- JPS6158267B2 JPS6158267B2 JP55178813A JP17881380A JPS6158267B2 JP S6158267 B2 JPS6158267 B2 JP S6158267B2 JP 55178813 A JP55178813 A JP 55178813A JP 17881380 A JP17881380 A JP 17881380A JP S6158267 B2 JPS6158267 B2 JP S6158267B2
- Authority
- JP
- Japan
- Prior art keywords
- machine
- pipe
- line
- pitch
- feed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B23/00—Tube-rolling not restricted to methods provided for in only one of groups B21B17/00, B21B19/00, B21B21/00, e.g. combined processes planetary tube rolling, auxiliary arrangements, e.g. lubricating, special tube blanks, continuous casting combined with tube rolling
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21D—MODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
- C21D9/00—Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor
- C21D9/08—Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor for tubular bodies or pipes
Landscapes
- Chemical & Material Sciences (AREA)
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Materials Engineering (AREA)
- Thermal Sciences (AREA)
- Crystallography & Structural Chemistry (AREA)
- Physics & Mathematics (AREA)
- Metallurgy (AREA)
- Organic Chemistry (AREA)
- Heat Treatment Of Articles (AREA)
- Heat Treatments In General, Especially Conveying And Cooling (AREA)
- Multi-Process Working Machines And Systems (AREA)
- Metal Rolling (AREA)
Description
【発明の詳細な説明】
この発明は丸棒又は鋼管の製造ラインにおいて
圧延等の成形工程からの鋼管等の端部に面取り又
はネジ切り等の精整処理を施すための精整装置に
関し、特に前工程である成形工程とのオンライン
化のための能力向上を果すための改良に関する。
例えば継目無鋼管製造ラインでは、圧延され冷却
されてほぼ定尺に切断された中間製品パイプを精
整ラインへ送り、管端の面取り、ネジ切り、ネジ
検査、管端保護具又は継手部品の螺着、水圧テス
ト、検尺秤量、マーキング等々の一連の処理を施
して製品としている。従来この様な精整ラインは
1ラインに各1台ずつの各処理機器が配置されて
おり、従つて近時の圧延能力の向上に対応して精
整ラインの処理能力を増そうとすると、1ライン
に各機1台の対応ではライン数を増さなければな
らず、搬送設備が余分に必要で設備専用面積も広
大となるほか、全精整ラインへのパイプの振り分
けおよび集合、及び工程を通じて各処理でのパイ
プのトラツキングが困難になる欠点も問題となつ
ている。
圧延等の成形工程からの鋼管等の端部に面取り又
はネジ切り等の精整処理を施すための精整装置に
関し、特に前工程である成形工程とのオンライン
化のための能力向上を果すための改良に関する。
例えば継目無鋼管製造ラインでは、圧延され冷却
されてほぼ定尺に切断された中間製品パイプを精
整ラインへ送り、管端の面取り、ネジ切り、ネジ
検査、管端保護具又は継手部品の螺着、水圧テス
ト、検尺秤量、マーキング等々の一連の処理を施
して製品としている。従来この様な精整ラインは
1ラインに各1台ずつの各処理機器が配置されて
おり、従つて近時の圧延能力の向上に対応して精
整ラインの処理能力を増そうとすると、1ライン
に各機1台の対応ではライン数を増さなければな
らず、搬送設備が余分に必要で設備専用面積も広
大となるほか、全精整ラインへのパイプの振り分
けおよび集合、及び工程を通じて各処理でのパイ
プのトラツキングが困難になる欠点も問題となつ
ている。
この発明は上述の状況に鑑みてなされたもの
で、精整ラインを1ラインの搬送ラインによつて
高能力化すること、およびライン中の機器の障害
発生時に能力を落しこそすれ全ライン停止には至
らずに処理を続行できるようにすることを目的と
するものである。
で、精整ラインを1ラインの搬送ラインによつて
高能力化すること、およびライン中の機器の障害
発生時に能力を落しこそすれ全ライン停止には至
らずに処理を続行できるようにすることを目的と
するものである。
すなわちこの発明の精整装置においては、1ラ
インの搬送装置に精整各機を例えば3台ずつ配置
し3ライン分の能力を持たせるものであり、同時
に各機器の設置台数の増加によつて1台のトラブ
ルによりラインが停止する確率が高くなつても、
例えば或る処理機能の3台の精整機器のうち1台
が障害により停止しても全ラインを停止させず
に、例えば各機2台ずつで2ライン分の能力で稼
動できるようにし、このために搬送装置は横送り
方式の送りピツチを3ピツチ、2ピツチ、1ピツ
チと変え得る例えばウオーキングビーム形のもの
を用いる。このようなウオーキングビームは本発
明者等が先に特願昭55−118434号(特開昭57−
42406号)によつて提案しているのでここではそ
の詳述は省略する。
インの搬送装置に精整各機を例えば3台ずつ配置
し3ライン分の能力を持たせるものであり、同時
に各機器の設置台数の増加によつて1台のトラブ
ルによりラインが停止する確率が高くなつても、
例えば或る処理機能の3台の精整機器のうち1台
が障害により停止しても全ラインを停止させず
に、例えば各機2台ずつで2ライン分の能力で稼
動できるようにし、このために搬送装置は横送り
方式の送りピツチを3ピツチ、2ピツチ、1ピツ
チと変え得る例えばウオーキングビーム形のもの
を用いる。このようなウオーキングビームは本発
明者等が先に特願昭55−118434号(特開昭57−
42406号)によつて提案しているのでここではそ
の詳述は省略する。
この発明を実施例図面と共に圧延パイプを例に
して詳述すれば以下の通りである。
して詳述すれば以下の通りである。
図面はこの発明の一実施例に係る精整装置のラ
イン配置を示す平面図で、例えば鋼管圧延ライン
等の末端に連設されるものである。図において1
は圧延済パイプを軸方向送りコンベア2から受け
とつて高速でほぼ定尺に切断する切断機で、その
出側コンベア3には前述ウオーキングビーム方式
等の横送り搬送装置4が1ライン接続されてい
る。この横送り搬送装置4は例えば前述した先の
提案(特開昭57−42406号)によるウオーキング
ビームを用い、等間隔で載せられるパイプのピツ
チに対し1ピツチ、2ピツチ、3ピツチの3段階
に送りピツチを切替えることのできるものであ
る。この最大送りピツチ数3に対応して各々3台
ずつの各種精整機器および検査機器等が処理工程
に対応して順番に搬送装置の両脇に沿つて配列さ
れる。すなわち図において5a,5bは各々3台
ずつの管端面取機、6は管内清掃機、7a,7b
は3台ずつの管端ネジ切機、8a,8bは3台ず
つのネジ検査機、9a,9bは3台ずつの例えば
管端保護具又はカツプリングなどを取付けるネジ
部品取付機、10は3台のドリフト・パワータイ
ト、11は3台の水圧テスト機、12は3台の検
尺秤量機、13は検尺秤量結果をマーキングする
3台のマーキング機である。
イン配置を示す平面図で、例えば鋼管圧延ライン
等の末端に連設されるものである。図において1
は圧延済パイプを軸方向送りコンベア2から受け
とつて高速でほぼ定尺に切断する切断機で、その
出側コンベア3には前述ウオーキングビーム方式
等の横送り搬送装置4が1ライン接続されてい
る。この横送り搬送装置4は例えば前述した先の
提案(特開昭57−42406号)によるウオーキング
ビームを用い、等間隔で載せられるパイプのピツ
チに対し1ピツチ、2ピツチ、3ピツチの3段階
に送りピツチを切替えることのできるものであ
る。この最大送りピツチ数3に対応して各々3台
ずつの各種精整機器および検査機器等が処理工程
に対応して順番に搬送装置の両脇に沿つて配列さ
れる。すなわち図において5a,5bは各々3台
ずつの管端面取機、6は管内清掃機、7a,7b
は3台ずつの管端ネジ切機、8a,8bは3台ず
つのネジ検査機、9a,9bは3台ずつの例えば
管端保護具又はカツプリングなどを取付けるネジ
部品取付機、10は3台のドリフト・パワータイ
ト、11は3台の水圧テスト機、12は3台の検
尺秤量機、13は検尺秤量結果をマーキングする
3台のマーキング機である。
上記のような可変送りピツチ横送り装置は、さ
らに詳しくは搬送装置4の入口から出口までの間
にいくつかの区分に分けて配設される。すなわち
入口には定ピツチでパイプを受けとつて1ピツチ
送りで横移送する区間が両側のT.P.切断機14
a,14bまで設定され、この後管端面取機5a
の手前から管内清掃機6の終りまでの区間がまず
はじめの可変送りピツチ区間とされ、その後方の
検査テーブル15は1ピツチ送りでも可変ピツチ
送りでもいずれでもよい。検査テーブル15中か
ら側方に延設されているのは検査によつて管端面
取不良と判定されたパイプをライン外の面取手入
テーブル16へ移送し、また手入後のパイプをラ
インへ戻すための軸方向送りコンベア17であ
る。さらに下流に至つてネジ切機1aの手前から
ネジ部品取付機9bの終りまでは別の可変送りピ
ツチ横送り装置による区間とされ、その下流に別
の検査テーブル18が設けられ、ネジ検査機8
a,8bで検出されたネジ切り不良パイプ又はネ
ジ部品が正規に装着されていないパイプ及び加工
機に故障が生じたときその位置に該当してそのま
ま還流される未加工材をコンベア19によつてラ
イン外へ移し、ライン外にてオフライン作業によ
り管端切断機20a,20bによつて不良ネジ部
等の管端(未加工材を除く)再切断し、台車21
によりネジ切機7aの上流側のコンベア22に移
送するようにしてオフラインの切り詰め作業ライ
ンでこの可変送りピツチ区間の出入口を接続し、
再びネジ切り等のオンライン作業へ戻すようにし
てある。検査テーブル15,18は各可変送りピ
ツチ区間の間に位置するパツフア区間として機能
し、不良材の抽出等によるパイプ列の抜けを補な
い、或いは各区間同志の接続におけるパイプ列の
円滑な移送を果す。
らに詳しくは搬送装置4の入口から出口までの間
にいくつかの区分に分けて配設される。すなわち
入口には定ピツチでパイプを受けとつて1ピツチ
送りで横移送する区間が両側のT.P.切断機14
a,14bまで設定され、この後管端面取機5a
の手前から管内清掃機6の終りまでの区間がまず
はじめの可変送りピツチ区間とされ、その後方の
検査テーブル15は1ピツチ送りでも可変ピツチ
送りでもいずれでもよい。検査テーブル15中か
ら側方に延設されているのは検査によつて管端面
取不良と判定されたパイプをライン外の面取手入
テーブル16へ移送し、また手入後のパイプをラ
インへ戻すための軸方向送りコンベア17であ
る。さらに下流に至つてネジ切機1aの手前から
ネジ部品取付機9bの終りまでは別の可変送りピ
ツチ横送り装置による区間とされ、その下流に別
の検査テーブル18が設けられ、ネジ検査機8
a,8bで検出されたネジ切り不良パイプ又はネ
ジ部品が正規に装着されていないパイプ及び加工
機に故障が生じたときその位置に該当してそのま
ま還流される未加工材をコンベア19によつてラ
イン外へ移し、ライン外にてオフライン作業によ
り管端切断機20a,20bによつて不良ネジ部
等の管端(未加工材を除く)再切断し、台車21
によりネジ切機7aの上流側のコンベア22に移
送するようにしてオフラインの切り詰め作業ライ
ンでこの可変送りピツチ区間の出入口を接続し、
再びネジ切り等のオンライン作業へ戻すようにし
てある。検査テーブル15,18は各可変送りピ
ツチ区間の間に位置するパツフア区間として機能
し、不良材の抽出等によるパイプ列の抜けを補な
い、或いは各区間同志の接続におけるパイプ列の
円滑な移送を果す。
検査テーブル18の下流からは、ドリフトパワ
ータイト10の手前からマーキング機13の終り
までさらに別の可変送りピツチ横送り装置による
区間となつており、その下流出口には製品ヤード
へ向けて軸方向送りコンベア23が複数列設けら
れ、その途中に塗装機24が配置されている。各
可変送りピツチ横送り区間においては、各精整機
器が3台ずつ健全に稼動される場合、パイプは3
ピツチ分の移送距離を一斉に運ばれ、またどこか
の機器群で3台中の1台がトラブルにより停止し
たときはパイプは2ピツチ分の移送距離を一斉に
運ばれて2/3の能力での精整処理が行なわれる
が、停止中の加工機が3台中の中央であるときは
送りピツチの変更はなく、不良と判定されたもの
及び未加工材は還流される。3台中の2台が停止
すればパイプは1ピツチ分の移動距離を一斉に運
ばれて1/3の能力での処理が継続される。この間
のパイプの送りピツチの変更と機器の故障台数と
の関係を第2図によつて説明すれば、次のとおり
である。すなわち、同図中、各場合について上段
の図は最大能力の3ピツチで被加工管pを搬送し
ているものとする。なお、Pは加工された管、p0
は加工されなかつた管を示す。
ータイト10の手前からマーキング機13の終り
までさらに別の可変送りピツチ横送り装置による
区間となつており、その下流出口には製品ヤード
へ向けて軸方向送りコンベア23が複数列設けら
れ、その途中に塗装機24が配置されている。各
可変送りピツチ横送り区間においては、各精整機
器が3台ずつ健全に稼動される場合、パイプは3
ピツチ分の移送距離を一斉に運ばれ、またどこか
の機器群で3台中の1台がトラブルにより停止し
たときはパイプは2ピツチ分の移送距離を一斉に
運ばれて2/3の能力での精整処理が行なわれる
が、停止中の加工機が3台中の中央であるときは
送りピツチの変更はなく、不良と判定されたもの
及び未加工材は還流される。3台中の2台が停止
すればパイプは1ピツチ分の移動距離を一斉に運
ばれて1/3の能力での処理が継続される。この間
のパイプの送りピツチの変更と機器の故障台数と
の関係を第2図によつて説明すれば、次のとおり
である。すなわち、同図中、各場合について上段
の図は最大能力の3ピツチで被加工管pを搬送し
ているものとする。なお、Pは加工された管、p0
は加工されなかつた管を示す。
(1) 最初の1機(A機)が故障した場合、3ピツ
チ送りのままではA機の位置に送られてくるパ
イプpは加工されないので、下段の図に示すよ
うに該当位置から2ピツチ送りに変更する。
チ送りのままではA機の位置に送られてくるパ
イプpは加工されないので、下段の図に示すよ
うに該当位置から2ピツチ送りに変更する。
(2) 中央の1機(B機)が故障した場合、この場
合は下段の図のように2ピツチ送りに変更して
も無意味である。
合は下段の図のように2ピツチ送りに変更して
も無意味である。
(3) 最後の1機(C機)が故障した場合、この場
合は上記(1)と同じである。
合は上記(1)と同じである。
(4) いずれか2機が故障した場合、1ピツチ送り
に変更する。
に変更する。
以上の説明から明らかなように、中央の1機が
故障した場合のみパイプの送りピツチの変更はな
く、中央以外の1機が故障した場合は送りピツチ
を2に変更する。また、2機故障した場合は送り
ピツチを1に変更する。未加工パイプP0は検査テ
ーブル18を通じて上流に還流され、再加工に供
される。勿論各機器群中の機器数は以上のような
3台に限ることはなく、複数台で各群同数なら何
台ずつでもよく、その台数に応じたピツチ数で横
送りするように構成すればよい。
故障した場合のみパイプの送りピツチの変更はな
く、中央以外の1機が故障した場合は送りピツチ
を2に変更する。また、2機故障した場合は送り
ピツチを1に変更する。未加工パイプP0は検査テ
ーブル18を通じて上流に還流され、再加工に供
される。勿論各機器群中の機器数は以上のような
3台に限ることはなく、複数台で各群同数なら何
台ずつでもよく、その台数に応じたピツチ数で横
送りするように構成すればよい。
以上に述べたようにこの発明によれば精整装置
の能力が1ラインで数倍に向上するばかりか能力
が複数段に変え得るものであり、また機器トラブ
ルによるライン停止の回避のほか、機器メンテナ
ンス又は工具取替中もライン停止をする必要がな
いなど、別の例えば鋼管圧延工程等の前段処理ラ
インとの連続オンライン化における能力バランス
に対処し得る構成としてその効果は顕著である。
の能力が1ラインで数倍に向上するばかりか能力
が複数段に変え得るものであり、また機器トラブ
ルによるライン停止の回避のほか、機器メンテナ
ンス又は工具取替中もライン停止をする必要がな
いなど、別の例えば鋼管圧延工程等の前段処理ラ
インとの連続オンライン化における能力バランス
に対処し得る構成としてその効果は顕著である。
第1図はこの発明の一実施例に係るライン配置
を示す平面図である、第2図はパイプの送りピツ
チの変更と機器の故障台数との関係を説明するた
めの図。 4:横送り搬送装置、5a,5b:管端面取
機、6:管内清掃機、7a,7b:ネジ切機、8
a,8b:ネジ検査機、9a,9b:ネジ部品取
付機、10:ドリフト・パワータイト、11:水
圧テスト機、12:検尺秤量機、13:マーキン
グ機。
を示す平面図である、第2図はパイプの送りピツ
チの変更と機器の故障台数との関係を説明するた
めの図。 4:横送り搬送装置、5a,5b:管端面取
機、6:管内清掃機、7a,7b:ネジ切機、8
a,8b:ネジ検査機、9a,9b:ネジ部品取
付機、10:ドリフト・パワータイト、11:水
圧テスト機、12:検尺秤量機、13:マーキン
グ機。
Claims (1)
- 1 丸棒又は鋼管の端部に対する面取り或いはネ
ジ切り等の精整処理を行なう精整装置において、
入口から出口まで1ライン構成で且つ鋼管等の送
りピッチが複数段に可変の横送り搬送装置の側部
に沿つて同一処理機能につき前記搬送装置の最大
送りピツチ数以下の一律の複数台数ずつの精整機
器からなる機器群を処理工程に合わせて順に配列
したことを特徴とする精整装置。
Priority Applications (10)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP55176536A JPS57100806A (en) | 1980-12-16 | 1980-12-16 | Producing device for seamless steel pipe |
| JP55178813A JPS57102737A (en) | 1980-12-16 | 1980-12-19 | Adaptive control system |
| JP55179721A JPS57103715A (en) | 1980-12-16 | 1980-12-20 | Seamless steel pipe manufacturing equipment |
| JP56074455A JPS57188619A (en) | 1980-12-16 | 1981-05-18 | Manufacturing facilities for seamless steel pipe |
| GB8137554A GB2089262B (en) | 1980-12-16 | 1981-12-11 | Seamless steel pipe manufacturing installation |
| FR8123288A FR2495969B1 (fr) | 1980-12-16 | 1981-12-14 | Installation de fabrication de tubes d'acier sans soudure |
| DE19813149647 DE3149647A1 (de) | 1980-12-16 | 1981-12-15 | Vorrichtung zur herstellung von nahtlosem stahl |
| US06/330,806 US4452061A (en) | 1980-12-16 | 1981-12-15 | Seamless steel pipe manufacturing installation |
| IT25610/81A IT1140335B (it) | 1980-12-16 | 1981-12-15 | Installazione per la fabbricazione di tubi in acciaio senza saldatura |
| CA000392412A CA1181618A (en) | 1980-12-16 | 1981-12-16 | Seamless pipe manufacturing installation |
Applications Claiming Priority (4)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP55176536A JPS57100806A (en) | 1980-12-16 | 1980-12-16 | Producing device for seamless steel pipe |
| JP55178813A JPS57102737A (en) | 1980-12-16 | 1980-12-19 | Adaptive control system |
| JP55179721A JPS57103715A (en) | 1980-12-16 | 1980-12-20 | Seamless steel pipe manufacturing equipment |
| JP56074455A JPS57188619A (en) | 1980-12-16 | 1981-05-18 | Manufacturing facilities for seamless steel pipe |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS57102737A JPS57102737A (en) | 1982-06-25 |
| JPS6158267B2 true JPS6158267B2 (ja) | 1986-12-10 |
Family
ID=27465693
Family Applications (4)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP55176536A Pending JPS57100806A (en) | 1980-12-16 | 1980-12-16 | Producing device for seamless steel pipe |
| JP55178813A Granted JPS57102737A (en) | 1980-12-16 | 1980-12-19 | Adaptive control system |
| JP55179721A Pending JPS57103715A (en) | 1980-12-16 | 1980-12-20 | Seamless steel pipe manufacturing equipment |
| JP56074455A Pending JPS57188619A (en) | 1980-12-16 | 1981-05-18 | Manufacturing facilities for seamless steel pipe |
Family Applications Before (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP55176536A Pending JPS57100806A (en) | 1980-12-16 | 1980-12-16 | Producing device for seamless steel pipe |
Family Applications After (2)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP55179721A Pending JPS57103715A (en) | 1980-12-16 | 1980-12-20 | Seamless steel pipe manufacturing equipment |
| JP56074455A Pending JPS57188619A (en) | 1980-12-16 | 1981-05-18 | Manufacturing facilities for seamless steel pipe |
Country Status (7)
| Country | Link |
|---|---|
| US (1) | US4452061A (ja) |
| JP (4) | JPS57100806A (ja) |
| CA (1) | CA1181618A (ja) |
| DE (1) | DE3149647A1 (ja) |
| FR (1) | FR2495969B1 (ja) |
| GB (1) | GB2089262B (ja) |
| IT (1) | IT1140335B (ja) |
Families Citing this family (18)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS59102501A (ja) * | 1982-11-29 | 1984-06-13 | Murata Mach Ltd | ワ−クの計測装置を備えた旋盤 |
| JPS60136022U (ja) * | 1984-02-20 | 1985-09-10 | アルプス電気株式会社 | 押釦スイツチ |
| DE3821188A1 (de) * | 1988-06-23 | 1989-12-28 | Schloemann Siemag Ag | Bandgiessanlage mit drehherdofen |
| US6264767B1 (en) | 1995-06-07 | 2001-07-24 | Ipsco Enterprises Inc. | Method of producing martensite-or bainite-rich steel using steckel mill and controlled cooling |
| DE102007017747B4 (de) * | 2007-04-12 | 2009-05-07 | V & M Deutschland Gmbh | Verfahren und Vorrichtung zur optischen Vermessung von Außengewinden |
| CN101751021B (zh) * | 2008-12-19 | 2011-08-24 | 鞍钢集团工程技术有限公司 | 一种无缝钢管生产过程信息跟踪方法 |
| KR101048264B1 (ko) * | 2009-06-03 | 2011-07-08 | 신원철 | 자동 니플 성형장치 |
| AR080800A1 (es) * | 2010-03-25 | 2012-05-09 | Sumitomo Metal Ind | Equipo para la fabricacion de tuberia o tubo de acero |
| DE102010052084B3 (de) * | 2010-11-16 | 2012-02-16 | V&M Deutschland Gmbh | Verfahren zur wirtschaftlichen Herstellung von nahtlos warmgewalzten Rohren in Rohrkontiwalzwerken |
| JP5304915B2 (ja) * | 2012-03-09 | 2013-10-02 | 新日鐵住金株式会社 | 金属管の製造方法及び製造設備 |
| DE102012108643A1 (de) * | 2012-09-14 | 2014-03-20 | Sandvik Materials Technology Deutschland Gmbh | Pilgerwalzstraße |
| JP6171834B2 (ja) * | 2013-10-21 | 2017-08-02 | Jfeスチール株式会社 | 厚肉鋼材製造用装置列 |
| JP6171851B2 (ja) * | 2013-10-29 | 2017-08-02 | Jfeスチール株式会社 | 継目無鋼管製造用装置列およびそれを利用した油井用高強度ステンレス継目無鋼管の製造方法 |
| AR114593A1 (es) * | 2018-03-28 | 2020-09-23 | Nippon Steel & Sumitomo Metal Corp | Instalación de tratamiento-térmico-y-tratamiento-de-acabado continuos de un tubo de acero sin costura |
| CN112570449B (zh) * | 2019-09-30 | 2022-12-20 | 宝钢湛江钢铁有限公司 | 一种高效的双机架双剪切线直通中厚板生产线及生产方法 |
| CN111901577A (zh) * | 2020-01-15 | 2020-11-06 | 吴庆芹 | 基于信号分析的即时投影系统以及相应终端 |
| CN115786678B (zh) * | 2023-02-07 | 2023-05-30 | 江苏古川机械有限公司 | 一种挖掘机破碎锤部件热处理装置 |
| CN118127295B (zh) * | 2024-05-08 | 2024-07-26 | 山东东铁铸锻有限公司 | 一种轧制研磨钢棒连续热处理输送线 |
Family Cites Families (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US1617936A (en) * | 1925-04-06 | 1927-02-15 | Bamberger Otto | Tube mill and process |
| US1930702A (en) * | 1928-07-14 | 1933-10-17 | William R Webster | Tube mill |
| US1826360A (en) * | 1930-04-18 | 1931-10-06 | Nat Tube Co | Seamless tube mill |
| US1980368A (en) * | 1932-05-21 | 1934-11-13 | Nat Tube Co | Tube mill layout |
| US3581384A (en) * | 1967-06-28 | 1971-06-01 | Mannesmann Ag | Method of producing seamless metal tubes |
| US3815726A (en) * | 1970-04-06 | 1974-06-11 | Mark V Automation Ltd | Conveyor |
| SU428923A1 (ru) * | 1972-08-29 | 1974-05-25 | П. С. Карзов, Л. Н. Лоховинин, Л. Г. Михайлов, Б. В. Бронштейн , Г. С. Ларин | Поточная линия для производства и механической обработки труб |
| JPS5467982A (en) * | 1977-11-09 | 1979-05-31 | Hitachi Ltd | Working table |
-
1980
- 1980-12-16 JP JP55176536A patent/JPS57100806A/ja active Pending
- 1980-12-19 JP JP55178813A patent/JPS57102737A/ja active Granted
- 1980-12-20 JP JP55179721A patent/JPS57103715A/ja active Pending
-
1981
- 1981-05-18 JP JP56074455A patent/JPS57188619A/ja active Pending
- 1981-12-11 GB GB8137554A patent/GB2089262B/en not_active Expired
- 1981-12-14 FR FR8123288A patent/FR2495969B1/fr not_active Expired
- 1981-12-15 DE DE19813149647 patent/DE3149647A1/de active Granted
- 1981-12-15 US US06/330,806 patent/US4452061A/en not_active Expired - Fee Related
- 1981-12-15 IT IT25610/81A patent/IT1140335B/it active
- 1981-12-16 CA CA000392412A patent/CA1181618A/en not_active Expired
Also Published As
| Publication number | Publication date |
|---|---|
| CA1181618A (en) | 1985-01-29 |
| DE3149647C2 (ja) | 1988-06-09 |
| GB2089262B (en) | 1984-12-19 |
| GB2089262A (en) | 1982-06-23 |
| US4452061A (en) | 1984-06-05 |
| DE3149647A1 (de) | 1982-08-12 |
| JPS57102737A (en) | 1982-06-25 |
| FR2495969B1 (fr) | 1985-09-06 |
| JPS57188619A (en) | 1982-11-19 |
| IT1140335B (it) | 1986-09-24 |
| JPS57100806A (en) | 1982-06-23 |
| JPS57103715A (en) | 1982-06-28 |
| FR2495969A1 (fr) | 1982-06-18 |
| IT8125610A0 (it) | 1981-12-15 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JPS6158267B2 (ja) | ||
| JPS6158268B2 (ja) | ||
| US4424616A (en) | Conditioning line for steel pipes | |
| RU2107960C1 (ru) | Автоматическая линия изготовления тепловыделяющих элементов и их разбраковки | |
| CN111804752B (zh) | 棒材生产线精整区工艺路线 | |
| JPH0390201A (ja) | 条鋼の圧延方法 | |
| US4068516A (en) | Method and apparatus for handling bar-shaped material | |
| KR940006576B1 (ko) | 반도체 장치의 조립장치 | |
| DE602004006215T2 (de) | Zuführ- und Transporteinheit für Tabak in einer Maschine zum Herstellen von Tabakprodukten | |
| JPS63163259A (ja) | 錠剤等の欠陥自動検査装置 | |
| CN107363647A (zh) | 滚子热处理以后自动连线加工工艺 | |
| JP2019065360A (ja) | 鋼管の熱処理ライン及び鋼管の搬送制御方法 | |
| CN215401599U (zh) | 一种配合机器人使用的转换料道机构 | |
| CN206543916U (zh) | 全自动矩形方管直料下料机 | |
| JPS61197315A (ja) | 鶏舎からの集卵コンベヤの制御装置 | |
| CN214211758U (zh) | 一种冷床上料运输辊道 | |
| CN119429466A (zh) | 一种仓储式模压工装自动更换转移方法 | |
| US20050015208A1 (en) | Multi machine inspection system | |
| JPH03202256A (ja) | 長尺材の未切断検出方法 | |
| SU876234A1 (ru) | Лини дл изготовлени обечаек | |
| CN204777572U (zh) | 一种智能混合物料工位推送系统 | |
| JP2010235243A (ja) | 長尺材の長さ仕分装置および長さ仕分方法 | |
| EP0634231A1 (en) | System to roll at least two sections in blocks of fast rolling mill stands | |
| CN116748900A (zh) | 一种钢轨加工生产线 | |
| CN106695010B (zh) | 全自动矩形方管直料下料机 |