JPH1136283A - Casting method and casting jig for steel sheet pile - Google Patents
Casting method and casting jig for steel sheet pileInfo
- Publication number
- JPH1136283A JPH1136283A JP19757797A JP19757797A JPH1136283A JP H1136283 A JPH1136283 A JP H1136283A JP 19757797 A JP19757797 A JP 19757797A JP 19757797 A JP19757797 A JP 19757797A JP H1136283 A JPH1136283 A JP H1136283A
- Authority
- JP
- Japan
- Prior art keywords
- steel pipe
- pile
- sheet pile
- pipe sheet
- joint
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Landscapes
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
(57)【要約】
【課題】 鋼管矢板を順次打設でき、建て込み精度が良
く、騒音も抑制できる。
【解決手段】 既打設の鋼管矢板1の天端に、継手管1
2を有する連結用仮杭10をリブ15で嵌合する。連結
用仮杭10に固定した連結板14の窓部14aから万力
17で鋼管矢板1と連結板14を固定し、連結用仮杭1
0の継手管12を鋼管矢板1の継手管3の延長上に位置
させる。連結用仮杭10の継手管12に次の鋼管矢板1
の継手管3を噛み合わせて、連結用仮杭10の位置まで
打設し、最初の鋼管矢板1の継手管3と連結させる。連
結用仮杭10を取り除いて、次の鋼管矢板1を更に打設
することで、最初の鋼管矢板1の打ち込み位置まで打ち
込む。
(57) [Summary] [Problem] To be able to sequentially drive steel pipe sheet piles, to have a good installation accuracy, and to suppress noise. SOLUTION: A joint pipe 1 is provided on a top end of a steel pipe sheet pile 1 already installed.
The connecting temporary pile 10 having 2 is fitted with the rib 15. The steel pipe sheet pile 1 and the connecting plate 14 are fixed with the vice 17 from the window 14a of the connecting plate 14 fixed to the connecting temporary pile 10, and the connecting temporary pile 1 is fixed.
0 is located on the extension of the joint pipe 3 of the steel sheet pile 1. The following steel pipe sheet pile 1 is attached to the joint pipe 12 of the temporary pile 10 for connection.
Of the steel pipe sheet piles 1 and connected to the temporary pile 10 for connection. The temporary pile 10 for connection is removed, and the next steel pipe sheet pile 1 is further driven in, thereby driving the steel pipe sheet pile 1 to the first driving position.
Description
【0001】[0001]
【発明の属する技術分野】本発明は、例えば土留め壁等
として用いられる鋼管矢板の打設方法及び打設治具に関
する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method and a jig for driving a steel sheet pile used as, for example, an earth retaining wall.
【0002】[0002]
【従来の技術】従来、鋼管矢板を、継手を介して、互い
に連結して打設することで、土留壁や止水壁を構築する
鋼管矢板工法が知られている。陸上において鋼管矢板を
打設する際には、桟橋を施工するとなると工費が莫大に
なるので、通常、桟橋は用いない。このような場合の鋼
管矢板の陸上での打設方法について、図11乃至図13
により説明する。下杭をなす鋼管矢板1には、母管2の
両側に例えばスリットの設けられた管状の継手管3が母
管2の長手方向に沿って連結されている。継手管3は母
管2より長さが短く、最終打ち込み時の打設抵抗を軽減
するために、母管2の下(先端)側部分については継手
管3が設けられていないのが一般的である。2. Description of the Related Art Conventionally, there has been known a steel pipe sheet pile construction method in which steel pipe sheet piles are connected to each other via a joint to form a retaining wall or a water blocking wall. When driving steel pipe sheet piles on land, the construction cost of piers is enormous, so piers are not usually used. FIGS. 11 to 13 show a method of driving a steel sheet pile on land in such a case.
This will be described below. A tubular joint pipe 3 having, for example, slits on both sides of the mother pipe 2 is connected to the steel pipe sheet pile 1 forming the lower pile along the longitudinal direction of the mother pipe 2. The joint pipe 3 is shorter than the mother pipe 2, and the joint pipe 3 is generally not provided at a lower (tip) side portion of the mother pipe 2 in order to reduce the driving resistance at the time of final driving. It is.
【0003】そして、先ず、隣接する鋼管矢板1の継手
管3同士を連結させつつ、鋼管矢板1を順次高止まりに
ハンマ4で打設する(図11参照)。ここで、鋼管矢板
1の継手管3のない下側部分の長さをL1とし、鋼管矢
板1を高止まりさせる高さ(鋼管矢板1の上端1aから
地面までの距離)をL2とした時、L1<L2とする。
このように設定しないと、高止まりされた鋼管矢板1の
継手管3の上端に次の鋼管矢板1の継手管3の下端を噛
み合わせることができず、鋼管矢板1の打設精度が著し
く低下することになるからである。高止まりに打設され
た各鋼管矢板1の下杭は、交互に先行杭1Aと後行杭1
Bとする。次に先行杭1Aの上端1aに、管状で先端に
係合部が設けられた雇い杭5を嵌合させ、これをハンマ
4で打設して最終打ち込みを行い、高止まりされている
1本おきの先行杭1Aを順次雇い杭5を介して最終打ち
込み位置まで打設する(図12参照)。次に高止まりの
後行杭1Bをハンマ4で順次打設して先行杭1Aと同一
高さまで打ち込むことになる(図13参照)。このよう
にして最終打ち込み位置まで打設された各鋼管矢板1が
継手管3で互いに連結された土留め壁等ができあがる。[0003] First, while connecting the joint pipes 3 of the adjacent steel pipe sheet piles 1, the steel pipe sheet piles 1 are sequentially driven at a high stop with a hammer 4 (see FIG. 11). Here, when the length of the lower portion of the steel pipe sheet pile 1 without the joint pipe 3 is L1, and the height at which the steel pipe sheet pile 1 stops at a high level (the distance from the upper end 1a of the steel pipe sheet pile 1 to the ground) is L2. It is assumed that L1 <L2.
Otherwise, the lower end of the joint pipe 3 of the next steel pipe sheet pile 1 cannot be engaged with the upper end of the joint pipe 3 of the steel pipe sheet pile 1 that has been stopped at a high level, and the driving accuracy of the steel pipe sheet pile 1 is significantly reduced. It is because it will be. The lower pile of each steel pipe sheet pile 1 driven at a high stop is alternately a leading pile 1A and a trailing pile 1
B. Next, a tubular hiring stake 5 having an engaging portion provided at the tip is fitted to the upper end 1a of the leading stake 1A, and is driven by a hammer 4 to perform final driving, so that one of the stakes which has been stopped high Every other preceding pile 1A is sequentially driven to the final driving position via the hiring pile 5 (see FIG. 12). Next, the trailing pile 1B which stops at a high level is sequentially driven by the hammer 4 and driven to the same height as the preceding pile 1A (see FIG. 13). In this way, an earth retaining wall or the like in which the steel pipe sheet piles 1 driven to the final driving position are connected to each other by the joint pipe 3 is completed.
【0004】[0004]
【発明が解決しようとする課題】しかしながら、このよ
うな打設方法では、雇い杭5は鋼管矢板1の母管2にか
ぶせて嵌合させるだけであるために、ハンマ4による打
設時に雇い杭5がはねたり、ぶれたりするために、鋼管
矢板1の打設において最も重要な下杭の鉛直性を確保す
ることが困難で、建て込み精度が悪いという欠点があ
る。またハンマ4による打設時の騒音が非常に大きいと
いう欠点もあった。However, in such a driving method, since the hiring pile 5 is merely fitted over the mother pipe 2 of the steel pipe sheet pile 1, the hiring pile 5 is set when the hammer 4 is driven. 5 has a drawback that it is difficult to secure the verticality of the lower pile, which is the most important in placing the steel pipe sheet pile 1, and the installation accuracy is poor. There is also a drawback that the noise at the time of driving by the hammer 4 is very large.
【0005】本発明は、このような課題に鑑みて、建て
込み精度が良く打設時の騒音も抑制できる鋼管矢板の打
設方法及び打設治具を提供することを目的とする。SUMMARY OF THE INVENTION In view of the above problems, an object of the present invention is to provide a method and a jig for driving a steel pipe sheet pile, which can be installed with high accuracy and can suppress noise during driving.
【0006】[0006]
【課題を解決するための手段】本発明による鋼管矢板の
打設方法は、地中に打設した第一の鋼管矢板の上部に、
継手部を有する打設治具を着脱可能に装着して継手部を
第一の鋼管矢板の継手の延長上に位置させ、打設治具の
継手部に第二の鋼管矢板の継手を連結して該第二の鋼管
矢板を打設することで、該第二の鋼管矢板の継手を第一
の鋼管矢板の継手に連結して打ち込めるようにしたこと
を特徴とするものである。従って、打設治具はその継手
部を第二の鋼管矢板を打設する際のガイドとして用いら
れるだけで、直接打設しないから、打設による騒音を抑
制して建て込み精度を向上でき、しかも第二の鋼管矢板
は打設治具の位置まで打ち込むことで第一の鋼管矢板の
継手と既に連結されており、打設治具を第一の鋼管矢板
から取り除いた後で、最終打ち込み位置まで正確に打設
できる。このようにして、各鋼管矢板を精度よく整列状
態で打設でき、しかも一本置きでなく順次鋼管矢板を最
終打ち込み位置まで打設できるから、機械移動のロスが
なく効率的な打設ができる。According to the present invention, there is provided a method for driving a steel pipe sheet pile according to the present invention, comprising the steps of:
A casting jig having a joint portion is detachably mounted to position the joint portion on an extension of the joint of the first steel sheet pile, and a joint of the second steel sheet pile is connected to the joint portion of the casting jig. The second steel pipe sheet pile is driven into the joint so that the joint of the second steel pipe sheet pile is connected to the joint of the first steel pipe sheet pile and can be driven. Therefore, the driving jig is used only as a guide when driving the joint portion of the second steel pipe sheet pile, and is not directly driven, so that noise due to driving can be suppressed to improve the installation accuracy, Moreover, the second steel pipe sheet pile is already connected to the joint of the first steel pipe sheet pile by driving to the position of the driving jig, and after the driving jig is removed from the first steel pipe sheet pile, the final driving position is set. Can be cast accurately. In this manner, the steel pipe sheet piles can be driven accurately in an aligned state, and the steel pipe sheet piles can be driven sequentially to the final driving position instead of every other, so that efficient driving can be performed without loss of machine movement. .
【0007】本発明による打設治具は、その一端に鋼管
矢板への嵌合部が備えられた母管と、該母管の側面に設
けられた継手部と、母管の一端に設けられた連結部とを
備えていて、嵌合部と連結部の間で鋼管矢板を嵌合して
鋼管矢板に装着するようにしたことを特徴とするもので
ある。打設治具の嵌合部を打設が終了した第一の鋼管矢
板に嵌合して締結部材で固定することで第一の鋼管矢板
の延長線上に配設でき、その後、第二の鋼管矢板の継手
を打設治具の継手部に噛み合わせて打設して第一の鋼管
矢板の継手に連結するまでガイドしつつ打ち下げ、打設
治具を取り除いた後で再度第二の鋼管矢板を打設する。
雇い杭と違って、打設治具は打設されない。尚、打設治
具と第一の鋼管矢板とを締結固定するには、締結部材に
よって、連結部に設けられた窓部を通して連結部及び第
一の鋼管矢板を締結固定する。A casting jig according to the present invention is provided with a mother pipe provided at one end thereof with a fitting portion to a steel pipe sheet pile, a joint provided on a side surface of the mother pipe, and one end of the mother pipe. And a connecting portion, wherein the steel pipe sheet pile is fitted between the fitting portion and the connecting portion and attached to the steel pipe sheet pile. The fitting portion of the casting jig is fitted to the first steel pipe sheet pile whose casting has been completed and fixed with a fastening member, so that it can be arranged on an extension of the first steel pipe sheet pile, and thereafter, the second steel pipe The joint of the sheet pile is engaged with the joint of the casting jig and driven down and guided down until it is connected to the joint of the first steel pipe sheet pile, and is knocked down. After removing the casting jig, the second steel pipe is removed again. Pile the sheet pile.
Unlike hiring stakes, the casting jig is not driven. In order to fasten and fix the driving jig and the first steel pipe sheet pile, the fastening part fastens and fixes the connection part and the first steel pipe sheet pile through a window provided in the connection part.
【0008】[0008]
【発明の実施の形態】以下、図1ないし図9に基づい
て、本発明の実施の形態について説明するが、上述の従
来技術と同一の部分には同一符号を用いて説明を省略す
る。図1は実施の形態に用いる連結用仮杭の斜視図、図
2は連結用仮杭の縦断面図、図3は図2に示す連結用仮
杭のA−A線断面図、図4は図2に示す連結用仮杭のB
−B線断面図、図5は図2に示す連結用仮杭のC−C線
断面図、図6は図2に示す連結用仮杭の部分拡大断面
図、図7は連結用仮杭と打設された鋼管矢板の上端との
連結状態を示す部分側面図、図8(a)〜(g)は鋼管
矢板の打設工程を示す図、図9は連結用仮杭と鋼管矢板
の上端との締結状態を示す部分断面図である。図1乃至
図5に示す連結用仮杭10(打設治具)は、鋼管矢板1
の母管2と同一外径の鋼管状の母管11の両側に、例え
ば180度の間隔をおいて径の異なる二つの継手管1
2,12が連結されて構成されている。各継手管12は
母管11より長く、母管11の長手方向の全長に亘って
設けられ、しかも一端12a,12aは母管11の先端
より先端側に突出している。しかも各継手管12にはそ
の長手方向にスリット13が設けられ、鋼管矢板1の継
手管3と噛み合わせて連結できるようになっている。DESCRIPTION OF THE PREFERRED EMBODIMENTS Embodiments of the present invention will be described below with reference to FIGS. 1 to 9. The same reference numerals are used for the same parts as those in the above-mentioned prior art, and the description is omitted. 1 is a perspective view of a temporary pile for connection used in the embodiment, FIG. 2 is a longitudinal sectional view of the temporary pile for connection, FIG. 3 is a cross-sectional view of the temporary pile for connection shown in FIG. B of connection temporary pile shown in FIG.
5 is a sectional view taken along line CC of the connecting temporary pile shown in FIG. 2, FIG. 6 is a partially enlarged sectional view of the temporary connecting pile shown in FIG. 2, and FIG. 8 (a) to 8 (g) are views showing a step of driving the steel pipe sheet pile, and FIG. 9 is a top view of the connection temporary pile and the steel pipe sheet pile. FIG. 6 is a partial cross-sectional view showing a fastening state with the above. The connecting temporary pile 10 (driving jig) shown in FIGS. 1 to 5 is a steel pipe sheet pile 1.
For example, two joint pipes 1 having different diameters are provided on both sides of a steel tubular mother pipe 11 having the same outer diameter as that of the mother pipe 2.
2, 12 are connected. Each joint pipe 12 is longer than the mother pipe 11 and is provided over the entire length in the longitudinal direction of the mother pipe 11, and one ends 12a, 12a protrude from the distal end of the mother pipe 11 to the distal end side. In addition, each joint pipe 12 is provided with a slit 13 in its longitudinal direction so that it can be engaged with and connected to the joint pipe 3 of the steel pipe sheet pile 1.
【0009】母管11の先端には、その周方向に例えば
四角形の凹溝11aが所定間隔で形成されている。そし
て母管11の先端領域には、凹溝11aを覆うように略
円筒状の連結板14(連結部)が溶接等で母管11に取
り付けられており、連結板14には母管11の凹溝11
aに重なる窓部14aが所定間隔で形成されている(図
1、図4参照)。連結板14はその先端縁が母管11の
先端より突出し且つ継手管12の上端12aよりは引っ
込められた位置にある。また母管11の先端部内側に
は、図1、図2、図4及び図5に示すように、嵌合部と
して例えば十字型のリブ15が取り付けられており、既
打設の鋼管矢板1の上端1aに凹凸嵌合され得るように
なっている。そのため、リブ15は母管11の先端から
外側に突出して、継手管12より先端側まで延在してい
る。しかも、図6に示すように、リブ15には、母管1
1の先端部から突出する部分の外径寸法が母管11の内
径より若干小さくなるように段部15aが形成されてい
る。これにより、連結板14とリブ15の間に、鋼管矢
板1の上端1aが嵌合する際の着座凹部16が略環状に
形成されることになる(図6、図7参照)。At the tip of the mother pipe 11, for example, rectangular concave grooves 11a are formed at predetermined intervals in the circumferential direction. A substantially cylindrical connecting plate 14 (connecting portion) is attached to the distal end region of the mother pipe 11 by welding or the like so as to cover the concave groove 11a. Groove 11
Window portions 14a overlapping with a are formed at predetermined intervals (see FIGS. 1 and 4). The connecting plate 14 is at a position where its leading edge protrudes from the leading end of the mother pipe 11 and is retracted from the upper end 12 a of the joint pipe 12. As shown in FIGS. 1, 2, 4 and 5, for example, a cross-shaped rib 15 is attached to the inside of the distal end of the mother pipe 11 as a fitting part. Can be fitted to the upper end 1a of the base. Therefore, the rib 15 protrudes outward from the distal end of the mother pipe 11 and extends to the distal end side from the joint pipe 12. In addition, as shown in FIG.
The step 15a is formed such that the outer diameter of the portion protruding from the front end of the first tube 1 is slightly smaller than the inner diameter of the mother pipe 11. As a result, a seating recess 16 when the upper end 1a of the steel pipe sheet pile 1 is fitted is formed between the connecting plate 14 and the rib 15 in a substantially annular shape (see FIGS. 6 and 7).
【0010】次に上述のような連結用仮杭10を用いた
鋼管矢板1の打設方法について説明する。図8におい
て、先ず最初の鋼管矢板1を図示しないハンマ4で最終
打ち込み位置(正規の高さ)まで打ち下げる(図8
(a)参照)。そして、この鋼管矢板1の上端1aに連
結用仮杭10を取り付ける(図8(b)参照)。即ち、
鋼管矢板1の上端1a内に連結用仮杭10のリブ15を
凹凸嵌合させると共に、リブ15と連結板14との間の
着座凹部16に最初の鋼管矢板1の上端1aを嵌合さ
せ、鋼管矢板1の上端1aを連結用仮杭10の母管11
の下端に当接させる(図7参照)。これにより鋼管矢板
1の上端1aで、連結用仮杭10の母管11の凹溝11
aを塞ぎ、窓部14aの縁部に重なる。しかも、連結用
仮杭10の継手管12は鋼管矢板1の継手管3の延長上
に位置させるものとする。この状態で、図9に示すよう
に、連結用仮杭14の窓部14a及び母管11の凹溝1
1aに万力17を挿入して、最初の鋼管矢板1の上端1
aと連結板14の窓部14aの縁部とを挟んで締め付け
固定する。この作業を複数の窓部14aについてそれぞ
れ行う。このようにして、最初の鋼管矢板1に連結用仮
杭10がほぼ直線状に仮固定されたことになる。Next, a method of driving the steel sheet pile 1 using the connecting temporary pile 10 will be described. In FIG. 8, first, the first steel sheet pile 1 is driven down by a hammer 4 (not shown) to a final driving position (regular height) (FIG. 8).
(A)). Then, the connecting temporary pile 10 is attached to the upper end 1a of the steel pipe sheet pile 1 (see FIG. 8B). That is,
The rib 15 of the connecting temporary pile 10 is fitted into the upper end 1a of the steel pipe sheet pile 1 in an uneven manner, and the upper end 1a of the first steel pipe sheet pile 1 is fitted into a seating recess 16 between the rib 15 and the connecting plate 14. The upper end 1a of the steel pipe sheet pile 1 is connected to the mother pipe 11 of the connecting temporary pile 10.
(See FIG. 7). Thereby, at the upper end 1a of the steel pipe sheet pile 1, the concave groove 11 of the mother pipe 11 of the connecting temporary pile 10 is formed.
a, and overlaps the edge of the window 14a. Moreover, the joint pipe 12 of the connecting temporary pile 10 is located on an extension of the joint pipe 3 of the steel pipe sheet pile 1. In this state, as shown in FIG. 9, the window portion 14a of the connecting temporary pile 14 and the concave groove 1 of the mother pipe 11 are formed.
Insert a vise 17 into the upper end 1 of the first sheet pile 1
a and the edge of the window 14a of the connecting plate 14 are clamped and fixed. This operation is performed for each of the windows 14a. In this way, the temporary connection pile 10 is temporarily fixed to the first steel pipe sheet pile 1 substantially linearly.
【0011】次に図8(c)に示すように、2本目の鋼
管矢板1の継手管3を連結用仮杭10の継手管12に噛
み合わせて連結させて、2本目の鋼管矢板1をハンマ4
で連結用仮杭10の上端位置まで打設する(図8(d)
参照)。その後、万力17を外して連結用仮杭10を取
り外し、2本目の鋼管矢板1を最初の鋼管矢板1と同一
の最終打ち込み位置まで打ち下げる(図8(e)、
(f)参照)。そして、連結用仮杭10を2本目の鋼管
矢板1に嵌合して連結し(図8(g)参照)、次の鋼管
矢板1を同様に打設してゆき、この作業を繰り返して土
留め壁等を構築する。尚、連結用仮杭10の連結板14
の下端部14bを図10に示すように外側に湾曲させれ
ば、鋼管矢板1と連結用仮杭10との嵌合がいっそうス
ムーズになる。Next, as shown in FIG. 8C, the joint pipe 3 of the second steel pipe sheet pile 1 is engaged with the joint pipe 12 of the connecting temporary pile 10 to be connected, and the second steel pipe sheet pile 1 is connected. Hammer 4
To the upper end position of the temporary pile 10 for connection (FIG. 8D)
reference). Thereafter, the vice 17 is removed, the connecting temporary pile 10 is removed, and the second steel pipe sheet pile 1 is driven down to the same final driving position as the first steel pipe sheet pile 1 (FIG. 8 (e),
(F)). Then, the connecting temporary pile 10 is fitted and connected to the second steel pipe sheet pile 1 (see FIG. 8 (g)), the next steel pipe sheet pile 1 is similarly driven, and this operation is repeated. Build retaining walls and the like. The connecting plate 14 of the connecting temporary pile 10
If the lower end portion 14b of the steel pipe is bent outward as shown in FIG. 10, the fitting between the steel pipe sheet pile 1 and the connecting temporary pile 10 becomes even smoother.
【0012】上述のように本実施の形態によれば、鋼管
矢板1を一本置きでなく連続して順次打設でき、しかも
打設に際して高止まりさせることなく直接最終打ち込み
位置まで打設できることになり、ハンマ等の機械移動の
ロスがなく効率的な打設作業ができる。しかも、打設に
際して、先に打設した鋼管矢板1に連結した連結用仮杭
10はこの既打設の鋼管矢板1と共に次の鋼管矢板1を
打設するためのガイド部材として用い、直接打設しない
から、従来の雇い杭と比較して騒音を抑制できると共に
建て込み精度を向上できる。また、施工場所によって鋼
管矢板1の継手管3の径の大きさが複数種類あれば、連
結用仮杭10の2つの継手管12の径を異ならせたこと
で、異なる径の継手管3に対応できることになる。As described above, according to the present embodiment, the steel pipe sheet piles 1 can be continuously driven instead of every other, and can be driven directly to the final driving position without stopping at a high height. Therefore, there is no loss of machine movement such as a hammer, and efficient driving work can be performed. In addition, at the time of driving, the connecting temporary pile 10 connected to the steel pipe sheet pile 1 previously driven is used as a guide member for driving the next steel pipe sheet pile 1 together with the already installed steel pipe sheet pile 1, and is directly driven. Since it is not provided, the noise can be suppressed and the accuracy of erection can be improved as compared with the conventional hiring stake. In addition, if there are a plurality of types of diameters of the joint pipe 3 of the steel pipe sheet pile 1 depending on the construction location, the diameters of the two joint pipes 12 of the connecting temporary pile 10 are made different, so that the joint pipes 3 having different diameters can be obtained. It will be able to respond.
【0013】尚、上述の実施の形態では、連結用仮杭1
0について、母管11の両側部に180度間隔で径の異
なる2つの継手管12を配設したが、継手管12の配設
間隔は任意でよい。また継手管12の外径寸法は2つの
継手管で同一でも相違するようにしてもよい。継手管1
2の外径寸法を同一にして交互に使用すれば継手管12
の耐久性が向上する。尚、連結用仮杭10の継手管12
は3つ以上でもよい。また、上述の実施の形態で示すよ
うに、継手管12は一方だけを鋼管矢板1の打設時のガ
イドとして用いるものであるから、1つだけ母管11に
取り付けるようにしてもよい。また、窓部14aにおけ
る連結用仮杭10と鋼管矢板1の連結には、万力17に
限らず、例えばボルトとナット等の各種の締結部材を採
用できる。互いに連結する各継手管3、12の一方は管
状でない継手形状でもよい。In the above-described embodiment, the connecting temporary stake 1
With respect to 0, two joint pipes 12 having different diameters are arranged on both sides of the mother pipe 11 at an interval of 180 degrees, but the arrangement interval of the joint pipes 12 may be arbitrary. The outer diameter of the joint pipe 12 may be the same or different between the two joint pipes. Fitting tube 1
2 can be used alternately with the same outer diameter.
Durability is improved. In addition, the joint pipe 12 of the connecting temporary pile 10
May be three or more. Further, as shown in the above-described embodiment, only one joint pipe 12 is used as a guide when the steel pipe sheet pile 1 is driven, so that only one joint pipe 12 may be attached to the mother pipe 11. The connection between the connecting temporary pile 10 and the steel pipe sheet pile 1 in the window portion 14a is not limited to the vise 17, and various fastening members such as bolts and nuts can be employed. One of the joint pipes 3 and 12 connected to each other may be a non-tubular joint shape.
【0014】[0014]
【発明の効果】以上説明したように、本発明に係る鋼管
矢板の打設方法によれば、地中に打設した第一の鋼管矢
板の上部に、継手部を有する打設治具を着脱可能に装着
して継手部を第一の鋼管矢板の継手の延長上に位置さ
せ、打設治具の継手部に第二の鋼管矢板の継手を連結し
て該第二の鋼管矢板を打設することで、該第二の鋼管矢
板の継手を第一の鋼管矢板の継手に連結して打ち込める
ようにしたから、鋼管矢板を連続して順次打設でき、し
かも打設に際して高止まりさせることなく直接最終打ち
込み位置まで打設できることになり、ハンマ等の機械移
動のロスがなく効率的な打設作業ができる。しかも、打
設に際して、先に打ち下げた第一の鋼管矢板に連結した
打設治具は第二の鋼管矢板を打設するためのガイド部材
として用い、直接打設しないから、従来の雇い杭と比較
して騒音を抑制できると共に建て込み精度を向上でき
る。また本発明による打設治具は、その一端に鋼管矢板
への嵌合部が備えられた母管と、該母管の側面に設けら
れた継手部と、母管の一端に設けられた連結部とを備え
ていて、嵌合部と連結部の間で鋼管矢板に嵌合して鋼管
矢板に結合するようにしたから、打設治具は第二の鋼管
矢板を打設するためのガイド部材として用いることがで
きて直接打設しない。そのため、従来の雇い杭と比較し
て騒音を抑制できると共に鋼管矢板の建て込み精度を良
好に制御できる。As described above, according to the method of driving a steel sheet pile according to the present invention, a driving jig having a joint is attached to and detached from the upper part of the first steel sheet pile driven in the ground. The joint part of the second steel pipe sheet pile is connected to the joint part of the driving jig and the second steel pipe sheet pile is put into place so that the joint part is positioned on the extension of the joint of the first steel pipe sheet pile. By doing so, the joint of the second steel pipe sheet pile is connected to the joint of the first steel pipe sheet pile and can be driven, so that the steel pipe sheet pile can be continuously driven in sequence and without stopping at a high height during driving. Since it is possible to drive directly to the final driving position, there is no loss of mechanical movement such as a hammer, and an efficient driving operation can be performed. In addition, at the time of driving, the driving jig connected to the first steel pipe sheet pile that was previously knocked down is used as a guide member for driving the second steel pipe sheet pile, and is not directly driven. Noise can be suppressed and the accuracy of installation can be improved. In addition, a casting jig according to the present invention includes a mother pipe provided with a fitting portion to a steel pipe sheet pile at one end, a joint provided on a side surface of the mother pipe, and a connection provided at one end of the mother pipe. And the connection jig is fitted to the steel pipe sheet pile between the fitting part and the connection part so as to be connected to the steel pipe sheet pile. Therefore, the driving jig is a guide for driving the second steel pipe sheet pile. It can be used as a member and is not directly cast. Therefore, the noise can be suppressed as compared with the conventional hiring pile, and the setting accuracy of the steel pipe sheet pile can be controlled well.
【図1】 本発明の実施の形態に用いる連結用仮杭の斜
視図である。FIG. 1 is a perspective view of a connecting temporary pile used in an embodiment of the present invention.
【図2】 連結用仮杭の縦断面図である。FIG. 2 is a vertical cross-sectional view of a connecting temporary pile.
【図3】 図2に示す連結用仮杭のA−A線断面図であ
る。FIG. 3 is a sectional view taken along line AA of the temporary connection pile shown in FIG. 2;
【図4】 図2に示す連結用仮杭のB−B線断面図であ
る。FIG. 4 is a sectional view taken along line BB of the temporary connection pile shown in FIG. 2;
【図5】 図2に示す連結用仮杭のC−C線断面図であ
る。FIG. 5 is a sectional view taken along line CC of the temporary connection pile shown in FIG. 2;
【図6】 図2の連結用仮杭の部分拡大断面図である。FIG. 6 is a partially enlarged cross-sectional view of the connecting temporary pile shown in FIG. 2;
【図7】 連結用仮杭と打設された鋼管矢板の上端との
連結状態を示す部分側面図である。FIG. 7 is a partial side view showing a connection state between a connection temporary pile and an upper end of a cast steel sheet pile.
【図8】 (a)〜(g)は鋼管矢板の打設工程を示す
図である。8 (a) to 8 (g) are views showing a step of driving a steel pipe sheet pile.
【図9】 連結用仮杭と鋼管矢板の上端との締結状態を
示す部分断面図である。FIG. 9 is a partial cross-sectional view showing a fastening state between a temporary connection pile and an upper end of a steel pipe sheet pile.
【図10】 連結用仮杭の他の形状を示す部分断面図で
ある。FIG. 10 is a partial cross-sectional view showing another shape of the connecting temporary pile.
【図11】 従来の鋼管矢板の打設方法を示す図であっ
て、高止まりの打設状態を示す図である。FIG. 11 is a view showing a conventional method of driving a steel sheet pile, and is a view showing a high-stop driving state.
【図12】 雇い杭を使って先行杭を打設する状態を示
す図である。FIG. 12 is a diagram showing a state in which a leading pile is driven by using a hiring pile.
【図13】 ハンマで後行杭を打設する状態を示す図で
ある。FIG. 13 is a view showing a state in which a trailing pile is driven by a hammer.
1 鋼管矢板 3 継手管 10 連結用仮杭 11 母管 12 継手管 14 連結板 14a 窓部 17 万力 DESCRIPTION OF SYMBOLS 1 Steel sheet pile 3 Joint pipe 10 Temporary pile for connection 11 Main pipe 12 Joint pipe 14 Connection board 14a Window 170,000 force
Claims (2)
部を有する打設治具を着脱可能に装着して前記継手部を
第一の鋼管矢板の継手の延長上に位置させ、前記打設治
具の継手部に第二の鋼管矢板の継手を連結して該第二の
鋼管矢板を打設することで、該第二の鋼管矢板の継手を
第一の鋼管矢板の継手に連結して打ち込めるようにした
鋼管矢板の打設方法。An installation jig having a joint portion is detachably mounted on an upper portion of a first steel pipe sheet pile that has been cast, and the joint part is positioned on an extension of a joint of the first steel pipe sheet pile. By connecting the joint of the second steel pipe sheet pile to the joint part of the driving jig and driving the second steel pipe sheet pile, the joint of the second steel pipe sheet pile is changed to the joint of the first steel pipe sheet pile. A method for driving steel pipe sheet piles that can be connected and driven.
れた母管と、該母管の側面に設けられた継手部と、前記
母管の一端に設けられた連結部とを備えていて、前記嵌
合部と連結部の間で鋼管矢板に嵌合して鋼管矢板に装着
するようにした打設治具。2. A mother pipe provided with a fitting part for fitting a steel pipe sheet pile at one end thereof, a joint part provided on a side surface of the mother pipe, and a connecting part provided at one end of the mother pipe. And a fitting jig which is fitted to the steel pipe sheet pile between the fitting part and the connecting part to be mounted on the steel pipe sheet pile.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP19757797A JPH1136283A (en) | 1997-07-23 | 1997-07-23 | Casting method and casting jig for steel sheet pile |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP19757797A JPH1136283A (en) | 1997-07-23 | 1997-07-23 | Casting method and casting jig for steel sheet pile |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| JPH1136283A true JPH1136283A (en) | 1999-02-09 |
Family
ID=16376818
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP19757797A Withdrawn JPH1136283A (en) | 1997-07-23 | 1997-07-23 | Casting method and casting jig for steel sheet pile |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH1136283A (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2009166084A (en) * | 2008-01-16 | 2009-07-30 | Nippon Steel Corp | Steel pipe sheet pile and its manufacturing method |
| WO2015107816A1 (en) * | 2014-01-14 | 2015-07-23 | 新日鐵住金株式会社 | Fixture for consecutively connecting assembled steel sheet piles and method for consecutively connecting assembled steel sheet piles |
| JP2023069014A (en) * | 2021-11-04 | 2023-05-18 | 株式会社奥村組 | Construction method of earth retaining wall |
-
1997
- 1997-07-23 JP JP19757797A patent/JPH1136283A/en not_active Withdrawn
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2009166084A (en) * | 2008-01-16 | 2009-07-30 | Nippon Steel Corp | Steel pipe sheet pile and its manufacturing method |
| WO2015107816A1 (en) * | 2014-01-14 | 2015-07-23 | 新日鐵住金株式会社 | Fixture for consecutively connecting assembled steel sheet piles and method for consecutively connecting assembled steel sheet piles |
| JPWO2015107816A1 (en) * | 2014-01-14 | 2017-03-23 | 新日鐵住金株式会社 | Combined steel sheet pile installation jig and combined steel sheet pile installation method |
| JP2023069014A (en) * | 2021-11-04 | 2023-05-18 | 株式会社奥村組 | Construction method of earth retaining wall |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US4516365A (en) | Support assembly and method | |
| JP7194471B2 (en) | Annular cofferdam and excavation work temporary facility structure and construction method using square pipe with variable cross-section | |
| JP3956133B2 (en) | Formwork panel and panel holding member | |
| JP3628417B2 (en) | Construction column construction method and guide pipe used for it | |
| JP6178030B1 (en) | Prior construction method for earth retaining of excavation groove and supporting device used for the construction method | |
| JPH01178610A (en) | Installation method for stressed materials | |
| KR102386967B1 (en) | Retaining structure and construction method using the same | |
| JPH10237874A (en) | Temporary deadline box and method of constructing structure using the same | |
| JP4419456B2 (en) | Method of joining reinforced concrete member and steel pipe concrete | |
| JP3124490B2 (en) | Formwork connector and formwork fixture for foundation concrete formwork | |
| JP2789509B2 (en) | Steel guide wall | |
| JPH108469A (en) | Construction method for earth retaining wall | |
| JPH07103559B2 (en) | Construction method for steel pipe piles | |
| JP2649682B2 (en) | Underground structure | |
| JP2578345B2 (en) | How to build a continuous underground wall | |
| JPH0223639Y2 (en) | ||
| CA1236677A (en) | Fence mender | |
| JP2618796B2 (en) | How to build a wall | |
| JP2001241188A (en) | Structure construction method and temporary gantry | |
| JP2022083204A (en) | Pile foundation and base member | |
| JP2001182077A (en) | Connection method between pile and anchoring bar | |
| JPH06330505A (en) | Frame body device and frame body bearing device therefor | |
| JPH05331837A (en) | Method for executing steel-made underground continuous wall | |
| JPH06136742A (en) | Connecting member for structural steel frame | |
| JPH0623637Y2 (en) | Clips for floating lath supporting rebar |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A300 | Withdrawal of application because of no request for examination |
Free format text: JAPANESE INTERMEDIATE CODE: A300 Effective date: 20041005 |