JPS5641925A - Removal of steel wire for earth anchor work - Google Patents
Removal of steel wire for earth anchor workInfo
- Publication number
- JPS5641925A JPS5641925A JP11765179A JP11765179A JPS5641925A JP S5641925 A JPS5641925 A JP S5641925A JP 11765179 A JP11765179 A JP 11765179A JP 11765179 A JP11765179 A JP 11765179A JP S5641925 A JPS5641925 A JP S5641925A
- Authority
- JP
- Japan
- Prior art keywords
- steel wire
- sheath
- inflation
- diameter
- removal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 229910000831 Steel Inorganic materials 0.000 title abstract 5
- 239000010959 steel Substances 0.000 title abstract 5
- 239000004568 cement Substances 0.000 abstract 4
- 230000003014 reinforcing effect Effects 0.000 abstract 3
- 238000009412 basement excavation Methods 0.000 abstract 2
- 239000008267 milk Substances 0.000 abstract 2
- 210000004080 milk Anatomy 0.000 abstract 2
- 235000013336 milk Nutrition 0.000 abstract 2
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
PURPOSE: To remove the steel wire safely without generation of noise, vibration, etc. by filling/curing cement milk in a sheath already inserted in a reinforcing hole and crushing cement under the earth anchor work designed to prevent landslide from the wall surface after excavation.
CONSTITUTION: The reinforcing hole 2 of 120mm in diameter and approximately 10W20m in length is drilled on a bank surface 1 formed through excavation in a foundation work or the like. In this reinforcing hole 2, a tubular sheath of 28W48mm in diameter with its tip closed with a lid and steel wire 4 of 12mm diameter are inserted. Then cement milk 5 is injected and hardened. When the foundation work, etc. are completed, the steel wire has to be removed. For this reason, an inflation/ crushing agent 8 is filled into the sheath 3. After the elapse of approximately 12hr of time after inflation/c rushing agent 8 was filled in the sheath 3, the sheath 3 and hardened cement are crushed by the inflation pressure of inflation/crushing agent 8, thus making easy the removal of the steel wire 4 from underground.
COPYRIGHT: (C)1981,JPO&Japio
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP11765179A JPS5641925A (en) | 1979-09-12 | 1979-09-12 | Removal of steel wire for earth anchor work |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP11765179A JPS5641925A (en) | 1979-09-12 | 1979-09-12 | Removal of steel wire for earth anchor work |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| JPS5641925A true JPS5641925A (en) | 1981-04-18 |
Family
ID=14716945
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP11765179A Pending JPS5641925A (en) | 1979-09-12 | 1979-09-12 | Removal of steel wire for earth anchor work |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS5641925A (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS59193309A (en) * | 1983-04-19 | 1984-11-01 | Tatsumi Denshi Kogyo Kk | Position measurement of self-travelling equipment |
| US5303511A (en) * | 1990-04-27 | 1994-04-19 | Toyoda Koki Kabushiki Kaisha | Spindle apparatus for supporting and rotating a workpiece |
-
1979
- 1979-09-12 JP JP11765179A patent/JPS5641925A/en active Pending
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS59193309A (en) * | 1983-04-19 | 1984-11-01 | Tatsumi Denshi Kogyo Kk | Position measurement of self-travelling equipment |
| US5303511A (en) * | 1990-04-27 | 1994-04-19 | Toyoda Koki Kabushiki Kaisha | Spindle apparatus for supporting and rotating a workpiece |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JPS5641925A (en) | Removal of steel wire for earth anchor work | |
| JPS5670324A (en) | Concrete crushing body and crushing method of concrete structure | |
| JPH06510341A (en) | Method and apparatus for driving tubes into the ground and cartridges used therefor and for subsequent tube blasting | |
| JPS5634823A (en) | Concrete pile injection constructing method | |
| JPS62242011A (en) | Method and apparatus for constructing shallow ground-improving pile | |
| JPS5736214A (en) | Reinforcing construction work of lock bolt for soft ground | |
| JPS6424913A (en) | Formation of expanded pit in ground | |
| JPS5536592A (en) | Construction method for cast-in-place differential- diameter pile | |
| JPS6340551Y2 (en) | ||
| JPS5724720A (en) | Increasing method for pull resistance of structure material driven into ground | |
| JPS5648431A (en) | Anchoring method | |
| JP2913631B2 (en) | Ground improvement method | |
| JPS573915A (en) | Method and apparatus for construction of reaction resistor body underground | |
| JPS5789019A (en) | Construction work of underground concrete structure | |
| JPS55155823A (en) | Burying method for pile | |
| JPS5667018A (en) | Construction of earth anchor and device thereof | |
| JPS55136322A (en) | Expansion piling method | |
| JP3552164B2 (en) | High pressure jet injection mixing method | |
| JPS6112053B2 (en) | ||
| JPS55116923A (en) | Method for construction of pile foundation | |
| JPS56159422A (en) | Bury and fixing of concrete pile | |
| JPS5545910A (en) | Pile pulling method | |
| JPS5585731A (en) | Method and apparatus for burying pile | |
| JPS57216A (en) | Internal excavation and foot protection work for pile | |
| JPS6019823A (en) | Pile burying work |