JPH1122396A - Segment transfer device - Google Patents

Segment transfer device

Info

Publication number
JPH1122396A
JPH1122396A JP9178371A JP17837197A JPH1122396A JP H1122396 A JPH1122396 A JP H1122396A JP 9178371 A JP9178371 A JP 9178371A JP 17837197 A JP17837197 A JP 17837197A JP H1122396 A JPH1122396 A JP H1122396A
Authority
JP
Japan
Prior art keywords
segment
main frame
frame
conveyor
jack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP9178371A
Other languages
Japanese (ja)
Other versions
JP3800740B2 (en
Inventor
Koichiro Kuwabara
紘一郎 桑原
Katsuo Watanabe
勝男 渡邊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
IHI Corp
Original Assignee
Ishikawajima Harima Heavy Industries Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ishikawajima Harima Heavy Industries Co Ltd filed Critical Ishikawajima Harima Heavy Industries Co Ltd
Priority to JP17837197A priority Critical patent/JP3800740B2/en
Publication of JPH1122396A publication Critical patent/JPH1122396A/en
Application granted granted Critical
Publication of JP3800740B2 publication Critical patent/JP3800740B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

(57)【要約】 【課題】 メインフレームの上面における前端部にセグ
メントが残ったような場合であっても、メインフレーム
の前後方向中間部分に空きがあれば、トンネル後方から
運搬してきたセグメントをメインフレームの上面におけ
る後端部に載せて順次前方へ詰めることができ、工事全
体の効率向上を図り得るセグメント搬送装置を提供す
る。 【解決手段】 三基に分割形成した前列コンベヤ15A
と中間コンベヤ15Bと後列コンベヤ15Cとを、シー
ルド掘進機のエレクタ14によるセグメント6組立位置
から後方へ向けて配設する。
(57) [Summary] [Problem] Even if a segment remains at the front end of the upper surface of the main frame, if there is an empty space in the middle part in the front-rear direction of the main frame, the segment transported from the rear of the tunnel can be removed. Provided is a segment transfer device that can be placed on a rear end portion of an upper surface of a main frame and sequentially packed forward, thereby improving the efficiency of the entire construction. SOLUTION: A front row conveyor 15A divided and formed into three groups.
The intermediate conveyor 15B and the rear row conveyor 15C are disposed rearward from the assembly position of the segment 6 by the erector 14 of the shield machine.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、大口径のトンネル
を掘進するシールド工法において、シールド掘進機のエ
レクタによるセグメント組立位置に、後方からセグメン
トを搬送するためのセグメント搬送装置に関するもので
ある。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a segment transfer device for transferring a segment from the rear to a segment assembling position by an erector of a shield excavator in a shield construction method for excavating a large-diameter tunnel.

【0002】[0002]

【従来の技術】この種のセグメント搬送装置としては、
従来、例えば、実願平4−67643号の明細書及び図
面に記載されているようなものが存在し、これは、図1
3〜図19に示される如く、既に円形に組み立てられた
既設セグメント1の内周底部に、トンネルの長手方向へ
延びるようレール2を敷設し、該レール2上に、上面5
にセグメント6を載置可能なメインフレーム3を、シー
ルド掘進機の前進に伴ってレール2上を前進し得るよ
う、多数の車輪4を介して配置し、前記メインフレーム
3に、多数のリフトアップジャッキ7を介してアップダ
ウンレールフレーム8を昇降可能に配設し、該アップダ
ウンレールフレーム8上に、上面12にセグメント6を
載置可能なセグメント搬送フレーム9を、搬送ジャッキ
11の伸縮作動により車輪10を介して前後進可能に設
けてなる構成を有している。
2. Description of the Related Art As this kind of segment conveying device,
Conventionally, for example, there is one described in the specification and drawings of Japanese Utility Model Application No. 4-67643, which is shown in FIG.
As shown in FIGS. 3 to 19, a rail 2 is laid on the inner peripheral bottom of the existing segment 1 already assembled in a circular shape so as to extend in the longitudinal direction of the tunnel.
The main frame 3 on which the segment 6 can be mounted is arranged via a number of wheels 4 so as to be able to advance on the rail 2 with the advance of the shield excavator. An up-down rail frame 8 is provided via a jack 7 so as to be able to move up and down. A segment transport frame 9 on which the segment 6 can be placed on the upper surface 12 is placed on the up-down rail frame 8 by the expansion and contraction operation of the transport jack 11. It has a configuration provided so as to be able to move forward and backward through wheels 10.

【0003】尚、図中、13はシールド掘進機のテール
フレーム、14はセグメント6をトンネル内周に円形に
組み立てるエレクタである。
[0003] In the drawing, reference numeral 13 denotes a tail frame of a shield machine, and 14 denotes an erector for assembling the segment 6 into a circular shape on the inner periphery of the tunnel.

【0004】前述の如き従来のセグメント搬送装置にお
いては、図13に示すようにリフトアップジャッキ7を
収縮させてアップダウンレールフレーム8とセグメント
搬送フレーム9を下降させた状態で、トンネル後方(図
13の右方)から図示していないセグメント台車で運搬
してきたセグメント6を図示していないホイスト等で吊
り上げてメインフレーム3の上方から吊り降ろすと、セ
グメント搬送フレーム9は下降していて、該セグメント
搬送フレーム9の上面12はメインフレーム3の上面5
よりも低い位置になっているので、吊り降ろされたセグ
メント6は、メインフレーム3の上面5に載置されるこ
とになる。
In the conventional segment transfer apparatus as described above, the lift-up jack 7 is contracted to lower the up-down rail frame 8 and the segment transfer frame 9 as shown in FIG. (Right side of FIG. 3), the segments 6 transported by a segment truck (not shown) are lifted by a hoist or the like (not shown) and suspended from above the main frame 3, and the segment transport frame 9 is lowered, and the segment transport is performed. The upper surface 12 of the frame 9 is the upper surface 5 of the main frame 3
The suspended segment 6 is placed on the upper surface 5 of the main frame 3.

【0005】続いて、図15に示すようにリフトアップ
ジャッキ7を伸長させると、アップダウンレールフレー
ム8とセグメント搬送フレーム9は上昇し、セグメント
搬送フレーム9の上面12はメインフレーム3の上面5
よりも高い位置となるため、メインフレーム3の上面5
に載置されていたセグメント6は、セグメント搬送フレ
ーム9の上面12によって持ち上げられ、該セグメント
搬送フレーム9の上面12にセグメント6が載置された
状態になる。
Subsequently, as shown in FIG. 15, when the lift-up jack 7 is extended, the up-down rail frame 8 and the segment transport frame 9 are raised, and the upper surface 12 of the segment transport frame 9 is moved to the upper surface 5 of the main frame 3.
The upper surface 5 of the main frame 3
Are lifted by the upper surface 12 of the segment transport frame 9, and the segment 6 is placed on the upper surface 12 of the segment transport frame 9.

【0006】次に、図16に示すように搬送ジャッキ1
1を伸長させると、セグメント搬送フレーム9は、上面
12にセグメント6を載置した状態のまま前進し、前記
搬送ジャッキ11が最も伸長した状態になった後、図1
7に示すようにリフトアップジャッキ7を収縮させてア
ップダウンレールフレーム8とセグメント搬送フレーム
9を下降させると、セグメント搬送フレーム9の上面1
2はメインフレーム3の上面5よりも低い位置になるた
め、セグメント6は前進した位置でメインフレーム3の
上面5に載置されることになり、この状態で前記搬送ジ
ャッキ11を収縮させると、セグメント6は前進した位
置でメインフレーム3の上面5に載置されたまま、セグ
メント搬送フレーム9のみが後退することになる。
[0006] Next, as shown in FIG.
1 is extended, the segment transport frame 9 moves forward with the segment 6 placed on the upper surface 12, and after the transport jack 11 is in the most extended state, FIG.
When the lift-up jack 7 is contracted to lower the up-down rail frame 8 and the segment transfer frame 9 as shown in FIG.
Since 2 is at a position lower than the upper surface 5 of the main frame 3, the segment 6 is placed on the upper surface 5 of the main frame 3 at the advanced position, and when the transport jack 11 is contracted in this state, While the segment 6 is placed on the upper surface 5 of the main frame 3 at the advanced position, only the segment transport frame 9 retreats.

【0007】この後、図18に示すように次のセグメン
ト6を図示していないホイスト等で吊り上げてメインフ
レーム3の上方から吊り降ろすと、メインフレーム3の
上面5には二つのセグメント6,6が並んで載置される
ことになり、ここで再び前記リフトアップジャッキ7を
伸長させてアップダウンレールフレーム8とセグメント
搬送フレーム9を上昇させた後、搬送ジャッキ11を伸
長させると、二つのセグメント6,6は並んだままセグ
メント搬送フレーム9の上面12によって前方に搬送さ
れ、続いて前記リフトアップジャッキ7を収縮させてア
ップダウンレールフレーム8とセグメント搬送フレーム
9を下降させると、二つのセグメント6は並んだまま前
進した位置でメインフレーム3の上面5に載置されるこ
とになる。
Then, as shown in FIG. 18, when the next segment 6 is lifted by a hoist or the like (not shown) and lowered from above the main frame 3, two segments 6 and 6 are formed on the upper surface 5 of the main frame 3. Are placed side by side. Here, the lift-up jack 7 is extended again to raise the up-down rail frame 8 and the segment transport frame 9, and then the transport jack 11 is extended. When the lift-up jack 7 is contracted to lower the up-down rail frame 8 and the segment transfer frame 9, the two segments 6 Will be placed on the upper surface 5 of the main frame 3 at the position where the main frame 3 has moved forward while being arranged side by side.

【0008】このようにメインフレーム3上方からのセ
グメント6の吊り降ろし、リフトアップジャッキ7の伸
長、搬送ジャッキ11の伸長、リフトアップジャッキ7
の収縮、搬送ジャッキ11の収縮の作動を繰り返すこと
により、図19に示すようにメインフレーム3の上面5
に多数のセグメント6を並べて載置し、これら多数のセ
グメント6を順次エレクタ14の方に搬送することが可
能となり、図19に示すようにメインフレーム3の上面
5に並べて載置されたセグメント6は、エレクタ14に
最も近い前方(図19の左方)のものが図示しない装置
によってエレクタ14に渡される。
As described above, the segments 6 are suspended from above the main frame 3, the lift-up jacks 7 are extended, the transport jacks 11 are extended, and the lift-up jacks 7 are extended.
By repeating the contraction of the main frame 3 and the contraction of the transport jack 11 as shown in FIG.
A large number of segments 6 are arranged side by side, and these many segments 6 can be sequentially conveyed toward the erector 14, and the segments 6 arranged side by side on the upper surface 5 of the main frame 3 as shown in FIG. 19 is passed to the erector 14 by a device (not shown) that is closest to the erector 14 (leftward in FIG. 19).

【0009】[0009]

【発明が解決しようとする課題】しかしながら、前述の
如き従来のセグメント搬送装置では、前後方向に延びる
一つの長いセグメント搬送フレーム9を駆動することに
よりセグメント6を1ピッチずつ前進させるようになっ
ているため、例えば、メインフレーム3の上面5におけ
る前端部にセグメント6が残ったような場合には、たと
えメインフレーム3の前後方向中間部分に空きがあった
としても、トンネル後方から図示していないセグメント
台車で運搬してきたセグメント6を図示していないホイ
スト等で吊り上げてメインフレーム3の上面5における
後端部に載せることは可能であるが、そのセグメント6
を前方へ詰めることができなくなり、このため、次のセ
グメント6を前記セグメント台車で運んできても受け渡
すことができず、該セグメント台車は停止、待機を余儀
なくされ、工事全体に支障を来すという欠点を有してい
た。
However, in the above-described conventional segment transport apparatus, one long segment transport frame 9 extending in the front-rear direction is driven to advance the segments 6 by one pitch. Therefore, for example, in the case where the segment 6 remains at the front end of the upper surface 5 of the main frame 3, even if there is an empty portion in the front-rear direction intermediate portion of the main frame 3, a segment not shown It is possible to lift the segment 6 transported by the cart with a hoist or the like (not shown) and place it on the rear end of the upper surface 5 of the main frame 3.
Cannot be forwarded, and therefore cannot be delivered even if the next segment 6 is carried by the segment truck, and the segment truck is forced to stop and wait, hindering the entire construction. Had the disadvantage that

【0010】本発明は、斯かる実情に鑑み、メインフレ
ームの上面における前端部にセグメントが残ったような
場合であっても、メインフレームの前後方向中間部分に
空きがあれば、トンネル後方から運搬してきたセグメン
トをメインフレームの上面における後端部に載せて順次
前方へ詰めることができ、工事全体の効率向上を図り得
るセグメント搬送装置を提供しようとするものである。
[0010] In view of such circumstances, the present invention conveys from the rear of the tunnel even if a segment remains at the front end of the upper surface of the main frame as long as there is an empty space in the front-rear middle part of the main frame. An object of the present invention is to provide a segment transport device that can put the completed segments on the rear end portion of the upper surface of the main frame and sequentially pack the segments forward, thereby improving the efficiency of the entire construction.

【0011】[0011]

【課題を解決するための手段】本発明は、上面に所要数
のセグメントを載置し得るメインフレームと、リフトア
ップジャッキを介して前記メインフレーム上に設けられ
たアップダウンレールフレームと、該アップダウンレー
ルフレーム上に前後進可能に設けられ、且つ前記リフト
アップジャッキが伸長したとき上面が前記メインフレー
ムの上面よりも上昇してセグメントを載置し得る一方、
前記リフトアップジャッキが収縮したとき上面が前記メ
インフレームの上面よりも下降するセグメント搬送フレ
ームとを備えたコンベヤを、シールド掘進機のエレクタ
によるセグメント組立位置から後方に向けて複数基配設
し、前記コンベヤのメインフレームの上面における前端
部に載置されたセグメントを、セグメント搬送フレーム
の作動により前側に位置するコンベヤのメインフレーム
の上面における後端部に移載し得るよう構成したことを
特徴とするセグメント搬送装置にかかるものである。
SUMMARY OF THE INVENTION The present invention provides a main frame on which a required number of segments can be mounted on an upper surface, an up-down rail frame provided on the main frame via a lift-up jack, and an up-down rail frame. While the upper surface is provided so as to be able to move forward and backward on the down rail frame, and when the lift-up jack is extended, the upper surface can rise above the upper surface of the main frame to mount the segment,
When the lift-up jack is contracted, a plurality of conveyors having a segment conveying frame whose upper surface is lower than the upper surface of the main frame are provided rearward from a segment assembly position by an erector of a shield machine, The segment mounted on the front end of the upper surface of the main frame of the conveyor can be transferred to the rear end of the upper surface of the main frame of the conveyor located on the front side by operating the segment transport frame. It relates to a segment transport device.

【0012】上記手段によれば、以下のような作用が得
られる。
According to the above means, the following effects can be obtained.

【0013】トンネル後方からセグメント台車で運搬し
てきたセグメントを最後列に位置するコンベヤのメイン
フレームの上面における後端部に載せた後、該最後列に
位置するコンベヤのリフトアップジャッキを伸長させる
と、アップダウンレールフレームと共にセグメント搬送
フレームが上昇してその上面でセグメントが支持され、
この状態で、セグメント搬送フレームをアップダウンレ
ールフレーム上で前進させると、セグメントはセグメン
ト搬送フレームの上面に載置された状態で前進し、続い
てリフトアップジャッキを収縮させると、セグメントは
前進位置で最後列に位置するコンベヤのメインフレーム
の上面に支持され、こうした作動を繰り返すことによ
り、最後列に位置するコンベヤのメインフレームの上面
に所要数のセグメントが載置される。
[0013] After the segments transported by the segment truck from the rear of the tunnel are placed on the rear end of the upper surface of the main frame of the conveyor located in the last row, the lift-up jacks of the conveyor located in the last row are extended. The segment transport frame rises with the up-down rail frame and the segment is supported on its upper surface,
In this state, when the segment transport frame is advanced on the up-down rail frame, the segment advances while being mounted on the upper surface of the segment transport frame, and subsequently, when the lift-up jack is contracted, the segment moves in the advanced position. The required number of segments are placed on the upper surface of the main frame of the conveyor positioned in the last row by repeating the above-described operation while being supported on the upper surface of the main frame of the conveyor positioned in the last row.

【0014】この後、前述と同様に、最後列に位置する
コンベヤのリフトアップジャッキを伸長させ、セグメン
ト搬送フレームをアップダウンレールフレーム上で前進
させ、リフトアップジャッキを収縮させると、前記最後
列に位置するコンベヤのメインフレームの上面における
前端部に載置されていたセグメントが、前側に位置する
コンベヤのメインフレームの上面における後端部に移載
される。
Thereafter, as described above, the lift-up jack of the conveyor located in the last row is extended, the segment transport frame is advanced on the up-down rail frame, and the lift-up jack is contracted. The segment placed on the front end of the upper surface of the main frame of the located conveyor is transferred to the rear end of the upper surface of the main frame of the conveyor located on the front side.

【0015】以下、各コンベヤにおいて、前記最後列に
位置するコンベヤの場合と同様の操作を繰り返し行うこ
とにより、セグメントを順次エレクタの方に搬送するこ
とが可能となる。
[0015] Hereinafter, by repeating the same operation as in the case of the conveyor positioned in the last row in each conveyor, the segments can be sequentially conveyed to the erector.

【0016】一方、仮に、最前列に位置するコンベヤの
メインフレームの上面における前端部にセグメントが残
って、最前列に位置するコンベヤより後方に位置する各
コンベヤのメインフレームに空きができたような場合に
は、トンネル後方からセグメント台車で運搬してきたセ
グメントを最後列に位置するコンベヤのメインフレーム
の上面における後端部に載せた後、前述と同様に最前列
に位置するコンベヤ以外のコンベヤを駆動すると、セグ
メントは順次前方へ1ピッチずつ詰めて行かれ、最前列
に位置するコンベヤのメインフレームの上面における後
端部まで移送される形となる。
On the other hand, it is assumed that a segment remains at the front end of the upper surface of the main frame of the conveyor positioned in the front row, and that the main frame of each conveyor positioned behind the conveyor positioned in the front row has an empty space. In this case, the segments conveyed by the segment truck from the rear of the tunnel are placed on the rear end of the upper surface of the main frame of the conveyor positioned in the last row, and then the conveyors other than the conveyor positioned in the front row are driven in the same manner as described above. Then, the segments are sequentially packed forward by one pitch at a time, and are transported to the rear end of the upper surface of the main frame of the conveyor located in the front row.

【0017】この結果、前記セグメント台車で運ばれて
きたセグメントを最後列に位置するコンベヤへ順次受け
渡すことが可能となり、該セグメント台車は停止、待機
をしなくて済み、作業が円滑に行われることとなり、工
事全体に支障を来すこともなくなる。
As a result, the segments transported by the segment truck can be sequentially delivered to the conveyor positioned in the last row, so that the segment truck does not need to stop and wait, and work can be performed smoothly. This will not hinder the entire construction.

【0018】[0018]

【発明の実施の形態】以下、本発明の実施の形態を図示
例と共に説明する。
Embodiments of the present invention will be described below with reference to the drawings.

【0019】図1〜図9は本発明を実施する形態の一例
であって、図中、図13〜図19と同一の符号を付した
部分は同一物を表わしており、基本的な構成は図13〜
図19に示す従来のものと同様であるが、本図示例の特
徴とするところは、図1〜図9に示す如く、三基に分割
形成した前列コンベヤ15Aと中間コンベヤ15Bと後
列コンベヤ15Cとを、シールド掘進機のエレクタ14
によるセグメント組立位置から後方へ向けて配設した点
にある。
FIGS. 1 to 9 show an embodiment of the present invention. In the drawings, the portions denoted by the same reference numerals as those in FIGS. 13 to 19 represent the same components. FIG.
19 is similar to the conventional one shown in FIG. 19, but the feature of the illustrated example is that, as shown in FIGS. 1 to 9, a front row conveyor 15A, an intermediate conveyor 15B, and a rear row conveyor 15C divided and formed into three groups. To the shield machine erector 14
In that it is arranged rearward from the segment assembly position.

【0020】前記各コンベヤ15A,15B,15Cは
それぞれ、トンネル内の上部に図示していない支持部材
によって設置され且つ上面5に所要数(図の例では三
個)のセグメント6をその内周面を下に向けて載置し得
るメインフレーム3と、リフトアップジャッキ7を介し
て前記メインフレーム3上に設けられたアップダウンレ
ールフレーム8と、該アップダウンレールフレーム8上
に搬送ジャッキ11の伸縮作動により車輪10を介して
前後進可能に設けられ、且つ前記リフトアップジャッキ
7が伸長したとき上面12が前記メインフレーム3の上
面5よりも上昇してセグメント6を載置し得る一方、前
記リフトアップジャッキ7が収縮したとき上面12が前
記メインフレーム3の上面5よりも下降するセグメント
搬送フレーム9とを備えてなる構成を有しており、前記
各メインフレーム3は、連結金具16によって連結して
ある。
Each of the conveyors 15A, 15B and 15C is installed by a support member (not shown) at the upper part in the tunnel, and a required number (three in the illustrated example) of the segments 6 are provided on the upper surface 5 of the inner peripheral surface thereof. Frame 3, which can be placed downward, an up-down rail frame 8 provided on the main frame 3 via a lift-up jack 7, and the expansion / contraction of the transport jack 11 on the up-down rail frame 8. When the lift-up jack 7 is extended, the upper surface 12 can be raised above the upper surface 5 of the main frame 3 to mount the segment 6 when the lift-up jack 7 is extended. When the up jack 7 is contracted, the upper surface 12 is moved downward from the upper surface 5 of the main frame 3. Has Ete consisting configuration, each main frame 3, are connected by a connecting member 16.

【0021】又、前記後列コンベヤ15Cのアップダウ
ンレールフレーム8の前端部は、中間コンベヤ15Bの
後端部に挿入されるよう張り出し、前記中間コンベヤ1
5Bのアップダウンレールフレーム8の前端部は、前列
コンベヤ15Aの後端部に挿入されるよう張り出してお
り、前記後列コンベヤ15Cのメインフレーム3の上面
5における前端部に載置されたセグメント6を、セグメ
ント搬送フレーム9の作動により前側に位置する中間コ
ンベヤ15Bのメインフレーム3の上面5における後端
部に移載し得るよう構成すると共に、前記中間コンベヤ
15Bのメインフレーム3の上面5における前端部に載
置されたセグメント6を、セグメント搬送フレーム9の
作動により前側に位置する前列コンベヤ15Aのメイン
フレーム3の上面5における後端部に移載し得るように
してある。
The front end of the up-down rail frame 8 of the rear row conveyor 15C projects so as to be inserted into the rear end of the intermediate conveyor 15B.
The front end of the 5B up-down rail frame 8 projects so as to be inserted into the rear end of the front row conveyor 15A, and the segment 6 placed on the front end of the upper surface 5 of the main frame 3 of the rear row conveyor 15C is moved. The intermediate conveyor 15B located on the front side can be transferred to the rear end of the upper surface 5 of the main frame 3 by the operation of the segment transport frame 9 and the front end of the intermediate conveyor 15B on the upper surface 5 of the main frame 3 Can be transferred to the rear end of the upper surface 5 of the main frame 3 of the front row conveyor 15A located on the front side by the operation of the segment transport frame 9.

【0022】尚、前記中間コンベヤ15Bのアップダウ
ンレールフレーム8及びセグメント搬送フレーム9の幅
方向の間隔は、図2に示す如く、前記前列、後列コンベ
ヤ15A,15Cのアップダウンレールフレーム8及び
セグメント搬送フレーム9の幅方向の間隔より広げてあ
るため、中間コンベヤ15Bのアップダウンレールフレ
ーム8及びセグメント搬送フレーム9と、前列、後列コ
ンベヤ15A,15Cのアップダウンレールフレーム8
及びセグメント搬送フレーム9とが干渉することはな
い。
As shown in FIG. 2, the interval between the up-down rail frame 8 and the segment transport frame 9 of the intermediate conveyor 15B in the width direction is set to the up-down rail frame 8 and the segment transport of the front row and rear row conveyors 15A and 15C. Since the width of the frame 9 is wider than the width of the frame 9, the up-down rail frame 8 and the segment transport frame 9 of the intermediate conveyor 15B and the up-down rail frame 8 of the front and rear conveyors 15A and 15C.
And the segment transport frame 9 does not interfere.

【0023】次に、上記図示例の作動を説明する。Next, the operation of the illustrated example will be described.

【0024】図1に示すように後列コンベヤ15Cのリ
フトアップジャッキ7を収縮させてアップダウンレール
フレーム8とセグメント搬送フレーム9を下降させた状
態で、トンネル後方(図1の右方)から図示していない
セグメント台車で運搬してきたセグメント6を図示して
いないリフタ等で上昇させて後列コンベヤ15Cのメイ
ンフレーム3の後部上方に渡すと、セグメント搬送フレ
ーム9は下降していて、該セグメント搬送フレーム9の
上面12はメインフレーム3の上面5よりも低い位置に
なっているので、渡されたセグメント6は、後列コンベ
ヤ15Cのメインフレーム3の上面5における後端部に
載置されることになる。
As shown in FIG. 1, the lift-up jack 7 of the rear row conveyor 15C is contracted to lower the up-down rail frame 8 and the segment transport frame 9, and is shown from the rear of the tunnel (right side in FIG. 1). When the segment 6 transported by the unsegmented truck is lifted by a lifter or the like (not shown) and passed above the rear part of the main frame 3 of the rear row conveyor 15C, the segment transport frame 9 is lowered, and the segment transport frame 9 The upper surface 12 of the main frame 3 is lower than the upper surface 5 of the main frame 3, and thus the transferred segments 6 are placed on the rear end of the upper surface 5 of the main frame 3 of the rear row conveyor 15C.

【0025】続いて、前記後列コンベヤ15Cのリフト
アップジャッキ7を伸長させると、アップダウンレール
フレーム8とセグメント搬送フレーム9は上昇し、セグ
メント搬送フレーム9の上面12はメインフレーム3の
上面5よりも高い位置となるため、メインフレーム3の
上面5に載置されていたセグメント6は、セグメント搬
送フレーム9の上面12によって持ち上げられ、該セグ
メント搬送フレーム9の上面12にセグメント6が載置
された状態になる。
Subsequently, when the lift-up jack 7 of the rear row conveyor 15C is extended, the up-down rail frame 8 and the segment transport frame 9 rise, and the upper surface 12 of the segment transport frame 9 is higher than the upper surface 5 of the main frame 3. The segment 6 placed on the upper surface 5 of the main frame 3 is lifted by the upper surface 12 of the segment transport frame 9 because of the high position, and the segment 6 is placed on the upper surface 12 of the segment transport frame 9. become.

【0026】次に、前記後列コンベヤ15Cの搬送ジャ
ッキ11を伸長させると、セグメント搬送フレーム9
は、上面12にセグメント6を載置した状態のまま前進
し、前記搬送ジャッキ11が最も伸長した状態になった
後、リフトアップジャッキ7を収縮させてアップダウン
レールフレーム8とセグメント搬送フレーム9を下降さ
せると、セグメント搬送フレーム9の上面12はメイン
フレーム3の上面5よりも低い位置になるため、セグメ
ント6は前進した位置でメインフレーム3の上面5に載
置されることになり、この状態で前記搬送ジャッキ11
を収縮させると、セグメント6は前進した位置でメイン
フレーム3の上面5に載置されたまま、セグメント搬送
フレーム9のみが後退することになる。
Next, when the transport jack 11 of the rear row conveyor 15C is extended, the segment transport frame 9 is moved.
Moves forward while the segment 6 is placed on the upper surface 12, and after the transport jack 11 is in the most extended state, the lift-up jack 7 is contracted to move the up-down rail frame 8 and the segment transport frame 9. When lowered, the upper surface 12 of the segment transport frame 9 is lower than the upper surface 5 of the main frame 3, so that the segment 6 is placed on the upper surface 5 of the main frame 3 at the advanced position. And the transport jack 11
Is contracted, only the segment transport frame 9 retreats while the segment 6 is placed on the upper surface 5 of the main frame 3 at the advanced position.

【0027】この後、次のセグメント6を図示していな
いリフタ等で上昇させて後列コンベヤ15Cのメインフ
レーム3の後部上方へ渡すと、後列コンベヤ15Cのメ
インフレーム3の上面5には二つのセグメント6,6が
並んで載置されることになり、ここで再び前記リフトア
ップジャッキ7を伸長させてアップダウンレールフレー
ム8とセグメント搬送フレーム9を上昇させた後、搬送
ジャッキ11を伸長させると、二つのセグメント6,6
は並んだままセグメント搬送フレーム9の上面12によ
って前方に搬送され、続いて前記リフトアップジャッキ
7を収縮させてアップダウンレールフレーム8とセグメ
ント搬送フレーム9を下降させると、二つのセグメント
6は並んだまま前進した位置でメインフレーム3の上面
5に載置されることになる。
Thereafter, the next segment 6 is lifted by a lifter or the like (not shown) and passed over the rear portion of the main frame 3 of the rear row conveyor 15C, and the two segments are placed on the upper surface 5 of the main frame 3 of the rear row conveyor 15C. 6 and 6 are placed side by side. Here, the lift-up jack 7 is extended again to raise the up-down rail frame 8 and the segment transport frame 9, and then the transport jack 11 is extended. Two segments 6, 6
Are transported forward by the upper surface 12 of the segment transport frame 9 while being lined up. Subsequently, when the lift-up jack 7 is contracted to lower the up-down rail frame 8 and the segment transport frame 9, the two segments 6 are aligned. It is placed on the upper surface 5 of the main frame 3 at a position where the main frame 3 has moved forward.

【0028】このように後列コンベヤ15Cのメインフ
レーム3後部上方へのセグメント6の受け取り、リフト
アップジャッキ7の伸長、搬送ジャッキ11の伸長、リ
フトアップジャッキ7の収縮、搬送ジャッキ11の収縮
の作動を繰り返すことにより、図6に示すように後列コ
ンベヤ15Cのメインフレーム3の上面5に所要数(図
の例では三個)のセグメント6が載置される。
Thus, the operation of receiving the segment 6 above the rear portion of the main frame 3 of the rear row conveyor 15C, extending the lift-up jack 7, extending the transport jack 11, contracting the lift-up jack 7, and contracting the transport jack 11 is performed. By repeating, a required number (three in the example in the figure) of the segments 6 are placed on the upper surface 5 of the main frame 3 of the rear row conveyor 15C as shown in FIG.

【0029】この後、前述と同様に、後列コンベヤ15
Cのリフトアップジャッキ7を伸長させ(図7参照)、
搬送ジャッキ11を伸長させ(図8参照)、リフトアッ
プジャッキ7を収縮させると(図9参照)、前記後列コ
ンベヤ15Cのメインフレーム3の上面5における前端
部に載置されていたセグメント6が、前側に位置する中
間コンベヤ15Bのメインフレーム3の上面5における
後端部に移載される。
Thereafter, similarly to the above, the rear row conveyor 15
C lift-up jack 7 is extended (see FIG. 7),
When the transport jack 11 is extended (see FIG. 8) and the lift-up jack 7 is contracted (see FIG. 9), the segment 6 placed on the front end portion of the upper surface 5 of the main frame 3 of the rear row conveyor 15C becomes It is transferred to the rear end of the upper surface 5 of the main frame 3 of the intermediate conveyor 15B located on the front side.

【0030】以下、中間コンベヤ15B並びに前列コン
ベヤ15Aにおいて、後列コンベヤ15Cの場合と同様
の操作を繰り返し行うことにより、セグメント6を順次
エレクタ14の方に搬送することが可能となる。
Thereafter, by repeating the same operation as in the case of the rear row conveyor 15C in the intermediate conveyor 15B and the front row conveyor 15A, the segments 6 can be sequentially conveyed to the erector 14.

【0031】一方、仮に、前列コンベヤ15Aのメイン
フレーム3の上面5における前端部にセグメント6が残
って、中間コンベヤ15Bや後列コンベヤ15Cのメイ
ンフレーム3に空きができたような場合には、トンネル
後方から図示していないセグメント台車で運搬してきた
セグメント6を図示していないリフタ等で上昇させて後
列コンベヤ15Cのメインフレーム3の上面5における
後端部に載せた後、前述と同様に後列コンベヤ15C並
びに中間コンベヤ15Bを駆動すると、セグメント6は
順次前方へ1ピッチずつ詰めて行かれ、前列コンベヤ1
5Aのメインフレーム3の上面5における後端部まで移
送される形となる。
On the other hand, if the segment 6 remains at the front end of the upper surface 5 of the main frame 3 of the front row conveyor 15A and the intermediate frame 15B or the main frame 3 of the rear row conveyor 15C is vacant, the tunnel 6 The segment 6 transported from behind by a segment truck (not shown) is lifted by a lifter (not shown) or the like and placed on the rear end of the upper surface 5 of the main frame 3 of the rear conveyor 15C. When the intermediate conveyor 15C and the intermediate conveyor 15B are driven, the segments 6 are successively packed forward by one pitch, and the front conveyor 1
5A is transferred to the rear end of the upper surface 5 of the main frame 3.

【0032】この結果、前記セグメント台車で運ばれて
きたセグメント6を後列コンベヤ15Cへ順次受け渡す
ことが可能となり、該セグメント台車は停止、待機をし
なくて済み、作業が円滑に行われることとなり、工事全
体に支障を来すこともなくなる。
As a result, the segments 6 carried by the segment truck can be sequentially transferred to the rear row conveyor 15C, and the segment truck does not need to stop and wait, and the work can be performed smoothly. In addition, it will not hinder the entire construction.

【0033】こうして、前列コンベヤ15Aのメインフ
レーム3の上面5における前端部にセグメント6が残っ
たような場合であっても、中間コンベヤ15Bや後列コ
ンベヤ15Cのメインフレーム3に空きがあれば、トン
ネル後方から運搬してきたセグメント6を後列コンベヤ
15Cのメインフレーム3の上面5における後端部に載
せて順次前方へ詰めることができ、工事全体の効率向上
を図り得る。
Thus, even if the segment 6 remains at the front end of the upper surface 5 of the main frame 3 of the front row conveyor 15A, if there is a vacancy in the intermediate frame 15B or the main frame 3 of the rear row conveyor 15C, the tunnel The segments 6 transported from the rear can be placed on the rear end of the upper surface 5 of the main frame 3 of the rear row conveyor 15C and sequentially packed forward, so that the efficiency of the entire construction can be improved.

【0034】尚、上述の図示例においては、三基に分割
形成した前列コンベヤ15Aと中間コンベヤ15Bと後
列コンベヤ15Cとを、トンネルの上部に配設してある
ため、トンネル下部に各種台車の枕木やレール等を敷設
する作業が行いやすくなり、作業効率の向上にもつなが
るが、前記コンベヤ15A,15B,15Cを、図13
〜図19に示される従来例と同様に、既設セグメント1
の内周底部に敷設したレール2上に車輪4を介して配設
してもよく、この場合には、セグメント6の外周面を下
に向けてメインフレーム3上に載置させる構造にするこ
とは言うまでもない。
In the illustrated example, the front conveyor 15A, the intermediate conveyor 15B, and the rear conveyor 15C, which are divided into three parts, are disposed above the tunnel, so that various truck sleepers are provided below the tunnel. Although the work of laying the rails and the rails becomes easy and leads to the improvement of the work efficiency, the conveyors 15A, 15B and 15C are not shown in FIG.
19 as in the conventional example shown in FIG.
May be arranged on rails 2 laid on the bottom of the inner circumference via wheels 4. In this case, a structure is adopted in which the outer surface of the segment 6 is placed on the main frame 3 with the outer surface facing downward. Needless to say.

【0035】又、上述の図示例においては、三基に分割
形成した前列コンベヤ15Aと中間コンベヤ15Bと後
列コンベヤ15Cとを、図2に示す如く、前後方向へ略
真っ直ぐに配設しているが、前記コンベヤ15A,15
B,15Cを平面的に見て所要の角度を持たせて配設す
ることも可能であり、このようにした場合には、カーブ
しているトンネルの施工において、従来のように真っ直
ぐで長いセグメント搬送装置では配置上無理があるよう
な場合であっても、トンネルのカーブに合わせて前記コ
ンベヤ15A,15B,15Cを配置でき有効となる。
In the illustrated example, the front conveyor 15A, the intermediate conveyor 15B, and the rear conveyor 15C, which are divided and formed into three units, are disposed substantially straight in the front-rear direction as shown in FIG. , The conveyors 15A, 15
It is also possible to arrange the B and 15C at a required angle in plan view, and in this case, in the construction of a curved tunnel, a straight and long segment as in the related art is used. Even if it is difficult to arrange the conveyors, the conveyors 15A, 15B and 15C can be arranged according to the curve of the tunnel, which is effective.

【0036】但し、前述の如く、コンベヤ15A,15
B,15Cを平面的に見て所要の角度を持たせて配設し
た場合には、リフタ等から後列コンベヤ15Cのメイン
フレーム3の上面5における後端部に移載されたセグメ
ント6と、前記後列コンベヤ15Cのメインフレーム3
の上面5における前端部から中間コンベヤ15Bのメイ
ンフレーム3の上面5における後端部に移載されたセグ
メント6と、前記中間コンベヤ15Bのメインフレーム
3の上面5における前端部から前列コンベヤ15Aのメ
インフレーム3の上面5における後端部に移載されたセ
グメント6とをそれぞれ、位置修正してやる必要があ
る。
However, as described above, the conveyors 15A, 15A
In the case where B and 15C are arranged at a required angle in plan view, the segment 6 transferred from a lifter or the like to the rear end of the upper surface 5 of the main frame 3 of the rear row conveyor 15C, Main frame 3 of back row conveyor 15C
The segment 6 transferred from the front end of the upper surface 5 of the main frame 3 of the intermediate conveyor 15B to the rear end of the main frame 3 of the intermediate conveyor 15B, and the main body of the front row conveyor 15A from the front end of the upper surface 5 of the main frame 3 of the intermediate conveyor 15B. It is necessary to correct the position of each of the segments 6 transferred to the rear end of the upper surface 5 of the frame 3.

【0037】このため、トンネルのカーブに合わせて前
記コンベヤ15A,15B,15Cを配置するような場
合には、図10〜図12に示す如く、セグメント6を前
後方向へスライド自在に支持するローラ17と、該ロー
ラ17上にセグメント6を支持させた状態で該セグメン
ト6の前後端面所要位置を押すことにより鉛直軸を中心
とするセグメント6のヨーイング修正用のヨーイングセ
ンタリングユニット18と、昇降ジャッキ19の伸縮作
動により昇降可能に配設され且つセグメント6をその円
周方向へスライド自在に支持する昇降ローラ20と、該
昇降ローラ20上にセグメント6を支持させた状態で該
セグメント6の両幅端面を押すことによりセグメント6
の円弧の中心軸を中心とするローリング修正用のローリ
ングセンタリングユニット21とを、各コンベヤ15
A,15B,15Cの後端部所要位置にそれぞれ配設す
る。
For this reason, when the conveyors 15A, 15B and 15C are arranged in accordance with the curve of the tunnel, as shown in FIGS. 10 to 12, the rollers 17 for supporting the segments 6 slidably in the front-rear direction. The yaw centering unit 18 for correcting yawing of the segment 6 about the vertical axis by pushing a required position of the front and rear end surfaces of the segment 6 while the segment 6 is supported on the rollers 17, and the lifting jack 19. An elevating roller 20 that is arranged to be able to move up and down by an expansion and contraction operation and supports the segment 6 so as to be slidable in the circumferential direction thereof, and the both width end faces of the segment 6 with the segment 6 being supported on the elevating roller 20. Pressing segment 6
And a rolling centering unit 21 for correcting rolling centered on the center axis of the arc of each of the conveyors 15.
A, 15B, and 15C are respectively provided at required rear end positions.

【0038】前記ヨーイングセンタリングユニット18
は、ヨーイング支持ブラケット18aに対し揺動自在に
枢着されたヨーイング押付部材18bと、該ヨーイング
押付部材18bに連結され且つヨーイング押付部材18
bの先端部をセグメント6の前端面或いは後端面に押し
付けてセグメント6のヨーイング修正を行うためのヨー
イングジャッキ18cとを備えてなる構成を有してい
る。
The yawing centering unit 18
Is a yawing pressing member 18b pivotally attached to the yawing supporting bracket 18a, and a yawing pressing member 18b connected to the yawing pressing member 18b.
and a yaw jack 18c for pressing the front end of the segment b against the front end face or the rear end face of the segment 6 to correct the yawing of the segment 6.

【0039】又、前記ローリングセンタリングユニット
21は、ローリング支持ブラケット21aに対し揺動自
在に枢着されたローリング押付部材21bと、該ローリ
ング押付部材21bに連結され且つローリング押付部材
21bの先端部をセグメント6の左右いずれかの幅端面
に押し付けてセグメント6のローリング修正を行うため
のローリングジャッキ21cとを備えてなる構成を有し
ている。
The rolling centering unit 21 includes a rolling pressing member 21b pivotally attached to the rolling support bracket 21a and a segment connected to the rolling pressing member 21b and a tip end of the rolling pressing member 21b. And a rolling jack 21c for pressing the left or right width end face of the segment 6 to correct the rolling of the segment 6.

【0040】尚、図10〜図12には、後列コンベヤ1
5Cの後端部に、前記ローラ17とヨーイングセンタリ
ングユニット18と昇降ローラ20とローリングセンタ
リングユニット21とを配設した例を示してあるが、中
間コンベヤ15B並びに前列コンベヤ15Aについて
も、メインフレーム3、アップダウンレールフレーム8
及びセグメント搬送フレーム9と干渉しないように前記
ローラ17とヨーイングセンタリングユニット18と昇
降ローラ20とローリングセンタリングユニット21と
を配設すればよい。
FIGS. 10 to 12 show a back row conveyor 1.
5C shows an example in which the roller 17, the yawing centering unit 18, the elevating roller 20, and the rolling centering unit 21 are disposed at the rear end, but the intermediate frame 15B and the front row conveyor 15A are also provided with the main frame 3, Up-down rail frame 8
The roller 17, the yawing centering unit 18, the elevating roller 20, and the rolling centering unit 21 may be provided so as not to interfere with the segment transport frame 9.

【0041】前記各コンベヤ15A,15B,15Cの
後端部に移載されたセグメント6の位置修正を行う場
合、先ず、前記ローラ17上にセグメント6を支持させ
た状態で、各ヨーイングセンタリングユニット18のヨ
ーイングジャッキ18cを伸長させると、ヨーイング押
付部材18bの先端部がセグメント6の前端面或いは後
端面に押し付けられ、セグメント6が前記ローラ17上
で鉛直軸を中心に旋回する方向へスライドし、該セグメ
ント6のヨーイング修正が行われ、続いて、昇降ジャッ
キ19を伸長させ昇降ローラ20を所要量だけ上昇させ
て、該昇降ローラ20上にセグメント6を支持させた状
態で、各ローリングセンタリングユニット21のローリ
ングジャッキ21cを伸長させると、ローリング押付部
材21bの先端部がセグメント6の左右の幅端面に押し
付けられ、セグメント6が前記昇降ローラ20上でセグ
メント6の円弧の中心軸を中心に揺動する方向へスライ
ドし、該セグメント6のローリング修正が行われる。
When correcting the position of the segment 6 transferred to the rear end of each of the conveyors 15A, 15B, 15C, first, with the segment 6 supported on the rollers 17, each yawing centering unit 18 When the yawing jack 18c is extended, the leading end of the yawing pressing member 18b is pressed against the front end surface or the rear end surface of the segment 6, and the segment 6 slides on the roller 17 in the direction of turning around the vertical axis. After the segment 6 is corrected for yawing, the lifting jack 19 is extended, the lifting roller 20 is raised by a required amount, and the segment 6 is supported on the lifting roller 20. When the rolling jack 21c is extended, the tip of the rolling pressing member 21b is Pressed against the width edge of the left and right segment 6, slides in the direction of the segment 6 is swung about the central axis of the arc of the segment 6 on the lift roller 20, rolling correction of the segment 6 is performed.

【0042】このようにすれば、コンベヤ15A,15
B,15Cを平面的に見て所要の角度を持たせて配設し
た場合でも、セグメント6は各コンベヤ15A,15
B,15Cにおいて正しい姿勢を保って搬送される形と
なり、セグメント6の搬送が円滑に行われることとな
る。又、シールドトンネルには必ずカーブがあるが、急
カーブに沿って進む別々の台車の上に各コンベヤを配設
すれば、自動的にカーブに追従してセグメントを搬送で
きるシステムを構築することができる。
By doing so, the conveyors 15A, 15A
Even when B and 15C are arranged with a required angle when viewed in a plane, the segment 6 can be connected to each of the conveyors 15A and 15C.
In B and 15C, the segment 6 is conveyed while maintaining the correct posture, so that the segment 6 can be conveyed smoothly. In addition, there is always a curve in the shield tunnel, but if you place each conveyor on a separate bogie that goes along a sharp curve, you can build a system that can automatically transport segments following the curve. it can.

【0043】尚、本発明のセグメント搬送装置は、上述
の図示例にのみ限定されるものではなく、分割形成する
コンベヤの基数は二基でも三基以上であってもよいこ
と、各コンベヤのメインフレーム上に載置されるセグメ
ントの個数は二個でも三個以上であってもよいこと等、
その他、本発明の要旨を逸脱しない範囲内において種々
変更を加え得ることは勿論である。
The segment conveying device of the present invention is not limited to the above-described example, and the number of conveyors to be divided and formed may be two or three or more. The number of segments placed on the frame may be two or three or more,
In addition, it goes without saying that various changes can be made without departing from the spirit of the present invention.

【0044】[0044]

【発明の効果】以上、説明したように本発明のセグメン
ト搬送装置によれば、最前列に位置するコンベヤのメイ
ンフレームの上面における前端部にセグメントが残った
ような場合であっても、最前列に位置するコンベヤより
後方に位置するコンベヤのメインフレームに空きがあれ
ば、トンネル後方から運搬してきたセグメントを、最後
列に位置するコンベヤのメインフレームの上面における
後端部に載せて順次前方へ詰めることができ、工事全体
の効率向上を図り得るという優れた効果を奏し得る。
As described above, according to the segment conveying apparatus of the present invention, even if a segment remains at the front end of the upper surface of the main frame of the conveyor located in the front row, If there is a vacancy in the main frame of the conveyor located behind the conveyor located at the end, the segments conveyed from the rear of the tunnel are placed on the rear end of the upper surface of the main frame of the conveyor located at the last row, and sequentially packed forward. This can provide an excellent effect that the efficiency of the entire construction can be improved.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明を実施する形態の一例の側面図である。FIG. 1 is a side view of an example of an embodiment of the present invention.

【図2】本発明を実施する形態の一例の平面図である。FIG. 2 is a plan view of an example of an embodiment of the present invention.

【図3】図1のIII−III矢視図である。FIG. 3 is a view taken in the direction of arrows III-III in FIG. 1;

【図4】図1のIV−IV矢視図である。FIG. 4 is a view taken in the direction of arrows IV-IV in FIG. 1;

【図5】図1のV−V矢視図である。FIG. 5 is a view taken in the direction of arrows VV in FIG. 1;

【図6】本発明を実施する形態の一例において後列コン
ベヤから中間コンベヤへセグメントを移載する場合の作
動状態を表わす第一の段階の側面図である。
FIG. 6 is a side view of a first stage showing an operation state when a segment is transferred from a rear row conveyor to an intermediate conveyor in an example of an embodiment of the present invention.

【図7】本発明を実施する形態の一例において後列コン
ベヤから中間コンベヤへセグメントを移載する場合の作
動状態を表わす第二の段階の側面図である。
FIG. 7 is a side view of a second stage showing an operating state when a segment is transferred from a rear conveyor to an intermediate conveyor in an example of an embodiment of the present invention.

【図8】本発明を実施する形態の一例において後列コン
ベヤから中間コンベヤへセグメントを移載する場合の作
動状態を表わす第三の段階の側面図である。
FIG. 8 is a side view of a third stage showing an operation state when a segment is transferred from a rear row conveyor to an intermediate conveyor in an example of an embodiment of the present invention.

【図9】本発明を実施する形態の一例において後列コン
ベヤから中間コンベヤへセグメントを移載する場合の作
動状態を表わす第四の段階の側面図である。
FIG. 9 is a side view of a fourth stage showing an operating state when the segments are transferred from the rear row conveyor to the intermediate conveyor in an example of the embodiment of the present invention.

【図10】本発明を実施する形態の一例においてコンベ
ヤの後端部に配設されるセグメント位置修正用の装置を
表わす側面図である。
FIG. 10 is a side view showing an apparatus for correcting a segment position provided at a rear end of a conveyor in an example of an embodiment of the present invention.

【図11】図10のXI−XI矢視図である。FIG. 11 is a view as viewed in the direction of arrows XI-XI in FIG. 10;

【図12】図10のXII−XII矢視図である。12 is a view taken in the direction of arrows XII-XII in FIG. 10;

【図13】従来例の側面図である。FIG. 13 is a side view of a conventional example.

【図14】図13のXIV−XIV矢視図である。FIG. 14 is a view taken in the direction of arrows XIV-XIV in FIG. 13;

【図15】図13に示す従来例においてセグメントを移
載する場合の図13の次の作動状態を表わす側面図であ
る。
FIG. 15 is a side view showing the next operation state of FIG. 13 when a segment is transferred in the conventional example shown in FIG.

【図16】図15の次の作動状態を表わす側面図であ
る。
FIG. 16 is a side view showing the next operation state of FIG. 15;

【図17】図16の次の作動状態を表わす側面図であ
る。
FIG. 17 is a side view showing the next operation state of FIG. 16;

【図18】図17の次の作動状態を表わす側面図であ
る。
FIG. 18 is a side view showing the next operation state of FIG. 17;

【図19】図18から更に続いた作動状態を表わす側面
図である。
FIG. 19 is a side view showing the operation state further continued from FIG. 18;

【符号の説明】[Explanation of symbols]

3 メインフレーム 5 上面 6 セグメント 7 リフトアップジャッキ 8 アップダウンレールフレーム 9 セグメント搬送フレーム 12 上面 14 エレクタ 15A 前列コンベヤ(コンベヤ) 15B 中間コンベヤ(コンベヤ) 15C 後列コンベヤ(コンベヤ) 3 Main frame 5 Upper surface 6 Segment 7 Lift-up jack 8 Up-down rail frame 9 Segment transport frame 12 Upper surface 14 Elector 15A Front row conveyor (conveyor) 15B Intermediate conveyor (conveyor) 15C Rear row conveyor (conveyor)

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 上面に所要数のセグメントを載置し得る
メインフレームと、 リフトアップジャッキを介して前記メインフレーム上に
設けられたアップダウンレールフレームと、 該アップダウンレールフレーム上に前後進可能に設けら
れ、且つ前記リフトアップジャッキが伸長したとき上面
が前記メインフレームの上面よりも上昇してセグメント
を載置し得る一方、前記リフトアップジャッキが収縮し
たとき上面が前記メインフレームの上面よりも下降する
セグメント搬送フレームとを備えたコンベヤを、シール
ド掘進機のエレクタによるセグメント組立位置から後方
に向けて複数基配設し、 前記コンベヤのメインフレームの上面における前端部に
載置されたセグメントを、セグメント搬送フレームの作
動により前側に位置するコンベヤのメインフレームの上
面における後端部に移載し得るよう構成したことを特徴
とするセグメント搬送装置。
A main frame on which a required number of segments can be placed; an up / down rail frame provided on the main frame via a lift-up jack; And when the lift-up jack is extended, the upper surface can rise above the upper surface of the main frame to mount the segment, while when the lift-up jack contracts, the upper surface is higher than the upper surface of the main frame. A plurality of conveyors having a descending segment transport frame are arranged rearward from a segment assembling position by an erector of a shield excavator, and a segment mounted on a front end of an upper surface of a main frame of the conveyor, The conveyor main frame located on the front side by the operation of the segment transport frame A segment transport device configured to be transferable to a rear end portion on an upper surface of a frame.
JP17837197A 1997-07-03 1997-07-03 Segment transport device Expired - Fee Related JP3800740B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP17837197A JP3800740B2 (en) 1997-07-03 1997-07-03 Segment transport device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP17837197A JP3800740B2 (en) 1997-07-03 1997-07-03 Segment transport device

Publications (2)

Publication Number Publication Date
JPH1122396A true JPH1122396A (en) 1999-01-26
JP3800740B2 JP3800740B2 (en) 2006-07-26

Family

ID=16047329

Family Applications (1)

Application Number Title Priority Date Filing Date
JP17837197A Expired - Fee Related JP3800740B2 (en) 1997-07-03 1997-07-03 Segment transport device

Country Status (1)

Country Link
JP (1) JP3800740B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6146844B1 (en) * 2016-11-22 2017-06-14 伊藤忠建機株式会社 Covering body transfer device
CN107905823A (en) * 2017-11-24 2018-04-13 徐工集团凯宫重工南京有限公司 It is a kind of to stretch section of jurisdiction conveyer and its operating method without top for shield machine segment transport
CN113187523A (en) * 2021-06-11 2021-07-30 中铁工程装备集团有限公司 Long-distance heavy-load duct piece conveying device and conveying method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6146844B1 (en) * 2016-11-22 2017-06-14 伊藤忠建機株式会社 Covering body transfer device
CN107905823A (en) * 2017-11-24 2018-04-13 徐工集团凯宫重工南京有限公司 It is a kind of to stretch section of jurisdiction conveyer and its operating method without top for shield machine segment transport
CN113187523A (en) * 2021-06-11 2021-07-30 中铁工程装备集团有限公司 Long-distance heavy-load duct piece conveying device and conveying method
CN113187523B (en) * 2021-06-11 2022-04-05 中铁工程装备集团有限公司 A long-distance heavy-load segment conveying device and transportation method

Also Published As

Publication number Publication date
JP3800740B2 (en) 2006-07-26

Similar Documents

Publication Publication Date Title
CN213504646U (en) Gas pipe fitting switching-over feeding mechanism
JP3845965B2 (en) Segment transport device
JP3800740B2 (en) Segment transport device
JP4866770B2 (en) Segment conveying apparatus and segment conveying method
JP2004190690A (en) Pipe carry-in connecting method and pipe carry-in carriage
JP5777029B2 (en) Small-diameter shield segment conveying mechanism and method
JP2562649Y2 (en) Segment transfer device
CN110295927A (en) One kind feeding piece machine walking dolly propulsion system
JP3763367B2 (en) Segment loading device and segment loading method
CN115653637A (en) A segment removal device
JPH063917Y2 (en) Segment transfer device
JP3060397B2 (en) Tunnel construction material transport system
JPH0424228Y2 (en)
JP2957095B2 (en) Segment feeder
JP3047614B2 (en) Segment supply method of shield method
JP2563210Y2 (en) Segment yawing correction device
JP3093165B2 (en) Segment feeder
JP3363875B2 (en) Segment feeder
JPH1181895A (en) Segment feeder
JPH0647917B2 (en) Segment feeder
JPH10131695A (en) Segment transfer equipment in shield construction
JPS627498U (en)
JP3765128B2 (en) Segment transport device
JP3280713B2 (en) Segment feeder
JP2010053653A (en) Segment-conveying apparatus

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20040512

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20060411

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20060424

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090512

Year of fee payment: 3

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090512

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100512

Year of fee payment: 4

LAPS Cancellation because of no payment of annual fees