JPH10317897A - Flow obstruction preventive structure of groundwater and segment piece and segment ring therefor - Google Patents

Flow obstruction preventive structure of groundwater and segment piece and segment ring therefor

Info

Publication number
JPH10317897A
JPH10317897A JP9132575A JP13257597A JPH10317897A JP H10317897 A JPH10317897 A JP H10317897A JP 9132575 A JP9132575 A JP 9132575A JP 13257597 A JP13257597 A JP 13257597A JP H10317897 A JPH10317897 A JP H10317897A
Authority
JP
Japan
Prior art keywords
water
groundwater
pipe
water pipe
underground structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP9132575A
Other languages
Japanese (ja)
Other versions
JP3846972B2 (en
JPH10317897A5 (en
Inventor
Toshio Kodama
敏雄 児玉
Kenkichi Moriyama
健吉 森山
Koushirou Saiki
公嗣良 斎木
Norio Unno
紀夫 海野
Kunihiro Hirayama
国弘 平山
Toru Moriyama
亨 守山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sato Kogyo Co Ltd
Original Assignee
Sato Kogyo Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sato Kogyo Co Ltd filed Critical Sato Kogyo Co Ltd
Priority to JP13257597A priority Critical patent/JP3846972B2/en
Publication of JPH10317897A publication Critical patent/JPH10317897A/en
Publication of JPH10317897A5 publication Critical patent/JPH10317897A5/ja
Application granted granted Critical
Publication of JP3846972B2 publication Critical patent/JP3846972B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

PROBLEM TO BE SOLVED: To prevent the flow obstruction of groundwater. SOLUTION: An annular water pipe 2A along the peripheral direction is installed into the peripheral wall of an underground structure 1A constructed by underground excavation, and water-collecting means 4, 4 projected into a ground through the water pipe 2A are mounted on the upstream side in the direction of the flow of groundwater in the underground structure 1A and discharge means 5, 5 projected into the ground through the water pipe 2A on the downstream side reverse to the water-collecting means 4, 4. Groundwater on the upstream side of the underground structure 1A is collected by the water- collecting means 4, 4 and introduced into the water pipe 2A, reaches the discharge means 5, 5 through the water pipe 2A, and discharged to the downstream side from the discharge means 5, 5.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、非開削の状態での
地中掘削に基づいて構築した地下構造物において生ず
る、地下水の流動阻害の防止構造に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a structure for preventing the flow of groundwater from being hindered in an underground structure constructed based on underground excavation in an uncut state.

【0002】[0002]

【従来の技術】地下水流動のある地盤において、道路用
トンネル、鉄道用トンネル等の地下構造物を構築した場
合、短期的あるいは長期的な地下水の流動阻害が生じ、
これによる周辺地盤の沈下や井戸水確保の困難化などが
問題となる。
2. Description of the Related Art When underground structures such as road tunnels and railway tunnels are constructed on ground with groundwater flow, short-term or long-term groundwater flow obstruction occurs.
This causes problems such as the settlement of the surrounding ground and difficulty in securing well water.

【0003】例えば図14に示すように、地下構造物1
00が透水層と難透水層または不透水層(以下、単に難
透水層という)とに跨がって、地下水流動を堰き止める
位置にある場合、地下水の流動が阻害される。図示の例
では、地下構造物100を挟んで上流側の地下水面h1
が当該地下構造物100の最上部を越える位置h2まで
上昇する一方、下流側の地下水面h3はその上昇分だけ
下方の位置h4まで下降することになる。このため、地
下構造物100の地下水流動方向に下流側において地盤
沈下や井戸水確保の困難化を生ずる。
[0003] For example, as shown in FIG.
When 00 is located over the permeable layer and the poorly permeable layer or the impermeable layer (hereinafter, simply referred to as the poorly permeable layer), the flow of groundwater is obstructed. In the illustrated example, the groundwater surface h1 on the upstream side with the underground structure 100 interposed therebetween.
Rises to a position h2 exceeding the uppermost part of the underground structure 100, while the groundwater surface h3 on the downstream side falls to a position h4 below by the rising amount. For this reason, land subsidence and well water securing become difficult on the downstream side in the groundwater flow direction of the underground structure 100.

【0004】また、地下構造物が透水層と難透水層また
は不透水層とに跨がっていなくとも、例えば地下構造物
が地下水流動経路に位置する場合には、地下水の流動は
阻害される。
[0004] Even if the underground structure does not straddle the permeable layer and the poorly permeable or impermeable layer, for example, if the underground structure is located in the groundwater flow path, the flow of groundwater is hindered. .

【0005】従来、地下構造物の構築を開削工法により
行う場合には、図15に示すように、地下構造物110
を挟んで上流側および下流側に集水用および放水用の縦
坑111,112をそれぞれ形成し、これらを地下構造
物110の下方側の難透水層に形成した横坑113によ
り通じさせて、地下水の流動阻害を防止していた。ま
た、地下構造物の外周に沿って通水管を設けたり同様に
透水領域を形成することも行われていた。
Conventionally, when an underground structure is constructed by an open-cutting method, as shown in FIG.
Vertical shafts 111 and 112 for collecting and discharging water are formed on the upstream side and the downstream side, respectively, and these are communicated by the horizontal shaft 113 formed in the low-permeable layer below the underground structure 110. It prevented the groundwater flow from being hindered. Also, a water pipe is provided along the outer periphery of the underground structure, and a water permeable region is similarly formed.

【0006】[0006]

【発明が解決しようとする課題】しかしながら、含水未
固結地盤においては、一般にシールド工法等の地中掘削
によって地下構造物を構築する工法が採用されるにもか
かわらず、かかる工法によって構築された地下構造物に
より生ずる地下水の流動阻害を防止するための有効な提
案はなかった。
However, the unconsolidated ground containing water is constructed by such a construction method even though a construction method for constructing an underground structure by underground excavation such as a shield construction method is generally employed. There have been no effective proposals to prevent groundwater flow obstruction caused by underground structures.

【0007】すなわち、開削工法により地下構造物を構
築する際には、その地下構造物の外周に沿って通水管を
設けたり透水領域を形成することは比較的容易である
が、これを非開削状態での地中掘削により地下構造物の
構築を行う工法に適用することはできない。
That is, when constructing an underground structure by the excavation method, it is relatively easy to provide a water pipe along the outer periphery of the underground structure or to form a water-permeable region, It cannot be applied to the method of constructing underground structures by underground excavation in the state.

【0008】また、地中掘削により地下構造物の構築を
行う場合であっても、前述した従来例のように通水のた
めの縦坑および横坑を形成することはできるが、作業が
大規模になるため好ましくない。
[0008] Further, even when an underground structure is constructed by underground excavation, a vertical shaft and a horizontal shaft for water passage can be formed as in the conventional example described above, but the work is large. It is not preferable because the scale becomes large.

【0009】そこで、本発明の主たる課題は、地中掘削
によって構築される地下構造物による地下水の流動阻害
を防止し、もって、周辺地盤の地下水環境の保全を図る
ことにある。また、他の課題は、地下水の流動阻害の防
止を図る上での作業の簡素化を図ることにある。
Accordingly, a main object of the present invention is to prevent the underground structure constructed by underground excavation from obstructing the flow of groundwater, and thereby to preserve the groundwater environment in the surrounding ground. Another object of the present invention is to simplify the work for preventing the flow of groundwater from being hindered.

【0010】[0010]

【課題を解決するための手段】上記課題を解決した本発
明は、地中掘削に基づいて構築される地下構造物の一方
側から他方側へ通じる通水路を形成したことを特徴とす
る地下水の流動阻害防止構造である。
SUMMARY OF THE INVENTION The present invention, which has solved the above-mentioned problems, has a feature of forming a water passage from one side to the other side of an underground structure constructed based on underground excavation. It has a flow inhibition structure.

【0011】この発明において、前記通水路を、通水管
および透水性材料からなる層の少なくとも一方によって
構築するのが好ましい。また、前記通水路に通じ、かつ
前記地下構造物の一方側において地下水の集水を行う集
水手段、および前記通水路に通じ、かつ前記地下構造物
の他方側において地下水の放水を行う放水手段の、少な
くとも一方を設けるのは好ましい。さらに、前記地下構
造物は、シールド工法によって構築されるシールドトン
ネル、またはコンクリート類吹付工法によって構築され
るトンネルである場合が提案される。
In the present invention, it is preferable that the water passage is constructed by at least one of a water pipe and a layer made of a water-permeable material. A water collecting means communicating with the water passage and collecting groundwater on one side of the underground structure; and a water discharging means communicating with the water passage and discharging groundwater on the other side of the underground structure. It is preferable to provide at least one of the above. Furthermore, it is proposed that the underground structure is a shield tunnel constructed by a shield method or a tunnel constructed by a concrete spraying method.

【0012】一方、シールド工法により構築されるシー
ルドトンネルに対して、本発明の地下水の流動阻害の防
止構造を適用するための装置として、一方側の周方向連
結面近傍から他方側の周方向連結面近傍まで延在する通
水管を備えることを特徴とするセグメントピースが提案
される。
On the other hand, as an apparatus for applying the structure for preventing groundwater flow obstruction of the present invention to a shield tunnel constructed by a shield method, a method of connecting a circumferential connection surface from one side to a circumferential connection surface on the other side. A segment piece is proposed which comprises a water pipe extending close to the surface.

【0013】また、このセグメントピースにおいて、少
なくとも地山側面に開口し、かつ前記通水管に通じる通
水孔を設けたものも提案される。
[0013] Further, in this segment piece, there is also proposed a segment piece having an opening at least on the side of the ground and having a water passage hole communicating with the water passage pipe.

【0014】さらに、周壁に、周方向に延在する一体的
な通水管を備えるとともに、少なくとも地山側面に開口
し、かつ前記通水管に通じる通水孔を備えることを特徴
とするセグメントリングも提案される。
[0014] Further, a segment ring characterized by being provided with an integral water pipe extending in the circumferential direction on the peripheral wall, and having a water hole that opens at least on the side of the ground and communicates with the water pipe. Suggested.

【0015】[0015]

【発明の実施の形態】本発明に係る地下水の流動阻害の
防止構造は、前述したように、地中掘削に基づいて構築
される地下構造物(本発明にいう地下構造物は、断面形
状に限定されず、例えば円形であっても異形であっても
良い)の一方側から他方側へ通じる通水路を形成したも
のであり、地下構造物内に通水路を形成する態様および
地下構造物の外側近傍に通水路を形成する態様が考えら
れる。
BEST MODE FOR CARRYING OUT THE INVENTION As described above, an underground structure constructed based on underground excavation (the underground structure according to the present invention has a sectional shape The water passage is formed from one side to the other side of the underground structure (for example, the shape may be circular or irregular). A mode in which a water passage is formed near the outside may be considered.

【0016】すなわち、先ず地下構造物内に通水路を形
成するものとして、図1に示すように、地下構造物1A
の周壁内部に、周方向に延在して環状とされた通水管2
Aを設ける態様(第1の態様)が考えられる。図示の例
では、地下構造物1Aの地下水流動方向で上流側に、通
水管2Aに通じかつ地中内に突出する集水手段4,4が
設けられ、その反対の下流側に通水管2Aに通じかつ地
中内に突出する放水手段5,5が設けられている。この
場合、地下構造物1Aの上流側の地下水は、集水手段
4,4により集水されて通水管2Aに導入された後、通
水管2Aを介して放水手段5,5に達し、ここから下流
側に放水される。
That is, first, assuming that a water passage is formed in the underground structure, as shown in FIG.
Water pipe 2 extending in the circumferential direction and having an annular shape
An embodiment in which A is provided (first embodiment) is considered. In the illustrated example, water collecting means 4 and 4 communicating with the water pipe 2A and protruding into the ground are provided on the upstream side in the groundwater flow direction of the underground structure 1A, and the water collecting pipe 2A is provided on the downstream side opposite thereto. Water discharge means 5 and 5 are provided that communicate with and protrude into the ground. In this case, the groundwater on the upstream side of the underground structure 1A is collected by the water collecting means 4, 4 and introduced into the water pipe 2A, and then reaches the water discharging means 5, 5 via the water pipe 2A. Water is discharged downstream.

【0017】この態様の変形例として、図2に示すよう
に、地下構造物1Bの内部空洞側に、周方向に延在して
環状とされた通水管2Bを設ける態様(第2の態様)が
考えられる。また、これとは逆に、図3に示すように地
下構造物1Cの外側に環状の通水管2Cを設ける態様
(第3の態様)も考えられる。これらの態様において
も、地下水は、地下構造物1B(または1C)の上流側
の地下水は、集水手段4,4、通水管2B(または2
C)および放水手段5,5の順に通水されて下流側に放
水される。尚、これら第2および第3の態様には、通水
管を地下構造物の周壁外面あるいは周壁内面に埋め込ん
だものも含まれる。
As a modified example of this embodiment, as shown in FIG. 2, an annular water pipe 2B extending in the circumferential direction is provided on the inner cavity side of the underground structure 1B (second embodiment). Can be considered. On the contrary, a mode (third mode) in which an annular water pipe 2C is provided outside the underground structure 1C as shown in FIG. 3 is also conceivable. Also in these embodiments, the groundwater is the groundwater upstream of the underground structure 1B (or 1C), the collecting means 4 and 4 and the water pipe 2B (or 2).
C) and the water discharging means 5, 5 in this order, and the water is discharged downstream. The second and third aspects include those in which a water pipe is embedded in the outer surface of the peripheral wall or the inner surface of the peripheral wall of the underground structure.

【0018】また、地下構造物に内部空洞を横切る横断
通水路を設ける態様(第4の態様)も考えられる。例え
ば、図4に示すように、上記第2の態様に従って環状の
通水管2B’を地下構造物1B’の内部空洞側に設ける
とともに、内部空洞を上下2段に分ける仕切壁6の内部
に、通水管2B’における地下水の流動方向で上流側の
部分および下流側の部分を結ぶ横断通水管7を設ける。
この場合、横断通水管は仕切壁の外面に沿わせて設けて
も良い。また上記第1の態様および第3の態様に従って
通水路を構築する場合、および次述する第5の態様に従
って通水路を形成した場合であっても、ここにいう横断
通水路を設けることができる。
Further, an embodiment (fourth embodiment) in which a transverse water passage crossing the internal cavity is provided in the underground structure is also conceivable. For example, as shown in FIG. 4, an annular water pipe 2B ′ is provided on the inner cavity side of the underground structure 1B ′ according to the second embodiment, and inside the partition wall 6 that divides the inner cavity into upper and lower two stages, A transverse water pipe 7 that connects the upstream part and the downstream part in the flow direction of the groundwater in the water pipe 2B ′ is provided.
In this case, the transverse water pipe may be provided along the outer surface of the partition wall. In addition, even when a water passage is constructed according to the first and third embodiments, and when a water passage is formed according to a fifth embodiment described below, the transverse water passage described herein can be provided. .

【0019】地下構造物の外側近傍に通水路を形成する
態様としては、図5に示すように、地下構造物1Dの外
側を囲んで、透水性材料からなる層2Dを設ける態様
(第5の態様)が考えられる。透水性材料としては、山
砂等の透水性の高い砂、透水性コンクリート等が考えら
れる。この場合、同図中に矢印で示すように、地下構造
物1Dの上流側の地下水は、透水性材料からなる層2D
を介して下流側に通水される。
As a mode of forming a water passage near the outside of the underground structure, as shown in FIG. 5, a layer 2D made of a water-permeable material is provided so as to surround the outside of the underground structure 1D (fifth embodiment). Aspect) is conceivable. As the water permeable material, sand having high water permeability such as mountain sand, water permeable concrete, and the like can be considered. In this case, as shown by the arrow in the figure, the groundwater on the upstream side of the underground structure 1D is made of a layer 2D made of a water-permeable material.
The water is passed downstream through.

【0020】これら図示した態様では、地下構造物の上
側および下側の両方に通水路を形成しているが、本発明
はこれに限定されず、例えば地下構造物の上側のみある
いは下側のみに通水路を形成することができる。前述の
横断通水路のみを設けても良い。通水性の観点からは、
少なくとも地下構造物の下側には通水路を形成するのが
好ましい。また、上述の地下構造物の上側のみあるいは
下側のみに通水路を形成する態様等や、前述の第1〜第
5の態様を、適宜、組み合わせることもできる。例え
ば、第1の態様(第2、第3または第4の態様)におけ
る通水管を設けるとともに第5の態様の透水性材料から
なる層を形成したり、あるいは第1の態様における通水
管を設けるとともに第2の態様(または第3の態様)の
通水管を設けることができる。尚、本発明では、地下水
の流動方向と通水路の通水方向(通水路における集水部
分と放水部分とを結ぶ方向)とのなす角度は適宜定める
ことができる。
In these illustrated embodiments, the water passages are formed on both the upper and lower sides of the underground structure. However, the present invention is not limited to this. For example, only the upper side or only the lower side of the underground structure is provided. A water passage can be formed. Only the above-mentioned cross water channel may be provided. From the viewpoint of water permeability,
It is preferable to form a water passage at least below the underground structure. Further, the above-described embodiment in which the water passage is formed only on the upper side or only below the underground structure, and the above-described first to fifth embodiments can be appropriately combined. For example, the water pipe according to the first aspect (second, third or fourth aspect) is provided and a layer made of the water-permeable material according to the fifth aspect is formed, or the water pipe according to the first aspect is provided. In addition, the water pipe of the second mode (or the third mode) can be provided. In the present invention, the angle between the flow direction of the groundwater and the flow direction of the water passage (the direction connecting the water collecting portion and the water discharge portion in the water passage) can be appropriately determined.

【0021】一方、これらの態様は、シールド工法によ
り構築されるシールドトンネルや、NATM工法等のコ
ンクリート類吹付工法により構築されるトンネル等の、
非開削の状態での地中掘削に基づいて構築される地下構
造物に対して適用される。そこで、次に、シールド工法
により構築されるシールドトンネルに対して、上記第1
の態様の通水路を形成する場合について、さらに具体的
に説明する。
On the other hand, these embodiments are applicable to a shield tunnel constructed by a shield method, a tunnel constructed by a concrete spraying method such as a NATM method, and the like.
Applies to underground structures constructed based on underground excavation in uncut conditions. Therefore, next, for the shield tunnel constructed by the shield method,
The case where the water passage according to the embodiment is formed will be described more specifically.

【0022】先ず、通常のシールド工法と同様に、現場
施工に先立ってセグメントピースを製造する。セグメン
トの種類としては、鉄筋コンクリート(RC)セグメン
ト、合成セグメント、スチールセグメント、ダグタイル
セグメントのいずれであっても良い。
First, similar to the ordinary shield method, a segment piece is manufactured prior to on-site construction. The segment type may be any of a reinforced concrete (RC) segment, a composite segment, a steel segment, and a ductile segment.

【0023】本発明に係るセグメントピース11は、図
6および図7に示すように単位通水管13aを内装す
る。単位通水管13aは、略、セグメントピース11に
おける一方側の周方向連結面から他方側の周方向連結面
まで延在するが、その両端は各連結面には達しない。こ
れと異なり、通水管を一方側の周方向連結面から他方側
の周方向連結面まで延在させることもできる。この場
合、後述するセグメントピースの連結によって、自動的
に、一方のセグメントピースの通水管の端部を、これに
連結される他方のセグメントピースの通水管の端部に連
結させることができるため好ましい。また、後述の連結
ボックス23や連結管24を使用しないため、これに伴
う連結作業が必要なくなる点でも好ましい。
The segment piece 11 according to the present invention includes a unit water pipe 13a as shown in FIGS. The unit water pipe 13a generally extends from the circumferential connection surface on one side of the segment piece 11 to the circumferential connection surface on the other side, but both ends do not reach the respective connection surfaces. Alternatively, the water pipe may extend from the circumferential connection surface on one side to the circumferential connection surface on the other side. In this case, the end of the water pipe of one segment piece can be automatically connected to the end of the water pipe of the other segment piece connected thereto by connection of the segment pieces described below, which is preferable. . In addition, since a connecting box 23 and a connecting pipe 24 to be described later are not used, it is also preferable in that the connecting work associated therewith becomes unnecessary.

【0024】セグメントピース11は、単位通水管13
a有する点以外は基本的には公知のものと異ならなず、
その略中央においてセグメント内空側および地山側に連
通するグラウトホール22、周方向側面にあって他のセ
グメントピースとの連結を可能ならしめる周方向継手
(いわゆるセグメント間継手)20,20…、およびト
ンネル延長方向側面にあって他のセグメントリングとの
連結を可能ならしめるいわゆるリング間継手21,21
…を備える。単位通水管13aは、グラウトホール22
に通じるように設けられる。また、図8にも示すよう
に、他のセグメントピースの単位通水管13aとの連結
のため、両側の周方向側部には単位通水管13aの端部
が露出するようにセグメント内空面に開口する連結ボッ
クス23が設けられる。例えば、鉄筋コンクリートセグ
メントの場合、図9に示すように鉄筋Fの間に単位通水
管13aを通せば良い。
The segment piece 11 includes a unit water pipe 13
Except for having a, it is basically the same as the known one,
A grout hole 22 communicating with the inner side of the segment and the ground side at substantially the center thereof, a circumferential joint (so-called inter-segment joint) 20, 20,... So-called ring-to-ring joints 21, 21 on the side in the tunnel extension direction that enable connection with other segment rings
... The unit water pipe 13a is a grout hole 22.
Provided to lead to. Further, as shown in FIG. 8, in order to connect the other segment piece to the unit water pipe 13 a, the end of the unit water pipe 13 a is exposed on both sides in the circumferential direction so that the inner surface of the segment is exposed. An open connection box 23 is provided. For example, in the case of a reinforced concrete segment, the unit water pipe 13a may be passed between the reinforcing bars F as shown in FIG.

【0025】現場での施工においては、通常のシールド
工法と同様に、このセグメントピース11をシールド機
の後方に搬入し、各々の周方向継手20,20…を連結
してセグメントリング12を構築する(図10参照)。
本例では、集水管14,14および放水管15,15
は、グラウトホール22,22…を利用して取付けるた
め、地下水流動の上流側および下流側の適宜の位置にグ
ラウトホール22,22…がくるようにセグメントリン
グ12を組み立てる。集水管14,14および放水管1
5,15の取付け孔は、グラルトホール22,22…と
は別の任意の位置に設けることもできる。
In the on-site construction, the segment piece 11 is carried into the rear of the shield machine and connected to the respective circumferential joints 20, 20,. (See FIG. 10).
In this example, the water collecting pipes 14, 14 and the water discharging pipes 15, 15
Is assembled using the grout holes 22, 22, so that the segment rings 12 are assembled so that the grout holes 22, 22... Are located at appropriate positions on the upstream and downstream sides of the groundwater flow. Water collection pipes 14, 14 and water discharge pipe 1
The mounting holes 5 and 15 can be provided at arbitrary positions different from the Glalt holes 22.

【0026】次に、図11にも示すように、各グラウト
ホール22,22…を介してグラウト材Gを裏込注入し
た後、各グラウトホール22,22…から集水管14,
14(または放水管15,15)の長さに応じた深さに
まで削孔機を用いて削孔する。この場合において、地質
が岩の場合には削岩機を用いることができる。また必要
に応じて手掘りで孔開けを行っても良い。これによって
形成された孔には、集水管14,14(または放水管1
5,15)を嵌め込む。25,25…はキャップであ
る。
Next, as shown in FIG. 11, the grout material G is back-filled and injected through the respective grout holes 22, 22,.
Using a drilling machine, drill holes to a depth corresponding to the length of 14 (or water discharge pipes 15, 15). In this case, if the geology is rock, a rock drill can be used. Holes may be drilled by hand if necessary. The holes thus formed are provided in the collecting pipes 14 and 14 (or in the discharging pipe 1).
5, 15). 25, 25 ... are caps.

【0027】続いて(あるいは併行して)、隣合う単位
通水管13a,13aの端部同士を連結して、セグメン
トリング12の周壁内部に、一体的な環状の通水管13
を構築する。具体的には、図12および図13に詳しい
ように、連結ボックス23,23…内に突き出た単位通
水管13a,13aの端部同士を、連結管24を介して
連結する。連結を容易にするために、連結管24には可
撓性の管を用いるのが好ましい。通水管同士の連結が終
了したならば、連結ボックス23,23…内にモルタル
を打設して連結部分を埋め殺す。
Subsequently (or in parallel), the ends of the adjacent unit water pipes 13a, 13a are connected to each other, and an integral annular water pipe 13 is formed inside the peripheral wall of the segment ring 12.
To build. Specifically, as shown in FIGS. 12 and 13, the ends of the unit water pipes 13 a protruding into the connection boxes 23 are connected via a connection pipe 24. Preferably, a flexible tube is used as the connection tube 24 to facilitate connection. When the connection of the water pipes is completed, mortar is poured into the connection boxes 23, 23,.

【0028】さらに、内面の平滑化及び化粧、シールド
施工時に生じた蛇行の修正、セグメントの補強、トンネ
ルの防蝕等、必要に応じて、セグメント内面の二次覆工
等を行う。以降、シールド機の掘進に伴って前述の作業
を繰り返し行って、シールドトンネル10が完成する。
完成したシールドトンネル10は、その上流側の地下水
が、集水管14,14によって通水管13に導かれた
後、図示の場合には主に下側の通水管13を介して反対
側の放水管15,15に達し、ここから再度地中に放出
される。このため、前述した図1に示す例と同様に、シ
ールドトンネル10が透水層と難透水層に跨がって位置
している場合であっても、地下水の流動は阻害されな
い。またセグメントピース11には予め単位通水管13
aが内装されているため、現場での作業の簡素化が図ら
れる。
Furthermore, secondary lining of the inner surface of the segment is performed as required, such as smoothing and makeup of the inner surface, correction of meandering generated during shield construction, reinforcement of the segment, corrosion protection of the tunnel, and the like. Thereafter, the above-described operation is repeated with the excavation of the shield machine, and the shield tunnel 10 is completed.
In the completed shield tunnel 10, after the groundwater on the upstream side is guided to the water pipe 13 by the water collecting pipes 14, 14, the drain pipe on the opposite side mainly passes through the lower water pipe 13 in the case of the drawing. It reaches 15,15, from which it is released again into the ground. For this reason, similarly to the example shown in FIG. 1 described above, even when the shield tunnel 10 is located straddling the permeable layer and the poorly permeable layer, the flow of the groundwater is not hindered. In addition, the unit piece water pipe 13 is
Since a is installed, work on site can be simplified.

【0029】ここでは、前述した第1の態様に従って、
シールドトンネルの周壁内部に通水管を設けた例につい
て説明した。前述の第2の態様および第3の態様に従っ
て通水管を設ける場合でも略同様である。
Here, according to the first embodiment described above,
The example in which the water pipe is provided inside the peripheral wall of the shield tunnel has been described. The same applies to the case where the water pipe is provided according to the second and third embodiments.

【0030】すなわち、図示しないが、通水管をセグメ
ントピースの内面または外面に沿わせて設ければ良い。
但し、通水管をセグメントピースの外面に沿わせて設け
る場合には、セグメントピース組み立て時における通水
管の連結のため、連結ボックスを地山側に開口させてお
く必要がある。また、通水管をセグメントピースの内面
に沿わせて配する場合(内面に埋め込む場合を除く)に
は、連結ボックスは必要ない。特に、この場合、現場
で、例えばセグメントリング組み立て後に通水管を配置
することもできる。
That is, although not shown, a water pipe may be provided along the inner surface or outer surface of the segment piece.
However, when the water pipe is provided along the outer surface of the segment piece, it is necessary to open the connection box to the ground side in order to connect the water pipe at the time of assembling the segment piece. When the water pipe is arranged along the inner surface of the segment piece (excluding the case where the water pipe is embedded in the inner surface), the connecting box is not required. In particular, in this case, the water pipe can also be arranged on site, for example, after assembling the segment ring.

【0031】第4の態様に従って横断通水路を構築する
場合には、仕切壁を構築するに当たり、前もって仕切壁
の内部に若しくは外面に沿わせて横断通水管を配設して
おき、これを通水管や、集水手段、放水手段に連結すれ
ば良い。また、仕切壁構築後に、仕切壁の外面に沿わせ
て横断通水管を配設し、これを通水管や集水手段、放水
手段に連結しても良い(図示せず)。
In the case of constructing a transverse waterway according to the fourth aspect, in constructing a partition wall, a transverse water pipe is previously arranged inside or along the outer surface of the partition wall, and the water is passed through the pipe. What is necessary is just to connect to a water pipe, a water collection means, and a water discharge means. Further, after the partition wall is constructed, a transverse water pipe may be provided along the outer surface of the partition wall and connected to the water pipe, the water collecting means, and the water discharging means (not shown).

【0032】第5の態様に従って外面側に透水性材料か
らなる層を有するシールドトンネルを構築する場合に
は、通常のシールド工法と同様のセグメントピースを用
いるとともに、通常用いられるグラウト剤の代わりに、
山砂等の透水性の高い砂や、透水性コンクリートとなる
注入剤を用い、通常のシールド工法と同様に裏込注入を
行えば良い(図示せず)。
When constructing a shield tunnel having a layer made of a water-permeable material on the outer surface side according to the fifth embodiment, a segment piece similar to the ordinary shield method is used, and instead of a grout agent that is usually used,
Backfilling may be performed using a highly permeable sand such as mountain sand or an injecting agent that becomes permeable concrete in the same manner as a normal shield method (not shown).

【0033】一方、本発明の地下水の流動阻害の防止構
造を、NATM工法等のコンクリート類吹付工法に適用
する場合であっても、前述の第1から第5の態様に示す
通水路を構築することができる。
On the other hand, even when the structure for preventing groundwater flow obstruction of the present invention is applied to a concrete spraying method such as the NATM method, the water passages described in the first to fifth aspects are constructed. be able to.

【0034】すなわち、コンクリート類吹付工法におい
て第1の態様の通水路を構築するには、トンネル掘削面
に対して一次吹付を行った後、かつ二次吹付の前におい
て、一次吹付面の適宜の位置に集水管および放水管の取
付け孔を削孔し、この取付け孔に集水管および放水管を
取付けるとともに、これら集水管および放水管に連通す
る通水管をトンネル周方向に配置する。これによって、
一次吹付面と二次吹付面との間、つまりトンネルの周壁
内部に通水管を設けることができる。
That is, in order to construct the water channel according to the first aspect in the concrete spraying method, after the primary spraying is performed on the tunnel excavation surface and before the secondary spraying, an appropriate spraying of the primary spraying surface is performed. At the position, a mounting hole for the water collecting pipe and the water discharge pipe is drilled, and a water collecting pipe and a water discharging pipe are attached to the mounting hole, and a water pipe communicating with the water collecting pipe and the water discharging pipe is arranged in the circumferential direction of the tunnel. by this,
A water pipe can be provided between the primary spraying surface and the secondary spraying surface, that is, inside the peripheral wall of the tunnel.

【0035】第2の態様の通水路を構築するには、通常
の施工方法と同様にして少なくとも二次吹付までを行っ
た後に、二次吹付面に対して、適宜の位置に集水管およ
び放水管の取付け孔を削孔し、この取付け孔に集水管お
よび放水管を取付けるとともに、これら集水管および放
水管に連通する通水管をトンネル周方向に配置する。
In order to construct the water channel of the second embodiment, after at least the secondary spraying is performed in the same manner as in a normal construction method, the water collecting pipe and the discharge pipe are placed at appropriate positions with respect to the secondary spraying surface. A mounting hole for the water pipe is drilled, and a water collecting pipe and a water discharge pipe are attached to the mounting hole, and a water pipe communicating with the water collecting pipe and the water discharging pipe is arranged in a circumferential direction of the tunnel.

【0036】これによって、二次吹付面の内面側に、つ
まりトンネルの周壁内面に沿って通水管を設けることが
できる。
Thus, a water pipe can be provided on the inner surface side of the secondary spray surface, that is, along the inner surface of the peripheral wall of the tunnel.

【0037】第3の態様の通水路を構築するには、トン
ネル掘削面に対して、適宜の位置に集水管および放水管
の取付け孔を削孔し、この取付け孔に集水管および放水
管を取付けるとともに、これら集水管および放水管に連
通する通水管をトンネル周方向に配置した後、通常の施
工方法と同様にして一次吹付、および二次吹付等を行
う。これによって、一次吹付面の外面側、つまりトンネ
ルの周壁外面に埋め込まれた通水管を設けることができ
る。
In order to construct the water passage of the third embodiment, holes for mounting the water collecting pipe and the water discharge pipe are drilled at appropriate positions on the tunnel excavation surface, and the water collecting pipe and the water discharging pipe are inserted into the mounting holes. At the same time as mounting, the water pipes communicating with the water collection pipe and the water discharge pipe are arranged in the circumferential direction of the tunnel, and then the primary spraying, the secondary spraying, etc. are performed in the same manner as a normal construction method. Thereby, a water pipe embedded on the outer surface side of the primary spraying surface, that is, on the outer surface of the peripheral wall of the tunnel can be provided.

【0038】コンクリート類吹付工法において前述の第
4の態様の通水路を構築する場合については、前述のシ
ールドトンネルの場合と同様である。
In the concrete spraying method, the case of constructing the water passage of the fourth embodiment is the same as the case of the shield tunnel.

【0039】第5の態様の通水路を構築するには、トン
ネル掘削面に対する一次吹付として、あるいは一次吹付
の前の予備的な吹付として、透水性コンクリートを吹き
付けることによって、トンネルの周壁の外側部分として
あるいはトンネルの周壁外面側に透水性コンクリートか
らなる層を設けることができる。
In order to construct the water passage of the fifth aspect, the outer portion of the peripheral wall of the tunnel is sprayed with the permeable concrete as a primary spray to the tunnel excavation surface or as a preliminary spray before the primary spray. Or a layer made of permeable concrete can be provided on the outer side of the peripheral wall of the tunnel.

【0040】<その他> (1)本発明にいう通水管としては、ゴム製のフレキシ
ブルホース等の可撓性の管や、FRP、塩化ビニル樹脂
等の非可撓性の管、ステンレス等の金属製の管等を用い
ることができる。これらのうちでも、酸や錆に強く経時
劣化の少ないものが望ましい。尚、本発明にいう通水管
には、これら部材としての管とは異なり、地下構造物の
周壁に設けた孔(すなわち内壁に周壁材料が露出する
孔)により形成される管状路も含まれる。
<Others> (1) Examples of the water pipe according to the present invention include a flexible pipe such as a rubber flexible hose, an inflexible pipe such as FRP and vinyl chloride resin, and a metal such as stainless steel. And the like can be used. Among these, those which are resistant to acid and rust and have little deterioration over time are desirable. It should be noted that the water pipe according to the present invention includes a tubular path formed by a hole provided in the peripheral wall of the underground structure (that is, a hole in which the peripheral wall material is exposed on the inner wall), unlike the pipe as these members.

【0041】(2)本発明にいう集水管、放水管として
は、管の周壁に多数の連通孔を有する、いわゆるストレ
ナーパイプを用いることができる。
(2) As the water collection pipe and the water discharge pipe according to the present invention, a so-called strainer pipe having a large number of communication holes in the peripheral wall of the pipe can be used.

【0042】(3)本発明では、通水管に砂等が流入し
たり、これによって目詰まりしたりするのを防止するた
めに、集水管・放水管にフィルターを内装することがで
きる。フィルターの材料としては、各種の、砂・活性炭
・布(不織布等含む)等を用いることができる。
(3) In the present invention, in order to prevent sand or the like from flowing into the water pipe or clogging due to the sand or the like, a filter can be provided in the water collection pipe / water discharge pipe. As the material of the filter, various kinds of sand, activated carbon, cloth (including nonwoven fabric, etc.) and the like can be used.

【0043】(4)集水管・放水管にフィルターを内装
する場合には、フィルターの目詰まりが生じることが想
定される。このため、カートリッジ式のフィルターを用
い、必要に応じて交換することができるようにするのが
好ましい。例えば、上記シールドトンネルの例におい
て、カートリッジ式のフィルターを用いるとともに、キ
ャップ25を着脱自在にする。特に二次覆工を行う場合
には、キャップ25の部分は覆工しないでおく。これに
よって、フィルターが目詰まりしたときには、このキャ
ップ25を外してフィルターを交換することが可能とな
る。
(4) When a filter is installed in the water collection pipe / water discharge pipe, it is assumed that the filter is clogged. For this reason, it is preferable to use a cartridge-type filter so that it can be replaced as needed. For example, in the above shield tunnel example, a cartridge type filter is used, and the cap 25 is made detachable. In particular, when performing secondary lining, the cap 25 is not wrapped. Thus, when the filter is clogged, the cap 25 can be removed to replace the filter.

【0044】(5) 本発明では、通水路の適宜の位
置、例えば上記シールドトンネルの例では、キャップ2
5によって蓋された通水管と集水管または放水管の連通
部部において、ポンプを設置して、強制的に通水を行う
ことができる。また、このポンプを利用して、地盤沈下
防止、井戸水保護、および地下水流量の調整等のために
集水側と同じ側に復水させることもできる。
(5) In the present invention, an appropriate position of the water passage, for example, in the case of the above-mentioned shield tunnel, the cap 2
A pump can be installed at the communicating portion between the water pipe and the water collecting pipe or the water discharge pipe covered by 5 to force water to flow. In addition, the pump can be used to return to the same side as the water collecting side for prevention of land subsidence, protection of well water, adjustment of groundwater flow, and the like.

【0045】(6) 本発明では、集水管・放水管にフ
ィルターを内装した場合には、通水路の適宜の位置、前
述(5)にいう連通部に、ポンプを設置して地下水を通
水方向と反対に逆流させ、フィルターに目詰まりした砂
を取り除くこともできる。この場合、前述の強制通水・
復水用のポンプを併用することもできる。
(6) In the present invention, when a filter is installed in the water collection pipe / water discharge pipe, a pump is installed at an appropriate position in the water passage, the communication part described in (5) above, and the groundwater is supplied. It can also be reversed in the opposite direction to remove sand clogged in the filter. In this case,
A condensate pump can also be used.

【0046】(7) 本発明では、通水路にマノメータ
等を設置して、集水側と放水側の水頭を測定することが
できる。さらに、通水路に間隙水圧計や流量計を設けれ
ば地下水の流量、流速等を測定できる。また、特に前述
した第2の態様のように、地下構造物の内面に沿わせて
通水管を配置する場合、透明な通水管を用いることによ
って、通水の確認および水質の観測を行うことができ
る。
(7) In the present invention, a manometer or the like can be installed in the water passage to measure the water head on the water collection side and the water discharge side. Further, if a pore water pressure gauge or a flow meter is provided in the water passage, the flow rate and the flow velocity of the groundwater can be measured. In addition, particularly when the water pipes are arranged along the inner surface of the underground structure as in the second aspect described above, it is possible to check the water flow and observe the water quality by using a transparent water pipe. it can.

【0047】(8) 本発明では、地下構造物に対する
通水経路および通水手段(通水管・透水性材料からなる
層)の選定、集水管・放水管の設置の可否、フィルター
の設置の可否、フィルターの目詰まり防止手段の設置の
可否、ポンプの設置の可否等については、地山の土質条
件(透水係数、地下水圧、地層構成、水質等)や、周辺
環境(河川、井戸、湧水源に近接している等の他、地下
構造物と地下水の流動方向との位置関係も含む)によっ
て適宜定めるることができる。
(8) In the present invention, selection of a water passage and a water passage means (layer made of a water passage pipe and a water permeable material) for an underground structure, availability of a water collection pipe / water discharge pipe, and availability of a filter The installation of a means to prevent filter clogging, the installation of a pump, etc. are based on the soil conditions of the ground (permeability, groundwater pressure, geological composition, water quality, etc.) and the surrounding environment (rivers, wells, spring water sources). And the positional relationship between the underground structure and the flow direction of the groundwater).

【0048】[0048]

【発明の効果】以上のとおり、本発明によれば、地中掘
削によって構築される地下構造物による地下水の流動阻
害を防止し、もって周辺地盤の地下水環境の保全を図る
ことができ、また、これに伴う作業の簡素化を図ること
ができる。
As described above, according to the present invention, it is possible to prevent the underground structure constructed by underground excavation from obstructing the flow of groundwater, thereby preserving the groundwater environment in the surrounding ground. Accordingly, the operation can be simplified.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の第1の態様の説明図である。FIG. 1 is an explanatory diagram of a first embodiment of the present invention.

【図2】本発明の第2の態様の説明図である。FIG. 2 is an explanatory diagram of a second embodiment of the present invention.

【図3】本発明の第3の態様の説明図である。FIG. 3 is an explanatory diagram of a third embodiment of the present invention.

【図4】本発明の第4の態様の説明図である。FIG. 4 is an explanatory diagram of a fourth embodiment of the present invention.

【図5】本発明の第5の態様の説明図である。FIG. 5 is an explanatory diagram of a fifth embodiment of the present invention.

【図6】セグメントピースの平面および横断面を示す図
である。
FIG. 6 is a diagram showing a plane and a cross section of a segment piece.

【図7】セグメントピースの側面および縦断面を示す図
である。
FIG. 7 is a diagram showing a side surface and a vertical cross section of a segment piece.

【図8】図6のII−II矢視図である。8 is a view taken in the direction of arrows II-II in FIG.

【図9】図6のIII −III 断面図である。FIG. 9 is a sectional view taken along the line III-III in FIG. 6;

【図10】シールドトンネルの縦断面図である。FIG. 10 is a longitudinal sectional view of a shield tunnel.

【図11】図10のIV部拡大図である。FIG. 11 is an enlarged view of a part IV in FIG. 10;

【図12】図10のV部拡大図である。FIG. 12 is an enlarged view of a portion V in FIG. 10;

【図13】図12の平面図である。FIG. 13 is a plan view of FIG.

【図14】地下水の流動阻害の説明図である。FIG. 14 is an explanatory diagram of groundwater flow inhibition.

【図15】従来例の説明図である。FIG. 15 is an explanatory diagram of a conventional example.

【符号の説明】[Explanation of symbols]

1A〜1D…地下構造物、2A〜2C…通水管、2C…
透水性材料からなる層、4…集水手段、5…放水手段、
6…仕切壁、7…横断通水路。
1A-1D: underground structure, 2A-2C: water pipe, 2C ...
A layer made of a water-permeable material, 4 ... water collecting means, 5 ... water discharging means,
6: Partition wall, 7: Crossing waterway.

───────────────────────────────────────────────────── フロントページの続き (72)発明者 海野 紀夫 東京都新宿区西新宿6丁目14番1号 佐藤 工業株式会社東京支店内 (72)発明者 平山 国弘 東京都新宿区西新宿6丁目14番1号 佐藤 工業株式会社東京支店内 (72)発明者 守山 亨 東京都新宿区西新宿6丁目14番1号 佐藤 工業株式会社東京支店内 ──────────────────────────────────────────────────続 き Continued on the front page (72) Inventor Norio Uno 6-14-1, Nishishinjuku, Shinjuku-ku, Tokyo Inside Sato Kogyo Co., Ltd. Tokyo Branch (72) Inventor Kunihiro Hirayama 6-14, Nishishinjuku, Shinjuku-ku, Tokyo No. 1 Sato Kogyo Co., Ltd. Tokyo Branch (72) Inventor Toru Moriyama 6-14-1, Nishi Shinjuku, Shinjuku-ku, Tokyo Sato Kogyo Co., Ltd. Tokyo Branch

Claims (7)

【特許請求の範囲】[Claims] 【請求項1】地中掘削に基づいて構築される地下構造物
の一方側から他方側へ通じる通水路を形成したことを特
徴とする地下水の流動阻害防止構造。
1. A structure for preventing flow of groundwater, wherein a water passage leading from one side to the other side of an underground structure constructed based on underground excavation is formed.
【請求項2】前記通水路を、通水管および透水性材料か
らなる層の少なくとも一方によって構築した請求項1記
載の地下水の流動阻害防止構造。
2. The structure according to claim 1, wherein said water passage is constructed by at least one of a water pipe and a layer made of a water-permeable material.
【請求項3】前記通水路に通じ、かつ前記地下構造物の
一方側において地下水の集水を行う集水手段、および前
記通水路に通じ、かつ前記地下構造物の他方側において
地下水の放水を行う放水手段の、少なくとも一方を設け
た請求項1または2記載の地下水の流動阻害防止構造。
3. A water collecting means communicating with the water passage and collecting groundwater on one side of the underground structure, and discharging water from the groundwater on the other side of the underground structure and communicating with the water passage. 3. The structure for preventing flow of groundwater according to claim 1, wherein at least one of water discharging means is provided.
【請求項4】前記地下構造物は、シールド工法によって
構築されるシールドトンネル、またはコンクリート類吹
付工法によって構築されるトンネルである請求項1〜3
のいずれか1項記載の地下水の流動阻害防止構造。
4. The underground structure is a shield tunnel constructed by a shield method or a tunnel constructed by a concrete spraying method.
4. The structure for preventing flow inhibition of groundwater according to any one of the above items.
【請求項5】一方側の周方向連結面近傍から他方側の周
方向連結面近傍まで延在する通水管を備えることを特徴
とするセグメントピース。
5. A segment piece comprising a water pipe extending from the vicinity of one circumferential connection surface to the vicinity of the other circumferential connection surface.
【請求項6】少なくとも地山側面に開口し、かつ前記通
水管に通じる通水孔を設けた請求項5記載のセグメント
ピース。
6. The segment piece according to claim 5, wherein a water passage hole is provided at least on the side of the ground and provided with a water passage hole communicating with the water pipe.
【請求項7】周壁に、周方向に延在する一体的な通水管
を備えるとともに、少なくとも地山側面に開口し、かつ
前記通水管に通じる通水孔を備えることを特徴とするセ
グメントリング。
7. A segment ring comprising: an integral water pipe extending in a circumferential direction on a peripheral wall; and a water hole that is opened at least on a ground side and that communicates with the water pipe.
JP13257597A 1997-05-22 1997-05-22 Construction method of groundwater flow prevention structure in tunnel Expired - Lifetime JP3846972B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP13257597A JP3846972B2 (en) 1997-05-22 1997-05-22 Construction method of groundwater flow prevention structure in tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP13257597A JP3846972B2 (en) 1997-05-22 1997-05-22 Construction method of groundwater flow prevention structure in tunnel

Publications (3)

Publication Number Publication Date
JPH10317897A true JPH10317897A (en) 1998-12-02
JPH10317897A5 JPH10317897A5 (en) 2005-04-07
JP3846972B2 JP3846972B2 (en) 2006-11-15

Family

ID=15084534

Family Applications (1)

Application Number Title Priority Date Filing Date
JP13257597A Expired - Lifetime JP3846972B2 (en) 1997-05-22 1997-05-22 Construction method of groundwater flow prevention structure in tunnel

Country Status (1)

Country Link
JP (1) JP3846972B2 (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006257790A (en) * 2005-03-18 2006-09-28 Zenitaka Corp Method and device for prevention of hindrance to flow of ground water
JP2008291516A (en) * 2007-05-24 2008-12-04 Ohbayashi Corp Structure for preventing flow impediment of underground water by shield tunnel, lining body, and shield tunnel
JP2008291517A (en) * 2007-05-24 2008-12-04 Ohbayashi Corp Structure for preventing flow impediment of underground water by shield tunnel, and shield tunnel
JP2009138442A (en) * 2007-12-06 2009-06-25 Ohbayashi Corp Segment, shield tunnel construction method, and shield tunnel
JP2012067520A (en) * 2010-09-24 2012-04-05 Sumitomo Osaka Cement Co Ltd Grout material filling method
JP2013007169A (en) * 2011-06-22 2013-01-10 Ohbayashi Corp Back-filling layer having water permeability partially and method for forming the same
CN105297754A (en) * 2015-08-22 2016-02-03 北京市勘察设计研究院有限公司 Structure for dredging barrier effect of underground engineering on underground water
KR20180052355A (en) * 2016-11-10 2018-05-18 건국대학교 산학협력단 Water pressure reduction device and construction method of segment tunnel equipped with the same

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4493699B2 (en) * 2008-01-31 2010-06-30 大豊建設株式会社 Water-permeable segment and tunnel using this water-permeable segment
JP5180152B2 (en) * 2009-06-19 2013-04-10 大豊建設株式会社 tunnel
CN107559023A (en) * 2017-09-05 2018-01-09 济南轨道交通集团有限公司 A kind of shield tunnel lining structure, system and method

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006257790A (en) * 2005-03-18 2006-09-28 Zenitaka Corp Method and device for prevention of hindrance to flow of ground water
JP2008291516A (en) * 2007-05-24 2008-12-04 Ohbayashi Corp Structure for preventing flow impediment of underground water by shield tunnel, lining body, and shield tunnel
JP2008291517A (en) * 2007-05-24 2008-12-04 Ohbayashi Corp Structure for preventing flow impediment of underground water by shield tunnel, and shield tunnel
JP2009138442A (en) * 2007-12-06 2009-06-25 Ohbayashi Corp Segment, shield tunnel construction method, and shield tunnel
JP2012067520A (en) * 2010-09-24 2012-04-05 Sumitomo Osaka Cement Co Ltd Grout material filling method
JP2013007169A (en) * 2011-06-22 2013-01-10 Ohbayashi Corp Back-filling layer having water permeability partially and method for forming the same
CN105297754A (en) * 2015-08-22 2016-02-03 北京市勘察设计研究院有限公司 Structure for dredging barrier effect of underground engineering on underground water
KR20180052355A (en) * 2016-11-10 2018-05-18 건국대학교 산학협력단 Water pressure reduction device and construction method of segment tunnel equipped with the same

Also Published As

Publication number Publication date
JP3846972B2 (en) 2006-11-15

Similar Documents

Publication Publication Date Title
JP5163424B2 (en) Groundwater drainage structure and tunnel construction method having the drainage structure
JP5982027B1 (en) Water leakage countermeasures for tunnels constructed by the Natom method
JP4493699B2 (en) Water-permeable segment and tunnel using this water-permeable segment
JP3846972B2 (en) Construction method of groundwater flow prevention structure in tunnel
JPH10317897A5 (en)
JP5180152B2 (en) tunnel
JP4255462B2 (en) Condensate well structure
KR100877452B1 (en) Intermediate wall construction method of 3ric excavation tunnel
JPH10280888A (en) Shield tunnel
FI66051C (en) ANORDINATION WITHOUT BORROWING
JP4074313B2 (en) Structure of steel sheet pile for water flow and water retaining wall, and its construction method.
JP2987501B2 (en) Tunnel entrance sealing device
JP4274898B2 (en) Groundwater flow conservation method
JP3170481B2 (en) Tunnel lining member and tunnel lining method
JP4589084B2 (en) A retaining wall with a built-in water pipe composed of a plurality of water passages, and a method for ensuring the flow of groundwater using the retaining wall
KR101143482B1 (en) Water Hammer Arrester Methode and Apparatus for Repairing pipelines Without digging
JP2611104B2 (en) Water passing method for continuous underground wall
JP3451564B2 (en) Underground water supply method and underground water supply equipment
CN216194777U (en) Novel deep foundation pit supporting and water stopping combined equipment
JP3892576B2 (en) Maintenance method of water vein in underground retaining wall construction section
KR100652187B1 (en) Grouting and Installation Method of Culvert Installation Site in Sanbokdo Road
JP2002348858A (en) Underground water-conveyance device and underground water-conveyance method
JP2005330769A (en) Structure and construction method of water passing earth retaining wall
JP2000130079A (en) Method for laying pipeline penetrating levee body with non-cut-and-cover
JP3661526B2 (en) Earth retaining structure for groundwater conservation

Legal Events

Date Code Title Description
A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20040521

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20040521

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20060414

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20060609

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20060811

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20060822

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100901

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100901

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110901

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120901

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120901

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130901

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130901

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140901

Year of fee payment: 8

EXPY Cancellation because of completion of term