第
1の破砕機が運転停止後、第2の破砕機により破砕廃棄
物を生成するためには5〜10分間程度の時間を必要と
するが、この間、溜り部に滞留している破砕廃棄物が定
量供給装置を経て熱処理装置に供給される。したがっ
て、熱処理装置では、効率的な熱処理を行うことができ
る。
[0010] According to this waste treatment apparatus, even if the first crusher stops operating periodically or due to an unexpected situation,
The operation of the second crusher can be started immediately. At this time, after the operation of the first crusher is stopped, it takes about 5 to 10 minutes to generate the crushed waste by the second crusher. The crushed waste is supplied to the heat treatment device via the quantitative supply device. Therefore, in the heat treatment apparatus, efficient heat treatment can be performed.

【0011】これにより、2つ必要であったピットのう
ち、破砕廃棄物ピットを設ける必要がなくなり、施設全
体の必要建設面積を大幅に減らすことができ、建設費用
も削減できる。
This eliminates the necessity of providing a crushed waste pit among the two required pits, so that the required construction area of the entire facility can be greatly reduced, and the construction cost can be reduced.

【0012】更に、熱処理装置、すなわち熱分解反応炉
によって生成した熱分解残留物を連続して燃焼溶融炉に
供給して溶融する場合、もしくは流動床式やストーカー
式等の焼却炉で破砕廃棄物を燃焼させる場合において、
破砕廃棄物の連続的かつ安定的な供給を受けることがで
きることから、かかる熱処理装置内の熱処理温度が安定
的に維持され、この熱処理装置から燃焼排ガスを回収し
て発電しようとする場合においても、安定した発電が行
うことができる。
Further, when the pyrolysis residue generated by the heat treatment apparatus, that is, the pyrolysis reaction furnace, is continuously supplied to a combustion melting furnace to be melted, or crushed waste is generated in a fluidized bed type or stalker type incinerator. When burning
Since the continuous and stable supply of the crushed waste can be received, the heat treatment temperature in such a heat treatment device is stably maintained, and even when the combustion exhaust gas is recovered from this heat treatment device and power is to be generated, Stable power generation can be performed.

【0013】[0013]

【発明の実施の形態】以下、本発明の実施の形態を、図
面を参照して説明する。図1は本発明の廃棄物処理装置
の概略構成を示している。図1の廃棄物処理装置におい
て、廃棄物搬送車等で収集された廃棄物a1は一旦、廃
棄物ピット2に貯えられた後、クレーン3によってホッ
パ4へ投入され、移送装置11から破砕機5に移送さ
れ、例えば二軸剪断式等の破砕機により所定の大きさ、
例えば150〜200mmの大きさに破砕され、破砕廃
棄物a2となる。破砕廃棄物a2は、定量供給装置6によ
り熱分解反応器20の投入部22に投入され、スクリュ
ーフィーダやプッシャー等の投入装置23を経て熱分解
反応器20のドラム21に供給される。
Embodiments of the present invention will be described below with reference to the drawings. FIG. 1 shows a schematic configuration of a waste disposal apparatus according to the present invention. In the waste treatment apparatus shown in FIG. 1, waste a 1 collected by a waste transporter or the like is temporarily stored in a waste pit 2 and then put into a hopper 4 by a crane 3. 5 and, for example, a predetermined size by a crusher such as a biaxial shearing type,
For example crushed to a size of 150 to 200 mm, the crushed waste a 2. The crushed waste a 2 is supplied to the charging section 22 of the thermal decomposition reactor 20 by the quantitative supply device 6, and is supplied to the drum 21 of the thermal decomposition reactor 20 via the charging device 23 such as a screw feeder or a pusher.

【0014】熱分解反応器20は、通常、横型回転式ド
ラムが用いられ、図示しないシール機構により、その内
部は低酸素雰囲気に保持され、また、燃焼溶融炉30の
後流側に配置される熱交換器(図示せず)により加熱さ
れた加熱空気gが、ラインL1から供給され、この加熱
空気gにより、内部は300〜600℃に、通常は45
0℃程度に加熱されている。そして、破砕廃棄物a2
熱分解反応器20のドラム21内で熱分解され、熱分解
ガスG1と主として不揮発性の熱分解残留物bとを生成
する。ドラム21で生成された熱分解ガスG1と熱分解
残留物bは排出装置24により分離され、熱分解ガスG
1はラインL2を経て燃焼溶融炉30のバーナ31に供給
される。
The thermal decomposition reactor 20 is usually a horizontal rotary drum, and the inside thereof is kept in a low oxygen atmosphere by a sealing mechanism (not shown), and is disposed on the downstream side of the combustion melting furnace 30. heated air g which has been heated by the heat exchanger (not shown) is supplied from the line L 1, this heated air g, inside the 300 to 600 ° C., usually 45
It is heated to about 0 ° C. Then, the crushed waste a 2 is thermally decomposed in the drum 21 of the pyrolysis reactor 20 to generate a pyrolysis gas G 1 and a mainly non-volatile pyrolysis residue b. The pyrolysis gas G 1 generated in the drum 21 and the pyrolysis residue b are separated by the discharging device 24,
1 is supplied to the burner 31 of the burning melting furnace 30 via line L 2.

【0015】ここで、前記廃棄物ピット2内の廃棄物a
1を熱分解反応器20のドラム21内へ供給する手段に
ついて、図2乃至図4を参照しながら詳述する。
Here, the waste a in the waste pit 2
The means for supplying 1 into the drum 21 of the pyrolysis reactor 20 will be described in detail with reference to FIGS.

【0016】図2において、定量供給装置6は、水平部
7と傾斜部8とを有するとともに、破砕廃棄物a2の溜
り部9が形成されたベルトコンベアで構成され、このベ
ルトコンベア表面には複数の桟10が配設されている。
かかる定量供給装置6において、破砕廃棄物a2は、水
平部7の右方向に移送された後、傾斜部8で右斜め上方
に移送されるが、溜り部9で一旦滞留し、この溜り部9
で徐々に桟10で切り分けられて一定量ずつ、投入装置
23を経て、熱分解反応器20のドラム21内に供給さ
れる。
In FIG. 2, the fixed quantity supply device 6 is constituted by a belt conveyor having a horizontal portion 7 and an inclined portion 8 and a reservoir 9 for crushed waste a 2 formed thereon. A plurality of bars 10 are provided.
In the quantitative supply device 6, the crushed waste a 2 is transported rightward of the horizontal portion 7, and then is transported obliquely upward and rightward by the inclined portion 8. 9
, Is gradually cut by the crosspiece 10, and is supplied into the drum 21 of the thermal decomposition reactor 20 through the charging device 23 by a predetermined amount.

【0017】そして、前記水平部7の上部には少なくと
も2基の破砕機、すなわち第1の破砕機5a及び第2の
破砕機5bが配置されている。この第1の破砕機5a及
び第2の破砕機5bは特に限定されるものではないが、
好ましくはほぼ同一の破砕性能を有するものであって、
一方の破砕機(例えば、第1の破砕機5a)が運転中
は、他方の破砕機(例えば、第2の破砕機5b)は予備
として待機するようになっている。そして、第1の破砕
機5aで破砕された破砕廃棄物a2は、前記した定量供
給装置6により投入シュート22及び投入装置23を経
て、熱分解反応器20のドラム21内に供給され、ここ
で熱分解される。
Further, at least two crushers, that is, a first crusher 5a and a second crusher 5b are arranged above the horizontal portion 7. Although the first crusher 5a and the second crusher 5b are not particularly limited,
Preferably have almost the same crushing performance,
While one crusher (for example, the first crusher 5a) is in operation, the other crusher (for example, the second crusher 5b) is on standby as a standby. Then, the crushed waste a 2 crushed by the first crusher 5a is supplied into the drum 21 of the pyrolysis reactor 20 via the charging chute 22 and the charging device 23 by the above-described quantitative supply device 6, where Pyrolyzed at

【0018】ところで、かかる廃棄物処理装置における
第1の破砕機5a及び第2の破砕機5bは、定期的に又
は不測の事態により運転を停止することがある。このと
き、第1の破砕機5aに取り付けられた停止信号検知器
14は、第1の破砕機5aの運転停止を検知するととも
に、直ちに、第2の破砕機5bに取り付けられた起動信
号発信器15へ発信し、これを受けた起動信号発信器1
5は、第2の破砕機5bへ起動信号を発信し、第2の破
砕機5bを起動させる。この間、すなわち第1の破砕機
5aの運転停止から破砕廃棄物a2が第2の破砕機5b
に投入されるまでの間、破砕機5aにより破砕された破
砕廃棄物a2が所定の時間、例えば5〜10分間、定量
供給装置6の溜り部9で滞留しながら一定量ずつ熱分解
反応器20のドラム21へ供給される。
Incidentally, the operation of the first crusher 5a and the second crusher 5b in such a waste disposal apparatus may be stopped periodically or due to an unexpected situation. At this time, the stop signal detector 14 attached to the first crusher 5a detects the stop of the operation of the first crusher 5a, and immediately starts the start signal transmitter attached to the second crusher 5b. 15 and the activation signal transmitter 1 receiving this
5 transmits a start signal to the second crusher 5b to start the second crusher 5b. During this time, i.e., crushed wastes a 2 from the stop of the operation of the first crusher 5a is a second crusher 5b
Until being turned, crusher crushed waste a 2 a predetermined time which is disrupted by 5a, for example 5 to 10 minutes, a predetermined amount by the pyrolysis reactor while staying at the reservoir 9 of the dispensing device 6 20 are supplied to the drum 21.

【0019】したがって、熱分解反応器20への破砕廃
棄物a2の供給は、中断されることなく、連続的に行う
ことが可能となるのである。第1の破砕機5aの停止を
確認して、第2の破砕機5bを起動する手段としては、
もちろん手動により起動する方式でもよい。
Therefore, the supply of the crushed waste a 2 to the pyrolysis reactor 20 can be continuously performed without interruption. As means for confirming the stop of the first crusher 5a and activating the second crusher 5b,
Of course, a method of manually starting may be used.

【0020】なお、前記実施例では第1の破砕機5aと
第2の破砕機5bの2基の破砕機を設置しているが、こ
れに限定されず処理能力に応じて3基以上設けてもよ
い。また、水平部7と傾斜部8は、一体化した構造にし
ているが、別々の装置とし連続的に配置する形式でもよ
い。更に、第1の破砕機5aに取り付けられた停止信号
検知器14と第2の破砕機5bに取り付けられた起動信
号発信器15は、信号ケーブルを介し直結しているが、
停止信号検知器14と起動信号発生装置15の間に制御
装置(図示せず)を配置し、制御装置にデータ記憶装置
ほかの装置を組み込んでもよい。
In the above embodiment, two crushers, a first crusher 5a and a second crusher 5b, are installed. However, the present invention is not limited to this, and three or more crushers may be provided according to the processing capacity. Is also good. Although the horizontal portion 7 and the inclined portion 8 have an integrated structure, they may be formed as separate devices and arranged continuously. Further, the stop signal detector 14 attached to the first crusher 5a and the start signal transmitter 15 attached to the second crusher 5b are directly connected via a signal cable.
A control device (not shown) may be arranged between the stop signal detector 14 and the start signal generating device 15, and a data storage device and other devices may be incorporated in the control device.

【0021】本発明の他の実施例を図3を参照しながら
説明する。定量供給装置6は水平部7のコンベアのみを
有し、溜り部9は第1の破砕機5aならびに第2の破砕
機5bと定量供給装置6の連結部に形成される構造とな
し、破砕機5で破砕された破砕廃棄物a2は、溜り部9
で一旦滞留し、この溜り部9で徐々に桟10で切り分け
られて一定量ずつ、投入装置23を経て、熱分解反応器
20のドラム21内に供給される。
Another embodiment of the present invention will be described with reference to FIG. The fixed amount supply device 6 has only a conveyor of a horizontal portion 7, and the reservoir 9 has a structure formed at a connection portion between the first crusher 5 a and the second crusher 5 b and the fixed amount supply device 6. The crushed waste a 2 crushed in step 5
, And is gradually cut by the bar 10 in the reservoir 9, and is supplied into the drum 21 of the pyrolysis reactor 20 via the charging device 23 by a predetermined amount.

【0022】更に、本発明の他の実施例を図4を参照し
ながら説明する。第1の破砕機5aで破砕された破砕廃
棄物a2は、ベルトコンベア7により右方向に移送され
る。そして、この破砕廃棄物a2は、熱分解反応器20
の投入装置23へ投入され投入シュート22と投入装置
23との間に形成された溜り部9で一旦滞留し、投入装
置23、例えばスクリューフィーダ23により一定量ず
つ切り分けられ熱分解反応器20のドラム21内に供給
される。第1の破砕機5aが運転を停止した場合、第2
の破砕機5bによる破砕廃棄物a2が投入装置23に搬
送されるまでの間、第1の破砕機5aにより破砕された
破砕廃棄物a2は、所定の時間、例えば5〜10分間、
溜り部9で滞留しながらスクリューフィーダ23により
一定量ずつ切り分けられ熱分解反応器20のドラム21
内に供給されるので、熱分解反応器20への破砕廃棄物
2の供給は中断されることがなく、連続的に行うこと
が可能となる。
Further, another embodiment of the present invention will be described with reference to FIG. Crushed waste a 2, which is crushed in the first crusher 5a, is transported by the belt conveyor 7 to the right. The crushed waste a 2 is supplied to the pyrolysis reactor 20.
Of the pyrolysis reactor 20 which is temporarily stored in the pool portion 9 formed between the charging chute 22 and the charging device 23 and cut by the charging device 23, for example, the screw feeder 23. 21. When the first crusher 5a stops operating, the second
Until crushed wastes a 2 by crusher 5b of is transported to the dosing device 23, crushed wastes a 2, which is disrupted by the first crusher 5a a predetermined time, for example 5 to 10 minutes,
The drum 21 of the pyrolysis reactor 20 is cut by the screw feeder 23 by a predetermined amount while staying in the reservoir 9.
Since supplied within, without supply of crushed waste a 2 to the pyrolysis reactor 20 is interrupted, it is possible to perform continuously.

【0023】このようにして、投入装置23により熱分
解反応器20に供給された破砕廃棄物a2は、熱分解反
応器20で熱分解されて生成した熱分解残留物bとな
り、排出装置24の下部より排出され、冷却装置25に
送られる。冷却装置25により80℃程度に冷却された
熱分解残留物bは、例えば磁選式、うず電流式、遠心式
又は風力選別式等の公知の単独または組み合わされた分
離機とを含む分離装置26にかけられ、熱分解カーボン
を主成分とする燃焼性成分cと不燃焼性成分dとに分離
され、不燃焼性成分dはコンテナ28に回収され再利用
される。
In this manner, the crushed waste a 2 supplied to the pyrolysis reactor 20 by the charging device 23 becomes a pyrolysis residue b generated by pyrolysis in the pyrolysis reactor 20 and the discharge device 24 And is sent to the cooling device 25. The pyrolysis residue b cooled to about 80 ° C. by the cooling device 25 is applied to a separation device 26 including a known single or combined separator such as a magnetic separation type, an eddy current type, a centrifugal type or a wind separation type. Then, it is separated into a combustible component c mainly composed of pyrolytic carbon and a non-combustible component d, and the non-combustible component d is collected in the container 28 and reused.

【0024】燃焼性成分cは、例えばボールミル式の粉
砕機27により、所定の大きさ、例えば1mm以下に微
粉砕され、燃焼性ラインL3を経て燃焼溶融炉30のバ
ーナ31に供給される。この微粉砕された燃焼性成分c
は、熱分解ガスラインL2から供給された熱分解ガスG1
と押込送風機34により燃焼用空気ラインL4を介して
供給された燃焼用空気eとともに1,300℃程度の高
温域で燃焼され、このとき発生した灰分は溶融スラグf
となって、この燃焼溶融炉30の内壁に付着し、更に、
内壁を流下し底部排出口32から水槽33に落下し冷却
固化される。
The combustible component c is the pulverizer 27 such as a ball mill type, a predetermined size, for example, milled in 1mm or less, is supplied to the burner 31 of the burning melting furnace 30 through the flammability line L 3. This finely crushed combustible component c
Is the pyrolysis gas G 1 supplied from the pyrolysis gas line L 2.
And the combustion air e supplied through the combustion air line L 4 by the forced air blower 34 in a high temperature range of about 1,300 ° C., and the ash generated at this time is molten slag f
And adheres to the inner wall of the combustion melting furnace 30,
It flows down the inner wall, falls from the bottom outlet 32 into the water tank 33, and is cooled and solidified.

【0025】燃焼溶融炉30で生じた高温排ガスG
2は、高温空気加熱器40を経由し煙道ガスラインL5
介して廃熱ボイラ41等の蒸気発生装置で熱回収され、
集塵機43で除塵され、更に排ガス浄化器44で有害成
分が除去された後、低温のクリーンな排ガスG3となっ
て誘引送風機45を介して煙突46から大気へ放出され
る。低温のクリーンな排ガスの一部はイナートガスとし
て、ファン47によって排ガス循環ラインL6を介して
冷却装置25へ戻される。廃熱ボイラ41で生成した蒸
気は、蒸気タービンを有する発電機42で発電に利用さ
れる。
High temperature exhaust gas G generated in the combustion melting furnace 30
2 is a heat recovery steam generator, such as a waste heat boiler 41 via a flue gas line L 5 through the hot air heater 40,
After the dust is removed by the dust collector 43 and the harmful components are further removed by the exhaust gas purifier 44, the exhaust gas G 3 is released into the atmosphere from the chimney 46 via the induction blower 45 as low-temperature clean exhaust gas G 3 . As inert gas a portion of the low-temperature clean gas is returned to the cooler 25 through the exhaust gas circulation line L 6 by the fan 47. The steam generated by the waste heat boiler 41 is used for power generation by a generator 42 having a steam turbine.

【0026】以上、本発明を図示の実施の形態について
詳述したが、本発明はそれらの実施の形態のみに限定さ
れるものではなく、熱処理装置として熱分解反応器に代
えて、例えば流動床式やストーカー式の焼却炉を用いる
ことができる。したがって、本発明の精神を逸脱せずし
て種々の改変を加え、多種多様の変形をなし得ることは
言うまでもない。
Although the present invention has been described in detail with reference to the illustrated embodiments, the present invention is not limited to these embodiments only. For example, a fluidized bed may be used instead of a thermal decomposition reactor as a heat treatment apparatus. A stoker type incinerator can be used. Therefore, it is needless to say that various modifications and various modifications can be made without departing from the spirit of the present invention.

【0027】[0027]

【発明の効果】以上、本発明によれば、2つ必要であっ
たごみを貯留するピットが、廃棄物受入れピットのみと
なり、同時にピットに付帯するクレーンほかの機器数や
運転要員が半減した。これにより、施設全体の建設面積
や建設費用が大幅に削減できる。
As described above, according to the present invention, only two waste storage pits are required for storing wastes, and at the same time, the number of cranes and other equipment and operating personnel associated with the pits have been reduced by half. As a result, the construction area and construction cost of the entire facility can be significantly reduced.

【0028】また、2基以上の破砕機を備えかつ破砕機
で破砕された破砕廃棄物は定量供給装置自体でまたは破
砕機と定量供給装置の連結部でもしくは定量供給装置と
投入装置との間の少なくともいずれか1カ所に形成され
た溜り部で所定時間滞留しながら、一定量ずつ熱分解反
応器に供給されることにより、以下の効果を生じる。 (1)定期的に又は不測の事態により、一方の破砕機
(第1の破砕機)が運転を停止しても、他方の破砕機
(第2の破砕機)からの破砕廃棄物の供給が途絶えず、
連続して安定的に破砕廃棄物を熱分解反応器に供給でき
る。 (2)前記により、熱処理装置の熱分解効率が高くな
る。 (3)熱処理装置、例えば、熱分解反応器によって破砕
廃棄物を熱分解し生成した燃焼性成分を燃焼溶融炉に供
給する場合、もしくは流動床式やストーカー式等の焼却
炉に破砕廃棄物を供給して燃焼させる場合、かかる熱処
理装置への破砕廃棄物の供給が途絶えることなく連続し
て行えるため、熱処理装置の燃焼温度を安定的に維持で
きる。 (4)前記燃焼溶融炉もしくは燃焼炉等の熱処理装置の
高温排ガスを蒸気発生装置を介し蒸気タービンで発電す
ることによって作る電気が、効率的かつ安定的に得るこ
とができる。
The crushed waste provided with two or more crushers and crushed by the crusher can be supplied by the quantitative supply device itself or at a connection portion between the crusher and the quantitative supply device or between the quantitative supply device and the charging device. Is supplied to the thermal decomposition reactor by a predetermined amount while staying in the reservoir formed at least one of the above for a predetermined time, the following effects are obtained. (1) Even if one crusher (first crusher) stops operating periodically or due to an unexpected situation, the supply of crushed waste from the other crusher (second crusher) is stopped. Without interruption,
The crushed waste can be continuously and stably supplied to the pyrolysis reactor. (2) Due to the above, the thermal decomposition efficiency of the heat treatment apparatus is increased. (3) When the flammable waste is pyrolyzed by a heat treatment apparatus, for example, a pyrolysis reactor, and the combustible component generated is supplied to a combustion melting furnace, or the crushed waste is supplied to a fluidized bed or stalker type incinerator. When supplying and burning, the crushed waste can be continuously supplied to the heat treatment apparatus without interruption, so that the combustion temperature of the heat treatment apparatus can be stably maintained. (4) Electricity generated by generating high-temperature exhaust gas from a heat treatment apparatus such as the combustion melting furnace or the combustion furnace with a steam turbine through a steam generator can be efficiently and stably obtained.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の廃棄物処理装置の概略構成図である。FIG. 1 is a schematic configuration diagram of a waste disposal apparatus of the present invention.

【図2】本発明になる定量供給装置の一実施の形態を模
式的に示した断面図である。
FIG. 2 is a cross-sectional view schematically showing one embodiment of the quantitative supply device according to the present invention.

【図3】本発明の溜り部を形成する他の実施の形態を模
式的に示した断面図である。
FIG. 3 is a cross-sectional view schematically showing another embodiment for forming a reservoir according to the present invention.

【図4】本発明の溜り部を形成する更に他の実施の形態
を模式的に示した断面図である。
FIG. 4 is a cross-sectional view schematically showing still another embodiment for forming a reservoir according to the present invention.

【図5】従来技術に係る廃棄物処理装置を示す系統図で
ある。
FIG. 5 is a system diagram showing a waste disposal apparatus according to the related art.

【符号の説明】[Explanation of symbols]

2 廃棄物受入れピット 3 クレーン 4、4a、4b ホッパ 5、5a、5b 破砕機 6 定量供給装置 7 水平部 8 傾斜部 9 溜り部 10 桟 11、11a、11b 移送装置 12 磁選機 13、28 コンテナ 14 停止信号検知器 15 起動信号発信器 20 熱分解反応器 21 ドラム 22 投入シュート 23 スクリューフィーダ(投入装置) 24 排出装置 25 冷却装置 26 分離装置 27 粉砕機 30 燃焼溶融炉 31 バーナ 32 底部排出口 33 水槽 40 高温空気加熱器 41 廃熱ボイラ 42 発電機 43 集塵機 44 排ガス浄化器 45 誘引送風機 46 煙突 G1 熱分解ガス G2 高温排ガス G3 クリーンな排ガス a1 廃棄物 a2 破砕廃棄物 b 熱分解残留物 c 燃焼性成分 d 不燃焼性成分 e 燃焼用空気 f 溶融スラグ g 加熱空気2 Waste receiving pit 3 Crane 4, 4a, 4b Hopper 5, 5a, 5b Crusher 6 Quantitative supply device 7 Horizontal portion 8 Inclined portion 9 Reservoir portion 10 Beam 11, 11a, 11b Transfer device 12 Magnetic separator 13, 28 Container 14 Stop signal detector 15 Start signal transmitter 20 Pyrolysis reactor 21 Drum 22 Charging chute 23 Screw feeder (Charging device) 24 Discharge device 25 Cooling device 26 Separator 27 Crusher 30 Combustion melting furnace 31 Burner 32 Bottom discharge port 33 Water tank 40 High-temperature air heater 41 Waste heat boiler 42 Generator 43 Dust collector 44 Exhaust gas purifier 45 Induction blower 46 Chimney G 1 Pyrolysis gas G 2 High-temperature exhaust gas G 3 Clean exhaust gas a 1 Waste a 2 Crushed waste b Thermal decomposition residue Material c Flammable component d Non-flammable component e Combustion air f Molten slag g Heated air

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 廃棄物を所定の大きさに破砕する破砕機
と、該破砕機によって破砕された破砕廃棄物を熱処理装
置近傍に配置された投入装置に搬送するための定量供給
装置を有する廃棄物処理装置において、前記定量供給装
置の上流側に少なくとも2以上の前記破砕機を直結する
よう配置するとともに前記破砕機と前記投入装置との間
に前記破砕廃棄物の溜り部を形成するようにしたことを
特徴とする廃棄物処理装置における廃棄物連続供給装
置。
1. A waste having a crusher for crushing waste to a predetermined size, and a quantitative supply device for transporting the crushed waste crushed by the crusher to an input device arranged near a heat treatment device. In the material processing apparatus, at least two or more of the crushers are arranged directly on the upstream side of the quantitative supply device, and the crushing waste is formed between the crusher and the charging device. A continuous waste supply device in a waste treatment device, characterized in that:
【請求項2】 溜り部は、破砕機と定量供給装置間また
は定量供給装置自体もしくは定量供給装置と投入装置間
の少なくともいずれか1箇所に形成されてなる請求項1
記載の廃棄物処理装置における廃棄物連続供給装置。
2. The reservoir according to claim 1, wherein the reservoir is formed between the crusher and the fixed-quantity supply device, or at least one of the fixed-quantity supply device itself or the fixed-quantity supply device and the charging device.
A continuous waste supply apparatus in the waste treatment apparatus described in the above.
【請求項3】 請求項1において、第1の破砕機の運転
停止を検知する停止信号検知器と、第2の破砕器の起動
信号を発信する起動信号発信器を有し、前記停止信号検
知器により前記第1の破砕機の運転停止を検出したとき
に該第1の破砕機の運転停止信号を前記起動信号発信器
に入力し、該起動信号発信器から第2の破砕機へ起動信
号を発信し該第2の破砕機を起動させることを特徴とす
る廃棄物処理装置における廃棄物連続供給装置。
3. The stop signal detector according to claim 1, further comprising a stop signal detector for detecting a stop of the operation of the first crusher, and a start signal transmitter for transmitting a start signal of the second crusher. When a stop of the operation of the first crusher is detected by the device, a stop signal of the first crusher is input to the start signal transmitter, and the start signal is transmitted from the start signal transmitter to the second crusher. And the second crusher is activated to transmit the waste continuously.
JP3455297A 1997-02-19 1997-02-19 Continuous waste supply equipment in waste treatment equipment Withdrawn JPH10232013A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP3455297A JPH10232013A (en) 1997-02-19 1997-02-19 Continuous waste supply equipment in waste treatment equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP3455297A JPH10232013A (en) 1997-02-19 1997-02-19 Continuous waste supply equipment in waste treatment equipment

Publications (1)

Publication Number Publication Date
JPH10232013A true JPH10232013A (en) 1998-09-02

Family

ID=12417481

Family Applications (1)

Application Number Title Priority Date Filing Date
JP3455297A Withdrawn JPH10232013A (en) 1997-02-19 1997-02-19 Continuous waste supply equipment in waste treatment equipment

Country Status (1)

Country Link
JP (1) JPH10232013A (en)

Similar Documents

Publication Publication Date Title
HU216119B (en) Process and apparatus for the thermal treatment of waste materials
JP3969846B2 (en) Pyrolysis reactor
JPH10232013A (en) Continuous waste supply equipment in waste treatment equipment
JPH1177017A (en) Method of preventing moisture absorption of molten or burnt fly ash
JP3973310B2 (en) Detoxification method for incineration ash
JP4918185B1 (en) Hybrid incinerator system
JP2001021126A (en) Dry distillation pyrolysis melting and combustion equipment for waste
JP4157187B2 (en) Method for preventing moisture absorption from molten or burned fly ash
JPH1073233A (en) Water cooling system for molten slag of combustion melting furnace
JP3732640B2 (en) Waste pyrolysis melting combustion equipment
JPH1114023A (en) Method and apparatus for conveying carbon powder
JPH10332118A (en) Waste pyrolysis method and pyrolysis reactor
JP4267801B2 (en) Waste crushing supply system
JP2007040696A (en) Heat storage method for heat storage device
JP3921765B2 (en) Waste pyrolysis gasification melting equipment
JP4410125B2 (en) Waste treatment facilities and waste treatment methods
JPH11182211A (en) Waste treatment and power generation combined equipment
JP2000213716A (en) Waste disposal plant
JP2000146149A (en) Dry distillation pyrolysis melting and combustion equipment for waste
JP3810149B2 (en) Operation method of pyrolysis reactor
JP2004116815A (en) Waste treatment system
JP3507807B2 (en) Pyrolysis equipment
JP2004012073A (en) Combustible dust treatment equipment for waste melting furnace
JP3893200B2 (en) Method for preventing closure of slag outlet in combustion melting furnace of waste treatment equipment
JP3759791B2 (en) Operation method of combustion melting furnace in waste treatment equipment

Legal Events

Date Code Title Description
A300 Withdrawal of application because of no request for examination

Free format text: JAPANESE INTERMEDIATE CODE: A300

Effective date: 20040511