- JPS60141996A JPS60141996A JP58248747A JP24874783A JPS60141996A JP S60141996 A JPS60141996 A JP S60141996A JP 58248747 A JP58248747 A JP 58248747A JP 24874783 A JP24874783 A JP 24874783A JP S60141996 A JPS60141996 A JP S60141996A
- Authority
- JP
- Japan
- Prior art keywords
- mortar
- segment
- dam bag
- bag
- space
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/20—Hydro energy
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.
Description
【発明の詳細な説明】
本発明はシールド工事における二次覆工のモルタル充填
方法に関するものである。DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a method for filling mortar in a secondary lining in shield construction.
従来地下に水道管等の41者造物を埋設するには第1図
に示すような工法が採用されていた。Conventionally, the method shown in Figure 1 has been used to bury structures such as water pipes underground.
即ちまずトンネルを掘進しつつ一次覆工であるセグメン
ト1を順次連結してトンネルの外側を形成する。続いて
水道管等の鋼管2を配置し図示していない支持手段によ
、?)ンネルの中心に支持した後出のう3を複数列、鋼
管2:とセグメント1との間に積み上げせき止を行なう
。次に土のう3の隙間を通してモルタル注入管4を配置
し、土のう3によって仕切られた空間内にモルタル5を
注入しセグメント1と@管2との間の空間をモルタル5
によって完全に充填し二次覆工としている。そして、所
定長さにわたって二次覆工が完了し、モルタルが硬化し
7だ後に土のう3を除去し再度次の空間を土のう3で仕
切シニ次覆工を行なうという工法がおこなわれていた。That is, first, while excavating a tunnel, the segments 1, which are the primary lining, are successively connected to form the outside of the tunnel. Next, a steel pipe 2 such as a water pipe is placed and supported by a support means (not shown). ) After being supported at the center of the tunnel, multiple rows of pipes 3 are piled up between the steel pipe 2: and the segment 1 to form a dam. Next, place the mortar injection pipe 4 through the gap between the sandbags 3, inject the mortar 5 into the space partitioned by the sandbag 3, and fill the space between the segment 1 and @pipe 2 with the mortar 5.
The secondary lining is then completely filled. Then, after the secondary lining has been completed over a predetermined length and the mortar has hardened, the sandbags 3 are removed, and the next space is partitioned again with the sandbags 3 to perform the secondary lining.
従って、土のう3の積み上げ、除去の作業を繰返し行な
わなければならないため多くの労力と時間を必要とし、
榛めてコスト;’:%となる欠点があった。Therefore, it is necessary to repeatedly stack and remove sandbags 3, which requires a lot of labor and time.
There was a drawback that the cost was %.
本発明は以上のような従来の欠点を除去するために成さ
れたもので、土のう等のf4上げ作業を必要とせずにモ
ルタル充填を行ない、工Jυ」を短縮し大幅なコストダ
ウンが実現で1!るシールド二次覆工のモルタル充填方
法を提供することを目的としている。The present invention has been made to eliminate the above-mentioned drawbacks of the conventional methods, and allows filling with mortar without requiring f4 raising work such as sandbags, shortening the construction time and achieving significant cost reductions. 1! The purpose of the present invention is to provide a mortar filling method for secondary shield lining.
以下、図面と共に本発明方法の詳細を説明する。第2図
以下は本発明の一実施例を説明するもので図中第1図ど
同一部分又は相当する部分は同一符号を付しその説明は
省略する。Hereinafter, details of the method of the present invention will be explained with reference to the drawings. FIG. 2 and subsequent figures illustrate one embodiment of the present invention. In the drawings, the same or corresponding parts as in FIG.
本発明に於てはモルタル充填空間を仕切る手段としてせ
き止め袋6を用いている。このせき止め袋6は例えば丈
夫なテント用布地等からセグメント1の内径とほぼ同じ
直径のドーナツ形の袋として構成されており、ドーナツ
形の中心部の空間には鋼管2が嵌合される。このせき止
め袋6は細長い袋状に形成L7たものを締結部7を介し
て連結してドーナツ形としたものであり、この締結部が
位信する上端部には工事用のモルタル注入管4及びエア
ー抜き管8が通るための凹部9が形成されている。In the present invention, a dam bag 6 is used as a means for partitioning the mortar filling space. The dam bag 6 is constructed as a donut-shaped bag made of, for example, strong tent fabric or the like and has a diameter approximately the same as the inner diameter of the segment 1, and the steel pipe 2 is fitted into the space at the center of the donut shape. This dam bag 6 is formed into a donut shape by connecting elongated bags L7 through a fastening part 7, and a mortar injection pipe 4 for construction work and a mortar injection pipe 4 for construction are attached to the upper end where this fastening part is connected. A recess 9 is formed through which the air vent pipe 8 passes.
まだ、このせき止め袋6の上半部の外周面の前後には吊
り金具10か所定間隔で複数個固定されている。これら
吊り金具10は第3図及び第4図に示すように鉄線11
などによシセグメント1のボルト12に連結される。A plurality of hanging fittings 10 are still fixed at predetermined intervals on the front and back of the outer peripheral surface of the upper half of the dam bag 6. These hanging fittings 10 are connected to iron wires 11 as shown in FIGS. 3 and 4.
It is connected to the bolt 12 of the segment 1, etc.
まだ、せき止め袋6の一方の側面には締結部7を狭んで
左右にモルタル注入用及びエアー抜き用を兼ねた通孔1
3が形成されており、この通孔13の周囲はリング状の
金具14により囲まれている。これら通孔13中には彼
達するように発泡モルタル等を供給するホー715の先
端が嵌合される。There are still holes 1 on one side of the dam bag 6 narrowing the fastening part 7 and serving both for mortar injection and air release on the left and right sides.
3 is formed, and the periphery of this through hole 13 is surrounded by a ring-shaped metal fitting 14. The tips of hoes 715 for supplying foamed mortar or the like are fitted into these through holes 13 so as to reach them.
続いて以上のような構造を有するせき止め袋6を用いた
モルタル充填方法について説明する1゜まず、第2図お
よび第3図に示すように仕切りを設けようとする位It
において鋼管2を囲んでせき止め袋6を装着する。この
時」−述したように吊シ金具10を用いて鉄線11によ
りセグメント1のボルト12側にせき止め袋6を吊り下
げるようにして装着する。Next, a mortar filling method using the dam bag 6 having the above structure will be explained.1 First, as shown in FIGS. 2 and 3, it is
A dam bag 6 is attached to surround the steel pipe 2. At this time, as described above, the dam bag 6 is hung and attached to the bolt 12 side of the segment 1 by the iron wire 11 using the hanging metal fitting 10.
続いて通孔13に対しホース15の先端を嵌合させる。Subsequently, the tip of the hose 15 is fitted into the through hole 13.
このホース15を介して発泡モルタルをせき止め袋6内
に供給する。せき止め袋6内に注入された発泡モルタル
は発泡して第4図に示すように次第にせき止め袋6を、
!3〈ら1せ、セグメント1と鋼管4との空間を満たし
空間がないように密封させる。Foamed mortar is supplied into the dam bag 6 through this hose 15. The foaming mortar injected into the dam bag 6 foams and gradually closes the dam bag 6 as shown in FIG.
! 3. Then fill the space between the segment 1 and the steel pipe 4 and seal it so that there is no space left.
完全に空間が密封された状態でモルタル注入管4を介し
て仕切られた空間内にモルタル5の注入が開始される。Injection of mortar 5 into the partitioned space via mortar injection pipe 4 is started in a state where the space is completely sealed.
ところで、せき止め袋6の表面からは水分だけが絞り出
されるため、袋内のモルタルの硬化後の強度は充分であ
るため従来の土のうのように除去する必要がなく、その
まま放置し、二次覆工のモルタルと一体化させ埋設して
しまうものである。なお、発泡モルタルをせき止め袋6
内に注入完了した後にはホース15をはすし通孔13を
完全に封鎖しておく必要がある。By the way, since only water is squeezed out from the surface of the dam bag 6, the strength of the mortar inside the bag after hardening is sufficient, so there is no need to remove it like with conventional sandbags. This is something that is buried and integrated with the mortar of the construction. In addition, the foam mortar should be placed in a dam bag 6.
After the injection is completed, it is necessary to remove the hose 15 and completely seal the passage hole 13.
このようにして発泡モルタルが注入されるせき止め袋を
用いて二次覆工を行う方法を採用しているため、従来の
ように土のう等の積み上げ、除去の作業は全く不要とな
り工期を短縮させると供に大幅なコストダウンを実現す
ることができる。In this way, we have adopted a method of performing secondary lining using dam bags into which foamed mortar is injected, so there is no need for the conventional work of piling up and removing sandbags, etc., which shortens the construction period. In addition, significant cost reductions can be achieved.
まだ、せき止め袋は膨張し1セグメントと鋼管との間の
隙間を完全に充填するだめ二次覆工のモルタルが隙間か
ら流出するような不都合は全く生じることがない。However, since the dam bag expands and completely fills the gap between the first segment and the steel pipe, there will be no inconvenience such as the mortar of the secondary lining flowing out from the gap.
以上の説明から明らか左ように本発明によれば、二次覆
工を行うべき空間を仕切る手段として発泡モルタルが注
入されるせき止め袋を用い、このせき止め袋に注入され
る発泡モルタルによってせき止め袋を膨張させセグメン
トと鋼管との間の空間を密封した状態で二次覆工のモル
タル注入を行う方法を採用しているため、従来のように
土のうの積み上げや除去という作業が全く不要で七の−
iJ、せき止め装白身を埋設してしまうことができ労力
を省くとともに工期の短縮と大幅なコストダウンを実現
することができる工法である。As is clear from the above description, according to the present invention, a dam bag into which foamed mortar is injected is used as a means for partitioning a space where secondary lining is to be performed, and the dam bag is formed by the foamed mortar injected into the dam bag. The method uses a method in which the space between the segment and the steel pipe is inflated and then the secondary lining mortar is injected in a state where the space between the segment and the steel pipe is sealed, so there is no need for the conventional work of piling up and removing sandbags.
iJ is a construction method that allows the dam body to be buried, which saves labor, shortens the construction period, and significantly reduces costs.
第1図は従来方法を示す説明図、第2図〜第4図は本発
明の一実施例をh究明するもので、第2図はせき止め袋
を装着した状態の正面図、第3図はせき止め袋を装着し
た状態の仙j面図、第4図は発泡モルタルをせき止め袋
内に注入している途中の側面図である。
1・・・セグメント 2・・・鋼管
4・・・モルタル注入管 5・・・モルタル6・・・せ
き止め袋 8・・・エアー抜き管9・・・凹部 lO・
・・吊り金具 11−・・・鈑
番線 12・・・ボルト 13・・・通孔用 願 人
株式会社 間 組
代 理 人 弁理士 高 雄次部Fig. 1 is an explanatory diagram showing a conventional method, Figs. 2 to 4 are for explaining an embodiment of the present invention, Fig. 2 is a front view of a state in which a dam bag is attached, and Fig. 3 is an explanatory diagram showing a conventional method. FIG. 4 is a side view of the bag with the dam bag attached, and a side view of the foamed mortar being injected into the bag. 1...Segment 2...Steel pipe 4...Mortar injection pipe 5...Mortar 6...Damming bag 8...Air vent pipe 9...Concavity lO・
...Hanging fittings 11-...Sheet number wire 12...Bolts 13...For through holes Request person
Yujibe Taka, Patent Attorney, Hazama Kumiyo Co., Ltd.
Claims (1)
と被埋設管の間に配置し、このせき止め袋内VC発泡モ
ルタルを充填し、膨張させ、セグメントと被埋設管の間
の空間を密封し、ついで二次覆工用モルタルを上記セグ
メントと被埋設管の間に注入を行うことを99とするシ
ーの ルドニ次覆再、モルタル充填方法。[Claims] A hollow donut-shaped dam bag is placed between the segment and the buried pipe, and the dam bag is filled with VC foam mortar and expanded to form a hole between the segment and the buried pipe. Sea's Rudoni secondary lining and mortar filling method includes sealing the space and then injecting mortar for secondary lining between the segment and the buried pipe.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP58248747A JPS60141996A (en) | 1983-12-27 | 1983-12-27 | Mortar filling method in shield secondary covering |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP58248747A JPS60141996A (en) | 1983-12-27 | 1983-12-27 | Mortar filling method in shield secondary covering |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| JPS60141996A true JPS60141996A (en) | 1985-07-27 |
Family
ID=17182763
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP58248747A Pending JPS60141996A (en) | 1983-12-27 | 1983-12-27 | Mortar filling method in shield secondary covering |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS60141996A (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH04131495A (en) * | 1990-09-20 | 1992-05-06 | Kubota Corp | Driving technique of back-filling material of piping in tunnel |
| JPH0457595U (en) * | 1990-09-19 | 1992-05-18 |
Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS5255228A (en) * | 1975-10-30 | 1977-05-06 | Taiho Kensetsu Kk | Method of placing backkfilling mortar in method of shield construction |
| JPS58199996A (en) * | 1982-05-14 | 1983-11-21 | 早部 清子 | Method and apparatus for supporting soil sheathing |
-
1983
- 1983-12-27 JP JP58248747A patent/JPS60141996A/en active Pending
Patent Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS5255228A (en) * | 1975-10-30 | 1977-05-06 | Taiho Kensetsu Kk | Method of placing backkfilling mortar in method of shield construction |
| JPS58199996A (en) * | 1982-05-14 | 1983-11-21 | 早部 清子 | Method and apparatus for supporting soil sheathing |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH0457595U (en) * | 1990-09-19 | 1992-05-18 | ||
| JPH04131495A (en) * | 1990-09-20 | 1992-05-06 | Kubota Corp | Driving technique of back-filling material of piping in tunnel |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JPH04343995A (en) | Middle part covering structure of juxtaposed tunnels | |
| JPS60141996A (en) | Mortar filling method in shield secondary covering | |
| JPH08226119A (en) | Packer and solid rock consolidation method using it | |
| JPS622120B2 (en) | ||
| JP2721950B2 (en) | Ground improvement method for tunnel excavation and surrounding area | |
| KR20100013070A (en) | Interval fills tool of soil guard work | |
| JPH0527755B2 (en) | ||
| JP3332507B2 (en) | How to build underground structures | |
| JP3467221B2 (en) | Ground reinforcement method | |
| JPH074600U (en) | Injection fixing type support member | |
| JP2529644B2 (en) | How to build an underground structure | |
| JPH08109633A (en) | Space filling method between earth retaining wall and wale and bag body used therefor | |
| JPH0433926B2 (en) | ||
| JPS62101711A (en) | Earth anchor and its construction | |
| JPH0438397A (en) | How to build underground structures | |
| JPS62141299A (en) | Tunnel lining construction method | |
| JPH089945B2 (en) | Method of pouring grout material into the ground | |
| JPH074174A (en) | Pit mouth sealing device | |
| JP2558168B2 (en) | Backfill injection method of segment in shield method | |
| JPH0243410A (en) | Method for building vertical hole on underground structure | |
| JPH0414545Y2 (en) | ||
| JPH0426395B2 (en) | ||
| JPS587096A (en) | Segment backing method of method of shield construction | |
| JP3083541B2 (en) | Method of filling cavity and method of filling cavity | |
| JPH0349354B2 (en) |