JPS6294657A - Steel bar construction method - Google Patents
Steel bar construction methodInfo
- Publication number
- JPS6294657A JPS6294657A JP23406185A JP23406185A JPS6294657A JP S6294657 A JPS6294657 A JP S6294657A JP 23406185 A JP23406185 A JP 23406185A JP 23406185 A JP23406185 A JP 23406185A JP S6294657 A JPS6294657 A JP S6294657A
- Authority
- JP
- Japan
- Prior art keywords
- reinforcing bars
- jig plate
- jig
- construction method
- cage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title claims description 14
- 229910000831 Steel Inorganic materials 0.000 title description 2
- 239000010959 steel Substances 0.000 title description 2
- 230000003014 reinforcing effect Effects 0.000 claims description 50
- 229910001294 Reinforcing steel Inorganic materials 0.000 claims description 4
- 230000002093 peripheral effect Effects 0.000 claims description 2
- 230000002787 reinforcement Effects 0.000 description 14
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 8
- 239000004567 concrete Substances 0.000 description 7
- 238000010586 diagram Methods 0.000 description 5
- 229910052742 iron Inorganic materials 0.000 description 4
- 239000011150 reinforced concrete Substances 0.000 description 2
- 241000238631 Hexapoda Species 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000009415 formwork Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000009417 prefabrication Methods 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Reinforcement Elements For Buildings (AREA)
Abstract
(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.
Description
【発明の詳細な説明】
[発明の目的]
tthΔ股肚隻」
本発明は鉄筋コンクリート建築物の柱・梁用の詐醜櫂体
り一閏十スLハp九ス
従来の技術
一般に、高層の鉄筋コンクリート建築物の躯体では、大
径の鉄筋や高強度の鉄筋を使用して鉄筋本数を少なくし
、コンクリートの充填性を良くして施工性を改良してい
る。[Detailed Description of the Invention] [Object of the Invention] The present invention is directed to the construction of a deformed paddle body for columns and beams of reinforced concrete buildings. In the framework of reinforced concrete buildings, construction workability is improved by using large-diameter reinforcing bars and high-strength reinforcing bars to reduce the number of reinforcing bars and improve the filling properties of concrete.
これらの大径鉄筋や高強度鉄筋の加工・組立ては従来の
人力による施工法では無理であって、プレハブ化する必
要があり、このため高精度の加工・組立工法が要求され
る。また、鉄筋は最終的にはコンクリート中に打込まれ
てしまうので、加工・組立段階で精度や品質の管理を十
分に行っておく必要がある。Processing and assembling these large-diameter reinforcing bars and high-strength reinforcing bars is impossible with conventional manual construction methods, and requires prefabrication, which requires highly accurate processing and assembly methods. Furthermore, since reinforcing bars are ultimately placed into concrete, it is necessary to adequately control accuracy and quality at the processing and assembly stage.
従来、プレハブ鉄筋構法として、第10図に示すように
枠組した型鋼10の内側に柱主筋11の端部を番線12
で結束して取付けるものがあった。Conventionally, as a prefabricated reinforcing steel construction method, the ends of the main column reinforcements 11 are attached to the wires 12 inside the framed steel section 10 as shown in FIG.
There was something that could be tied together and installed.
l呪mしようとする間 ヴ
しかしながら、上記従来の構法では、篭鉄筋の組立て精
度が不十分であったり、取付は作業に手間取るばかりで
なく、特に芯篭鉄筋の建込みに際1− f I+−ii
4+FKI ’IXK/11答1m 823−−hk
Ik + L −しatr’EIE4にである等の問題
点があった。However, in the conventional construction method described above, not only is the assembly precision of the cage reinforcing bars insufficient, and the installation is time-consuming, but it is especially difficult to install the core cage reinforcing bars. -ii
4+FKI 'IXK/11 answer 1m 823--hk
There were problems such as Ik + L- and atr'EIE4.
本発明は上記従来の問題点を解決するためになされたも
ので、その目的とするところは、高精度で高能率に組立
てることのできる鉄筋構法を提供することにある。The present invention was made to solve the above-mentioned conventional problems, and its purpose is to provide a reinforcing steel construction method that can be assembled with high precision and high efficiency.
[発明の構成1
qを するための ・
本発明の鉄筋構法は、主筋の両端部を治具プレートによ
り保持しながら柱又は梁用の篭鉄筋を地組みし、少なく
とも一方の治具プレートを取付けた状態で該篭鉄筋を吊
り上げて建込むことを特徴とし、また、思量鉄筋と外周
部篭鉄筋とを別々の治具プレートにより保持しながら独
立して地組みした後、まず思量鉄筋を治具プレートを取
付けた状態で建込み、次に該思量鉄筋の外側に上記外周
部篭鉄筋を治具プレートを取付けた状態で建込んで両治
具プレートを組み付け、篭鉄筋を一体的に建込むことを
特徴とするものである。[To accomplish Structure 1 q of the invention - The reinforcing bar construction method of the present invention assembles the cage reinforcing bars for columns or beams into the ground while holding both ends of the main bars with jig plates, and attaches at least one jig plate. It is characterized in that the girder reinforcing bars are hoisted and erected in a state in which the girder reinforcing bars are suspended, and the girder reinforcing bars and the outer gag reinforcing bars are held by separate jig plates and assembled into the ground independently, and then the girder reinforcing bars are first placed in a jig. Erect the gage with the plates attached, then erect the outer circumferential gag reinforcing bars with the jig plate attached to the outside of the bulk reinforcing bars, assemble both jig plates, and erect the gag reinforcing bars integrally. It is characterized by:
尺1鮭
以下、本発明の実施例について、図面を参照しながら説
明する。Embodiments of the present invention will be described below with reference to the drawings.
第1図は、柱篭鉄筋の地組み作業状態を示すものである
。Fig. 1 shows the state of assembling the column reinforcement bars.
虫ず、建築現場のスFツクヤード付近に地組み空間を挾
むように枠組足場1を組立てる。両側の枠組足場1の間
には上下にパイプ又は棒材2,3を差し渡しておく。Insects will assemble frame scaffolding 1 near the building site's building site so as to sandwich the ground assembly space. Pipes or rods 2 and 3 are passed vertically between the frame scaffolds 1 on both sides.
上方の棒材2は地組みする柱篭鉄筋の頭部に位置し、第
2図に示すような柱頭部治具プレート4を取り付ける。The upper bar 2 is located at the head of the column cage reinforcing bar to be assembled into the ground, and a column head jig plate 4 as shown in FIG. 2 is attached.
また、下方の棒材3は柱篭鉄筋の脚部に位置し、第3A
図に示すような柱脚部上側治具プレート5を取り付ける
と共に、該柱脚部上側治具プレート5の下方の地面には
柱脚部下側治具プレート6を設置する。In addition, the lower bar 3 is located at the leg of the pillar cage reinforcement, and the 3rd A
A column base upper jig plate 5 as shown in the figure is attached, and a column base lower jig plate 6 is installed on the ground below the column base upper jig plate 5.
上記柱頭部治具プレート4は、第2図に示すような形状
をした鉄板から構成されている。即ち、中央部にはコン
クリート打込用の穴4aが形成されており、散大4aを
囲むように主筋保持部4bが形成されている。該主筋保
持部4bは四隅に4笛所と、その内側に円周状に8箇所
配置されており、いずれも外方に開いた溝状に形成され
ている。The column head jig plate 4 is composed of an iron plate having a shape as shown in FIG. That is, a hole 4a for pouring concrete is formed in the center, and a main reinforcement holding part 4b is formed so as to surround the expansion 4a. The main reinforcement holding portion 4b has four grooves at the four corners and eight positions arranged circumferentially inside the four grooves, all of which are formed in the shape of a groove that opens outward.
本実施例では主筋保持部4bに弧状7ランノ受片4b’
が取付けられているが、必ずしも必要でない。In this embodiment, the main reinforcement holding part 4b has an arcuate 7-run receiving piece 4b'.
is installed, but it is not necessary.
また、全部又は一部の主筋保持部4bの上記弧状7ラン
ノ受片4b’にほぼ対向する位置にナラ)4cが固着さ
れていて、該ナラ)4cに螺着したポル)4dにより、
セットした主鉄筋S、を緊定するようになっている。In addition, an oak (4c) is fixed to a position substantially opposite to the arcuate 7-run receiving piece 4b' of all or part of the main reinforcement holding portion 4b, and a hole (4d) screwed onto the oak (4c) allows
It is designed to tighten the set main reinforcing bar S.
4eは吊上げフック用穴である。4e is a hole for a lifting hook.
また、上記柱脚部上側治具プレート5は、第3A図に示
すように柱主筋S+(第4図参照)のうち、円周方向に
一本置きの主筋Slが通り抜けるような穴5aを配置し
であると共に、上記柱脚部下側治具プレート5に対して
圧接継手の位置を上下千鳥状にずらせるに必要な高さ位
置にセットされている。尚、第3A図及び第3B図に示
す仮想円は主筋S、の下端面が突当る位置を示している
。In addition, as shown in FIG. 3A, the column base upper jig plate 5 has holes 5a arranged so that every other main reinforcement S1 of the column main reinforcements S+ (see FIG. 4) passes through in the circumferential direction. At the same time, it is set at a height position necessary to shift the position of the pressure joint in a vertical staggered manner with respect to the column base lower jig plate 5. Incidentally, the virtual circles shown in FIGS. 3A and 3B indicate the positions where the lower end surfaces of the main reinforcements S collide.
従って、以上のように構成配置された各治具プ周方向に
隣接する主筋S、が柱脚部上側治具プレート5と下側治
具プレート6により上下千鳥状に正確に位置決めされる
と共に、柱頭部治具プレート4により確実に固定され、
これに7−プS2を配筋して柱篭鉄筋を構成する。Therefore, the circumferentially adjacent main reinforcements S of each jig arranged as described above are accurately positioned in a vertical staggered manner by the column base upper jig plate 5 and lower jig plate 6. It is securely fixed by the column head jig plate 4,
7-pipe S2 is arranged on this to form the pillar cage reinforcing bars.
続いて、柱頭部治具プレート4の吊上げフック用穴4e
を介して柱篭鉄筋を吊り上げ、第5図に示すように建物
の下層階の柱篭鉄筋上に建込んで、その千鳥状の継手部
分を自動ガス圧接機等により圧接する。Next, the lifting hook hole 4e of the column head jig plate 4
As shown in FIG. 5, the pillar cage reinforcing bars are lifted up and placed on the pillar cage reinforcing bars on the lower floor of the building, and the staggered joints are pressure welded using an automatic gas pressure welding machine or the like.
尚、下層階の外柱等で柱中央部に思量鉄筋を配筋する場
合がある。第6図は芯鉄節用頭部治具プレート7を示す
もので、基本的には第2図に示す頭部治具プレート4等
と同様の構成を有する。この思量鉄筋は上記外周部篭鉄
筋とは独立して同様の方法で地組される。In addition, there are cases in which structural reinforcing bars are placed in the center of external columns on lower floors. FIG. 6 shows a head jig plate 7 for core iron knots, which basically has the same structure as the head jig plate 4 shown in FIG. 2. This bulk reinforcing bar is assembled into the ground in a similar manner to the above-mentioned outer circumferential cage reinforcing bar.
地組みされた思量鉄筋は第7図に示すように下層階の思
量鉄筋上側に圧接して建込まれる。As shown in Figure 7, the ground-assembled structural reinforcing bars are placed in pressure contact with the upper sides of the structural reinforcing bars on the lower floors.
続いて、別に地組みされた外周部篭鉄筋を上記IE11
湛1ハ窯答剥白露f1ル個1F星n賂ス 1f六8図に
示すように圧接すると共に、両頭部治具プレー)7.8
を組付けて、一体的に建込む。尚・思量鉄筋の頭部治具
プレート7は外周部篭鉄筋を建込む際に、一旦取外して
、外周部篭鉄筋の建込後にその治具プレート8の上側に
組付けるようにしでも良い。Next, the outer circumferential cage reinforcing bars, which were assembled separately, were attached to the IE11 above.
1F 68 As shown in Figure 1F, press the kiln and peel off the white dew f1, and press both heads with jig play) 7.8
Assemble and build as one. In addition, the head jig plate 7 of the bulk reinforcing bar may be removed once when erecting the outer periphery cage reinforcing bars, and then assembled onto the upper side of the jig plate 8 after the outer periphery cage reinforcing bars are erected.
以上のようにして建込んだ柱篭鉄筋に梁鉄筋を組み付け
ると共に型枠をセットして、上記柱頭部治具プレート4
の穴4a内にコンクリート打込用のホースを挿入して低
い位置からコンクリートを打ち込む。コンクリートが硬
化したら、上記柱頭部治具プレート4を取り外す。Attach the beam reinforcing bars to the pillar cage reinforcing bars erected as described above, set the formwork, and set the above-mentioned column head jig plate 4.
Insert a concrete pouring hose into the hole 4a and pour concrete from a low position. Once the concrete has hardened, the column head jig plate 4 is removed.
[発明の効果]
(1)両端部を治具プレートにより保持した状態で篭鉄
筋を地組みするようにしたので、組み立て精度が格段に
向上するばかりでなく、組み立て作業も能率よく行え、
コストダウンとなる。[Effects of the invention] (1) Since the gage reinforcing bars are assembled into the ground with both ends held by jig plates, not only the assembly accuracy is greatly improved, but also the assembly work can be carried out efficiently.
This results in cost reduction.
(2)治具プレートを取り付けた状態で建込み、コンク
リートを打設するようにしたので、建込み精度並びに建
込み作業能率が向上する。(2) Since the construction and concrete are poured with the jig plate attached, the construction accuracy and construction work efficiency are improved.
(3)思量鉄筋と外周部篭鉄筋とをそれぞれの治具プレ
ートを介して組付けながら建込んで一体化するようにし
たので、柱筋全体の精度が向上し、また建込み作業能率
も向上する。(3) By assembling and integrating the columnar reinforcing bars and the outer circumferential cage reinforcing bars through their respective jig plates, the accuracy of the entire column reinforcement is improved, and the efficiency of the erection work is also improved. do.
第1図は柱篭鉄筋の地組み作業状態を示す図、第2図は
柱頭部治具プレートの平面図、第3A図は柱脚部上側治
具プレートの平面図、第3B図は柱脚部下側治具プレー
トの平面図、第4図は第1図IV−IV線に沿った端面
図、@5図は柱鉄筋の建込状態の説明図、第6図は芯鉄
篩用の柱頭部治具プレートの平面図、第7図は芯鉄筋の
建込説明図、第8図は外周鉄筋の建込説明図、第9図は
第8図[−IXに沿った端面図、第10図は従来のプレ
ハブ鉄筋構法の説明図である。
1・・・枠組足場、2,3・・・棒材、4・・・柱頭部
治具プレート、4a・・・穴、4b・・・主筋保持部、
4b’・・・弧状7ランノ受片、4c・・・ナツト、4
d・・・ボルト、4e・・・吊上げフック用穴、5・・
・柱脚部上側治具プレート、6・・・柱脚部下側治具プ
レート、7・・・芯鉄節用頭部治具プレート、Sl・・
・主鉄筋、S2・・・7−ブ。Figure 1 is a diagram showing the state of the column cage reinforcement work, Figure 2 is a plan view of the column head jig plate, Figure 3A is a plan view of the column base upper jig plate, and Figure 3B is the column base. A plan view of the lower jig plate, Figure 4 is an end view taken along the line IV-IV in Figure 1, Figure @5 is an explanatory diagram of the installed state of column reinforcing bars, and Figure 6 is the column head for the core iron sieve. Fig. 7 is an explanatory diagram of erection of core reinforcing bars, Fig. 8 is an explanatory diagram of erection of peripheral reinforcing bars, Fig. 9 is an end view along Fig. 8 [-IX, Fig. 10 The figure is an explanatory diagram of the conventional prefabricated reinforcing steel construction method. 1... Frame scaffolding, 2, 3... Bar material, 4... Column head jig plate, 4a... Hole, 4b... Main reinforcement holding part,
4b'...Arc-shaped 7 run piece, 4c...Nut, 4
d... Bolt, 4e... Hole for lifting hook, 5...
・Column base upper jig plate, 6... Column base lower jig plate, 7... Head jig plate for core iron section, Sl...
・Main reinforcing bar, S2...7-bu.
Claims (2)
柱又は梁用の篭鉄筋を地組みし、少なくとも一方の治具
プレートを取付けた状態で該篭鉄筋を吊り上げて建込む
ことを特徴とする鉄筋構法。(1) The gage reinforcing bars for columns or beams are assembled into the ground while holding both ends of the main bars with jig plates, and the gag reinforcing bars are hoisted and erected with at least one of the jig plates attached. Reinforced construction method.
により保持しながら独立して地組みした後、まず芯篭鉄
筋を治具プレートを取付けた状態で建込み、次に該芯篭
鉄筋の外側に上記外周部篭鉄筋を治具プレートを取付け
た状態で建込んで両治具プレートを組み付け、篭鉄筋を
一体的に建込むことを特徴とする鉄筋構法。(2) After the core cage reinforcing bars and the outer cage reinforcing bars are assembled independently while being held by separate jig plates, the core cage reinforcing bars are first erected with the jig plates attached, and then the core basket reinforcing bars are erected with the jig plates attached. A reinforcing steel construction method characterized by erecting the outer peripheral gag reinforcing bars with a jig plate attached to the outside of the gag reinforcing bars, assembling both jig plates, and erecting the gag reinforcing bars integrally.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP23406185A JPS6294657A (en) | 1985-10-19 | 1985-10-19 | Steel bar construction method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP23406185A JPS6294657A (en) | 1985-10-19 | 1985-10-19 | Steel bar construction method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS6294657A true JPS6294657A (en) | 1987-05-01 |
| JPH0510465B2 JPH0510465B2 (en) | 1993-02-09 |
Family
ID=16964973
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP23406185A Granted JPS6294657A (en) | 1985-10-19 | 1985-10-19 | Steel bar construction method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS6294657A (en) |
Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS5915168A (en) * | 1982-07-14 | 1984-01-26 | 株式会社熊谷組 | Joint of reinforcing iron wire |
-
1985
- 1985-10-19 JP JP23406185A patent/JPS6294657A/en active Granted
Patent Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS5915168A (en) * | 1982-07-14 | 1984-01-26 | 株式会社熊谷組 | Joint of reinforcing iron wire |
Also Published As
| Publication number | Publication date |
|---|---|
| JPH0510465B2 (en) | 1993-02-09 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JPH09209451A (en) | Joint construction of up and down columns with beam and joint method | |
| JPH08270071A (en) | Column-beam joint structure of concrete structures | |
| JPS6294657A (en) | Steel bar construction method | |
| JPH031562Y2 (en) | ||
| JPH11172964A (en) | Tower structure construction method | |
| JPH031561Y2 (en) | ||
| JP2614000B2 (en) | Basics of steel frame | |
| JPH07113260A (en) | How to join columns and beams | |
| JPH02229337A (en) | Concrete pillar construction method | |
| JPS6195136A (en) | Construction of multistoried building skeletal by precast reinforced concrete unit | |
| JPH02167937A (en) | Connecting work of steel plate-concrete structure | |
| JP2518568Y2 (en) | Connection structure of steel beams to concrete columns | |
| JPH06287998A (en) | Constructing method for preliminary assembling of reinforced concrete composite beam | |
| JPH044091Y2 (en) | ||
| JPS61225448A (en) | Reinforced steel composite column | |
| JPS6255377A (en) | Steel bar assembling construction method of reinforced concrete structure | |
| JPH0459978B2 (en) | ||
| JPH032435A (en) | Construction method for jointing column and steel frame reinforced-concrete beam to each other | |
| JPH03151429A (en) | Reinforcement preassembled beam with formwork and working method thereof | |
| JPH0434146A (en) | Column and beam joining method and its structure | |
| JPS61237737A (en) | Reinforcing bar and iron skeletal composite pillar | |
| JPH0623514B2 (en) | Construction method of reinforced steel frame composite building frame | |
| JPH03187436A (en) | Supporting member for construction pillar of reinforced concrete building | |
| JPS645134B2 (en) | ||
| JPS63125743A (en) | Construction of building |