JPH11269853A - Construction method of concrete structure - Google Patents

Construction method of concrete structure

Info

Publication number
JPH11269853A
JPH11269853A JP7053998A JP7053998A JPH11269853A JP H11269853 A JPH11269853 A JP H11269853A JP 7053998 A JP7053998 A JP 7053998A JP 7053998 A JP7053998 A JP 7053998A JP H11269853 A JPH11269853 A JP H11269853A
Authority
JP
Japan
Prior art keywords
concrete
outer frame
crushed stone
fluidity
poured
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP7053998A
Other languages
Japanese (ja)
Inventor
Hideaki Sato
英明 佐藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kumagai Gumi Co Ltd
Original Assignee
Kumagai Gumi Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kumagai Gumi Co Ltd filed Critical Kumagai Gumi Co Ltd
Priority to JP7053998A priority Critical patent/JPH11269853A/en
Publication of JPH11269853A publication Critical patent/JPH11269853A/en
Pending legal-status Critical Current

Links

Landscapes

  • Revetment (AREA)

Abstract

PROBLEM TO BE SOLVED: To shorten a time for infiltration of highly fluidal concrete and to firmly combine large particle sized crushed stone with the highly fluidal concrete. SOLUTION: After large particle sized crushed stone 2 as aggregate is charged to the inside formed by a concrete outer frame 1, highly fluidal concrete 3 is placed to the inside of the outer frame 1. Casting of the concrete 3 is made from above of the outer frame 1, or it can be made from below the outer frame 1 through a concrete casting pipe by piping the concrete casting pipe inside the outer frame 1 in the case the large particle sized crushed stone 2 is charged. After the concrete 3 is placed inside the outer frame 1 to be formd, in such a way as the large particle sized crushed stone 2 is charged, the order in the casting of the concrete 3 and the charge of the large particle sized crushed stone 2 can be changed.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】この発明は、コンクリートダ
ムやその他のコンクリート構造物の施工方法に関する。
The present invention relates to a method for constructing a concrete dam and other concrete structures.

【0002】[0002]

【従来の技術】特開平8−177035号公報には、堤
体の外形としてのコンクリート製の外枠を形成する工程
と、外枠の内部に現場での発生土を投入して締固めて発
生土層を形成する工程と、発生土層に高流動性コンクリ
ートを含浸させて堆積層を形成する工程とを1サイクル
とし、この1サイクルの工程を繰り返すことにより所定
高さの砂防ダムの袖部を形成する方法が開示されてい
る。
2. Description of the Related Art Japanese Patent Application Laid-Open No. 8-177,035 discloses a process of forming an outer frame made of concrete as an outer shape of a bank, and a method of putting soil generated on site into the outer frame and compacting the soil. The step of forming the soil layer and the step of impregnating the generated soil layer with high-fluidity concrete to form a sedimentary layer are defined as one cycle, and by repeating the one cycle, the sleeve portion of the sabo dam having a predetermined height is obtained. Are disclosed.

【0003】[0003]

【発明が解決しようとする課題】しかし、前記従来の方
法では、締固められた発生土層に高流動性コンクリート
を浸透させるため、高流動性コンクリートの浸透に長時
間を要するうえ、発生土と高流動性コンクリートとの強
固な結合を得にくいという問題がある。
However, in the above-mentioned conventional method, since the high-fluidity concrete penetrates into the compacted soil layer, it takes a long time to penetrate the high-fluidity concrete, and the generated soil and There is a problem that it is difficult to obtain a strong bond with high-fluidity concrete.

【0004】そこで、この発明は、骨材として大粒径砕
石を利用し、高流動性コンクリートの浸透の短時間化、
大粒径砕石と高流動性コンクリートとの強固な結合化を
得ることができるコンクリート構造物の施工方法を提供
しようとするものである。
[0004] Therefore, the present invention utilizes large-sized crushed stone as an aggregate to shorten the permeation time of highly fluid concrete,
An object of the present invention is to provide a method for constructing a concrete structure capable of obtaining a strong bond between a large-sized crushed stone and high-fluidity concrete.

【0005】[0005]

【課題を解決するための手段】請求項1の発明にあって
は、コンクリート製の外枠を形成し、この外枠の内部に
骨材としての大粒径砕石を投入した後、高流動性コンク
リートを外枠の内部に上方より打設することを特徴とし
ている。請求項2の発明にあっては、コンクリート製の
外枠を形成し、この外枠の内部にコンクリート打設用パ
イプを配管すると共に骨材としての大粒径砕石を投入し
た後、コンクリート打設用パイプを介して高流動性コン
クリートを外枠の内部に下方より打設することを特徴と
している。請求項3の発明にあっては、コンクリート製
の外枠を形成し、この外枠の内部に高流動性コンクリー
トを打設した後、骨材としての大粒径砕石を投入するこ
とを特徴としている。
According to the first aspect of the present invention, a concrete outer frame is formed, and a large particle size crushed stone as an aggregate is introduced into the outer frame. It is characterized in that concrete is poured into the outer frame from above. According to the second aspect of the present invention, a concrete outer frame is formed, a concrete casting pipe is piped into the outer frame, and a large-grained crushed stone as an aggregate is poured. It is characterized in that high-fluidity concrete is poured into the outer frame from below through a pipe for use. The invention according to claim 3 is characterized in that a concrete outer frame is formed, high-fluidity concrete is poured into the inside of the outer frame, and then large-sized crushed stone as an aggregate is charged. I have.

【0006】[0006]

【発明の実施の形態】図1〜図2は第1実施形態を示
し、図1はコンクリート構造物としてのコンクリートダ
ムを施工する工程を示し、図2は高流動性コンクリート
3が打設された状態の側面を示す。
1 and 2 show a first embodiment, FIG. 1 shows a process of constructing a concrete dam as a concrete structure, and FIG. 2 shows a high fluidity concrete 3 cast therein. 3 shows a side view of the state.

【0007】図1において、この第1実施形態では、先
ず、ステップ101に示すように、堤体の外形としての
コンクリート製の外枠1を多層に形成する。外枠1は、
図外の型枠を用いて外部配合コンクリートを打設するこ
とにより、所定高さの上方が開口された中空状に形成さ
れる。外枠1は、養生後の固化した状態において、外枠
1の内部に投入されるステップ102に示す大粒径砕石
2やその後に打設されるステップ103に示す高流動性
コンクリート3を負担し得るに十分な強度及び厚さに定
められている。
Referring to FIG. 1, in the first embodiment, first, as shown in step 101, a concrete outer frame 1 as an outer shape of a bank is formed in multiple layers. Outer frame 1 is
By casting external compound concrete using a mold (not shown), it is formed in a hollow shape having an opening at a predetermined height. The outer frame 1 bears, in the solidified state after curing, large crushed stone 2 shown in step 102 which is put into the outer frame 1 and high fluidity concrete 3 shown in step 103 which is cast thereafter. The strength and thickness are determined to be sufficient.

【0008】次に、ステップ102に示すように、養生
後の外枠1の内部に骨材としての大粒径砕石2を外枠1
の天端付近まで投入する。大粒径砕石2は、現場で発生
する土砂より例えば粒径が150mm以上有る砕石を選
別して利用する。そして、選別された大粒径砕石2は、
ロックフィルダムの施工と同様に、図外の大型重機を用
いて外枠1の内部に撒き出されて敷き詰められる。
Next, as shown in step 102, large crushed stone 2 as an aggregate is placed inside the outer frame 1 after curing.
Into the vicinity of the top. The large crushed stone 2 is used by selecting crushed stone having a particle diameter of 150 mm or more, for example, from earth and sand generated on site. And the sorted large crushed stone 2
Similar to the construction of the rock fill dam, it is scattered and spread inside the outer frame 1 using a large heavy machine (not shown).

【0009】その後、ステップ103に示すように、セ
メントと砂及び水が流動性の良いスラリー状態に混練さ
れた高流動性コンクリート3を外枠1の内部に上方より
打設する。高流動性コンクリート3は、図外のコンクリ
ートバケットやコンクリートシュート或いはコンクリー
トポンプ等を用いて打設されることにより、各大粒径砕
石2の相互の隙間を経由して外枠1の底部より上方に徐
々に充填される。そして、外枠1の天端付近まで充填さ
れたら、高流動性コンクリート3の打設を止める。その
まま、高流動性コンクリート3が養生期間を経て固化す
ることにより、外枠1と大粒径砕石2と高流動性コンク
リート3とが一体となり所定高さのコンクリートダムに
なる。その後、必要ならば、仕上げを行う。
Thereafter, as shown in step 103, a highly fluid concrete 3 in which cement, sand and water are kneaded into a slurry having good fluidity is poured into the outer frame 1 from above. The high-fluidity concrete 3 is cast using a concrete bucket, a concrete chute, a concrete pump, or the like (not shown), so that the concrete 3 is located above the bottom of the outer frame 1 through the gap between the large crushed stones 2. Is gradually filled. When the outer frame 1 is filled to the vicinity of the top end, the pouring of the highly fluid concrete 3 is stopped. As the high-fluidity concrete 3 is solidified after the curing period, the outer frame 1, the large-diameter crushed stone 2 and the high-fluidity concrete 3 are integrated into a concrete dam having a predetermined height. Thereafter, if necessary, finishing is performed.

【0010】この第1実施形態の方法によれば、骨材と
して大粒径砕石2を用いたことにより、各大粒径砕石2
の相互間に隙間が形成され、それらの隙間が外枠1の内
部で上下左右に不規則に連続している。よって、図2に
示すように、高流動性コンクリート3が各大粒径砕石2
の相互の隙間に短時間で万遍なく浸透できる。又、浸透
した高流動性コンクリート3が大粒径砕石2の個々を包
むように固化して各大粒径砕石2を強固に結合できる。
According to the method of the first embodiment, since the large crushed stone 2 is used as the aggregate, each large crushed stone 2
Are formed, and these gaps are irregularly continuous vertically and horizontally within the outer frame 1. Therefore, as shown in FIG.
Can evenly penetrate into the gaps between each other in a short time. In addition, the infiltrated high-fluidity concrete 3 is solidified so as to wrap each of the large-sized crushed stones 2, and the large-sized crushed stones 2 can be strongly bonded.

【0011】図3〜図4は第2実施形態を示し、図3は
コンクリートダムを施工する工程を示し、図4は高流動
性コンクリート3が打設された状態の側面を示す。
FIGS. 3 and 4 show a second embodiment, FIG. 3 shows a step of constructing a concrete dam, and FIG. 4 shows a side view of a state where the highly fluid concrete 3 has been poured.

【0012】図3において、この第2実施形態では、先
ず、図1のステップ101と同様なステップ201に示
すように、図外の型枠を用いて外部配合コンクリートを
打設することにより、所定高さの上方が開口されたコン
クリート製の外枠1を多層に形成する。
In FIG. 3, in the second embodiment, first, as shown in step 201 similar to step 101 in FIG. An outer frame 1 made of concrete with an opening at an upper portion of the height is formed in a multilayer.

【0013】次に、ステップ202に示すように、養生
後の外枠1の内底部にコンクリート圧送管のようなコン
クリート打設用パイプ4を配管した後、大粒径砕石2を
外枠1の内部に撒き出して敷き詰める。
Next, as shown in step 202, a concrete casting pipe 4 such as a concrete feed pipe is laid on the inner bottom of the outer frame 1 after curing, and then the large-sized crushed stone 2 is formed on the outer frame 1. Spread out inside and spread.

【0014】その後、ステップ203に示すように、コ
ンクリート打設用パイプ4の一端に図外のコンクリート
ポンプを接続し、コンクリートポンプよりコンクリート
打設用パイプ4に高流動性コンクリート3を圧送する。
これにより、図4にも示すように、高流動性コンクリー
ト3がコンクリート打設用パイプ4の周壁に設けられた
複数の排出口4aより外枠1の内部に下方より打設され
る。そして、高流動性コンクリート3が各大粒径砕石2
の相互の隙間を経由して外枠1の底部より上方に徐々に
充填されて外枠1の天端付近に到達したら、高流動性コ
ンクリート3の打設を止める。そのまま、高流動性コン
クリート3が養生期間を経て固化することにより、外枠
1と大粒径砕石2と高流動性コンクリート3とが一体と
なり所定高さのコンクリートダムになる。その後、必要
ならば、仕上げを行う。
Thereafter, as shown in step 203, a concrete pump (not shown) is connected to one end of the concrete placing pipe 4, and the high-flowable concrete 3 is pumped from the concrete pump to the concrete placing pipe 4.
Thereby, as shown in FIG. 4, the high-fluidity concrete 3 is cast from below into the outer frame 1 through a plurality of discharge ports 4 a provided on the peripheral wall of the concrete casting pipe 4. Then, the high-fluidity concrete 3 is made of each large-sized crushed stone 2
When the filler is gradually filled above the bottom of the outer frame 1 through the gap between the two and reaches near the top end of the outer frame 1, the pouring of the highly fluid concrete 3 is stopped. As the high-fluidity concrete 3 is solidified after the curing period, the outer frame 1, the large-diameter crushed stone 2 and the high-fluidity concrete 3 are integrated into a concrete dam having a predetermined height. Thereafter, if necessary, finishing is performed.

【0015】この第2実施形態の方法によれば、外枠1
の形成、コンクリート打設用パイプ4の配管及び大粒径
砕石2の投入、高流動性コンクリート3の下方よりの打
設により、高流動性コンクリート3が各大粒径砕石2の
相互の隙間に短時間で万遍なく浸透し、高流動性コンク
リート3が大粒径砕石2の個々を包むように固化して各
大粒径砕石2を強固に結合できる。
According to the method of the second embodiment, the outer frame 1
Of high-fluidity concrete 3 in the gaps between the large-size crushed stones 2 by forming concrete, laying pipes for concrete casting pipes 4 and feeding large-sized crushed stones 2, and placing the high-flowable concrete 3 from below. It can permeate uniformly in a short time, solidify the high-fluidity concrete 3 so as to wrap each of the large-sized crushed stones 2, and can firmly bind each large-sized crushed stone 2.

【0016】この第2実施形態では図4に示すようにコ
ンクリート打設用パイプ4を外枠1の内底部に接触した
形態に配管したが、コンクリート打設用パイプ4を外枠
1の内底部より離して配管しても良い。
In the second embodiment, as shown in FIG. 4, the concrete casting pipe 4 is arranged in contact with the inner bottom of the outer frame 1, but the concrete casting pipe 4 is connected to the inner bottom of the outer frame 1. The piping may be further apart.

【0017】図5は第3実施形態のコンクリートダムを
施工する工程を示す。この第3実施形態では、先ず、図
1のステップ101と同様なステップ301に示すよう
に、図外の型枠を用いて外部配合コンクリートを打設す
ることにより、所定高さの上方が開口されたコンクリー
ト製の外枠1を多層に形成する。
FIG. 5 shows a process of constructing a concrete dam according to the third embodiment. In the third embodiment, first, as shown in Step 301 similar to Step 101 in FIG. 1, an upper portion of a predetermined height is opened by pouring external compound concrete using a formwork not shown. The outer frame 1 made of concrete is formed in multiple layers.

【0018】次に、ステップ302に示すように、養生
後の外枠1の内部に高流動性コンクリート3を図外のコ
ンクリートバケットやコンクリートシュート或いはコン
クリートポンプ等を用いて外枠1の上方より打設する。
この高流動性コンクリート3の打設量は、その後にステ
ップ303に示す大粒径砕石2が投入されても、高流動
性コンクリート3の液面が外枠1の天端付近に到達し、
高流動性コンクリート3が外枠1より溢れ出ない量に定
められる。
Next, as shown in step 302, the highly fluid concrete 3 is poured into the outer frame 1 after curing from above the outer frame 1 using a concrete bucket, concrete chute, concrete pump or the like (not shown). Set up.
Even if the large-diameter crushed stone 2 shown in step 303 is subsequently introduced, the liquid level of the high-fluidity concrete 3 reaches near the top end of the outer frame 1,
The amount is set so that the high fluidity concrete 3 does not overflow from the outer frame 1.

【0019】その後、ステップ303に示すように、外
枠1の内部のスラリー状態の高流動性コンクリート3に
大粒径砕石2を上方より投入して、大粒径砕石2を外枠
1の天端付近まで敷き詰める。そのまま、高流動性コン
クリート3が養生期間を経て固化することにより、外枠
1と大粒径砕石2と高流動性コンクリート3とが一体と
なり所定高さのコンクリートダムになる。その後、必要
ならば、仕上げを行う。
Thereafter, as shown in step 303, the large crushed stone 2 is poured into the slurry of the high fluidity concrete 3 inside the outer frame 1 from above, and the large crushed stone 2 Spread near the edge. As the high-fluidity concrete 3 is solidified after the curing period, the outer frame 1, the large-diameter crushed stone 2 and the high-fluidity concrete 3 are integrated into a concrete dam having a predetermined height. Thereafter, if necessary, finishing is performed.

【0020】この第3実施形態の方法によれば、外枠1
の形成、高流動性コンクリート3の打設、大粒径砕石2
の投入により、高流動性コンクリート3が各大粒径砕石
2の相互の隙間に短時間で万遍なく浸透し、高流動性コ
ンクリート3が大粒径砕石2の個々を包むように固化し
て各大粒径砕石2を強固に結合できる。
According to the method of the third embodiment, the outer frame 1
Formation, casting of high-fluidity concrete 3, large-sized crushed stone 2
, The high-fluidity concrete 3 penetrates uniformly into the gaps between the large crushed stones 2 in a short time, and the high-fluidity concrete 3 solidifies so as to wrap the large crushed stones 2 individually. The large crushed stone 2 can be firmly bonded.

【0021】前記各実施形態のように、外枠1を外部配
合コンクリートを用いて多層に先行施工したので、外枠
1を形成するための型枠が大粒径砕石2や高流動性コン
クリート3の重量を負担することが不要となり、上記型
枠を高強度化することなく先行施工する外枠1の高さを
高くすることができる。又、大粒径砕石2を現場で発生
土より選別して利用すれば、選別の手間は増えるが、発
生土の他の場所への廃棄量を減らすことができる。
As in each of the above embodiments, the outer frame 1 was pre-constructed in multiple layers using external compounding concrete, so that the formwork for forming the outer frame 1 is made of a large grain crushed stone 2 or a highly fluid concrete 3. And the height of the outer frame 1 to be pre-constructed can be increased without increasing the strength of the formwork. Further, if the large-sized crushed stone 2 is selected from the generated soil on the site and used, the time and labor required for the selection are increased, but the amount of waste generated in other places can be reduced.

【0022】又、前記各実施形態において、高流動性コ
ンクリート3の打設前に、パイプクーリングを外枠1の
内部に配管すれば、高流動性コンクリート3の1回当た
りの打設高さを、従来の一般的な打設高さよりも高くす
ることができる。
Further, in each of the above embodiments, if the pipe cooling is provided inside the outer frame 1 before the high-fluidity concrete 3 is poured, the height of the high-fluidity concrete 3 per cast can be reduced. The height can be made higher than the conventional general casting height.

【0023】前記各実施形態において、投入された大粒
径砕石2の上に覆工板を敷設すれば、重機類の走行が可
能である。
In each of the above embodiments, if a lining plate is laid on the large crushed crushed stone 2, heavy equipment can travel.

【0024】前記各実施形態では多層に先行施工した外
枠1の内部に大粒径砕石2の投入と高流動性コンクリー
ト3の打設とを行ったが、外枠1の1層形成と大粒径砕
石2の投入と高流動性コンクリート3の打設とを1サイ
クルの工程とし、この1サイクルの工程を繰り返すこと
により、所定高さのコンクリートダムを形成しても良
い。
In each of the above embodiments, large-sized crushed stones 2 and high-fluidity concrete 3 are poured into the outer frame 1 which has been pre-constructed in multiple layers. The charging of the crushed stone 2 and the placing of the high-fluidity concrete 3 may be regarded as one cycle, and a concrete dam having a predetermined height may be formed by repeating the one cycle.

【0025】前記各実施形態ではコンクリート構造物と
してコンクリートダムを例示したが、コンクリートダム
以外の大規模なマスコンクリート、コンクリート舗装、
大型基礎等のようなコンクリート構造物の施工にも適用
できる。
In each of the above embodiments, concrete dams are exemplified as concrete structures. However, large-scale mass concrete other than concrete dams, concrete pavement,
It can also be applied to the construction of concrete structures such as large foundations.

【0026】前記各実施形態において、外枠1を作る際
の型枠としてPC型枠を使用すれば、型枠を転用する作
業を省ける。
In each of the above embodiments, if a PC form is used as the form when the outer frame 1 is made, the work of diverting the form can be omitted.

【0027】前記各実施形態において、高流動性コンク
リート3に使う砂の一部として、現場の骨材製造プラン
トより出る濁水の微粒分である例えば5mm以下のもの
を選択して使用しても良い。その使用量は、高流動性コ
ンクリート3の使用量の例えば5%程度である。
In each of the above-described embodiments, as a part of the sand used for the high-fluidity concrete 3, for example, those having a fine particle content of 5 mm or less, which is a fine particle of muddy water discharged from an on-site aggregate manufacturing plant, may be selected and used. . The used amount is, for example, about 5% of the used amount of the high fluidity concrete 3.

【0028】[0028]

【発明の効果】以上のように、請求項1の発明によれ
ば、コンクリート製の外枠の内部に大粒径砕石を投入し
た後、高流動性コンクリートを外枠の内部に上方より打
設することにより、骨材として大粒径砕石を用いたこと
により、高流動性コンクリートが外枠の内部で上下左右
に不規則に連続した大粒径砕石の相互の隙間を経て外枠
の底部より上方に盛り上がるように打設され、高流動性
コンクリートが大粒径の相互の隙間に短時間で万遍なく
浸透できる。又、浸透した高流動性コンクリートが大粒
径砕石の個々を包むように固化して各大粒径砕石を強固
に結合できる。請求項2の発明によれば、コンクリート
製の外枠の内部にコンクリート打設用パイプを配管する
と共に大粒径砕石を投入した後、コンクリート打設用パ
イプを介して高流動性コンクリートを外枠の内部に下方
より打設することにより、高流動性コンクリートが外枠
の内部で上下左右に不規則に連続した大粒径砕石の相互
の隙間を経て外枠の底部に到達する時間を短縮しつつ下
方より上方に盛り上がるように打設され、高流動性コン
クリートが大粒径砕石の相互の隙間に万遍なく浸透し、
大粒径砕石の個々を包むように固化して各大粒径砕石を
強固に結合できる。請求項3の発明によれば、コンクリ
ート製の外枠の内部に高流動性コンクリートを打設した
後に大粒径砕石を投入することにより、高流動性コンク
リートの打設時間を短縮して、高流動性コンクリートが
大粒径砕石の相互の隙間に万遍なく浸透し、大粒径砕石
の個々を包むように固化して各大粒径砕石を強固に結合
できる。
As described above, according to the first aspect of the present invention, after large-sized crushed stone is poured into a concrete outer frame, high-fluidity concrete is poured into the outer frame from above. By using large crushed stone as the aggregate, the highly fluid concrete passes through the gap between large crushed stones that are irregularly continuous vertically and horizontally within the outer frame from the bottom of the outer frame. It is poured so that it rises upward, so that high-fluidity concrete can permeate into the gaps between the large-diameter particles uniformly in a short time. In addition, the infiltrated high-fluidity concrete is solidified so as to wrap each of the large-sized crushed stones, so that the large-sized crushed stones can be strongly bonded. According to the second aspect of the present invention, after the concrete casting pipe is piped into the concrete outer frame and the large-sized crushed stone is charged, the high-flowable concrete is put through the concrete casting pipe. The time required for the highly fluid concrete to reach the bottom of the outer frame through the gaps between large-sized crushed stones that are irregularly continuous vertically and horizontally inside the outer frame It is poured so that it rises upward from below, and high-fluidity concrete penetrates into the gaps between large crushed stones evenly,
The large-sized crushed stones are solidified so as to wrap them individually, and the large-sized crushed stones can be strongly bonded. According to the third aspect of the present invention, the high fluidity concrete is poured into the inside of the outer frame made of concrete, and then the crushed stone having a large particle diameter is charged. The fluidized concrete penetrates all the gaps between the large-sized crushed stones and solidifies so as to wrap each of the large-sized crushed stones, so that each large-sized crushed stone can be firmly bonded.

【図面の簡単な説明】[Brief description of the drawings]

【図1】 発明の第1実施形態の工程図。FIG. 1 is a process chart of a first embodiment of the present invention.

【図2】 同第1実施形態の高流動性コンクリートが打
設された側面図。
FIG. 2 is a side view in which the high-fluidity concrete of the first embodiment is cast.

【図3】 発明の第2実施形態の工程図。FIG. 3 is a process drawing of a second embodiment of the present invention.

【図4】 同第2実施形態の高流動性コンクリートが打
設された側面図。
FIG. 4 is a side view in which the high-fluidity concrete of the second embodiment is cast.

【図5】 発明の第3実施形態の工程図。FIG. 5 is a process chart of a third embodiment of the invention.

【符号の説明】[Explanation of symbols]

1 外枠 2 大粒径砕石 3 高流動性コンクリート 4 コンクリート打設用パイプ Reference Signs List 1 outer frame 2 large grain size crushed stone 3 high fluidity concrete 4 concrete casting pipe

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 コンクリート製の外枠により形成された
内部に骨材としての大粒径砕石を投入した後、高流動性
コンクリートを外枠の内部に上方より打設することを特
徴とするコンクリート構造物の施工方法。
1. A concrete characterized in that after a large-sized crushed stone as an aggregate is poured into the inside formed by a concrete outer frame, high-fluidity concrete is poured into the outer frame from above. Construction method of the structure.
【請求項2】 コンクリート製の外枠により形成された
内部にコンクリート打設用パイプを配管すると共に骨材
としての大粒径砕石を投入した後、コンクリート打設用
パイプを介して高流動性コンクリートを外枠の内部に下
方より打設することを特徴とするコンクリート構造物の
施工方法。
2. A concrete casting pipe is piped into an interior formed by a concrete outer frame, and a large particle size crushed stone as an aggregate is charged. Then, the highly fluid concrete is passed through the concrete casting pipe. A concrete structure, characterized in that a concrete structure is poured into the outer frame from below.
【請求項3】 コンクリート製の外枠により形成された
内部に高流動性コンクリートを打設した後、この高流動
性コンクリートの内部に骨材としての大粒径砕石を投入
することを特徴とするコンクリート構造物の施工方法。
3. A high-fluidity concrete is poured into an interior formed by a concrete outer frame, and then a large-size crushed stone as an aggregate is poured into the high-fluidity concrete. Construction method of concrete structure.
JP7053998A 1998-03-19 1998-03-19 Construction method of concrete structure Pending JPH11269853A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP7053998A JPH11269853A (en) 1998-03-19 1998-03-19 Construction method of concrete structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP7053998A JPH11269853A (en) 1998-03-19 1998-03-19 Construction method of concrete structure

Publications (1)

Publication Number Publication Date
JPH11269853A true JPH11269853A (en) 1999-10-05

Family

ID=13434442

Family Applications (1)

Application Number Title Priority Date Filing Date
JP7053998A Pending JPH11269853A (en) 1998-03-19 1998-03-19 Construction method of concrete structure

Country Status (1)

Country Link
JP (1) JPH11269853A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014025261A (en) * 2012-07-26 2014-02-06 Kajima Corp Construction method for concrete placing joint
CN112942090A (en) * 2021-01-27 2021-06-11 河南中交路通工程监理咨询有限公司 Road and bridge structure with large-particle-size asphalt concrete and construction process thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014025261A (en) * 2012-07-26 2014-02-06 Kajima Corp Construction method for concrete placing joint
CN112942090A (en) * 2021-01-27 2021-06-11 河南中交路通工程监理咨询有限公司 Road and bridge structure with large-particle-size asphalt concrete and construction process thereof

Similar Documents

Publication Publication Date Title
JP6841964B2 (en) Construction method of combined dam
CN106759496B (en) Anti-settling inspection shaft changes the outfit technique
WO2017185817A1 (en) Construction method for on-site mixing cement-soil pile overground
CN102926398A (en) Construction method of inclined column type corrosion resistant foundation for power line in salt lake area
CN108396761A (en) The non-fully pile foundation cushion cap and production method under precipitation state inside a kind of foundation pit
JP2000154553A (en) How to build a tunnel
CN112359848A (en) Construction method for backfilling fertilizer groove by using solidified soil
CN103242009B (en) A kind of abutment infiltration material non-fine concrete block and manufacture craft thereof
CN101008178A (en) Soft base processing construction process using excavating and stirring method
JP2018021303A (en) Manufacturing method of fluidized soil cement
JP2007051517A (en) Inclined surface forming method reinforced by external protective material
CN107142902B (en) High head and large flow tunneling boring damming method
CN114960342A (en) Road curb filling structure and construction method
CN100523394C (en) Construction method for concrete shaft wall module masonry
CN110080314A (en) A method of reducing pile foundation side friction
JP2004225453A (en) Construction method of civil engineering structure
JP6999253B1 (en) How to build a sabo dam
CN210797245U (en) Structure is backfilled to bridgehead abutment back of body
CN107299620A (en) Sluice main structure construction scheme
CN208280156U (en) The non-fully pile foundation cushion cap under precipitation state inside a kind of foundation pit
JP7436970B2 (en) Ground improvement method and structure
CN108193706A (en) A kind of downward construction concrete pouring procedure of part contrary sequence method vertical structure
JP2001261405A (en) Prepacked concrete construction method using dismantled concrete
CN204875831U (en) Top layer soil solidifies on spot and closes foundation structure that bears with pile cluster
JPH05132942A (en) Backfilling material and backfilling method

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20060313

A131 Notification of reasons for refusal

Effective date: 20060328

Free format text: JAPANESE INTERMEDIATE CODE: A131

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20060808