JPH11223176A - Hot rock body power generating method and device - Google Patents
Hot rock body power generating method and deviceInfo
- Publication number
- JPH11223176A JPH11223176A JP10023166A JP2316698A JPH11223176A JP H11223176 A JPH11223176 A JP H11223176A JP 10023166 A JP10023166 A JP 10023166A JP 2316698 A JP2316698 A JP 2316698A JP H11223176 A JPH11223176 A JP H11223176A
- Authority
- JP
- Japan
- Prior art keywords
- water
- steam
- power generation
- hot water
- permeable layer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24T—GEOTHERMAL COLLECTORS; GEOTHERMAL SYSTEMS
- F24T10/00—Geothermal collectors
- F24T10/20—Geothermal collectors using underground water as working fluid; using working fluid injected directly into the ground, e.g. using injection wells and recovery wells
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/10—Geothermal energy
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Hydrology & Water Resources (AREA)
- Sustainable Development (AREA)
- Sustainable Energy (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Engine Equipment That Uses Special Cycles (AREA)
Abstract
Description
【0001】[0001]
【発明の属する技術分野】本発明は、高温岩体に形成さ
れた注入井で透水層に水を送り込んで加熱し蒸気や熱水
にして生産井で回収し、この蒸気や熱水により発電を行
う高温岩体発電方法及びこれを利用する高温岩体発電装
置に関する。さらに詳述すると、本発明は、透水層に水
を送り込む注入方法及び注水手段の改良と、透水層から
蒸気等を回収する回収方法及び回収手段の改良に関する
ものである。BACKGROUND OF THE INVENTION The present invention relates to an injection well formed in a high-temperature rock body, in which water is fed into a permeable layer, heated and converted into steam or hot water, collected in a production well, and power is generated by the steam or hot water. The present invention relates to a hot rock power generation method to be performed and a hot rock power generation device using the same. More specifically, the present invention relates to an improvement in an injection method for injecting water into a permeable layer and an injection means, and a recovery method and an improvement in a recovery method for recovering steam and the like from the permeable layer.
【0002】[0002]
【従来の技術】高温岩体発電を行うために、約200〜
400℃の地熱を有する地下岩盤に向けて注入井と生産
井とを約100〜450m離して掘削して、これら注入
井と生産井との間に水を加熱しながら流通させるための
透水層を多数作成する。そして、注入井で透水層に水を
注入して生産井で透水層から蒸気または熱水を取り出し
て発電に使用する。2. Description of the Related Art In order to perform hot rock power generation, about 200 to
An injection well and a production well are excavated at a depth of about 100 to 450 m toward an underground bedrock having a geothermal temperature of 400 ° C., and a permeable layer for flowing water between the injection well and the production well while heating the water is formed. Create many. Then, water is injected into the permeable layer at the injection well, and steam or hot water is taken out of the permeable layer at the production well and used for power generation.
【0003】そして、注入井で多数の透水層に水を送り
込むために、図5に示すように注入井101の内部に複
数の噴出孔102を有する鉄管103を設置する。各噴
出孔102は透水層104と同等の深度となる位置に形
成されている。この鉄管103に地上から水を送り込む
ことにより、各噴出孔102から水が噴出してその付近
の透水層104に流し込まれる。ここで、各噴出孔10
2の大きさは、各透水層104に注入した水が高温岩体
105から均等に熱を抽出するために最適な水量となる
よう設定しておく。[0005] In order to feed water into a large number of permeable layers at the injection well, an iron pipe 103 having a plurality of ejection holes 102 is installed inside the injection well 101 as shown in FIG. Each ejection hole 102 is formed at a position having a depth equivalent to that of the water permeable layer 104. When water is sent into the iron pipe 103 from the ground, water is spouted from each spout 102 and flows into the permeable layer 104 in the vicinity. Here, each ejection hole 10
The size of 2 is set so that the water injected into each permeable layer 104 has an optimal amount of water for uniformly extracting heat from the hot rock 105.
【0004】一方、生産井では、内部に例えば鉄管を設
置して各透水層から噴き出される蒸気や熱水をまとめて
回収している。この回収用の鉄管は発電装置に接続され
て蒸気タービンに蒸気を供給している。[0004] On the other hand, in a production well, for example, an iron pipe is installed inside to collect steam and hot water spouted from each permeable layer. The iron pipe for recovery is connected to a power generator and supplies steam to a steam turbine.
【0005】[0005]
【発明が解決しようとする課題】しかしながら、上述し
た高温岩体発電方法では、透水層105を流通する水に
より岩体温度が低下して透水層104での流通抵坑が変
化したときに噴出孔102から透水層104への注入量
が変化してしまうので、生産井で各透水層104ごとに
抽出される熱量が不均等になってしまう。このように抽
出する熱量に不均等が生ずると生産井で得られる蒸気や
熱水の温度にばらつきが生じて発電効率を低下させてし
まうので、これを防止するために透水層104への注入
量が変化したときに鉄管103を引き上げて噴出孔10
2の大きさを調整している。しかし、この調整作業は煩
雑であるため、高温岩体発電の作業性が悪いものとなっ
ている。However, in the hot rock power generation method described above, when the temperature of the rock body decreases due to the water flowing through the permeable layer 105 and the flow tunnel in the permeable layer 104 changes, the discharge hole is formed. Since the injection amount from 102 to the permeable layer 104 changes, the amount of heat extracted for each permeable layer 104 in the production well becomes uneven. If the amount of heat to be extracted becomes uneven in this manner, the temperature of steam or hot water obtained in the production well will vary and the power generation efficiency will be reduced. When the pressure changes, the iron tube 103 is pulled up and the ejection holes 10
The size of 2 is adjusted. However, since the adjustment work is complicated, the workability of the hot rock power generation is poor.
【0006】また、生産井では各透水層からの蒸気や熱
水をまとめて回収用鉄管に流通させているので、透水層
ごとの熱水の噴き出し圧力の差により干渉が生じてしま
う。例えば、下方の透水層から噴き出す熱水が上方の透
水層から噴き出す熱水よりも高圧であるときに、これら
の熱水を1本の鉄管で回収すると下方からの熱水が上方
の透水層に流れ込んでしまったり上方の透水層からの熱
水の噴出を妨げたりすることがある。このような熱水の
干渉が生ずると高温岩体からの熱回収の効率が低下して
しまうので、高温岩体発電の発電効率を向上させるのが
困難であった。[0006] Further, in the production well, since steam and hot water from each permeable layer are collectively circulated through the recovery iron pipe, interference occurs due to a difference in hot water jet pressure between the permeable layers. For example, when the hot water spouting from the lower permeable layer is at a higher pressure than the hot water spouting from the upper permeable layer, if these hot waters are collected by a single iron tube, the hot water from the lower part is transferred to the upper permeable layer. It may flow in or prevent hot water from escaping from the upper permeable layer. When such hot water interference occurs, the efficiency of heat recovery from the high-temperature rock mass is reduced, so that it has been difficult to improve the power generation efficiency of the high-temperature rock power generation.
【0007】そこで、本発明は、透水層での流通抵坑が
変化したときに透水層への注水量を容易に調整できると
共に生産井で各透水層の熱水の干渉を防止する高温岩体
発電方法及びこれを利用する高温岩体発電装置を提供す
ることを目的とする。Accordingly, the present invention provides a high-temperature rock body that can easily adjust the amount of water injected into a permeable layer when a flow shaft in the permeable layer changes, and that prevents interference of hot water in each permeable layer in a production well. An object of the present invention is to provide a power generation method and a hot rock power generation device using the same.
【0008】[0008]
【課題を解決するための手段】かかる目的を達成するた
め、請求項1記載の発明は、高温岩体に形成された注入
井で高温岩体中の複数の透水層に水を送り込む注水工程
と、水が透水層を流通しながら加熱されて蒸気や熱水に
成る加熱工程と、高温岩体に形成された生産井で透水層
からの蒸気や熱水を回収する回収工程と、回収工程で回
収された蒸気や熱水により発電を行う発電工程とを備え
る高温岩体発電方法において、注水工程で透水層ごとに
独立して水を送り込むと共に透水層ごとに注水量を制御
するようにしている。Means for Solving the Problems To achieve the above object, the invention according to claim 1 comprises a water injection step of sending water to a plurality of permeable layers in the hot rock with an injection well formed in the hot rock. In the heating step, water is heated while flowing through the permeable layer to become steam or hot water, and in the production well formed in the high-temperature rock body, the collecting step of collecting steam or hot water from the permeable layer, In a high-temperature rock power generation method including a power generation step of generating power by using collected steam or hot water, water is independently supplied to each permeable layer in the water injection step, and the amount of water injected is controlled for each permeable layer. .
【0009】したがって、透水層を流通する水により岩
体温度が低下して透水層での流通抵坑が変化したとき
に、各透水層に対して注水量を個別に制御することによ
り透水層への注入量を一定にすることができる。このた
め、生産井で各透水層ごとに抽出される熱量を均等にす
ることができる。Therefore, when the temperature of the rock body decreases due to the water flowing through the permeable layer and the flow tunnel in the permeable layer changes, the amount of water injected into each permeable layer is individually controlled to control the permeable layer. Can be constant. For this reason, the amount of heat extracted for each permeable layer in the production well can be equalized.
【0010】また、請求項2記載の発明は、高温岩体に
形成された注入井で高温岩体中の複数の透水層に水を送
り込む注水工程と、水が透水層を流通しながら加熱され
て蒸気や熱水に成る加熱工程と、高温岩体に形成された
生産井で透水層からの蒸気や熱水を回収する回収工程
と、回収工程で回収された蒸気や熱水により発電を行う
発電工程とを備える高温岩体発電方法において、回収工
程で透水層ごとに独立して蒸気や熱水を回収するように
している。The invention according to claim 2 is a water injection step in which water is supplied to a plurality of permeable layers in the high-temperature rock by an injection well formed in the high-temperature rock, and the water is heated while flowing through the permeable layer. Heating process to generate steam and hot water, a recovery process to recover steam and hot water from the permeable layer in a production well formed in high-temperature rock, and power generation using the steam and hot water recovered in the recovery process In the high-temperature rock power generation method including a power generation step, steam and hot water are independently recovered for each permeable layer in the recovery step.
【0011】したがって、生産井に開口する透水層同士
の間で熱水の噴き出し圧力の差が生じていても互いに影
響を受けることはないので、蒸気や熱水の回収量を増大
することができる。Therefore, even if there is a difference in hot water jet pressure between the permeable layers opened to the production well, they are not affected by each other, so that the amount of recovered steam and hot water can be increased. .
【0012】さらに、請求項3記載の発明は、高温岩体
に形成された注入井で高温岩体中の複数の透水層に水を
送り込む注水工程と、水が透水層を流通しながら加熱さ
れて蒸気や熱水に成る加熱工程と、高温岩体に形成され
た生産井で透水層からの蒸気や熱水を回収する回収工程
と、回収工程で回収された蒸気や熱水により発電を行う
発電工程とを備える高温岩体発電方法において、注水工
程で透水層ごとに独立して水を送り込むと共に透水層ご
とに注水量を制御して、尚かつ回収工程で透水層ごとに
独立して蒸気や熱水を回収するようにしている。Further, the invention according to claim 3 is a water injection step in which water is sent to a plurality of permeable layers in the hot rock with an injection well formed in the hot rock, and the water is heated while flowing through the permeable bed. Heating process to generate steam and hot water, a recovery process to recover steam and hot water from the permeable layer in a production well formed in high-temperature rock, and power generation using the steam and hot water recovered in the recovery process In the high-temperature rock power generation method including the power generation step, water is independently supplied to each permeable layer in the water injection step, the amount of water injected is controlled for each permeable layer, and steam is independently generated for each permeable layer in the recovery step. And to recover hot water.
【0013】したがって、透水層を流通する水により岩
体温度が低下して透水層での流通抵坑が変化したとき
に、各透水層に対して注水量を個別に制御することによ
り透水層への注入量を一定にすることができる。このた
め、生産井で各透水層ごとに抽出される熱量を均等にす
ることができる。また、生産井に開口する透水層同士の
間で熱水の噴き出し圧力の差が生じていても互いに影響
を受けることはないので、蒸気や熱水の回収量を増大す
ることができる。Therefore, when the temperature of the rock body decreases due to the water flowing through the permeable layer and the flow tunnel in the permeable layer changes, the amount of water injected into each permeable layer is individually controlled to control the permeable layer. Can be constant. For this reason, the amount of heat extracted for each permeable layer in the production well can be equalized. Further, even if there is a difference in hot water ejection pressure between the permeable layers opened to the production well, they are not affected by each other, so that the amount of recovered steam and hot water can be increased.
【0014】一方、請求項4記載の発明では、高温岩体
に形成された注入井で高温岩体中の複数の透水層に水を
送り込んで加熱して蒸気や熱水にする注水手段と、高温
岩体に形成された生産井で透水層からの蒸気や熱水を回
収する回収手段と、回収手段により回収された蒸気や熱
水により発電を行う発電手段とを備える高温岩体発電装
置において、注水手段は、外管と、外管の内部を長手方
向に仕切る長手方向に垂直な複数の仕切壁と、隣り合う
仕切壁の間の仕切空間と外管の外部とを連通する連通孔
と、外管の仕切壁が形成された部分の外周に形成した環
形状の遮水突起と、外管に収容されて仕切空間のそれぞ
れに下流側端部が開口すると共に上流側が送水ポンプに
取り付けられる複数の内管と、内管から噴出する水量を
内管ごとに調整する制御手段とを有するようにしてい
る。[0014] On the other hand, in the invention according to claim 4, water is supplied to a plurality of permeable layers in the high-temperature rock body by an injection well formed in the high-temperature rock body and heated to produce steam or hot water, In a high-temperature rock power generation apparatus, there is provided a recovery means for recovering steam and hot water from a permeable layer in a production well formed in a high-temperature rock body, and a power generation means for generating power using the steam and hot water recovered by the recovery means. The water injection means includes an outer pipe, a plurality of partition walls perpendicular to the longitudinal direction that partition the inside of the outer pipe in the longitudinal direction, and a communication hole that communicates a partition space between adjacent partition walls and the outside of the outer pipe. A ring-shaped water-blocking projection formed on the outer periphery of a portion where the partition wall of the outer pipe is formed; and a downstream end opened in each of the partition spaces accommodated in the outer pipe and an upstream side attached to a water pump. Adjust the number of inner pipes and the amount of water spouted from each inner pipe for each inner pipe. So that a control means.
【0015】したがって、注水井の透水層に注水を行う
ときは、送水ポンプから各内管に水を供給し仕切空間に
噴出させる。水は仕切空間から連通孔を通過して外管の
外部に流出する。この水が、隣接する2つの遮水突起の
間に充填してから透水層に入り込む。そして、透水層を
流通する水により岩体温度が低下して透水層での流通抵
坑が変化したときは、各内管から噴出する水量を制御手
段により個別に調整する。このため、各内管から透水層
に対する注入量を一定にすることができる。これによ
り、生産井で各透水層ごとに抽出される熱量を均等にす
ることができる。Therefore, when water is injected into the permeable layer of the water injection well, water is supplied from the water supply pump to each of the inner pipes and jetted into the partition space. The water flows out of the outer space through the communication hole from the partition space. This water fills the space between two adjacent water-impervious projections and then enters the permeable layer. Then, when the temperature of the rock body decreases due to the water flowing through the permeable layer and the flow channel in the permeable layer changes, the amount of water spouted from each inner pipe is individually adjusted by the control means. For this reason, the injection amount from each inner pipe to the permeable layer can be made constant. This makes it possible to equalize the amount of heat extracted for each permeable layer in the production well.
【0016】しかも、連通孔から噴き出された水は外管
と抗壁との間を伝わって漏れ出すことが遮水突起により
防止されるので、各透水層への注水の際の圧力損失を低
減して確実な注水を行うことができる。In addition, the water jetted from the communication hole is prevented from leaking through the space between the outer tube and the wall by the water-blocking projections. It is possible to reduce the amount of water to be surely injected.
【0017】また、請求項5記載の発明は、高温岩体に
形成された注入井で高温岩体中の複数の透水層に水を送
り込んで加熱して蒸気や熱水にする注水手段と、高温岩
体に形成された生産井で透水層からの蒸気や熱水を回収
する回収手段と、回収手段により回収された蒸気や熱水
により発電を行う発電手段とを備える高温岩体発電装置
において、回収手段は、外管と、外管の内部を長手方向
に仕切る長手方向に垂直な複数の仕切壁と、隣り合う仕
切壁の間の仕切空間と外管の外部とを連通する連通孔
と、外管の仕切壁が形成された部分の外周に形成した環
形状の遮水突起と、外管に収容されて仕切空間のそれぞ
れに上流側端部が開口すると共に下流側が発電手段に接
続される複数の内管とを有するようにしている。Further, the invention according to claim 5 is a water injection means for feeding water to a plurality of permeable layers in the high-temperature rock body by using an injection well formed in the high-temperature rock body and heating the water to form steam or hot water; In a high-temperature rock power generation apparatus, there is provided a recovery means for recovering steam and hot water from a permeable layer in a production well formed in a high-temperature rock body, and a power generation means for generating power using the steam and hot water recovered by the recovery means. The recovery means includes an outer pipe, a plurality of partition walls perpendicular to the longitudinal direction that partition the inside of the outer pipe in the longitudinal direction, and a communication hole that communicates a partition space between adjacent partition walls and the outside of the outer pipe. A ring-shaped water-impervious projection formed on the outer periphery of the part where the partition wall of the outer pipe is formed, and an upstream end opened in each of the partition spaces accommodated in the outer pipe and the downstream side connected to the power generation means. And a plurality of inner tubes.
【0018】したがって、生産井に開口する透水層から
蒸気等の回収を行うときは、各透水層から噴き出された
蒸気等が隣接する2つの遮水突起の間に充填して連通孔
を経て仕切空間の内部に入り込む。さらに、蒸気等は仕
切空間から内管に入り込んで発電手段に供給される。こ
のため、各透水層ごとに異なる2つの遮水突起の間に充
填して発電手段に直接供給されるので、透水層同士の間
で熱水の噴き出し圧力の差が生じていても互いに影響を
受けることはなく、蒸気や熱水の回収量を増大すること
ができる。Therefore, when recovering steam or the like from the permeable layer opened to the production well, the steam or the like spouted from each permeable layer fills between two adjacent water-impervious projections and passes through the communication hole. Get inside the partition space. Further, steam or the like enters the inner pipe from the partition space and is supplied to the power generation means. For this reason, it is filled between two different water-impervious projections for each water-permeable layer and supplied directly to the power generation means. Therefore, even if there is a difference in the pressure of hot water jetted between the water-permeable layers, they affect each other. Without receiving it, the amount of recovered steam or hot water can be increased.
【0019】さらに、請求項6記載の発明は、高温岩体
に形成された注入井で高温岩体中の複数の透水層に水を
送り込んで加熱して蒸気や熱水にする注水手段と、高温
岩体に形成された生産井で透水層からの蒸気や熱水を回
収する回収手段と、回収手段により回収された蒸気や熱
水により発電を行う発電手段とを備える高温岩体発電装
置において、注水手段は、外管と、外管の内部を長手方
向に仕切る長手方向に垂直な複数の仕切壁と、隣り合う
仕切壁の間の仕切空間と外管の外部とを連通する連通孔
と、外管の仕切壁が形成された部分の外周に形成した環
形状の遮水突起と、外管に収容されて仕切空間のそれぞ
れに下流側端部が開口すると共に上流側が送水ポンプに
取り付けられる複数の内管と、内管から噴出する水量を
内管ごとに調整する制御手段とを有すると共に、回収手
段は、外管と、外管の内部を長手方向に仕切る長手方向
に垂直な複数の仕切壁と、隣り合う仕切壁の間の仕切空
間と外管の外部とを連通する連通孔と、外管の仕切壁が
形成された部分の外周に形成した環形状の遮水突起と、
外管に収容されて仕切空間のそれぞれに上流側端部が開
口すると共に下流側が発電手段に接続される複数の内管
とを有するようにしている。Further, the invention according to claim 6 is a water injection means for injecting water into a plurality of permeable layers in the high-temperature rock body by using an injection well formed in the high-temperature rock body and heating it to produce steam or hot water; In a high-temperature rock power generation apparatus, there is provided a recovery means for recovering steam and hot water from a permeable layer in a production well formed in a high-temperature rock body, and a power generation means for generating power using the steam and hot water recovered by the recovery means. The water injection means includes an outer pipe, a plurality of partition walls perpendicular to the longitudinal direction that partition the inside of the outer pipe in the longitudinal direction, and a communication hole that communicates a partition space between adjacent partition walls and the outside of the outer pipe. A ring-shaped water-blocking projection formed on the outer periphery of a portion where the partition wall of the outer pipe is formed; and a downstream end opened in each of the partition spaces accommodated in the outer pipe and an upstream side attached to a water pump. Adjust the number of inner pipes and the amount of water spouted from each inner pipe for each inner pipe. Control means, and the collecting means, the outer pipe, a plurality of partition walls perpendicular to the longitudinal direction that partition the inside of the outer pipe in the longitudinal direction, a partition space between adjacent partition walls and the outside of the outer pipe. And a ring-shaped water-impervious projection formed on the outer periphery of the part where the partition wall of the outer pipe is formed,
An upstream end is opened in each of the partition spaces accommodated in the outer tube, and a plurality of inner tubes connected to the power generation means on the downstream side are provided.
【0020】したがって、注水井の透水層に注水を行う
ときは、送水ポンプから各内管に水を供給し仕切空間に
噴出させる。水は仕切空間から連通孔を通過して外管の
外部に流出する。この水が、隣接する2つの遮水突起の
間に充填してから透水層に入り込む。そして、透水層を
流通する水により岩体温度が低下して透水層での流通抵
坑が変化したときは、各内管から噴出する水量を制御手
段により個別に調整する。このため、各内管から透水層
に対する注入量を一定にすることができる。これによ
り、生産井で各透水層ごとに抽出される熱量を均等にす
ることができる。しかも、連通孔から噴き出された水は
外管と抗壁との間を伝わって漏れ出すことが遮水突起に
より防止されるので、各透水層への注水の際の圧力損失
を低減して確実な注水を行うことができる。Therefore, when water is injected into the permeable layer of the injection well, water is supplied from the water supply pump to each of the inner pipes and jetted into the partition space. The water flows out of the outer space through the communication hole from the partition space. This water fills the space between two adjacent water-impervious projections and then enters the permeable layer. Then, when the temperature of the rock body decreases due to the water flowing through the permeable layer and the flow channel in the permeable layer changes, the amount of water spouted from each inner pipe is individually adjusted by the control means. For this reason, the injection amount from each inner pipe to the permeable layer can be made constant. This makes it possible to equalize the amount of heat extracted for each permeable layer in the production well. In addition, since the water jetted from the communication hole is prevented from leaking through the outer tube and the anti-wall by the water-blocking projection, the pressure loss when water is injected into each permeable layer is reduced. Reliable water injection can be performed.
【0021】また、生産井に開口する透水層から蒸気等
の回収を行うときは、各透水層から噴き出された蒸気等
が隣接する2つの遮水突起の間に充填して連通孔を経て
仕切空間の内部に入り込む。さらに、蒸気等は仕切空間
から内管に入り込んで発電手段に供給される。このた
め、各透水層ごとに異なる2つの遮水突起の間に充填し
て発電手段に直接供給されるので、透水層同士の間で熱
水の噴き出し圧力の差が生じていても互いに影響を受け
ることはなく、蒸気や熱水の回収量を増大することがで
きる。When recovering steam or the like from the permeable layer opened to the production well, steam or the like spouted from each permeable layer fills between two adjacent water-impervious projections and passes through the communication hole. Get inside the partition space. Further, steam or the like enters the inner pipe from the partition space and is supplied to the power generation means. For this reason, it is filled between two different water-impervious projections for each water-permeable layer and supplied directly to the power generation means. Therefore, even if there is a difference in the pressure of hot water jetted between the water-permeable layers, they affect each other. Without receiving it, the amount of recovered steam or hot water can be increased.
【0022】[0022]
【発明の実施の形態】以下、本発明の構成を図面に示す
実施の形態の一例に基づいて詳細に説明する。図1に示
すように、本実施形態の高温岩体発電装置34は、高温
岩体5に形成された注入井7で高温岩体5中の複数の透
水層19に水を送り込んで加熱して蒸気や熱水にする注
水手段20と、高温岩体5に形成された生産井30で透
水層19からの蒸気や熱水を回収する回収手段31と、
回収手段31により回収された蒸気や熱水により発電を
行う発電手段32とを備えている。DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS The configuration of the present invention will be described below in detail based on an example of an embodiment shown in the drawings. As shown in FIG. 1, the hot rock power generation device 34 of the present embodiment sends water to the plurality of permeable layers 19 in the hot rock 5 by using the injection well 7 formed in the hot rock 5 and heats the water. A water injection means 20 for producing steam or hot water, a recovery means 31 for recovering steam or hot water from the permeable layer 19 in a production well 30 formed in the high-temperature rock 5,
And a power generating means 32 for generating power using the steam or hot water collected by the collecting means 31.
【0023】そして、注水手段20は、外管21と、外
管21の内部を長手方向に仕切る長手方向に垂直な複数
の仕切壁22と、隣り合う仕切壁22の間の仕切空間2
3と外管21の外部とを連通する連通孔24と、外管2
1の仕切壁22が形成された部分の外周に形成した環形
状の遮水突起25と、外管21に収容されて仕切空間2
3のそれぞれに下流側端部が開口すると共に上流側が送
水ポンプ9に取り付けられる複数の内管26と、内管2
6から噴出する水量を内管26ごとに調整する制御手段
33とを有している。また、注水手段20は、櫓6によ
り地上から注入井7の内部に吊り下げられて支持されて
いる。The water injection means 20 includes an outer pipe 21, a plurality of partition walls 22 that partition the inside of the outer pipe 21 in the longitudinal direction, and a plurality of partition walls 22 perpendicular to the longitudinal direction, and a partition space 2 between adjacent partition walls 22.
A communication hole 24 for communicating the outer tube 3 with the outside of the outer tube 21;
A ring-shaped water-blocking projection 25 formed on the outer periphery of the portion where the first partition wall 22 is formed;
3, a plurality of inner pipes 26 each having a downstream end open and an upstream side attached to the water pump 9;
And control means 33 for adjusting the amount of water spouting from each inner tube 26. The water injection means 20 is suspended from the ground by the tower 6 and is supported inside the injection well 7.
【0024】内管26の上流側には送水ポンプ9が取り
付けられている。この送水ポンプ9は地上に設置されて
いる。送水ポンプ9は貯水池8に連結管28で連結され
ている。そして、送水ポンプ9は貯水池8の水を各内管
26に供給する。このとき、制御手段33により内管2
6から噴出する水量を内管26ごとに調整することがで
きる。このため、各透水層19への注入量を対応する内
管26ごとに別個に調整することができる。制御手段3
3としては、例えば流量制御弁を使用したものや、ポン
プ出力を内管26ごとに個別に調整できるポンプを使用
したもの等がある。The water supply pump 9 is mounted on the upstream side of the inner pipe 26. The water pump 9 is installed on the ground. The water pump 9 is connected to the reservoir 8 by a connecting pipe 28. Then, the water pump 9 supplies the water in the reservoir 8 to each of the inner pipes 26. At this time, the control means 33 controls the inner pipe 2
The amount of water spouted from 6 can be adjusted for each inner tube 26. For this reason, the amount injected into each permeable layer 19 can be adjusted separately for each corresponding inner pipe 26. Control means 3
Examples of the type 3 include a type using a flow control valve and a type using a pump capable of individually adjusting the pump output for each inner pipe 26.
【0025】内管26は仕切壁22を貫通して設けられ
ている。この貫通部分は密封されている。このため、各
仕切空間23は連通孔24のみにより外部に連通されて
いる。図1及び図2に示すように、内管26は下流側端
部の深度を異ならせて3本設けられている。このため、
注入井7の深度の異なる3箇所で透水層19に独立して
注水を行うことができる。本実施形態では内管26を3
本としているが、これには限られず2本または4本以上
としても良い。これらの場合でも、注入井7の深度の異
なる複数箇所で透水層19ごとに注水を行うことができ
る。The inner pipe 26 extends through the partition wall 22. This penetrating part is sealed. Therefore, each partition space 23 is communicated with the outside only by the communication hole 24. As shown in FIGS. 1 and 2, three inner pipes 26 are provided at different downstream end portions. For this reason,
Water can be independently injected into the permeable layer 19 at three different depths of the injection well 7. In this embodiment, the inner pipe 26 is 3
The number of books is not limited to two, but may be two or four or more. Even in these cases, water injection can be performed for each permeable layer 19 at a plurality of locations at different depths of the injection well 7.
【0026】また、外管21及び注入井7は断面円形と
している。外管21の下端部は開放されて開口21aが
形成されている。外管21は、短管を繋ぎ合わせて長い
管としている。すなわち、注水手段20を注入井7に設
置する際は、櫓6から最初は短い外管21を吊り下げて
次々に短管を繋ぎ合わせて下方に伸ばすようにする。こ
こでの接続方法としてはねじ止めや溶接等の既存または
新規の接続手段を使用することができるが、組立や取り
外しの容易さを考慮してねじ止めとすることが好まし
い。The outer tube 21 and the injection well 7 have a circular cross section. The lower end of the outer tube 21 is opened to form an opening 21a. The outer tube 21 is formed as a long tube by joining short tubes. That is, when the water injection means 20 is installed in the injection well 7, a short outer pipe 21 is first suspended from the tower 6, and short pipes are successively connected and extended downward. As the connection method here, existing or new connection means such as screwing or welding can be used, but it is preferable to use screwing in consideration of ease of assembly and removal.
【0027】内管26の下流側端部が開口する部分の短
管は、連通孔24を有するものとしている。連通孔24
は外管21の強度を余り弱めない程度の大きさ及び数量
とする。また、連通孔24の配置としては、例えば千鳥
状とすることができる。さらに、仕切壁22は短管の上
下端部に形成している。これにより、仕切壁22の取付
を容易に行うことができる。The short pipe at the portion where the downstream end of the inner pipe 26 opens has a communication hole 24. Communication hole 24
Is a size and quantity that does not significantly reduce the strength of the outer tube 21. Further, the arrangement of the communication holes 24 can be, for example, a staggered shape. Further, partition walls 22 are formed at the upper and lower ends of the short pipe. Thereby, the partition wall 22 can be easily attached.
【0028】そして、外管21の外径は注入井7の内径
よりも約20mm小さくしている。すなわち、外管21
の外周面と坑壁7aとの間は約10mmの間隔を有す
る。このため、連通孔24から噴き出された水が坑壁7
aと外管21の外周面との間を流通する抵坑が大きいの
で上側に水漏れし難くなる。ここで、上側への水漏れを
防止するために最上位置の連通孔24の形成深度は約1
00m以上とすることが好ましい。また、連通孔24か
ら噴き出された水の漏れが少ないので、坑壁7aを押圧
する水圧の損失を小さくできる。本実施形態では外管2
1の外周面と坑壁7aとの隙間を約10mmとし最上位
置の連通孔24の形成深度を約100m以上としている
が、これには限られず水の圧力,流量,粘性等の大きさ
や外管21及び坑壁7aの間を流通する際の抵坑等に基
づいて上側への水漏れを防止できる範囲で設定すること
ができる。The outer diameter of the outer tube 21 is smaller than the inner diameter of the injection well 7 by about 20 mm. That is, the outer tube 21
Has an interval of about 10 mm between the outer peripheral surface and the pit wall 7a. For this reason, the water spouted from the communication hole 24 causes the
Since the shaft flowing between the inner pipe a and the outer peripheral surface of the outer pipe 21 is large, water leakage hardly occurs upward. Here, in order to prevent water leakage to the upper side, the formation depth of the communication hole 24 at the uppermost position is about 1
It is preferably at least 00 m. Further, since there is little leakage of water spouted from the communication hole 24, the loss of water pressure pressing the pit wall 7a can be reduced. In the present embodiment, the outer tube 2
1, the gap between the outer peripheral surface and the pit wall 7a is about 10 mm, and the formation depth of the communication hole 24 at the uppermost position is about 100 m or more. However, the present invention is not limited to this. It can be set within a range in which upward leakage of water can be prevented based on a shaft or the like when flowing between the shaft 21 and the pit wall 7a.
【0029】内管26及び外管21としては、高温岩体
5の温度条件を考慮すると鉄製のものを用いることが好
ましい。As the inner pipe 26 and the outer pipe 21, it is preferable to use an iron pipe in consideration of the temperature condition of the high-temperature rock 5.
【0030】さらに、遮水突起25は外管21の外周面
から約5mm突出している。すなわち、遮水突起25と
坑壁7aとは約5mmの隙間を有している。この程度の
隙間で有れば、連通孔24から噴出された水が遮水突起
25と坑壁7aの間からほとんど漏れ出すことはない。
このため、連通孔24から噴き出された水の漏れが少な
いので、坑壁7aを押圧する水圧の損失を小さくでき
る。しかも、注水手段20を注入井7に設置する際に、
遮水突起25を坑壁7aに接触させることなく容易に挿
入することができる。本実施形態では遮水突起25と坑
壁7aとの隙間を約5mmとしているが、これには限ら
れず水の圧力,流量,粘性等の大きさや遮水突起25及
び坑壁7aの間を流通する際の抵坑等に基づいて水漏れ
を防止できる範囲で設定することができる。Further, the water-blocking projection 25 protrudes from the outer peripheral surface of the outer tube 21 by about 5 mm. That is, there is a gap of about 5 mm between the water-blocking projection 25 and the pit wall 7a. With such a gap, the water jetted from the communication hole 24 hardly leaks from between the impermeable protrusion 25 and the pit wall 7a.
For this reason, there is little leakage of water spouted from the communication hole 24, and it is possible to reduce the loss of water pressure that presses the pit wall 7a. Moreover, when installing the water injection means 20 in the injection well 7,
The water-blocking projection 25 can be easily inserted without making contact with the pit wall 7a. In the present embodiment, the gap between the impermeable protrusion 25 and the pit wall 7a is set to about 5 mm. However, the present invention is not limited to this. It can be set within a range in which water leakage can be prevented based on a shaft or the like at the time.
【0031】一方、回収手段31は、外管21と、外管
21の内部を長手方向に仕切る長手方向に垂直な複数の
仕切壁22と、隣り合う仕切壁22の間の仕切空間23
と外管21の外部とを連通する連通孔24と、外管21
の仕切壁22が形成された部分の外周に形成した環形状
の遮水突起25と、外管21に収容されて仕切空間23
のそれぞれに上流側端部が開口すると共に下流側が発電
手段32に接続される複数の内管26とを有している。On the other hand, the recovery means 31 comprises an outer tube 21, a plurality of partition walls 22 which vertically partition the inside of the outer tube 21, and a partition space 23 between adjacent partition walls 22.
A communication hole 24 that communicates with the outside of the outer tube 21;
Ring-shaped water-impervious projections 25 formed on the outer periphery of the portion where the partition wall 22 is formed, and the partition space 23 accommodated in the outer tube 21.
Has a plurality of inner pipes 26 each of which has an upstream end open and a downstream side connected to the power generation means 32.
【0032】ここで、回収手段31に用いる外管21と
仕切壁22と連通孔24と遮水突起25と内管26とは
いずれも注水手段20に用いるものと構成を同様にして
いるので、符号を同じくして詳細な説明は省略する。Here, the outer pipe 21, the partition wall 22, the communication hole 24, the water-blocking projection 25, and the inner pipe 26 used for the collecting means 31 have the same configuration as that used for the water injection means 20. The detailed description is omitted with the same reference numerals.
【0033】発電手段32は、回収手段31の内管26
から得られた蒸気及び熱水により例えば蒸気タービンを
駆動させて発電を行うものである。そして、使用された
蒸気は復水されて貯水池8に戻される。この発電手段3
2は本発明の特徴的な構成ではないので、蒸気及び熱水
により発電を行うものであれば既知のまたは新規のもの
で良い。The power generation means 32 is provided in the inner pipe 26 of the recovery means 31.
For example, a steam turbine is driven by steam and hot water obtained from the above to generate power. Then, the used steam is condensed and returned to the reservoir 8. This power generation means 3
2 is not a characteristic configuration of the present invention, and may be any known or new device that generates power using steam and hot water.
【0034】回収手段31は、櫓6により地上から生産
井30の内部に吊り下げられて支持されている。そし
て、回収手段31の設置深度は、生産井30の内部に開
口する透水層19と連通孔24とが向き合うものとす
る。これにより、各透水層19から噴き出された蒸気や
熱水は、それぞれ別個の遮水突起25,25の間に充填
されて連通孔24から仕切空間23に入り込む。そし
て、この蒸気や熱水は別個の仕切空間23からそれぞれ
の内管26を経て発電手段32に供給される。The collecting means 31 is suspended from the ground by the tower 6 and is supported inside the production well 30. The installation depth of the collecting means 31 is such that the permeable layer 19 opening inside the production well 30 and the communication hole 24 face each other. As a result, the steam and the hot water spouted from each permeable layer 19 are filled between the separate water-blocking projections 25 and 25 and enter the partition space 23 from the communication hole 24. Then, the steam and the hot water are supplied from the separate partition spaces 23 to the power generation means 32 through the respective inner pipes 26.
【0035】上述した高温岩体発電装置34を設置する
手順を以下に説明する。The procedure for installing the above-described hot rock power generator 34 will be described below.
【0036】注入井7を作成するために、高温岩体5に
ボーリング坑7’を掘削する。この掘削方法は既存のま
たは新規のいかなる方法でも良いが、例えば以下の手順
により掘削する。In order to form the injection well 7, a borehole 7 ′ is excavated in the hot rock 5. This excavation method may be any existing or new method. For example, excavation is performed according to the following procedure.
【0037】図3及び図4に示すように、ここでの掘削
装置1は、少なくとも3本の内管2〜4を通した外管1
5をボーリング坑7’の内部に挿入すると共に、第1の
内管2に高圧の液体を第2の内管3に気体をそれぞれ供
給し、第1の内管2の先端に接続した液圧モータから成
るダウンホールモータ12を液体で駆動させてビット1
3を回転させる一方、ダウンホールモータ12を駆動さ
せた液体の圧力と気体の浮力とで第3の内管4を通じて
掘削ズリ14を排出し且つ液体を回収するものである。
第1の内管2の先端はダウンホールモータ12の液圧供
給口12aに接続されており、その後端は貯水池8の水
を圧送する送水ポンプ9に接続されている。第2の内管
3の先端は第3の内管4の先端近傍位置に接続されてお
り、その後端はコンプレッサ10に接続されている。さ
らに、第3の内管4の先端はダウンホールモータ12の
後方に開口しており、その後端は貯水池8に開口してい
る。ダウンホールモータ12の吐水口12bは、ビット
13と坑壁7aとの間に向けて形成されている。As shown in FIGS. 3 and 4, the excavator 1 here has an outer pipe 1 through at least three inner pipes 2 to 4.
5 is inserted into the borehole 7 ′, a high-pressure liquid is supplied to the first inner pipe 2, and a gas is supplied to the second inner pipe 3. The downhole motor 12 composed of a motor is driven by liquid to
3, while the drill hole 14 is discharged through the third inner pipe 4 and the liquid is collected by the pressure of the liquid and the buoyancy of the gas that have driven the downhole motor 12.
The front end of the first inner pipe 2 is connected to a hydraulic pressure supply port 12 a of a downhole motor 12, and the rear end is connected to a water pump 9 for pumping water in a reservoir 8. The tip of the second inner pipe 3 is connected to a position near the tip of the third inner pipe 4, and the rear end is connected to the compressor 10. Further, the distal end of the third inner pipe 4 opens behind the downhole motor 12, and the rear end opens to the reservoir 8. The water outlet 12b of the downhole motor 12 is formed between the bit 13 and the wellhead wall 7a.
【0038】なお、外管15、第1の内管2、第2の内
管3、第3の内管4としては使用する温度条件を考慮す
ると鉄製のものを用いることが好ましい。ただし、必ず
しも鉄製の管を使用する必要はなく、使用温度が低い場
合にはプラスチック製等の管を用いても良い。また、必
ずしも第2の内管3の先端を第3の内管4の先端近傍に
接続する必要はなく、掘削ズリ14を上昇させてある程
度高圧水の圧力が弱まったところで圧縮空気を供給でき
る位置に第2の内管3の先端を接続しても良い。The outer tube 15, the first inner tube 2, the second inner tube 3, and the third inner tube 4 are preferably made of iron in consideration of the temperature conditions to be used. However, it is not necessary to use an iron pipe, and when the operating temperature is low, a pipe made of plastic or the like may be used. Further, it is not always necessary to connect the tip of the second inner pipe 3 to the vicinity of the tip of the third inner pipe 4, and a position where the excavation slide 14 is raised and compressed air can be supplied when the pressure of the high-pressure water is weakened to some extent. Alternatively, the tip of the second inner tube 3 may be connected.
【0039】そして、地上に組んだ櫓6を利用して掘削
装置1をボーリング坑7’内に降ろすようにして挿入す
る。次に、貯水池8内の水を送水ポンプ9で加圧して第
1の水管2に供給し、この高圧水によってダウンホール
モータ12を駆動させてビット13を高速回転させる。
高速回転するビット13は岩体5を掘削し、これにより
発生した掘削ズリ14は周囲に溜まる。一方、ダウンホ
ールモータ12を駆動した高圧水は吐水口12bから噴
出してビット13と坑壁7aとの間に流れ込み、坑壁7
aとの摩擦で加熱されるビット13を冷却すると共に掘
削ズリ14をビット13の後方に押し流す。そして、こ
の高圧水と掘削ズリ14の流れは第3の内管4に流入す
る。Then, the excavator 1 is inserted into the boring pit 7 'by using the tower 6 assembled on the ground. Next, the water in the reservoir 8 is pressurized by the water pump 9 and supplied to the first water pipe 2, and the high-pressure water drives the downhole motor 12 to rotate the bit 13 at high speed.
The bit 13 that rotates at a high speed excavates the rock 5, and the generated excavation waste 14 accumulates in the surroundings. On the other hand, the high-pressure water that has driven the downhole motor 12 blows out from the water discharge port 12b and flows between the bit 13 and the wellhead wall 7a.
The bit 13 heated by friction with a is cooled, and the excavation waste 14 is flushed behind the bit 13. Then, the flow of the high-pressure water and the drilling waste 14 flows into the third inner pipe 4.
【0040】一方、第2の内管3内にはコンプレッサ1
0より圧縮空気が供給される。圧縮空気は第3の内管4
内に流入し、その浮力で第3の内管4内を上昇する掘削
ズリ14及び高圧水に上昇力を与える。この浮力の助け
を借りて掘削ズリ14と高圧水が第3の内管4内を上昇
し、地上の貯水池8内に排出される。即ち、第3の内管
4を通じてボーリング坑7’内から掘削ズリ14が排出
されると共に高圧水が回収される。ビット13が岩体5
を掘削するのに従ってビット13を下降させることで、
ボーリング坑7’を堀り進める。そして、必要な深さだ
け掘り下げたら掘削装置を停止させて、地上に組んだ櫓
6を利用して掘削装置1をボーリング坑7’から取り出
すよう上昇させる。On the other hand, in the second inner pipe 3, the compressor 1
Compressed air is supplied from zero. The compressed air is supplied to the third inner pipe 4
The buoyancy of the excavation waste 14 and the high-pressure water that rises in the third inner pipe 4 give rise to the buoyancy. With the help of this buoyancy, the drilling waste 14 and the high-pressure water rise in the third inner pipe 4 and are discharged into the reservoir 8 on the ground. That is, the drilling waste 14 is discharged from the borehole 7 ′ through the third inner pipe 4 and the high-pressure water is recovered. Bit 13 is rock 5
By lowering bit 13 as you excavate
Drill the boring pit 7 '. Then, when the excavator is dug down to a required depth, the excavator is stopped, and the excavator 1 is raised using the tower 6 assembled on the ground so as to be taken out of the boring pit 7 '.
【0041】この掘削方法では、第3の内管4に第1の
内管2から圧縮空気を供給することで浮力を発生させて
掘削ズリ14と高圧水の上昇を助けているので、高圧水
を多量に使用しなくても掘削ズリ14の排出と高圧水の
回収を容易に行うことができる。また、掘削ズリ14の
排出と高圧水の回収を専用の第3の内管4で行ってお
り、尚かつこの第3の内管4の内面はボーリング坑7’
の坑壁7aに比べて滑らかであり掘削ズリ14及び高圧
水の流れ抵坑は小さいので、掘削ズリ14の排出や高圧
水の回収が容易になる。さらに、岩体5中に断層などの
水の逃げ道となるものが存在していても第3の内管4を
介して掘削ズリ14の排出と高圧水の回収を確実に行う
ことができる。In this excavation method, compressed air is supplied from the first inner pipe 2 to the third inner pipe 4 to generate buoyancy to assist the excavation slip 14 and the high-pressure water to rise. It is possible to easily discharge the excavation waste 14 and recover the high-pressure water without using a large amount of water. Further, the discharge of the drilling waste 14 and the recovery of the high-pressure water are performed by the dedicated third inner pipe 4, and the inner surface of the third inner pipe 4 is formed by a boring hole 7 ′.
The excavation waste 14 and the high-pressure water flow are small compared to the wellhead wall 7a, so that the discharge of the excavation waste 14 and the recovery of the high-pressure water are facilitated. Furthermore, even if a rock or the like, which serves as an escape path for water, exists in the rock body 5, the discharge of the excavation waste 14 and the recovery of high-pressure water can be reliably performed through the third inner pipe 4.
【0042】次に、形成したボーリング坑7’から岩体
5の内部に透水層19を作成する。この作成は、例えば
注水手段20を兼用した透水層作成装置の利用により以
下の手順で行う。但し、透水層19を作成する透水層作
成装置としては、本実施形態のように注水手段20と兼
用したものに限られず専用の装置を使用しても良い。Next, a permeable layer 19 is formed inside the rock 5 from the formed boring pit 7 '. This creation is performed in the following procedure, for example, by using a permeable layer creating apparatus that also serves as the water injection means 20. However, the permeable layer forming device for forming the permeable layer 19 is not limited to the device that also serves as the water injection means 20 as in the present embodiment, and a dedicated device may be used.
【0043】透水層作成装置20を櫓6の利用により下
降させて挿入させる。そして、透水層作成装置20が所
定の深度に達して下降を停止させてから、各内管26の
上流側端部を送水ポンプ9に連結する。連結後、送水ポ
ンプ9を駆動して貯水池8の水を加圧して各内管26に
同時に供給する。The permeable layer forming device 20 is lowered and inserted by using the tower 6. Then, after the permeable layer forming device 20 reaches a predetermined depth and stops descending, the upstream end of each inner pipe 26 is connected to the water pump 9. After the connection, the water pump 9 is driven to pressurize the water in the reservoir 8 and simultaneously supply the water to each of the inner pipes 26.
【0044】各内管26の下流側端部では高圧水が仕切
空間23の内部に噴出する。そして、水は仕切空間23
の底部から貯められて連通孔24に達すると連通孔24
から外管21の外部に噴出する。また、外管21の最も
下部では仕切空間23に水が貯まることなく開口21a
から噴出する。At the downstream end of each of the inner tubes 26, high-pressure water spouts into the partition space 23. And the water is the partition space 23
When it is stored from the bottom of the container and reaches the communication hole 24, the communication hole 24
From the outer tube 21. At the lowermost part of the outer tube 21, the opening 21 a
Erupts from
【0045】連通孔24から噴出した高圧水は、その連
通孔24の上下に設けられた遮水突起25,25と坑壁
7aと外管21の外面との間に貯められる。そして、こ
の空間から空気を追い出して完全に充填されると、高圧
水が坑壁7aを押圧する。また、外管21の最も下部で
は、高圧水は最下位置の遮水突起25と坑壁7aとの間
に貯められ空気を追い出して完全に充填されると坑壁7
aを押圧する。The high-pressure water spouted from the communication hole 24 is stored between the water-blocking projections 25, 25 provided above and below the communication hole 24, the pit wall 7 a, and the outer surface of the outer pipe 21. Then, when the air is expelled from this space and completely filled, the high-pressure water presses the wellhead wall 7a. At the lowermost part of the outer tube 21, the high-pressure water is stored between the water-blocking projection 25 at the lowest position and the pit wall 7a, and drives out the air to completely fill the pit wall 7.
Press a.
【0046】ここで、坑壁7aに既に多数の幅狭の節理
が形成されている場合は、坑壁7aに高圧水を作用させ
ることにより一部の節理が他の節理を狭めながら広がっ
て水を引き込み透水層19を作成する。また、坑壁7a
に節理が形成されていない場合は、坑壁7aに高圧水を
作用させることにより新たな割れ目が生じて水を引き込
んで透水層19を作成する。このとき、透水層19に流
れ込む水量は、理論上は割れ目の幅の3乗(実際上は2
乗)に比例して増加する。If a large number of narrow joints have already been formed on the pit wall 7a, high pressure water is applied to the pit wall 7a so that some joints spread while narrowing other joints, thereby reducing water. To form the permeable layer 19. In addition, pit wall 7a
When the joint is not formed, high pressure water is applied to the pit wall 7a, a new crack is generated, and water is drawn in to form the permeable layer 19. At this time, the amount of water flowing into the permeable layer 19 is theoretically the cube of the width of the fracture (actually 2
To the power).
【0047】そして、この透水層作成装置の内管26の
上流部に制御手段33を取り付けてそのまま注水手段2
0とする。本実施形態では透水層作成装置を高温岩体発
電装置34の注水手段20と兼用しているので、透水層
19の作成後に透水層作成装置を注入井7から取り出す
必要がない。このため、高温岩体発電装置34の設置の
コストを削減することができると共に工期を短縮するこ
とができる。Then, a control means 33 is attached to the upstream part of the inner pipe 26 of the permeable layer forming apparatus, and
Set to 0. In this embodiment, since the permeable formation device is also used as the water injection means 20 of the hot rock power generation device 34, it is not necessary to remove the permeable formation device from the injection well 7 after the formation of the permeable layer 19. For this reason, it is possible to reduce the cost of installing the hot rock power generation device 34 and shorten the construction period.
【0048】一方、透水層19が作成された領域内の数
カ所に透水層19の内部の蒸気や熱水を回収する生産井
30を作成する。生産井30の掘削手順は上述した注入
井7と同様であるので説明を省略する。そして、掘削さ
れた生産井30に回収手段31を設置する。この生産井
30への回収手段31の設置手順は上述した注入井7へ
の注水手段20(透水層作成装置)と同様であるので説
明を省略する。さらに、生産井30に設置した回収手段
31の内管26の下流側を発電手段32に接続する。On the other hand, production wells 30 for collecting steam and hot water inside the permeable layer 19 are formed at several places in the area where the permeable layer 19 is formed. The excavation procedure of the production well 30 is the same as that of the injection well 7 described above, and the description is omitted. Then, the collecting means 31 is installed in the excavated production well 30. The procedure for installing the recovery means 31 in the production well 30 is the same as that of the water injection means 20 (permeable layer forming apparatus) for the injection well 7 described above, and therefore the description is omitted. Further, the downstream side of the inner pipe 26 of the collection means 31 installed in the production well 30 is connected to the power generation means 32.
【0049】上述した高温岩体発電装置34により発電
を行う手順を以下に説明する。The procedure for power generation by the hot rock power generator 34 will be described below.
【0050】この高温岩体発電方法は、高温岩体5に形
成された注入井7で高温岩体5中の複数の透水層19に
水を送り込む注水工程と、水が透水層19を流通しなが
ら加熱されて蒸気や熱水に成る加熱工程と、高温岩体5
に形成された生産井30で透水層19からの蒸気や熱水
を回収する回収工程と、回収工程で回収された蒸気や熱
水により発電を行う発電工程とを備えている。In this hot rock power generation method, a water injection step of sending water to a plurality of permeable layers 19 in the hot rock 5 through the injection well 7 formed in the hot rock 5, and water flowing through the permeable bed 19. A heating process of forming steam or hot water while heating
And a power generation step of generating power using the steam and hot water collected in the recovery step.
【0051】注水工程では、送水ポンプ9を駆動して貯
水池8の水を各内管26に同時に供給する。各内管26
の下流側端部では水が仕切空間23の内部に噴出する。
そして、水は仕切空間23の底部から貯められて連通孔
24に達すると連通孔24から外管21の外部に噴出す
る。また、外管21の最も下部では仕切空間23に水が
貯まることなく開口21aから噴出する。In the water injection step, the water pump 9 is driven to supply the water in the reservoir 8 to each of the inner pipes 26 at the same time. Each inner pipe 26
At the downstream end, water spouts into the partition space 23.
When the water is stored from the bottom of the partition space 23 and reaches the communication hole 24, the water is ejected from the communication hole 24 to the outside of the outer tube 21. Further, at the lowermost part of the outer tube 21, water is spouted from the opening 21a without storing water in the partition space 23.
【0052】連通孔24から噴出した水は、その連通孔
24の上下に設けられた遮水突起25,25と坑壁7a
と外管21の外面との間に貯められる。そして、水はこ
の空間から透水層19の中に流れ込む。また、外管21
の最も下部では、水は最下位置の遮水突起25と坑壁7
aとの間に貯められて透水層19の中に流れ込む。この
とき、連通孔24から噴き出された水は外管21と抗壁
7aとの間を伝わって漏れ出すことが遮水突起25,2
5により防止されるので、各透水層19への注水の際の
圧力損失を低減して確実な注水を行うことができる。The water spouted from the communication hole 24 is separated from the water blocking projections 25 provided above and below the communication hole 24 and the pit wall 7a.
And the outer surface of the outer tube 21. Then, water flows into the permeable layer 19 from this space. In addition, the outer tube 21
At the lowest part of the water, the water impinges at the lowest position and the
a and flows into the permeable layer 19. At this time, the water spouted from the communication hole 24 is transmitted between the outer tube 21 and the anti-wall 7a and leaks out.
5, the pressure loss at the time of injecting water into each permeable layer 19 can be reduced and reliable water injection can be performed.
【0053】透水層19に注入された水は、加熱工程で
高温岩体5により加熱されて熱水及び蒸気に成りいずれ
かの生産井30に到達する。ここで、透水層19を流通
する水により岩体温度が低下して透水層19での流通抵
坑が変化したときは、各内管26から噴出する水量を制
御手段33により個別に調整して、各内管26から透水
層19に対する注入量を一定にする。これにより、生産
井30で各透水層19ごとに抽出される熱量を均等にす
ることができるので、発電効率を向上させることができ
る。しかも、注水手段20を注水井から取り出すこと無
く各透水層19ごとに注水量を変更できるので、注水量
の変更のための煩雑な作業を要せず発電の作業性を向上
させることができる。The water injected into the permeable layer 19 is heated by the high-temperature rock 5 in the heating step to become hot water and steam, and reaches one of the production wells 30. Here, when the temperature of the rock body decreases due to the water flowing through the water permeable layer 19 and the flow shaft in the water permeable layer 19 changes, the amount of water spouted from each inner pipe 26 is individually adjusted by the control means 33. The injection amount from each inner tube 26 to the permeable layer 19 is made constant. Thereby, the amount of heat extracted for each permeable layer 19 in the production well 30 can be equalized, so that the power generation efficiency can be improved. Moreover, since the water injection amount can be changed for each permeable layer 19 without taking out the water injection means 20 from the injection well, the work of power generation can be improved without the need for complicated work for changing the water injection amount.
【0054】回収工程では、各生産井30で透水層19
からの蒸気及び熱水が回収手段31の遮水突起25,2
5と坑壁7aと外管21の外面との間に貯められる。そ
して、蒸気及び熱水は、この空間から連通孔24を通過
して仕切空間23に入り込む。さらに、蒸気及び熱水
は、各仕切空間23から内管26を経て発電手段32に
供給される。このため、各透水層19ごとに異なる2つ
の遮水突起25の間に充填して発電手段32に直接供給
されるので、透水層19同士の間で熱水の噴き出し圧力
の差が生じていても互いに影響を受けることはなく、蒸
気や熱水の回収量を増大することができる。これによ
り、高温岩体5からの熱回収の効率を向上させることが
できるので、発電効率を向上させることができる。In the recovery step, the permeable layer 19 is formed at each production well 30.
The steam and hot water from the water are impermeable projections 25 and 2 of the recovery means 31.
5 and between the pit wall 7a and the outer surface of the outer tube 21. Then, the steam and the hot water pass through the communication hole 24 from this space and enter the partition space 23. Further, the steam and the hot water are supplied from each partition space 23 to the power generation means 32 via the inner pipe 26. For this reason, since it fills between the two water-impervious projections 25 different for each water-permeable layer 19 and is directly supplied to the power generation means 32, there is a difference in the pressure of hot water jetted between the water-permeable layers 19. Are not affected by each other, and the amount of recovered steam or hot water can be increased. Thereby, the efficiency of heat recovery from the high-temperature rock 5 can be improved, so that the power generation efficiency can be improved.
【0055】発電工程では、発電手段32が供給された
蒸気を利用して蒸気タービンを作動させて発電を行う。
また、復水した蒸気は貯水池8に戻される。In the power generation step, the power generation means 32 operates the steam turbine using the supplied steam to generate power.
The condensed steam is returned to the reservoir 8.
【0056】なお、上述の実施形態は本発明の好適な実
施の一例ではあるがこれに限定されるものではなく本発
明の要旨を逸脱しない範囲において種々変形実施可能で
ある。例えば、本実施形態では透水層作成装置と注水手
段20とを兼用したものを使用しているが、これには限
られずこれらを別個の装置としても良い。この場合も、
各内管26から噴出する水量を制御手段33により個別
に調整することにより生産井30で各透水層19ごとに
抽出される熱量を均等にできると共に、注水手段20を
注水井から取り出すこと無く各透水層19ごとに注水量
を変更できる。The above embodiment is an example of a preferred embodiment of the present invention, but the present invention is not limited to this, and various modifications can be made without departing from the spirit of the present invention. For example, in the present embodiment, a device that serves both as the water permeable layer forming device and the water injection means 20 is used, but the present invention is not limited to this, and these devices may be separate devices. Again,
By individually adjusting the amount of water spouted from each inner pipe 26 by the control means 33, the amount of heat extracted for each permeable layer 19 in the production well 30 can be made uniform, and each water can be extracted without taking out the water injection means 20 from the water injection well. The amount of water injected can be changed for each permeable layer 19.
【0057】また、本実施形態では注水手段20と回収
手段31との両方を備えているが、いずれか一方のみを
備えるようにしても良い。この場合、注水手段20のみ
を備えていても、生産井7で各透水層19ごとに抽出さ
れる熱量を均等にできると共に注水量の変更のための煩
雑な作業を不要にでき、また各透水層19への注水の際
の圧力損失を低減して確実な注水を行うことができる。
一方、回収手段31のみを備えていても、蒸気や熱水の
回収量を増大して高温岩体からの熱回収の効率を向上さ
せることができるので、発電効率を向上させることがで
きる。In the present embodiment, both the water injection means 20 and the recovery means 31 are provided, but only one of them may be provided. In this case, even if only the water injection means 20 is provided, the amount of heat extracted for each permeable layer 19 in the production well 7 can be equalized, and a complicated operation for changing the amount of injected water can be eliminated. The pressure loss at the time of pouring water into the layer 19 can be reduced to perform reliable pouring.
On the other hand, even if only the recovery unit 31 is provided, the efficiency of heat recovery from the high-temperature rock body can be improved by increasing the recovery amount of steam or hot water, so that the power generation efficiency can be improved.
【0058】[0058]
【発明の効果】以上の説明より明らかなように、請求項
1記載の高温岩体発電方法によれば、注水工程で透水層
ごとに独立して水を送り込むと共に透水層ごとに注水量
を制御するので、透水層を流通する水により岩体温度が
低下して透水層での流通抵坑が変化したときに、各透水
層に対して注水量を個別に制御することにより透水層へ
の注入量を一定にすることができる。このため、生産井
で各透水層ごとに抽出される熱量を均等にすることがで
きるので、発電効率を向上させることができる。しか
も、注水手段を注水井から取り出すこと無く各透水層ご
とに注水量を変更できるので、注水量の変更のための煩
雑な作業を要せず発電の作業性を向上させることができ
る。As is apparent from the above description, according to the hot rock power generation method of the first aspect, water is independently supplied to each permeable layer in the water injection step, and the amount of water injected is controlled for each permeable layer. When the rock temperature decreases due to the water flowing through the permeable layer and the flow through the permeable layer changes, the amount of water injected into each permeable layer is individually controlled to inject into the permeable layer. The amount can be constant. For this reason, since the amount of heat extracted for each permeable layer in the production well can be equalized, the power generation efficiency can be improved. In addition, since the water injection amount can be changed for each permeable layer without taking out the water injection means from the injection well, complicated work for changing the water injection amount is not required, and the workability of power generation can be improved.
【0059】また、請求項2記載の高温岩体発電方法に
よれば、回収工程で透水層ごとに独立して蒸気や熱水を
回収するので、生産井に開口する透水層同士の間で熱水
の噴き出し圧力の差が生じていても互いに影響を受ける
ことはない。このため、蒸気や熱水の回収量を増大する
ことができる。これにより、高温岩体からの熱回収の効
率を向上させることができるので、発電効率を向上させ
ることができる。According to the high-temperature rock power generation method of the second aspect, since steam and hot water are independently collected for each permeable layer in the recovery step, heat is generated between the permeable layers opened to the production well. Even if there is a difference between the pressures at which water is jetted out, they are not affected by each other. For this reason, the recovery amount of steam or hot water can be increased. Thereby, the efficiency of heat recovery from the high-temperature rock body can be improved, so that the power generation efficiency can be improved.
【0060】さらに、請求項3記載の高温岩体発電方法
によれば、透水層を流通する水により岩体温度が低下し
て透水層での流通抵坑が変化したときに、各透水層に対
して注水量を個別に制御することにより透水層への注入
量を一定にすることができる。このため、生産井で各透
水層ごとに抽出される熱量を均等にすることができるの
で、発電効率を向上させることができる。しかも、注水
手段を注水井から取り出すこと無く各透水層ごとに注水
量を変更できるので、注水量の変更のための煩雑な作業
を要せず発電の作業性を向上させることができる。ま
た、生産井に開口する透水層同士の間で熱水の噴き出し
圧力の差が生じていても互いに影響を受けることはな
い。このため、蒸気や熱水の回収量を増大することがで
きる。これにより、高温岩体からの熱回収の効率を向上
させることができるので、発電効率を向上させることが
できる。Further, according to the high-temperature rock power generation method of the third aspect, when the rock temperature is lowered by the water flowing through the water permeable layer and the flow tunnel in the water permeable layer changes, each water permeable layer is connected. On the other hand, by individually controlling the water injection amount, the injection amount into the permeable layer can be made constant. For this reason, since the amount of heat extracted for each permeable layer in the production well can be equalized, the power generation efficiency can be improved. In addition, since the water injection amount can be changed for each permeable layer without taking out the water injection means from the injection well, complicated work for changing the water injection amount is not required, and the workability of power generation can be improved. Also, even if there is a difference in hot water jetting pressure between the permeable layers that open to the production well, they are not affected by each other. For this reason, the recovery amount of steam or hot water can be increased. Thereby, the efficiency of heat recovery from the high-temperature rock body can be improved, so that the power generation efficiency can be improved.
【0061】一方、請求項4記載の高温岩体発電装置に
よれば、透水層を流通する水により岩体温度が低下して
透水層での流通抵坑が変化したときに、各内管から噴出
する水量を制御手段で個別に調整することにより各内管
から透水層に対する注入量を一定にすることができる。
このため、生産井で各透水層ごとに抽出される熱量を均
等にすることができるので、発電効率を向上させること
ができる。しかも、注水手段を注水井から取り出すこと
無く各透水層ごとに注水量を変更できるので、注水量の
変更のための煩雑な作業を要せず発電の作業性を向上さ
せることができる。しかも、連通孔から噴き出された水
は外管と抗壁との間を伝わって漏れ出すことが遮水突起
により防止されるので、各透水層への注水の際の圧力損
失を低減して確実な注水を行うことができる。On the other hand, according to the high-temperature rock power generation device of the present invention, when the temperature of the rock body decreases due to the water flowing through the permeable layer and the flow tunnel in the permeable layer changes, the inner pipes are connected to each other. By individually adjusting the amount of water jetted out by the control means, the amount of water injected from each inner pipe into the permeable layer can be made constant.
For this reason, since the amount of heat extracted for each permeable layer in the production well can be equalized, the power generation efficiency can be improved. In addition, since the water injection amount can be changed for each permeable layer without removing the water injection means from the injection well, the workability of power generation can be improved without requiring a complicated operation for changing the water injection amount. In addition, since the water jetted from the communication hole is prevented from leaking along the outer pipe and the anti-wall by the water blocking projection, the pressure loss at the time of water injection into each permeable layer is reduced. Reliable water injection can be performed.
【0062】また、請求項5記載の高温岩体発電装置に
よれば、各透水層ごとに異なる2つの遮水突起の間に充
填して発電手段に直接供給されることにより、透水層同
士の間で熱水の噴き出し圧力の差が生じていても互いに
影響を受けることは無い。このため、蒸気や熱水の回収
量を増大することができる。これにより、高温岩体から
の熱回収の効率を向上させることができるので、発電効
率を向上させることができる。According to the high-temperature rock power generation device of the fifth aspect, the space between the two water-permeable layers is filled between two different water-impervious projections and supplied directly to the power generation means, so that the water-permeable layers are separated from each other. Even if there is a difference in hot water ejection pressure between them, they are not affected by each other. For this reason, the recovery amount of steam or hot water can be increased. Thereby, the efficiency of heat recovery from the high-temperature rock body can be improved, so that the power generation efficiency can be improved.
【0063】さらに、請求項6記載の高温岩体発電装置
によれば、透水層を流通する水により岩体温度が低下し
て透水層での流通抵坑が変化したときに、各内管から噴
出する水量を制御手段で個別に調整することにより各内
管から透水層に対する注入量を一定にすることができ
る。このため、生産井で各透水層ごとに抽出される熱量
を均等にすることができるので、発電効率を向上させる
ことができる。しかも、注水手段を注水井から取り出す
こと無く各透水層ごとに注水量を変更できるので、注水
量の変更のための煩雑な作業を要せず発電の作業性を向
上させることができる。しかも、連通孔から噴き出され
た水は外管と抗壁との間を伝わって漏れ出すことが遮水
突起により防止されるので、各透水層への注水の際の圧
力損失を低減して確実な注水を行うことができる。Further, according to the high-temperature rock power generation device of the sixth aspect, when the temperature of the rock body decreases due to the water flowing through the permeable layer and the flow tunnel in the permeable layer changes, each inner pipe is By individually adjusting the amount of water jetted out by the control means, the amount of water injected from each inner pipe into the permeable layer can be made constant. For this reason, since the amount of heat extracted for each permeable layer in the production well can be equalized, the power generation efficiency can be improved. In addition, since the water injection amount can be changed for each permeable layer without taking out the water injection means from the injection well, complicated work for changing the water injection amount is not required, and the workability of power generation can be improved. In addition, since the water jetted from the communication hole is prevented from leaking through the outer tube and the anti-wall by the water-blocking projection, the pressure loss when water is injected into each permeable layer is reduced. Reliable water injection can be performed.
【0064】また、各透水層ごとに異なる2つの遮水突
起の間に充填して発電手段に直接供給されることによ
り、透水層同士の間で熱水の噴き出し圧力の差が生じて
いても互いに影響を受けることは無い。このため、蒸気
や熱水の回収量を増大することができる。これにより、
高温岩体からの熱回収の効率を向上させることができる
ので、発電効率を向上させることができる。Further, by filling between two different water-impervious projections for each water-permeable layer and directly supplying it to the power generation means, even if there is a difference in hot water jet pressure between the water-permeable layers. They are not affected by each other. For this reason, the recovery amount of steam or hot water can be increased. This allows
Since the efficiency of heat recovery from the high-temperature rock can be improved, the power generation efficiency can be improved.
【図1】本発明の高温岩体発電装置の全体を示す概略の
側面図である。FIG. 1 is a schematic side view showing the entire hot rock power generation device of the present invention.
【図2】図1のII−II線で切断した状態を示す横断
面図である。FIG. 2 is a cross-sectional view showing a state cut along a line II-II in FIG. 1;
【図3】ボーリング坑を掘削する掘削装置の全体を示す
概略の側面図である。FIG. 3 is a schematic side view showing an entire excavator for excavating a boring pit.
【図4】ボーリング坑を掘削する掘削装置の主要部を示
す側面図である。FIG. 4 is a side view showing a main part of an excavator for excavating a borehole.
【図5】従来の高温岩体発電装置の注水手段を示す側面
図である。FIG. 5 is a side view showing a water injection means of the conventional hot rock power generation device.
5 高温岩体 7 注入井 9 送水ポンプ 19 透水層 20 注水手段 21 外管 22 仕切壁 23 仕切空間 24 連通孔 25 遮水突起 26 内管 30 生産井 31 回収手段 32 発電手段 33 制御手段 34 高温岩体発電装置 Reference Signs List 5 high-temperature rock 7 injection well 9 water pump 19 water-permeable layer 20 water injection means 21 outer pipe 22 partition wall 23 partition space 24 communication hole 25 water-blocking projection 26 inner pipe 30 production well 31 recovery means 32 power generation means 33 control means 34 high-temperature rock Body power generator
Claims (6)
岩体中の複数の透水層に水を送り込む注水工程と、前記
水が前記透水層を流通しながら加熱されて蒸気や熱水に
成る加熱工程と、前記高温岩体に形成された生産井で前
記透水層からの前記蒸気や熱水を回収する回収工程と、
前記回収工程で回収された前記蒸気や熱水により発電を
行う発電工程とを備える高温岩体発電方法において、前
記注水工程で前記透水層ごとに独立して水を送り込むと
共に前記透水層ごとに注水量を制御することを特徴とす
る高温岩体発電方法。1. A water injection step of feeding water to a plurality of permeable layers in the high-temperature rock body at an injection well formed in the high-temperature rock body, and the water is heated while flowing through the permeable layer to generate steam or hot water. Heating step, and a recovery step of recovering the steam or hot water from the permeable layer in a production well formed in the high-temperature rock body,
A high-temperature rock power generation method, comprising: a power generation step of generating power by using the steam or hot water recovered in the recovery step.In the high-temperature rock power generation method, water is independently supplied to each of the permeable layers in the water injection step, and injection is performed for each of the permeable layers. A hot rock power generation method characterized by controlling the amount of water.
岩体中の複数の透水層に水を送り込む注水工程と、前記
水が前記透水層を流通しながら加熱されて蒸気や熱水に
成る加熱工程と、前記高温岩体に形成された生産井で前
記透水層からの前記蒸気や熱水を回収する回収工程と、
前記回収工程で回収された前記蒸気や熱水により発電を
行う発電工程とを備える高温岩体発電方法において、前
記回収工程で前記透水層ごとに独立して前記蒸気や熱水
を回収することを特徴とする高温岩体発電方法。2. A water injection step of feeding water to a plurality of permeable layers in the high-temperature rock body at an injection well formed in the high-temperature rock body, and heating the water while flowing through the permeable layer to produce steam or hot water. Heating step, and a recovery step of recovering the steam or hot water from the permeable layer in a production well formed in the high-temperature rock body,
And a power generation step of generating power using the steam or hot water collected in the recovery step.In the high-temperature rock mass power generation method, the steam or hot water is recovered independently for each of the permeable layers in the recovery step. High-temperature rock power generation method.
岩体中の複数の透水層に水を送り込む注水工程と、前記
水が前記透水層を流通しながら加熱されて蒸気や熱水に
成る加熱工程と、前記高温岩体に形成された生産井で前
記透水層からの前記蒸気や熱水を回収する回収工程と、
前記回収工程で回収された前記蒸気や熱水により発電を
行う発電工程とを備える高温岩体発電方法において、前
記注水工程で前記透水層ごとに独立して水を送り込むと
共に前記透水層ごとに注水量を制御して、尚かつ前記回
収工程で前記透水層ごとに独立して前記蒸気や熱水を回
収することを特徴とする高温岩体発電方法。3. A water injection step in which water is supplied to a plurality of permeable layers in the high-temperature rock body by an injection well formed in the high-temperature rock body, and the water is heated while flowing through the permeable layer to generate steam or hot water. Heating step, and a recovery step of recovering the steam or hot water from the permeable layer in a production well formed in the high-temperature rock body,
A high-temperature rock power generation method, comprising: a power generation step of generating power by using the steam or hot water recovered in the recovery step.In the high-temperature rock power generation method, water is independently supplied to each of the permeable layers in the water injection step, and injection is performed for each of the permeable layers. A high-temperature rock power generation method, comprising controlling the amount of water and independently collecting the steam or hot water for each of the permeable layers in the collection step.
岩体中の複数の透水層に水を送り込んで加熱して蒸気や
熱水にする注水手段と、前記高温岩体に形成された生産
井で前記透水層からの前記蒸気や熱水を回収する回収手
段と、前記回収手段により回収された前記蒸気や熱水に
より発電を行う発電手段とを備える高温岩体発電装置に
おいて、前記注水手段は、外管と、前記外管の内部を長
手方向に仕切る長手方向に垂直な複数の仕切壁と、隣り
合う前記仕切壁の間の仕切空間と前記外管の外部とを連
通する連通孔と、前記外管の前記仕切壁が形成された部
分の外周に形成した環形状の遮水突起と、前記外管に収
容されて前記仕切空間のそれぞれに下流側端部が開口す
ると共に上流側が送水ポンプに取り付けられる複数の内
管と、前記内管から噴出する水量を前記内管ごとに調整
する制御手段とを有することを特徴とする高温岩体発電
装置。4. An injection well formed in the high-temperature rock, water injection means for feeding water to a plurality of permeable layers in the high-temperature rock and heating it to produce steam or hot water, and water injection means formed in the high-temperature rock. A high temperature rock power generation device comprising: a recovery unit that recovers the steam or hot water from the permeable layer in a production well; and a power generation unit that generates power using the steam or hot water recovered by the recovery unit. The water injection means communicates with the outer pipe, a plurality of partition walls perpendicular to the longitudinal direction that partition the inside of the outer pipe in the longitudinal direction, and a partition space between the adjacent partition walls and the outside of the outer pipe. A hole, an annular water-impervious projection formed on the outer periphery of a portion of the outer pipe where the partition wall is formed, and a downstream end opening in each of the partition spaces accommodated in the outer pipe and upstream. A plurality of inner pipes whose sides are attached to the water pump, Control means for adjusting the amount of water to be ejected for each of said inner pipes.
岩体中の複数の透水層に水を送り込んで加熱して蒸気や
熱水にする注水手段と、前記高温岩体に形成された生産
井で前記透水層からの前記蒸気や熱水を回収する回収手
段と、前記回収手段により回収された前記蒸気や熱水に
より発電を行う発電手段とを備える高温岩体発電装置に
おいて、前記回収手段は、外管と、前記外管の内部を長
手方向に仕切る長手方向に垂直な複数の仕切壁と、隣り
合う前記仕切壁の間の仕切空間と前記外管の外部とを連
通する連通孔と、前記外管の前記仕切壁が形成された部
分の外周に形成した環形状の遮水突起と、前記外管に収
容されて前記仕切空間のそれぞれに上流側端部が開口す
ると共に下流側が前記発電手段に接続される複数の内管
とを有することを特徴とする高温岩体発電装置。5. An injection well formed in the high-temperature rock, water injection means for feeding water to a plurality of permeable layers in the high-temperature rock and heating it to produce steam or hot water. A high temperature rock power generation device comprising: a recovery unit that recovers the steam or hot water from the permeable layer in a production well; and a power generation unit that generates power using the steam or hot water recovered by the recovery unit. The collection means includes an outer tube, a plurality of partition walls perpendicular to the longitudinal direction that partition the inside of the outer tube in the longitudinal direction, and a communication that communicates a partition space between the adjacent partition walls and the outside of the outer tube. A hole, an annular water-impervious projection formed on the outer periphery of a portion of the outer pipe where the partition wall is formed, and an upstream end opening in each of the partition spaces accommodated in the outer pipe and downstream. Side having a plurality of inner pipes connected to the power generation means. High-temperature rock power generation equipment.
岩体中の複数の透水層に水を送り込んで加熱して蒸気や
熱水にする注水手段と、前記高温岩体に形成された生産
井で前記透水層からの前記蒸気や熱水を回収する回収手
段と、前記回収手段により回収された前記蒸気や熱水に
より発電を行う発電手段とを備える高温岩体発電装置に
おいて、前記注水手段は、外管と、前記外管の内部を長
手方向に仕切る長手方向に垂直な複数の仕切壁と、隣り
合う前記仕切壁の間の仕切空間と前記外管の外部とを連
通する連通孔と、前記外管の前記仕切壁が形成された部
分の外周に形成した環形状の遮水突起と、前記外管に収
容されて前記仕切空間のそれぞれに下流側端部が開口す
ると共に上流側が送水ポンプに取り付けられる複数の内
管と、前記内管から噴出する水量を前記内管ごとに調整
する制御手段とを有すると共に、前記回収手段は、外管
と、前記外管の内部を長手方向に仕切る長手方向に垂直
な複数の仕切壁と、隣り合う前記仕切壁の間の仕切空間
と前記外管の外部とを連通する連通孔と、前記外管の前
記仕切壁が形成された部分の外周に形成した環形状の遮
水突起と、前記外管に収容されて前記仕切空間のそれぞ
れに上流側端部が開口すると共に下流側が前記発電手段
に接続される複数の内管とを有することを特徴とする高
温岩体発電装置。6. An injection well formed in the high-temperature rock, water injection means for feeding water into a plurality of permeable layers in the high-temperature rock and heating it to produce steam or hot water, and water injection means formed in the high-temperature rock. A high temperature rock power generation device comprising: a recovery unit that recovers the steam or hot water from the permeable layer in a production well; and a power generation unit that generates power using the steam or hot water recovered by the recovery unit. The water injection means communicates with the outer pipe, a plurality of partition walls perpendicular to the longitudinal direction that partition the inside of the outer pipe in the longitudinal direction, and a partition space between the adjacent partition walls and the outside of the outer pipe. A hole, an annular water-impervious projection formed on an outer periphery of a portion of the outer tube where the partition wall is formed, and a downstream end opening in each of the partition spaces accommodated in the outer tube and upstream. A plurality of inner pipes whose sides are attached to the water pump, A control means for adjusting the amount of water to be ejected for each of the inner pipes is provided, and the recovery means is adjacent to an outer pipe, and a plurality of partition walls perpendicular to the longitudinal direction that partition the inside of the outer pipe in the longitudinal direction. A communication hole that communicates a partition space between the partition walls with the outside of the outer pipe, an annular water-impervious projection formed on an outer periphery of a portion of the outer pipe where the partition wall is formed, and the outer pipe And a plurality of inner pipes each of which has an upstream end opening in each of the partition spaces and a downstream side connected to the power generation means.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP10023166A JPH11223176A (en) | 1998-02-04 | 1998-02-04 | Hot rock body power generating method and device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP10023166A JPH11223176A (en) | 1998-02-04 | 1998-02-04 | Hot rock body power generating method and device |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| JPH11223176A true JPH11223176A (en) | 1999-08-17 |
Family
ID=12103049
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP10023166A Pending JPH11223176A (en) | 1998-02-04 | 1998-02-04 | Hot rock body power generating method and device |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH11223176A (en) |
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2009105605A1 (en) * | 2008-02-21 | 2009-08-27 | William Riley | Utilization of geothermal energy |
| US7952219B2 (en) | 2007-09-27 | 2011-05-31 | William Riley | Hydroelectric pumped-storage |
| US8215104B2 (en) | 2008-09-29 | 2012-07-10 | William Riley | Energy from subterranean reservoir fluid |
| US8661818B2 (en) | 2009-02-23 | 2014-03-04 | Mitsubishi Heavy Industries, Ltd. | Hot dry rock generation system |
| EP2652252A4 (en) * | 2010-12-14 | 2015-03-11 | Halliburton Energy Serv Inc | Geothermal energy production |
| JP5989885B1 (en) * | 2015-10-30 | 2016-09-07 | 市野 文明 | Underground heat exchange system and water channel formation method thereof |
| CN119353141A (en) * | 2024-12-24 | 2025-01-24 | 岩土科技股份有限公司 | A method for generating hydroelectric power in an ultra-deep well using the density difference between hot and cold water of geothermal energy |
-
1998
- 1998-02-04 JP JP10023166A patent/JPH11223176A/en active Pending
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US7952219B2 (en) | 2007-09-27 | 2011-05-31 | William Riley | Hydroelectric pumped-storage |
| WO2009105605A1 (en) * | 2008-02-21 | 2009-08-27 | William Riley | Utilization of geothermal energy |
| US8215104B2 (en) | 2008-09-29 | 2012-07-10 | William Riley | Energy from subterranean reservoir fluid |
| US8661818B2 (en) | 2009-02-23 | 2014-03-04 | Mitsubishi Heavy Industries, Ltd. | Hot dry rock generation system |
| EP2652252A4 (en) * | 2010-12-14 | 2015-03-11 | Halliburton Energy Serv Inc | Geothermal energy production |
| JP5989885B1 (en) * | 2015-10-30 | 2016-09-07 | 市野 文明 | Underground heat exchange system and water channel formation method thereof |
| CN119353141A (en) * | 2024-12-24 | 2025-01-24 | 岩土科技股份有限公司 | A method for generating hydroelectric power in an ultra-deep well using the density difference between hot and cold water of geothermal energy |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US4099570A (en) | Oil production processes and apparatus | |
| CN104864177B (en) | A kind of no-dig technique bores top and combines Pipeline Crossing Program method | |
| CN113738317A (en) | Method for combined exploitation of deep coal bed gas and dry hot rock type geothermal | |
| CN104763368B (en) | Major diameter downhole hammer port seal and its reverse circulation construction technique | |
| KR101403041B1 (en) | Open type geothermal system unit | |
| NO326050B1 (en) | Downhole drilling device and method for inducing loft in drilling fluid by means of independent pump | |
| EA017990B1 (en) | Drilling using drill in sand control liner | |
| CN113338802B (en) | A fluidized hydraulic coal mining system for ground directional drilling | |
| CN113464136A (en) | Fluidized coal mining system and method combining ground directional drilling and underground roadway | |
| NO317126B1 (en) | Procedure for injecting drilling waste into a well during drilling | |
| CN105822257B (en) | Horizontal well intelligent sliding sleeve | |
| CN110984130A (en) | A pulp-stopping system and a pulp-stopping method for preventing clogging of a crushing belt and preventing slurry from returning to the outside of a hole | |
| US3730592A (en) | Method of subterranean drilling and mining | |
| CN109630076A (en) | A kind of method of radially horizontal well and decompression heat injection unitized production gas hydrates | |
| US3439953A (en) | Apparatus for and method of mining a subterranean ore deposit | |
| CN113236341A (en) | Device for enhancing gas extraction in underground coal mine and using method | |
| CN109057757A (en) | A kind of gas hydrate mining methods and device | |
| CN113187449B (en) | Exploitation method and pipe column for natural gas hydrate | |
| CN111101917B (en) | Coal seam hydraulic fracturing combined resonance gas extraction method and hole packer | |
| WO2013153388A2 (en) | Improved underground coal gasification methods, systems and apparatus | |
| CN114876375B (en) | Drilling equipment and drilling construction method | |
| CN104763338A (en) | Hole expanding device, pull-back hole expanding assembly and hole expanding drilling method thereof | |
| CN110344801B (en) | Fracturing operation method for combustible ice exploitation, exploitation method and exploitation system | |
| CN108301769A (en) | A kind of RW types horizontal well construction method and its drilling tool used | |
| JP4834569B2 (en) | Ground improvement method and ground improvement device |