JPS62242010A - Vertical joint construction work for continuous underground wall - Google Patents

Vertical joint construction work for continuous underground wall

Info

Publication number
JPS62242010A
JPS62242010A JP8430186A JP8430186A JPS62242010A JP S62242010 A JPS62242010 A JP S62242010A JP 8430186 A JP8430186 A JP 8430186A JP 8430186 A JP8430186 A JP 8430186A JP S62242010 A JPS62242010 A JP S62242010A
Authority
JP
Japan
Prior art keywords
reinforcing bar
joint box
joint
reinforcing bars
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP8430186A
Other languages
Japanese (ja)
Other versions
JPH0362847B2 (en
Inventor
Kenichi Tsuura
津浦 謙一
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kumagai Gumi Co Ltd
Original Assignee
Kumagai Gumi Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kumagai Gumi Co Ltd filed Critical Kumagai Gumi Co Ltd
Priority to JP8430186A priority Critical patent/JPS62242010A/en
Publication of JPS62242010A publication Critical patent/JPS62242010A/en
Publication of JPH0362847B2 publication Critical patent/JPH0362847B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

PURPOSE:To shorten the period of construction work by a method in which the cross reinforcing bars of a reinforcing bar cage are connected in a joint casing and a continuous underground wall of high strength is exactly constructed. CONSTITUTION:A reinforcing bar cage 2 whose cross reinforcing bars 3 each have an elastic covering cylinder 4 fitted on one end and a hollow joint casing 23 are alternately set in a trench excavated in the ground 1. Underwater concrete 5 is placed by excluding the inside of the casing 23 and cured. Afterwards, the bars 3 are connected with connecting reinforcing bars 6 in the casing 23, and concrete is placed into the casing 23. Since the bars 3 can be exactly and strongly connected, the strength of the underground continuous wall can be raised. Also, since the connecting operation can be performed in the casing 23, the whole construction period can be shortened.

Description

【発明の詳細な説明】 〔産業上の利用分野〕 この発明は、剛性の大きい大型基礎あるいはその他の構
造物を築造する場合に採用する連続地中壁の垂直継手施
工法に関するものである。
DETAILED DESCRIPTION OF THE INVENTION [Field of Industrial Application] The present invention relates to a vertical joint construction method for continuous underground walls, which is employed when constructing large-scale foundations or other structures with high rigidity.

〔従来技術〕[Prior art]

従来、連続地中壁を施工する場合のコンクIJ +ト壁
体相互の垂直継手として、種々の型式のものが提案され
ているが、施工実績が多いものは、泥水中における重ね
継手が主体である。
Conventionally, various types of vertical joints between concrete IJ and concrete walls have been proposed when constructing continuous underground walls, but the ones with a lot of construction experience are mainly lap joints in muddy water. be.

従来、重ね継手の主なものとして、(1)仕切鉄板と砕
石充填方式、(2)仮設ゲツクス方式、(3)継手函体
方式が知られている。
Conventionally, the main types of lap joints known are (1) partition iron plate and crushed stone filling method, (2) temporary hooks method, and (3) joint box method.

前記(11の方式は、第58図に示すように、先行壁体
8と後行壁体施工予定部分との間を仕切り鉄板9で仕切
り、この仕切り鉄板9を先行壁体8の鉄筋篭の両端部も
しくは一端部に増付け、先行壁体の鉄筋篭の横方向鉄筋
10を、重ね継手長板上の長さにわたって後行壁体施工
予定部分に延長し、先行壁体のコンクリート打設前には
、仕切り鉄板の後行壁体側に砕石を充填し、仕切り鉄板
の変形防止や鉄筋篭の移動防止を計り、後行壁体用の溝
11を掘削したのち、せん断補強筋12を有する後行壁
体用の鉄筋篭13を建込み、その鉄筋篭13の横方向鉄
筋14を前記先行壁体8から突出している横方向鉄筋1
0の内@または外側に間隔をおいて配置する方式である
。しかし、前記(1)の方式の場合は、砕石にセメント
分が侵透すると砕石の除去が困難になり、かつ後行壁体
用の溝を掘削する際に砕石除去の確認が困難であり、さ
らに重ね継手における壁厚の有効高さDlが小さいので
、曲げモーメントに対し構造上不利である。また前記(
2)の方式の場合は、仮設?ツクスの周囲にコンクリー
ト等が回り込むと、仮設デツクスの引抜きが困難になる
。さらに前記(3)の方式の場合は、施工手順が複雑で
あるという問題がある。
As shown in FIG. 58, the method (11) above uses a partition iron plate 9 to partition the area where the preceding wall 8 and the subsequent wall are to be constructed. Add the horizontal reinforcing bars 10 of the reinforcing bar cage of the preceding wall to both ends or one end, and extend the horizontal reinforcing bars 10 of the reinforcing bar basket of the preceding wall to the part where the succeeding wall is planned to be constructed over the length of the lap joint long plate, and before concrete is placed on the preceding wall. After filling the trailing wall side of the partition iron plate with crushed stone to prevent deformation of the partition iron plate and preventing movement of the reinforcing bar cage, a groove 11 for the trailing wall body is excavated, and a rear wall with shear reinforcing bars 12 is installed. A reinforcing bar cage 13 for the row wall body is erected, and the transverse reinforcing bars 14 of the reinforcing bar cage 13 are protruded from the preceding wall body 8.
This is a method of arranging them at intervals within or outside 0. However, in the case of the method (1) above, it becomes difficult to remove the crushed stone if the cement penetrates into the crushed stone, and it is difficult to confirm that the crushed stone has been removed when excavating the groove for the trailing wall. Furthermore, since the effective height Dl of the wall thickness in the lap joint is small, it is structurally disadvantageous with respect to bending moments. Also mentioned above (
In the case of method 2), is it temporary? If concrete, etc. gets around the deck, it will be difficult to pull out the temporary deck. Furthermore, in the case of method (3), there is a problem that the construction procedure is complicated.

さらにまた、前記+11 (2] (31の方式の場合
、下記の共通の問題点がある。
Furthermore, in the case of the above-mentioned +11 (2) (31) method, there are the following common problems.

A 後行側の鉄筋篭の吊り降ろし時に、その鉄筋篭が重
ね継手部に接触して、鉄筋が変形することがあるが、こ
れを確認することができない。
A When the reinforcing bar basket on the trailing side is lifted down, the reinforcing bar basket may come into contact with the lap joint and the reinforcing bars may be deformed, but this cannot be confirmed.

もし重ね継手部が変形したことを知った場合でも、その
変形を矯正することは不可能であるので、設計強度を確
保することは極めて困難である。
Even if it is known that the lap joint has been deformed, it is impossible to correct the deformation, so it is extremely difficult to ensure the design strength.

B 従来、前記Aの問題点を解決するために、先行側鉄
筋篭と後行側鉄筋篭との間隔に余裕をもたせた設計を行
なっているが、一般に、先行側鉄筋篭と後行側鉄筋篭と
の間隙は10m程度であるので、曲げモーメントに対し
耐力的に不利になる。この耐力低下の値は、壁厚等によ
っても異なるが、計算上の強度で一般部の強度の60〜
80チ程度に低下するのが普通であり、このため経済性
の点で問題がおる。
B Conventionally, in order to solve problem A above, designs have been made in which the leading side reinforcing bar cage and the trailing side reinforcing bar basket have a margin of space between them. Since the gap with the basket is about 10 m, it is disadvantageous in terms of resistance to bending moments. The value of this reduction in yield strength varies depending on the wall thickness, etc., but the calculated strength is 60 to 60% of the strength of the general part.
It is normal for the temperature to drop to about 80 inches, which poses a problem in terms of economy.

C重ね継手の前記問題を解決する方法として、壁体の垂
直継手位置を曲げモーメント、せん断力の比較的小さい
位置に設置することも考えられるが、施工上、壁体の垂
直継手位置が制限される場合が多いので、前記問題を解
決することは困難である。
One way to solve the above-mentioned problem with C-lap joints is to install the vertical joints on the wall at locations where the bending moment and shear force are relatively small, but the vertical joints on the wall are limited in construction. It is difficult to solve the above problem because there are many cases where

〔発明の目的、構成〕[Purpose and structure of the invention]

この発明は、前記の問題点である連続地中壁の垂直継手
において不確実な泥水中における鉄筋の重ね継手を採用
しないで、継手函内のドライ空間において、隣り合う鉄
筋篭における横鉄筋を、連結鉄筋を介して圧接、溶接あ
るいはねじ継手等の機械的連結手段により連結すること
により連続地中壁全体を強固にすることができる連続地
中壁の垂直継手施工法を提供することを目的とするもの
であって、この発明の要旨とするところは、地盤1に設
けた溝内に、鉄筋篭2における多数の横鉄筋3の少なく
とも一端部に弾性被覆筒4を嵌設して構成した被覆筒付
き鉄筋篭と、上下方向に延長する中空の継手函とを、横
方向に交互に並べて配置し、かつ前記溝内の継手函内部
を除く部分に水中コンクリート6を打設し、その水中コ
ンクリート6の養生時間を経過したのち、継手函内をド
ライの状態にし、その継手函内で、隣り合う鉄筋篭2に
おける横鉄筋3を、連結鉄筋7を介して圧接。
This invention eliminates the above-mentioned problem of overlapping reinforcing bars in vertical joints of continuous underground walls in uncertain muddy water, and instead connects horizontal reinforcing bars in adjacent reinforcing bar cages in the dry space inside the joint box. The purpose of the present invention is to provide a vertical joint construction method for a continuous underground wall that can strengthen the entire continuous underground wall by connecting it by mechanical connection means such as pressure welding, welding, or screw joints through connecting reinforcing bars. The gist of the present invention is to provide a covering constructed by fitting an elastic covering tube 4 into at least one end of a large number of horizontal reinforcing bars 3 in a reinforcing bar cage 2 in a groove provided in the ground 1. Reinforcement cages with cylinders and hollow joint boxes extending vertically are arranged side by side alternately, and underwater concrete 6 is cast in the groove excluding the inside of the joint boxes, and the underwater concrete After the curing time of 6 has elapsed, the inside of the joint box is kept dry, and the horizontal reinforcing bars 3 in adjacent reinforcing bar baskets 2 are pressure-welded via the connecting reinforcing bars 7 inside the joint box.

溶接あるいはねじ継手等の機械的連結手段により連結し
たのち、前記継手函内にコンクリート8を打設すること
を特徴とする連続地中壁の垂直継手施工法にある。
A vertical joint construction method for a continuous underground wall is characterized in that after the connection is made by mechanical connection means such as welding or screw joints, concrete 8 is poured into the joint box.

〔実施例〕〔Example〕

次にこの発明を図示の例によって詳細に説明する。 Next, the present invention will be explained in detail using illustrated examples.

第19図ないし第23図はこの発明の第1実施例におい
て用いられる片側に弾性被覆筒4を有する被覆筒付き鉄
筋篭15を示すものであって、左右方向に延長する多数
の横鉄筋3が1前後方向に間隔をおいて平行に並ぶ2つ
の垂直面上において上下方向に間隔をおいて配置され、
上下方向に延長する多数の縦鉄筋17は、左右方向に間
隔をおいて配置されると共に各横鉄筋乙に固定され、か
つ前後方向に隣り合う横鉄筋3および縦鉄筋17の交差
部付近が巾止め鉄筋1日を介して連結され、前記多数の
横鉄筋3.縦鉄筋17および巾止め鉄筋18により鉄筋
篭2が構成されている。
19 to 23 show a covered reinforcing bar cage 15 having an elastic covered tubing 4 on one side used in the first embodiment of the present invention, in which a large number of horizontal reinforcing bars 3 extending in the left-right direction are shown. 1 arranged at intervals in the vertical direction on two vertical planes arranged in parallel at intervals in the front-rear direction,
A large number of vertical reinforcing bars 17 extending in the vertical direction are arranged at intervals in the left-right direction and are fixed to each horizontal reinforcing bar B, and have a width near the intersection of the horizontal reinforcing bars 3 and vertical reinforcing bars 17 that are adjacent to each other in the front-back direction. 3. The plurality of transverse reinforcing bars are connected through stop reinforcing bars. A reinforcing bar cage 2 is configured by the vertical reinforcing bars 17 and the stopper reinforcing bars 18.

金属または硬質合成樹脂からなる箱状の被覆筒本体19
の一端部の外周にコ゛ム製筒体20の一端部が嵌合され
て圧接または接着剤により固定され、かつ被覆筒本体1
9の他端部にゴム製環状/にツキング21が嵌合係止さ
れ、さらに前記ゴム製筒体20の他端部に蓋22が着脱
自在に嵌合固定されて、弾性被覆筒4が構成され、前記
鉄筋篭2における各横鉄筋3の一端部に、弾性被覆筒4
におけるゴム製環状バッキング21が摺動可能に嵌合さ
れている。
Box-shaped covering tube body 19 made of metal or hard synthetic resin
One end of the comb cylinder 20 is fitted onto the outer periphery of one end and fixed by pressure welding or adhesive, and the covering cylinder main body 1
A rubber ring-shaped fitting 21 is fitted and locked to the other end of the rubber cylinder 20, and a lid 22 is removably fitted and fixed to the other end of the rubber cylinder 20, thereby forming an elastic covering cylinder 4. An elastic covering tube 4 is attached to one end of each horizontal reinforcing bar 3 in the reinforcing bar basket 2.
A rubber annular backing 21 is slidably fitted therein.

第24図および第25図はこの発明の第1実施例におい
て用いられる両側に弾性被覆筒4を有する被覆筒付き鉄
筋篭16を示すものであって、前述のように構成された
弾性被覆筒4におけるゴム製環状・ぐツキング21が鉄
筋篭2における各横鉄筋5の両端部に摺動可能に嵌合さ
れている。
24 and 25 show a reinforcing bar cage 16 with sheathing tubes 4 having elastic sheathing tubes 4 on both sides used in the first embodiment of the present invention. A rubber annular rubber ring 21 is slidably fitted to both ends of each horizontal reinforcing bar 5 in the reinforcing bar cage 2.

第26図および第27図はこの発明の第1実施例におい
て用いられる鋼製継手函23を示すものであって、上下
方向に延長する正方形断面または長方形断面の鋼製函体
24の底部側に底板25が固定され、その底板25に通
水孔26が設けられると共に開閉弁27が取付けられ、
かつ函体24の左右両側の板体28.29には、多数の
横鉄筋挿通用透孔30が、鉄筋篭2における横鉄筋3の
端部の間隔と同一間隔で設けられ、さらに前記透孔60
に設けられた雌ねじに雄ねじを有する蓋61が螺合され
ている。
FIGS. 26 and 27 show a steel joint box 23 used in the first embodiment of the present invention. A bottom plate 25 is fixed, a water hole 26 is provided in the bottom plate 25, and an on-off valve 27 is attached.
In addition, in the plates 28 and 29 on both the left and right sides of the box 24, a large number of through-holes 30 for inserting horizontal reinforcing bars are provided at the same intervals as the intervals between the ends of the horizontal reinforcing bars 3 in the reinforcing bar basket 2, and further, the through-holes 60
A lid 61 having a male thread is screwed into a female thread provided in the cover 61 .

第1図ないし第18図は前記水中コンクリート5および
鋼製継手函23を使用したこの発明の第1実施例を示す
ものであって、まず第1図および第2図に示すように、
先行エレメント設置予定部の地盤1を溝壁崩壊防止用泥
水32を用いて溝掘機により掘削して、所定深さの先行
エレメント用の溝63を設け、次いで継手函26をクレ
ーン64により吊上運搬して、前記溝33内の右側端部
に接触させながら吊り降ろし、その継手函26を垂直状
態で溝底部に着座させる。この場合、継手函23が#3
3内の泥水32の浮力により下降しなくなるのを防止す
るために、開閉弁27を開放して、溝33内の溝壁崩壊
防止用泥水32を継手函23内に流入させながら、継手
函26を吊り降ろしていく。
1 to 18 show a first embodiment of the present invention using the underwater concrete 5 and steel joint box 23. First, as shown in FIGS. 1 and 2,
The ground 1 in the area where the preceding element is to be installed is excavated with a trench excavator using muddy water 32 for preventing collapse of trench walls to provide a groove 63 for the preceding element of a predetermined depth, and then the joint box 26 is lifted by a crane 64. The joint box 26 is carried and lowered while contacting the right end of the groove 33, and the joint box 26 is seated vertically at the bottom of the groove. In this case, the joint box 23 is #3
In order to prevent the muddy water 32 in the groove 33 from descending due to the buoyancy, the on-off valve 27 is opened to allow the muddy water 32 for preventing groove wall collapse in the groove 33 to flow into the joint box 23. is lifted down.

次に第3図および第4図に示すように1片側に弾性被覆
筒4を備えている被覆筒付き鉄筋篭15における各弾性
被覆筒4を前記継手函26の左側に接触させながら、ク
レーン34により被覆筒付き鉄筋篭15を溝36内に吊
り降ろして行き、次いで第5図ないし第7図に示すよう
に、溝33の上部を跨ぐ複数本の支持ビーム35の両端
部を地盤上の支持台36に載置し、かつ鉄筋篭2の上端
部に連結された吊り鉄筋37を、支持ビーム35および
その上に載置されたレベル調整用センターホールジヤツ
キ68に挿通すると共に、そのセンターホールジヤツキ
38の中空ピストンに対しナツト39にエリ係合し、さ
らにそのジヤツキ38により被覆筒付き鉄筋篭15のレ
ベルを調整して、その被覆筒付き鉄筋篭15における各
横鉄筋3の端部を継手函23における横鉄筋挿通用透孔
30内に対向するように配置し、この状態で第8図およ
び第9図に示すように、溝33内に水中コンクリート5
を打設する。
Next, as shown in FIGS. 3 and 4, the crane 3 The reinforcing bar cage 15 with a covered tube is suspended into the groove 36, and then, as shown in FIGS. The hanging reinforcing bars 37 placed on the stand 36 and connected to the upper end of the reinforcing bar cage 2 are inserted through the support beam 35 and the center hole jack 68 for level adjustment placed on it, and the center hole The nut 39 is engaged with the hollow piston of the jack 38, and the level of the reinforcing bar cage 15 with a jacketed tube is adjusted by the jack 38, and the end of each horizontal reinforcing bar 3 in the reinforcing bar cage 15 with a jacket tube is adjusted. The joint box 23 is placed so as to face the horizontal reinforcing bar insertion through-hole 30, and in this state, as shown in FIGS. 8 and 9, underwater concrete 5 is placed in the groove 33.
to be poured.

次に第10図および第11図に示すように、泥水62を
用いて後行エレメント用の溝40を設けたのち、第12
図および第13図に示すように。
Next, as shown in FIGS. 10 and 11, after forming the groove 40 for the trailing element using muddy water 62,
As shown in FIG.

左右両側に弾性被覆筒4を備えている被覆筒付き鉄筋篭
16と継手函23とをクレーンにより溝切内に吊り降ろ
し、かつその溝40内の継手函26と被覆筒付き鉄筋篭
16とを前述のようなセンターホールジヤツキ68を使
用したレベル調整支持装置により支持して、前記被覆筒
付き鉄筋篭16における各横鉄筋3の両端部を左右両側
の継手函23における横鉄筋挿通用透孔30内に対向す
るように配置し、次いで第14図および第15図に示す
ように、各継手函230間において溝40内に水中コン
クリート5を打設する。
The reinforcing bar cage 16 with a sheathed tube, which has elastic sheathing tubes 4 on both left and right sides, and the joint box 23 are lowered into the groove by a crane, and the joint box 26 and the reinforcing bar cage 16 with a sheathed tube inside the groove 40 are removed. Supported by a level adjustment support device using the center hole jack 68 as described above, both ends of each horizontal reinforcing bar 3 in the covered reinforcing bar basket 16 are connected to through holes for passing the horizontal reinforcing bars in the left and right joint boxes 23. 30 so as to face each other, and then, as shown in FIGS. 14 and 15, underwater concrete 5 is placed in the groove 40 between each joint box 230.

次に水中コンクリート5の養生時間を経過したのち、前
記開閉弁27を閉じて、ポンプにより継手函23内の泥
水を排除し、次いで作業員が継手函23内に入って前記
蓋61および蓋22を順次取外したのち、第16図ない
し第18図に示すように、連結鉄筋6を隣り合う鉄筋篭
2における各横鉄筋3の端部にわたって配置して溶接に
より固着し、次に弾性被覆筒4内にモルタルを充填した
のち、継手函23内にコンクリート7を打設充填する。
Next, after the curing time of the underwater concrete 5 has elapsed, the on-off valve 27 is closed and the muddy water inside the joint box 23 is removed by the pump. 16 to 18, the connecting reinforcing bars 6 are placed across the ends of each horizontal reinforcing bar 3 in the adjacent reinforcing bar cages 2 and fixed by welding, and then the elastic sheathing tube 4 is removed. After filling the inside with mortar, concrete 7 is cast and filled into the joint box 23.

次に後行エレメント用の溝40の掘削と、継手函26お
よび被覆筒付き鉄筋篭16の吊り降ろしと、連結鉄筋乙
による横鉄筋乙の連結と、モルタルおよびコンクリート
7の充填とを必要回数反復して行なって所要長さの連続
地中壁を構築する。
Next, the excavation of the groove 40 for the trailing element, the lifting and lowering of the joint box 26 and the reinforcing bar basket 16 with covered tube, the connection of the horizontal reinforcing bars B with the connecting reinforcing bars B, and the filling of mortar and concrete 7 are repeated as many times as necessary. Then, construct a continuous underground wall of the required length.

前記実施例のように1弾性被覆筒4を横鉄筋乙に対し摺
動可能に嵌設しておけば、弾性被覆筒4の左右方向位置
に不揃いが生じた場合、その左右方向位置が揃うように
容易に調整することができる。
If the first elastic sheathing tube 4 is slidably fitted to the horizontal reinforcing bar B as in the above embodiment, even if the horizontal positions of the elastic sheathing tubes 4 are uneven, the left and right positions will be aligned. can be easily adjusted.

鋼製継手函23を溝内に吊り降ろしたのち、その継手函
26に沿って被覆筒付き鉄筋篭15.16を吊り降ろし
ていく場合、その被覆筒付き鉄筋篭15.16が溝巾方
向に偏位するのを防止する目的で、第28図および第2
9図に示すように、継手函23における左右両側の板体
28,29の中央部に、T形断面の垂直なガイド部材4
1のウェブを溶接により固着し、そのガイド部材41に
より被覆筒付き鉄筋篭15,16における前後両側の横
鉄筋6の端部をガイドしながら吊り降ろしてもよい。
After suspending the steel joint box 23 into the groove, when the reinforcing bar cage 15.16 with a coated tube is suspended along the joint box 26, the reinforcing bar cage 15.16 with a coated tube will move in the groove width direction. 28 and 2 for the purpose of preventing deviation.
As shown in FIG. 9, a vertical guide member 4 with a T-shaped cross section is installed in the center of the left and right plates 28 and 29 of the joint box 23.
1 web may be fixed by welding, and the guide member 41 may be used to guide the ends of the horizontal reinforcing bars 6 on both the front and rear sides of the reinforcing bar baskets 15 and 16 with covered tubes while being suspended.

隣り合う鉄筋篭2の横鉄筋6を、連結鉄筋を介して連結
する場合、第30図に示すように、各鉄筋篭2における
横鉄筋3の端部に連結鉄筋6A。
When horizontal reinforcing bars 6 of adjacent reinforcing bar baskets 2 are connected via connecting reinforcing bars, as shown in FIG.

6Bの一端部を溶接により固着し、かつ各連結鉄筋6A
、6Bの他端部を溶接により相互に固着してもよく、ま
た第31図に示すように横鉄筋乙の端部に雄ねじを設け
ると共に、連結鉄筋6の両端部に雄ねじを設け、連結鉄
筋6の両端部と横鉄筋乙の端部とをスリーブナツト42
により連結してもよい。さらにまた、横鉄筋6の端部と
連結鉄筋6の端部とを圧接により一体に連結してもよい
One end of 6B is fixed by welding, and each connecting reinforcing bar 6A
, 6B may be fixed to each other by welding, and as shown in FIG. Connect both ends of 6 and the end of horizontal reinforcing bar B with sleeve nuts 42.
They may be connected by Furthermore, the ends of the horizontal reinforcing bars 6 and the ends of the connecting reinforcing bars 6 may be integrally connected by pressure welding.

第62図および第63図に示すように、弾性被覆筒4に
おける被覆筒本体19にゴム製環状・セラキング21を
設けないで、被覆筒本体19の端板に横鉄筋3を挿通し
て溶接により固着してもよい。
As shown in FIGS. 62 and 63, the rubber ring/ceraking 21 is not provided in the covering tube main body 19 of the elastic covering tube 4, and the horizontal reinforcement 3 is inserted into the end plate of the covering tube main body 19 and welded. It may be fixed.

また泥水62および水中コンクリート5の圧力によりゴ
ム製筒体20が抑圧変形される恐れを排除するために1
弾性被覆筒4内に予め砂等の粒状物を充填しておいても
よい。
In addition, in order to eliminate the possibility that the rubber cylindrical body 20 is suppressed and deformed due to the pressure of the muddy water 62 and the underwater concrete 5,
The elastic covering cylinder 4 may be filled with granular material such as sand in advance.

さらにまた、両側に弾性被覆筒4を有する被覆筒付き鉄
筋篭16を、予め溝内に吊り降ろされた左右両側の継手
函26の間に吊り降ろす場合は、被覆筒付き鉄筋篭16
における左右両側の弾性被覆筒4のうち、少なくとも一
方の弾性被覆筒4を横鉄筋6に対し摺動可能に嵌設して
おき、必要に応じ弾性被覆筒4を摺動させて、左右の弾
性被覆筒4をそれぞれ継手函26に接触させながら、被
覆筒付き鉄筋篭16を吊り降ろしていく。しかし、被覆
筒付き鉄筋篭16と継手函23とを交互に吊り降ろす場
合は、横鉄筋3の両端部に弾性被覆筒4の被覆筒本体1
9を固定してもよい。
Furthermore, when the reinforcing bar cage 16 with covered tubes having the elastic covered tubes 4 on both sides is suspended between the joint boxes 26 on both the left and right sides that have been previously suspended in the groove, the reinforcing bar cage with covered tubes 16
At least one of the left and right elastic sheathing tubes 4 is slidably fitted onto the horizontal reinforcing bars 6, and if necessary, the elastic sheathing tube 4 is slid to adjust the left and right elasticity. The reinforcing bar basket 16 with the covering tube is suspended while bringing the covering tube 4 into contact with the joint box 26. However, when the reinforcing bar basket 16 with sheathing tube and the joint box 23 are hung down alternately, the sheathing tube main body 1 of the elastic sheathing tube 4 is attached to both ends of the horizontal reinforcing bar 3.
9 may be fixed.

第34図はこの発明を連続地中壁のL形継宇部に実施し
た第2実施例を示すものであって、直角に配置された被
覆筒付き鉄筋篭15A、16Bにおける外側の横鉄’d
3Aの端部と、L形の連結鉄筋6Aの両端部とが溶接に
より連結され、かつ各被覆筒付き鉄筋篭16A、16B
における内側の横鉄筋3Bの端部に直線状の連結鉄筋6
Bの一端部が溶接により連結され、その連結鉄筋6Bの
他端部は継手函23に対し溶接により固着され、さらに
各被覆筒付き鉄筋篭16A、16Bに固定された素止鉄
筋46の端部に傾斜連結鉄筋6Cの端部が溶接により固
着されているが、その他の構成は第1実施例の場合と同
様である。
FIG. 34 shows a second embodiment in which the present invention is applied to an L-shaped joint part of a continuous underground wall, and shows the outer horizontal iron 'd of reinforcing bar cages 15A and 16B with covered tubes arranged at right angles.
3A and both ends of the L-shaped connecting reinforcing bar 6A are connected by welding, and the reinforcing bar baskets 16A and 16B each have a covered tube.
A straight connecting reinforcing bar 6 is attached to the end of the inner horizontal reinforcing bar 3B in
One end of the connecting reinforcing bar 6B is connected by welding, the other end of the connecting reinforcing bar 6B is fixed to the joint box 23 by welding, and the end of the bare reinforcing bar 46 is fixed to each covered reinforcing bar cage 16A, 16B. The ends of the inclined connecting reinforcing bars 6C are fixed by welding, but the other configurations are the same as in the first embodiment.

第65図はこの発明を連続地中壁のT形継平部に実施し
た第3実施例を示すものであって、継手函23を挾んで
対向する被覆筒付き鉄筋篭16Aにおける各横鉄筋3A
の端部に連結鉄筋6Aの両端部が溶接により連結され、
かつ前記被覆筒付き鉄筋篭16Aに対し直角に配置され
た被覆筒付き鉄筋篭16Bにおける横鉄筋6Bの端部に
連結鉄筋6Bの一端部が溶接により固着され、さらに連
結鉄筋6Bの他端部は継手函26に対し溶接により固着
されているが、その他の構成は第1実施例の場合と同様
である。
FIG. 65 shows a third embodiment in which the present invention is applied to a T-shaped joint part of a continuous underground wall, in which each horizontal reinforcing bar 3A in a reinforcing bar cage 16A with a covering tube faces oppositely with a joint box 23 in between.
Both ends of the connecting reinforcing bar 6A are connected by welding to the end of the connecting reinforcing bar 6A,
One end of the connecting reinforcing bar 6B is fixed by welding to the end of the horizontal reinforcing bar 6B in the reinforcing bar cage with sheathing tube 16B disposed at right angles to the reinforcing bar cage with sheathing tube 16A, and the other end of the connecting reinforcing bar 6B is fixed by welding. Although it is fixed to the joint box 26 by welding, the other structure is the same as that of the first embodiment.

第36図ないし第39図はこの発明の第4実施例を示す
ものであって、まず第36図および第37図に示すよう
に、鉄筋篭2の各横鉄筋乙における右側端部を継手函2
3に挿通して構成した継手函付き鉄筋篭44を、先行エ
レメント用の溝33内に吊り降ろし、次に第38図およ
び第39図に示すように、鉄筋篭2の各横鉄筋乙におけ
る右側端部を継手函26に挿通すると共に、鉄筋篭2の
各横鉄筋5における左側端部に弾性被覆筒4を固定また
は摺動可能に嵌設して構成した継手函および被覆筒付き
鉄筋篭45を、前記弾性被覆筒4を継手函23に接触さ
せながら吊り降ろすように構成しているが、その他の構
成は第1実施例の場合と同様である。
36 to 39 show a fourth embodiment of the present invention. First, as shown in FIGS. 36 and 37, the right end of each horizontal reinforcing bar B of the reinforcing bar cage 2 is connected to a joint box 2
The reinforcing bar cage 44 with a joint box inserted into the reinforcing bar cage 2 is suspended into the groove 33 for the preceding element, and then, as shown in FIGS. 38 and 39, the right side of each horizontal reinforcing bar B A joint box and reinforcing bar cage with covering tube 45 configured by inserting an end into the joint box 26 and fixing or slidably fitting an elastic covering tube 4 to the left end of each horizontal reinforcing bar 5 of the reinforcing bar cage 2. is configured so that the elastic covering tube 4 is suspended while being in contact with the joint box 23, but the other configurations are the same as in the first embodiment.

第40図および第41図はこの発明の第5実施例におい
て用いられる鋼製継手函46を示すものであって、垂直
なフランジ板47の内側に、これに直角な2枚の連結板
4日がフランジ板巾方向に間隔をおいて配置されて溶接
により固着され、かつ各連結板48の内側にわたって補
剛板49が配置されて溶接により固着されることにより
、函体ユニット50が構成され、2つの函体ユニット5
0が間隔をおいて平行に配置されると共に、各函体ユニ
ット50における連結板48の内面にわたつて帯状の蓋
板51が当接され、さらにその蓋板51に内側から挿通
されたボルト52は連結板48に螺合され、そのボルト
52により蓋板51が連結板48に対し着脱自在に固定
されている。
40 and 41 show a steel joint box 46 used in the fifth embodiment of the present invention, in which two connecting plates perpendicular to the vertical flange plate 47 are installed inside the vertical flange plate 47. are arranged at intervals in the flange plate width direction and fixed by welding, and a stiffening plate 49 is arranged over the inside of each connecting plate 48 and fixed by welding, thereby forming a box unit 50, Two box units 5
0 are arranged in parallel at intervals, a band-shaped cover plate 51 is abutted across the inner surface of the connecting plate 48 in each box unit 50, and bolts 52 are inserted into the cover plate 51 from the inside. is screwed to the connecting plate 48, and the cover plate 51 is removably fixed to the connecting plate 48 by the bolts 52.

第42図ないし第57図はこの発明の第5実施例を示す
ものであって、まず第42図および第43図に示すよう
に、先行エレメント設置予定部の左右両端の地盤1を泥
水32を用いてアースオーが等の掘削機により掘削して
、所要深さの円形の縦孔53A、53Bを設け、次に第
44図および第45図に示すように、継手函46をクレ
ーン(図示を省略した)により吊上運搬して各縦孔53
A。
42 to 57 show a fifth embodiment of the present invention. First, as shown in FIG. 42 and FIG. Circular vertical holes 53A and 53B of the required depth were created by drilling with an excavator such as Earth-O, etc., and then the joint box 46 was removed using a crane (not shown) as shown in FIGS. ) and transported by lifting to each vertical hole 53.
A.

53B内に吊り降ろしたのち、第46図および第47図
に示すように、継手函46の周囲の泥水にケイ酸ンーダ
およびセメント等からなる固化剤を添加して攪拌混合す
ることにより、泥水固化物ヌに変化させ、その泥水固化
物54により継手函46を固定し、かつ右側の縦孔53
Bから右側に所定距離だけ離れた位置において、溝壁崩
壊防止用泥水32を用いて掘削機により後行エレメント
用の縦孔53Cを掘削する。
53B, as shown in FIGS. 46 and 47, a solidifying agent made of silicate powder, cement, etc. is added to the muddy water around the joint box 46 and mixed with stirring to solidify the muddy water. The joint box 46 is fixed by the muddy solidified material 54, and the vertical hole 53 on the right side is fixed.
At a position a predetermined distance away from B to the right, a vertical hole 53C for the trailing element is excavated by an excavator using the muddy water 32 for preventing collapse of the trench wall.

なお前記泥水固化物54を生成するために、溝内にセメ
ント含有泥水等からなる固化性泥水を注入して泥水62
と置換してもよく、あるいは、溝を掘削する際に固化性
泥水を用いて掘削し、その固化性泥水が固化する前に溝
内に継手函46を吊り降ろしてもよい。
In order to generate the solidified muddy material 54, solidified muddy water such as cement-containing muddy water is injected into the groove to form the muddy water 62.
Alternatively, the groove may be excavated using solidifying muddy water, and the joint box 46 may be suspended into the trench before the solidifying muddy water solidifies.

次に第48図および第49図に示すように、先行エレメ
ント設置予定部の左右両側の縦孔53A。
Next, as shown in FIGS. 48 and 49, vertical holes 53A are formed on both the left and right sides of the portion where the preceding element is to be installed.

53Bに挿入されている継手函46内に、トレミー管(
図示を省略した)を挿入して、その継手函46の下部に
根固めコンクリート55を打設し、継手函46の下部の
根固めを行ない、かつ後行エレメント用の縦孔53C内
に継手函46を吊り降ろす。
The tremie tube (
(not shown) is inserted, concrete 55 is poured into the lower part of the joint box 46, the lower part of the joint box 46 is hardened, and the joint box is inserted into the vertical hole 53C for the trailing element. 46 is lowered.

なお継手函46の下部の内側および外側に根固めコンク
リート55を打設して根固めを行なったのち、前述のよ
うにして、継手函46の周囲に泥水固化物54を生成し
てもよい。
Note that after the foot protection concrete 55 is poured on the inside and outside of the lower part of the joint box 46 to perform foot hardening, the solidified mud 54 may be generated around the joint box 46 as described above.

次に第50図および第51図に示すように、先行エレメ
ント設置予定部の両側の継手函46の間の地盤1および
泥水固化物54を、泥水32を用いて掘削機により掘削
して、前記根固めコンクリート55の上部のレベル付近
に達する深さの溝56Aを設け、かつ継手函46におけ
る溝56A側の蓋板51を溝56A内の溝壁崩壊防止用
泥水32中に露出させ、さらに後行エレメント用の縦孔
53C内にある継手函46内の下部に根固めコンク17
− ト55を打設すると共に、その継手函46の周囲に
泥水固化物54を生成する。
Next, as shown in FIGS. 50 and 51, the ground 1 and the solidified mud 54 between the joint boxes 46 on both sides of the part where the preceding element is to be installed are excavated with an excavator using the mud 32. A groove 56A having a depth reaching near the level of the upper part of the foot protection concrete 55 is provided, and the cover plate 51 on the groove 56A side of the joint box 46 is exposed in the muddy water 32 for preventing groove wall collapse in the groove 56A. A foot protection concrete 17 is placed at the bottom of the joint box 46 in the vertical hole 53C for the row element.
- At the same time as pouring the joint box 55, solidified mud 54 is generated around the joint box 46.

次に第21m、第24図および第25図に示した構造の
被覆筒付き鉄筋篭16を、第52図および第53図に示
すように、#56Aの両側の継手函46に接触させなが
ら溝56A内に吊り降ろしたのち、溝56A内にトレミ
ー管(図示を省略した)を用いて水中コンクリート5を
打設する。
Next, as shown in FIGS. 52 and 53, the reinforcing bar cage 16 with a covered tube having the structure shown in FIGS. After being suspended into the groove 56A, the underwater concrete 5 is cast into the groove 56A using a tremie pipe (not shown).

次に先行エレメントの場合と同様にして、第54図およ
び第55図に示すように、後行エレメント設置予定部の
両側の継手函46の間の地盤1および泥水固化物54を
、泥水を用いて掘削して根固めコンクリート55の上部
のレベル付近に達する深さの溝56Bを設けたのち、被
覆筒付き鉄筋篭16を#ll56B内に吊り降ろし、次
いでその溝56B内に水中コンクリート5を打設する。
Next, in the same manner as in the case of the preceding element, as shown in FIGS. 54 and 55, the ground 1 and solidified muddy material 54 between the joint boxes 46 on both sides of the planned installation area of the succeeding element are cleaned using muddy water. After excavating and providing a groove 56B deep enough to reach near the level of the upper part of the foot protection concrete 55, the reinforcing bar cage 16 with a covering tube is lowered into #ll 56B, and then underwater concrete 5 is poured into the groove 56B. Set up

次に水中コンクリート5の養生時間を経過したのち、溝
53B内にある継手函46内の泥水を排除し、次いで継
手函46におけるボルト52を増列して蓋板51を撤去
することにより、先行エレメントおよび後行エレメント
のコンクリートの一部を継手函46内に露出させ、かつ
弾性被覆筒4の蓋を増列して、第56図に示す状態にす
る。
Next, after the curing time of the underwater concrete 5 has elapsed, the muddy water in the joint box 46 in the groove 53B is removed, and then the bolts 52 in the joint box 46 are increased in rows and the cover plate 51 is removed. Parts of the concrete of the element and the succeeding element are exposed in the joint box 46, and the lids of the elastic sheathing tubes 4 are added in rows to the state shown in FIG. 56.

次に第57図に示すように、隣り合う鉄筋篭2の横鉄筋
3にわたって連結鉄筋6を配置して溶接により固着した
のち、弾性被覆筒4内にモルタルを充填し、かつ前記継
手函46を構成する一対の函体ユニット50の間にコン
クリート7を打設する。
Next, as shown in FIG. 57, the connecting reinforcing bars 6 are arranged across the horizontal reinforcing bars 3 of the adjacent reinforcing bar baskets 2 and fixed by welding, and then the elastic covering tube 4 is filled with mortar, and the joint box 46 is closed. Concrete 7 is poured between the pair of configuring box units 50.

次に後行エレメント用の溝40の掘削と、継手函26お
よび被覆筒付き鉄筋篭16の吊り降ろしと、連結鉄筋6
による横鉄筋乙の連結と、モルタルおよびコンクリート
7の充填とを必要回数反復して行なって所要長さの連続
地中壁を構築する。
Next, the groove 40 for the trailing element is excavated, the joint box 26 and the reinforcing bar cage 16 with a covering tube are suspended, and the connecting reinforcing bar 6 is
Connecting horizontal reinforcing bars B and filling with mortar and concrete 7 are repeated as many times as necessary to construct a continuous underground wall of the required length.

第5実施例の場合も、継手函46における函体ユニット
50または蓋板51にガイド部材を増付けて、そのガイ
ド部材により被覆筒付き鉄筋篭16をガイドしながら吊
り降ろして、その被覆筒付き鉄筋篭16を所定の位置に
正確に設置するようにしてもよい。
In the case of the fifth embodiment as well, a guide member is added to the box unit 50 or the cover plate 51 in the joint box 46, and the reinforcing bar cage 16 with a covering tube is guided and suspended by the guide member, and the reinforcing bar cage 16 with the covering tube is suspended. The reinforcing bar basket 16 may be accurately installed at a predetermined position.

この発明を実施する場合、巾止め鉄筋18を有する鉄筋
篭2を使用すれば、壁体に加わるせん断力に対し強力に
対抗させることができる。また継手函23.46内に鉄
筋を配置してコンクリートを打設すれば、連続地中壁の
垂直継手部の強度を一層向上させることができる。さら
にまた、横鉄筋6と連結鉄筋とを圧接により一体に結合
してもよい。
When carrying out this invention, if the reinforcing bar cage 2 having the stopper reinforcing bars 18 is used, the shearing force applied to the wall can be strongly resisted. Further, by placing reinforcing bars inside the joint box 23.46 and pouring concrete, the strength of the vertical joint part of the continuous underground wall can be further improved. Furthermore, the horizontal reinforcing bars 6 and the connecting reinforcing bars may be integrally connected by pressure welding.

〔発明の効果〕〔Effect of the invention〕

この発明によれば、継手函内をドライの状態とし、その
ドライにした継手函内で、隣り合う鉄筋篭2の横鉄筋3
を、連結鉄筋6を介して圧接。
According to this invention, the inside of the joint box is kept in a dry state, and the horizontal reinforcing bars 3 of adjacent reinforcing bar cages 2 are
are pressure-welded via the connecting reinforcing bars 6.

溶接あるいはねじ継手等の機械的連結手段により連結す
るので、従来の泥水中で行なう重ね継手に比べて、隣り
合う鉄筋篭2の横鉄筋6を確実にかつ強力に連結するこ
とができ、次いで継手函内にコンクリート7を打設する
ので、連続地中壁の垂直継手の強度を著しく大きくする
と共に強度上の信頼性を向上させることができ、しかも
連続地中壁を構成するエレメントの直線状連結部に限ら
ず、L形、T形、十形等の交差継手部にも容易に実施す
ることができ、かつ継手函の両側の溝内に被覆筒付き鉄
筋篭を吊り降ろして水中コンクリート5を打設したのち
、他の場所での後行エレメント用溝の掘削、被覆筒付き
鉄筋篭の吊り降ろし、水中コンクリート打設、継手函の
吊り降ろし作業と関係なく、前記継手函内でその両側の
鉄筋篭2における横鉄筋3の連結作業を行なうことがで
きるので、連続地中壁構築の全体の工期を短縮すること
ができる。また継手函に沿って吊シ降ろされる鉄筋篭2
における横鉄筋3の端部は弾性被覆筒4によシ被覆され
ているので、既に吊り降ろされている継手函が多少傾斜
していても、弾性被覆筒付き鉄筋篭を吊り降ろす際に、
弾性被覆筒4を継手函により自動的に弾性変形させて、
支障なく吊り降ろし作業を行なうことができ、さらに横
鉄筋3と連結鉄筋6との連結部で壁厚の有効高さD2が
減少しないので、連続地中壁における垂直継手が弱点に
ならず、そのため施工上の都合により任意の位置に継手
を設置できる等の効果が得られる。
Since the connections are made by mechanical connection means such as welding or threaded joints, the horizontal reinforcing bars 6 of adjacent reinforcing bar baskets 2 can be connected reliably and strongly compared to conventional lap joints performed in muddy water. Since the concrete 7 is placed inside the box, the strength of the vertical joints of the continuous underground wall can be significantly increased, and the reliability of the strength can be improved. It can be easily carried out not only for joints, but also for L-shaped, T-shaped, and ten-shaped cross joints, and the underwater concrete 5 can be carried out by suspending reinforcing bar cages with covered tubes into the grooves on both sides of the joint box. After pouring, regardless of the excavation of a trench for the trailing element at another location, the lifting and lowering of a reinforcing bar cage with a covered tube, the underwater concrete pouring, and the lifting and lowering of a joint box, inside the joint box on both sides. Since the work of connecting the horizontal reinforcing bars 3 in the reinforcing bar cage 2 can be performed, the entire construction period for constructing a continuous underground wall can be shortened. Also, the reinforcing bar cage 2 is suspended along the joint box.
The ends of the horizontal reinforcing bars 3 are covered with the elastic sheathing tube 4, so even if the joint box that has already been lowered is slightly inclined, when the reinforcing bar cage with the elastic sheathing tube is lowered,
The elastic covering cylinder 4 is automatically elastically deformed by the joint box,
The lifting and lowering work can be carried out without any problems, and since the effective height D2 of the wall thickness does not decrease at the joint between the horizontal reinforcing bars 3 and the connecting reinforcing bars 6, the vertical joints in the continuous underground wall do not become weak points. Effects such as being able to install the joint at any position depending on construction convenience can be obtained.

【図面の簡単な説明】[Brief explanation of drawings]

第1図ないし第27図はこの発明の第1実施例を示すも
のであって、第1図は地盤に設けた先行エレメント用溝
に継手函を挿入している状態を示す縦断正面図、第2図
はその横断平面図、第6図は先行エレメント用溝内に被
覆筒付き鉄筋篭を吊り降ろしている状態を示す縦断正面
図、第4図はその横断平面図、第5図は被覆筒付き鉄筋
篭を所定のレベルに支持している状態を示す平面図、第
6図はその縦断正面図、第7図はレベル調整支持装置に
よる鉄筋篭支持状態を示す縦断側面図、第8図は先行エ
レメント用溝内に水中コンクリートを打設した状態を示
す縦断正面図、第9図はその横断平面図、第10図は後
行エレメント用溝を掘削した状態を示す縦断正面図、第
11図はその横断平面図、第12図は後行エレメント用
溝内に継手函および被覆筒付き鉄筋篭を吊り降ろした状
態を示す縦断正面図、第13図はその横断平面図、第1
4図は後行エレメント用溝内に水中コンクリートを打設
した状態を示す縦断正面図、第15図はその横断平面図
、第16図は隣り合う鉄筋篭の横鉄筋を連結鉄筋を介し
て連結すると共に継手函内にコンクリートを打設した状
態を示す縦断正面図、第17図はその横断平面図、第1
8図は第16図における横鉄筋連結部付近を拡大して示
す縦断正面図、M19図はこの発明の第1実施例におい
て用いられる片側に弾性被覆筒を有する被覆筒付き鉄筋
篭の平面図、第20図はその一部切欠正面図、第21図
はその被覆筒付き鉄筋篭の一部を拡大して示す一部縦断
正面図、第22図は第21図のA−A線断面図、第23
図は第21図のB−B線断面図、第24図はこの発明の
第1実施例において用いられる両側に弾性被覆筒を有す
る被覆筒付き鉄筋篭の平面図、第25図はその一部切欠
正面図、第26図はこの発明の第1実施例において用い
られる継手函の縦断正面図、第27図は第26図のC−
C線断面図である。 第28図は継手函に増付けられたガイド部材と被覆筒付
き鉄筋篭との関係を示す横断平面図、第29図はその縦
:断正面図である。第30図および第31図は隣り合う
鉄筋篭における横鉄筋連結部の他の例を示す縦断正面図
、第32図は横鉄筋に固定された弾性被覆筒の縦断正面
図、第33図は第32図のD−D線断面図、第34図は
この発明の第2実施例の方法により施工された連続地中
壁のL形継平部を示す横断平面図、第35図はこの発明
の第3実施例の方法により施工された連続地中壁のT形
継宇部を示す横断平面図である。 第36図ないし第39図はこの発明の′I44実施例を
示すものであって、第36図は先行エレメント用溝内に
継手函付き鉄筋篭を吊り降ろしている状態を示す縦断正
面図、第37図はその横断平面図、第38図は後行エレ
メント用溝内に継手函および被覆筒付き鉄筋篭を吊り降
ろしている状態を示す縦断正面図、第69図はその横断
平面図である。 第40図はこの発明の第5実施例において用いられる継
手函の一部切欠縦断正面図、第41図はその横断平面図
である。 第42図ないし第57図はこの発明の第5実施例を示す
ものであって、第42図は先行エレメント設置予定部の
左右両側に位置する縦孔を設けた状態を示す縦断正面図
、第43図はその横断平面図、第44図は各縦孔内に継
手函を吊り降ろした状態を示す縦断正面図、第45図は
その横断平面図、第46図は先行エレメント設置予定部
の左右両側の縦孔内に泥水固化物を生成させると共に。 後行エレメント設置予定部の右側に縦孔を設けた状態を
示す縦断正面図、第47図はその横断平面図、第48図
は先行エレメント設置予定部の左右両側の継手函の下部
に根固めコンクリートを打設した状態を示す縦断正面図
、第49図はその横断平面図、第50図は先行エレメン
ト用溝を掘削しかつ後行エレメント設置予定部の右側の
縦孔内に泥水固化物を生成すると共にその縦孔内の継手
函の下部に根巻きコンクリートを打設した状態を示す縦
断正面図、第51図はその横断平面図、第52図は先行
エレメント用溝内に被覆筒付き鉄筋篭を吊り降ろして水
中コンクリートを打設した状態を示す縦断正面図、第5
3図はその横断平面図、第54図は後行エレメント用溝
内に被覆筒付き鉄筋篭を吊り降ろして水中コンクリ−ト
を打設した状態を示す縦断正面図、第55図はその縦断
平面図、第56図は継手函の蓋板を撤去した継手部を示
す横断平面図、第57図は隣り合う鉄筋篭における横鉄
筋を連結鉄筋を介して連結しかつ継手函内にコンクリー
トを打設した状態を示す横断平面図である。第58図は
従来の壁体垂直継手を示す横断平面図である。 図において、1は地盤、2は鉄筋篭、3は横鉄筋、4は
弾性被覆筒、5は水中コンクリート、6は連結鉄筋、7
はコンクリート、15および16は被覆筒付き鉄筋篭、
17は縦鉄筋、18は巾止め鉄筋、19は被覆筒本体、
2oはコゝム裂筒体、21はゴム製環状・ぐツキング、
22は蓋、23は鋼製継手函、25は底板、26は通水
孔、27は開閉弁、30は横鉄筋挿通用透孔、61は蓋
、38はレベル調整用センターホールジヤツキ、41は
ガイド部材、44ti継手函付き鉄筋篭、45は継手函
および被覆筒付き鉄筋篭、46は継手函、51は蓋板、
52はボルト、53A〜53Cは縦孔、54は泥水固化
物、55は根固めコンクリート、56Aおよび56Bは
溝である。 第1図 第2図 第4図 第8図 第9図 第21図 担 華29図 414] 第32図 第33図
1 to 27 show a first embodiment of the present invention, in which FIG. 1 is a longitudinal sectional front view showing a state in which a joint box is inserted into a groove for a leading element provided in the ground, and FIG. Figure 2 is a cross-sectional plan view of the same, Figure 6 is a vertical front view showing the reinforcing bar cage with a sheathed tube being suspended in the groove for the preceding element, Figure 4 is its cross-sectional plan view, and Figure 5 is the coated tube. 6 is a plan view showing a state in which the reinforcing bar cage is supported at a predetermined level, FIG. 6 is a longitudinal sectional front view thereof, FIG. Fig. 9 is a longitudinal sectional front view showing a state in which underwater concrete is placed in the trench for the leading element; Fig. 10 is a longitudinal sectional front view showing the state in which the trench for the trailing element has been excavated; Fig. 11 12 is a longitudinal sectional front view showing a state in which the joint box and reinforcing bar cage with sheathing tube are suspended in the trailing element groove; FIG. 13 is a lateral plan view thereof;
Figure 4 is a longitudinal sectional front view showing the state in which underwater concrete is placed in the groove for the trailing element, Figure 15 is a cross-sectional plan view thereof, and Figure 16 is a connection between the horizontal reinforcing bars of adjacent reinforcing bar cages via connecting reinforcing bars. At the same time, Fig. 17 is a longitudinal sectional front view showing the state in which concrete has been poured into the joint box, and Fig. 17 is a cross-sectional plan view thereof.
Fig. 8 is a vertical sectional front view showing an enlarged view of the vicinity of the horizontal reinforcing bar connection part in Fig. 16, and Fig. M19 is a plan view of a reinforcing bar cage with a covering tube having an elastic covering tube on one side used in the first embodiment of the present invention. Fig. 20 is a partially cutaway front view of the same, Fig. 21 is a partially longitudinal front view showing an enlarged view of a part of the reinforcing bar cage with sheathing tube, Fig. 22 is a sectional view taken along line A-A in Fig. 21, 23rd
The figure is a sectional view taken along the line B-B in Fig. 21, Fig. 24 is a plan view of a reinforcing bar cage with sheathing tubes having elastic sheathing tubes on both sides used in the first embodiment of the present invention, and Fig. 25 is a part thereof. 26 is a longitudinal sectional front view of the joint box used in the first embodiment of the present invention, and FIG. 27 is a cutaway front view of the joint box shown in FIG. 26.
It is a sectional view taken along line C. FIG. 28 is a cross-sectional plan view showing the relationship between the guide member added to the joint box and the reinforcing bar cage with a covering tube, and FIG. 29 is a vertical cross-sectional view thereof. FIGS. 30 and 31 are longitudinal sectional front views showing other examples of horizontal reinforcing bar connections in adjacent reinforcing bars, FIG. 32 is a vertical sectional front view of an elastic jacket tube fixed to the horizontal reinforcing bars, and FIG. 32 is a sectional view taken along the line D-D in FIG. 32, FIG. 34 is a cross-sectional plan view showing an L-shaped joint of a continuous underground wall constructed by the method of the second embodiment of the present invention, and FIG. FIG. 7 is a cross-sectional plan view showing a T-shaped joint of a continuous underground wall constructed by the method of the third embodiment. 36 to 39 show the 'I44 embodiment of the present invention, in which FIG. 36 is a longitudinal sectional front view showing a state in which a reinforcing bar basket with a joint box is suspended in the leading element groove, and FIG. FIG. 37 is a cross-sectional plan view thereof, FIG. 38 is a vertical cross-sectional front view showing a state in which a joint box and a reinforcing bar cage with a covering tube are suspended in the trailing element groove, and FIG. 69 is a cross-sectional plan view thereof. FIG. 40 is a partially cutaway longitudinal sectional front view of a joint box used in the fifth embodiment of the present invention, and FIG. 41 is a cross-sectional plan view thereof. 42 to 57 show a fifth embodiment of the present invention, in which FIG. 42 is a longitudinal sectional front view showing a state in which vertical holes are provided on both left and right sides of the portion where the preceding element is scheduled to be installed; Fig. 43 is a cross-sectional plan view of the same, Fig. 44 is a vertical cross-sectional front view showing the joint box suspended in each vertical hole, Fig. 45 is a cross-sectional plan view of the same, and Fig. 46 shows left and right views of the area where the preceding element is to be installed. Along with producing solidified mud in the vertical holes on both sides. A vertical sectional front view showing a state in which a vertical hole is provided on the right side of the area where the trailing element is scheduled to be installed, Figure 47 is a cross-sectional plan view thereof, and Figure 48 is a foot protection at the bottom of the joint box on both the left and right sides of the area where the preceding element is planned to be installed. Fig. 49 is a longitudinal sectional front view showing the state of concrete being poured, Fig. 49 is a cross-sectional plan view thereof, and Fig. 50 shows the excavation of a trench for the leading element and the filling of solidified mud into the vertical hole on the right side of the area where the trailing element is planned to be installed. Fig. 51 is a cross-sectional plan view of the concrete that has been formed and concrete is placed at the bottom of the joint box in the vertical hole, and Fig. 52 shows the reinforcing bar with a covering tube in the groove for the preceding element. Vertical front view showing the state in which the basket is suspended and underwater concrete is poured, No. 5
Figure 3 is a cross-sectional plan view of the same, Figure 54 is a vertical front view showing a state in which a reinforcing bar cage with a covering tube is suspended in the trailing element groove and underwater concrete is poured, and Figure 55 is a vertical cross-sectional plane thereof. Figure 56 is a cross-sectional plan view showing the joint part with the lid plate of the joint box removed, and Figure 57 is a cross-sectional plan view showing the horizontal reinforcing bars in adjacent reinforcing bar baskets connected via connecting reinforcing bars and concrete being poured into the joint box. FIG. FIG. 58 is a cross-sectional plan view showing a conventional wall vertical joint. In the figure, 1 is the ground, 2 is the reinforcing bar, 3 is the horizontal reinforcing bar, 4 is the elastic covering tube, 5 is the underwater concrete, 6 is the connecting reinforcing bar, and 7
is concrete, 15 and 16 are reinforced cages with covered tubes,
17 is the vertical reinforcing bar, 18 is the stopper reinforcing bar, 19 is the covering tube body,
2o is a comb cleft cylinder, 21 is a rubber ring/gutsuking,
22 is a lid, 23 is a steel joint box, 25 is a bottom plate, 26 is a water hole, 27 is an on-off valve, 30 is a through hole for inserting horizontal reinforcing bars, 61 is a lid, 38 is a center hole jack for level adjustment, 41 is a guide member, 44ti is a reinforcing bar basket with a joint box, 45 is a reinforcing bar cage with a joint box and a covering tube, 46 is a joint box, 51 is a lid plate,
52 is a bolt, 53A to 53C are vertical holes, 54 is solidified mud, 55 is foot protection concrete, and 56A and 56B are grooves. Figure 1 Figure 2 Figure 4 Figure 8 Figure 9 Figure 21 Figure 29 Figure 414] Figure 32 Figure 33

Claims (1)

【特許請求の範囲】[Claims] 地盤1に設けた溝内に、鉄筋篭2における多数の横鉄筋
3の少なくとも一端部に弾性被覆筒4を嵌設して構成し
た被覆筒付き鉄筋篭と、上下方向に延長する中空の継手
函とを、横方向に交互に並べて配置し、かつ前記溝内の
継手函内部を除く部分に水中コンクリート5を打設し、
その水中コンクリート5の養生時間を経過したのち、継
手函内をドライの状態にし、その継手函内で、隣り合う
鉄筋篭2における横鉄筋3を、連結鉄筋6を介して圧接
、溶接あるいはねじ継手等の機械的連結手段により連結
したのち、前記継手函内にコンクリート7を打設するこ
とを特徴とする連続地中壁の垂直継手施工法。
A reinforcing bar cage with a covering tube constructed by fitting an elastic covering tube 4 into at least one end of a large number of horizontal reinforcing bars 3 in a reinforcing bar cage 2 in a groove provided in the ground 1, and a hollow joint box extending in the vertical direction. and are arranged side by side alternately in the horizontal direction, and underwater concrete 5 is placed in the part of the groove excluding the inside of the joint box,
After the curing time of the underwater concrete 5 has elapsed, the inside of the joint box is kept dry, and within the joint box, the horizontal reinforcing bars 3 in the adjacent reinforcing bar baskets 2 are welded, welded or screwed together via the connecting reinforcing bars 6. A vertical joint construction method for a continuous underground wall, characterized in that after the joint is connected by a mechanical connection means such as the above, concrete 7 is poured into the joint box.
JP8430186A 1986-04-14 1986-04-14 Vertical joint construction work for continuous underground wall Granted JPS62242010A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP8430186A JPS62242010A (en) 1986-04-14 1986-04-14 Vertical joint construction work for continuous underground wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP8430186A JPS62242010A (en) 1986-04-14 1986-04-14 Vertical joint construction work for continuous underground wall

Publications (2)

Publication Number Publication Date
JPS62242010A true JPS62242010A (en) 1987-10-22
JPH0362847B2 JPH0362847B2 (en) 1991-09-27

Family

ID=13826654

Family Applications (1)

Application Number Title Priority Date Filing Date
JP8430186A Granted JPS62242010A (en) 1986-04-14 1986-04-14 Vertical joint construction work for continuous underground wall

Country Status (1)

Country Link
JP (1) JPS62242010A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112376596A (en) * 2020-11-04 2021-02-19 上海智平基础工程有限公司 Filling type rubber joint pipe and construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112376596A (en) * 2020-11-04 2021-02-19 上海智平基础工程有限公司 Filling type rubber joint pipe and construction method

Also Published As

Publication number Publication date
JPH0362847B2 (en) 1991-09-27

Similar Documents

Publication Publication Date Title
JP6636773B2 (en) Construction structure and construction method of tunnel lining body
CN101939492B (en) Precast temporary facility structure and construction method for the same
JP5619646B2 (en) Construction method of underground structure and underground structure
KR100657655B1 (en) Prefab pile for ground stability method
JP4440497B2 (en) Construction method of underground continuous wall and construction method of underground structure
JPS5916621B2 (en) How to build side walls of underground tanks
JP6006004B2 (en) Pile head space formation auxiliary tool, hollow ready-made pile provided with the same, pile head processing method using the hollow ready-made pile, and pile head space forming method
KR101266113B1 (en) Joint construction method for steel tube for non-open cut excavation
JPS61122320A (en) Method of coupling continuous underground wall with underground structure
JPH0362847B2 (en)
JP2001173135A (en) Underground outer wall of structure and its construction method
JP4780004B2 (en) Reinforcing and reinforcing method for existing quay and its reinforcing structure
JP5267242B2 (en) Pier foundation structure and bridge pier foundation construction method
JP3713117B2 (en) How to build the foundation
JP7096469B1 (en) Small cross-section underground continuous wall
JP2571426B2 (en) Construction method of retaining wall
JPH01315520A (en) Construction method for underground external walls of buildings
CN110158574A (en) Continuous underground wall structure
JP2603307B2 (en) Retaining method for the upper part of the continuous underground wall
JPH06146269A (en) Construction method for joint part of underground wall
JP2000130070A (en) Construction method for vertical shaft for shield
JPS58150631A (en) Construction work of underground structure
JPH0892954A (en) Pile device, and construction method thereof
JPH0647821B2 (en) Construction method of continuous underground wall and steel panel for continuous underground wall construction
JPS61257529A (en) Underground continuous wall construction work