- Publication number
- JPS6013199A JPS6013199A JP12143883A JP12143883A JPS6013199A JP S6013199 A JPS6013199 A JP S6013199A JP 12143883 A JP12143883 A JP 12143883A JP 12143883 A JP12143883 A JP 12143883A JP S6013199 A JPS6013199 A JP S6013199A
- Authority
- JP
- Japan
- Prior art keywords
- segment
- rail
- invert
- tunnel
- laid
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims description 5
- 238000005553 drilling Methods 0.000 title 1
- 238000009412 basement excavation Methods 0.000 claims description 8
- 238000010276 construction Methods 0.000 description 12
- 230000032258 transport Effects 0.000 description 6
- 239000000463 material Substances 0.000 description 5
- 238000004804 winding Methods 0.000 description 4
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical class C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 description 3
- 238000009415 formwork Methods 0.000 description 2
- 239000002689 soil Substances 0.000 description 2
- 241001553014 Myrsine salicina Species 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000004140 cleaning Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000002347 injection Methods 0.000 description 1
- 239000007924 injection Substances 0.000 description 1
- 238000003754 machining Methods 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 238000007790 scraping Methods 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.
Description
【発明の詳細な説明】
本発明は掘進機をもってトンネルを掘進するに当って、
トンネル孔の中心下部にインバートセグメントを用いこ
れを中心としてセグメントを組立ててゆくことによって
、すりの搬出、セグメントの搬入組立てなどを極めて容
易に整然と行うことができ、裏込め材の同時注入は勿論
必要に応じて二次巻立てをも極めて容易に行うことので
きるインバートセグメントを用いたトンネル掘進方法に
関するものである。[Detailed Description of the Invention] The present invention provides the following features when excavating a tunnel with an excavator:
By using an invert segment at the bottom of the center of the tunnel hole and assembling the segments around this, it is possible to carry out the removal of the pickpocket, carry in the segment, and assemble it in an extremely easy and orderly manner, and it is of course necessary to simultaneously inject backfill material. This invention relates to a tunnel excavation method using invert segments that can extremely easily perform secondary winding according to the conditions.
従来のシールド工法またはIBM工法においては、掘進
機の推進に伴って、その直後に、油圧〕くワーユニット
、油タンク、電気の動力盤、制御盤、すり搬送ベルトな
どを装置した後続台車を掘進とともに移行させて、掘進
機の推進、すりの搬出、セグメントの搬入組立てなどの
作業を連続的に行っている。In the conventional shield construction method or IBM construction method, as the excavator is propelled, a following truck equipped with a hydraulic power unit, oil tank, electric power panel, control panel, slide conveyor belt, etc. is immediately excavated. Work such as propelling the excavator, transporting the pickpockets, and transporting and assembling the segments is carried out continuously.
捷だその後方においては、すり車、セグメント;y¥搬
台車などを往動、復動させ、すりの搬出とかセグメント
の4般入などをしなければならないし、さらに後方では
前記のすり車とかセグメント運搬台車を後方へ寸だ後方
より前方へ運行させるだめに、本線レールを設けてこの
上を走行させて、外部にすりを搬出したり外部よりセグ
メントなどを搬入したりしている。Behind the pickpocket, the pickpocket wheel, segment; In order to move the segment transport cart from the rear to the front, a main rail is provided and the truck is run on it to transport pickpockets to the outside or to bring in segments from the outside.
ところが前記の後続台車とかすり車、セグメント運搬止
はトンネジ内で順次組立てられるセグメントの底面にレ
ーIしを敷設してその上を走行するようにしなければな
らない;つ工、環状に組立てられるセグメントの底面に
レールを敷設するには、セグメントの円弧状の底面に先
ず、渡し材+ flわちレール受梁を渡し、これに歩廊
板の敷設とレールの取付けという面倒なことをしなけれ
ばならない。However, the following truck, scraping wheel, and segment transport stop must be made to run on a rail laid on the bottom of the segments that are assembled in sequence in the tunnel; To lay a rail on the bottom surface, it is first necessary to pass a bridge + fl, that is, a rail support beam, to the arcuate bottom surface of the segment, and then go through the troublesome task of laying a walkway board and attaching the rail to this.
またとくにトンネルの掘進が順次進んで行くこのテール
部では、後続台車をこの部で継続的に運行させるために
は、前記レール受梁とかレージとかを絶えず前方に敷設
し、後続台車レージの移し換えをしてゆか水ばならない
し、狭くて足場が極端に悪いテール部でこの操作を行い
ながらずりの(股出とかセグメントの組立−Cを行うこ
とは極めて困難であってこれがトンネn/、ATA進の
効率に大きな影響を与えていた。In addition, especially in this tail section where tunnel excavation progresses sequentially, in order to allow the following bogies to continuously operate in this section, the rail support beams and rails must be constantly laid forward, and the following bogie rails must be relocated. It is extremely difficult to perform this operation in the narrow tail section where footing is extremely poor, and it is extremely difficult to perform shear extension and segment assembly. This had a significant impact on the efficiency of progress.
本発明けこのような問題を解決せんとするものであって
、それには、掘進機でトンネジを掘進するに当ってテー
ル部において、中央下部にインバートセグメントを先ず
敷設してこれを中心にしてセグメントを組立て、そして
インバートセグメントの中央上面に木線レー1しを取付
けるとともに、その左右上面に形成した軌道面に跨って
後続台車を移行させるようにし、寸だその後方ではその
軌道面にプラットフォーム枠を摺動可能に設けてこれに
レージを取付けてすり車、セグメント運搬台車を移行さ
せかつその後方においてこのレールと本線レールとを連
結して、すり車とかセグメント運搬台車が本線レール上
を走行可能にするようにしてその工事を単純化し工事の
能率化を図り工期の短縮と工費の軽減を可能にしだもの
である。The present invention aims to solve such problems, and in order to do so, when excavating a tunnel with an excavator, an invert segment is first laid in the lower center part of the tail part, and the segment is moved around this invert segment. Then, a wooden wire rail 1 is attached to the top center of the invert segment, and the following bogie is moved across the track surfaces formed on the left and right top surfaces, and at the very rear, the platform frame is attached to the track surface. It is made to be slidable, a rail is attached to it, the pulley wheel and segment transport trolley are moved, and this rail and the main line rail are connected behind it, so that the pulley wheel and segment transport trolley can run on the main line rail. In this way, the construction work is simplified and the construction efficiency is improved, making it possible to shorten the construction period and reduce construction costs.
これを図面について説明する。This will be explained with reference to the drawings.
第1図および第2図において、
(1)は掘進されたトンネル孔に順次組立てら九たセグ
メント、(2)は後続台車、(5)はプラットフォーム
枠、(3′)はプラットフォーム枠(3)群の後部のプ
ラットフォーム枠、(4)は本線レールを示す。In Figures 1 and 2, (1) is the nine segments that are assembled in the excavated tunnel hole in sequence, (2) is the trailing bogie, (5) is the platform frame, and (3') is the platform frame (3). Platform frame at the rear of the group, (4) shows the main rail.
前記各部の詳細を次に説明する。The details of each part will be explained next.
環状に組立てられるセグメン) (1)の内環体の中央
下部においては、第4図ないし筑6図で示されるように
、インバートセグメント(5)を用いる。インバートセ
グメント(5)の中央には、導流溝(1′7)を備え導
流溝(17)を挾んでその両側に本線レールのレール取
付面(6)(6)を形成し、レール取付’fU(6)(
6)の外側にこれより稍高く軌道面(y)(7)を形成
する。Segments assembled into an annular shape) In the lower center of the inner annular body of (1), as shown in FIGS. 4 to 6, an invert segment (5) is used. The center of the invert segment (5) is provided with a flow guide groove (1'7), and rail mounting surfaces (6) (6) for the main rail are formed on both sides of the flow guide groove (17). 'fU(6)(
On the outside of 6), a raceway surface (y) (7) is formed slightly higher than this.
セグメント(1)はインバートセグメント(5)f中心
としてその左右に順次環状に組立てられる。The segments (1) are assembled into a ring in order on the left and right sides of the inverted segment (5) f as the center.
第5図において後続台車(2)は、油圧パワーユニット
(a)、油タンク(b)、電気の動力盤、制御盤(C)
、すり搬送ベルト(15)などを装備したものでトンネ
ル掘進に当ってテール部で、トンネル掘削、すり搬送、
セグメント組立などの作業をなすについて最とも重要な
装置である。In Fig. 5, the following truck (2) includes a hydraulic power unit (a), an oil tank (b), an electric power panel, and a control panel (C).
, and is equipped with a pickpocket conveyor belt (15), etc. When excavating a tunnel, the tail part is used to carry out tunnel excavation, pickpocket conveyance,
This is the most important equipment for tasks such as segment assembly.
この後続台!(2)i−tインバートセグメント(5)
の左右の軌道面(y)(Pl)上を移行するが、これに
は第4図で示すように台足(8)を設けて軌道面(7)
(7)を摺動するようにしてもよいが、この台足(8)
(8)の代りに車輪を設ぽるようにしてもよい。This successor! (2) i-t invert segment (5)
It moves on the left and right raceway planes (y) (Pl), but as shown in Figure 4, a stand foot (8) is provided to move it on the raceway plane (7).
(7) may be made to slide, but this pedestal (8)
Wheels may be provided in place of (8).
同図において、(9)(9)は後続台車(2)の上方左
右に設けたローラであって、このローラ(9)(9)は
後続台車(2)の転倒を防ぎ常に安定的に軌道面(1(
7)上を摺動できるようにし作業を円滑に安全に行うこ
とを可能にする。In the same figure, (9) and (9) are rollers provided on the upper left and right sides of the following bogie (2), and these rollers (9) (9) prevent the following bogie (2) from overturning and keep the track stable at all times. Surface (1 (
7) The top can be slid on to allow work to be carried out smoothly and safely.
プラットフォーム枠(3)は、後続台*(2)の後方に
おいて、多数並設させるものであり、このプラットフォ
ーム枠(3)にはトンネル軸線方向の左右においてそれ
ぞれレール(1o)(lo)を敷設し、その上をすり車
とかセグメントなどの資材を運ぶトロを運行させる。A large number of platform frames (3) are installed in parallel behind the following platform * (2), and rails (1o) (lo) are laid on the platform frames (3) on the left and right sides of the tunnel axis, respectively. , and a toro that transports materials such as a pick-up wheel and segments will run on top of it.
(ll)はプラットフォーム枠(3)の中央に立設せる
柱、(12)は柱(11)の上部に設けた桁材でその両
端に設けだローラ(13)(11’dMJ立“Cられた
セグメント(1)内面を転動する。(ll) is a pillar installed in the center of the platform frame (3), and (12) is a girder installed at the top of the pillar (11), and rollers (13) (11'dMJ vertical The segment (1) rolls on the inner surface.
プラットフォーム(3)の下面にば台(足′(I4“)
(1,4)を設け、との台足(14)(14)はインバ
ートセグメント(5)の軌道面(7)(7)上を摺動す
る。On the underside of the platform (3) are the feet (I4").
(1, 4) are provided, and the platform feet (14) and (14) slide on the raceway surfaces (7) (7) of the invert segment (5).
プラットフォーム(3)の上方の桁材(12)上には掘
進機で掘削されたすりを搬送しこれを下方に移行してき
たすり車に投入するための搬送ベル) (16)を設置
” ル@ m 送ヘル、)(xs )は後続台車(2)
の搬送ベルト(15)に連繋したものである。A conveyor bell (16) is installed on the girder (12) above the platform (3) to convey the pickpocket excavated by the excavator and throw it into the pickpocket wheel that has moved downward. m sending her,) (xs) is the following truck (2)
It is connected to the conveyor belt (15).
(3′)はプラットフォーム枠(3)群の後方に並列し
たプラットフォーム枠でこ・のプラットフォーム枠(3
1)には、前記のような支柱(11)4’(i材(12
)などを設けず、トンネジし軸線方向左右2列にレール
(10′)(101)を取付ける。プラットフォーム枠
(3+)の下面にも台足(14”)D4’ )を取付は
インバートセグメント(5)の軌道面(7)(7)上を
摺iN#−する。(3') is a platform frame parallel to the rear of the platform frame (3) group.
1) includes the pillars (11) 4' (i material (12
), etc., and install the rails (10') and (101) in two rows on the left and right in the axial direction by screwing them. Attach the pedestal (14'') D4') to the lower surface of the platform frame (3+) by sliding it on the track surface (7) (7) of the invert segment (5).
本線レール(4)はインバートセグメント(5’)のレ
ール取付面(6)(6)に数句けられていて、この木線
レーIしく4)汀前記のプラットフォーム枠(31)群
に取付けた左右のレージしく1O1)(10I)とそれ
ぞれ連絡結する。The main rail (4) has several marks on the rail mounting surface (6) (6) of the invert segment (5'), and this wooden rail (4) is attached to the platform frame (31) group mentioned above. It connects with the left and right Rageshiku 1O1) (10I) respectively.
本発明においては掘削施工車には、テール部においてそ
の工事にもつとも活躍する後続台車(2)は、インバ−
トセグメント(5)上の軌道面(ツ)(l上を移動し、
別に同車移行のだめのレールを特別必要としない。In the present invention, in the excavation construction vehicle, the trailing cart (2) which is also active in the construction at the tail part is an inverter.
moving on the orbital surface (tsu) (l) on the segment (5),
There is no special need for a rail for transferring the same car.
このことに組立”Cたセグメントに、レール取付けのた
めに渡し材を設けるとか歩廊板を設けるような必要が全
くないということであり、またトンネル掘進ような煩雑
な手数が全く不必要となることである。This means that there is no need to provide a bridge or a walkway board for rail attachment to the assembled segment, and there is no need for complicated steps such as digging a tunnel. It is.
−4)ζ後続台車(2)に続いて設けられるすす搬送の
ためのすり車とか、セグメント(1)そC)他の資材の
搬入のだめの運搬台車は、インバートセグメント(5′
)の軌道面(7)(7’)上を摺動する各プラットフォ
ーム枠(3X3’)上にレール(10)(lO)、(1
0’ )(lo’ )を取付けてその土を走行させるよ
うにしたことによりこれにも矢張り渡し材とか歩廊板な
ど必要とせず、簡単にこれが数句けられまたその取外し
移動などの手間が全くかからなく、プラットフォーム枠
(3)(3′)を掘進に伴って1111″1次前方に摺
動させて行くだけで、すむので、その作業が単純化され
て能率的に行うことができる。-4) ζThe invert segment (5'
) rails (10) (lO), (1
By attaching the 0') (lo') and running on the soil, there is no need for arrow struts or walkway boards, and this can be easily done several times, and the trouble of removing and moving them is also saved. It doesn't take much time at all, and all you have to do is slide the platform frames (3) (3') forward 1111'' as you excavate, so the work is simplified and can be done efficiently. .
そしてプラットフォーム枠(s’)(3’)上に取付け
たレール(lO)(lO)、(10′)(101)は、
それだけそのレベルを高くすることができるので、これ
で坑内を広く使用することができることになり、しだが
ってすり車などは大きな容量のものを使用でき、作業が
しやすくなり安全面でも有利であるし、またそれだけ車
輛編成が短くなり、同プラットフォーム枠(3)(z’
)の仮推進距離が短ぐなる。そしてこれ壕でのように
渡し材の上にレージしを敷設−するのに較べ軌道が安定
するので車輛の走行速度を早くすることができる。And the rails (lO) (lO), (10') (101) installed on the platform frame (s') (3') are
Since the level can be raised that much, the underground area can be used more widely, which means that a large-capacity pulley can be used, which makes work easier and is advantageous in terms of safety. Yes, and the vehicle formation is that much shorter, and the same platform frame (3) (z'
)'s temporary propulsion distance becomes shorter. This also stabilizes the track compared to laying a ledge on top of the crossing material as in trenches, allowing vehicles to travel faster.
さらに太線レール(4)は取付金具をもって直接インバ
ートセグメント(5)のレール取付面(a)(a)K取
付ければよいので短時間にこれを行うことができその作
業も簡単になる。Furthermore, since the thick wire rail (4) can be directly attached to the rail attachment surface (a) (a) (a) K of the invert segment (5) using the attachment fittings, this can be done in a short time and the work becomes simple.
そして堀削搬出作業中堀削土砂が坑内に落ちこぼれても
、これはインバートセグメント(5)の導流溝(17)
に集収されこれを排除清掃することも容易であるので絶
えず行われる坑内?i¥′掃時間全時間することができ
る。Even if excavated soil falls into the mine during the excavation work, it will be removed from the flow guide groove (17) of the invert segment (5).
Is it easy to eliminate and clean the collected underground underground? i\' cleaning time can be the entire time.
本発明によれば、このようにテール部における各種の作
業が極めて容易となり整然と行うことができるので、セ
グメント組立後の扱込め材注入をセグメント組立の怖工
時に同時注入が容易にできることになるし、壕だ必要に
応じ二次巻立でのための各種の準備T作並びにその巻立
てを容易に行うことができる。According to the present invention, as described above, various operations on the tail portion can be performed extremely easily and in an orderly manner, so that the injection of handling material after segment assembly can be easily carried out at the same time during the machining of segment assembly. The trench makes it easy to perform various preparations for secondary winding and winding if necessary.
干なわち二次巻立てのためには、従来は先ず後続台車、
渡し相、歩廊板の鉱夫搬出が必要となるが、本発明方法
によれば、この場合本線レールの撤去だけですみ、また
型枠は、インバートセグメントを使用していることによ
って馬蹄形断面のものでよく、そしてこれは同セグメン
トの軌道面を利用することによって移動がし易く、また
型枠のセット解枠がし易くコンクリート打設量も無駄が
なく少なくてすむ。Conventionally, in order to perform secondary winding, the following truck,
Although it is necessary for the miners to carry out the ferry and walkway boards, according to the method of the present invention, in this case, only the main rails need to be removed, and the formwork can be of a horseshoe-shaped cross section due to the use of inverted segments. This is easy to move by using the track surface of the same segment, and it is also easy to set and disassemble the formwork, and the amount of concrete poured can be reduced without waste.
本発明方法は、このように掘削施ニーS度が向上し安全
作業となり作業能率がよくなって工期を短縮し施工コス
トを引下げることができるし、また必要に応じてなし得
る二次巻の工期をも短縮することができる。The method of the present invention improves the S degree of excavation, makes work safer, improves work efficiency, shortens the construction period, and reduces construction costs. The construction period can also be shortened.
箪1図はトンネル掘進施工中のトンネルの横断平面図で
同図(イ)はその左半部 同図(ロ)I−iその右半部
である。第2図は同じく縦断側面図で同図(イ)は左半
部 同図(ロ)は右半部、第3図はテール部の拡大縦断
側面図、5−茅4°甲はヤ9へ二仝純断掌を示すもので
あるがその1実施例図である。第5図は奥2図B −B
@断面図、第6図は同じ(0−0線断面図である。
1・−・・セグメント 2・ll11′・後続台車 3
.31・・(・プラットフォーム枠 4・・!・本線レ
ール 5・・φ・インバートセグメント 6・・・・レ
ール取付面 7・・・・軌道面 1o1・10’・・e
・レールFigure 1 is a cross-sectional plan view of the tunnel during tunnel excavation construction. Figure (a) is the left half of the tunnel, and figure (b) is the right half of the tunnel. Figure 2 is a vertical side view of the same, Figure (A) is the left half, Figure (B) is the right half, and Figure 3 is an enlarged vertical side view of the tail. This is an example diagram showing two pure sections. Figure 5 is back 2 Figures B-B
@Cross-sectional view and Figure 6 are the same (cross-sectional view taken along the 0-0 line.
.. 31...(-Platform frame 4...! Main line rail 5...φ Invert segment 6...Rail mounting surface 7...Race surface 1o1・10'...e
·rail
Claims (1)
lし部において、中央下部に、先ずインバートセグメン
トを敷設し、インバートセグメントは掘進機の推進に伴
って、順次敷設組立ててゆくとともに、インバートセグ
メントを中心としてセグメントを組立て、インバートセ
グメントの中央上面に本線レールを取付け、捷たその左
右上面に形成せる軌道面に跨って、油圧パワーユニット
、油タンク、電気の動力盤、制御盤、すり搬送ベルトコ
ンベヤなどを装備した後続台車を移行せし゛め、その後
方には前記軌道面にプラットフォーム枠を摺動可能に設
けてその土には、左右両側に平行してレールを敷設し、
各レールにはずり車、セグメント運搬台車を往動あるい
は復動せしめ、その後方((おいては両し−・ルと前記
本線レールとを連結して、すり車セグメント運隠台車が
両しヱルと本線レール上を走行可能にしたインバートセ
グメントを用いたトンネル掘進方法。1. When excavating a tunnel one by one with an excavator, an invert segment is first laid at the lower center of the cutting part, and as the excavator advances, the invert segment is sequentially laid and assembled. Assemble the segments around the invert segment, attach the main line rail to the upper center of the inverted segment, and install the hydraulic power unit, oil tank, electric power panel, control panel, and slide conveyor belt across the track surfaces formed on the left and right upper surfaces of the inverted segment. A platform frame is slidably provided on the track surface behind it, and rails are laid in parallel on both the left and right sides of the platform frame.
A slide wheel and a segment transport trolley are made to move forward or backward on each rail, and behind the slide wheel and segment transport trolley are connected to the main rail. A tunnel excavation method using inverted segments that allows running on main line rails.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP12143883A JPS6013199A (en) | 1983-07-04 | 1983-07-04 | Tunnel drilling method using invert segment |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP12143883A JPS6013199A (en) | 1983-07-04 | 1983-07-04 | Tunnel drilling method using invert segment |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS6013199A true JPS6013199A (en) | 1985-01-23 |
| JPH0341640B2 JPH0341640B2 (en) | 1991-06-24 |
Family
ID=14811136
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP12143883A Granted JPS6013199A (en) | 1983-07-04 | 1983-07-04 | Tunnel drilling method using invert segment |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS6013199A (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH05118192A (en) * | 1991-10-29 | 1993-05-14 | Nikko Co Ltd | Mud handler of shield machine |
| JP2019085727A (en) * | 2017-11-02 | 2019-06-06 | 株式会社東宏 | Belt conveyor support device |
Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS51102235U (en) * | 1976-02-19 | 1976-08-17 | ||
| JPS5220504A (en) * | 1975-08-06 | 1977-02-16 | Koichi Uemura | Method of causing automatic advancement of operation truck for laying rails |
-
1983
- 1983-07-04 JP JP12143883A patent/JPS6013199A/en active Granted
Patent Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS5220504A (en) * | 1975-08-06 | 1977-02-16 | Koichi Uemura | Method of causing automatic advancement of operation truck for laying rails |
| JPS51102235U (en) * | 1976-02-19 | 1976-08-17 |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH05118192A (en) * | 1991-10-29 | 1993-05-14 | Nikko Co Ltd | Mud handler of shield machine |
| JP2019085727A (en) * | 2017-11-02 | 2019-06-06 | 株式会社東宏 | Belt conveyor support device |
Also Published As
| Publication number | Publication date |
|---|---|
| JPH0341640B2 (en) | 1991-06-24 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN105041328B (en) | It is a kind of for big horse-shoe tunnel can cast-in-place supporting shield machine | |
| JP5444169B2 (en) | Shield tunnel construction method | |
| CN112502721B (en) | Arc-shaped bifurcation stepping construction method for positioning double TBMs based on double-line separate repair | |
| CN109208639B (en) | An underground pipe gallery pipe segment assembly device and construction method thereof | |
| US5129761A (en) | Pipe placement method and apparatus | |
| JP6549411B2 (en) | Floor construction method of shield tunnel | |
| JPH08170486A (en) | Tunnel excavation shearing gantry | |
| US4396313A (en) | Method of forming flooring in tunnels | |
| JP4111285B2 (en) | Laying a temporary track for tunnel construction | |
| JP2021075889A (en) | Work floor and support column construction method | |
| JP5185797B2 (en) | Ground excavation apparatus and excavation method | |
| JP3051568B2 (en) | Traveling equipment for subsequent equipment of a tunnel excavator | |
| JPH0341640B2 (en) | ||
| JPH03151497A (en) | Segment transfer device used in shield method | |
| JP2003307096A (en) | Tunnel construction method | |
| CN109488322B (en) | Tunnel inverted arch rapid excavation construction equipment and construction method thereof | |
| JPH0246559Y2 (en) | ||
| JP4022081B2 (en) | Temporary track for shield tunnel construction | |
| JP3689165B2 (en) | Material and material transport structure for uplift excavation | |
| JP2002285800A (en) | Rails and wide carriages for construction in tunnel excavation | |
| JPH08165881A (en) | Tunnel excavation method | |
| JPH03129099A (en) | Tunnel lining method and equipment for shield construction method | |
| JPH08184287A (en) | Tunnel excavation method and gantry used for this method | |
| CN205387939U (en) | T -shaped undercut tunnel shield constructs construction and transports ballast soil system | |
| JPH03161700A (en) | Construction method for underground continuous wall, etc. making underground tunnel as base |