JPS5976329A - Pile driver - Google Patents

Pile driver

Info

Publication number
JPS5976329A
JPS5976329A JP18652782A JP18652782A JPS5976329A JP S5976329 A JPS5976329 A JP S5976329A JP 18652782 A JP18652782 A JP 18652782A JP 18652782 A JP18652782 A JP 18652782A JP S5976329 A JPS5976329 A JP S5976329A
Authority
JP
Japan
Prior art keywords
pile
sheet
guide frame
sheet pile
pile driver
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP18652782A
Other languages
Japanese (ja)
Other versions
JPH023853B2 (en
Inventor
Minao Ishihara
美奈雄 石原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NICHIYOO KK
Original Assignee
NICHIYOO KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NICHIYOO KK filed Critical NICHIYOO KK
Priority to JP18652782A priority Critical patent/JPS5976329A/en
Publication of JPS5976329A publication Critical patent/JPS5976329A/en
Publication of JPH023853B2 publication Critical patent/JPH023853B2/ja
Granted legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D13/00Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
    • E02D13/04Guide devices; Guide frames

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

PURPOSE:To easily move the whole of a pile driver by a method which a pile driver is attached in a reciprocally movable manner in the driving direction to the upside of a guide frame to guide the driving direction of sheet piles, and an extrusible movable ring in contact with the upside of sheet piles driven is provided to the rear end of the guide frame. CONSTITUTION:An early-period sheet pile 4A is driven at the head position of driving line, the H-shaped steel 2 of a pile driver is matched with the driving direction, and both sides of the sheet pile 4A are contacted with an uprising part 12A and a hanging part 14 by operating interval alteration means 6 and 7. The setting of the guide frame 3 is completed according to thickness of sheet piles 4. The pile drive body 17 is orderly moved on the guide frame 3 by an oil motor 28, and sheet piles supported by the guide frame 3 are penetrated into the ground in connection with the sheet pile 4A by means of the chuck 48 of the driver body 17. After the driving of a series of sheet piles 4, an oil-pressure cylinder 70 is extended, the rear end of the guide frame 3 is lifted up by the movable ring 71, the whole of the pile driver is moved, and sheet piles are again driven.

Description

【発明の詳細な説明】 本発明は、杭打機に係り、とくに、矢板を直線上に連続
して打込むことが可能な杭打機に関する。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a pile driver, and particularly to a pile driver capable of continuously driving sheet piles in a straight line.

一役に、締め切り工事、土留め工事、農業用水路工事な
どでは、取扱いの簡便さ、施工の迅速さなどから矢板が
用いられている。この矢板は、杭打機で土中に順次打込
まれて矢板壁を杉皮するのに使用されるものである。こ
の場合、各矢板はセクション合せが行なわれ互いに一体
化されるが、矢板壁に設計強度を正しく発揮させるため
に矢板の鉛直度が正確に保持されほか、その壁側は真っ
すぐ直線上に維持されていなければならない。この為、
矢板の両側を挾むようにして打込方向に延設した導枠を
地面に設け、壁側の曲折防止が図られている。従来は、
前記導枠として、矢板壁全体に沼ってコンクリート打し
たり、可搬式導枠を工部進行に従って移動設置するよう
にしていた。しかし、なから、斯かる従来技術にあって
は、杭打機と導枠とを全く別個に装備する構成な為、矢
板の鉛直度の保持が困難であり、打込方向から見て当該
矢板が左右に傾斜するという不都合があった。
Sheet piles are used in closing construction, earth retaining construction, agricultural canal construction, etc. due to their ease of handling and speed of construction. These sheet piles are driven into the soil one after another by a pile driver and are used to cover the sheet pile walls with cedar bark. In this case, each sheet pile is section-aligned and integrated with each other, but the verticality of the sheet pile is maintained accurately and the wall side is maintained in a straight line so that the sheet pile wall can properly demonstrate its design strength. must be maintained. For this reason,
A guiding frame extending in the driving direction is installed on the ground to sandwich both sides of the sheet pile to prevent bending of the wall side. conventionally,
As the guiding frame, concrete was poured over the entire sheet pile wall, or a portable guiding frame was moved and installed as the construction progressed. However, in this conventional technology, since the pile driving machine and the guiding frame are equipped completely separately, it is difficult to maintain the verticality of the sheet pile, and when viewed from the driving direction, the sheet pile is There was an inconvenience that it tilted from side to side.

そして一旦、傾斜が生じると、その修正が難かしく施工
精度が低下したり、修正作業に時間を要するという事態
を招いていた。
Once a slope occurs, it is difficult to correct it, resulting in a decrease in construction accuracy and a time-consuming process.

本発明は上記従来技術の欠点に鑑みなされたものであり
、矢板を精度良く迅速かつ連続的に打込むことができる
杭打機を提供することを、その目的とする。
The present invention has been made in view of the drawbacks of the prior art described above, and an object of the present invention is to provide a pile driver that can drive sheet piles accurately, rapidly, and continuously.

本発明は、矢板の打込方向を誘導する導枠ど、この導枠
に打込方向へ進退自在に係合装備した杭打機本体と、こ
の杭打機本体をスライド移動する手段と、前記導枠の少
なくとも後端部に設けた押出し自在の移動輪とを備えた
ことにより、上記目的を達成しようとするものである。
The present invention provides a pile driving machine body equipped with a guiding frame for guiding the driving direction of sheet piles, which engages with the guiding frame so as to be able to move forward and backward in the driving direction, a means for sliding the pile driving machine body, and a means for sliding the pile driving machine body, and The above object is achieved by providing a movable wheel that can be freely pushed out and provided at least at the rear end of the guiding frame.

以下、本発明の一実施例を第1図乃至第5図に基づいて
説明する。
Hereinafter, one embodiment of the present invention will be described based on FIGS. 1 to 5.

第1図は、本発明に係る杭打機を示す概略斜視図である
。図に於て、左右−組の案内フレームとしてのl−I型
鋼1,2が互いに平行に装備されて成る導枠3が地上に
矢板4,4.・・・の打込方向(第1図の斜め右上方向
ンに延設されている。この導枠3は、矢板4を左右から
挾み込むことにより、矢板4を正しく直線上に打込むた
めのものである。
FIG. 1 is a schematic perspective view showing a pile driver according to the present invention. In the figure, a guide frame 3 consisting of L-I type steels 1 and 2 as left and right sets of guide frames installed parallel to each other is placed on the ground with sheet piles 4, 4. ... driving direction (extending diagonally in the upper right direction in Figure 1).This guide frame 3 is used to drive the sheet piles 4 correctly in a straight line by inserting the sheet piles 4 from the left and right. belongs to.

前記H型鋼1,2(徒所定箇所を補強部材5,5・・・
によって補強されており、前後端部に間隔変更手段6,
7が装備されている。前側の間隔変更手段6は、上下平
行に配設さf″した案内板8,9を有するスライド枠l
Oと、HWWN22間に介装されてト■型鋼2に対し1
を左右方向へ移動する油圧ジヤツキ11(第2図参照)
とから成る。前記H型鋼2は案内板8,9間を摺動する
ように成っている。前記後端側の間隔変更手段7は、1
1型鋼lの後端に固着されたコ字状のアーム部材12と
、下端が前記Hm鋼2の後端に固着され、上端部が前記
アーム部材12の水平部13に摺動自在に嵌装された吊
持部材14と、前記アーム部材12の先端と該吊持部材
14の下端部とのl”NJに介装されて、H型鋼2に対
し1を左右方向へ移動する油圧ジヤツキ15とから成る
。前記油圧ジヤツキ11と、15を同期17て作動さぜ
ることにより、H型鋼1゜2の間隔を、その平行を保ち
ながら変更出来るようになっている。このH型鋼1,2
間は矢板4の厚さに応じて変更される。
Said H-beam steels 1, 2 (reinforcing members 5, 5...
It is reinforced by the spacing changing means 6 at the front and rear ends.
7 is equipped. The front interval changing means 6 includes a slide frame l having guide plates 8 and 9 disposed vertically and parallel to each other.
O and HWWN22 are interposed between
Hydraulic jack 11 that moves from side to side (see Figure 2)
It consists of The H-shaped steel 2 is configured to slide between guide plates 8 and 9. The distance changing means 7 on the rear end side includes 1
A U-shaped arm member 12 is fixed to the rear end of the type 1 steel l, the lower end is fixed to the rear end of the Hm steel 2, and the upper end is slidably fitted into the horizontal part 13 of the arm member 12. and a hydraulic jack 15 that is interposed between the tip of the arm member 12 and the lower end of the suspension member 14 and moves 1 to the left and right with respect to the H-shaped steel 2. By operating the hydraulic jacks 11 and 15 in synchronization 17, it is possible to change the distance between the H-shaped steels 1.2 while maintaining their parallelism.
The distance is changed depending on the thickness of the sheet pile 4.

前記アーム部材12の水平g13下面側に(、、−1、
第5図に示すように吊持部材14と立上り部12との間
に油圧シリンダ70が固着されており、こ 。
On the lower surface side of the horizontal g13 of the arm member 12 (,, -1,
As shown in FIG. 5, a hydraulic cylinder 70 is fixed between the suspension member 14 and the rising portion 12.

の油圧シリンダ70の1端部に移動輪71が昇降自在に
装備さnている。この移動輪71は、杭打機全体を打込
進行方向へ移惑する際、前記油圧シリンダ70の伸延動
作によって矢板4の上端に当接押下さ才しるようになっ
ている。このとき矢板4から反力を受けて導枠3の後端
部が地面から離れるため、当該杭打機の前端部をロープ
等で牽引すれば前記移動輪71が矢板4上を回転し簡単
に杭打機の移動設置を行なうことができる。
A movable wheel 71 is installed at one end of a hydraulic cylinder 70 so as to be movable up and down. The movable wheel 71 is pressed down against the upper end of the sheet pile 4 by the extension action of the hydraulic cylinder 70 when the entire pile driver is moved in the driving direction. At this time, the rear end of the guide frame 3 leaves the ground due to the reaction force from the sheet pile 4, so if the front end of the pile driver is pulled with a rope or the like, the movable wheel 71 rotates on the sheet pile 4 and easily Pile driver can be moved and installed.

前記導枠3の上には、移動架台16がH型鋼1゜2の長
手方向にスライド自在に装備されており、この移動架台
16の」二に杭打機本体17が搭載されている。前記移
動架台16は、左、右−組の架台部材18.19とから
成り、架台部材18の左9114部及び架台部材19の
右端部が各々■(型銅1゜2の水平フランジ20.21
の左、右端に鉤状に係合しく第2図参照)、[■型鋼1
,2の左、右移動に応じて、該架台部月18,19も一
体的に移動するようになっている。これらの架台部材1
8゜19i−J、該架台部材18.19の上側に、左石
方向移mυが自在に装備されたコ字状平面の基板22に
よって組合わされている。前記右側の架台部材19及び
H型j142には移動架台16のスライド手段が装備さ
itている。このスライド手段は、架台部材19の前端
に設けられた移動部24と、H型g12の内側のウェッ
ブ25の上端部長手方向に沿って配設されたチェーン2
6から成る。前記移動部24を詳述すると、架台部材1
9の前端に固着さλするとともに水平フランジ21に涜
って前号へ延設さj、た台板27に、オイルモータ28
及びごのオイルモータ28で回転されるギア機構29(
第2図参照)が装備されており、このギア機構29の出
力軸30が前記I(型鋼1,2の間を辿って鉛直方向へ
水平7ランジ20.21の畳面側に突出し、先端に前記
チェーン26と係合するグーエーンギア32が設けら?
Lでいる。前記チェーン26は、H型鋼2の前後端に設
けられた支持部材33.33(−一万は、第2図参照)
に植設したポル)34.34(−万は、図示せずンによ
って張設されるとともに、支持板35でチェーン26の
下側が支持−6nるように成っている。前記オイルモー
タ28を操作してチェーンギア32を回転するとチェー
ン26から反力を受け、移動架萱16が導枠3のrit
T後方向に移動するようになっている。
A movable frame 16 is installed on the guiding frame 3 so as to be slidable in the longitudinal direction of the H-shaped steel 1°2, and a pile driver main body 17 is mounted on the second side of the movable frame 16. The movable pedestal 16 consists of left and right pedestal members 18 and 19, and the left 9114 part of the pedestal member 18 and the right end part of the pedestal member 19 are respectively
(see Fig. 2), [■ Type steel 1
, 2 move to the left or right, the pedestal parts 18, 19 also move integrally. These frame members 1
8°19i-J, is combined with a U-shaped flat substrate 22 on which a left stone direction shifter mυ is freely provided on the upper side of the pedestal member 18.19. The right side frame member 19 and the H-shaped j142 are equipped with a sliding means for the movable frame 16. This sliding means includes a moving part 24 provided at the front end of the frame member 19, and a chain 2 disposed along the longitudinal direction of the upper end of the web 25 inside the H-shaped g12.
Consists of 6. To explain the moving part 24 in detail, the gantry member 1
The oil motor 28 is fixed to the front end of the base plate 27 and extends to the front side of the horizontal flange 21.
A gear mechanism 29 (
2), and the output shaft 30 of this gear mechanism 29 protrudes vertically to the mating surface side of the horizontal 7 langes 20 and 21 following between the steel sections 1 and 2, and at the tip thereof. Is there a gear 32 that engages with the chain 26?
I'm L. The chain 26 includes support members 33 and 33 (-10,000, see FIG. 2) provided at the front and rear ends of the H-shaped steel 2.
The chain 26 is supported by a support plate 35, and the lower side of the chain 26 is supported by a support plate 35.The oil motor 28 is operated When the chain gear 32 is rotated, a reaction force is received from the chain 26, and the movable frame 16 moves to the rit of the guiding frame 3.
It is designed to move in the backward direction.

前記移動架台16の上側に搭載された杭打機本体17ン
よ、前記架台部材18.19の各々の上端部にそ・/1
ぞれ一体して設けられたスライド溝36゜37に左右方
向へスライド自在に係合する基板22と、この基板22
の上側に前後方向に回動可能Vこ装置ハ11さノ1.た
杭打機本体部38とから成る。この杭打機本体部38は
、底板39と、この底板39の左、右側(iillVc
垂設すtLft側kt 40 、41 ト、こitらの
111140 、41間の上部工筒所に横設さitた。
As for the pile driving machine main body 17 mounted on the upper side of the movable frame 16, the upper end of each of the frame members 18 and 19 is
A substrate 22 that is slidably engaged in slide grooves 36 and 37 provided integrally in the left and right directions, and this substrate 22
V-shaped device that can be rotated in the front and back direction upwards 11 1. It consists of a pile driver main body part 38. This pile driver main body part 38 includes a bottom plate 39, left and right sides of this bottom plate 39 (iillVc
It was installed horizontally in the upper work station between 111140 and 41 on the Lft side.

111i強管42.43及び介装部材44.45を介し
て前記側壁40.41に装着を几だ左右−組の昇降用油
圧シリンダ46.47と、この昇降用油圧シリンダ46
.47の下端に吊持されたコ字状のチャック部48と、
このチャック部48の先端↑b15内側に対向して設け
らrI、た固定チャック49及び可動チャック50とか
ら成る。前記架台部材18.19の基板22外坦1の左
、右端部に突片51 ) 52、この突片51152[
対向する基板22の左右端に突片53,54^叛設され
でおり、この内、架台部材18側の突片51.53がボ
ルト止めされている。このため、前記I(型鋼2 VC
対し1が左、右に移動すると、基板22の右半部が架台
部材19上でスライドするように成っている。
111i hard pipes 42.43 and intervening members 44.45 to the side wall 40.41, a set of left and right lifting hydraulic cylinders 46.47, and this lifting hydraulic cylinder 46.
.. A U-shaped chuck part 48 suspended from the lower end of 47;
The chuck portion 48 is composed of a fixed chuck 49 and a movable chuck 50, which are provided opposite to each other inside the tip ↑b15 of the chuck portion 48. Projections 51 ) 52 are provided on the left and right ends of the outer surface 1 of the substrate 22 of the mount member 18 , 19 , and the projections 51 152 [
Protrusions 53 and 54 are provided on the left and right ends of the opposing substrate 22, of which the protrusions 51 and 53 on the pedestal member 18 side are bolted. For this reason, the above I (type steel 2 VC
On the other hand, when the counter 1 moves to the left or right, the right half of the board 22 slides on the pedestal member 19.

尚、突片52,54側をボルト止めし、基板22の左半
部を架台部材18上でスライドさせるようにすることも
可能である。前記スライド溝36゜37は、タブテール
状に形成されて移動架台16と基板22とが確実に係合
するよう1で成っている。
Note that it is also possible to bolt the protrusions 52 and 54 and slide the left half of the board 22 on the pedestal member 18. The slide grooves 36 and 37 are formed in a tab tail shape and are made of 1 so that the movable pedestal 16 and the board 22 can be surely engaged with each other.

前記基板22と底版39との間には回動手段55が設け
られており、矢板40打込方向に対し、杭打機本体部3
8を前後に傾斜出来るように成っている。即ち、第2図
及び第4図に示す如く底板39の下側で後端部の左右両
側が軸受機信56゜57によって前後方向に回動自在に
軸支されている。底板39の前端部には、基板22に植
設さnたネジ棒56がバカ穴57を貫挿して上方へ突設
されており、ネジ棒56の基板22下面側に調節ナツト
58が螺合されている。この調節ナツト58を回して杭
打機本体部38の傾斜角を調節出来るようになっている
。これは、杭打機本体部38による矢板4の圧入方向を
調節して該矢板4の打込進行方向への傾斜を防止するな
ど圧入法線を変えるためのものである。前記ネジ棒56
の上端には底板39の抜は止ナツト59が螺合されてい
る。前記底板39と(111@40との間には補強部材
60が固着されている。
A rotating means 55 is provided between the base plate 22 and the bottom plate 39, and rotates the pile driver main body 3 with respect to the driving direction of the sheet pile 40.
8 can be tilted back and forth. That is, as shown in FIGS. 2 and 4, both left and right sides of the rear end portion are rotatably supported in the front and rear directions by bearings 56 and 57 below the bottom plate 39. At the front end of the bottom plate 39, a threaded rod 56 embedded in the base plate 22 is inserted through a hole 57 and protrudes upward, and an adjustment nut 58 is screwed onto the lower surface side of the base plate 22 of the screw rod 56. has been done. By turning this adjustment nut 58, the inclination angle of the pile driver main body 38 can be adjusted. This is to adjust the direction in which the sheet pile 4 is pressed in by the pile driver main body 38 and to prevent the sheet pile 4 from tilting in the direction in which the sheet pile is driven, or to change the normal line of the press-in. The threaded rod 56
A locking nut 59 for removing the bottom plate 39 is screwed onto the upper end of the bottom plate 39. A reinforcing member 60 is fixed between the bottom plate 39 and (111@40).

前記昇降用シリンダ46.47は、互いに同期して昇降
し1、チャック部48を上下動作させるように成ってい
る。前記固定チャック49.可動チャック50は垂直面
ン・有する円板状に形成されており、固定チャック49
は、チャック部48の左腕48A移端部内側に固定され
、可動チャック50は該チャック部48の右腕48Bの
後端部内側に油圧シリンダ61によって左右方向に移動
可能に装備されている。前記固定チャック49.可動チ
ャック50は矢板4の打込進行方向に対し互いに平行と
なるように対向して設けられており、可4111チャッ
ク50の移動動作によって矢板4をその厚さ方向に押E
E挾持出来るようになっている。
The lifting cylinders 46 and 47 are configured to move up and down 1 in synchronization with each other, thereby moving the chuck section 48 up and down. The fixed chuck 49. The movable chuck 50 is formed into a disc shape with a vertical surface, and the fixed chuck 49
is fixed to the inner side of the transitional end of the left arm 48A of the chuck part 48, and the movable chuck 50 is installed inside the rear end of the right arm 48B of the chuck part 48 so as to be movable in the left-right direction by a hydraulic cylinder 61. The fixed chuck 49. The movable chucks 50 are provided so as to face each other parallel to the driving direction of the sheet pile 4, and the moving operation of the movable chuck 50 pushes the sheet pile 4 in its thickness direction.
It is designed so that it can be held in place.

前記チャック部48のAi1面側には、左右端部に鉤状
曲11″r部を有する保合部材62が固着されており、
この保合部材62が前記底板39と補強管42との間に
固オにされた案内板63に上下方向に摺動自在に嵌合さ
れている。これにより、前述した杭打機本体部38の傾
斜に拘わらずチャック部48の上下動作が確実になされ
るように成っている。前記杭打機本体部38は後向きに
導枠3上して搭載されている。また、固定チャック49
.可動チャック50は側@40,41より後方へ突出し
て装備されており、これにより、1つの矢板4の打込終
了後、該矢板4の隣りに次の打込用の矢板4を吊込む際
、杭打機本体1Gの前後移動が少なくて済むように成っ
ている。前記11III壁41の前側には油圧操作部6
4が設けら′!tている。
A retaining member 62 having a hook-shaped curved 11″r portion at the left and right ends is fixed to the Ai1 surface side of the chuck portion 48,
This retaining member 62 is fitted into a guide plate 63 fixed between the bottom plate 39 and the reinforcing tube 42 so as to be slidable in the vertical direction. This ensures that the chuck section 48 can be moved up and down irrespective of the inclination of the pile driver main body section 38 mentioned above. The pile driver main body 38 is mounted on the guiding frame 3 facing backward. In addition, the fixed chuck 49
.. The movable chuck 50 is equipped so as to protrude rearward from the sides 40 and 41, so that after driving one sheet pile 4, when hanging the next sheet pile 4 next to the sheet pile 4, , the back and forth movement of the pile driver main body 1G is reduced. A hydraulic operating section 6 is provided on the front side of the 11III wall 41.
4 is set! I'm here.

前記架台部拐18.19の中央(lull端縁はl(型
鋼1.2の中央lit端より外側に位置している。前記
基板22.底板39には各々方形溝652台形溝66が
刻設さytでおり、矢板4を遊挿出来るように成ってい
る。これらの万形溝651台形溝66の大きさ、並びに
前記固定チャック49及び可動チャック50の間隔は、
前記H型鋼1,2の間隔が変更されても当該基板22.
底板39に接することなく十分矢板4を導枠3に緩やか
に挾持させることが出来る大きさに形成されている。前
記固定チャック49の矢板当接面49Aは、H型鋼1の
水平7ランジ20内端面2OAと同一鉛直面内に位置す
るようになっている。
The center (lull edge of the frame part 18, 19 is located outside the center edge of the shaped steel 1.2. A square groove 652 and a trapezoidal groove 66 are carved in the base plate 22 and the bottom plate 39, respectively. The size of the groove 651 and the trapezoid groove 66 and the interval between the fixed chuck 49 and the movable chuck 50 are as follows.
Even if the distance between the H-shaped steels 1 and 2 is changed, the substrate 22.
It is formed in a size that allows the sheet pile 4 to be sufficiently gently clamped on the guiding frame 3 without coming into contact with the bottom plate 39. The sheet pile contact surface 49A of the fixed chuck 49 is located in the same vertical plane as the inner end surface 2OA of the horizontal 7 flange 20 of the H-shaped steel 1.

尚、前記油圧ジヤツキ11,15、オイルモータ28、
昇降用油圧シリンダ46,47、矢板4挾持用の油圧シ
リンダ61、移動輪71昇降用の油圧シリンダ70は各
々図示しない油圧源に接続されており、油圧操作部64
のレバー操作で作動されるようになっている。
In addition, the hydraulic jacks 11, 15, the oil motor 28,
The hydraulic cylinders 46 and 47 for lifting, the hydraulic cylinder 61 for holding the sheet pile 4, and the hydraulic cylinder 70 for lifting the movable wheels 71 are each connected to a hydraulic power source (not shown), and a hydraulic operating section 64
It is activated by operating the lever.

次に、上記実施例の全体的動作につき説明する。Next, the overall operation of the above embodiment will be explained.

矢板は例えば、コンクリート矢板を使用する。まず、矢
板壁を形成すべき打込線の先頭位置に垂直度、穂軸に注
意しなから初期矢板4Aを打込む。
For example, concrete sheet piles are used as the sheet piles. First, the initial sheet pile 4A is driven into the leading position of the driving line where the sheet pile wall is to be formed, paying attention to the verticality and the cob.

次に前記(l型鋼1,2の間隔を矢板4の厚さ以上に開
き、杭打機全体をロープで吊上げ前記アーム部材12の
立上が1’%12Aと、吊持部材14とで前記初期矢板
4Aの地上突出部を挾むように設置する。この際前記油
圧シリンダ70は縮小しておき、また立上り部12Aを
矢板4の第1図の右面に接しさせ、H型鋼2を拐込進行
方向に合わせる。続いて間隔変更手段6,7f作動させ
、H型鋼1,2の間隔を挾め吊持部材14が該矢板4の
左面に接するようにする。このとき■(型鋼1,2が平
行移動するので矢板4の板厚に応じた導枠3のセットが
完了する。前記杭打機本体部38の固定チャック49と
、H型鋼1の中央側端縁とは鉛直面内で面一である。
Next, the distance between the L-shaped steels 1 and 2 is opened to a thickness greater than the thickness of the sheet pile 4, and the entire pile driving machine is hoisted with a rope so that the arm member 12 rises by 1'% 12A and the lifting member 14 is The initial sheet pile 4A is installed so as to sandwich the above-ground projecting part.At this time, the hydraulic cylinder 70 is contracted, and the rising part 12A is brought into contact with the right side of the sheet pile 4 in FIG. Next, the interval changing means 6 and 7f are operated to sandwich the interval between the H-beams 1 and 2 so that the hanging member 14 is in contact with the left side of the sheet pile 4. At this time, As it moves, the setting of the guide frame 3 according to the thickness of the sheet pile 4 is completed.The fixed chuck 49 of the pile driver main body 38 and the center edge of the H-shaped steel 1 are flush with each other in the vertical plane. be.

次に、オイルモータ28f駆動し1、杭打機本体16を
前方へ進めたのち、次回の打込用の矢板4を吊込み前記
初期矢板4Aの前側にセクション合わせを行ないながら
導枠3内に挿入する。このとき、二つの矢板4A、4が
成す壁軸Fi導枠3に案内されて直線となる。また、矢
板4の左面が固定チャック49に接する。再びオイルモ
ータ28を駆動し杭打機本体16を後進させてチャック
部48内に矢板4を抱持させ、該杭打機本体16の前後
位置及び前記回動機構55を調節して矢板4の圧入法線
と固定チャック49.可動チャン2500作用線とを一
致させる。この回動機構55は、以後、固定とし、土圧
等によって前記圧入法線が傾斜した場合などに必要に応
じて調節する。
Next, the oil motor 28f is driven 1 to advance the pile driver main body 16 forward, and then the sheet pile 4 for the next driving is suspended and inserted into the guide frame 3 while aligning the section to the front side of the initial sheet pile 4A. insert. At this time, it is guided by the wall axis Fi guiding frame 3 formed by the two sheet piles 4A and 4, and becomes a straight line. Further, the left side of the sheet pile 4 is in contact with the fixed chuck 49. The oil motor 28 is driven again to move the pile driver main body 16 backward to hold the sheet pile 4 in the chuck part 48, and adjust the longitudinal position of the pile driver main body 16 and the rotation mechanism 55 to move the sheet pile 4 backward. Press-fit normal line and fixed chuck 49. The line of action of the movable chamber 2500 is aligned. This rotation mechanism 55 will be fixed from now on, and will be adjusted as necessary, such as when the press-fit normal line is inclined due to earth pressure or the like.

また、オイルモータ28の停止で杭打機本体16の位詮
決めがなされる。
Furthermore, the position of the pile driver main body 16 is determined by stopping the oil motor 28.

杭打機本体16のセット完了後、矢板4の圧入動作に入
る。即ち、油圧シリンダ61を作動し、可動チャック5
0を固定チャック49側に移動して矢板4全所定の押圧
力で挾持する(第3図の矢印イ参照)。次に、昇降用油
圧シリンダ46゜47を降下させ、前記チャック部48
で挾持した矢板4を地中に圧入する(第3図の矢印口、
ホ参照ン。可動チャック50を右方向へ移動し矢板4の
挟持を止める(8g3図の矢印〕・参照)。昇降用油圧
シリンダ46.47’、(上昇させチャック部48を原
位置に戻す(第3図の矢印二、へ参照〕。
After the setting of the pile driver main body 16 is completed, the press-fitting operation of the sheet pile 4 begins. That is, by operating the hydraulic cylinder 61, the movable chuck 5
0 to the fixed chuck 49 side and clamp the entire sheet pile 4 with a predetermined pressing force (see arrow A in FIG. 3). Next, the lifting hydraulic cylinders 46° 47 are lowered, and the chuck portion 48
Press the sheet pile 4 held between the
Ho reference. Move the movable chuck 50 to the right to stop holding the sheet pile 4 (see arrow in figure 8g3). Hydraulic cylinders 46 and 47' for raising and lowering (raise and return the chuck part 48 to its original position (see arrow 2 in FIG. 3)).

以下、前述した動作を矢板4が地中に所定の長さ圧入さ
れるまで繰り返す。圧入反力は、杭打機本体16.導枠
3の自重が受は持つ。この矢板4の杭打作業は静圧によ
り地面近くで行なわれるため無振動、無騒音で周囲の環
境に悪影響をか、ぼすことがなく、また、矢板4が振動
や座屈で破損することもなム。捷た、固定チ“ヤツク4
9が導枠3の端縁と面一な鉛直面内を移動するので該矢
板の鉛直度を正確に維持出来る。前記矢板4の杭打終了
後、前記オイルモータ28を作動して杭打機本体16を
前進させ次の打込用の矢板4を吊込み前述と同様にして
杭打機本体16のセット、矢板4の圧入を行なう。
Thereafter, the above-described operation is repeated until the sheet pile 4 is press-fitted into the ground for a predetermined length. The press-in reaction force is generated by the pile driver main body 16. The weight of guide frame 3 is the weight of the guide frame 3. This pile driving work of the sheet pile 4 is performed near the ground due to static pressure, so there is no vibration or noise, and there is no negative impact on the surrounding environment, and there is no possibility that the sheet pile 4 will be damaged due to vibration or buckling. Monamu. Fixed fixed chuck 4
Since the guide frame 9 moves in a vertical plane flush with the edge of the guiding frame 3, the verticality of the sheet pile can be maintained accurately. After driving the sheet pile 4, the oil motor 28 is operated to move the pile driver main body 16 forward, and the sheet pile 4 for the next driving is suspended.The pile driver main body 16 is set and the sheet pile is set in the same manner as described above. Perform press fitting in step 4.

この様にして次々と矢板4の圧入を行ない導枠3の前端
まで来たならば、前記油圧シリンダ70を伸延して移動
輪71で導枠3後端部を持上げ(第5図参照)杭打機全
体を略導枠3の長さ分だけ移動する。次に、油圧シリン
ダ70を縮小し導枠3後端を地面に下す。このとき打込
が完了した矢板壁前端の矢板4をアーム部材12の立上
り部12Aと吊持部材14が挾むようにする。以上の杭
打機の移動、矢板の圧入動作を、以下順次繰り返せばよ
い。尚、杭打機を移動する場合は、矢印4の厚さより導
枠3の間隔を拡げて行なうようにすると作業が容易にな
る。また、矢板の引抜は、前述した杭打機を逆に動作さ
せることにより、簡単に出来る。
In this way, the sheet piles 4 are press-fitted one after another until they reach the front end of the guiding frame 3, then the hydraulic cylinder 70 is extended and the movable wheel 71 lifts the rear end of the guiding frame 3 (see Fig. 5). The entire batter is moved approximately by the length of the guiding frame 3. Next, the hydraulic cylinder 70 is contracted and the rear end of the guide frame 3 is lowered to the ground. At this time, the sheet pile 4 at the front end of the sheet pile wall, which has been completely driven, is held between the rising portion 12A of the arm member 12 and the hanging member 14. The above-mentioned movement of the pile driver and press-fitting of the sheet piles may be repeated in sequence. In addition, when moving the pile driver, the work will be made easier if the interval between the guide frames 3 is made wider than the thickness of the arrow 4. Further, the sheet pile can be easily pulled out by operating the pile driver described above in reverse.

この実施例によれば、矢板の打込進行方向を導< 1%
枠を設けたので矢板壁の穂軸を直線上に形成出来、この
導枠上に杭打機本体を進退自在に装備したので導枠の移
動設置と杭打機本体の移動を同時に行なうことができる
とともに、杭打機本体を導枠上で前後移動させながら矢
板を連続的に打込むことが出来るので作業の能率が著し
く向上する。
According to this embodiment, the driving direction of the sheet pile is guided <1%
By providing a frame, the cob of the sheet pile wall can be formed in a straight line, and since the pile driver body is mounted on this guiding frame so that it can move forward and backward, it is possible to move and install the guiding frame and move the pile driver body at the same time. In addition, it is possible to continuously drive sheet piles while moving the pile driver body back and forth on the guide frame, which significantly improves work efficiency.

前記杭打機本体のスライド移動をチェーン及びチェーン
ギアによって行なうため、簡単な構成で確実に進退動作
を行なうことができ、また、導枠上を広範囲に移動させ
ることができる。また静圧によって矢板の圧入を行なう
ので環境への悪影響や矢板の破損等が生じず、圧入法線
も打込状況、土庄等に応じて簡単に変更することができ
る。更に、固定チャックが導枠端縁より延長した鉛直面
内で移動するため矢板の鉛直度を正確に保持することが
できる。また、導枠の間隔を変更可能に構成したので矢
板の板厚を選ばず汎用性が太である。また、この導枠の
間隔変更に拘わらず固定チャックが常に導枠端縁上方に
位置するように成っているため設置作業が容易である。
Since the sliding movement of the pile driver body is performed by a chain and a chain gear, it is possible to reliably move forward and backward with a simple configuration, and it can be moved over a wide range on the guide frame. Furthermore, since the sheet piles are press-fitted using static pressure, there is no adverse effect on the environment or damage to the sheet piles, and the press-in normal line can be easily changed depending on the driving situation, soil structure, etc. Furthermore, since the fixed chuck moves within a vertical plane extending from the edge of the guide frame, the verticality of the sheet pile can be maintained accurately. In addition, since the interval between the guide frames can be changed, it is highly versatile regardless of the thickness of the sheet pile. Further, the fixing chuck is always positioned above the edge of the guide frame regardless of the change in the interval between the guide frames, so that the installation work is easy.

また杭打機全体を移動する際、移動輪を矢板上端に押下
し杭打機の後端部?持上げて行なうようにしたので、牽
引力が少なく済み、かつ、迅速に移動設置できる。
Also, when moving the entire pile driver, push the moving wheel onto the top of the sheet pile and press the rear end of the pile driver. Since it is carried out by lifting, less traction force is required and it can be moved and installed quickly.

尚、上記実施例に於ては、導枠をH型鋼で形成したが工
型鋼、プレート等で構成してもよく、杭打機本体の進退
移動は油圧シリンダで行なってもよく、移動架台はコ字
状の合板とし1合板の一端を一万のH型鋼の水平フラン
ジに係合させるとともに、他端は単に他方のH型鋼の水
平フランジ上に摺動自在に装備してもよく、右側の架台
部材と基板をボルト止めした場合fAどには左側を可動
チャック、右側を固定チャックとしてもよく、また、H
型鋼杭を使用する場合には、左右両方とも可動チャック
と17、鋸矢板を順次逆向に打込む場合には、左右両方
の可動チャックを交互C・こ−万固定。
In the above embodiment, the guide frame was made of H-shaped steel, but it may be made of machined steel, plates, etc. The main body of the pile driver may be moved forward and backward by a hydraulic cylinder, and the movable frame may be made of One end of the plywood is made into a U-shape and is engaged with the horizontal flange of the 10,000 H-shaped steel, and the other end may be simply slidably mounted on the horizontal flange of the other H-shaped steel, and the right side When the frame member and the board are bolted together, the left side may be a movable chuck and the right side may be a fixed chuck.
When using shaped steel piles, use movable chucks on both the left and right (17), and when driving sawn sheet piles in reverse directions, alternately fix both the left and right movable chucks.

他方可動で使用すればよい。また、押出し自在の移動輪
は、前記アーム部材の水平部下面Vこ設ける他、各IJ
型鋼後端部の各々に一つずつ設けたり、或いは、各1−
I型鋼の13iJ及び後端部に一つずつ設けてもよい。
On the other hand, it can be used in a movable manner. In addition, a movable wheel that can be pushed out is provided on the horizontal lower surface V of the arm member, and also on each IJ.
One at each rear end of the shaped steel, or one at each end.
One each may be provided at the 13iJ and rear end portions of the I-type steel.

以上のように、本発明によれば導枠に杭打機本体を装備
し、かつ、導枠に押出し自在に移動輪を設けたので杭打
場所へ導枠及び杭打機本体全迅速。
As described above, according to the present invention, the guide frame is equipped with the pile driver main body, and the guide frame is provided with a movable wheel that can be pushed out freely, so that the guide frame and the pile driver main body can be quickly moved to the pile driving site.

容易に設置出来、矢板が該導枠と杭打機本体のチャック
部との上下2箇所で支持さ才しるため、矢板の鉛lα度
を正確に保持することができ、また、この杭打機本体が
進退自在に装備されているため連続的に杭打作業を行な
うことができる。
It can be easily installed, and since the sheet pile is supported at two places, the upper and lower parts of the guide frame and the chuck part of the pile driving machine, the lead angle of the sheet pile can be accurately maintained, and this pile driving The machine body is equipped to move forward and backward, allowing continuous pile driving work.

【図面の簡単な説明】[Brief explanation of drawings]

第1図は本発明に係る杭打機を示す概略斜視図、第2図
は第1図の■−■線に沿った縦断面図、第3図は杭打機
本体部に設けられたチャック部の動作説明図、第4図(
−J:杭打機本体部の回動手段の動作説明図、第5図は
第1図のA部分を示す概略図である。 1.2・・・H型鋼、3・・・導枠、4,4A・・・矢
板、17・・・杭打機本体。 特許出願人 株式会社 ニアヨー 第2図 第3図 第4図 第5図 3 ノ
Fig. 1 is a schematic perspective view showing a pile driver according to the present invention, Fig. 2 is a longitudinal sectional view taken along the line ■-■ in Fig. 1, and Fig. 3 is a chuck provided on the main body of the pile driver. An explanatory diagram of the operation of the section, Fig. 4 (
-J: An explanatory diagram of the operation of the rotating means of the main body of the pile driver. FIG. 5 is a schematic diagram showing part A in FIG. 1. 1.2...H-shaped steel, 3...Guiding frame, 4,4A...Sheet pile, 17...Pile driver main body. Patent applicant Nearyo Co., Ltd. Figure 2 Figure 3 Figure 4 Figure 5 Figure 3

Claims (1)

【特許請求の範囲】[Claims] (I)、矢板の打込方向を誘導する導枠と、この導枠に
打込方向へ進退自在に保合装備した杭打機本体と、この
杭打機本体をスライド移動する手段と、前記導枠の少な
くとも後端部に設けた押出し自在の移動輪とから成るこ
とを特徴とする杭打機。
(I) a guiding frame for guiding the driving direction of the sheet pile; a pile driving machine body equipped with the guiding frame so as to be able to move forward and backward in the driving direction; and means for sliding the pile driving machine body; A pile driver comprising a movable wheel that can be freely pushed out and provided at least at the rear end of a guiding frame.
JP18652782A 1982-10-23 1982-10-23 Pile driver Granted JPS5976329A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP18652782A JPS5976329A (en) 1982-10-23 1982-10-23 Pile driver

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP18652782A JPS5976329A (en) 1982-10-23 1982-10-23 Pile driver

Publications (2)

Publication Number Publication Date
JPS5976329A true JPS5976329A (en) 1984-05-01
JPH023853B2 JPH023853B2 (en) 1990-01-25

Family

ID=16190048

Family Applications (1)

Application Number Title Priority Date Filing Date
JP18652782A Granted JPS5976329A (en) 1982-10-23 1982-10-23 Pile driver

Country Status (1)

Country Link
JP (1) JPS5976329A (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03101647U (en) * 1990-02-01 1991-10-23

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5555723A (en) * 1978-10-17 1980-04-23 Kondougumi:Kk Pile drive-insertion device

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5555723A (en) * 1978-10-17 1980-04-23 Kondougumi:Kk Pile drive-insertion device

Also Published As

Publication number Publication date
JPH023853B2 (en) 1990-01-25

Similar Documents

Publication Publication Date Title
CN214832669U (en) Tubular pile perpendicularity regulating and controlling device
CN114991149A (en) Municipal construction piling device with auxiliary supporting structure and method thereof
US8534960B2 (en) Piling device
CN210907848U (en) Reinforcing bar aligning shearing mechanism
JPS5976329A (en) Pile driver
JPS59109617A (en) Static load type pile drawer
JPS5976328A (en) Pile driver
JP4044875B2 (en) Steel pipe pile press-fitting and drawing machine
JPS5976327A (en) Pile driver
CN109518691B (en) Pile extractor
CN218757464U (en) Lifting pile pressing equipment for precast concrete sheet pile
JP3536033B2 (en) Steel pipe pile press-in and pull-out machine
JPH06200525A (en) Pile press-in method, and pile press-in and pull-out machine therefor
CN218843090U (en) Pile driving equipment for house construction
JP2786963B2 (en) Steel pile building equipment
JPH07127060A (en) Pile pressing-in machine and pile pressing-in and drawing-out construction method
JPS6011960Y2 (en) sheet pile driver
CN216948214U (en) Auxiliary device for quickly connecting steel sheet piles
CN114808948B (en) Five-axis cement mixing pile H-shaped steel positioning device and construction method
JP2005105763A (en) Clamp device of steel pipe pile
CN216999699U (en) Ground anchor dismounting device for power engineering
CN113186918B (en) A piling equipment for construction engineering
JPS6227542Y2 (en)
JP4719041B2 (en) Pile press-in method and pile press-out machine
GB2116139A (en) Elevating acute turn guide for hose hauler apparatus