JPS6059221A - Anchoring work having water weeping effect - Google Patents

Anchoring work having water weeping effect

Info

Publication number
JPS6059221A
JPS6059221A JP16650683A JP16650683A JPS6059221A JP S6059221 A JPS6059221 A JP S6059221A JP 16650683 A JP16650683 A JP 16650683A JP 16650683 A JP16650683 A JP 16650683A JP S6059221 A JPS6059221 A JP S6059221A
Authority
JP
Japan
Prior art keywords
ground
anchor
hollow pipe
hole
drain pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP16650683A
Other languages
Japanese (ja)
Inventor
Hiroshi Furube
古部 浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hazama Ando Corp
Original Assignee
Hazama Gumi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hazama Gumi Ltd filed Critical Hazama Gumi Ltd
Priority to JP16650683A priority Critical patent/JPS6059221A/en
Publication of JPS6059221A publication Critical patent/JPS6059221A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • E02D5/80Ground anchors
    • E02D5/808Ground anchors anchored by using exclusively a bonding material

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

PURPOSE:To stabilize the ground by removing groundwater as well as obtain a tensile force for anchors by a method in which a perforated protective hollow pipe is inserted into the middle long portion of anchor, and a fixing plate having a drain pipe leading to the perforated protective hollow pipe is provided to the head of the anchor. CONSTITUTION:A tension member 5 is inserted to a fixing portion 1 of a hole 4 drilled in the ground 11, a filling material 6 is packed into the fixing portion 1, and a perforated protective hollow pipe 7 is inserted into the free long portion 2 of an anchor to cover the tension member 5. The tension member 5 is fixed through a fixing plate 9 with nuts 10 to the head 3 of the anchor and then to the ground 11. Since the plate 9 is led to a drain pipe 8 and the hollow pipe 7, groundwater in the ground 11 is discharged through the water conveyance hole 12 of the hollow pipe 7 and the drain pipe 8 from the perforated wall of the hole 4 of the free long portion 2.

Description

【発明の詳細な説明】 この発明は、地盤の安定化をさせるための水抜き効果を
向上したアンカー工法に関する。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to an anchor construction method that improves the drainage effect for stabilizing the ground.

従来、地盤中にあらかじめ引張り材を挿入する挿入孔を
穿孔し、この挿入孔に引張り材を挿入して充填4Aを充
填することにより引張り力を得て地すべりなどの力に抵
抗するアンカー工法が用いられる。また、地盤の安定化
工法としては、このように力で対抗する工法の他に地盤
を不安定にさせる要因となる地下水を排除することによ
り地盤の不安定化を抑制する工法が用いられる。
Conventionally, an anchor method has been used in which an insertion hole for inserting a tensile material is drilled in advance in the ground, and the tensile material is inserted into this insertion hole and filled with Filler 4A to obtain tensile force and resist forces such as landslides. It will be done. In addition to the method of using force to stabilize the ground, a method of suppressing the instability of the ground by eliminating groundwater, which can cause instability of the ground, is also used.

この発明は、」二連の欠点を解決する工法にして引張り
力を得ると同時に地下水を排除して地盤を安定化させる
ための水抜き効果を有するアンカー工法を提供するもの
である。
This invention provides an anchor construction method that solves the two drawbacks and has a drainage effect for obtaining tensile force and at the same time removing groundwater and stabilizing the ground.

次に、この発明の実施例を図面に基づいて説明する。第
1図は、この発明によるアンカー工法の全体断面図を示
す。図において、アンカーは先端部は定着部/、中間部
は自由長部2およびアンカー頭部3より構成されている
。先づ、地盤//中に穿孔した挿入孔lの定着部/まで
引張り材Sを挿入するとともに、充填材乙を定着部/に
充填した後、アンカーの自由長部2に引張り材5に有孔
保護中空管7を挿入して引張りイオjを被覆する。次い
で、アンカー頭部3に引張り利左を固定プレート9を介
してす、ト10により引張り拐夕を地盤//と定着させ
る。前記固定プレート9には、排水管にが有孔保護管7
内と連通ずるように設けられており、地盤ll中の地下
水は自由長部2のアンカー挿入孔tの孔壁から有孔保護
管7の導水孔12を通過して排水管gより排水される。
Next, embodiments of the present invention will be described based on the drawings. FIG. 1 shows an overall sectional view of the anchor construction method according to the present invention. In the figure, the anchor is composed of a fixing part at the distal end, a free length part 2 and an anchor head 3 at the middle part. First, the tensile material S is inserted up to the anchoring part / of the insertion hole l drilled in the ground //, and after filling the anchoring part / with the filler material B, the tensile material 5 is inserted into the free length part 2 of the anchor. A hole protection hollow tube 7 is inserted to cover the tensile iodine. Next, the tension rod is attached to the anchor head 3 via the fixing plate 9, and the tension suspension is fixed to the ground by means of the fixing plate 9. The fixing plate 9 has a perforated protection pipe 7 for the drainage pipe.
The groundwater in the ground 11 is drained from the hole wall of the anchor insertion hole t of the free length part 2, passes through the water guide hole 12 of the perforated protection pipe 7, and is drained from the drain pipe g. .

第2図は、有孔保護中空管と引張り拐との被覆部の詳細
であり、有孔保護中空管7は外周に多数の導水孔/2が
貫設され、地盤l/の地下水を保護管7内に導水する構
造となっている。
Figure 2 shows the details of the covered part of the perforated protection hollow pipe and the tensile cable. It has a structure in which water is introduced into the protection tube 7.

第3図は、排水管の設置状態の詳祁1図であり、排水管
gは固定ブレートワに下向きに傾斜して貫着され、保護
中空管7と連通して地下水を排水し易くしたものである
Fig. 3 is a detailed view of the installed state of the drain pipe, in which the drain pipe g is pierced through the fixed platen at an angle downward and communicates with the protective hollow pipe 7 to facilitate drainage of groundwater. It is.

第弘図は、他の排水法の詳細図であり、有孔保護中空管
7を省略して地盤//中に自由長部2と直接連通した排
水孔/3を下向きに傾斜して穿孔して地盤//中の地下
水を排水させるものである。
Figure No. 3 is a detailed diagram of another drainage method, in which the perforated protective hollow pipe 7 is omitted and a drainage hole /3 that directly communicates with the free length part 2 is drilled in the ground with a downward slope. This is to drain the groundwater in the ground.

上述の通り、この発明は従来の工法に比して、地盤中の
地下水を容易に排水して地盤の安定化を図って水抜き効
果を向」ニすることにより経費の節減が期待される。
As mentioned above, compared to conventional construction methods, the present invention is expected to reduce costs by easily draining groundwater in the ground, stabilizing the ground, and improving the drainage effect.

【図面の簡単な説明】[Brief explanation of drawings]

第1図は、この発明のアンカー工法の全体断面図、第2
図は、有孔保護中空管と引張り材との被覆部の詳細図、
第3図は、排水管の設置状態図の詳細図、第μ図は、他
の排水法の詳細図である。 /:定着部 2:自由長部 3:アンカー頭部 t:挿入孔 5:引張り拐 乙:充填材 7二イi孔保護中空管 に:′排水管 9:固定プレート 10:ナツト //地盤 /2 導水孔 /3 排水孔
Figure 1 is an overall sectional view of the anchor construction method of this invention, and Figure 2 is a
The figure is a detailed view of the covering part between the perforated protective hollow tube and the tensile material.
FIG. 3 is a detailed diagram of the installation state of the drain pipe, and FIG. μ is a detailed diagram of another drainage method. /: Anchoring part 2: Free length part 3: Anchor head t: Insertion hole 5: Tension hole 2: Filler 7 2 hole protection hollow tube: 'Drain pipe 9: Fixing plate 10: Nut//Ground /2 Water supply hole /3 Drainage hole

Claims (1)

【特許請求の範囲】[Claims] (1)地盤中に所定深さまで穿孔した挿入孔に引張り材
を挿入し、引張り利の先端部の定着部に充填材を充填す
るとともに、中間部の自由・枝部に有孔保護中空管を挿
入した後、アンカー頭部に有孔保護中空管内と連通ずる
排水管を有する固定プレートを介してナツトに引張り利
を地盤と定着することを特徴とする水抜き効果を有する
アンカー工法 (2、特許請求の範囲第1項記載の挿入孔の自由長部と
直接に連通ずる排水孔を地盤に穿孔することを特徴とす
る水抜き効果を有するアンカー」二法
(1) Insert the tensile material into the insertion hole drilled to a predetermined depth in the ground, fill the anchoring part at the tip of the tensile material with the filler material, and protect the hollow tube with holes in the free and branch parts of the middle part. After inserting the anchor, the nut is pulled and fixed to the ground through a fixing plate having a drain pipe communicating with the inside of the perforated protective hollow pipe at the anchor head (2). 2. An anchor having a water draining effect characterized by drilling a drainage hole in the ground that directly communicates with the free length of the insertion hole according to claim 1.
JP16650683A 1983-09-12 1983-09-12 Anchoring work having water weeping effect Pending JPS6059221A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP16650683A JPS6059221A (en) 1983-09-12 1983-09-12 Anchoring work having water weeping effect

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP16650683A JPS6059221A (en) 1983-09-12 1983-09-12 Anchoring work having water weeping effect

Publications (1)

Publication Number Publication Date
JPS6059221A true JPS6059221A (en) 1985-04-05

Family

ID=15832610

Family Applications (1)

Application Number Title Priority Date Filing Date
JP16650683A Pending JPS6059221A (en) 1983-09-12 1983-09-12 Anchoring work having water weeping effect

Country Status (1)

Country Link
JP (1) JPS6059221A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103437354A (en) * 2013-08-29 2013-12-11 湖南城市学院 Water drainage anchor rod and construction method

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4511233Y1 (en) * 1965-10-11 1970-05-20
JPS5844122A (en) * 1982-08-23 1983-03-15 Shin Gijutsu Kaihatsu Kk Protection of free longitudinal portion of earth anchor device

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4511233Y1 (en) * 1965-10-11 1970-05-20
JPS5844122A (en) * 1982-08-23 1983-03-15 Shin Gijutsu Kaihatsu Kk Protection of free longitudinal portion of earth anchor device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103437354A (en) * 2013-08-29 2013-12-11 湖南城市学院 Water drainage anchor rod and construction method
CN103437354B (en) * 2013-08-29 2015-11-25 湖南城市学院 Drainage anchor rod and construction method

Similar Documents

Publication Publication Date Title
US4397589A (en) Ground anchorage means utilizing a reinforcement or tie insulated from the ground
US5836124A (en) Foundation tube for use as a foundation for masts, posts, pillars, etc.
JPS6059221A (en) Anchoring work having water weeping effect
US4413929A (en) Rock bolt
CN208472720U (en) One kind can grouted anchor bar locating support device
FR2381135A1 (en) ANCHORING METHOD AND DEVICE
JP2983471B2 (en) How to build a retaining wall
JPH0313628A (en) Open caisson sinking method and equipment
JPS649413B2 (en)
JPH033773B2 (en)
JPS5880022A (en) Anchor device
KR200325653Y1 (en) Earth anchor including a duplex grouting pipe
SU1406387A1 (en) Method of setting a roof bolt
US3915231A (en) Method for drilling through cavities during earth drilling operations
CH609401A5 (en) Method of anchoring a structural supporting member pressed into the ground
DE2039109B2 (en) Scavenging pipe for excess anchoring compound - is inserted in collapsed state and scavenging water emerges through perforations
JP2552517B2 (en) Anchor body sheath of ground anchor
JPS5719422A (en) Fixing method of net in process covering slope with net
JP3116095B2 (en) Construction method of new material ground anchor
JPH10168876A (en) Anchor method
JPH0418085B2 (en)
JPH06248646A (en) Installation structure for earth anchor
JPH057833B2 (en)
JPS6124492B2 (en)
JPS6022113Y2 (en) Guide tower bottom support device