JPH10332104A - Coal-fired boiler mill feed control method - Google Patents

Coal-fired boiler mill feed control method

Info

Publication number
JPH10332104A
JPH10332104A JP9142184A JP14218497A JPH10332104A JP H10332104 A JPH10332104 A JP H10332104A JP 9142184 A JP9142184 A JP 9142184A JP 14218497 A JP14218497 A JP 14218497A JP H10332104 A JPH10332104 A JP H10332104A
Authority
JP
Japan
Prior art keywords
coal
output
signal
amount
main steam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP9142184A
Other languages
Japanese (ja)
Inventor
Hiroshi Shimizu
宏 清水
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
IHI Corp
Original Assignee
Ishikawajima Harima Heavy Industries Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ishikawajima Harima Heavy Industries Co Ltd filed Critical Ishikawajima Harima Heavy Industries Co Ltd
Priority to JP9142184A priority Critical patent/JPH10332104A/en
Publication of JPH10332104A publication Critical patent/JPH10332104A/en
Pending legal-status Critical Current

Links

Landscapes

  • Control Of Steam Boilers And Waste-Gas Boilers (AREA)

Abstract

(57)【要約】 【課題】 スートブロワの運転に伴う主蒸気圧力の一時
的な上昇を抑制し得、該主蒸気圧力を主蒸気圧力設定値
に保持することができ、発電機における発電量を要求さ
れる発電量に制御し得る石炭焚ボイラのミル給炭量制御
方法を提供する。 【解決手段】 スートブロワ29の運転時に、給炭量指
令25aを一時的に減少させて給炭量23aを所要量だ
け減少させるよう構成する。
(57) [Summary] [PROBLEMS] A temporary increase in main steam pressure accompanying the operation of a soot blower can be suppressed, the main steam pressure can be maintained at a main steam pressure set value, and the amount of power generation in a generator can be reduced. Provided is a method for controlling the amount of coal supplied to a mill of a coal-fired boiler that can control the required amount of power generation. SOLUTION: When operating a soot blower 29, a coal supply command 25a is temporarily reduced to reduce a coal supply 23a by a required amount.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、石炭焚ボイラのミ
ル給炭量制御方法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for controlling the amount of coal supplied to a mill of a coal-fired boiler.

【0002】[0002]

【従来の技術】一般に、火力発電プラントにおける石炭
焚ボイラは、図4に示されるように、ボイラ本体1の火
炉1a内に、ミル4から供給される燃料としての微粉炭
Fを多数のバーナ2から噴射して燃焼させ、生成された
燃焼ガスG2により、ボイラ本体1の伝熱管内を流れる
水、蒸気を加熱し、且つボイラ本体1の副側壁1b内に
配設された過熱器5内を流れる主蒸気を過熱し、熱を奪
われた燃焼ガスG2を後部伝熱部1cの下端からボイラ
排ガスG3として排ガスダクト3へ排出し、前記過熱器
5で過熱された過熱蒸気Vを過熱蒸気管6から蒸気ター
ビン7へ導き、該蒸気タービン7を駆動して発電機8を
駆動し、発電を行うようになっている。
2. Description of the Related Art Generally, as shown in FIG. 4, a coal-fired boiler in a thermal power plant includes a pulverized coal F as a fuel supplied from a mill 4 in a furnace 1a of a boiler body 1 and a plurality of burners 2 as shown in FIG. The combustion gas G2 is injected into the boiler body 1 to heat water and steam flowing through the heat transfer tube, and the inside of the superheater 5 disposed in the sub-side wall 1b of the boiler body 1. The flowing main steam is superheated, the combustion gas G2 deprived of heat is discharged from the lower end of the rear heat transfer section 1c to the exhaust gas duct 3 as boiler exhaust gas G3, and the superheated steam V superheated by the superheater 5 is superheated steam pipe. The steam turbine 7 is guided to the steam turbine 7, and the steam turbine 7 is driven to drive the generator 8 to generate power.

【0003】前記ミル4には、その上方に設置されたコ
ールバンカ9から石炭が、モータ等の駆動装置10によ
って駆動される給炭機11により投入され、ミル4にお
いて石炭の粉砕が行われ、微粉炭Fが微粉炭管12を介
して前記バーナ2へ空気搬送されるようになっている。
[0003] Coal from a coal bunker 9 installed above the mill 4 is fed by a coal feeder 11 driven by a driving device 10 such as a motor. The charcoal F is pneumatically conveyed to the burner 2 via the pulverized coal pipe 12.

【0004】前記発電機8における発電量は、蒸気ター
ビン7へ導入される過熱蒸気Vの圧力(主蒸気圧力)と
流量(主蒸気流量)とを制御することによって、要求さ
れる発電量となるように調整され、前記主蒸気圧力の制
御については、給炭機11からミル4へ供給される石炭
の量(給炭量)を制御することによって行われ、又、前
記主蒸気流量の制御については、過熱蒸気管6の蒸気タ
ービン7入口部に設けられた主蒸気流量調節弁13の開
度を調節することによって行われるようになっている。
The amount of power generated by the generator 8 is controlled by controlling the pressure (main steam pressure) and the flow rate (main steam flow rate) of the superheated steam V introduced into the steam turbine 7 to obtain the required power generation amount. The control of the main steam pressure is performed by controlling the amount (coal feed amount) of coal supplied from the coal feeder 11 to the mill 4, and the control of the main steam flow rate is performed. Is performed by adjusting the opening of the main steam flow control valve 13 provided at the inlet of the steam turbine 7 of the superheated steam pipe 6.

【0005】図4中、14は主蒸気圧力14aを検出す
る圧力検出器、15は主蒸気圧力設定値16と圧力検出
器14で検出された主蒸気圧力14aとの差を求め、主
蒸気圧力偏差15aを出力する減算器、17は減算器1
5から出力される主蒸気圧力偏差15aを比例積分処理
して該主蒸気圧力偏差15aをなくすために必要となる
メガワットベースの信号17aを出力する比例積分調節
器、18はボイラ負荷指令19に比例積分調節器17か
ら出力される信号17aを加算してボイラマスタ指令1
8aを出力する加算器、20は加算器18から出力され
るボイラマスタ指令18aに基づき給炭量設定値20a
を求めて出力する関数発生器、21は給炭機11の駆動
装置10の回転数21aを検出する回転検出器、22は
給炭機11上に現在ある石炭の重量22aを検出するロ
ードセル等の重量検出器、23は回転検出器21で検出
された駆動装置10の回転数21aと重量検出器22で
検出された石炭の重量22aとの積を求め、実際の給炭
量23aを出力する乗算器、24は関数発生器20から
出力される給炭量設定値20aと乗算器23から出力さ
れる給炭量23aとの差を求め、給炭量偏差24aを出
力する減算器、25は減算器24から出力される給炭量
偏差24aを比例積分処理して該給炭量偏差24aをな
くすためのミルマスタとしての給炭量指令25aを給炭
機11の駆動装置10へ出力する比例積分調節器であ
る。
In FIG. 4, reference numeral 14 denotes a pressure detector for detecting a main steam pressure 14a. Reference numeral 15 denotes a difference between a main steam pressure set value 16 and a main steam pressure 14a detected by the pressure detector 14, thereby obtaining a main steam pressure. A subtractor that outputs the deviation 15a, and 17 is a subtractor 1
5 is a proportional-integral controller that outputs a megawatt-based signal 17a required to eliminate the main steam pressure deviation 15a by performing a proportional integral process on the main steam pressure deviation 15a output from the main steam pressure deviation 15a. The signal 17a output from the integration controller 17 is added to the boiler master command 1
The adder 20 outputs the set value 20a of the coal supply based on the boiler master command 18a output from the adder 18.
A function generator 21 for detecting and outputting the rotation speed 21a of the driving device 10 of the coal feeder 11; a load cell 22 for detecting the weight 22a of the coal present on the coal feeder 11; The weight detector 23 calculates the product of the number of revolutions 21a of the driving device 10 detected by the rotation detector 21 and the weight 22a of the coal detected by the weight detector 22, and outputs the actual coal supply 23a. , 24 is a subtractor for calculating the difference between the coal supply set value 20a output from the function generator 20 and the coal supply 23a output from the multiplier 23, and outputting a coal supply deviation 24a. Integral control for outputting a coal feed command 25a as a mill master for eliminating the coal feed deviation 24a to the drive unit 10 of the coal feeder 11 by proportionally integrating the coal feed amount deviation 24a output from the boiler 24. It is a vessel.

【0006】尚、前記関数発生器20には、図5に示さ
れるような関数が設定されており、該関数は、ボイラマ
スタ指令18aの増減に対し給炭量設定値20aを略比
例させて増減させることを表わしている。
A function as shown in FIG. 5 is set in the function generator 20, and this function increases and decreases the coal supply amount set value 20a substantially in proportion to the increase and decrease of the boiler master command 18a. It means to make it.

【0007】又、図4中、26は発電機8の実際の発電
機出力26aを検出する発電機出力検出器、27はボイ
ラ負荷指令19と発電機出力検出器26で検出された発
電機出力26aとの差を求め、発電機出力偏差27aを
出力する減算器、28は減算器27から出力される発電
機出力偏差27aを比例積分処理して該発電機出力偏差
27aをなくすための開度指令28aを主蒸気流量調節
弁13へ出力する比例積分調節器である。
In FIG. 4, reference numeral 26 denotes a generator output detector for detecting the actual generator output 26a of the generator 8, and 27 denotes a boiler load command 19 and the generator output detected by the generator output detector 26. 26a is a subtractor for obtaining a difference from the output 26a and outputting a generator output deviation 27a. 28 is an opening for eliminating the generator output deviation 27a by performing a proportional integral process on the generator output deviation 27a output from the subtractor 27. This is a proportional-integral controller that outputs a command 28a to the main steam flow control valve 13.

【0008】図4に示される石炭焚ボイラの運転時に
は、圧力検出器14によって主蒸気圧力14aが検出さ
れ、減算器15において主蒸気圧力設定値16と前記圧
力検出器14で検出された主蒸気圧力14aとの差が求
められ、主蒸気圧力偏差15aが比例積分調節器17へ
出力され、該比例積分調節器17において前記減算器1
5から出力される主蒸気圧力偏差15aが比例積分処理
されて該主蒸気圧力偏差15aをなくすために必要とな
るメガワットベースの信号17aが加算器18へ出力さ
れ、該加算器18においてボイラ負荷指令19に前記比
例積分調節器17から出力される信号17aが加算され
てボイラマスタ指令18aが関数発生器20へ出力さ
れ、該関数発生器20において前記加算器18から出力
されるボイラマスタ指令18aに基づき給炭量設定値2
0aが求められて減算器24へ出力される一方、回転検
出器21によって給炭機11の駆動装置10の回転数2
1aが検出されると共に、重量検出器22によって給炭
機11上に現在ある石炭の重量22aが検出され、乗算
器23において前記回転検出器21で検出された駆動装
置10の回転数21aと前記重量検出器22で検出され
た石炭の重量22aとの積が求められ、実際の給炭量2
3aが減算器24へ出力され、該減算器24において前
記関数発生器20から出力される給炭量設定値20aと
前記乗算器23から出力される給炭量23aとの差が求
められ、給炭量偏差24aが比例積分調節器25へ出力
され、該比例積分調節器25において前記減算器24か
ら出力される給炭量偏差24aが比例積分処理されて該
給炭量偏差24aをなくすためのミルマスタとしての給
炭量指令25aが給炭機11の駆動装置10へ出力さ
れ、これにより、ミル4へ供給される実際の給炭量23
aが、ボイラマスタ指令18aに基づいて設定される給
炭量設定値20aとなるよう制御され、ミル4からボイ
ラ本体1の火炉1a内へ所要量の微粉炭Fが供給され、
蒸気タービン7へ導入される主蒸気圧力14aが主蒸気
圧力設定値16に保持される。
In operation of the coal-fired boiler shown in FIG. 4, the main steam pressure 14a is detected by the pressure detector 14, and the main steam pressure set value 16 and the main steam pressure detected by the pressure detector 14 are detected by the subtractor 15. The difference from the pressure 14a is obtained, and the main steam pressure deviation 15a is output to the proportional-integral controller 17, where the subtracter 1
5, the main steam pressure deviation 15a is proportionally integrated, and a megawatt-based signal 17a required for eliminating the main steam pressure deviation 15a is output to the adder 18. The adder 18 outputs a boiler load command. 19 is added to the signal 17a output from the proportional-integral controller 17, and a boiler master command 18a is output to the function generator 20. The function generator 20 supplies power based on the boiler master command 18a output from the adder 18. Coal quantity set value 2
0a is calculated and output to the subtractor 24, while the rotation detector 21 detects the rotation speed 2 of the driving device 10 of the coal feeder 11.
1a, the weight 22a of the coal currently present on the coal feeder 11 is detected by the weight detector 22, and the rotation speed 21a of the driving device 10 detected by the rotation The product of the coal and the weight 22a of the coal detected by the weight detector 22 is obtained, and the actual coal supply amount 2
3a is output to the subtractor 24, and the difference between the coal supply set value 20a output from the function generator 20 and the coal supply 23a output from the multiplier 23 is calculated in the subtracter 24. The coal amount deviation 24a is output to a proportional integral controller 25. The proportional integral controller 25 performs a proportional integration process on the coal amount deviation 24a output from the subtracter 24 to eliminate the coal amount deviation 24a. The coal feed command 25a as a mill master is output to the driving device 10 of the coal feeder 11, whereby the actual coal feed 23 supplied to the mill 4 is output.
is controlled so as to be a coal feed set value 20a set based on the boiler master command 18a, and a required amount of the pulverized coal F is supplied from the mill 4 into the furnace 1a of the boiler body 1,
Main steam pressure 14 a introduced into steam turbine 7 is maintained at main steam pressure set value 16.

【0009】同時に、発電機出力検出器26によって発
電機8の実際の発電機出力26aが検出され、減算器2
7においてボイラ負荷指令19と前記発電機出力検出器
26で検出された発電機出力26aとの差が求められ、
発電機出力偏差27aが比例積分調節器28へ出力さ
れ、該比例積分調節器28において前記減算器27から
出力される発電機出力偏差27aが比例積分処理されて
該発電機出力偏差27aをなくすための開度指令28a
が主蒸気流量調節弁13へ出力され、該主蒸気流量調節
弁13の開度が調節され、蒸気タービン7へ導入される
主蒸気流量が所要値に保持され、これにより、発電機8
における発電量が要求される発電量となるように調整さ
れる。
At the same time, the actual generator output 26a of the generator 8 is detected by the generator output detector 26, and the subtractor 2
In 7, the difference between the boiler load command 19 and the generator output 26a detected by the generator output detector 26 is determined,
The generator output deviation 27a is output to the proportional-integral controller 28. In the proportional-integral controller 28, the generator output deviation 27a output from the subtracter 27 is subjected to proportional integration processing to eliminate the generator output deviation 27a. Opening command 28a
Is output to the main steam flow control valve 13, the opening degree of the main steam flow control valve 13 is adjusted, and the main steam flow introduced into the steam turbine 7 is maintained at a required value.
Is adjusted so that the power generation amount at the required power generation amount becomes the required power generation amount.

【0010】ところで、前述の如き石炭焚ボイラの場
合、運転が継続されて行くと、ボイラ本体1の炉壁内面
や過熱器5等の伝熱管表面に煤が付着し、ボイラ本体1
の収熱率が低下するため、ボイラ本体1内における所要
箇所に、スートブロワ29を挿入配置し、該スートブロ
ワ29を、定期的に或いは煤の付着状況に応じて、ボイ
ラ本体1外部からボイラ本体1内に向けボイラ本体1の
幅方向(図4中紙面と直交する方向)へ徐々に挿入しつ
つ軸線を中心に回転させて行き、ボイラ本体1の炉壁内
面や過熱器5等の伝熱管表面に蒸気等を吹き付け、付着
した煤を吹き払って除去するようにしている。
Meanwhile, in the case of the coal-fired boiler as described above, as the operation is continued, soot adheres to the inner wall of the furnace wall of the boiler main body 1 and the surface of the heat transfer tube such as the superheater 5 and the like.
The soot blower 29 is inserted and arranged at a required position in the boiler main body 1 and the soot blower 29 is periodically or in accordance with the state of adhering soot from the outside of the boiler main body 1. While gradually inserting in the width direction of the boiler main body 1 (a direction perpendicular to the plane of the paper in FIG. 4), it is rotated around an axis, and the inner surface of the furnace wall of the boiler main body 1 and the surface of the heat transfer tube such as the superheater 5 are rotated. , Etc., and the attached soot is blown off and removed.

【0011】尚、図4の例ではボイラ本体1のノーズ部
1d下方に挿入配置されるスートブロワ29のみを図示
し、それ以外の箇所に挿入配置されるスートブロワにつ
いては省略してある。
In the example of FIG. 4, only the soot blower 29 inserted under the nose portion 1d of the boiler main body 1 is shown, and the soot blower inserted at other places is omitted.

【0012】[0012]

【発明が解決しようとする課題】しかしながら、前述の
如く、スートブロワ29からボイラ本体1の炉壁内面や
過熱器5等の伝熱管表面に蒸気等を吹き付け、付着した
煤を吹き払って除去した場合、ボイラ本体1の収熱率が
向上し、この収熱率の向上が主蒸気圧力14aの制御の
一時的な外乱となり、あたかも給炭量23aが増加され
給炭量設定値20aを越えた量の石炭がミル4へ投入さ
れたかの如く作用し、主蒸気圧力14aが一時的に上昇
し、発電機8における発電量が要求される発電量を越え
てしまい、制御が思い通りに行われなくなるという欠点
があった。
However, as described above, when soot is blown from the soot blower 29 onto the inner wall of the furnace wall of the boiler main body 1 or the surface of the heat transfer tube such as the superheater 5 to remove attached soot. The heat absorption rate of the boiler body 1 is improved, and the improvement in the heat absorption rate is a temporary disturbance in the control of the main steam pressure 14a, and as if the coal supply 23a was increased and exceeded the coal supply set value 20a. Is operated as if the coal were put into the mill 4, the main steam pressure 14a temporarily increased, the power generation in the generator 8 exceeded the required power generation, and the control was not performed as desired. was there.

【0013】本発明は、斯かる実情に鑑み、スートブロ
ワの運転に伴う主蒸気圧力の一時的な上昇を抑制し得、
該主蒸気圧力を主蒸気圧力設定値に保持することがで
き、発電機における発電量を要求される発電量に制御し
得る石炭焚ボイラのミル給炭量制御方法を提供しようと
するものである。
The present invention has been made in view of the above circumstances, and can suppress a temporary increase in main steam pressure due to operation of a soot blower.
An object of the present invention is to provide a method for controlling a mill coal feed rate of a coal-fired boiler, which can maintain the main steam pressure at a set value of the main steam pressure and can control a power generation amount in a power generator to a required power generation amount. .

【0014】[0014]

【課題を解決するための手段】本発明は、ミルへ供給さ
れる実際の給炭量が、ボイラマスタ指令に基づいて設定
される給炭量設定値となるよう、給炭機へ給炭量指令を
出力する石炭焚ボイラのミル給炭量制御方法において、
スートブロワの運転時には、給炭量指令を一時的に減少
させて給炭量を所要量だけ減少させることを特徴とする
石炭焚ボイラのミル給炭量制御方法にかかるものであ
る。
SUMMARY OF THE INVENTION According to the present invention, a coal feed amount is supplied to a coal feeder such that an actual coal feed amount supplied to a mill becomes a set value based on a boiler master command. In the method for controlling the amount of coal supplied to a mill of a coal-fired boiler that outputs
The present invention relates to a method for controlling the amount of coal supplied to a mill of a coal-fired boiler, wherein the operation of the soot blower temporarily reduces the amount of supplied coal to reduce the amount of supplied coal by a required amount.

【0015】上記手段によれば、以下のような作用が得
られる。
According to the above means, the following effects can be obtained.

【0016】スートブロワの運転が行われると、ボイラ
本体の収熱率が向上し、この収熱率の向上が蒸気タービ
ンへ導入される主蒸気圧力の制御の一時的な外乱とな
り、あたかも給炭量が増加され給炭量設定値を越えた量
の石炭がミルへ投入されたかの如く作用し、主蒸気圧力
が一時的に上昇しようとするが、スートブロワの運転時
に、給炭量指令を一時的に減少させて給炭量を所要量だ
け減少させると、蒸気タービンへ導入される主蒸気圧力
が主蒸気圧力設定値に保持され、一時的に上昇すること
が回避され、発電機における発電量が要求される発電量
を越えてしまうこともなくなる。
When the soot blower is operated, the heat collection rate of the boiler body is improved, and this improvement in the heat collection rate becomes a temporary disturbance in the control of the main steam pressure introduced into the steam turbine. Is increased and the amount of coal exceeding the set coal supply value acts as if it were fed into the mill, and the main steam pressure attempts to temporarily increase.However, when the soot blower is operating, the When the coal supply is reduced by the required amount by reducing the main steam pressure, the main steam pressure introduced to the steam turbine is maintained at the main steam pressure set value, a temporary increase is avoided, and the power generation amount in the generator is required. The amount of generated power will not be exceeded.

【0017】[0017]

【発明の実施の形態】以下、本発明の実施の形態を図示
例と共に説明する。
Embodiments of the present invention will be described below with reference to the drawings.

【0018】図1〜図3は本発明を実施する形態の一例
であって、図中、図4及び図5と同一の符号を付した部
分は同一物を表わしており、基本的な構成は図4及び図
5に示す従来のものと同様であるが、本図示例の特徴と
するところは、図1〜図3に示す如く、0%の信号30
を出力する信号発生器31と、α%の信号32を出力す
る信号発生器33と、前記信号発生器31から出力され
る0%の信号30と前記信号発生器33から出力される
α%の信号32のうちいずれか一方を信号34として出
力する切換リレー35と、該切換リレー35から出力さ
れる信号34が変化した場合に、その変化率を設定値以
下の範囲内に制限する処理を行って信号36を出力する
変化率制限器37と、該変化率制限器37から出力され
る信号36と前記切換リレー35から出力される信号3
4との差を求め、偏差信号38を出力する減算器39
と、前記信号発生器31から出力される0%の信号30
と前記減算器39から出力される偏差信号38のうちい
ずれか一方を信号40として出力する切換リレー41
と、比例積分調節器25から出力される給炭量指令25
aに前記切換リレー41から出力される信号40を加算
し、給炭量指令25a’を給炭機11の駆動装置10へ
出力する加算器42とを追加装備し、スートブロワ29
の運転時に、給炭量指令25aを一時的に減少させて給
炭量23aを所要量だけ減少させるよう構成した点にあ
る。
FIGS. 1 to 3 show an embodiment of the present invention. In the drawings, the same reference numerals as those in FIGS. 4 and 5 denote the same parts. This is similar to the conventional one shown in FIGS. 4 and 5, but the feature of this example is that, as shown in FIGS.
, A signal generator 33 that outputs a signal 32 of α%, a signal 30 of 0% output from the signal generator 31, and a signal generator 33 of α% output from the signal generator 33. A switching relay 35 that outputs one of the signals 32 as a signal 34, and a process of limiting the rate of change to a set value or less when the signal 34 output from the switching relay 35 changes. A rate-of-change limiter 37 that outputs a signal 36, a signal 36 output from the rate-of-change limiter 37, and a signal 3 output from the switching relay 35.
Subtracter 39 for obtaining a difference from the output signal 4 and outputting a deviation signal 38
0% signal 30 output from the signal generator 31
And a switching relay 41 for outputting any one of the deviation signal 38 output from the subtractor 39 as a signal 40.
And the coal feed command 25 output from the proportional-integral controller 25
a is added to the signal 40 output from the switching relay 41, and an adder 42 for outputting a coal supply command 25a 'to the drive unit 10 of the coal feeder 11 is additionally provided.
During the operation, the coal supply command 25a is temporarily reduced to reduce the coal supply 23a by a required amount.

【0019】前記切換リレー35,41の切り換えるた
めの回路は、図2及び図3に示す如く、スートブロワ2
9の運転時に「1」となる運転信号43が入力され、該
運転信号43が「0」から「1」に変化したときに、予
め設定した時間遅れT1を生じさせて「1」に変化する
遅延信号44を出力するオンディレイタイマ45と、該
オンディレイタイマ45から出力される遅延信号44が
入力され、該遅延信号44が「0」から「1」に変化し
たときに、予め設定した時間遅れT2を生じさせて
「1」に変化する遅延信号46を出力するオンディレイ
タイマ47と、前記オンディレイタイマ45から出力さ
れる遅延信号44によってセットされ、「1」の信号4
8を出力して前記切換リレー35,41をb→c側から
a→c側へ切り換える一方、前記オンディレイタイマ4
7から出力される遅延信号46によってリセットされ、
「0」の信号48を出力して前記切換リレー35,41
をa→c側からb→c側へ切り換えるシングルフリップ
フロップ49とを備えてなる構成を有している。尚、前
記オンディレイタイマ45に設定した時間遅れT1は、
スートブロワ29の運転信号43が出力されてから実際
にスートブロワ29の運転が開始されるまでには若干の
タイムラグがあるため、このタイムラグを想定したもの
であり、一方、前記オンディレイタイマ47に設定した
時間遅れT2は、スートブロワ29の運転が実際に開始
されてから終了する直前までの時間に相当するようにし
てある。又、図2中、50はNOT回路である。
As shown in FIGS. 2 and 3, a circuit for switching the switching relays 35 and 41 is a soot blower 2.
When the operation signal 43 that becomes “1” is input during the operation of No. 9 and the operation signal 43 changes from “0” to “1”, a predetermined time delay T1 is caused to change to “1”. An on-delay timer 45 that outputs a delay signal 44 and a delay signal 44 that is output from the on-delay timer 45 are input, and when the delay signal 44 changes from “0” to “1”, a predetermined time An on-delay timer 47 that outputs a delay signal 46 that changes to "1" by causing a delay T2, and a delay signal 44 output from the on-delay timer 45, the signal 4 of "1"
8 to switch the switching relays 35 and 41 from the b → c side to the a → c side.
7 is reset by the delay signal 46 output from
A signal 48 of "0" is output to output the switching relays 35 and 41.
And a single flip-flop 49 for switching from a → c side to b → c side. The time delay T1 set in the on-delay timer 45 is:
Since there is a slight time lag from when the operation signal 43 of the soot blower 29 is output to when the operation of the soot blower 29 is actually started, this time lag is assumed. On the other hand, the on-delay timer 47 is set. The time delay T2 is set to correspond to the time from when the operation of the soot blower 29 is actually started until immediately before it ends. In FIG. 2, reference numeral 50 denotes a NOT circuit.

【0020】次に、上記図示例の作動を説明する。Next, the operation of the illustrated example will be described.

【0021】スートブロワ29の運転が行われていない
状態での通常の石炭焚ボイラの運転時には、切換リレー
35,41はそれぞれb→c側に切り換えられており、
信号発生器31から出力される0%の信号30が信号4
0として加算器42へ出力されるため、比例積分調節器
25から出力される給炭量偏差24aをなくすためのミ
ルマスタとしての給炭量指令25aが、加算器42を経
てそのまま給炭量指令25a’として給炭機11の駆動
装置10へ出力され、これにより、ミル4へ供給される
実際の給炭量23aが、ボイラマスタ指令18aに基づ
いて設定される給炭量設定値20aとなるよう制御さ
れ、ミル4からボイラ本体1の火炉1a内へ所要量の微
粉炭Fが供給され、蒸気タービン7へ導入される主蒸気
圧力14aが主蒸気圧力設定値16に保持される。
During normal operation of the coal-fired boiler in a state where the soot blower 29 is not operated, the switching relays 35 and 41 are switched from b to c, respectively.
0% signal 30 output from signal generator 31 is signal 4
Since it is output to the adder 42 as 0, the coal feed command 25a as a mill master for eliminating the coal feed deviation 24a output from the proportional-integral controller 25 passes through the adder 42 as it is. Is output to the driving device 10 of the coal feeder 11 so that the actual coal feed 23a supplied to the mill 4 becomes the coal feed set value 20a set based on the boiler master command 18a. Then, a required amount of pulverized coal F is supplied from the mill 4 into the furnace 1a of the boiler body 1, and the main steam pressure 14a introduced into the steam turbine 7 is maintained at the main steam pressure set value 16.

【0022】一方、石炭焚ボイラの運転が継続されて行
き、ボイラ本体1の炉壁内面や過熱器5等の伝熱管表面
に煤が付着すると、スートブロワ29の運転信号43が
オンディレイタイマ45へ入力され、該オンディレイタ
イマ45において、前記スートブロワ29の運転信号4
3が出力されてから実際にスートブロワ29の運転が開
始されるまでの時間に相当する時間遅れT1経過後、
「1」の遅延信号44がシングルフリップフロップ49
へ出力され、該シングルフリップフロップ49がセット
され「1」の信号48が出力されて切換リレー35,4
1がb→c側からa→c側へ切り換えられる。
On the other hand, when the operation of the coal-fired boiler is continued and soot adheres to the inner surface of the furnace wall of the boiler main body 1 or the surface of the heat transfer tube such as the superheater 5, the operation signal 43 of the soot blower 29 is sent to the on-delay timer 45. The on-delay timer 45 inputs the operation signal 4 of the soot blower 29.
After the elapse of a time delay T1 corresponding to the time from when 3 is output to when the operation of the soot blower 29 is actually started,
The delay signal 44 of “1” is a single flip-flop 49
The single flip-flop 49 is set and the signal 48 of "1" is output to the switching relays 35 and 4
1 is switched from the b → c side to the a → c side.

【0023】前記切換リレー35,41がb→c側から
a→c側へ切り換えられると、信号発生器33から出力
されるα%の信号32が切換リレー35を介して信号3
4として減算器39と変化率制限器37へ出力され、該
変化率制限器37において前記切換リレー35から出力
される信号34の変化率を設定値以下の範囲内に制限す
る処理が行われて信号36が前記減算器39へ出力さ
れ、該減算器39において前記変化率制限器37から出
力される信号36と前記切換リレー35から出力される
信号34との差が求められ、偏差信号38が切換リレー
41を介して信号40として加算器42へ出力され、該
加算器42において前記比例積分調節器25から出力さ
れる給炭量指令25aに前記切換リレー41から出力さ
れるマイナスの信号40が加算され、給炭量指令25
a’として給炭機11の駆動装置10へ出力され、これ
により、ミル4へ供給される実際の給炭量23aが、ボ
イラマスタ指令18aに基づいて設定される給炭量設定
値20aより、スートブロワ29の運転に伴うボイラ本
体1の収熱率の向上に対応する分だけ若干少なくなるよ
う制御され、ミル4からボイラ本体1の火炉1a内へ通
常より所要量だけ少ない微粉炭Fが供給され、蒸気ター
ビン7へ導入される主蒸気圧力14aが主蒸気圧力設定
値16に保持され、一時的に上昇することが回避され、
発電機8における発電量が要求される発電量を越えてし
まうこともなくなり、制御が思い通りに行われることと
なる。
When the switching relays 35 and 41 are switched from the b → c side to the a → c side, the α% signal 32 output from the signal generator 33 is transmitted to the signal 3 via the switching relay 35.
4 is output to the subtractor 39 and the change rate limiter 37, and the change rate limiter 37 performs a process of limiting the change rate of the signal 34 output from the switching relay 35 to within a set value or less. A signal 36 is output to the subtractor 39, and a difference between the signal 36 output from the change rate limiter 37 and the signal 34 output from the switching relay 35 is obtained in the subtracter 39. The signal 40 is output to the adder 42 via the switching relay 41 as a signal 40. In the adder 42, the minus signal 40 output from the switching relay 41 is added to the coal feed command 25a output from the proportional-integral controller 25. It is added and the amount of coal supply 25
is output to the drive unit 10 of the coal feeder 11 as a ', whereby the actual coal feed amount 23a supplied to the mill 4 is calculated from the soot blower set value 20a set based on the boiler master command 18a. The pulverized coal F is controlled by the mill 4 into the furnace 1a of the boiler main body 1 by a required amount smaller than usual by a required amount, so that the pulverized coal F is controlled to be slightly lower by an amount corresponding to the improvement of the heat collection rate of the boiler main body 1 accompanying the operation of the 29 The main steam pressure 14a introduced into the steam turbine 7 is maintained at the main steam pressure set value 16 to avoid a temporary rise,
The amount of power generated by the generator 8 does not exceed the required amount of power generation, and control is performed as desired.

【0024】尚、給炭量指令25aの減少分をα%から
徐々に少なくしているのは、スートブロワ29の運転に
伴うボイラ本体1の収熱率の向上による主蒸気圧力14
aの上昇はあくまでも一時的なものであって時間の経過
と共に収まり安定化して行くためである。
The reason why the decrease in the coal feed amount command 25a is gradually reduced from α% is that the main steam pressure 14 due to the improvement of the heat collection rate of the boiler main body 1 due to the operation of the soot blower 29.
This is because the rise of “a” is only temporary, and stops and stabilizes over time.

【0025】前記オンディレイタイマ45から出力され
る遅延信号44は、前記シングルフリップフロップ49
だけでなくオンディレイタイマ47にも入力されてお
り、該オンディレイタイマ47において前記遅延信号4
4が「0」から「1」に変化してから予め設定した時間
遅れT2、即ちスートブロワ29の運転が実際に開始さ
れてから終了する直前までの時間が経過すると、オンデ
ィレイタイマ47から「1」の遅延信号46が前記シン
グルフリップフロップ49へ出力され、該シングルフリ
ップフロップ49がリセットされ「0」の信号48が出
力されて前記切換リレー35,41がa→c側からb→
c側へ切り換えられる。
The delay signal 44 output from the on-delay timer 45 is applied to the single flip-flop 49
The delay signal 47 is also input to the on-delay timer 47,
When the time delay T2 set in advance from the change of the state of the soot blower 29 from “0” to “1”, that is, the time from when the operation of the soot blower 29 is actually started to immediately before the end thereof has elapsed, the on-delay timer 47 sets “1” Is output to the single flip-flop 49, the single flip-flop 49 is reset and a signal 48 of "0" is output, and the switching relays 35 and 41 are switched from a → c side to b →
Switch to c side.

【0026】前記切換リレー35,41がa→c側から
b→c側へ切り換えられると、前述の通常の石炭焚ボイ
ラの運転時と同様、信号発生器31から出力される0%
の信号30が信号40として加算器42へ出力され、比
例積分調節器25から出力される給炭量偏差24aをな
くすためのミルマスタとしての給炭量指令25aが、加
算器42を経てそのまま給炭量指令25a’として給炭
機11の駆動装置10へ出力され、これにより、ミル4
へ供給される実際の給炭量が、ボイラマスタ指令18a
に基づいて設定される給炭量設定値20aとなるよう制
御され、ミル4からボイラ本体1の火炉1a内へ所要量
の微粉炭Fが供給され、蒸気タービン7へ導入される主
蒸気圧力14aが主蒸気圧力設定値16に保持される。
When the switching relays 35 and 41 are switched from the a → c side to the b → c side, the 0% output from the signal generator 31 is output in the same manner as in the normal operation of the coal-fired boiler described above.
Is output to the adder 42 as a signal 40, and the coal feed command 25a as a mill master for eliminating the coal feed deviation 24a output from the proportional-integral controller 25 is supplied through the adder 42 as it is. It is output to the drive unit 10 of the coal feeder 11 as the quantity command 25a '.
The actual amount of coal supplied to the boiler master command 18a
Is controlled so as to be a coal feed set value 20a set based on the above-described formula, a required amount of pulverized coal F is supplied from the mill 4 into the furnace 1a of the boiler body 1, and the main steam pressure 14a introduced into the steam turbine 7 Is maintained at the main steam pressure set value 16.

【0027】こうして、スートブロワ29の運転に伴う
主蒸気圧力14aの一時的な上昇を抑制し得、該主蒸気
圧力14aを主蒸気圧力設定値16に保持することがで
き、発電機8における発電量を要求される発電量に制御
し得る。
In this manner, a temporary increase in the main steam pressure 14a due to the operation of the soot blower 29 can be suppressed, and the main steam pressure 14a can be maintained at the main steam pressure set value 16, and the power generation in the generator 8 Can be controlled to the required power generation.

【0028】尚、本発明の石炭焚ボイラのミル給炭量制
御方法は、上述の図示例にのみ限定されるものではな
く、本発明の要旨を逸脱しない範囲内において種々変更
を加え得ることは勿論である。
It should be noted that the method for controlling the amount of supplied coal in a mill of a coal-fired boiler of the present invention is not limited to the above-described illustrated example, and various changes can be made without departing from the scope of the present invention. Of course.

【0029】[0029]

【発明の効果】以上、説明したように本発明の石炭焚ボ
イラのミル給炭量制御方法によれば、スートブロワの運
転に伴う主蒸気圧力の一時的な上昇を抑制し得、該主蒸
気圧力を主蒸気圧力設定値に保持することができ、発電
機における発電量を要求される発電量に制御し得るとい
う優れた効果を奏し得る。
As described above, according to the method for controlling the amount of coal supplied to a coal-fired boiler according to the present invention, it is possible to suppress a temporary increase in the main steam pressure accompanying the operation of a soot blower. Can be maintained at the set value of the main steam pressure, and the power generation amount in the power generator can be controlled to the required power generation amount.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明を実施する形態の一例の全体概要構成図
である。
FIG. 1 is an overall schematic configuration diagram of an example of an embodiment of the present invention.

【図2】図1に示される切換リレーの切換回路図であ
る。
FIG. 2 is a switching circuit diagram of the switching relay shown in FIG.

【図3】本発明を実施する形態の一例における各機器の
出力信号を表わすタイムチャートである。
FIG. 3 is a time chart illustrating output signals of respective devices according to an example of an embodiment of the present invention.

【図4】従来例の全体概要構成図である。FIG. 4 is an overall schematic configuration diagram of a conventional example.

【図5】図1及び図4に示される関数発生器20に設定
された関数を表わす線図である。
FIG. 5 is a diagram showing functions set in function generator 20 shown in FIGS. 1 and 4;

【符号の説明】[Explanation of symbols]

1 ボイラ本体 4 ミル 5 過熱器 7 蒸気タービン 8 発電機 11 給炭機 14 圧力検出器 14a 主蒸気圧力 18a ボイラマスタ指令 20a 給炭量設定値 23a 給炭量 25a 給炭量指令 29 スートブロワ 30 信号 31 信号発生器 32 信号 33 信号発生器 34 信号 35 切換リレー 36 信号 37 変化率制限器 38 偏差信号 39 減算器 40 信号 41 切換リレー 42 加算器 43 運転信号 44 遅延信号 45 オンディレイタイマ 46 遅延信号 47 オンディレイタイマ 48 信号 49 シングルフリップフロップ V 過熱蒸気 DESCRIPTION OF SYMBOLS 1 Boiler main body 4 Mill 5 Superheater 7 Steam turbine 8 Generator 11 Coal supply machine 14 Pressure detector 14a Main steam pressure 18a Boiler master command 20a Coal supply amount set value 23a Coal supply amount 25a Coal supply amount command 29 Soot blower 30 Signal 31 Signal Generator 32 Signal 33 Signal Generator 34 Signal 35 Switching Relay 36 Signal 37 Rate-of-Change Limiter 38 Deviation Signal 39 Subtractor 40 Signal 41 Switching Relay 42 Adder 43 Operation Signal 44 Delay Signal 45 On Delay Timer 46 Delay Signal 47 On Delay Timer 48 signal 49 Single flip-flop V Superheated steam

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 ミルへ供給される実際の給炭量が、ボイ
ラマスタ指令に基づいて設定される給炭量設定値となる
よう、給炭機へ給炭量指令を出力する石炭焚ボイラのミ
ル給炭量制御方法において、 スートブロワの運転時には、給炭量指令を一時的に減少
させて給炭量を所要量だけ減少させることを特徴とする
石炭焚ボイラのミル給炭量制御方法。
1. A coal-fired boiler mill for outputting a coal feed amount command to a coal feeder so that the actual coal feed amount supplied to the mill becomes a coal feed amount set value set based on a boiler master command. A method for controlling the amount of coal supplied to a mill of a coal-fired boiler, wherein the amount of supplied coal is reduced by a required amount during the operation of the soot blower.
JP9142184A 1997-05-30 1997-05-30 Coal-fired boiler mill feed control method Pending JPH10332104A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP9142184A JPH10332104A (en) 1997-05-30 1997-05-30 Coal-fired boiler mill feed control method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP9142184A JPH10332104A (en) 1997-05-30 1997-05-30 Coal-fired boiler mill feed control method

Publications (1)

Publication Number Publication Date
JPH10332104A true JPH10332104A (en) 1998-12-15

Family

ID=15309341

Family Applications (1)

Application Number Title Priority Date Filing Date
JP9142184A Pending JPH10332104A (en) 1997-05-30 1997-05-30 Coal-fired boiler mill feed control method

Country Status (1)

Country Link
JP (1) JPH10332104A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015007511A (en) * 2013-06-26 2015-01-15 株式会社日立製作所 Boiler control device
CN111308886A (en) * 2020-04-07 2020-06-19 兰州陇能电力科技有限公司 Coal-fired unit coordination control method and system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015007511A (en) * 2013-06-26 2015-01-15 株式会社日立製作所 Boiler control device
CN111308886A (en) * 2020-04-07 2020-06-19 兰州陇能电力科技有限公司 Coal-fired unit coordination control method and system
CN111308886B (en) * 2020-04-07 2023-06-02 兰州陇能电力科技有限公司 Coordinated control method and system for coal-fired unit

Similar Documents

Publication Publication Date Title
US5529021A (en) Forced once-through steam generator
JPH10332104A (en) Coal-fired boiler mill feed control method
JP4062810B2 (en) Control method and apparatus for air preheater bypass damper
JP2000171003A (en) Reheat steam temperature control method for coal-fired power plant
JPH0762525B2 (en) Boiler combustion control device
JPH01237325A (en) power plant
JP2002106831A (en) Pulverized coal-fired boiler equipment
JP3758240B2 (en) Air flow control method and apparatus for exhaust recombustion type combined cycle plant
JP2887999B2 (en) Fuel control device for auxiliary boiler in multiple boiler facilities
JP3882294B2 (en) Combustion air flow rate control method and apparatus in exhaust recombustion combined cycle power plant
JP3941405B2 (en) Boiler automatic control apparatus and method
JP3755910B2 (en) Water injection control device for reheat steam desuperheater
JP3941254B2 (en) Coordinated control method of air preheater bypass damper and economizer bypass damper
JP3820636B2 (en) Method and apparatus for controlling feed water temperature in exhaust recombustion combined cycle plant
JP2894118B2 (en) Boiler steam temperature control method
JPS63135712A (en) Automatic controller for boiler
SU885703A1 (en) System for controlling steam temperature after heat generating unit undustrial superheater
JP3354776B2 (en) Operation method of incinerator complex plant equipment
JP2002168406A (en) Boiler reheat steam temperature controller
JPH0493501A (en) Boiler spray flow control method
JPH09303704A (en) Combustion air controller for exhaust gas recirculation boiler
JPH11351552A (en) Mill primary air flow control method and apparatus for pulverized coal-fired boiler
JPH01291013A (en) Operation of fluidized bed boiler provided with soot blower
JP2002022157A (en) Boiler plant desulfurization ventilator control method
JPH01195903A (en) Extraction controller for extraction steam turbine

Legal Events

Date Code Title Description
EXPY Cancellation because of completion of term