JPH1122379A - Existing pipe laying method and excavator - Google Patents

Existing pipe laying method and excavator

Info

Publication number
JPH1122379A
JPH1122379A JP9182259A JP18225997A JPH1122379A JP H1122379 A JPH1122379 A JP H1122379A JP 9182259 A JP9182259 A JP 9182259A JP 18225997 A JP18225997 A JP 18225997A JP H1122379 A JPH1122379 A JP H1122379A
Authority
JP
Japan
Prior art keywords
pipe
excavator
temporary
existing
existing pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP9182259A
Other languages
Japanese (ja)
Inventor
Michihiro Ootani
美智浩 大谷
Moriyoshi Takeuchi
盛代司 竹内
Kiyoshi Katsunuma
清 勝沼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Komatsu Ltd
Original Assignee
Komatsu Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Komatsu Ltd filed Critical Komatsu Ltd
Priority to JP9182259A priority Critical patent/JPH1122379A/en
Publication of JPH1122379A publication Critical patent/JPH1122379A/en
Pending legal-status Critical Current

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

(57)【要約】 【課題】 流体を流しながら既設管を新管に布設替えで
きるし、既設管の状態と異なる状態で新管を布設できる
ようにする。 【解決手段】 既設管4の布設替え部分4b内に仮設管
6を挿入して固定し、この仮設管6で上流側部分4cの
流体を下流側部分4dに流す。この状態で推進機5を仮
設管6をガイドとして推進して布設替え部分4bを切削
・掘削しながら新管11を布設して新管に布設替えする
工法である。
(57) [Summary] [PROBLEMS] To replace an existing pipe with a new pipe while flowing a fluid, and to lay a new pipe in a state different from the state of the existing pipe. SOLUTION: A temporary pipe 6 is inserted into a replacement part 4b of an existing pipe 4 and fixed, and the fluid of an upstream part 4c flows through the temporary pipe 6 to a downstream part 4d. In this state, the propulsion device 5 is propelled using the temporary pipe 6 as a guide, and a new pipe 11 is laid while cutting and excavating the replacement section 4b to replace the new pipe.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、下水道などの流体
が流れる老朽化した既設管を新管に布設替えする工法及
びその工法に用いる掘進機に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for replacing an old pipe, in which a fluid such as sewerage flows, with a new pipe, and a machine for use in the method.

【0002】[0002]

【従来の技術】老朽化した既設管を新管に布設替えする
工法としては、例えば特開平2−217591号公報に
示す第1の工法、特許第2578184号公報に示す第
2の工法、特開平2−236392号公報に示す第3の
工法等が知られている。
2. Description of the Related Art As a method of replacing an aging existing pipe with a new pipe, for example, a first method disclosed in Japanese Patent Application Laid-Open No. 2-217591, a second method described in Japanese Patent No. 2578184, and A third method disclosed in Japanese Patent Application Laid-Open No. 2-236392 is known.

【0003】前述の第1の工法は、掘削機を既設管に沿
って推進して地山と既設管を掘削・破壊すると共に、既
設管の掘削・破壊部分よりも上流側をシールし、既設管
に流れる流体を掘進機内部を通して排水し、その掘削・
破壊した跡に新管を布設する工法である。
[0003] In the first construction method described above, an excavator is propelled along an existing pipe to excavate and destroy the ground and the existing pipe, and the upstream of the excavated and destroyed portion of the existing pipe is sealed, and the existing pipe is sealed. Drain the fluid flowing through the pipe through the excavator,
This is a method of laying a new pipe at the site of the destruction.

【0004】前述の第2の工法は、掘進機を既設管に沿
って推進して地山と既設管を掘削・破壊し、その掘削・
破壊した跡に新管を布設する工法である。
In the above-mentioned second method, an excavator is propelled along an existing pipe to excavate and destroy the ground and the existing pipe.
This is a method of laying a new pipe at the site of the destruction.

【0005】前述の第3の工法は、発進立坑から掘進機
を到達立坑に向けて推進ジャッキで推進して既設管を切
削し、所定ストローク切削毎にこの掘進機と推進ジャッ
キとの間に新管をつぎ足しながら到達立坑まで推進して
既設管を新管に布設替えする工法である。
[0005] In the above-mentioned third method, an excavator is propelled from a starting shaft toward a reaching shaft by a propulsion jack to cut an existing pipe, and a new stroke is provided between the excavator and the propulsion jack every time a predetermined stroke is cut. In this method, existing pipes are replaced with new pipes by adding pipes and propelling to the arrival shaft.

【0006】[0006]

【発明が解決しようとする課題】第1の工法によれば、
既設管を流れる流体を推進機内部を通して排水するの
で、既設管に流体を流しながら新管に布設替えできる。
例えば、下水管に下水を流しながら老朽化した下水管を
新管に布設替えできる。
According to the first method,
Since the fluid flowing through the existing pipe is drained through the inside of the propulsion device, the pipe can be replaced with a new pipe while flowing the fluid through the existing pipe.
For example, an old sewage pipe can be replaced with a new pipe while flowing sewage through the sewage pipe.

【0007】しかしながら、この第1の工法は掘進機の
先行壁体を既設管に嵌合して上流側と下流側を水密し、
その先行壁体内部、筒体を通して上流側の流体を下流側
に排水するので、先行壁体と既設管内面との間を確実に
水密することは困難であり、先行壁体と既設管内面との
間から流体が洩れて掘進機内に流れ込むことがある。
However, in the first method, the preceding wall of the excavator is fitted to the existing pipe to make the upstream and downstream watertight,
Since the fluid on the upstream side is drained to the downstream side through the inside of the preceding wall body and the cylindrical body, it is difficult to ensure watertightness between the preceding wall body and the existing pipe inner surface. Fluid may leak from between and flow into the excavator.

【0008】掘進機内に流体が流れ込むと掘進機と後続
して新管を布設する作業がやりづらくなったりする。
If a fluid flows into the excavator, it may be difficult to lay a new pipe following the excavator.

【0009】特に、既設管が鉄筋コンクリート製の下水
道の場合には、その下水道の内面が凹凸やひび割れの有
る形状のために先行壁体との間を確実に水密することは
困難である。
In particular, when the existing pipe is a sewer made of reinforced concrete, it is difficult to make sure that the inner surface of the sewer has irregularities or cracks, and that the inner wall of the sewer is tightly sealed with the preceding wall.

【0010】また、掘進機は先行壁体をガイドして既設
管に沿って推進するために、新管は既設管が埋設されて
いたとおりに布設される。このために、既設管が長年の
使用によって土圧等で弯曲している場合には、その弯曲
した状態で新管が布設され、既設管の弯曲等を修正して
正しい状態で新管を布設できない。
Further, since the excavator guides the preceding wall body and propels it along the existing pipe, the new pipe is laid as if the existing pipe was buried. For this reason, if the existing pipe is curved due to earth pressure due to long-term use, a new pipe is laid in the curved state, and the new pipe is laid in the correct state by correcting the curvature of the existing pipe. Can not.

【0011】前述の第2の工法では既設管を布設替えす
る時に流体を流すことができない。このために、下水管
を布設替えする場合には布設替えする区画よりも上流側
の下水管に下水を流すことができない。
[0011] In the above-mentioned second method, it is impossible to flow a fluid when replacing an existing pipe. For this reason, when the sewer pipe is replaced, the sewage cannot flow into the sewer pipe on the upstream side of the section to be replaced.

【0012】また、掘進機は既設管をガイドとして推進
しながら既設管を切削するから、第1の工法と同様に新
管は既設管が埋設されていたとおりに布設されるので、
既設管の弯曲等を修正して正しい状態で新管を布設でき
ない。
Further, since the excavator cuts the existing pipe while propelling the existing pipe as a guide, the new pipe is laid as the existing pipe is buried, as in the first method.
A new pipe cannot be laid in the correct state by correcting the curvature of the existing pipe.

【0013】前述の第3の工法では発進立坑と到達立坑
との間の既設管に流体を流すことができない。このため
に、下水管を布設替えする場合には到達立坑よりも上流
側の下水管に下水を流すことができない。
In the third method described above, fluid cannot flow through the existing pipe between the starting shaft and the reaching shaft. For this reason, when replacing a sewer pipe, sewage cannot be made to flow to the sewer pipe upstream of the reaching shaft.

【0014】そこで、本発明は前述の課題を解決できる
ようにした既設管の布設替え工法及び掘進機を提供する
ことを目的とする。
It is an object of the present invention to provide an existing pipe laying method and an excavator capable of solving the above-mentioned problems.

【0015】[0015]

【課題を解決するための手段及び作用・効果】第1の発
明は、既設管4の内部に仮設管6を布設し、この布設し
た仮設管6を固定した後に、この仮設管6をガイドとし
て掘進機5を推進して既設管4を切削掘削し、その後に
掘進機5の後部から新管11を布設することを特徴とす
る既設管の布設替え工法である。
According to the first aspect of the present invention, a temporary pipe 6 is laid inside an existing pipe 4 and the laid temporary pipe 6 is fixed, and then the temporary pipe 6 is used as a guide. This is a method of replacing existing pipes, characterized in that the excavator 5 is propelled to cut and excavate the existing pipe 4, and then a new pipe 11 is installed from the rear of the excavator 5.

【0016】第1の発明によれば、既設管4の布設替え
する部分4bよりも上流側部分4cと下流側部分4dが
仮設管6で連通され、その上流側部分4cと下流側部4
dとに仮設管6を通して流体が流通する。
According to the first aspect of the present invention, the temporary pipe 6 connects the upstream section 4c and the downstream section 4d of the existing pipe 4 with respect to the section 4b to be replaced, and the upstream section 4c and the downstream section 4c.
Fluid circulates through the temporary pipe 6 to d.

【0017】これによって、既設管に流体を流しながら
新管に布設替えできる。このため布設替え部分よりも上
流側で下水管に下水を流しながら下水管を布設替えする
ことができる。
Thus, it is possible to replace the pipe with a new pipe while flowing the fluid through the existing pipe. For this reason, the sewage pipe can be replaced while the sewage flows into the sewage pipe on the upstream side of the replacement section.

【0018】また、既設管4の上流側部分4cと下流側
部分4dとに仮設管6を通して流体が流通するから、既
設管4の内面がどのような形状であっても既設管4の布
設替え部分4bに流体が洩れることがない。
Further, since the fluid flows through the temporary pipe 6 to the upstream portion 4c and the downstream portion 4d of the existing pipe 4, the replacement of the existing pipe 4 can be performed regardless of the inner surface of the existing pipe 4. No fluid leaks into the part 4b.

【0019】これによって、新管を布設する作業がやり
易くなる。
Thus, the work of laying a new pipe becomes easier.

【0020】また、既設管4の内部に布設した仮設管6
に沿って掘進機5を推進するので、その仮設管6の中心
を既設管4の中心に対して若干変位して布設すれば、既
設管4の埋設されていた状態と若干異なる状態で新管1
1を布設できる。
The temporary pipe 6 laid inside the existing pipe 4
When the excavator 5 is propelled along, the center of the temporary pipe 6 is slightly displaced with respect to the center of the existing pipe 4 to lay the new pipe in a state slightly different from the state where the existing pipe 4 is buried. 1
1 can be laid.

【0021】これによって、既設管4の土圧等による弯
曲を修正して正しい状態で新管を布設できる。
Thus, the curvature of the existing pipe 4 due to earth pressure or the like can be corrected and a new pipe can be laid in a correct state.

【0022】第2の発明は、第1の発明において、既設
管4と仮設管6との間に充填材9を充填して仮設管6を
固定する既設管の布設替え工法である。
The second invention is a method of replacing the existing pipe in which the filler 9 is filled between the existing pipe 4 and the temporary pipe 6 to fix the temporary pipe 6 in the first invention.

【0023】第2の発明によれば、既設管4と仮設管8
との間が充填材9で閉塞された状態で掘進機5によって
切削・掘削するので、鉄筋コンクリート製の既設管4を
切削・掘削する際に、そのコンクリートが切削されて鉄
筋の一部が露出しても、その露出した鉄筋の一部が充填
材9で保持されて内方に大きく動くことがない。
According to the second invention, the existing pipe 4 and the temporary pipe 8
When the existing pipe 4 made of reinforced concrete is cut or excavated, the concrete is cut and a part of the rebar is exposed. However, a part of the exposed rebar is held by the filler 9 and does not largely move inward.

【0024】これによって、鉄筋を掘削機5で切削し易
くなる。
This makes it easier to cut the reinforcing bar with the excavator 5.

【0025】第3の発明は、中心に仮設管貫通孔29を
有するカッタヘッド26を備えた掘進機本体20と、こ
の掘進機本体20に取付けられて仮設管6に沿って掘進
機本体20を案内する案内装置と、前記掘進機本体20
内に設けられてカッタヘッド26で切削・掘削したもの
を排出する排土装置で構成したことを特徴とする掘進機
である。
According to the third aspect of the present invention, an excavator body 20 having a cutter head 26 having a temporary pipe through hole 29 at the center, and the excavator body 20 attached to the excavator body 20 along the temporary pipe 6 are provided. A guiding device for guiding, the excavator body 20
The excavator is provided with an earth removal device configured to discharge the material cut and excavated by the cutter head 26.

【0026】第3の発明によれば、仮設管6を仮設管貫
通孔29に貫通し、案内装置で掘進機本体20を仮設管
6に沿って案内することで、掘進機が仮設管6に沿って
計画通り正しく推進されるし、切削・掘削したものが排
土装置で後方に排出される。
According to the third invention, the excavator is inserted into the temporary pipe 6 by penetrating the temporary pipe 6 into the temporary pipe through hole 29 and guiding the excavator body 20 along the temporary pipe 6 by the guide device. It is propelled correctly as planned, and the cut and excavated material is discharged backward by the earth removal device.

【0027】これによって、既設管4内に仮設管6を布
設して固定した後に、その仮設管6に沿って推進して既
設管4を切削・掘削する掘進機として好適なものとな
る。
Thus, after the temporary pipe 6 is laid in the existing pipe 4 and fixed, it is propelled along the temporary pipe 6 to be suitable as an excavator for cutting and excavating the existing pipe 4.

【0028】第4の発明は、第3の発明におけるカッタ
ヘッド26の前面を、外周部が内周部よりも前方に突出
した漏斗状とした掘進機である。
The fourth invention is an excavator in which the front surface of the cutter head 26 according to the third invention has a funnel shape in which an outer peripheral portion projects forward from an inner peripheral portion.

【0029】第4の発明によれば、カッタヘッド26に
よって切削・掘削されたものはカッタヘッド26の外方
に拡散せずに中心に向う。
According to the fourth aspect, the material cut and excavated by the cutter head 26 is directed to the center without diffusing to the outside of the cutter head 26.

【0030】これによって、既設管4を切削・掘削した
時に、その切削・掘削したものは既設管4の内方に向う
ので、既設管4よりも外方に埋設された物に悪影響を与
えることがない。
Thus, when the existing pipe 4 is cut and excavated, the cut and excavated material is directed toward the inside of the existing pipe 4, so that the object buried outside the existing pipe 4 is adversely affected. There is no.

【0031】第5の発明は、第3の発明における掘進機
本体20を上下・左右に揺動自在なアーティキュレート
タイプで掘進方向変更可能とし、前記案内装置を掘進機
本体20に対して径方向に相対変位する調整機構を設け
た掘進機である。
According to a fifth aspect of the present invention, the excavator main body 20 according to the third aspect of the present invention is an articulate type capable of swinging up and down, left and right, and is capable of changing the excavating direction. This is an excavator provided with an adjustment mechanism for relative displacement.

【0032】第5の発明によれば、掘進機本体20を上
下・左右に揺動して掘進方向を変更した時に調整機構に
より案内装置を掘進機本体20に対して径方向に追従さ
せて調整して掘進機本体20の推進方向の向きに合わせ
て案内装置を相対変位させる。
According to the fifth aspect of the present invention, when the excavator body 20 is swung up and down and left and right to change the excavation direction, the guide mechanism is adjusted to follow the excavator body 20 in the radial direction by the adjusting mechanism. Then, the guide device is relatively displaced in accordance with the direction of the propulsion direction of the excavator body 20.

【0033】これによって、案内装置を仮設管6に沿っ
て案内しながら推進する時に推進方向に合わせて調整す
ることができる。
Thus, when the guide device is propelled while being guided along the temporary pipe 6, it can be adjusted in accordance with the propulsion direction.

【0034】第6の発明は、第3の発明において、外筒
41内にスクリュー42を備えた内筒43を挿通したス
クリューコンベヤ40で排土装置とし、この内筒43内
に仮設管6が挿通するようにしてスクリューコンベヤ4
0を案内装置とした請求項3記載の掘進機である。
According to a sixth aspect of the present invention, in the third aspect, a screw conveyor 40 in which an inner cylinder 43 provided with a screw 42 is inserted into an outer cylinder 41 is used as a soil discharging device. Screw conveyor 4 so that it can be inserted
The excavator according to claim 3, wherein 0 is a guide device.

【0035】第6の発明によれば、排土装置と案内装置
がスクリューコンベヤ40で兼用されるから、構造簡単
となる。
According to the sixth aspect of the present invention, since the screw discharging device 40 and the guiding device are shared by the screw conveyor 40, the structure is simplified.

【0036】[0036]

【発明の実施の形態】BEST MODE FOR CARRYING OUT THE INVENTION

(既設管を新管に布設替えする工法)図1(a)に示す
ように、地盤1に第1の立坑2と第2の立坑3を形成
し、既設管4の一部分4aを第1の立坑2、第2立坑3
に露出させる。この第1の立坑2と第2の立坑3との間
の部分4bを布設替えする。
(Construction method of replacing existing pipes with new pipes) As shown in FIG. 1 (a), a first shaft 2 and a second shaft 3 are formed on the ground 1, and a part 4a of the existing pipe 4 is converted into a first shaft. 2 shafts, 2 shafts
Exposure to The portion 4b between the first shaft 2 and the second shaft 3 is replaced.

【0037】図1(b)に示すように、既設管4の第1
の立坑2、第2の立坑3に露出した一部分4aをそれぞ
れ切断して除去する。
As shown in FIG. 1B, the first pipe 4
The portions 4a exposed to the shaft 2 and the second shaft 3 are cut and removed.

【0038】図1(c)に示すように、第1の立坑2に
掘進機5を設けると共に、既設管4の布設替え部分4b
に仮設管6を挿入し、コンクリート製の支持台7で位置
決めして支持する。この仮設管6の一端部を既設管4の
上流側部分4cにシール材(蓋)8を介して突出し、仮
設管6の他端部を掘進機5を貫通して既設管4の下流側
部分4dにシール材(蓋)8を介して突出する。
As shown in FIG. 1 (c), an excavator 5 is provided in the first shaft 2 and a replacement part 4b of the existing pipe 4 is provided.
, A temporary pipe 6 is inserted into the pipe, and positioned and supported by a concrete support 7. One end of the temporary pipe 6 protrudes through an upstream portion 4c of the existing pipe 4 via a sealing material (lid) 8, and the other end of the temporary pipe 6 penetrates the excavator 5 to a downstream portion of the existing pipe 4. 4d protrudes through the sealing material (lid) 8.

【0039】このようにすることで、既設管4の上流側
部分4cに流れた下水などの流体が仮設管6を通って既
設管4の下流側部分4dに流れるから、既設管4の途中
の布設替え部分4bを新管と布設替えする際に流体を流
すことができる。
By doing so, the fluid such as sewage flowing into the upstream portion 4c of the existing pipe 4 flows through the temporary pipe 6 to the downstream portion 4d of the existing pipe 4, and A fluid can be flowed when the replacement section 4b is replaced with a new pipe.

【0040】図1(c)のように、仮設管6を挿入完了
したら、既設管4の布設替え部分4bと仮設管6との間
にモルタル等の充填材9を充填して仮設管5を位置決め
して固定する。
As shown in FIG. 1C, when the insertion of the temporary pipe 6 is completed, the filler 9 such as mortar is filled between the replacement part 4b of the existing pipe 4 and the temporary pipe 6, and the temporary pipe 5 is filled. Position and fix.

【0041】図1(d)のように前記掘進機5で既設管
4の布設替え部分4bと充填材9と地盤1を掘削・切削
しながら仮設管6をガイドとして第2の立坑3に向けて
掘進し、その掘進した部分10に新管11を布設する。
As shown in FIG. 1 (d), the excavator 5 excavates and cuts the replacement portion 4b, the filler 9 and the ground 1 of the existing pipe 4 and directs it toward the second shaft 3 with the temporary pipe 6 as a guide. A new pipe 11 is laid in the dug portion 10.

【0042】図1(e)に示すように、第2の立坑3ま
で掘進して既設管4の布設替え部分4bを全て新管11
と布設替え完了したら、第1の立坑2で新管11と既設
管4の下流側部分4dを継ぎ管で連通すると共に、掘進
機5を第2の立坑3から地上に持ち上げて既設管4の上
流側部分4cと新管11を継ぎ管で連通しながら仮設管
6を撤去する。
As shown in FIG. 1 (e), the excavation is carried out to the second shaft 3 so that the replacement part 4b of the existing pipe 4 is entirely replaced with the new pipe 11.
When the replacement of the existing pipe 4 is completed, the new pipe 11 and the downstream portion 4d of the existing pipe 4 are connected to each other by the connecting pipe at the first shaft 2, and the excavator 5 is lifted from the second shaft 3 to the ground, and The temporary pipe 6 is removed while the upstream pipe 4c and the new pipe 11 are connected by a connecting pipe.

【0043】以上の説明では、既設管4の途中の所定長
さの部分4bのみを新管と布設替えする工法について述
べたが、既設管を所定長さ毎に順次布設替えする場合に
は図1(e)の状態となったら、上流側に第3の立坑を
掘削して図1(b)以降の動作を繰り返して行えば良
い。
In the above description, the construction method in which only the portion 4b of a predetermined length in the middle of the existing pipe 4 is replaced with a new pipe has been described. When the state becomes 1 (e), the third shaft may be excavated upstream and the operation after FIG. 1 (b) may be repeated.

【0044】(掘進機の構造)図2と図3に示すよう
に、掘進機本体20は筒状の前部本体21と筒状の中間
部本体22と筒状の後部本体23を備え、前記前部本体
21と中間部本体22はアーティキュレートジャッキ2
4で上下・左右に揺動自在となり、中間部本体22と後
部本体23とに推進用ジャッキ25が取付けてある。こ
れによってアーティキュレート式の掘進機本体を形成し
ている。
(Structure of the excavator) As shown in FIGS. 2 and 3, the excavator main body 20 includes a cylindrical front main body 21, a cylindrical intermediate main body 22, and a cylindrical rear main body 23. The front body 21 and the middle body 22 are connected to the articulated jack 2.
4, it is swingable up and down, left and right, and a propulsion jack 25 is attached to the intermediate body 22 and the rear body 23. Thus, an articulated excavator body is formed.

【0045】前部本体21にはカッタヘッド26が取付
けてあり、このカッタヘッド26はモータ27で回転駆
動される。カッタヘッド26の前面板28は外周部が中
心部よりも前方に突出した漏斗状で、その前面板28の
回転中心には仮設管貫通孔29が形成してある。
A cutter head 26 is mounted on the front main body 21, and the cutter head 26 is driven to rotate by a motor 27. The front plate 28 of the cutter head 26 has a funnel shape in which the outer peripheral portion protrudes forward from the center, and a temporary pipe through hole 29 is formed at the center of rotation of the front plate 28.

【0046】前記仮設管貫通孔29に前述の仮設管6が
貫通する。前述の既設管4はほぼ台形状の鉄筋コンクリ
ート製であり、カッタヘッド26の掘削範囲は既設管4
の外周形状よりも大きく、カッタヘッド26で既設管4
及び地盤1、充填材9を掘削できるようにしてある。
The above-mentioned temporary pipe 6 penetrates through the temporary pipe through hole 29. The above-mentioned existing pipe 4 is made of substantially trapezoidal reinforced concrete.
Of the existing pipe 4
In addition, the ground 1 and the filler 9 can be excavated.

【0047】前記カッタヘッド26の前面板28にはデ
ィスクカッタ30、ギアカッタ31が取付けてある。カ
ッタヘッド26を回転駆動することでディスクカッタ3
0で鉄筋コンクリート製の既設管4を切断掘削を行な
い、ギアカッタ31で切羽円周方向の鉄筋の切断掘削を
行なう。
A disk cutter 30 and a gear cutter 31 are mounted on a front plate 28 of the cutter head 26. By rotating the cutter head 26, the disk cutter 3 is rotated.
At 0, the existing pipe 4 made of reinforced concrete is cut and excavated, and the gear cutter 31 cuts and excavates the reinforcing steel in the circumferential direction of the face.

【0048】前記後部本体23にはワイヤブラシ式のテ
ールシール32が取付けてあり、前記中間部本体22に
はリンク式のセグメントエレクタ33が取付けてある。
A wire brush type tail seal 32 is attached to the rear main body 23, and a link type segment erector 33 is mounted to the intermediate main body 22.

【0049】前記掘進機本体20内には排土装置を形成
するスクリューコンベヤ40が取付けてある。このスク
リューコンベヤ40は外筒41内にスクリュー42を備
えた内筒43を回転可能に挿入してある。外筒41に固
設したブラケット44が中間部本体22に固設した反力
受け45にピン46と径方向の長孔47で連結され、外
筒41の中間部は中間部本体22に回転方向には固定
で、径方向には相対変位可能に支持されている。
A screw conveyor 40 forming an earth discharging device is mounted inside the excavator body 20. In the screw conveyor 40, an inner cylinder 43 having a screw 42 is rotatably inserted into an outer cylinder 41. A bracket 44 fixed to the outer cylinder 41 is connected to a reaction force receiver 45 fixed to the intermediate portion main body 22 by a pin 46 and an elongated hole 47 in a radial direction. , And is supported so as to be relatively displaceable in the radial direction.

【0050】外筒41の前部寄りは前部本体21にゴ
ム、スプリング等の緩衝材48を介して径方向に相対変
位可能に支持され、この外筒41の前部寄りと前部本体
21とに亘って図4に示すように4本の姿勢制御ジャッ
キ49が回転方向に等間隔で取付けてある。
The front portion of the outer cylinder 41 is supported by the front body 21 via a cushioning material 48 such as rubber or a spring so as to be relatively displaceable in the radial direction. As shown in FIG. 4, four attitude control jacks 49 are attached at equal intervals in the rotation direction.

【0051】前記外筒41の後部寄りにガイドローラ5
0が取付けてある。このガイドローラ50は仮設管6の
外面に接する。前記内筒43と仮設管6との間は止水シ
ール材51でシールしてある。
The guide roller 5 is located near the rear of the outer cylinder 41.
0 is attached. This guide roller 50 contacts the outer surface of the temporary pipe 6. The space between the inner cylinder 43 and the temporary pipe 6 is sealed with a water-stop sealing material 51.

【0052】前記外筒41の後部寄りにスクリューコン
ベヤ用のモータ52が取付けてあり、このモータ52の
出力側がピニオン、リングギヤ等で内筒43に連結し、
モータ52を駆動することで内筒43がスクリュー42
とともに回転される。53はセグメントである。
A screw conveyor motor 52 is mounted near the rear of the outer cylinder 41, and the output side of the motor 52 is connected to the inner cylinder 43 by a pinion, a ring gear or the like.
By driving the motor 52, the inner cylinder 43 is
Rotated with. 53 is a segment.

【0053】前記外筒41の後部寄りに図5に示すよう
に排出口54が設けてあり、この排出口54の下方にベ
ルトコンベヤ55が設けてある。外筒41の前端部には
投入口56が設けてある。
As shown in FIG. 5, a discharge port 54 is provided near the rear of the outer cylinder 41, and a belt conveyor 55 is provided below the discharge port 54. An input port 56 is provided at the front end of the outer cylinder 41.

【0054】次に掘削動作を説明する。推進用ジャッキ
25を伸縮することで掘進機本体20は、スクリューコ
ンベヤ40の外筒41に取付けたガイドローラ50、内
筒43を案内として仮設管6に沿って推進する。つま
り、スクリューコンベヤ40が案内装置を形成してい
る。
Next, the excavating operation will be described. By extending and retracting the propulsion jack 25, the machine 20 protrudes along the temporary pipe 6 with the guide roller 50 and the inner cylinder 43 attached to the outer cylinder 41 of the screw conveyor 40 as guides. That is, the screw conveyor 40 forms a guide device.

【0055】前述のように推進しながらカッタヘッド2
6を回転することで、既設管4のコンクリート壁及び鉄
筋を切削すると共に、充填材9及び地盤1の既設管4の
周囲を掘削する。
While propelled as described above, the cutter head 2
By rotating 6, the concrete wall and the reinforcing bar of the existing pipe 4 are cut, and the surroundings of the filler 9 and the existing pipe 4 of the ground 1 are excavated.

【0056】既設管4の切削片(コンクリート片、鉄筋
片)、掘削ズリ(土砂、充填材片)は投入口56からス
クリューコンベヤ40の外筒41と内筒43との間に投
入され、スクリュー42の回転によって後方に搬送さ
れ、排出口54からベルトコンベヤ55上に落下し、ベ
ルトコンベヤ55で後方に排出される。
Cutting pieces (concrete pieces, reinforcing bar pieces) and excavated scraps (earth and sand, filler pieces) of the existing pipe 4 are charged from the input port 56 between the outer cylinder 41 and the inner cylinder 43 of the screw conveyor 40, and are screwed. The paper is conveyed rearward by the rotation of the roller 42, falls onto the belt conveyor 55 from the discharge port 54, and is discharged rearward by the belt conveyor 55.

【0057】前記カッタヘッド26の前面板28は外周
部が中心部よりも前方に突出した漏斗状であるから、既
設管4の切削片、掘削ズリは既設管4の外方に拡散せず
に内方に向う。これによって、既設管4の外周に埋設し
てある他の埋設物に悪い影響を与えることがない。
Since the front plate 28 of the cutter head 26 has a funnel shape in which the outer peripheral portion protrudes forward from the central portion, the cut pieces and excavated chips of the existing pipe 4 do not diffuse outside the existing pipe 4. Turn inward. As a result, other buried objects buried in the outer circumference of the existing pipe 4 are not adversely affected.

【0058】また、仮設管6の外周面付近の充填物9は
カッタヘッド26の仮設管貫通孔29の周縁に取付けた
ビット57で掘削される。
The filler 9 near the outer peripheral surface of the temporary pipe 6 is excavated by a bit 57 attached to the periphery of the temporary pipe through hole 29 of the cutter head 26.

【0059】また、案内装置を構成するスクリューコン
ベヤ40の外筒41はガイドローラ50で仮設管6の外
周面で支持され、その外筒41は中間部本体22に対し
て径方向に変位可能であり、前部本体21に対して緩衝
材48で任意方向に変位可能であるから、姿勢制御ジャ
ッキ49を伸縮することでスクリューコンベヤ40は掘
進機本体20に対して径方向に相対変位する。
The outer cylinder 41 of the screw conveyor 40 constituting the guide device is supported on the outer peripheral surface of the temporary pipe 6 by a guide roller 50, and the outer cylinder 41 is radially displaceable with respect to the intermediate body 22. The screw conveyor 40 can be displaced radially relative to the excavator body 20 by expanding and contracting the attitude control jack 49 because the cushion member 48 can be displaced in any direction with respect to the front body 21.

【0060】つまり、姿勢制御ジャッキ49等によって
スクリューコンベヤ40(案内装置)を径方向に変位す
る調整機構を構成している。
That is, an adjusting mechanism for radially displacing the screw conveyor 40 (guide device) by the attitude control jack 49 or the like is provided.

【0061】このようであるから、アーティキュレート
ジャッキ24を伸縮して前部本体21を上下・左右に揺
動することで掘進方向を仮設管6に沿って変更する時に
スクリューコンベヤ40を前部本体21に対して相対的
に変位させることで、スクリューコンベヤ40を常に仮
設管6に正しく沿わせることができる。
As described above, the screw conveyor 40 is moved when the excavation direction is changed along the temporary pipe 6 by extending and contracting the articulated jack 24 and swinging the front body 21 up and down and left and right. By displacing the screw conveyor 40 relative to the screw 21, the screw conveyor 40 can always be correctly aligned with the temporary pipe 6.

【0062】つまり、仮設管6と掘進機本体20との間
には径方向の大きなスペースがあるので、掘進機本体2
0を仮設管6に対して上下・左右方向に大きく変位する
ことができるが、仮設管6とスクリューコンベヤ40の
内筒43との間の径方向のスペースが小さいので、前述
のように掘進機本体20を上下・左右に変位させて掘進
方向の向きを変えた時にスクリューコンベヤ40を掘進
機本体20に対して相対的に上下・左右に変位させて推
進方向の向きを掘進機本体20と異ならせ、内筒43と
仮設管6が干渉しないようにする。
That is, since there is a large radial space between the temporary pipe 6 and the machine body 20, the machine body 2
0 can be largely displaced in the vertical and horizontal directions with respect to the temporary pipe 6. However, since the radial space between the temporary pipe 6 and the inner cylinder 43 of the screw conveyor 40 is small, the excavator as described above is used. When the body 20 is displaced up and down and left and right to change the direction of the excavation direction, the screw conveyor 40 is displaced up and down and left and right relative to the excavator body 20 so that the direction of the propulsion direction is different from that of the excavator body 20. So that the inner tube 43 and the temporary pipe 6 do not interfere with each other.

【0063】前述のようにして所定ストローク掘進した
ら、セグメント53を巻き立てて新管11とする。
When the predetermined stroke is excavated as described above, the segment 53 is wound up to form a new pipe 11.

【0064】次に掘進機の第2の実施の形態を説明す
る。図6に示すように、掘進機本体20とカッタヘッド
26は第1の実施の形態で同一であり、排土装置をベル
トコンベヤ60としてある。このベルトコンベヤ60が
掘進機本体20の中心からずれた位置に取付けられて仮
設管6と干渉しないようにしてある。カッタヘッド26
で掘削、切削した掘削片、切削片は図7に示すようにシ
ュート61でベルトコンベヤ60上に落下される。
Next, a description will be given of a second embodiment of the excavator. As shown in FIG. 6, the excavator body 20 and the cutter head 26 are the same in the first embodiment, and the discharging device is a belt conveyor 60. The belt conveyor 60 is mounted at a position shifted from the center of the excavator body 20 so as not to interfere with the temporary pipe 6. Cutter head 26
The excavated and cut pieces and cut pieces are dropped on the belt conveyor 60 by the chute 61 as shown in FIG.

【0065】中間部本体22に案内装置62が取付けて
ある。この案内装置62は図8に示すようにリング状フ
レーム63に4つのガイドローラ64を仮設管6の中心
に対して放射状に取付けてある。
A guide device 62 is mounted on the intermediate body 22. The guide device 62 has four guide rollers 64 mounted on a ring-shaped frame 63 radially with respect to the center of the temporary pipe 6 as shown in FIG.

【0066】前記ガイドローラ64はシリンダ65で仮
設管6の中心に向けて進退自在となり、これによって調
整機構を構成している。
The guide roller 64 can be advanced and retracted toward the center of the temporary pipe 6 by the cylinder 65, thereby constituting an adjusting mechanism.

【0067】次に掘進機の第3の実施の形態を説明す
る。図9と図10に示すように、掘進機本体20は前述
の各実施の形状と同様であり、カッタヘッド26は外周
カッタヘッド70と内周カッタヘッド71で形成してあ
る。
Next, a description will be given of a third embodiment of the excavator. As shown in FIGS. 9 and 10, the excavator body 20 has the same shape as that of each of the above-described embodiments, and the cutter head 26 is formed by an outer cutter head 70 and an inner cutter head 71.

【0068】外周カッタヘッド70は外周カッタヘッド
用モータ72で回転され、その前面板73は外周部が内
周部よりも前方に突出した漏斗状で、その前面板73に
ディスクカッタ30が取付けてある。内周カッタヘッド
71は筒状体で、その内周面が仮設管貫通孔29として
あり、内周カッタヘッド用モータ74で外周カッタヘッ
ド71と反対方向に回転される。この内周用カッタヘッ
ド71の前端部に充填材9を切削するビット75が取付
けてある。
The outer cutter head 70 is rotated by a motor 72 for the outer cutter head. The front plate 73 has a funnel shape in which the outer peripheral portion projects forward from the inner peripheral portion. The disk cutter 30 is mounted on the front plate 73. is there. The inner peripheral cutter head 71 is a cylindrical body, the inner peripheral surface of which is a temporary pipe through-hole 29, and is rotated in a direction opposite to the outer peripheral cutter head 71 by an inner peripheral cutter head motor 74. A bit 75 for cutting the filler 9 is attached to the front end of the inner peripheral cutter head 71.

【0069】前記内周カッタヘッド71は外周カッタヘ
ッド71の中心孔76よりも前方に突出し、この外周カ
ッタヘッド71の中心孔76にはテーパ状の筒体77が
固着してあり、この筒体77と内周カッタヘッド71の
外周面とでV字状の空間部を形成し、かつその外周面と
筒体77とにクラッシャ歯78が固着されて切羽クラッ
シャー79を構成している。
The inner cutter head 71 projects forward from the center hole 76 of the outer cutter head 71, and a tapered cylindrical body 77 is fixed to the center hole 76 of the outer cutter head 71. A V-shaped space is formed between the outer peripheral surface of the inner cutter head 71 and the outer peripheral surface of the inner peripheral cutter head 71, and crusher teeth 78 are fixed to the outer peripheral surface and the cylindrical body 77 to form a face crusher 79.

【0070】このようであるから、既設管4の切削片や
充填材9の掘削片は切羽クラッシャー79で破砕され、
その破砕片がカッタヘッド内部空間80に入り込む。
As described above, the cut pieces of the existing pipe 4 and the excavated pieces of the filler 9 are crushed by the face crusher 79,
The crushed pieces enter the cutter head internal space 80.

【0071】前記カッタヘッド内部空間80は泥水シー
ル材81等で他の部分と水密され、送泥管82と排泥管
83が突出している。排泥管83の途中に機内クラッシ
ャー84が設けてある
The cutter head internal space 80 is made watertight with other parts by a muddy water sealing material 81 or the like, and a mud feeding pipe 82 and a mud discharging pipe 83 protrude. An in-machine crusher 84 is provided in the middle of the exhaust pipe 83.

【0072】このようであるから、カッタヘッド内部空
間80内は送泥管82で送られた泥水で加圧され、投入
された破砕片は泥水とともに排泥管83で排出される。
排泥管83で排出された破砕片は機内クラッシャ84で
より小さく破砕された後に排泥管83で排出される。
As described above, the inside of the cutter head internal space 80 is pressurized by the muddy water fed by the muddy pipe 82, and the crushed pieces inputted are discharged by the muddy pipe 83 together with the muddy water.
The crushed pieces discharged from the sludge pipe 83 are crushed smaller by the in-machine crusher 84 and then discharged from the sludge pipe 83.

【0073】これにより、コンクリート片、鉄筋片を切
羽クラッシャー79、機内クラッシャー84でより小さ
く破砕するので、排土装置を泥水排土タイプとすること
ができる。
As a result, the concrete piece and the reinforcing bar piece are crushed smaller by the face crusher 79 and the in-machine crusher 84, so that the soil discharging device can be of a muddy water discharging type.

【0074】この場合にも中間部本体22に案内装置6
2が取付けてある。
Also in this case, the guide device 6
2 is attached.

【0075】以上の掘進機は掘進機本体20を複数に分
割して推進用ジャッキ25で推進するタイプとしたが、
別置きの推進用シリンダの推力を利用して掘進機本体2
0を推進するタイプとしても良い。
The above excavator is of a type in which the excavator body 20 is divided into a plurality of parts and propelled by the propulsion jacks 25.
Excavator body 2 using the thrust of a separate propulsion cylinder
A type that promotes 0 may be used.

【0076】例えば、図11に示すように中間部本体2
2に後部本体23としてスペーサ管90を接続し、この
スペーサ管90を推進管91を介して推進用ジャッキの
推力で推進する。この場合には、推進管91が新管11
となる。
For example, as shown in FIG.
A spacer tube 90 is connected to the rear body 2 as the rear body 23, and the spacer tube 90 is propelled by a propulsion jack through a propulsion tube 91. In this case, the propulsion pipe 91 is the new pipe 11
Becomes

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の布設替え工法の実施の形態を示す工程
順説明図である。
BRIEF DESCRIPTION OF DRAWINGS FIG. 1 is an explanatory diagram of a process sequence showing an embodiment of a replacement method according to the present invention.

【図2】掘進機の第1の実施の形態を示す断面図であ
る。
FIG. 2 is a sectional view showing a first embodiment of the excavator.

【図3】カッタヘッドの前面図である。FIG. 3 is a front view of the cutter head.

【図4】図2のA−A断面図である。FIG. 4 is a sectional view taken along line AA of FIG. 2;

【図5】図2のB−B断面図である。FIG. 5 is a sectional view taken along line BB of FIG. 2;

【図6】掘進機の第2の実施の形態を示す断面図であ
る。
FIG. 6 is a sectional view showing a second embodiment of the excavator.

【図7】図6のC−C断面図である。FIG. 7 is a sectional view taken along the line CC of FIG. 6;

【図8】図6のD−D断面図である。FIG. 8 is a sectional view taken along the line DD of FIG. 6;

【図9】掘進機の第3の実施の形態を示す断面図であ
る。
FIG. 9 is a sectional view showing a third embodiment of the excavator.

【図10】カッタヘッドの前面図である。FIG. 10 is a front view of the cutter head.

【図11】掘進機の第4の実施の形態を示す断面図であ
る。
FIG. 11 is a sectional view showing a fourth embodiment of an excavator.

【符号の説明】[Explanation of symbols]

1…地盤 2…第1の立坑 3…第2の立坑 4…既設管 4a…一部分 4b…布設替え部分 4c…上流側部分 4d…下流側部分 5…掘進機 6…仮設管 7…支持台 8…シール材 9…充填材 10…掘削部分 11…新管 20…掘進機本体 21…前部本体 22…中間部本体 23…後部本体 24…アーティキュレートジャッキ 25…推進用ジャッキ 26…カッタヘッド 27…モータ 28…前面板 29…仮設管貫通孔 30…ディスクカッタ 31…ギアカッタ 32…テールシール 33…セグメントエレクタ 40…スクリューコンベヤ 41…外筒 42…スクリュー 43…内筒 44…ブラケット 45…反力受け 46…ピン 47…長孔 48…緩衝材 49…姿勢制御ジャッキ 50…ガイドローラ 51…止水シール材 52…モータ 53…セグメント 54…排出口 55…ベルトコンベヤ 56…投入口 60…ベルトコンベヤ 61…シュート 62…案内装置 63…リング状フレーム 64…ガイドローラ 65…シリンダ 70…外周カッタヘッド 71…内周カッタヘッド 72…外周カッタヘッド用モータ 73…前面板 74…内周カッタヘッド用モータ 75…ビット 76…中心孔 77…筒体 78…クラッシャ歯 79…切羽クラッシャー 80…カッタヘッド内部空間 81…泥水シール材 82…送泥管 83…排泥管 84…機内クラッシャー 90…スペーサ管 91…推進管 DESCRIPTION OF SYMBOLS 1 ... Ground 2 ... 1st shaft 3 ... 2nd shaft 4 ... Existing pipe 4a ... Part 4b ... Replacement part 4c ... Upstream part 4d ... Downstream part 5 ... Drilling machine 6 ... Temporary pipe 7 ... Support stand 8 ... Seal material 9 ... Filling material 10 ... Drilled part 11 ... New tube 20 ... Excavator body 21 ... Front body 22 ... Intermediate body 23 ... Rear body 24 ... Articulated jack 25 ... Propulsion jack 26 ... Cutter head 27 ... Motor 28 Front plate 29 Temporary pipe through hole 30 Disc cutter 31 Gear cutter 32 Tail seal 33 Segment elector 40 Screw conveyor 41 Outer cylinder 42 Screw 43 ... Inner cylinder 44 Bracket 45 Reaction force receiver 46 ... Pin 47 ... Long hole 48 ... Buffer material 49 ... Position control jack 50 ... Guide roller 51 ... Waterproof sealing material 52 ... Motor 53 ... Segume G 54 ... outlet 55 ... belt conveyor 56 ... inlet 60 ... belt conveyor 61 ... chute 62 ... guide device 63 ... ring-shaped frame 64 ... guide roller 65 ... cylinder 70 ... outer peripheral cutter head 71 ... inner peripheral cutter head 72 ... outer periphery Cutter head motor 73 ... Front plate 74 ... Inner peripheral cutter head motor 75 ... Bit 76 ... Center hole 77 ... Cylinder 78 ... Crusher tooth 79 ... Cut face crusher 80 ... Cutter head inner space 81 ... Muddy water sealing material 82 ... Muddy Pipe 83: Drainage pipe 84: In-machine crusher 90: Spacer pipe 91: Propulsion pipe

Claims (6)

【特許請求の範囲】[Claims] 【請求項1】 既設管(4)の内部に仮設管(6)を布
設し、この布設した仮設管(6)を固定した後に、この
仮設管(6)をガイドとして掘進機(5)を推進して既
設管(4)を切削掘削し、その後に掘進機(5)の後部
から新管(11)を布設することを特徴とする既設管の
布設替え工法。
1. A temporary pipe (6) is laid inside an existing pipe (4), and after fixing the laid temporary pipe (6), the excavator (5) is guided by the temporary pipe (6). A method of replacing existing pipes, comprising cutting and excavating the existing pipe (4) by propulsion, and then laying a new pipe (11) from the rear of the excavator (5).
【請求項2】 既設管(4)と仮設管(6)との間に充
填材(9)を充填して仮設管(6)を固定する請求項1
記載の既設管の布設替え工法。
2. The temporary pipe (6) is fixed by filling a filler (9) between the existing pipe (4) and the temporary pipe (6).
Replacement method of existing pipes described.
【請求項3】 中心に仮設管貫通孔(29)を有するカ
ッタヘッド(26)を備えた掘進機本体(20)と、こ
の掘進機本体(20)に取付けられて仮設管(6)に沿
って掘進機本体(20)を案内する案内装置と、前記掘
進機本体(20)内に設けられてカッタヘッド(26)
で切削・掘削したものを排出する排土装置で構成したこ
とを特徴とする掘進機。
3. An excavator body (20) provided with a cutter head (26) having a temporary pipe through-hole (29) at the center, and attached to the excavator body (20) and along the temporary pipe (6). A guiding device for guiding the excavator body (20), and a cutter head (26) provided in the excavator body (20).
An excavator characterized by comprising an earth removal device for discharging the material cut and excavated in the above.
【請求項4】 カッタヘッド(26)の前面を、外周部
が内周部よりも前方に突出した漏斗状とした請求項3記
載の掘進機。
4. The excavator according to claim 3, wherein the front surface of the cutter head (26) has a funnel shape in which an outer peripheral portion projects forward from an inner peripheral portion.
【請求項5】 掘進機本体(20)を上下・左右に揺動
自在なアーティキュレートタイプで掘進方向変更可能と
し、前記案内装置を掘進機本体(20)に対して径方向
に相対変位する調整機構を設けた請求項3記載の掘進
機。
5. The excavator body (20) is an articulate type capable of swinging up and down and left and right so that the excavation direction can be changed, and the guide device is adjusted to be displaced in the radial direction relative to the excavator body (20). The machine according to claim 3, further comprising a mechanism.
【請求項6】 外筒(41)内にスクリュー(42)を
備えた内筒(43)を挿通したスクリューコンベヤ(4
0)で排土装置とし、この内筒(43)内に仮設管
(6)が挿通するようにしてスクリューコンベヤ(4
0)を案内装置とした請求項3記載の掘進機。
6. A screw conveyor (4) in which an inner cylinder (43) having a screw (42) is inserted into an outer cylinder (41).
0) is an earth removal device, and the screw conveyor (4) is inserted so that the temporary pipe (6) is inserted into the inner cylinder (43).
The excavator according to claim 3, wherein 0) is a guide device.
JP9182259A 1997-07-08 1997-07-08 Existing pipe laying method and excavator Pending JPH1122379A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP9182259A JPH1122379A (en) 1997-07-08 1997-07-08 Existing pipe laying method and excavator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP9182259A JPH1122379A (en) 1997-07-08 1997-07-08 Existing pipe laying method and excavator

Publications (1)

Publication Number Publication Date
JPH1122379A true JPH1122379A (en) 1999-01-26

Family

ID=16115131

Family Applications (1)

Application Number Title Priority Date Filing Date
JP9182259A Pending JPH1122379A (en) 1997-07-08 1997-07-08 Existing pipe laying method and excavator

Country Status (1)

Country Link
JP (1) JPH1122379A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006028870A (en) * 2004-07-15 2006-02-02 Komatsu Ltd Cutter head and roller cutter and reconstruction promotion method
JP2007247320A (en) * 2006-03-17 2007-09-27 Suiken:Kk Existing concrete pipe crushing machine
JP2018040205A (en) * 2016-09-09 2018-03-15 隆広 青木 Propulsion pipe laying device, propulsion pipe laying method, and existing sewer pipe updating method
KR102185511B1 (en) * 2020-02-20 2020-12-02 창문건설주식회사 Excavting apparatus for changing superannuated pipe

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006028870A (en) * 2004-07-15 2006-02-02 Komatsu Ltd Cutter head and roller cutter and reconstruction promotion method
JP2007247320A (en) * 2006-03-17 2007-09-27 Suiken:Kk Existing concrete pipe crushing machine
JP2018040205A (en) * 2016-09-09 2018-03-15 隆広 青木 Propulsion pipe laying device, propulsion pipe laying method, and existing sewer pipe updating method
KR102185511B1 (en) * 2020-02-20 2020-12-02 창문건설주식회사 Excavting apparatus for changing superannuated pipe

Similar Documents

Publication Publication Date Title
EP0342246B1 (en) Existing pipeline renewing method and apparatus therefor
US11603760B2 (en) Shield method
AU604570B2 (en) Method and apparatus for building pipeline and shield tunnelling machine
US4915543A (en) Existing pipeline renewing method and apparatus therefor
JP6132672B2 (en) Existing pipe renewal method
JP6479892B2 (en) Cutting crushing system, cutting crushing method, reconstruction promotion method
JP3401177B2 (en) Sewer renewal shield excavator
JPH0244996B2 (en)
JPH0465956B2 (en)
JP2578184B2 (en) Ring drilling rig
JP2507827B2 (en) Underground method of pipe
JPH1193562A (en) Branch shield excavation method and shield excavator capable of branch excavation
JP3616898B2 (en) Method for joining underground structures using propulsion device
JP3435438B2 (en) Magnifying shield device and construction method
JP6804067B2 (en) Tunnel boring machine
JP3153887B2 (en) Joining method of shield tunnel
JP2539028B2 (en) Ring drilling rig
KR20030005651A (en) Pipe laying apparatus
JP2712686B2 (en) Shield machine
JPH0438279B2 (en)
JPH06235293A (en) Shield excavator and pipe laying and exchanging constructing method using this
JPH0419358B2 (en)
JP4418609B2 (en) Tunnel replacement device
JPH04238997A (en) Ring-shaped lining device for planned tunnel
JPH02217592A (en) Method of renewing existing buried pipe

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20051216

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20051228

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20060419