JPH10272981A - Material handling vehicle - Google Patents

Material handling vehicle

Info

Publication number
JPH10272981A
JPH10272981A JP7870397A JP7870397A JPH10272981A JP H10272981 A JPH10272981 A JP H10272981A JP 7870397 A JP7870397 A JP 7870397A JP 7870397 A JP7870397 A JP 7870397A JP H10272981 A JPH10272981 A JP H10272981A
Authority
JP
Japan
Prior art keywords
boom
container
swing
loading platform
loading
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP7870397A
Other languages
Japanese (ja)
Inventor
Hiromi Sukegawa
廣美 助川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TCM Corp
Original Assignee
Toyo Umpanki Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toyo Umpanki Co Ltd filed Critical Toyo Umpanki Co Ltd
Priority to JP7870397A priority Critical patent/JPH10272981A/en
Publication of JPH10272981A publication Critical patent/JPH10272981A/en
Pending legal-status Critical Current

Links

Landscapes

  • Forklifts And Lifting Vehicles (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a material handling vehicle that is able to load a plurality of conveyed materials on the deck. SOLUTION: This material handling vehicle is provided with two loading parts 11a and 11b in a deck 11 and also a material handling gear 13 being free of housing a container 12 into these loading parts 11a and 11b, and this material handling gear 13 is composed of a first boom 14 installed in a rear end of the deck 11 free of rocking motion, a first boom rocker device 17, a second boom 23 installed in a tip part of the first boom 14 free of rocking motion, a second rocker device 25, and a lifting sling installed in a tip of the second boom 23, respectively. In this constitution, the lifting sling is engaged with the container 12, rocking the first boom 14, and the container 12 is able to be loaded or unloaded to or from the rear loading part 11b. In addition, the first boom 14 and the second boom 23 are rocked up and down, whereby the container 12 is able to be loaded or unloaded to or from the front loading part 11a as well.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、たとえば製鉄工場
で炉、鍋を清掃した時にでるレンガ、スラグ等を積込み
運搬するのに使用される荷役車両に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a cargo handling vehicle used for loading and transporting bricks, slag, and the like that are produced when cleaning furnaces and pots in, for example, an ironworks.

【0002】[0002]

【従来の技術】従来、この種の荷役車両としては、図8
〜図10に示す荷役車両39が使用されていた。すなわ
ち荷役車両39は、トラックヘッド40とトレーラ41
などからなり、ここでトラックヘッド40は、車輪43
や運転部44などにより構成され、またトレーラ41
は、車輪45を有する荷台46の後部にアウトリガー4
7を配設することで構成される。そしてトラックヘッド
40の後部に、縦方向軸42などを介してトレーラ41
の前部が連結され、以って牽引自在に構成されている。
2. Description of the Related Art Conventionally, as this kind of cargo handling vehicle, FIG.
10 was used. That is, the cargo handling vehicle 39 includes the truck head 40 and the trailer 41
And the like, where the track head 40 is
And a driving unit 44.
The outrigger 4 is attached to the rear of the bed 46 having wheels 45.
7 is provided. At the rear of the track head 40, a trailer 41 is connected via a vertical shaft 42 or the like.
Are connected to each other so that they can be pulled.

【0003】前記荷台46上に設けられる荷役装置48
は、左右方向(車幅方向)で一対のブーム49を有し、
これらブーム49は、荷台46後端部でその軸心方向が
左右方向の左右方向軸50により各別に連結されること
で、荷台46上部とその後方に亘って左右方向軸50を
中心に前後揺動自在に構成される。そして両ブーム49
の遊端間は、左右方向の連結部材51により一体化され
ている。
A cargo handling device 48 provided on the loading platform 46
Has a pair of booms 49 in the left-right direction (vehicle width direction),
These booms 49 are respectively connected at the rear end of the loading platform 46 by left and right horizontal shafts 50 so as to swing back and forth about the horizontal shaft 50 over the upper portion of the loading platform 46 and the rear thereof. It is configured to be movable. And both booms 49
Are integrated by a connecting member 51 in the left-right direction.

【0004】また両ブーム49の先端よりやや左右方向
軸50側の内面側には、左右方向ピン52が設けられ、
この左右方向ピン52の左右両側にそれぞれ固定具53
が外嵌めされ、これら固定具53に設けられたUボルト
54を介してチェーン55が吊るされている。そして各
チェーン55の端部には複数のフック56が設けられ、
コンテナ57の吊りピン57aを係合可能に構成されて
いる。
[0004] A left-right pin 52 is provided on the inner surface slightly closer to the left-right shaft 50 than the ends of both booms 49.
Fixtures 53 are provided on both left and right sides of the left and right direction pins 52, respectively.
Are externally fitted, and a chain 55 is suspended via U bolts 54 provided on the fixing tools 53. A plurality of hooks 56 are provided at the end of each chain 55,
The hanging pin 57a of the container 57 is configured to be engageable.

【0005】また前記ブーム49を揺動させるためのシ
リンダー装置58が左右一対に設けられている。これら
シリンダー装置58の本体58aは、荷台46の前端に
設けられたブラケット59にピン60を介して連結さ
れ、また後方へ伸びるピストンロッド58bは、ブーム
49側のブラケット61にピン62を介して連結されて
いる。また両ブーム49の左右方向軸50近傍の内面側
には、左右方向のフック用ピン63が設けられ、このフ
ック用ピン63に回動自在にコンテナ用フック64が設
けられている。そしてコンテナ57の後方下部には、係
合部57bが設けられ前記コンテナ用フック64と係合
自在に構成されている。
[0005] A pair of left and right cylinder devices 58 for swinging the boom 49 are provided. The main body 58a of the cylinder device 58 is connected via a pin 60 to a bracket 59 provided at the front end of the loading platform 46, and the piston rod 58b extending rearward is connected via a pin 62 to a bracket 61 on the boom 49 side. Have been. Further, on the inner surface side of the both booms 49 near the left-right axis 50, a left-right hook pin 63 is provided, and the hook pin 63 is provided with a container hook 64 rotatably. An engagement portion 57b is provided at a lower rear portion of the container 57, and is configured to be freely engageable with the container hook 64.

【0006】このような従来構成によると、たとえば製
鉄工場で炉、鍋を清掃した時にでるレンガ、スラグ等を
コンテナ57に積込み、このコンテナ57を持ち上げて
運搬するとき、まず、図8の仮想線に示すように、アウ
トリガー47を進展させて接地させ、トレーラ41を安
定させた状態で、作業者が、コンテナ57に設けられた
前後左右一対の吊りピン57aに、フック56を係合さ
せる。このとき両ブーム49は、シリンダー装置58の
進展により左右方向軸50の周りに後方へ揺動されてい
る。この状態で、運転部44内の別の作業者(オペレー
タ)がシリンダー装置58を収縮操作することで、まず
上方へ揺動されながら前方へ揺動されるブーム49を介
して、コンテナ57が持ち上げられ、そしてブーム49
が前方へ揺動されたのち下方へ揺動されることで、コン
テナ57を図8の実線に示すように荷台46上に位置し
得る。
According to such a conventional configuration, for example, bricks, slag, and the like that are obtained when cleaning a furnace and a pot in an ironworks are loaded into the container 57, and when the container 57 is lifted and transported, first, a virtual line shown in FIG. As shown in (2), the worker engages the hook 56 with a pair of front, rear, left and right suspension pins 57a provided on the container 57 in a state where the outrigger 47 is extended and grounded and the trailer 41 is stabilized. At this time, the booms 49 are swung rearward around the left-right axis 50 by the extension of the cylinder device 58. In this state, when another operator (operator) in the operation unit 44 contracts the cylinder device 58, the container 57 is lifted via the boom 49 which is first swung upward while being swung upward. And boom 49
The container 57 can be positioned on the loading platform 46 as shown by the solid line in FIG.

【0007】図10に示すように、積み込まれたレン
ガ、スラグ等をコンテナ57の後方から放出するダンプ
作業を行うときは、作業者が前記コンテナ用フック64
を係合部57bに係合させることで前記ブーム49とコ
ンテナ57とは一体となる。この状態で運転部44内の
作業者がシリンダー装置58を進展操作することで、ま
ず上方へ揺動されながら後方へ揺動されるブーム49と
一体にコンテナ57が揺動する。すなわちまずコンテナ
57の前部を持ち上げながらその後部を下方へ徐々に下
げることで、コンテナ57をトレーラー41の後方位置
に立設させ得る。以って積み込まれたレンガ、スラグ等
を放出し得る。
As shown in FIG. 10, when performing a dumping operation for discharging loaded bricks, slag, and the like from the rear of the container 57, an operator operates the container hook 64.
The boom 49 and the container 57 are integrated with each other by engaging with the engaging portion 57b. In this state, when the operator in the operating unit 44 operates the cylinder device 58 to extend, the container 57 swings integrally with the boom 49 that swings backward while swinging upward. That is, the container 57 can be erected at a position rearward of the trailer 41 by first lowering the rear portion of the container 57 while gradually lifting the front portion thereof. Thus, the loaded brick, slag, and the like can be discharged.

【0008】[0008]

【発明が解決しようとする課題】しかし、上記した荷役
車両によると、被搬送物を1個しか載置することができ
ないため、大量のレンガ、スラグ等を積み込み運搬する
には、荷役車両を何度も往復させなければならず、作業
能率が悪いなどの問題がある。
However, according to the above-mentioned cargo handling vehicle, only one conveyed object can be placed. Therefore, in order to load and transport a large amount of bricks, slag, etc., the cargo handling vehicle must be equipped with a large amount of cargo. It is necessary to reciprocate again and again, and there is a problem that work efficiency is poor.

【0009】そこで本発明のうち請求項1記載の発明
は、荷台に複数の被搬送物を積み込んで能率良く運搬す
ることができる荷役車両を提供することを目的としたも
のである。
SUMMARY OF THE INVENTION It is an object of the present invention to provide a cargo handling vehicle capable of loading a plurality of articles to be carried on a carrier and transporting the articles efficiently.

【0010】また請求項2記載の発明は、荷役装置によ
る作業を迅速かつ確実に行える荷役車両を提供すること
を目的としたものである。
Another object of the present invention is to provide a cargo handling vehicle capable of performing work by a cargo handling device quickly and reliably.

【0011】[0011]

【課題を解決するための手段】前述した目的を達成する
ために、本発明のうちで請求項1記載の荷役車両は、荷
台上に荷役装置を設け、複数の被搬送物を、荷台前後に
設けられた載置部に載置自在に構成し、前記荷役装置
は、荷台後端部に揺動自在に設けられた左右一対の第1
ブームと、この第1ブームと荷台側との間に設けられた
第1ブーム揺動装置と、第1ブームの先端部に揺動自在
に設けられた第2ブームと、この第2ブームと第1ブー
ムとの間に設けられた第2ブーム揺動装置と、前記第2
ブーム先端に設けられかつ被搬送物に対して係脱自在な
吊り具とにより構成したことを特徴としたものである。
In order to achieve the above object, a cargo handling vehicle according to the present invention is provided with a cargo handling device on a loading platform, and a plurality of objects to be transported are placed in front of and behind the loading platform. The loading and unloading device is configured to be freely mounted on a mounting portion provided, and the loading and unloading device comprises a pair of left and right first
A boom, a first boom swinging device provided between the first boom and the loading platform side, a second boom swingably provided at a tip end of the first boom, and a second boom and a second boom. A second boom swing device provided between the first boom and the second boom;
It is characterized in that it is constituted by a hanger provided at the end of the boom and capable of being detachably engaged with the transferred object.

【0012】したがって請求項1の発明によると、吊り
具を被搬送物に係合させ、さらに第1ブーム揺動装置を
駆動させて第1ブームを揺動させることで、被搬送物を
荷台後側の載置部に載せたり、荷台から降ろしたりし得
る。また吊り具を被搬送物に係合させた状態で、第1ブ
ーム揺動装置を駆動させて第1ブームを揺動させかつ第
2ブーム揺動装置を駆動させて第2ブームを揺動させる
ことで、前記被搬送物を荷台前側の載置部に載せたり、
荷台から降ろしたりし得る。
Therefore, according to the first aspect of the present invention, the hanging object is engaged with the object to be conveyed, and further, the first boom swinging device is driven to swing the first boom, so that the object to be conveyed is placed after the loading platform. On the side or on the loading platform. Further, in a state where the suspending member is engaged with the transported object, the first boom swing device is driven to swing the first boom, and the second boom swing device is driven to swing the second boom. By placing the transferred object on the mounting portion in front of the loading platform,
And can be unloaded.

【0013】また本発明の請求項2記載の荷役車両は、
上記した請求項1記載の構成において、吊り具が、第2
ブームの内側先端部に揺動自在に設けられかつ係止部を
有する板体と、第2ブームに設けられかつ板体を左右方
向で移動させる板体移動装置と、第2ブームに設けられ
かつ板体の揺動を第2ブームに対する一定の揺動角度に
おいて固定自在な左右一対の板体固定装置とから構成さ
れ、前記板体は、被搬送物に設けられた係止具に係脱自
在に構成したことを特徴としたものである。
According to a second aspect of the present invention, there is provided a cargo-handling vehicle.
In the configuration according to claim 1, the hanging member is a second member.
A plate body swingably provided at the inner end of the boom and having a locking portion, a plate body moving device provided on the second boom and moving the plate body in the left-right direction, and provided on the second boom; A pair of left and right plate body fixing devices capable of fixing the swing of the plate body at a fixed swing angle with respect to the second boom, wherein the plate body is detachable from a locking member provided on the transferred object. It is characterized by having been constituted in.

【0014】したがって請求項2の発明によると、板体
移動装置を駆動させて板体を左右方向の内向きに移動さ
せることで、板体の係止部を被搬送物の係止具に係合し
得、また板体移動装置を駆動させて板体を左右方向の外
向きに移動させることで、板体の係止部を被搬送物の係
止具から離脱し得る。そして被搬送物からの放出作業を
行う際は、前記係止部を係止具に係合させかつ被搬送物
を載置部に載せた状態から第1ブーム揺動装置を駆動さ
せて第1ブームを揺動させ、この第1ブームがほぼ立設
した位置において第2ブーム揺動装置を駆動させて第2
ブームを揺動させる。次に板体が、第2ブームに対して
一定の揺動角度になる時、板体固定装置を駆動させると
ともに、第2ブーム揺動装置の駆動を止めると板体の揺
動が阻止される。この状態からさらに第1ブーム揺動装
置を駆動させて、第1ブームを後方へ揺動させる。この
とき第1ブームと第2ブームと板体とが一体となってお
り、さらに板体と被搬送物とが一体となっていることか
ら、第1ブーム、第2ブーム、板体が後方へ揺動するの
と一体に、被搬送物は、その前部を持ち上げながら後部
を下方へ徐々に下げることで車両の後方位置に立設し
得、以って放出を行える。
Therefore, according to the second aspect of the present invention, the plate body moving device is driven to move the plate body inward in the left-right direction, so that the locking portion of the plate body is engaged with the locking member of the transferred object. By driving the plate moving device to move the plate outward in the left-right direction, the locking portion of the plate can be disengaged from the locking member of the transported object. When performing the discharging operation from the transported object, the first boom swinging device is driven by driving the first boom swing device from a state where the locking portion is engaged with the locking tool and the transported object is placed on the mounting portion. The second boom swing device is driven at a position where the first boom is almost upright by swinging the boom.
Swing the boom. Next, when the plate is at a certain swing angle with respect to the second boom, the plate body fixing device is driven, and when the drive of the second boom swing device is stopped, the plate body is prevented from swinging. . From this state, the first boom swing device is further driven to swing the first boom backward. At this time, the first boom, the second boom, and the plate are integrated with each other, and the plate and the transferred object are integrated with each other. In conjunction with the swinging movement, the transported object can be erected at the rear position of the vehicle by gradually lowering the rear portion while lifting the front portion thereof, thereby discharging the object.

【0015】[0015]

【発明の実施の形態】以下に、本発明の実施の形態を、
製鉄工場で炉、鍋を清掃した時にでるレンガ、スラグ等
をコンテナに積込み運搬するのに使用される荷役車両に
採用した状態として、図1〜図7に基づいて説明する。
DESCRIPTION OF THE PREFERRED EMBODIMENTS Embodiments of the present invention will be described below.
Referring to FIGS. 1 to 7, a description will be given of a state in which bricks, slag, and the like that are produced when a furnace and a pot are cleaned in an ironworks are used in a cargo handling vehicle used to load and transport containers.

【0016】すなわち、図1および図2に示すように荷
役車両1は、トラックヘッド2と、このトラックヘッド
2の後部に縦方向軸3を介して連結されたトレーラ4と
により構成される。前記トラックヘッド2は、車輪5を
有する前部車体6と、この前部車体6上に設けられた運
転部7と、この運転部7内で各シリンダー装置(後述す
る)を駆動可能に設けられた操作レバー8などにより構
成されている。また前記トレーラ4は、車輪9を有する
後部車体10の上面側に、荷台11が設けられ、この荷
台11の前後にそれぞれ前側載置部11aと後側載置部
11bとを設け、コンテナ(被搬送物の一例)12を載
置自在に構成している。
That is, as shown in FIGS. 1 and 2, the cargo handling vehicle 1 includes a track head 2 and a trailer 4 connected to a rear portion of the track head 2 via a vertical shaft 3. The track head 2 is provided with a front vehicle body 6 having wheels 5, an operation unit 7 provided on the front vehicle body 6, and a driving unit for driving each cylinder device (described later) in the operation unit 7. It comprises an operating lever 8 and the like. The trailer 4 is provided with a loading platform 11 on the upper surface side of a rear vehicle body 10 having wheels 9. A front loading section 11 a and a rear loading section 11 b are provided before and after the loading platform 11, respectively. An example of the transported object 12 is configured to be freely mounted.

【0017】前記後部車体10には、前記荷台11上で
コンテナ12を、前記操作レバー8の操作により積み卸
し作業および積み込まれたレンガ、スラグ等の放出作業
が可能な荷役装置13が設けられている。すなわち荷役
装置13は、左右方向(車幅方向)で一対の第1ブーム
14を有し、これら第1ブーム14は、荷台11の後端
部でその軸心方向が左右方向の左右方向軸15により各
別に連結されることで、荷台11上部とその後方に亘っ
て左右方向軸15を中心に前後揺動自在に構成される。
そして両第1ブーム14の遊端間は、左右方向の連結部
材16により一体化されている。
The rear body 10 is provided with a loading / unloading device 13 capable of loading / unloading the container 12 on the loading platform 11 and discharging the loaded bricks, slag, and the like by operating the operation lever 8. I have. That is, the loading / unloading device 13 has a pair of first booms 14 in the left-right direction (vehicle width direction). By being connected separately to each other, it is configured to be swingable back and forth around the left-right axis 15 over the upper portion of the loading platform 11 and the rear thereof.
The free ends of the first booms 14 are integrated by a left-right connecting member 16.

【0018】また前記左右方向軸15を中心に前記第1
ブーム14を揺動させるための下部シリンダー装置(第
1ブーム揺動装置の一例)17が左右一対に設けられて
いる。これら下部シリンダー装置17の本体17aは、
荷台11の後側載置部11bの左右側方に設けられたブ
ラケット18にピン19を介して連結され、また後方へ
伸びるピストンロッド17bは、第1ブーム14側のブ
ラケット20にピン21を介して連結されている。なお
この下部シリンダー装置17は、運転部7の操作レバー
8により駆動可能に構成されている。
Further, the first axis is centered on the horizontal axis 15.
A lower cylinder device (an example of a first boom swing device) 17 for swinging the boom 14 is provided in a pair of right and left. The main body 17a of these lower cylinder devices 17
A piston rod 17b connected to brackets 18 provided on the left and right sides of the rear mounting portion 11b of the loading platform 11 via pins 19, and extends rearward via a pin 21 to a bracket 20 on the first boom 14 side. Connected. The lower cylinder device 17 is configured to be drivable by the operation lever 8 of the operation unit 7.

【0019】さらに第1ブーム14の先端よりやや左右
方向軸15側には、左右方向の揺動軸22が設けられ、
この揺動軸22を基端部として第2ブーム23が、両第
1ブーム14の内側でそれぞれ一対設けられている。前
記第2ブーム23の中間部には、回動自在なピン24が
設けられるとともに、第1ブーム14の上端部でかつ前
後のほぼ中間部に設けられた上部シリンダー装置(第2
ブーム揺動装置の一例)25のロッド部25aと前記ピ
ン24とが連結され、運転部7の操作レバー8の操作に
基づく上部シリンダー装置25の駆動により、第2ブー
ム23が揺動軸22を中心に揺動自在に構成されてい
る。
Further, a left-right swing shaft 22 is provided slightly to the left-right shaft 15 side from the tip of the first boom 14.
A pair of second booms 23 are provided inside the first booms 14 with the swing shaft 22 as a base end. A rotatable pin 24 is provided at an intermediate portion of the second boom 23, and an upper cylinder device (a second cylinder device) provided at an upper end portion of the first boom 14 and substantially at an intermediate portion between front and rear.
One example of a boom swinging device) The rod portion 25a of 25 is connected to the pin 24, and the second boom 23 drives the swinging shaft 22 by driving the upper cylinder device 25 based on the operation of the operating lever 8 of the operating unit 7. It is configured to be swingable at the center.

【0020】また図1〜図3に示すように両第2ブーム
23の先端には、第1貫通孔26が左右方向に設けら
れ、この第1貫通孔26よりさらに揺動軸22側には、
第2貫通孔27が左右方向に設けられている。両第2ブ
ーム23の内側には、それぞれ両第2ブーム23に平行
かつ近接した位置でL字形状の吊り板(板体の一例)2
8が、そのほぼ中心部に移動ピン29を左右方向の外向
きに突出させ、これら移動ピン29を前記第1貫通孔2
6に嵌通させた状態で、移動ピン29を中心に回動自在
に設けられている。
As shown in FIGS. 1 to 3, a first through hole 26 is provided at the tip of each of the second booms 23 in the left-right direction, and further on the side of the swing shaft 22 than the first through hole 26. ,
A second through hole 27 is provided in the left-right direction. Inside the two second booms 23, L-shaped suspension plates (an example of a plate) 2 at positions parallel to and close to the two second booms 23, respectively.
8 protrudes outwardly in the left-right direction at substantially the center of the movable pin 29, and moves the movable pin 29 to the first through hole 2.
6 and is provided so as to be rotatable around a moving pin 29.

【0021】前記左右両第2ブーム23の一対間で、第
1貫通孔26に隣接した位置に、ベル・クランク機構を
有する第1リンク部30が設けられている。この第1リ
ンク部30の一方の端部30aと、第2ブーム23の第
1貫通孔26から突出した移動ピン29とが連結され、
さらに第1リンク部30の他方の端部30bと、フック
シリンダ(板体移動装置の一例)31のロッド部31a
とが連結されている。このフックシリンダ31は、運転
部7の操作レバー8により駆動可能に設けられている。
A first link portion 30 having a bell-crank mechanism is provided between a pair of the left and right second booms 23 and adjacent to the first through hole 26. One end 30a of the first link portion 30 is connected to a moving pin 29 projecting from the first through hole 26 of the second boom 23,
Further, the other end portion 30b of the first link portion 30 and the rod portion 31a of the hook cylinder (an example of a plate moving device) 31
And are connected. The hook cylinder 31 is provided so as to be driven by the operation lever 8 of the operation unit 7.

【0022】また左右両第2ブーム23の一対間で、第
2貫通孔27に隣接した位置に、ベル・クランク機構を
有する第2リンク部32が設けられている。この第2リ
ンク部32の一方の端部32aと、第2ブーム23の第
2貫通孔27から突出した固定ピン33とが連結され、
この固定ピン33は、吊り板28に設けられた孔部28
aに、第2ブーム23と吊り板28とが互いに水平状姿
勢の位置において連通自在に構成されている。さらに第
2リンク部32の他方の端部32bと、ロックシリンダ
(板体固定装置の一例)34のロッド部34aとが連結
されている。このロックシリンダ34は、運転部7の操
作レバー8により駆動可能に設けられている。
A second link 32 having a bell-crank mechanism is provided between a pair of the left and right second booms 23 and adjacent to the second through hole 27. One end 32a of the second link portion 32 is connected to a fixing pin 33 projecting from the second through hole 27 of the second boom 23,
The fixing pin 33 is provided in the hole 28 provided in the suspension plate 28.
a, the second boom 23 and the suspension plate 28 are configured to be able to communicate with each other at a position in a horizontal posture. Further, the other end portion 32b of the second link portion 32 is connected to a rod portion 34a of a lock cylinder (an example of a plate fixing device) 34. The lock cylinder 34 is provided so as to be drivable by the operation lever 8 of the operation unit 7.

【0023】また前記吊り板28の一方の端部28bと
他方の端部28cには、それぞれ孔部(係止部の一例)
35が設けられている。そしてコンテナ12の左右両側
面の上部には、複数の吊りピン(係止具の一例)12a
が側方へ突出するよう設けられ、前記孔部35と係合自
在に構成されている。
The one end 28b and the other end 28c of the suspension plate 28 are each provided with a hole (an example of a locking portion).
35 are provided. A plurality of hanging pins (an example of a locking tool) 12 a
Is provided so as to protrude to the side, and is configured to be freely engageable with the hole 35.

【0024】以下に、上記した実施の形態における作用
を説明する。図4に示すように、たとえばレンガ、スラ
グ等をコンテナ12に積込み、このコンテナ12を荷台
11の後側載置部11bに載せる際は、下部シリンダー
装置17のピストンロッド17bを突出させ、かつ、上
部シリンダー装置25のロッド部25aを収縮させて第
1ブーム14と第2ブーム23とがほぼ重なり合う姿勢
から、まず、コンテナ12に対し、操作レバー8の操作
により、フックシリンダ31を駆動させそのロッド部3
1aを進展動させる。すると第1リンク部30を介して
移動ピン29および吊り板28が、図3の仮想線から実
線に示すように、左右方向の内側向きに移動し、以って
コンテナ12の吊りピン12aに吊り板28の孔部35
が外嵌めされて係合される。次に下部シリンダー装置1
7を収縮動させて第1ブーム14を揺動させるとコンテ
ナ12は、水平状態を保ったまま持ち上げられ(図4の
イ位置に示す)、さらに下部シリンダー装置17を収縮
動させてこのコンテナ12を荷台11の後側載置部11
bに載せる(図4のロ位置に示す)。コンテナ12を荷
台11から卸す作業に際しては、上述とは逆の動作が実
行される。
The operation of the above embodiment will be described below. As shown in FIG. 4, for example, when bricks, slag, and the like are loaded into the container 12 and the container 12 is placed on the rear placement portion 11b of the loading platform 11, the piston rod 17b of the lower cylinder device 17 is projected, and The rod portion 25a of the upper cylinder device 25 is contracted so that the first boom 14 and the second boom 23 substantially overlap each other. Part 3
Move 1a forward. Then, the moving pin 29 and the suspension plate 28 move inward in the left-right direction from the imaginary line in FIG. 3 to the solid line via the first link portion 30, and are thereby suspended on the suspension pins 12 a of the container 12. Hole 35 of plate 28
Are externally fitted and engaged. Next, lower cylinder device 1
When the first boom 14 is swung by retracting the container 7, the container 12 is lifted while maintaining the horizontal state (shown at the position A in FIG. 4), and further, the lower cylinder device 17 is retracted to move the container 12. Of the loading platform 11
b (shown in a position B in FIG. 4). In the operation of unloading the container 12 from the carrier 11, the reverse operation is performed.

【0025】次に、図5に示すように、別のコンテナ1
2を荷台11の前側載置部11aに載せる際は、まず、
上述と同様に操作レバー8の操作により、フックシリン
ダ31を駆動させそのロッド部31aを進展動させる。
すると、第1リンク部30を介して移動ピン29および
吊り板28が、図3の仮想線から実線に示すように、左
右方向の内側向きに移動し、以って前記コンテナ12の
吊りピン12aに吊り板28の孔部35が外嵌めされて
係合される。
Next, as shown in FIG.
When placing 2 on the front placing portion 11a of the loading platform 11, first,
As described above, by operating the operation lever 8, the hook cylinder 31 is driven to move the rod portion 31a forward.
Then, the moving pin 29 and the suspension plate 28 move inward in the left-right direction from the imaginary line in FIG. 3 to the solid line via the first link portion 30, whereby the suspension pin 12 a of the container 12 is moved. The hole 35 of the suspension plate 28 is externally fitted and engaged.

【0026】次に下部シリンダー装置17を収縮動させ
て第1ブーム14を揺動させるとともに、上部シリンダ
ー装置25を進展動させて、第1ブーム14に対して第
2ブーム23を揺動させると、コンテナ12は、水平状
態を保ったまま持ち上げられ(図5のイ位置に示す)、
荷台11の後側載置部11bに載せられたコンテナ12
の上方を大きく迂回し、さらに下部シリンダー装置17
を収縮動させかつ上部シリンダー装置25を進展動させ
ることで、コンテナ12を荷台11の前側載置部11a
に載せる(図5のロ位置に示す)。このコンテナ12の
荷台11からの卸し作業に際しては、上述とは逆の動作
が実行される。
Next, the lower cylinder device 17 is contracted to swing the first boom 14, and the upper cylinder device 25 is moved forward to swing the second boom 23 relative to the first boom 14. , The container 12 is lifted while keeping the horizontal state (shown in the position A in FIG. 5),
The container 12 placed on the rear placing portion 11b of the bed 11
Circumvents the upper part of the lower cylinder device 17
And the upper cylinder device 25 is moved forward to move the container 12 to the front mounting portion 11a of the loading platform 11.
(Shown in the position B in FIG. 5). In the operation of unloading the container 12 from the carrier 11, the reverse operation is performed.

【0027】さらにコンテナ12からレンガ、スラグ等
の放出作業を行う際は、図3および図6、図7に示すよ
うに、吊り板28の孔部35をコンテナ12の吊りピン
12aに係合させかつコンテナ12を前側載置部11a
(または後側載置部11b)に載せた状態から、下部シ
リンダー装置17を進展動させて第1ブーム14を揺動
させ、この第1ブーム14がほぼ立設した位置におい
て、上部シリンダー装置25を収縮動させて第2ブーム
23を揺動させる。次に吊り板28と第2ブーム23と
が互いに水平状の姿勢の位置(図7のイ位置にて示す)
になる時、ロックシリンダ34を駆動させてそのロッド
部34aを進展動させるととともに、上部シリンダー装
置25の駆動を止めると、第2リンク部32を介して作
動方向が固定ピン33の軸心方向へ変向される。これに
より固定ピン33は、左右方向の内側向きに移動し、以
って図3の実線に示すように、吊り板28の孔部28a
に外嵌めされて係合される。
Further, when discharging the bricks, slag, etc. from the container 12, the holes 35 of the suspension plate 28 are engaged with the suspension pins 12a of the container 12, as shown in FIGS. And the container 12 is placed on the front
(Or the rear mounting portion 11b), the lower cylinder device 17 is moved forward to swing the first boom 14, and the upper cylinder device 25 is moved to a position where the first boom 14 is almost upright. To make the second boom 23 swing. Next, a position where the suspension plate 28 and the second boom 23 are in a horizontal position with respect to each other (shown by a position A in FIG. 7).
When the lock cylinder 34 is driven to move the rod portion 34a forward and the driving of the upper cylinder device 25 is stopped, the operation direction is changed to the axial direction of the fixed pin 33 via the second link portion 32. Be converted to As a result, the fixing pin 33 moves inward in the left-right direction, and as shown by the solid line in FIG.
And is engaged with the outside.

【0028】この状態からさらに下部シリンダー装置1
7を進展動させると、第1ブーム14が後方へ揺動す
る。このとき第1ブーム14と第2ブーム23と吊り板
28とが一体となっており、さらに吊り板28とコンテ
ナ12とが一体となっている。したがって第1ブーム1
4、第2ブーム23、吊り板28が後方へ揺動するのと
一体に、コンテナ12はその前部を持ち上げながら後部
を下方へ徐々に下げることで、図6のイ位置および図7
のロ位置に示すように、コンテナ12をトレーラ4の後
方位置に立設させ得る。以って積み込まれたレンガ、ス
ラグ等を放出し得る。なおコンテナ12を荷台11上に
載せた状態に戻す際は、上述とは逆の動作が実行され
る。
From this state, the lower cylinder device 1
When the first boom 14 is moved forward, the first boom 14 swings rearward. At this time, the first boom 14, the second boom 23, and the suspension plate 28 are integrated, and the suspension plate 28 and the container 12 are integrated. Therefore, the first boom 1
4, together with the second boom 23 and the suspension plate 28 swinging backward, the container 12 gradually lowers the rear part while lifting the front part thereof, so that the container 12 is positioned at the position a in FIG.
The container 12 can be erected at the rear position of the trailer 4 as shown in the position (b). Thus, the loaded brick, slag, and the like can be discharged. When the container 12 is returned to the state where it is placed on the loading platform 11, an operation reverse to that described above is performed.

【0029】なお、荷台11の前側載置部11aに対し
て後側載置部11bが低く形成されるように高低差をつ
けることにより、運転部7からの後方視界が良好とな
り、目視による各作業をより好適に行える。
By providing a height difference so that the rear mounting portion 11b is formed lower than the front mounting portion 11a of the loading platform 11, the rear view from the operating portion 7 becomes good, and each Work can be performed more suitably.

【0030】上記した実施の形態では、吊り板28と、
フックシリンダ31と、ロックシリンダ34などとから
なる吊り具を採用しているが、これは、チェーンまたは
ワイヤーロープであってもよい。
In the above embodiment, the suspension plate 28
Although a hanging tool including the hook cylinder 31 and the lock cylinder 34 is employed, this may be a chain or a wire rope.

【0031】上記した実施の形態では、第1ブーム揺動
装置および第2ブーム揺動装置としてシリンダー装置が
示されているが、これはボールねじ形式など他の形式を
採用してもよい。
In the above-described embodiment, the cylinder device is shown as the first boom swing device and the second boom swing device, but other types such as a ball screw type may be adopted.

【0032】上記した実施の形態では、トラックヘッド
2の前部車体6とトレーラ4の後部車体10とが縦方向
軸3を介して連結された荷役車両1が示されているが、
他の連結手段を用いてもよく、さらに車体が一体型の荷
役車両であってもよい。
In the above-described embodiment, the cargo handling vehicle 1 in which the front vehicle body 6 of the track head 2 and the rear vehicle body 10 of the trailer 4 are connected via the vertical shaft 3 is shown.
Other connecting means may be used, and the vehicle body may be an integrated cargo handling vehicle.

【0033】[0033]

【発明の効果】上記した本発明の請求項1によると、第
1ブーム揺動装置の駆動により第1ブームを揺動させる
ことで、被搬送物を荷台後側の載置部へ積み卸しでき、
さらに第2ブーム揺動装置の駆動により第2ブームを揺
動させることで、被搬送物を荷台前側の載置部へ積み卸
しできることから、荷役車両は、2個(複数個)の被搬
送物の搬送を同時に行うことができて、実質的にその走
行距離や作業時間を短縮できて作業能率を向上でき、さ
らには荷役車両の燃料を節約できるなど経済的効果も期
待できる。
According to the first aspect of the present invention, by moving the first boom by driving the first boom swinging device, it is possible to load and unload the transported object to the loading portion at the rear side of the loading platform. ,
Further, by swinging the second boom by driving the second boom swinging device, the transported object can be loaded and unloaded to the mounting portion in front of the loading platform. Transport can be performed at the same time, and the traveling distance and work time can be substantially reduced, so that work efficiency can be improved, and further, an economic effect such as saving fuel for cargo handling vehicles can be expected.

【0034】また上記した本発明の請求項2によると、
荷台前後の載置部へ積み卸しできるとともに、放出作業
も含めて運転部の作業員のみにより迅速かつ確実に行う
ことができる。
According to the second aspect of the present invention,
It can be loaded and unloaded to the loading sections before and after the loading platform, and can be quickly and reliably performed by only the operators of the operating section, including the discharging operation.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の実施の形態の一例を示し、荷役車両の
運搬時での側面図である。
FIG. 1 is a side view illustrating an example of an embodiment of the present invention when a cargo handling vehicle is being transported.

【図2】同荷役車両の運搬時での平面図である。FIG. 2 is a plan view of the cargo handling vehicle during transportation.

【図3】同荷役車両の板体移動装置および板体固定装置
を示す一部切り欠き平面図である。
FIG. 3 is a partially cutaway plan view showing a plate moving device and a plate fixing device of the cargo handling vehicle.

【図4】同荷役車両における後側載置部への積み卸しを
示す要部の概略側面図である。
FIG. 4 is a schematic side view of a main part showing unloading to a rear mounting portion in the cargo handling vehicle.

【図5】同荷役車両における前側載置部への積み卸しを
示す要部の概略側面図である。
FIG. 5 is a schematic side view of a main part of the loading and unloading vehicle, showing unloading to a front mounting portion.

【図6】同荷役車両における後側載置部からダンプ時の
側面図である。
FIG. 6 is a side view of the cargo handling vehicle when dumping from a rear mounting portion.

【図7】同荷役車両における前側載置部からダンプ時の
側面図である。
FIG. 7 is a side view of the cargo handling vehicle when dumping from a front mounting portion.

【図8】従来例を示し、荷役車両の積み卸し時の側面図
である。
FIG. 8 is a side view showing a conventional example when loading and unloading vehicles are unloaded.

【図9】同荷役車両の積み卸し時の平面図である。FIG. 9 is a plan view at the time of unloading of the cargo handling vehicle.

【図10】同荷役車両におけるダンプ時の側面図であ
る。
FIG. 10 is a side view of the cargo handling vehicle at the time of dumping.

【符号の説明】[Explanation of symbols]

1 荷役車両 11 荷台 11a 前側載置部 11b 後側載置部 12 コンテナ(被搬送物の一例) 12a 吊りピン(係止具の一例) 13 荷役装置 14 第1ブーム 17 下部シリンダー装置(第1ブーム揺動装置の
一例) 23 第2ブーム 25 上部シリンダー装置(第2ブーム揺動装置の
一例) 28 吊り板(板体の一例) 31 フックシリンダ(板体移動装置の一例) 34 ロックシリンダ(板体固定装置の一例) 35 孔部(係止部の一例)
DESCRIPTION OF SYMBOLS 1 Cargo handling vehicle 11 Carrier 11a Front placement part 11b Rear placement part 12 Container (an example of a thing to be conveyed) 12a Hanging pin (an example of a locking device) 13 Loading equipment 14 1st boom 17 Lower cylinder device (1st boom) Example of swinging device) 23 Second boom 25 Upper cylinder device (Example of second boom swinging device) 28 Suspension plate (Example of plate) 31 Hook cylinder (Example of plate moving device) 34 Lock cylinder (Plate) An example of a fixing device) 35 holes (an example of a locking portion)

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 荷台上に荷役装置を設け、複数の被搬送
物を、荷台前後に設けられた載置部に載置自在に構成
し、前記荷役装置は、荷台後端部に揺動自在に設けられ
た左右一対の第1ブームと、この第1ブームと荷台側と
の間に設けられた第1ブーム揺動装置と、第1ブームの
先端部に揺動自在に設けられた第2ブームと、この第2
ブームと第1ブームとの間に設けられた第2ブーム揺動
装置と、前記第2ブーム先端に設けられかつ被搬送物に
対して係脱自在な吊り具とにより構成したことを特徴と
する荷役車両。
1. A cargo handling device is provided on a loading platform, and a plurality of transported objects are configured to be able to be mounted on loading portions provided before and after the loading platform, and the loading device is swingable at a rear end portion of the loading platform. A pair of left and right first booms, a first boom swing device provided between the first boom and the loading platform side, and a second boom swingably provided at a tip end of the first boom. Boom and this second
A second boom swinging device is provided between the boom and the first boom, and a hanger is provided at a tip of the second boom and is detachable from a conveyed object. Cargo handling vehicle.
【請求項2】 吊り具が、第2ブームの内側先端部に揺
動自在に設けられかつ係止部を有する板体と、第2ブー
ムに設けられかつ板体を左右方向で移動させる板体移動
装置と、第2ブームに設けられかつ板体の揺動を第2ブ
ームに対する一定の揺動角度において固定自在な左右一
対の板体固定装置とから構成され、前記板体は、被搬送
物に設けられた係止具に係脱自在に構成したことを特徴
とする請求項1記載の荷役車両。
2. A plate body provided with a suspending member at a tip end inside the second boom so as to swing freely and a plate body provided on the second boom and moving the plate body in the left-right direction. A moving device and a pair of left and right plate fixing devices provided on the second boom and capable of fixing the swing of the plate at a fixed swing angle with respect to the second boom; The cargo handling vehicle according to claim 1, wherein the vehicle is configured to be freely disengageable from a locking member provided on the vehicle.
JP7870397A 1997-03-31 1997-03-31 Material handling vehicle Pending JPH10272981A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP7870397A JPH10272981A (en) 1997-03-31 1997-03-31 Material handling vehicle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP7870397A JPH10272981A (en) 1997-03-31 1997-03-31 Material handling vehicle

Publications (1)

Publication Number Publication Date
JPH10272981A true JPH10272981A (en) 1998-10-13

Family

ID=13669238

Family Applications (1)

Application Number Title Priority Date Filing Date
JP7870397A Pending JPH10272981A (en) 1997-03-31 1997-03-31 Material handling vehicle

Country Status (1)

Country Link
JP (1) JPH10272981A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2000021788A1 (en) * 1998-10-13 2000-04-20 Shawtrans Equipment (Proprietary) Limited Refuse-handling vehicle
WO2004080754A3 (en) * 2003-03-14 2005-03-31 Manfred Schaich Container handling device for a container transporting vehicle

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2000021788A1 (en) * 1998-10-13 2000-04-20 Shawtrans Equipment (Proprietary) Limited Refuse-handling vehicle
WO2004080754A3 (en) * 2003-03-14 2005-03-31 Manfred Schaich Container handling device for a container transporting vehicle

Similar Documents

Publication Publication Date Title
JP3375330B2 (en) Container handling equipment
US3487964A (en) Self-loading side loaders
US5018932A (en) Apparatus for handling a load by arm, notably for a truck or trailer
JPS62500863A (en) combination track
US3486641A (en) Bulk loader,unloader,and cargo container handling crane and method
JPH10272981A (en) Material handling vehicle
CN115432549A (en) Lifting equipment and container unloading method
JP2991156B2 (en) Cargo handling equipment using cranes
JP3255863B2 (en) Cargo handling vehicle
JP4201492B2 (en) Cargo handling vehicle
CN214530837U (en) Lifting device and loader
KR101695420B1 (en) Dumping device for container
CN222892934U (en) Multi-type intermodal loading and unloading machine
CN111846996A (en) Material unloading equipment and material unloading device
CN222743604U (en) A loading and unloading attachment used in multimodal transport containers
CN222081916U (en) A special box and combined accessories for bulk cargo loading operation
CN216508079U (en) Loading and unloading structure
JPH10250985A (en) Multipurpose crane
JP3267547B2 (en) Cargo handling vehicle
JPH036586Y2 (en)
JPH10194035A (en) Cargo-handling vehicle
JPS5847731A (en) Continuous unloader
JPH10338461A (en) Glove for lifting work
JPH07172794A (en) Ice gripper of material handling vehicle
JPH0743062Y2 (en) Transfer device

Legal Events

Date Code Title Description
A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20020806