JPH11217604A - How to charge the blast furnace - Google Patents
How to charge the blast furnaceInfo
- Publication number
- JPH11217604A JPH11217604A JP5001698A JP5001698A JPH11217604A JP H11217604 A JPH11217604 A JP H11217604A JP 5001698 A JP5001698 A JP 5001698A JP 5001698 A JP5001698 A JP 5001698A JP H11217604 A JPH11217604 A JP H11217604A
- Authority
- JP
- Japan
- Prior art keywords
- blast furnace
- charging
- furnace
- coke
- charge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Landscapes
- Manufacture Of Iron (AREA)
Abstract
(57)【要約】
【課題】 本発明は、高炉により生産される銑鉄の品質
ならびに生産量の変動に伴う炉内状況の変化に対しても
安定な融着帯を形成し、円滑な高炉操業を行うための融
着帯形状を形成するのに適した高炉への装入物装入方法
を提供するものである。
【解決手段】 ベルレス高炉における装入物の高炉内装
入に際し、高炉直上の炉頂ホッパー内へ下部にコークス
を投入後、次いでその上部に鉄鉱石を投入し、該炉頂ホ
ッパー内でコークスと鉄鉱石を層状に貯留後、遮断弁を
開放し旋回シュートを介して装入物を高炉内の高炉炉中
心部近傍、または高炉中間部から装入を開始し、旋回シ
ュートを順次高炉壁側方向へ移動させながら高炉炉壁側
において装入を完了し、高炉内においてコークスと鉄鉱
石との混合物層を形成する高炉への装入物装入方法。
(57) [Summary] [PROBLEMS] To provide a smooth blast furnace operation that forms a cohesive zone that is stable against changes in the furnace conditions due to variations in the quality and production of pig iron produced by the blast furnace. To provide a method of charging a blast furnace with a charge suitable for forming a cohesive zone shape for performing the heat treatment. SOLUTION: When charging a charge in a bellless blast furnace into a blast furnace interior, coke is charged into a lower part in a furnace top hopper immediately above the blast furnace, and then iron ore is charged into the upper part thereof, and coke and iron ore are charged in the furnace hopper. After the stones are stored in layers, the shut-off valve is opened, and the charge is started from the vicinity of the center of the blast furnace in the blast furnace or from the middle of the blast furnace via the swirl chute, and the swirl chute is sequentially moved toward the blast furnace wall. A method for charging a blast furnace in which charging is completed on the blast furnace wall side while moving, and a mixed layer of coke and iron ore is formed in the blast furnace.
Description
【0001】[0001]
【発明の属する技術分野】本発明は、高炉により生産さ
れる銑鉄の品質ならびに生産量の変動に伴う炉内状況の
変化に対しても安定な融着帯を形成し、円滑な高炉操業
を行うための融着帯形状を形成するのに適した高炉への
装入物装入方法に関するものである。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention forms a cohesive zone that is stable against changes in the furnace conditions due to variations in the quality and production of pig iron produced by a blast furnace, and performs a smooth blast furnace operation. For charging a charge to a blast furnace suitable for forming a cohesive zone shape for use.
【0002】[0002]
【従来の技術】高炉における主な制御手段は装入物分布
制御と送風制御の二つがある。送風制御によりレースウ
ェイ条件(レースウェイ形状、レースウェイ内温度分
布、レースウェイ内ガス組成分布ほか)が決まるが、装
入物分布制御は、高炉内の反応伝熱を左右するガス流分
布、融着帯の形状を決める唯一の手段であるため、最も
よく用いられかつ最も重要な制御手段である。2. Description of the Related Art There are two main control means in a blast furnace: charge distribution control and blowing control. The raceway conditions (raceway shape, raceway temperature distribution, raceway gas composition distribution, etc.) are determined by the ventilation control, but the charge distribution control is based on the gas flow distribution, melting, which affects the reaction heat transfer in the blast furnace. It is the most commonly used and most important control because it is the only means of determining the shape of the garment.
【0003】高炉内の融着帯の形成方法および形状につ
いては既に知られているが、ここで改めてその形成状況
を以下に述べる。一般に高炉は高炉炉頂部より鉄鉱石、
焼結鉱、ペレット(以下、単に鉄鉱石と称す)と、コー
クスを交互に装入し、炉下部の送風羽口(以下、単に羽
口と称す)より熱風を吹き込んで操業を行っている。高
炉においては、羽口先端部分でコークスと熱風との反応
により生じたCOガスを含む高温の炉内ガスで、前記鉄
鉱石を炉内降下中に加熱−還元(間接還元)−溶融す
る。[0003] Although a method and a shape of a cohesive zone in a blast furnace are already known, the formation thereof will be described below again. Generally, the blast furnace is made of iron ore,
Sinter ore, pellets (hereinafter, simply referred to as iron ore), and coke are charged alternately, and hot air is blown from a blowing tuyere (hereinafter, simply referred to as tuyere) at the bottom of the furnace to operate. In the blast furnace, the iron ore is heated, reduced (indirectly reduced) and melted during the descent in the furnace by a high-temperature furnace gas containing CO gas generated by a reaction between coke and hot air at the tuyere tip.
【0004】さらに、鉄鉱石の溶融物を滴下中に滴下帯
部に存在するコークスで還元(直接還元)しつつ湯溜り
部に集め、適時、出銑口より炉外に排出する。この鉄鉱
石は溶融滴下する直前に軟化融着状態(以下、単に融着
帯と称す)となり、コークスを挟んで炉内に存在してい
る。[0004] Further, the molten iron ore is reduced (directly reduced) by the coke existing in the dropping zone during the dropping, collected in the pool, and discharged from the taphole out of the furnace at an appropriate time. This iron ore is in a softened and fused state (hereinafter simply referred to as a cohesive zone) immediately before being dropped by melting, and is present in the furnace with coke interposed therebetween.
【0005】このように、高炉内においては、装入した
鉄鉱石が塊状の状態にある塊状帯、軟化融着した状態に
ある融着帯、溶融滴下状態にある滴下帯が存在してお
り、前記炉内ガスは羽口先端部よりこの滴下帯、融着
帯、塊状帯を順次通って炉外に排出している。この三者
の通気抵抗は融着帯が最も大きく、次いで塊状帯であ
り、滴下帯が最も小さくなっている。したがって、融着
帯の形状によっては塊状帯と滴下帯の形状も異なり、炉
内の通気性およびガス利用率が異なったものとなる。As described above, in the blast furnace, there are a massive zone in which the charged iron ore is in a massive state, a fusion zone in a softened and fused state, and a dripping zone in a molten dripping state. The gas in the furnace is discharged from the tuyere tip to the outside of the furnace through the dripping zone, the fusion zone, and the lump zone in order. The airflow resistance of the three members is the largest in the fusion zone, followed by the massive band, and the smallest in the dripping zone. Therefore, depending on the shape of the cohesive zone, the shape of the lump zone and the shape of the dripping zone are different, and the gas permeability and the gas permeability in the furnace are different.
【0006】例えば、融着帯の頂部が高くなるいわゆる
中心流型融着帯においては、塊状帯が狭くなる反面、滴
下帯が広くなるので通気性は良好となると同時に、炉内
ガスが炉心部を常時流れてガス流が安定化するために、
ガス利用率も高位のレベルに維持できる。また、融着帯
頂部が低くなるいわゆるフラット型融着帯においては、
塊状帯が広くなる反面、滴下帯が狭くなるので通気性は
悪くなると同時に、炉内ガスが偏流する可能性があり、
ガス利用率が低下することもある。For example, in a so-called central flow type cohesive zone in which the top of the cohesive zone is high, the lump zone is narrow, but the dripping zone is wide, so that the air permeability is good and the gas in the furnace is at the core. In order to stabilize the gas flow
Gas utilization can also be maintained at a high level. In a so-called flat type fusion band in which the top of the fusion band is low,
While the lump band becomes wider, the drip zone becomes narrower, so the gas permeability deteriorates, and the gas in the furnace may drift.
Gas utilization may be reduced.
【0007】この通気性およびガス利用率は生産性およ
び燃料比に深い関係を有するものであり、高炉操業中に
該融着帯の位置および形状を検知し、これによって融着
帯を制御すれば、通気性およびガス利用率を最適状態に
調節することができ、生産性の増大、燃料比の節減を図
ることができる。[0007] The permeability and the gas utilization rate have a deep relationship with the productivity and the fuel ratio. If the position and shape of the cohesive zone are detected during the operation of the blast furnace, the cohesive zone can be controlled accordingly. In addition, it is possible to adjust the air permeability and the gas utilization rate to an optimum state, thereby increasing the productivity and reducing the fuel ratio.
【0008】このような高炉内での融着帯の制御方法と
しては、幾つかの発明が開示されている。例えば特公昭
63−61367号公報に提示されている技術によれ
ば、高炉の炉腹部あるいはそれ以下の部分から、炉内に
1個または複数個のゾンデを挿通し、該ゾンデから得ら
れるガス・固体温度、ガス組成の実測値の情報から、融
着帯の上側および下側の位置を求めるとともに、該融着
帯の位置が高炉操業上最適な位置を占めるように、高炉
の半径方向の鉄鉱石層厚とコークス層厚の比(O/C)
の分布および粒度分布を制御することを特徴としてい
る。Several inventions have been disclosed as methods for controlling the cohesive zone in such a blast furnace. For example, according to the technique disclosed in Japanese Patent Publication No. 63-61367, one or a plurality of sondes are inserted into the furnace from the abdomen or lower part of the blast furnace, and gas obtained from the sondes is inserted. From the information on the measured values of the solid temperature and the gas composition, the upper and lower positions of the cohesive zone are determined, and iron ore in the radial direction of the blast furnace is determined so that the position of the cohesive zone occupies the optimum position for blast furnace operation. Ratio of stone layer thickness to coke layer thickness (O / C)
And the particle size distribution is controlled.
【0009】すなわち、融着帯の制御として高炉へ装入
する鉄鉱石とコークスのO/Cの分布を制御することに
よって適切な融着帯を得ることができるとされており、
その理由として、鉄鉱石層はコークス層に比べて粒子径
および層の空間率が小さいので、高炉の半径方向のうち
で鉄鉱石層厚が相対的に厚い部分ではガスの通気性が悪
く、そのためその部分を流れるガス流速、ガス流量が低
下する。しかして、ガス流量の低下はいろいろな面に影
響を及ぼす。例えば伝熱に関して云えば単位断面積を流
れるガス顕熱量の低下、固体への伝熱性の悪化をもたら
す。また、反応に関しては、鉄鉱石を還元するための還
元ガスの濃度が低下し、充分なガス量が供給されないた
めに還元推進力が弱まることから、還元率の相対的低下
をきたす。That is, it is said that an appropriate cohesive zone can be obtained by controlling the O / C distribution of iron ore and coke charged into the blast furnace as control of the cohesive zone.
The reason is that the iron ore layer has a smaller particle diameter and a smaller voidage of the layer than the coke layer, so gas permeability is poor in the relatively thick part of the iron ore layer in the radial direction of the blast furnace. The gas flow rate and gas flow rate flowing through that portion decrease. Thus, a decrease in the gas flow rate affects various aspects. For example, in terms of heat transfer, the amount of sensible heat flowing through the unit cross-sectional area decreases, and the heat transfer to solids deteriorates. In addition, regarding the reaction, the concentration of the reducing gas for reducing the iron ore decreases, and a sufficient amount of gas is not supplied, so that the reduction driving force is weakened, thereby causing a relative reduction in the reduction rate.
【0010】以上のことから、半径方向でO/Cの高い
部分はガス・固体温度が低い状態にあり、還元率の低下
に繋がっている。したがって、例えば中心部で高い融着
帯を実現するためには炉下部の中心部に充分な熱を供給
することが必要である。そのためには炉中心部にガスの
供給を増す操作、すなわち中心部のO/Cを小さくする
ことが必要であり、また周辺部で高い融着帯を実現する
ためには同様な理由から、周辺部のO/Cを小さくする
操作を必要とすると述べられている。From the above, the portion where the O / C is high in the radial direction has a low gas / solid temperature, which leads to a reduction in the reduction rate. Therefore, for example, in order to realize a high cohesive zone at the center, it is necessary to supply sufficient heat to the center at the lower part of the furnace. For that purpose, it is necessary to increase the gas supply to the center of the furnace, that is, to reduce the O / C at the center, and to realize a high cohesive zone at the periphery, for the same reason, It is stated that an operation for reducing the O / C of the unit is required.
【0011】しかし、従来の通常の高炉装入物の装入方
法に従えば、例えば図4に示すように、コークス2
(C)と鉄鉱石3(O)とを順次層状に装入すると炉中
心部においては、鉄鉱石の装入層の厚みが厚くコークス
装入層の厚みが薄くなる傾向を避けることはできない。
これは鉄鉱石の安息角がコークスの安息角に比べて小さ
く、かつ鉄鉱石とコークスの嵩密度が大きく異なり、均
一に装入されたコークスを鉄鉱石装入時に鉄鉱石が削り
込み、勢い炉中心部において鉄鉱石の層が必然的に厚く
なる現象を生じる。したがって、炉中心においては炉下
部から供給されるガスの流れが、炉中心部の鉄鉱石の厚
い部分では通気性が悪くなり、その結果ガスは流れが比
較的容易な炉周辺部に向かいその部分を流れることにな
る。However, according to a conventional method of charging a blast furnace charge, for example, as shown in FIG.
If (C) and iron ore 3 (O) are sequentially charged in layers, the tendency of the iron ore charging layer being thick and the coke charging layer being thin at the center of the furnace cannot be avoided.
This is because the iron ore has a smaller angle of repose than the coke, and the bulk density of the iron ore and the coke is significantly different. A phenomenon occurs in which the iron ore layer becomes inevitably thick in the center. Therefore, at the center of the furnace, the gas flow supplied from the lower part of the furnace has poor air permeability in the thick part of the iron ore in the center of the furnace, and as a result, the gas flows toward the furnace peripheral part where the flow is relatively easy, and the gas flows there. Will flow.
【0012】このような装入物の分布状態に対して高炉
中心部のみにコークスを特別の手段によって装入し、炉
中心部にチムニー状のコークス堆積状態を積極的に保持
せしめようとする技術が例えば特公平6−37649号
に開示されている。該公報に記載された技術を高炉操業
に適用すれば、炉中心部にコークスのチムニーを容易に
作ることができるはずであるが、後述するように高炉の
実操業においては一旦作られたチムニー状のコークス層
では、時によっては炉心部の通気性が過大となり、下方
向からの上昇ガス流が強すぎてチムニー状に堆積しよう
とするコークスを吹き上げ、図5に模式的に示したよう
にコークスが周辺部に飛散し、実際には目的とするコー
クス中心部装入の効果が得られないない状態になること
もあった。A technique for charging coke only to the central portion of the blast furnace by a special means in order to keep the chimney-like coke accumulated state in the central portion of the furnace in response to such a distribution state of the charged material. Is disclosed, for example, in Japanese Patent Publication No. 6-37649. If the technology described in the publication is applied to blast furnace operation, it should be possible to easily produce a coke chimney in the center of the furnace. In some cases, the air permeability of the core part becomes excessively large in the coke layer, and the rising gas flow from the downward direction is too strong to blow up coke that is going to be deposited in a chimney shape, and as shown schematically in FIG. Scattered around the periphery, and in some cases, the desired effect of charging the central part of the coke could not be obtained.
【0013】[0013]
【発明が解決しようとする課題】前記したように、融着
帯の適切な形状については知られており、図2に示すよ
うに融着帯9を中心部が高い逆V型にすることが、現状
の高炉操業を行う上で理想的な形状とされている。この
ためには上記したように、炉中心部のO/Cを小さくす
る必要があり、これは言い換えると炉中心部のコークス
量ができるだけ多くなるような装入物の装入方法が好ま
しいと言うことである。As described above, an appropriate shape of the cohesive zone is known, and as shown in FIG. It is an ideal shape for the current blast furnace operation. For this purpose, as described above, it is necessary to reduce the O / C at the center of the furnace. In other words, it is preferable to employ a method of charging the charge such that the coke amount at the center of the furnace is as large as possible. That is.
【0014】実際の高炉において装入物(鉄鉱石、コー
クス等)の理想とする装入分布状態、すなわち適切なO
/Cを保持するための高炉半径方向での分布状態を得る
ためには、それに適した装入設備が必要となる。しかし
て、ベルレス高炉においては、上記した分布状態を得る
ための装入物の装入を実施しようと思えば可能である
が、旋回シュートの傾動角を広範囲に動かす必要が生
じ、そのため、高出銑比を指向している現状の高炉操業
条件下では、装入物を炉内に装入するのに時間が長くか
かり過ぎるという問題があり、必要とするO/Cの炉半
径方向分布を作り込めない事態が起こることもあった。In an actual blast furnace, the ideal charge distribution state of the charge (iron ore, coke, etc.),
In order to obtain a distribution state in the blast furnace radial direction for maintaining / C, charging equipment suitable for the distribution state is required. However, in the case of a bellless blast furnace, it is possible to perform the charging of the charged material to obtain the above-mentioned distribution state, but it is necessary to move the tilt angle of the swiveling chute over a wide range. Under the current blast furnace operating conditions, which are oriented to the pig ratio, there is a problem that it takes too long to charge the charge into the furnace, and the required radial distribution of O / C is created. Sometimes things went wrong.
【0015】また上記に述べたように、炉中心部への装
入コークスは炉中心部を上昇するガス流の影響を受ける
ので、その対応策も考慮したうえで適切な装入方法を採
用しなければ、目的とする装入分布状態が得られない惧
れがあり、これら全てのことを総括したうえ旋回シュー
トの傾動角を広範囲に動かさず、かつ特別な装入設備を
要さずに従前の装入設備で簡便容易に、上記した如き炉
半径方向でのO/Cの分布状態を得ることができる装入
技術についての開発が強く要望されていた。As described above, the coke charged into the furnace center is affected by the gas flow ascending in the furnace center. Therefore, an appropriate charging method is adopted in consideration of the countermeasures. If not, there is a possibility that the intended charging distribution state may not be obtained, and all these points are summarized, and the tilting angle of the turning chute does not move over a wide range, and no special charging equipment is required. There has been a strong demand for the development of a charging technique capable of easily and easily obtaining the O / C distribution state in the furnace radial direction as described above with the charging equipment described above.
【0016】[0016]
【課題を解決するための手段】本発明は上記課題を解決
するためになされたもので、下記手段をとるものであ
る。 (1).ベルレス高炉における装入物の高炉内装入に際
し、高炉直上の炉頂ホッパー内へ下部にコークスを投入
後、次いでその上部に鉄鉱石を投入し、該炉頂ホッパー
内で鉄鉱石とコークスを層状に貯留後、遮断弁を開放し
旋回シュートを介して装入物を高炉内へ装入する高炉へ
の装入物装入方法。 (2).前記旋回シュートを介して装入物を順次高炉内
に装入するに当たり、装入物を高炉炉中心部近傍から装
入を開始し、旋回シュートを順次高炉壁側方向へ移動さ
せながら高炉炉壁側において装入を完了し、高炉内にお
いてコークスと鉄鉱石との混合物層を形成する(1)記
載の高炉への装入物装入方法。SUMMARY OF THE INVENTION The present invention has been made to solve the above-mentioned problems, and employs the following means. (1). Upon charging the charge in the bellless blast furnace to the interior of the blast furnace, after charging coke into the lower part of the furnace hopper immediately above the blast furnace, and then charging iron ore into the upper part, iron ore and coke are layered in the furnace hopper. A method of charging the blast furnace with the blast furnace in which the shut-off valve is opened after the storage and the charge is charged into the blast furnace via the swirling chute. (2). In order to sequentially charge the charge into the blast furnace through the swirl chute, the charge is started from near the center of the blast furnace, and the swirl chute is sequentially moved in the direction of the blast furnace wall while the blast furnace wall is moved. (1) The method of charging a blast furnace according to (1), wherein the charging is completed on the side and a mixture layer of coke and iron ore is formed in the blast furnace.
【0017】(3).前記旋回シュート介して装入物を
順次高炉内に装入するに当たり、装入物を高炉中間部か
ら装入を開始し、旋回シュートを順次高炉炉壁方向へ移
動させながら高炉炉壁側において装入を完了し、高炉内
においてコークスと鉄鉱石との混合物層を形成する
(1)記載の高炉への装入物装入方法。 (4).前記(2)において、装入物の装入を開始する
高炉中心部近傍を高炉炉口半径方向で、炉中心から炉壁
までの間で炉口半径に対して0.2未満とした高炉への
装入物装入方法。 (5).前記(3)において、装入物の装入を開始する
中間部を高炉炉口半径方向で、炉中心から炉壁までの間
で炉口半径に対して0.2〜0.4の範囲とした高炉へ
の装入物装入方法。(3). When sequentially charging the charge into the blast furnace through the swirling chute, charging is started from the intermediate portion of the blast furnace, and the swirling chute is sequentially moved in the direction of the blast furnace wall to load the charge on the blast furnace wall side. (1) The method for charging a charge into a blast furnace according to (1), wherein charging is completed and a mixture layer of coke and iron ore is formed in the blast furnace. (4). In the above (2), to the blast furnace in which the vicinity of the center of the blast furnace where the charging of the charge is started is in the blast furnace furnace radial direction and the distance from the furnace center to the furnace wall is less than 0.2 with respect to the furnace port radius. How to charge the charge. (5). In the above (3), the intermediate portion at which the charging of the charged material is started is set in a range of 0.2 to 0.4 with respect to the furnace opening radius between the furnace center and the furnace wall in the blast furnace furnace opening radial direction. How to charge the charged blast furnace.
【0018】(6).前記(2)または(4)の装入物
の装入をコークス装入と交互に行い、高炉内においてコ
ークスと混合物とで二層の連続装入層を形成する高炉へ
の装入物装入方法。 (7).前記(2)ないし(5)のいずれかに記載の装
入物の装入を鉄鉱石装入とコークス装入に次いで行い、
高炉内において鉄鉱石、コークス、混合物とで三層の連
続装入層を形成する高炉への装入物装入方法。 (8).前記(2)または(4)の装入物の装入をコー
クス装入と鉄鉱石装入に次いで行い、高炉内においてコ
ークス、鉄鉱石、混合物とで三層の連続装入層を形成す
る高炉への装入物装入方法。(6). The charging of the charge of the above (2) or (4) is alternately performed with the charging of coke, and the charging of the charge into the blast furnace is performed in the blast furnace, in which the coke and the mixture form a two-layer continuous charged layer. Method. (7). The charging of the charge according to any of the above (2) to (5) is performed next to the charging of iron ore and the charging of coke,
A method of charging a blast furnace in which three continuous layers are formed with iron ore, coke, and a mixture in a blast furnace. (8). The charging of the charge (2) or (4) is performed after the charging of coke and the charging of iron ore, and the blast furnace for forming a three-layer continuous charging layer with coke, iron ore and the mixture in the blast furnace. How to charge the charge to the.
【0019】(9).前記(2)または(4)の装入物
の装入を鉄鉱石装入とコークス装入との間で行い、高炉
内において鉄鉱石、混合物、コークスとで三層の連続装
入層を形成する高炉への装入物装入方法。 (10).炉頂ホッパー内にコークスと鉄鉱石を層状に
貯留する際に、炉頂ホッパー内の鉄鉱石量とコークス量
の比を変更して高炉内へ装入する(1)ないし(9)の
いずれかに記載の高炉への装入物装入方法。(9). The charging of the charge of (2) or (4) is performed between the charging of iron ore and the charging of coke, and a three-layer continuous charging layer is formed with the iron ore, the mixture, and the coke in the blast furnace. To charge the blast furnace. (10). When storing coke and iron ore in a layered manner in the furnace top hopper, change the ratio of iron ore amount and coke amount in the furnace top hopper and charge the blast furnace with any of (1) to (9). 2. A method for charging a charge into a blast furnace according to (1).
【0020】(11).炉頂ホッパー内にコークスと鉄
鉱石を層状に貯留する際に、炉頂ホッパー内に貯留する
コークスの粒度を変更して高炉内へ装入する(1)ない
し(10)のいずれかに記載の高炉への装入物装入方
法。 (12).炉頂ホッパー内にコークスと鉄鉱石を層状に
貯留する際に、炉頂ホッパー内に貯留するコークスを低
反応性のコークスに変更して高炉内へ装入する(1)な
いし(11)のいずれかに記載の高炉への装入物装入方
法。 (13).炉頂ホッパー内にコークスと鉄鉱石を層状に
貯留する際に、炉頂ホッパー内に貯留する鉄鉱石とし
て、焼結鉱にペレット、スクラップを混合して高炉内へ
装入する(1)ないし(12)のいずれかに記載の高炉
への装入物装入方法。(11). The method according to any one of (1) to (10), wherein when storing coke and iron ore in a layered manner in the furnace top hopper, the particle size of the coke stored in the furnace hopper is changed and charged into the blast furnace. How to charge the blast furnace. (12). When coke and iron ore are stored in layers in the furnace top hopper, coke stored in the furnace hopper is changed to low-reactivity coke and charged into the blast furnace (1) to (11). A method for charging a charge into a blast furnace as described in the crab. (13). When coke and iron ore are stored in layers in the furnace top hopper, pellets and scrap are mixed with the sintered ore and charged into the blast furnace as the iron ore stored in the furnace hopper (1) to ( 12) A method for charging a charge into a blast furnace according to any one of 12).
【0021】[0021]
【発明の実施の形態】本発明者らが高炉における装入物
の装入状態を多方面に亙って考察したところ、前述した
ように高炉中心部に装入されるコークスは比重が軽く、
かつ嵩密度が小さいため、時によっては炉下方向からの
上昇ガス流によって吹き上げられ飛散するので、コーク
ス間に間隙ができ、その間隙部に比重の重い鉄鉱石が入
り込み(鉄鉱石は安息角が小さいので容易)、炉中心部
に所望とするコークスの堆積層を得ることに、支障をき
たす惧れがあることが判明した。BEST MODE FOR CARRYING OUT THE INVENTION The present inventors have studied the charged state of a charge in a blast furnace from various directions. As described above, the coke charged in the center of the blast furnace has a low specific gravity,
In addition, because of its low bulk density, it is sometimes blown up and scattered by the rising gas flow from the lower part of the furnace, so that a gap is formed between the coke and iron ore having a high specific gravity enters the gap (iron ore has a repose angle of repose). It was found that there was a risk that there would be a problem in obtaining a desired coke deposition layer in the center of the furnace.
【0022】そこで本発明者らは高炉内融着帯の制御に
おいて、高炉装入物中の高炉半径方向でのO/Cを適切
に調整するために、特別の装入装置を用いることなく従
来の装入物装入装置によって行うために多くの検討を重
ねた結果、ベルレス高炉においては炉頂ホッパーへの装
入物の貯留に工夫を凝らすことによって、容易に実施で
きるとの知見を得ることができ本発明を開発することに
成功したものである。In order to appropriately adjust the O / C in the blast furnace radial direction in the blast furnace charge in the control of the cohesive zone in the blast furnace, the present inventors have adopted a conventional method without using a special charging device. After conducting a lot of studies to make use of the charging equipment of this type, it was found that the bellless blast furnace can be easily implemented by devising the storage of the charging material in the top hopper. And succeeded in developing the present invention.
【0023】本発明の根幹をなす技術思想は、高炉炉頂
の直上のホッパーにおいて、コークス、鉄鉱石等の高炉
装入物を層状に貯留せしめるところにあり、該貯留後の
装入物を高炉内旋回シュートを介して所定位置に所定量
(貯留された量)投入することによって、目的とするO
/C分布状態を有する装入物の装入層を高炉内に形成す
るものである。The technical idea that forms the basis of the present invention is that blast furnace charges such as coke and iron ore are stored in layers in a hopper immediately above the blast furnace furnace top. By inserting a predetermined amount (stored amount) into a predetermined position via the inner turning chute,
A charge layer of a charge having a / C distribution state is formed in a blast furnace.
【0024】以下、本発明を図面に基づいて詳細に説明
する。目的とする装入物層を得るには、図1に示すよう
なベルレス高炉において、高炉炉頂部の直上にある炉頂
ホッパー1の下部に先ずコークス2を貯留し、次いでそ
の上部に鉄鉱石3を層状に貯留した後、該ホッパー下部
の遮断弁を開放し、高炉内の旋回シュート10を介して
高炉内へ装入することにより行う。高炉内への装入は図
1に示されたような炉頂ホッパー1内での貯留状態であ
れば、コークス2から先に炉頂ホッパー1から落下して
旋回シュート10に達する。したがって、装入の開始当
初は炉内へコークス2のみの投入が行われ、次いでコー
クスと鉄鉱石との混合物4が投入され、最後に鉄鉱石3
のみの投入が行われる。Hereinafter, the present invention will be described in detail with reference to the drawings. In order to obtain a target charge layer, in a bellless blast furnace as shown in FIG. 1, coke 2 is first stored in a lower part of a top hopper 1 immediately above a blast furnace top, and then iron ore 3 is stored thereabove. Is stored in the form of a layer, the shut-off valve at the lower part of the hopper is opened, and the hopper is charged into the blast furnace via the swirling chute 10 in the blast furnace. If the charging into the blast furnace is in the state of being stored in the top hopper 1 as shown in FIG. 1, the coke 2 drops from the top hopper 1 first and reaches the swirling chute 10. Therefore, at the beginning of charging, only coke 2 is charged into the furnace, then a mixture 4 of coke and iron ore is charged, and finally iron ore 3 is charged.
Only input is performed.
【0025】すなわち、当該装入物の落下時期に合わせ
て旋回シュート10の位置を目的とする位置に移動設定
すれば、前記装入物の種類(コークス2単独、コークス
2と鉄鉱石3との混合物4(m)、鉄鉱石3単独)に応
じ、必要とする位置へ必要量装入することが選択実施で
きる。That is, if the position of the revolving chute 10 is set to move to a target position in accordance with the falling time of the charge, the type of the charge (coke 2 alone, coke 2 and iron ore 3 Depending on the mixture 4 (m) and the iron ore 3 alone), it is possible to selectively carry out charging a required amount to a required position.
【0026】しかして、前述したように好ましい形状の
逆V型融着帯9を得ようとするならば、旋回シュート1
0の設定位置を炉中心部またはその近傍の炉半径方向で
炉口半径に対して0.2未満に設置した状態から、炉頂
ホッパー遮断弁の開放を行ない炉頂ホッパー1内の貯留
物を落下させるに従って、旋回シュート10の位置を順
次炉壁8側方向へ移動し炉壁8で装入を完了させれば、
炉中心部にコークス2のみを、炉壁方向に向かうに従っ
てコークス2と鉄鉱石3の混合物4(m)を、炉壁8側
には鉄鉱石3のみの装入を行うことができる(以下、こ
のような装入によって装入された装入物層を混合物層7
(M)と称す)。However, if it is desired to obtain the inverted V-shaped fusion zone 9 having a preferable shape as described above, the turning chute 1
From the state where the setting position of 0 is set at less than 0.2 with respect to the furnace opening radius in the furnace radial direction at or near the center of the furnace, the furnace top hopper shutoff valve is opened, and the stored material in the furnace top hopper 1 is removed. As it is dropped, the position of the swirling chute 10 is sequentially moved toward the furnace wall 8 to complete the charging on the furnace wall 8.
It is possible to charge only the coke 2 in the center of the furnace, the mixture 4 (m) of the coke 2 and the iron ore 3 toward the furnace wall, and the iron ore 3 only on the furnace wall 8 side (hereinafter, referred to as “the coke 2”). The charge layer charged by such charging is mixed with the mixture layer 7.
(M)).
【0027】本発明のように炉中心部近傍から装入物を
装入する技術では、装入物の粒度偏析効果(周辺の粒度
が小さく、中心に向かうにつれて粒度が上昇する)を利
用できないが、混合物層の中心部にコークスを確実に装
入できる。このようにして装入された混合物層7(M)
の炉中心部から炉壁までの炉半径方向での分布状況の例
を示したのが図3であり、炉中心部においては混合物4
(m)を有するので、従前の装入のようにコークス層5
(C)の層厚が薄く、鉄鉱石層6(O)の層厚が厚くな
ったとしても全体でのコークス2の分布状態は、図4に
示される従来の通常の装入方法に比し、炉中心部に比較
的多くのコークス2が装入されていることが判る。In the technique of charging the charged material from the vicinity of the center of the furnace as in the present invention, the effect of the particle size segregation of the charged material (the peripheral particle size is small and the particle size increases toward the center) cannot be used. As a result, coke can be reliably charged into the center of the mixture layer. Mixture layer 7 (M) charged in this way
FIG. 3 shows an example of the distribution in the furnace radial direction from the center of the furnace to the furnace wall.
(M), so that the coke layer 5
Even if the layer thickness of (C) is thin and the layer thickness of iron ore layer 6 (O) is thick, the distribution state of coke 2 as a whole is smaller than that of the conventional ordinary charging method shown in FIG. It can be seen that a relatively large amount of coke 2 is charged in the center of the furnace.
【0028】また、前記したように炉中心部の炉下方向
からの上昇ガス流が強い場合は、上記装入に際し旋回シ
ュート10の位置を順次炉壁方向へ移動しながら装入を
続行するが、混合物4(m)の装入開始位置を炉半径方
向で、炉口半径に対して0.2〜0.4の範囲の炉中間
部から始める(図3)。しかる後、その上部への次回の
装入には鉄鉱石3を装入載置することによって、混合物
層7(M)の装入開始部の混合物4(コークスが主体と
なっている)を鉄鉱石3の炉心方向への流れ込みを利用
し、該混合物4(m)を炉中心部へ押し込み、炉中心部
に主にコークスを主体としたチムニー状の装入物層を形
成せしめることができる。As described above, when the rising gas flow from the lower part of the furnace at the center of the furnace is strong, the charging is continued while the position of the swirling chute 10 is sequentially moved toward the furnace wall during the charging. Then, the charging start position of the mixture 4 (m) is started in the furnace radial direction from the middle part of the furnace in the range of 0.2 to 0.4 with respect to the furnace opening radius (FIG. 3). After that, the iron ore 3 is charged and placed in the upper portion of the mixture for the next charging, so that the mixture 4 (mainly composed of coke) of the mixture starting portion of the mixture layer 7 (M) is iron ore. Utilizing the flow of the stone 3 in the core direction, the mixture 4 (m) is pushed into the furnace center, and a chimney-like charge layer mainly composed of coke can be formed in the furnace center.
【0029】すなわち、炉中心部にはコークス層5
(C)の流動化コークス2(前記したように炉中心部に
存在するコークスは、絶えず炉中心を上昇するガス流に
よって舞い上がり、上昇・降下を繰り返すので流動化さ
れた状態となっている)と鉄鉱石3との混合した混合物
が堆積された状態となっているので、このような装入物
層を確保できれば、炉中心部に所望の通気性の良好なチ
ムニーを炉中心部に形成することもできる。なお、鉄鉱
石3の装入に際しては、当然のことながら下部に装入さ
れている混合物4(m)の装入位置を越えない位置で装
入を完了しなければ、鉄鉱石3が混合物4(m)を越え
炉中心部に鉄鉱石3が多く装入され、目的とする効果が
得られなくなる。That is, the coke layer 5 is located at the center of the furnace.
(C) fluidized coke 2 (as described above, the coke present in the center of the furnace is continuously fluidized by the gas flow rising in the center of the furnace and repeatedly rising and falling, so that it is in a fluidized state). Since the mixture mixed with the iron ore 3 is in a deposited state, if such a charge layer can be secured, a desired air-permeable chimney can be formed in the center of the furnace at the center of the furnace. Can also. When the iron ore 3 is charged, if the charging is not completed at a position which does not exceed the charging position of the mixture 4 (m) charged at the lower part, the iron ore 3 is naturally charged. (M), a large amount of iron ore 3 is charged into the furnace center, and the desired effect cannot be obtained.
【0030】このような混合物層7(M)の高炉内への
装入については、通常の装入物の装入時の中で適宜組み
合わせて用いるもので、その装入形態については種々の
パターンが考えられる。例えば、そのパターンを列記す
ると表1のようになる。パターンではコークス2と混
合物4の装入が交互に行われる。この場合では所定のO
/Cを維持するためにコークス層5(C)の厚さを薄く
するか、混合物層7(M)中の鉄鉱石3を多くし装入物
全体でのO/Cの適正量を確保する必要がある。また、
パターン、では通常の鉄鉱石層6(O)、コークス
層5(C)の装入に加えて混合物層7(M)の装入を付
加したもので、混合物4(m)中でのO/Cは余り変え
る必要はない。さらに、パターンは混合物層7(M)
と混合物層7(M)の装入間に鉄鉱石層6(O)とコー
クス層5(C)をそれぞれ組み入れたもので、この場合
も混合物層7(M)中のO/Cは殆ど変える必要はな
い。The charging of the mixture layer 7 (M) into the blast furnace is appropriately combined during the normal charging, and the charging mode is determined by various patterns. Can be considered. For example, the patterns are listed in Table 1. In the pattern, charging of coke 2 and mixture 4 is performed alternately. In this case, the predetermined O
In order to maintain / C, the thickness of the coke layer 5 (C) is reduced, or the iron ore 3 in the mixture layer 7 (M) is increased to secure an appropriate amount of O / C in the whole charge. There is a need. Also,
In the pattern, the charge of the mixture layer 7 (M) was added in addition to the charge of the normal iron ore layer 6 (O) and the coke layer 5 (C). C does not need to be changed much. Further, the pattern is a mixture layer 7 (M).
The iron ore layer 6 (O) and the coke layer 5 (C) are respectively incorporated between the charging of the mixture layer 7 (M) and the O / C in the mixture layer 7 (M) is almost changed also in this case. No need.
【0031】上記パターン中については、上述の混合
物層7(M)の装入の開始を炉中間部からとする装入方
法が適用できる。すなわち、該装入方法を採った場合混
合物層7(M)の上部に次回装入の鉄鉱石3が載置さ
れ、鉄鉱石層6(O)が必ず混合物層7(M)の上部に
位置するので、鉄鉱石3とコークス2との比重差により
鉄鉱石3によるコークスの崩し込みにより、炉中心部へ
のコークスの流れ込みが行われる。このことはパターン
中混合物層7(M)の装入後、次の装入が鉄鉱石層6
(O)の場合も当然同様の効果が期待できるので、上記
装入態様に限って適用が可能である。In the above-mentioned pattern, a charging method in which the charging of the mixture layer 7 (M) is started from the furnace intermediate portion can be applied. That is, when the charging method is adopted, the iron ore 3 to be charged next time is placed above the mixture layer 7 (M), and the iron ore layer 6 (O) is always positioned above the mixture layer 7 (M). Therefore, the coke flows into the furnace center due to the collapse of the coke caused by the iron ore 3 due to the specific gravity difference between the iron ore 3 and the coke 2. This means that after charging the mixture layer 7 (M) in the pattern, the next charging was the iron ore layer 6
In the case of (O), the same effect can be expected, and therefore, the present invention can be applied only to the above-mentioned charging mode.
【0032】[0032]
【表1】 [Table 1]
【0033】上述のパターンは装入順序の全てのパター
ンを示したものではなく、本発明の理解を助けるために
記したに過ぎず、高炉操業においては融着帯9の状態に
応じて混合物層7(M)の装入を1チャージ内で1〜2
回、または数チャージで1回の割合で行うことは自在に
選択実施できる。高炉装入物のO/Cは高炉操業上決ま
ってくるもので、上記例における炉頂ホッパー内でのO
/Cも当然全体の装入物中のO/Cの値から考慮し適正
なO/Cを決めるべきである。The above-mentioned patterns do not show all the patterns of the charging order, but are merely provided to assist the understanding of the present invention. In the blast furnace operation, the mixture layer is formed according to the condition of the cohesive zone 9. Charge 7 (M) 1-2 in 1 charge
It is possible to freely select and carry out the operation at a rate of once or several charges. The O / C of the blast furnace charge is determined by the operation of the blast furnace, and the O / C in the furnace hopper in the above example is determined.
Of course, the appropriate O / C should be determined in consideration of the value of O / C in the whole charge.
【0034】本発明において装入する混合物4(m)の
装入開始位置を炉中心部近傍および炉中間部としたが、
炉中心部近傍の場合はその範囲を炉半径方向で炉口半径
に対して0.2未満とする。これは炉中心部のガス上昇
流が比較的弱く、コークスの飛散が少ないと予測された
ときには、通常の装入状態での装入が可能であるのでこ
のような範囲とした。また、炉中間部の場合はその範囲
を炉半径方向で炉口半径に対して0.2〜0.4とす
る。これは炉中心部のガス上昇流の影響を受ける場合、
その影響を避けるために設定した範囲を示した値であ
る。In the present invention, the charging start position of the mixture 4 (m) to be charged is set near the center of the furnace and the middle of the furnace.
In the case of the vicinity of the furnace center, the range is less than 0.2 with respect to the furnace opening radius in the furnace radial direction. When the gas ascending flow in the central part of the furnace is relatively weak and the scattering of coke is predicted to be small, the charging can be performed in a normal charging state. In the case of the furnace middle part, the range is 0.2 to 0.4 with respect to the furnace opening radius in the furnace radial direction. This is affected by the upward flow of gas in the center of the furnace,
This is a value indicating a range set to avoid the influence.
【0035】また、炉頂ホッパー内に貯留される混合物
4中のコークス2は、鉄鉱石3との兼ね合いからその粒
度を選択し、適正な粒度を保持し混合物4中でコークス
2の分布が所定の範囲に入るよう心掛ける。さらに、上
記コークス2はその反応性からみて高反応性コークスを
必要とせず、中反応性または低反応性コークスも充分利
用できる。さらにまた、鉄鉱石3としても焼結鉱にペレ
ット、スクラップを混合したものを用いることも可能で
あるThe particle size of the coke 2 in the mixture 4 stored in the furnace top hopper is selected in consideration of the balance with the iron ore 3, the proper particle size is maintained, and the distribution of the coke 2 in the mixture 4 is predetermined. Try to be within the range. Furthermore, the coke 2 does not require high-reactivity coke in view of its reactivity, and medium-reactivity or low-reactivity coke can be sufficiently used. Furthermore, it is also possible to use a mixture of sintered ore and pellets and scrap as the iron ore 3.
【0036】[0036]
【実施例】以下、本発明を実際の高炉に適用した実施例
について説明する。操業を行った高炉は内容積3280
m3 を有する微粉炭吹き込み実施中の高炉である。表2
にこの高炉で本発明による炉頂ホッパーでの高炉装入物
の貯留状態とO/Cを示し、さらに装入物の装入パター
ンと前装入物でのO/Cも同様に示した。また、本発明
の実施による結果はシャフト部ゾンデ中心部のガス利用
率を尺度としてその効果を示した。これらはいずれも7
日間同一装入方法を継続したものであり、表2中の数値
はその間での平均値を表している。DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment in which the present invention is applied to an actual blast furnace will be described below. The operated blast furnace has an inner volume of 3280
This is a blast furnace in which pulverized coal having m 3 is being injected. Table 2
In this blast furnace, the storage state and O / C of the blast furnace charge in the furnace top hopper according to the present invention are shown, as well as the charge pattern of the charge and the O / C of the preceding charge. In addition, the results of the implementation of the present invention showed the effect by using the gas utilization rate at the central part of the sonde of the shaft as a scale. These are all 7
The same charging method was continued for a day, and the numerical values in Table 2 represent the average values during the period.
【0037】[0037]
【表2】 [Table 2]
【0038】実施番号1〜4は装入パターン〜につ
いて請求項2および4の態様で実施したものであり、実
施番号5〜7については請求項3および5の態様で実施
したものである。また、実施番号8〜10については炉
頂ホッパーへ貯留するコークの粒度および低反応性コー
クスの使用、さらには炉頂ホッパーに貯留する鉄鉱石と
しての焼結鉱、ペレット、スクラップ等について実施し
た。なお実施番号11については比較のために従来例を
挙げた。表2から明らかなように、本発明によれば良好
な融着帯が従来例に比して安定して得られた結果、高炉
操業が安定し、かつ高出銑比を確保することができた。The working numbers 1 to 4 are carried out according to the embodiments of claims 2 and 4 with respect to the charging pattern ~, and the working numbers 5 to 7 are carried out according to the embodiments of claims 3 and 5. In addition, for the execution numbers 8 to 10, the particle size of the coke stored in the furnace top hopper and the use of low-reactivity coke, and the sinters, pellets, scraps, and the like as the iron ore stored in the furnace hopper were performed. As for the execution number 11, a conventional example is given for comparison. As is clear from Table 2, according to the present invention, as a result that a good cohesive zone was obtained more stably than the conventional example, the blast furnace operation was stabilized, and a high tapping ratio could be secured. Was.
【0039】[0039]
【発明の効果】以上説明したように、本発明装入方法を
実施することにより、高炉装入物の鉄鉱石とコークスの
比率を炉半径方向において、その分布を任意にかつ適切
に形成させることができ、最適な高炉内融着帯形状を安
定して得ることが可能となったため、高炉内円周方向に
安定した周辺ガス流を形成させることができる。As described above, by performing the charging method of the present invention, the distribution of iron ore and coke in the blast furnace charge can be arbitrarily and appropriately formed in the radial direction of the furnace. As a result, it is possible to stably obtain the optimum shape of the cohesive zone in the blast furnace, so that a stable peripheral gas flow can be formed in the circumferential direction in the blast furnace.
【図1】本発明による炉頂ホッパーでの装入物の貯留状
態を示す図FIG. 1 is a diagram showing a state of storing a charge in a furnace top hopper according to the present invention.
【図2】高炉内での逆V型融着帯の例を示す図FIG. 2 is a view showing an example of an inverted V-type cohesive zone in a blast furnace.
【図3】本発明の装入方法によって得られた装入物の装
入層の形状を示す図FIG. 3 is a view showing the shape of a charge layer of a charge obtained by the charge method of the present invention.
【図4】通常の高炉装入における鉄鉱石層とコークス層
の形状を示す図FIG. 4 is a diagram showing shapes of an iron ore layer and a coke layer in a normal blast furnace charging.
【図5】炉中心部の上昇ガス流が大きい場合の炉中心部
の装入コークスの状態を模式的に示す図FIG. 5 is a diagram schematically showing the state of coke charged in the center of the furnace when the rising gas flow in the center of the furnace is large.
1 炉頂ホッパー 2 コークス 3 鉄鉱石 4 混合物(m) 5 コークス層(C) 6 鉄鉱石層(O) 7 混合物層(M) 8 炉壁 9 融着帯 10 旋回シュート DESCRIPTION OF SYMBOLS 1 Furnace top hopper 2 Coke 3 Iron ore 4 Mixture (m) 5 Coke layer (C) 6 Iron ore layer (O) 7 Mixture layer (M) 8 Furnace wall 9 Cohesive zone 10 Rotating chute
Claims (13)
入に際し、高炉直上の炉頂ホッパー内へ下部にコークス
を投入後、次いでその上部に鉄鉱石を投入し、該炉頂ホ
ッパー内でコークスと鉄鉱石を層状に貯留後、遮断弁を
開放し旋回シュートを介して装入物を高炉内へ装入する
ことを特徴とする高炉への装入物装入方法。When charging the charge in a bellless blast furnace into a blast furnace interior, coke is charged into a lower part of a furnace top hopper immediately above the blast furnace, and then iron ore is charged into the upper part thereof. A method for charging a blast furnace with a charge, characterized in that after storing iron ore in layers, a shutoff valve is opened and a charge is charged into the blast furnace via a swirling chute.
高炉内に装入するに際し、装入物を高炉炉中心部近傍か
ら装入を開始し、旋回シュートを順次高炉壁側方向へ移
動させながら高炉炉壁側において装入を完了し、高炉内
においてコークスと鉄鉱石との混合物層を形成すること
を特徴とする請求項1記載の高炉への装入物装入方法。2. When the charge is sequentially charged into the blast furnace through the swirling chute, charging is started from near the center of the blast furnace, and the swirling chute is sequentially moved toward the blast furnace wall. 2. The method for charging a blast furnace according to claim 1, wherein the charging is completed on the blast furnace wall side while the mixture is being formed, and a mixture layer of coke and iron ore is formed in the blast furnace.
高炉内に装入するに当たり、装入物を高炉中間部から装
入を開始し、旋回シュートを順次高炉炉壁方向へ移動さ
せながら高炉炉壁側において装入を完了し、高炉内にお
いてコークスと鉄鉱石との混合物層を形成することを特
徴とする請求項1記載の高炉への装入物装入方法。3. When the charge is sequentially charged into the blast furnace through the swirling chute, charging is started from an intermediate portion of the blast furnace, and while the charging chute is sequentially moved toward the blast furnace wall. 2. The method of charging a blast furnace according to claim 1, wherein the charging is completed on the blast furnace wall side, and a mixture layer of coke and iron ore is formed in the blast furnace.
開始する高炉中心部近傍を高炉炉口半径方向で、炉中心
から炉壁までの間で炉口半径に対して0.2未満とした
ことを特徴とする高炉への装入物装入方法。4. The blast furnace according to claim 2, wherein the vicinity of the center of the blast furnace at which charging of the charged material is started is in the radial direction of the blast furnace furnace port, and 0.2 mm from the furnace center to the furnace wall with respect to the furnace port radius. A method for charging a charge to a blast furnace, wherein
開始する中間部を高炉炉口半径方向で、炉中心から炉壁
までの間で炉口半径に対して0.2〜0.4の範囲とし
たことを特徴とする高炉への装入物装入方法。5. The blast furnace according to claim 3, wherein the intermediate portion at which the charging is started is 0.2 to 0 with respect to the furnace radius from the furnace center to the furnace wall in the blast furnace furnace radial direction. 4. A method for charging a charge into a blast furnace, characterized in that the range is set to 4.
装入をコークス装入と交互に行い、高炉内においてコー
クスと混合物とで二層の連続装入層を形成することを特
徴とする高炉への装入物装入方法。6. The charging of the charge according to claim 2 or 4 is alternately performed with the charging of coke, and the coke and the mixture form a two-layer continuous charging layer in the blast furnace. How to charge the blast furnace.
に記載の装入物の装入を鉄鉱石装入とコークス装入に次
いで行い、高炉内において鉄鉱石、コークス、混合物と
で三層の連続装入層を形成することを特徴とする高炉へ
の装入物装入方法。7. The charging of the charge according to any one of claims 2 to 5 is performed after the charging of iron ore and the charging of coke, and the charging of iron ore, coke, and the mixture is performed in a blast furnace. A method for charging a charge into a blast furnace, comprising forming a continuous charge layer of layers.
装入をコークス装入と鉄鉱石装入に次いで行い、高炉内
においてコークス、鉄鉱石、混合物とで三層の連続装入
層を形成することを特徴とする高炉への装入物装入方
法。8. The charging of the charge according to claim 2 or 4 is performed after the charging of coke and the charging of iron ore, and the continuous charging of three layers of coke, iron ore, and the mixture is performed in the blast furnace. A method for charging a charge to a blast furnace, comprising forming a layer.
装入を鉄鉱石装入とコークス装入との間で行い、高炉内
において鉄鉱石、混合物、コークスとで三層の連続装入
層を形成することを特徴とする高炉への装入物装入方
法。9. The charging of the charge according to claim 2 or 4 is performed between the charging of iron ore and the charging of coke, and the iron ore, the mixture, and the coke are continuously formed in a three-layer structure in the blast furnace. A method for charging a blast furnace with a charge, comprising forming a charge layer.
層状に貯留する際に、炉頂ホッパー内の鉄鉱石量とコー
クス量の比を変更して高炉内へ装入することを特徴とす
る請求項1ないし請求項9のいずれかに記載の高炉への
装入物装入方法。10. When the coke and the iron ore are stored in a layer in the furnace top hopper, the ratio between the iron ore amount and the coke amount in the furnace top hopper is changed and charged into the blast furnace. A method for charging a blast furnace according to any one of claims 1 to 9.
層状に貯留する際に、炉頂ホッパー内に貯留するコーク
スの粒度を変更して高炉内へ装入することを特徴とする
請求項1ないし請求項10のいずれかに記載の高炉への
装入物装入方法。11. The method according to claim 1, wherein when coke and iron ore are stored in layers in the furnace top hopper, the particle size of the coke stored in the furnace top hopper is changed and the coke is charged into the blast furnace. A method for charging a charge into a blast furnace according to any one of claims 10 to 10.
層状に貯留する際に、炉頂ホッパー内に貯留するコーク
スを低反応性のコークスに変更して高炉内へ装入するこ
とを特徴とする請求項1ないし請求項11のいずれかに
記載の高炉への装入物装入方法。12. When coke and iron ore are stored in layers in a furnace top hopper, coke stored in the furnace hopper is changed to low-reactivity coke and charged into a blast furnace. The method for charging a blast furnace according to any one of claims 1 to 11, wherein the method comprises the steps of:
層状に貯留する際に、炉頂ホッパー内に貯留する鉄鉱石
として、焼結鉱にペレット、スクラップを混合して高炉
内へ装入することを特徴とする請求項1ないし請求項1
2のいずれかに記載の高炉への装入物装入方法。13. When coke and iron ore are stored in layers in a furnace top hopper, pellets and scrap are mixed with sinter and charged into a blast furnace as iron ores to be stored in the furnace top hopper. Claim 1 or Claim 1 characterized by the above-mentioned.
3. A method for charging a charge into a blast furnace according to any one of 2.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP5001698A JPH11217604A (en) | 1997-11-28 | 1998-02-17 | How to charge the blast furnace |
Applications Claiming Priority (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP9-341970 | 1997-11-28 | ||
| JP34197097 | 1997-11-28 | ||
| JP5001698A JPH11217604A (en) | 1997-11-28 | 1998-02-17 | How to charge the blast furnace |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| JPH11217604A true JPH11217604A (en) | 1999-08-10 |
Family
ID=26390458
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP5001698A Withdrawn JPH11217604A (en) | 1997-11-28 | 1998-02-17 | How to charge the blast furnace |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH11217604A (en) |
-
1998
- 1998-02-17 JP JP5001698A patent/JPH11217604A/en not_active Withdrawn
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP5696814B2 (en) | Raw material charging method for bell-less blast furnace | |
| JPS63153385A (en) | Method and system of operating vertical type furnace | |
| JP2020152989A (en) | Blast furnace operation method and pig iron manufacturing method | |
| JP3573780B2 (en) | Raw material charging method for bellless blast furnace | |
| JP3787237B2 (en) | Method of charging high-pellet iron ore into a blast furnace | |
| JP2002003910A (en) | Blast furnace operation method | |
| JPH11217605A (en) | How to charge the blast furnace | |
| JP2005290511A (en) | Blast furnace operation method | |
| JP3588877B2 (en) | Ore and coke charging method in bellless blast furnace | |
| JP2000178617A (en) | Charge method for blast furnace core activation | |
| JP3787238B2 (en) | Charging method into the center of the blast furnace | |
| JP2001279309A (en) | Raw material charging method to blast furnace | |
| JP3700457B2 (en) | Blast furnace operation method | |
| JP3787240B2 (en) | How to charge the blast furnace center | |
| JP2000204407A (en) | Method of charging the charge in the center of the blast furnace | |
| JPH11209806A (en) | How to charge the charge in the center of the blast furnace | |
| JP2022150455A (en) | Pig iron production method | |
| KR100376480B1 (en) | Burden distribution control method in blast furnace by using coke | |
| JP3608485B2 (en) | Raw material charging method in bell-less blast furnace | |
| JP3700458B2 (en) | Low Si hot metal manufacturing method | |
| JP3995380B2 (en) | Raw material charging method to blast furnace | |
| KR100418978B1 (en) | Layer injection method for preventing complex layer to radial direction in blast furnace | |
| JP6950718B2 (en) | How to charge raw materials for Bellless blast furnace | |
| KR101242695B1 (en) | Raw material charging method for bell-less blast furnace | |
| JP2006152317A (en) | Blast furnace operation method |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A300 | Withdrawal of application because of no request for examination |
Free format text: JAPANESE INTERMEDIATE CODE: A300 Effective date: 20050510 |