JPS58143036A - Construction of network skeletal dome - Google Patents

Construction of network skeletal dome

Info

Publication number
JPS58143036A
JPS58143036A JP2412782A JP2412782A JPS58143036A JP S58143036 A JPS58143036 A JP S58143036A JP 2412782 A JP2412782 A JP 2412782A JP 2412782 A JP2412782 A JP 2412782A JP S58143036 A JPS58143036 A JP S58143036A
Authority
JP
Japan
Prior art keywords
dome
support
unit
lift
central
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2412782A
Other languages
Japanese (ja)
Other versions
JPS6332939B2 (en
Inventor
優 森山
武 山田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TOMOEGUMI IRON WORKS
TOMOEGUMI TEKKOSHO KK
Original Assignee
TOMOEGUMI IRON WORKS
TOMOEGUMI TEKKOSHO KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TOMOEGUMI IRON WORKS, TOMOEGUMI TEKKOSHO KK filed Critical TOMOEGUMI IRON WORKS
Priority to JP2412782A priority Critical patent/JPS58143036A/en
Publication of JPS58143036A publication Critical patent/JPS58143036A/en
Publication of JPS6332939B2 publication Critical patent/JPS6332939B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Tents Or Canopies (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Vibration Dampers (AREA)

Abstract

(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。
(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.

Description

【発明の詳細な説明】 この斃−は、食天儀型野球楊等に使用する綱■骨格ドー
ムの構頗方法#C関するものである。
DETAILED DESCRIPTION OF THE INVENTION This article relates to method #C for constructing a rope skeleton dome used in a food-based baseball bat, etc.

この種の網目骨格ドームの従来の構築方法としては、基
鷹円周部から順に内側上方へと構築を進め最終の天窓ま
で行なう方法がある。しかしながら、このような構築方
法の場合、ドームの内側上方へ進むはと、構築作業位置
が高くなるため、鳳機パネルまたは各杆材の吊上げや結
合作業Ell々の不便や危険を伴ない工期の長期化を免
れなかった。
A conventional method for constructing this type of mesh skeleton dome is to proceed inwardly and upwardly from the base circumference until reaching the final skylight. However, in the case of this construction method, the construction work position becomes higher as the dome moves upward inside the dome, so the construction period is shortened without the inconvenience and danger of lifting and joining the tengoku panel or each rod material. The situation could not be avoided for a long time.

この発明は、このような事情に僑みて提案されたもので
、その目的は作業の安全性が高く工期の頌縮が図れる構
築方法を提供することにあゐ。
This invention was proposed in light of the above circumstances, and its purpose is to provide a construction method that provides high work safety and shortens the construction period.

この発@に係る構築方法は、周方崗に分割された平II
形状扇形の多数の単位ドーム部から構成書れ、この単位
ドームが中央ドーム部と1111蝋ド一五部とから形成
され工いる#18骨格ドームの構築方法であって、ドー
ム中央sKす7トアツプ用中央支柱を立設するεともに
前記側壁ドームSを支持し得るリフトアップ用支柱を移
動自在に立設し、側壁ドーム部を組立てて完成時よりも
開き気味に前記リフトアップ用支柱に支持させた彼中央
ドーム部地上付近において組立ててリフトアップ用中央
支柱およびリフトアップ用支柱によって上昇させて単位
ドーム郁を組立て、次いで、リフトアップ用支柱を次の
単位ドーム組立位置まで移動させて次の単位ドームを組
立て、このような単位ドームの組立てを順次行なってド
ームを構築し、地上付近において全1の組立てを行なう
ようKしたものである。
The construction method related to this development is based on Hei II, which was divided into Zhoufangang.
A method for constructing a #18 skeletal dome, which is constructed from a number of fan-shaped unit dome parts, and each unit dome is formed from a central dome part and 15 parts of 1111 wax, and the dome center sK 7 tops. A lift-up column capable of supporting the side wall dome S is movably erected together with a central column ε, and the side wall dome portion is assembled and supported on the lift-up column with the side wall dome part opened slightly more than when completed. The unit dome is assembled by assembling the central dome near the ground and lifting it up using the lift-up center column and the lift-up column.Then, the lift-up column is moved to the next unit dome assembly position and the next unit is assembled. The dome is assembled, and the dome is constructed by sequentially assembling such unit domes, and the entire assembly is performed near the ground.

以下、この発明を図示する一実施例に基づいて説明する
。#1111.第2図に示すように、綱目骨格ドームD
は、馬方向に分割された平面形状順形の多数の単位ドー
ムsDUから構成され、この単位ドーム部DTIは平面
形状略台形状の中央ドームsDυ1と平面形状略台形状
の@壁ドーム部j172とから形成され、ドーム中央s
Kはドーム中央にす7トアツプ用中央支柱1が、完成時
にその頭部がドームから突出するように立設され、@−
ドーム郁D1]2を支持し得る一対のリフトアップ用支
柱2が移動自在に立設されていも。一対のリフトアップ
用支柱2は、中央ド−A@ntr1とII!1m1ドー
A@ D v 2 Jニー f)接klf。
The present invention will be described below based on an illustrated embodiment. #1111. As shown in Figure 2, the mesh skeleton dome D
is composed of a large number of unit domes sDU having a regular planar shape divided in the horse direction, and this unit dome portion DTI includes a central dome sDυ1 having a substantially trapezoidal planar shape and a @wall dome portion j172 having a substantially trapezoidal planar shape. formed from the center of the dome s
K stands in the center of the dome, and the central column 1 for top up is erected so that its head protrudes from the dome when completed.
Even if a pair of lift-up columns 2 capable of supporting the dome Iku D1]2 are movably erected. The pair of lift-up columns 2 are the center door A@ntr1 and II! 1 m1 do A @ D v 2 J knee f) contact klf.

部における両端に配置され、移動できるようKその高さ
がll!lできる。この支柱2は、案内軌条器上を車輪
で移動するよう圧しても良いし、自ら車輪をもって移動
するようKL”(も良い。
It is placed at both ends of the section and its height is ll so that it can be moved. I can do it. This support column 2 may be pressed so that it moves on wheels on a guide rail, or it may be moved using wheels on its own.

こf)ような構成において、断面三角形状のコンクリー
ト基礎4が打設されており、先づ、ここにトラツタクレ
ーン(図示省略)によりサポート5を使用し′C@壁ド
ーム@J)U2を組立てる。
f) In such a configuration, a concrete foundation 4 with a triangular cross-section is poured, and a truck crane (not shown) uses a support 5 to construct a 'C@Wall Dome@J) U2. Assemble.

組立てられた@壁ドーム郁DU2は、ジヤツキ6により
完成時よりも開き気w/i、にそのWaS部をリフトア
ップ用支柱2に支持させる。
The assembled @wall dome DU2 is opened more open than when completed by the jacks 6, and its WaS portion is supported by the lift-up struts 2.

リフトアップ用中央支柱1は、内部にタワークレーン7
を備えるとと−に上下動自在に支持された吊具8N−有
している。中央ドーム部ptrlをサポート9を使用し
て地上付近で組立て、吊具8とリフトアップ用支柱2に
取付けられた吊JIL10とKよって中央ドーム部J)
Ulを吊上げ。
The lift-up central column 1 has a tower crane 7 inside.
It has a hanging tool 8N- which is supported so as to be able to move up and down. Assemble the central dome part ptrl near the ground using the support 9, and hang the hanging JIL10 and K attached to the hanging tool 8 and the lift-up column 2. Therefore, the central dome part J)
Lift up Ul.

ジヤツキ6の押付力な解除して中央ドーム部Dυ1の端
部と側壁ドーム部DU2の端部とを接続し単位ドームD
Uが組立てられる。ここで、この端部と端部との関に接
続部材11を介在させても良い。
The pressing force of the jack 6 is released and the end of the central dome part Dυ1 and the end of the side wall dome part DU2 are connected to form a unit dome D.
U is assembled. Here, a connecting member 11 may be interposed between the ends.

次いで、リフFアップ用支柱20頭部を縮めて次の組立
位置まで移動させ次の単位ドーム部Dυを組立てこれを
順次繰返してドームDが構築される。ここで、単位ドー
ム部DUの組立鵬序は、II/45図に示すように一つ
の単位ドーム部Dυを組立てたら対向する単位ドーム部
J)Uを組立てるようにするのがバランス上望ましい。
Next, the head of the ref-F-up strut 20 is retracted and moved to the next assembly position to assemble the next unit dome portion Dυ, and this process is sequentially repeated to construct the dome D. Here, as for the assembly order of the unit dome part DU, it is desirable for balance to assemble one unit dome part Dυ and then assemble the opposing unit dome part J)U as shown in Figure II/45.

前述のとおりこの発明によれば、ドーム自体を移動する
ことなく一つ一つ確実に構築できるとともに組立作業の
はとんとか地上付近において行なえるため作業の安全性
が^く、工期の短縮が図れる。高揚程のクレーンがほと
んどいらず、大朧ドームの建設に有効である。
As mentioned above, according to this invention, the domes can be reliably constructed one by one without moving the dome itself, and the assembly work can be done near the ground, which improves the safety of the work and shortens the construction period. I can figure it out. This method is effective in constructing Oboro Dome, as it requires almost no high-lift cranes.

【図面の簡単な説明】[Brief explanation of drawings]

第111.第2図は、このQIIIjK係る網目資格ド
ームを示す平面図、縦断面図、第5図は構築順を示す概
略図である。 1・・・リフトアップ用中央支柱、2・・・す7トアツ
プ用支柱、3・・・案内軌条、4・・・コンクリート基
礎、5・・・サポート、6・−・ジヤツキ、7・・・タ
ワークレーy、 8・・・吊具、9・・・サポート、1
0・・・吊^% 11 ・・・接続部材。
No. 111. FIG. 2 is a plan view and longitudinal cross-sectional view showing the mesh qualification dome according to this QIIIjK, and FIG. 5 is a schematic diagram showing the order of construction. DESCRIPTION OF SYMBOLS 1... Central support for lift-up, 2... Support for seat 7 lift-up, 3... Guide rail, 4... Concrete foundation, 5... Support, 6... Jacket, 7... Tower clay y, 8... Hanging tool, 9... Support, 1
0... Hanging^% 11... Connection member.

Claims (1)

【特許請求の範囲】[Claims] (1)馬方崗に分割された平wy#状層形の多数の単位
ドーム部から構成され、この単位ドーム部が中央ドーム
部と側壁ドーム部とから形成されている網目骨格ドーム
の構築方法であって、ドーム中央部にリフトアップ用中
央支柱を立設するとともに前記側壁ドーム部を支持し得
るり7トアツプ用支柱を移動幽11EK立設し、側壁ド
ーム部を組立工て完成時よりも開き気味に前記り7トア
ツプ用支柱に支持させた後中央ドーム部を地上付近に絢
いて組立ててリフトアップ用中央支柱およびリフトアッ
プ用支柱によって上昇させて単位ド一本部を組立て、次
いで、v7トアツプ用支柱を次の単位ドーム組立位置ま
で移動させて次の単位ドームを組立て、このような単位
ドームの組立工を順次行なってドー^を構築することな
善−とす番綱関骨格ドームの構築方法。
(1) Method for constructing a mesh skeleton dome, which is composed of a large number of flat layered unit dome parts divided into squares, and each unit dome part is formed from a central dome part and side wall dome parts. A central lift-up support pillar was erected in the center of the dome, and a 7-top support pillar was moved to support the side wall dome part, and the side wall dome part was assembled. After supporting the V7 top up support with a slight opening, the central dome is assembled near the ground and raised by the lift up central support and the lift up support to assemble the unit dome, and then the V7 top up It is better to move the support support to the next unit dome assembly position and assemble the next unit dome, and then assemble the unit domes one after another to construct the dome. Method.
JP2412782A 1982-02-17 1982-02-17 Construction of network skeletal dome Granted JPS58143036A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2412782A JPS58143036A (en) 1982-02-17 1982-02-17 Construction of network skeletal dome

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2412782A JPS58143036A (en) 1982-02-17 1982-02-17 Construction of network skeletal dome

Publications (2)

Publication Number Publication Date
JPS58143036A true JPS58143036A (en) 1983-08-25
JPS6332939B2 JPS6332939B2 (en) 1988-07-01

Family

ID=12129640

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2412782A Granted JPS58143036A (en) 1982-02-17 1982-02-17 Construction of network skeletal dome

Country Status (1)

Country Link
JP (1) JPS58143036A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5916635A (en) * 1982-07-16 1984-01-27 Nagao Tekkosho:Kk Press machine provided with robot

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01254442A (en) * 1988-04-05 1989-10-11 Stanley Electric Co Ltd How to turn on the auxiliary stop lamp

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5916635A (en) * 1982-07-16 1984-01-27 Nagao Tekkosho:Kk Press machine provided with robot

Also Published As

Publication number Publication date
JPS6332939B2 (en) 1988-07-01

Similar Documents

Publication Publication Date Title
JPS58143036A (en) Construction of network skeletal dome
JPH04161566A (en) Constructing apparatus for large space building
JP3981469B2 (en) Construction method of concrete structure
JPH10280543A (en) Construction method of dome-like roof
JPS6333529B2 (en)
JPH04161565A (en) Construction of large space building
JPH0932120A (en) Method of construction of structure
JPH062434A (en) How to build a steel frame roof
JPH0431412Y2 (en)
JPS6333530B2 (en)
JPH06101348A (en) How to build a tower
JP3553370B2 (en) Work stage device for steel tower construction and steel tower construction method
JP3785742B2 (en) Steel tower construction method for steel tower supported chimney
JPS6282175A (en) Construction method for height increasing rebuilding while existing building is operated
JP3715378B2 (en) Automatic roof raising device and method of building a building by raising the roof
JPH0344180B2 (en)
JPH06185120A (en) Construction method for upper structure of roof, etc.
JPS5844161A (en) Building of tower-like structure
JPH0539637A (en) Construction method for domed roof and heavy hoist therefor
JP3781484B2 (en) How to lift structures
JPS596985B2 (en) Lift-up construction method for structures
JPH04118438A (en) Method and apparatus for construction of building
JPH06146594A (en) Building construction method
JPH07305536A (en) All weather type parallel building method of towerlike structure
JPH08120944A (en) Temporary roof device