JPH11292425A - Elevator installation method - Google Patents

Elevator installation method

Info

Publication number
JPH11292425A
JPH11292425A JP10287398A JP10287398A JPH11292425A JP H11292425 A JPH11292425 A JP H11292425A JP 10287398 A JP10287398 A JP 10287398A JP 10287398 A JP10287398 A JP 10287398A JP H11292425 A JPH11292425 A JP H11292425A
Authority
JP
Japan
Prior art keywords
value
hanging weight
hoistway
floor
car
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP10287398A
Other languages
Japanese (ja)
Inventor
Kenichi Mochizuki
健一 望月
Kaizo Ogano
會三 小鹿野
Tsuguhiko Nakada
次彦 中田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Building Systems Co Ltd
Original Assignee
Hitachi Building Systems Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Building Systems Co Ltd filed Critical Hitachi Building Systems Co Ltd
Priority to JP10287398A priority Critical patent/JPH11292425A/en
Publication of JPH11292425A publication Critical patent/JPH11292425A/en
Pending legal-status Critical Current

Links

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

(57)【要約】 【課題】 吊合い錘のケガキ線3aと最上階乗場床面5
aとの水平合わせを精度良く行うことができず、ロープ
流さ設定において再度ロープ長さを調整しなければなら
ないという問題点があった。 【解決手段】 最上階乗場床面5aから仮固定した乗か
ごの床面4aまでの距離とカウンタークリアランスHと
を加えた値から、ロープ伸び量を除いた値を求め、バッ
ファ2上面から上方に計算値分だけ測定しながら吊合い
錘3を吊上げる方法としたため、精度良く吊合い錘3の
吊上げ位置を決定することが可能である。
(57) [Summary] [Problem] Marking line 3a of hanging weight and floor 5 of the top floor landing
There was a problem that the horizontal alignment with a could not be performed with high accuracy, and the rope length had to be adjusted again in setting the rope flow. SOLUTION: From the value obtained by adding the distance from the top floor landing floor 5a to the floor surface 4a of the temporarily fixed car and the counter clearance H, a value excluding the amount of rope elongation is obtained, and the value is obtained from the upper surface of the buffer 2 upward. Since the hanging weight 3 is lifted while measuring only the calculated value, the lifting position of the hanging weight 3 can be accurately determined.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明はエレベータの据付工
法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an elevator installation method.

【0002】[0002]

【従来の技術】従来、エレベータの据付作業、特に乗か
ごと吊合い錘とをロープにて連結する作業時には昇降路
内に足場を組立てないで行う足場なし工法を用いてい
る。
2. Description of the Related Art Conventionally, a scaffoldless construction method has been used in which an elevator is installed, particularly when a car and a hanging weight are connected by a rope, without assembling a scaffold in a hoistway.

【0003】この工法の一例を図3を用いて説明する。An example of this method will be described with reference to FIG.

【0004】図3は従来のエレベータの据付工法を示す
昇降路縦断面図である。
FIG. 3 is a vertical sectional view of a hoistway showing a conventional elevator installation method.

【0005】まず昇降路1底部に吊合い錘3の落下の衝
撃を緩める緩衝器2(以下バッファと呼ぶ)を設置し、
このバッファ2の上面からそのエレベータの機種によっ
て定められた吊合い錘3の下降限度までの距離Hを持た
せて吊合い錘3を仮固定する。
[0005] First, a buffer 2 (hereinafter referred to as a buffer) is provided at the bottom of the hoistway 1 to alleviate the impact of the hanging weight 3 falling.
The suspension weight 3 is temporarily fixed with a distance H from the upper surface of the buffer 2 to the lower limit of the suspension weight 3 determined by the model of the elevator.

【0006】そして、乗かご4を図に示す昇降路1底部
近傍に仮固定する。
Then, the car 4 is temporarily fixed near the bottom of the hoistway 1 shown in the figure.

【0007】次に、仮固定した前記吊合い錘3の最下部
乗場床面5bから水平に位置する部位にケガキ線3aを
印す。
Next, a marking line 3a is marked on a portion of the temporarily fixed hanging weight 3 which is located horizontally from the lowest landing floor 5b.

【0008】その後図示しないウインチにて吊合い錘3
を、前記ケガキ線3aが最上階乗場床面5aと水平とな
る位置まで吊上げ仮固定する。
Thereafter, the weight 3 is suspended by a winch (not shown).
Is temporarily lifted and fixed to a position where the marking line 3a is horizontal with the top floor landing floor 5a.

【0009】そして最後に図示しないロープにより、巻
上機7を介して吊合い錘3と乗かご4とを連結し、この
巻上機7により乗かご4を昇降させ、昇降路内機器を据
付けていた。
Finally, the hanging weight 3 and the car 4 are connected to each other by a rope (not shown) via a hoisting machine 7, and the car 4 is raised and lowered by the hoisting machine 7, and the equipment in the hoistway is installed. I was

【0010】なおこの種の据付工法の一例としては、特
開昭62−285885号公報等にその開示がみられ
る。
An example of this kind of installation method is disclosed in Japanese Patent Application Laid-Open No. 62-285885.

【0011】[0011]

【発明が解決しようとする課題】しかし前記従来技術で
は、前記ケガキ3aと乗場床面5a、5bの水平位置を
合わせるのに木材等の水平棒6を用いていたため、前記
昇降路1の奥行き寸法が大きい場合、ケガキ線3aのケ
ガキ作業及び床面5aとケガキ線3aの位置合わせ作業
ともに精度良く行うことができなかった。
In the prior art, however, the horizontal dimension of the hoistway 1 is determined by using a horizontal bar 6 made of wood or the like to adjust the horizontal position of the marking 3a and the landing floors 5a and 5b. Is large, the marking operation of the marking line 3a and the positioning operation of the floor surface 5a and the marking line 3a cannot be performed with high accuracy.

【0012】そしてこの吊合い錘3の仮固定位置が正確
でないと、乗かご4と吊合い錘3とを連結するロープの
長さも不正確となり、ロープ張設作業終了後、再度ロー
プ長さを調整しなければならないという問題点があっ
た。
If the temporary fixing position of the hanging weight 3 is not accurate, the length of the rope connecting the car 4 and the hanging weight 3 will also be inaccurate. There was a problem that it had to be adjusted.

【0013】さらに前記ロープは負荷が掛かることによ
り伸びるが前記従来技術では、この伸び量も考慮してい
なかったため、ロープ長さ調整作業が必要となるという
問題点もあった。
Further, the rope elongates when a load is applied, but the prior art does not take this elongation into consideration, so that there is a problem in that a rope length adjusting operation is required.

【0014】またさらに前記ウインチは最下階乗場5b
に設置することから、前記従来技術では、ウインチを操
作する作業員及び吊合い錘の位置をみる作業員が必要と
なり、その作業費が高価となるという問題点もあった。
Further, the winch is located at the lowest floor landing 5b.
Therefore, in the above-mentioned prior art, there is a problem that an operator who operates the winch and an operator who checks the position of the hanging weight are required, and the operation cost is high.

【0015】本発明はこれらの問題点を鑑みてなされた
もので、その目的はロープの長さ調整作業なしに効率良
く行うことを可能としたエレベータの据付工法を提供す
るにある。
The present invention has been made in view of these problems, and an object of the present invention is to provide an elevator installation method capable of efficiently performing the operation without adjusting the length of a rope.

【0016】[0016]

【課題を解決するための手段】本発明は上記目的を達成
するため、乗かごを昇降路底部近傍に、吊合い錘を昇降
路頂部近傍にそれぞれ仮固定し、その状態で前記乗かご
と吊合い錘とを巻上機を介してロープにて連結し、前記
巻上機にて前記乗かごを駆動しながら昇降路内機器の据
付を行うエレベータの据付工法において、最上階乗場の
床面から前記仮固定した乗かごの床面までの間の距離を
測定し、この測定値に機種毎に設定された前記吊合い錘
の下降限度位置から昇降路底部に設置された緩衝器の上
面までの距離の値を加え、またこの加えた値から前記ロ
ープの伸び量値を除いた値を求め、その後長尺体からな
る測定器の一端部を前記吊合い錘の底面に取付けるとと
もにこの測定器の他端側を前記緩衝器の上面に対向させ
た状態で、前記吊合い錘を、前記一端部から他端部まで
の値が前記求めた値となるまで吊上げ、前記昇降路頂部
へ仮固定することを特徴とする。
According to the present invention, in order to achieve the above object, a car is temporarily fixed near the bottom of the hoistway, and a hanging weight is temporarily fixed near the top of the hoistway. In the elevator installation method of installing the equipment in the hoistway while driving the car with the hoist, the counterweight and the rope are connected via the hoist, and from the floor of the top floor landing Measure the distance between the temporarily fixed car floor and the measured value from the lower limit position of the hanging weight set for each model to the upper surface of the shock absorber installed at the bottom of the hoistway. The distance value is added, and the value obtained by subtracting the amount of elongation of the rope from the added value is obtained. Thereafter, one end of a measuring device made of a long body is attached to the bottom surface of the hanging weight, and With the other end side facing the upper surface of the shock absorber, Gastric weight, the lifting from one end to the value of the to the other end becomes a value obtained above, characterized in that it temporarily fixed to the hoistway top portion.

【0017】本発明によれば、上記のように最上階乗場
床面から仮固定した乗かごの床面までの距離、すなわち
乗かごの昇降に必要な距離と、吊合い錘の下限度位置か
ら緩衝器上面までの距離、すなわち吊合い錘が安全に昇
降できるクリアランスとを加えた値から、ロープの伸び
量を除いた値を求め、前記緩衝器上面から上方にこの求
めた値を測定器にて測定しながら吊合い錘を吊上げ仮固
定するようにしたため、精度良く位置を決めて吊合い錘
を吊上げて仮固定することができる。
According to the present invention, as described above, the distance from the floor of the top floor of the landing to the floor of the temporarily fixed car, that is, the distance required for raising and lowering the car, and the lower limit position of the hanging weight From the distance to the upper surface of the shock absorber, that is, the value obtained by adding the clearance that allows the hanging weight to safely move up and down, a value excluding the amount of elongation of the rope is obtained, and the obtained value is measured upward from the upper surface of the shock absorber to the measuring device Since the hanging weight is lifted and temporarily fixed while measuring, the position of the hanging weight can be accurately determined and the hanging weight can be lifted and temporarily fixed.

【0018】[0018]

【発明の実施の形態】以下、本発明の一実施の形態を図
1及び図2を用いて説明する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS One embodiment of the present invention will be described below with reference to FIGS.

【0019】図1及び図2は、本発明の一実施形態であ
るエレベータの据付工法を示す昇降路縦断面図である。
FIGS. 1 and 2 are vertical sectional views of a hoistway showing an elevator installation method according to an embodiment of the present invention.

【0020】本発明の据付工法においても、前述した昇
降路1底部近傍に吊合い錘3と乗かご4とを仮固定する
までの作業は同一であるため、それ以後の作業を説明す
る。
In the installation method of the present invention as well, the work up to temporarily fixing the hanging weight 3 and the car 4 near the bottom of the hoistway 1 described above is the same, and the subsequent work will be described.

【0021】まず長尺体から成る測定器、例えば巻き尺
8を用いて最上階乗場の床面5aから乗かご4の床面4
までの距離を測定する。
First, using a measuring instrument made of a long body, for example, a tape measure 8, the floor 4a of the car 4 is moved from the floor 5a of the top floor landing.
Measure the distance to

【0022】これは図1に示すように床面5aから巻き
尺8の端部8aを床面4aまで垂下させた状態で床面5
aと対向する部分の値を巻き尺8から読み取るように行
う方法とすると正確に効率良く測定できる。
As shown in FIG. 1, the end surface 8a of the tape measure 8 is suspended from the floor surface 5a to the floor surface 4a.
If a method is adopted in which the value of the portion facing a is read from the tape measure 8, accurate and efficient measurements can be made.

【0023】次に、吊合い錘3の下降限度位置から緩衝
器であるバッファ2の上面までの距離H(以後、カウン
タークリアランスという)の値を前記測定値に加え、こ
れから図示しないロープ伸び量を除いた値を計算してお
く。
Next, the value of the distance H (hereinafter referred to as a counter clearance) from the lower limit position of the hanging weight 3 to the upper surface of the buffer 2 as a shock absorber is added to the above-mentioned measured value. Calculate the excluded value.

【0024】ここでカウンタークリアランスHは、エレ
ベータの機種毎に安全性を考慮して所定の値が設定され
ており、ロープ伸び量は完成時に必要とされるロープ長
さとほぼ同一とすることができる前記測定値に、伸び率
0.3%を掛けることにより求めることができる。
Here, the counter clearance H is set to a predetermined value in consideration of safety for each elevator model, and the amount of rope elongation can be made substantially the same as the rope length required at the time of completion. It can be obtained by multiplying the measured value by an elongation percentage of 0.3%.

【0025】次に、作業員は昇降路1底部にて巻き尺8
の端部8aを吊合い錘3の底部に取付け、この巻き尺8
の他端側をバッファ2の上面に対向した状態に保持して
おく。
Next, a worker measures the tape measure 8 at the bottom of the hoistway 1.
Of the tape measure 8 is attached to the bottom of the hanging weight 3.
Is held in a state of facing the upper surface of the buffer 2.

【0026】そしてこの状態で、図示しないウインチを
駆動し、前記巻き尺8の他端側が前記計算値を示すまで
吊上げ、その値を示した位置に吊合い錘3を仮固定し、
この仮固定した吊合い錘3と乗かご4とを図示しないロ
ープにて連結することにより本据付工法は完了する。
In this state, a winch (not shown) is driven and lifted until the other end of the tape measure 8 indicates the calculated value, and the hanging weight 3 is temporarily fixed at a position indicating the calculated value.
The installation method is completed by connecting the temporarily fixed hanging weight 3 and the car 4 with a rope (not shown).

【0027】本実施形態では以上のように、床面5a、
4a間の距離、すなわち乗かご4の昇降に必要な距離
と、吊合い錘3が安全に昇降するためバッファ2上面と
の間に設定されたカウンタクリアランスHとを加え、ロ
ープ伸び量を引いた値を計算し、バッファ2上面から上
方にこの計算値分だけ昇降路1底部で測定しながら吊合
い錘3を吊上げる方法としたため、精度良く吊合い錘3
の吊上げ位置を決め、仮固定することができる。
In the present embodiment, as described above, the floor surface 5a,
The distance between the ropes 4a, that is, the distance required for raising and lowering the car 4 and the counter clearance H set between the hanging weight 3 and the upper surface of the buffer 2 for safely lifting and lowering, were added to reduce the amount of rope elongation. Since the weight is calculated and the weight 3 is lifted upward from the upper surface of the buffer 2 while measuring the calculated value at the bottom of the hoistway 1, the weight 3 is accurately measured.
Can be determined and temporarily fixed.

【0028】よって、据付完了後に再度、ロープ長さ調
整を行うことも不要となり全体として大幅に据付作業効
率が向上する。
Therefore, it is not necessary to adjust the length of the rope again after the installation is completed, and the efficiency of the installation work is greatly improved as a whole.

【0029】なお、本工法において前記測定値及び計算
値を巻き尺8に記しておけば、吊合い錘3の吊上げ作業
時により容易にその吊上げ位置を決定することが可能で
ある。
If the measured value and the calculated value are recorded on the tape measure 8 in the present method, the lifting position of the hanging weight 3 can be more easily determined at the time of lifting operation.

【0030】また本工法では吊合い錘3の吊上げ位置を
昇降路1底部にて確認しながらウインチを駆動して吊上
げ作業を行えることから、作業員1人にて本作業を行う
ことができ、従来の2人作業からコストを半減できる。
In this method, the lifting operation can be performed by driving the winch while confirming the lifting position of the hanging weight 3 at the bottom of the hoistway 1, so that one worker can perform the lifting work. The cost can be halved from the conventional two-person operation.

【0031】[0031]

【発明の効果】本発明は以上のような据付工法としたた
め、ロープ長さ調整作業なしに効率良くエレベータを据
付けることができる。
As described above, the present invention adopts the above-described installation method, so that the elevator can be efficiently installed without the need for adjusting the rope length.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の一実施形態であるエレベータの据付工
法を示す昇降路縦断面図である。
FIG. 1 is a hoistway longitudinal sectional view showing an elevator installation method according to an embodiment of the present invention.

【図2】本発明の一実施形態であるエレベータの据付工
法を示す昇降路縦断面図である。
FIG. 2 is a vertical sectional view of a hoistway showing an elevator installation method according to an embodiment of the present invention.

【図3】従来のエレベータ据付工法を示す昇降路縦断面
図である。
FIG. 3 is a vertical sectional view of a hoistway showing a conventional elevator installation method.

【符号の説明】[Explanation of symbols]

1 昇降路 2 バッファ 3 吊合い錘 4 乗かご 4a 乗かごの床面 5a 最上階乗場の床面 7 巻上機 8 測定機 H 下降限度位置から昇降路底部に設置された緩衝器の
上面までの距離
Reference Signs List 1 hoistway 2 buffer 3 hanging weight 4 car 4a car floor 5a floor of the top floor 7 hoisting machine 8 measuring machine H from the lower limit position to the upper surface of the shock absorber installed at the bottom of the hoistway distance

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 乗かごを昇降路底部近傍に、吊合い錘を
昇降路頂部近傍にそれぞれ仮固定し、その状態で前記乗
かごと吊合い錘とを巻上機を介してロープにて連結し、
前記巻上機にて前記乗かごを駆動しながら昇降路内機器
の据付を行うエレベータの据付工法において、最上階乗
場の床面から前記仮固定した乗かごの床面までの間の距
離を測定し、この測定値に機種毎に設定された前記吊合
い錘の下降限度位置から昇降路底部に設置された緩衝器
の上面までの距離の値を加え、またこの加えた値から前
記ロープの伸び量値を除いた値を求め、その後長尺体か
らなる測定器の一端部を前記吊合い錘の底面に取付ける
とともにこの測定器の他端側を前記緩衝器の上面に対向
させた状態で、前記吊合い錘を、前記一端部から他端部
までの値が前記求めた値となるまで吊上げ、前記昇降路
頂部へ仮固定することを特徴とするエレベータの据付工
法。
1. The car is temporarily fixed near the bottom of the hoistway, and the hanging weight is temporarily fixed near the top of the hoistway. In this state, the car and the hanging weight are connected by a rope via a hoist. And
In the elevator installation method of installing equipment in the hoistway while driving the car by the hoist, measure the distance from the floor of the top floor landing to the floor of the temporarily fixed car. Then, add the value of the distance from the lower limit position of the hanging weight set for each model to the upper surface of the shock absorber installed at the bottom of the hoistway to the measured value, and calculate the extension of the rope from the added value. Obtain the value excluding the quantity value, then, with one end of the measuring device made of a long body attached to the bottom surface of the hanging weight and the other end of the measuring device facing the upper surface of the shock absorber, An elevator installation method, wherein the hanging weight is lifted until the value from the one end to the other end becomes the calculated value, and is temporarily fixed to the top of the hoistway.
JP10287398A 1998-04-14 1998-04-14 Elevator installation method Pending JPH11292425A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP10287398A JPH11292425A (en) 1998-04-14 1998-04-14 Elevator installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP10287398A JPH11292425A (en) 1998-04-14 1998-04-14 Elevator installation method

Publications (1)

Publication Number Publication Date
JPH11292425A true JPH11292425A (en) 1999-10-26

Family

ID=14339025

Family Applications (1)

Application Number Title Priority Date Filing Date
JP10287398A Pending JPH11292425A (en) 1998-04-14 1998-04-14 Elevator installation method

Country Status (1)

Country Link
JP (1) JPH11292425A (en)

Similar Documents

Publication Publication Date Title
CN109534215B (en) Suspension type well operation robot
CN112323796B (en) A kind of inclined prefabricated pile construction device and construction method thereof
CN108016971A (en) The installation method of elevator
CN101830388A (en) Installation method of counter-weight frame of elevator
CN112566864B (en) Application method of lift extension technology of elevator
CN103145012A (en) Elevator device
JPH11292425A (en) Elevator installation method
JP2000086113A (en) Elevator and its installation method
JP2001328778A (en) Elevator counterweight lowering buffer distance measurement device
JP4929045B2 (en) Guide rail installation method for machine room-less elevator
JP2001226052A (en) Elevator weight measurement method
JPH08245116A (en) Elevator installation method
JP2001335255A (en) Elevator installation method and elevator installation unit
JPH0734069Y2 (en) Lifting device for car or counterweight in elevator
JP3056945B2 (en) Elevator
JP6555183B2 (en) Elevator elevator weight measuring device
JPH05319727A (en) Elevator main rope elongation detector
JP3444816B2 (en) How to replace the main elevator cable
CN114127002A (en) Elevator installation method and installation aids
CN218088464U (en) An elevator guide rail vibration detection device
JP2001163546A (en) Construction method for installation work for machine- roomless elevator
JPH05278964A (en) Elevator main rope elongation detector
JPH0442301Y2 (en)
JP3297345B2 (en) Governor rope extension method for construction elevators
JP2008195487A (en) Hanging jig for elevator leash