JPS631484B2 - - Google Patents
Info
- Publication number
- JPS631484B2 JPS631484B2 JP8461882A JP8461882A JPS631484B2 JP S631484 B2 JPS631484 B2 JP S631484B2 JP 8461882 A JP8461882 A JP 8461882A JP 8461882 A JP8461882 A JP 8461882A JP S631484 B2 JPS631484 B2 JP S631484B2
- Authority
- JP
- Japan
- Prior art keywords
- water level
- blow
- water
- signal
- intermittent
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 267
- 238000001514 detection method Methods 0.000 claims description 62
- 238000007664 blowing Methods 0.000 claims description 48
- 238000002485 combustion reaction Methods 0.000 description 19
- 239000000523 sample Substances 0.000 description 18
- 238000010586 diagram Methods 0.000 description 8
- 230000007423 decrease Effects 0.000 description 7
- 239000000446 fuel Substances 0.000 description 7
- 238000004891 communication Methods 0.000 description 6
- 230000001186 cumulative effect Effects 0.000 description 5
- 230000008020 evaporation Effects 0.000 description 4
- 238000001704 evaporation Methods 0.000 description 4
- 238000010438 heat treatment Methods 0.000 description 3
- 230000001960 triggered effect Effects 0.000 description 3
- VYPSYNLAJGMNEJ-UHFFFAOYSA-N Silicium dioxide Chemical compound O=[Si]=O VYPSYNLAJGMNEJ-UHFFFAOYSA-N 0.000 description 2
- 239000000567 combustion gas Substances 0.000 description 2
- 230000000295 complement effect Effects 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 239000012535 impurity Substances 0.000 description 2
- 238000007689 inspection Methods 0.000 description 2
- 238000012423 maintenance Methods 0.000 description 2
- 239000000047 product Substances 0.000 description 2
- OYPRJOBELJOOCE-UHFFFAOYSA-N Calcium Chemical compound [Ca] OYPRJOBELJOOCE-UHFFFAOYSA-N 0.000 description 1
- FYYHWMGAXLPEAU-UHFFFAOYSA-N Magnesium Chemical compound [Mg] FYYHWMGAXLPEAU-UHFFFAOYSA-N 0.000 description 1
- 229910052791 calcium Inorganic materials 0.000 description 1
- 239000011575 calcium Substances 0.000 description 1
- 239000012459 cleaning agent Substances 0.000 description 1
- 239000004020 conductor Substances 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000002828 fuel tank Substances 0.000 description 1
- 229910052749 magnesium Inorganic materials 0.000 description 1
- 239000011777 magnesium Substances 0.000 description 1
- 230000003287 optical effect Effects 0.000 description 1
- 239000002244 precipitate Substances 0.000 description 1
- 238000010926 purge Methods 0.000 description 1
- 230000000630 rising effect Effects 0.000 description 1
- 239000000377 silicon dioxide Substances 0.000 description 1
- 230000007704 transition Effects 0.000 description 1
Landscapes
- Control Of Steam Boilers And Waste-Gas Boilers (AREA)
Description
【発明の詳細な説明】
この発明はボイラ系における缶水の間歇的な排
泄(以下、間歇ブローという)の実行を検出する
ための間歇ブロー検出装置に係わり、特に、ブロ
ー作業中の缶水水位の降下レベルと降下速度、更
には、ブロー後の給水作業中の缶水水位の上昇速
度に基づいて間歇ブローの実行を検出するように
した新規な間歇ブロー検出装置に関する。DETAILED DESCRIPTION OF THE INVENTION The present invention relates to an intermittent blow detection device for detecting the intermittent discharge of can water (hereinafter referred to as intermittent blow) in a boiler system, and particularly relates to an intermittent blow detection device for detecting the intermittent discharge of can water (hereinafter referred to as intermittent blow) in a boiler system. The present invention relates to a novel intermittent blow detection device that detects the execution of intermittent blow based on the level and rate of fall of the can water level and the rate of rise of the can water level during water supply work after blowing.
一般に、ボイラ系を長時間運転すると、缶水が
濃縮化されるので、缶水中に含まれるカルシウ
ム、マグネシウム、シリカ等の不純物濃度が増大
し、これが水管内に析出付着してスケールに成長
するものである。 Generally, when a boiler system is operated for a long period of time, the canned water becomes concentrated, which increases the concentration of impurities such as calcium, magnesium, and silica contained in the canned water, which precipitates and adheres to the water pipes and grows into scale. It is.
そして、スケールが熱の不良導体であるため
に、スケールの付着はボイラ系の熱交換の効率を
低下させるばかりか、水管を高温度に至らしめ、
ついには、焼損をも招くことが知られている。 Since scale is a poor conductor of heat, the adhesion of scale not only reduces the efficiency of heat exchange in the boiler system, but also causes the water pipes to reach high temperatures.
It is known that this can eventually lead to burnout.
また、同様に、清缶剤等の不純物濃度も増大
し、これが缶水中に気泡層を誘発し、而して、該
気泡層の気泡が水となつて、蒸気中に混入してキ
ヤリーオーバを生じ、ボイラ系に接続されたバル
ブ等の関連機器の損傷を招くことも知られてい
る。かかるスケールの成長やキヤリーオーバを防
ぐためには、缶水の濃縮化がある程度、進行した
ときに、缶水の一部を間歇的にブローして新しい
缶水と部分的に置換することが行われており、そ
の回数及び時期は、ボイラ系の運転管理上、特
に、次回ブロー作業の時期を把握するための基礎
データとして、記録される必要があつた。 Similarly, the concentration of impurities such as can cleaning agents increases, which induces a bubble layer in the can water, and the bubbles in the bubble layer turn into water and mix into the steam, causing carryover. It is also known that this can cause damage to related equipment such as valves connected to the boiler system. In order to prevent such scale growth and carryover, once the concentration of canned water has progressed to a certain extent, a portion of the canned water is intermittently blown to replace it partially with fresh canned water. Therefore, the number and timing of blowing operations needed to be recorded in order to manage the operation of the boiler system, especially as basic data for understanding the timing of the next blowing operation.
更に、ボイラの保守・点検等に際しては、缶水
の全部を排泄すること(以下、完全ブローとい
う)も行われており、運転管理の便宜上、前記間
歇ブローを上記完全ブローと区別して記録するこ
とが要請されていた。 Furthermore, during maintenance and inspection of boilers, all of the canned water is discharged (hereinafter referred to as complete blowing), and for convenience of operation management, the intermittent blowing should be recorded separately from the complete blowing. was requested.
しかしながら、従前のボイラ系では、間歇ブロ
ー作業等に際して、その回数と時期を手作業でも
つて運転日誌等に記録するという煩雑な作業を伴
つていたので、かかる煩雑な作業は往々にして懈
怠され易く、ブロー作業に関する履歴データを喪
失してしまい、ブロー作業の時期を適切に把握す
ることができず、ひいては、缶水を著しい濃縮状
態に至らしめ、スケールの成長を許し、キヤリー
オーバを頻発させ、結果的に機器の損傷を招く危
険性が極めて大であるという欠点があつた。 However, in conventional boiler systems, when performing intermittent blowing work, etc., it was necessary to manually record the number and timing of the work in an operating logbook, etc., and this complicated work was often neglected. It is easy to lose historical data regarding the blowing operation, making it impossible to properly grasp the timing of the blowing operation, which in turn leads to the canned water becoming extremely concentrated, allowing scale to grow, and causing frequent carry-overs. The drawback was that there was an extremely high risk of damaging the equipment as a result.
この発明の目的は上記従来技術に基づく間歇ブ
ロー作業等の時期把握の問題点に鑑み、ブロー作
業中の缶水水位の降下レベルと降下速度が特定値
以上であり、かつ、ブロー後の給水作業中の缶水
水位の上昇時間が特定値以下であることを検出し
て間歇ブロー検出信号を出力することにより、上
記欠点を除去し、間歇ブローの実行を、完全ブロ
ーの実行から区別して自動的に検出し、間歇ブロ
ー作業に関する履歴データの自動記録を可能にす
るボイラ系における間歇ブロー検出装置を提供せ
んとするものである。 The purpose of this invention is to solve the problem of determining the timing of intermittent blowing work based on the above-mentioned conventional technology, and to solve the problem of determining the timing of intermittent blowing work, etc., and to ensure that the level and rate of decline of the can water level during the blowing work are above a specific value, and that the water supply after the blowing work is performed. By detecting that the rising time of the water level in the can is less than a specific value and outputting an intermittent blow detection signal, the above drawback can be eliminated, and the execution of intermittent blowing can be automatically distinguished from the execution of complete blowing. An object of the present invention is to provide an intermittent blow detection device for a boiler system, which enables automatic recording of historical data regarding intermittent blow work.
上記目的に沿うこの発明の構成は、第一、第二
の水位センサを設けて水位検出部を形成し、ブロ
ー作業に際しては、ブローコツクが開かれて、ボ
イラ中の缶水水位が降下し、第一の設定位置に到
達すると、第一の水位センサがこれを検出して第
一の水位信号を出力し、続いて、缶水水位の降下
が続行し、第一の設定位置の下方の第二の設定位
置に到達すると、第二の水位センサがこれを検出
して第二の水位信号を出力し、第二の水位信号が
出力されたことと、第一の水位信号と第二の水位
信号の時間差とに基づいて、ブロー速度検出部は
缶水水位の降下レベルと降下速度を計測し、降下
レベルが第二の水位信号を得る程度に大きく、し
かも、降下速度が特定の速度以上であること、す
なわち、第一の水位信号と第二の水位信号の時間
差が特定の時間以下であることを検出したとき
に、上記ブロー速度検出部はブロー速度信号を出
力し、この信号を一旦記憶して、ブロー速度記憶
部は継続的にブロー速度記憶信号を出力し、更
に、ブロー直後の給水作業に際しては、ブローコ
ツクが閉じられて、給水指令信号に応答してボイ
ラへの給水が開始され、缶水水位が再び上昇し
て、第二の設定位置に到達すると、第二の水位セ
ンサがこれを検出して再び第二の水位信号を出力
し、給水指令信号と第二の水位信号との時間差に
基づいて、ブロー状態検出部は、第二の設定位置
より下方の水管に蓄積される缶水のための給水時
間を計測し、これが特定の時間以下であるとき
に、上記ブロー状態検出部は、ブロー状態検出信
号を出力し、そして、前記ブロー速度記憶信号と
上記ブロー状態検出信号とが同時的に得られて、
両者の論理積が「1」となるときは、間歇ブロー
検出部は、上記論理積に基づいて、間歇ブローの
実行を検出して間歇ブロー検出信号を出力するよ
うにしたことを特徴とするものである。 The structure of the present invention in accordance with the above object is that a first and second water level sensor is provided to form a water level detection section, and during blowing work, the blowing stock is opened and the can water level in the boiler is lowered. When the first set position is reached, the first water level sensor detects this and outputs the first water level signal, and then the can water level continues to drop and the second set position below the first set position is reached. When the set position is reached, the second water level sensor detects this and outputs a second water level signal. Based on the time difference, the blow speed detection unit measures the level and rate of decrease in the can water level, and determines whether the level of decrease is large enough to obtain a second water level signal and the rate of decrease is greater than or equal to a specific rate. That is, when it is detected that the time difference between the first water level signal and the second water level signal is less than or equal to a specific time, the blow speed detection section outputs a blow speed signal and temporarily stores this signal. Then, the blow speed storage section continuously outputs the blow speed storage signal, and furthermore, when water supply work is performed immediately after blowing, the blow cock is closed, water supply to the boiler is started in response to the water supply command signal, and the canister is When the water level rises again and reaches the second set position, the second water level sensor detects this and outputs the second water level signal again, and the time difference between the water supply command signal and the second water level signal is Based on this, the blow state detection section measures the water supply time for canned water accumulated in the water pipe below the second setting position, and when this is less than a specific time, the blow state detection section , outputting a blow state detection signal, and obtaining the blow speed storage signal and the blow state detection signal simultaneously;
When the logical product of both becomes "1", the intermittent blow detection section detects the execution of the intermittent blow based on the logical product and outputs the intermittent blow detection signal. It is.
さて、後続するこの発明の実施例の説明に先が
けて、この発明の構成を付設することができる典
型的な小形ボイラ系の構成及び動作を説明すれば
以下の通りである。 Now, before explaining the subsequent embodiments of the present invention, the structure and operation of a typical small boiler system to which the structure of the present invention can be attached will be explained as follows.
第1図Aは、かかるボイラ系の構成を示すブロ
ツク説明図であり、ボイラ1はその断面が示され
ている。第1図Bは第1図AにおけるA−A断面
図である。 FIG. 1A is a block explanatory diagram showing the configuration of such a boiler system, and a cross section of the boiler 1 is shown. FIG. 1B is a sectional view taken along the line AA in FIG. 1A.
図において、ボイラ1の内部は壁1aの内周面
に沿つて多数の水管1bが立設され、水管1bは
中空筒状体から成り、その下端部は環状の下部管
寄せ1c(水室)に、そして、その上端部は同じ
く環状の上部管寄せ1d(蒸気室)にそれぞれ連
通し、下部管寄せ1c及び水管1bの下部には、
缶水が収納される。 In the figure, inside a boiler 1, a large number of water pipes 1b are installed along the inner circumferential surface of a wall 1a, and the water pipes 1b are made of a hollow cylindrical body, and the lower end thereof is an annular lower header 1c (water chamber). The upper end portions thereof communicate with the annular upper header 1d (steam chamber), and the lower portions of the lower header 1c and the water pipe 1b,
Canned water is stored.
水管1bで囲まれたボイラ1の中心部には、燃
焼室1eが形成され、その上部には、電動機1f
で駆動されるブロア1gに連通する風道1hが設
けられ、風道1h内には、ノズル棒1iと電極棒
1jが垂設される。 A combustion chamber 1e is formed in the center of the boiler 1 surrounded by water pipes 1b, and an electric motor 1f is provided above the combustion chamber 1e.
An air passage 1h is provided which communicates with a blower 1g driven by a blower 1g, and a nozzle rod 1i and an electrode rod 1j are vertically provided within the air passage 1h.
燃焼室1eの下端部は、多数の水管1bの中空
部を経て煙道1kに連通する。上部管寄せ1dか
らは、連通管1lが壁1a外に延びて下部管寄せ
1cに連通する。 The lower end of the combustion chamber 1e communicates with the flue 1k through the hollow portions of a large number of water pipes 1b. From the upper header 1d, a communication pipe 1l extends outside the wall 1a and communicates with the lower header 1c.
連通管1lの中間部には、缶水水位を目視可能
に表示する水位ゲージ1mと水位検出部2が介装
される。水位検出部2には、給水制御部3が接続
され、その出力端子は給水ポンプ4を駆動する電
動機4aに接続される。給水ポンプ4の導入管は
図示しない水源に連通し、その吐出管は下部管寄
せ1cに連通する。 A water level gauge 1m and a water level detector 2 for visually displaying the canned water level are installed in the middle of the communication pipe 1l. A water supply control section 3 is connected to the water level detection section 2 , and an output terminal thereof is connected to an electric motor 4 a that drives a water supply pump 4 . An inlet pipe of the water supply pump 4 communicates with a water source (not shown), and a discharge pipe thereof communicates with the lower header 1c.
更に、連通管1lの上部には、圧力検出部5が
接続され、その出力端子は燃焼制御部6に接続さ
れる。燃焼制御部6からは、制御信号線6a〜6
cが延びて電動機1f、電極棒1j、燃料ポンプ
6dのそれぞれに接続される。燃料ポンプ6dの
導入管は図示しない燃料タンクに連通し、その吐
出管はノズル棒1iに連通する。そして、下部管
寄せ1cからはブロー管1nが延びて、ブローコ
ツク1pを介して図示しない排水路に連通し、上
部管寄せ1dからは蒸気管1qが延びて図示しな
い所望の蒸気負荷に連通する。 Further, a pressure detection section 5 is connected to the upper part of the communication pipe 1l, and its output terminal is connected to a combustion control section 6. From the combustion control unit 6, control signal lines 6a to 6
c extends and is connected to each of the electric motor 1f, electrode rod 1j, and fuel pump 6d. An inlet pipe of the fuel pump 6d communicates with a fuel tank (not shown), and a discharge pipe thereof communicates with the nozzle rod 1i. A blow pipe 1n extends from the lower header 1c and communicates with a drainage channel (not shown) via a blower stock 1p, and a steam pipe 1q extends from the upper header 1d and communicates with a desired steam load (not shown).
上記ボイラ系の構成では、蒸気を発生させるに
際しては、電動機1fでもつてブロア1gを駆動
して風道1h内に空気を圧送しつつ電極棒1jに
高電圧を印加してノズル棒1iの先端から噴射さ
れる燃料を着火させ、これを燃焼室1e内で燃焼
させる。かかる燃焼により生じた高温度の燃焼ガ
スは、燃焼室1e下端部から水管1bの中空部に
進入し、これを通過して煙道1kに至り排気され
る。この間に熱交換が行われて水管1b中の缶水
が加熱されて蒸気となり、これが上部管寄せ1d
にて収集、蓄積され、蒸気管1qを通じて蒸気負
荷に供給されるものである。 In the configuration of the boiler system described above, when generating steam, the electric motor 1f drives the blower 1g to forcefully feed air into the air passage 1h while applying a high voltage to the electrode rod 1j to generate steam from the tip of the nozzle rod 1i. The injected fuel is ignited and combusted within the combustion chamber 1e. High-temperature combustion gas generated by such combustion enters the hollow part of the water pipe 1b from the lower end of the combustion chamber 1e, passes through it, reaches the flue 1k, and is exhausted. During this time, heat exchange takes place and the canned water in the water pipe 1b is heated and turned into steam, which is then transferred to the upper header 1d.
The steam is collected and stored at the steam pipe 1q and supplied to the steam load through the steam pipe 1q.
そして、燃焼制御に関しては、上部管寄せ1d
内の蒸気圧を連通管1lを通じて抽出して圧力検
出部5に供給し、圧力検出部5は上部管寄せ1d
内の蒸気圧が予め設定された下限蒸気圧に達した
ことを検出したときには、下限蒸気圧信号を、同
様に、上限蒸気圧に達したことを検出したときに
は、上限蒸気圧信号を燃焼制御部6に送る。 Regarding combustion control, the upper header 1d
The steam pressure in the upper header 1d is extracted through the communication pipe 1l and supplied to the pressure detector 5.
When the combustion control section detects that the vapor pressure within the combustion chamber has reached a preset lower limit vapor pressure, the lower limit vapor pressure signal is sent to the combustion control section. Send to 6.
燃焼制御部6は、蒸気の消費が続行して上部管
寄せ1d内の蒸気圧が降下し、圧力検出部5から
下限蒸気圧信号を受けたときには、制御信号線6
aを通じて電動機1fを始動させて、ブロア1g
でもつて風道1hを空気パージしてから制御信号
線6bを通じて電極棒1jに高電圧を印加すると
ともに、制御信号線6cを通じて燃料ポンプ6d
を始動させて、ノズル棒1iから噴射される燃料
に点火し燃焼を開始させ、更に、蒸気の発生が続
行して蒸気圧が上昇し、圧力検出部5から上限蒸
気圧信号を受けたときには、制御信号線6cを通
じて燃料ポンプ6dを停止させて燃料供給を断つ
ことにより燃焼を停止させるとともに、燃焼ガス
の排出を待つて制御信号線6aを通じて電動機1
fを停止させてブロア1gからの送風を断つ。 When the combustion control unit 6 receives a lower limit steam pressure signal from the pressure detection unit 5 due to continued consumption of steam and the steam pressure in the upper header 1d falls, the combustion control unit 6 connects the control signal line 6 to the lower limit steam pressure signal from the pressure detection unit 5.
Start electric motor 1f through a, and blower 1g
After purging the air passage 1h with air, a high voltage is applied to the electrode rod 1j through the control signal line 6b, and at the same time, a high voltage is applied to the electrode rod 1j through the control signal line 6c.
starts, the fuel injected from the nozzle rod 1i is ignited to start combustion, and further, when steam generation continues and the steam pressure increases and an upper limit steam pressure signal is received from the pressure detection section 5, Combustion is stopped by stopping the fuel pump 6d and cutting off the fuel supply through the control signal line 6c, and after waiting for combustion gas to be discharged, the electric motor 1 is connected through the control signal line 6a.
Stop f and cut off the air from blower 1g.
而して、燃焼の断続制御でもつて、上部管寄せ
1d内の蒸気圧を上下限蒸気圧として予め設定さ
れた両圧力値の間の圧力値に保つことができるも
のである。 Thus, even with intermittent control of combustion, the steam pressure in the upper header 1d can be maintained at a pressure value between the two pressure values preset as the upper and lower steam pressure limits.
なお、簡便な装置では、電動機1f、燃料ポン
プ6dの始動・停止制御、及び電極棒1jへの高
電圧の印加を同時的に行つてもよい。 In addition, in a simple device, the start/stop control of the electric motor 1f and the fuel pump 6d, and the application of high voltage to the electrode rod 1j may be performed simultaneously.
更に、給水系に関しては、連通管1l内の気水
境界面、すなわち、水管1b中の缶水水位の変化
を水位検出部2に伝達し、水位検出部2は缶水水
位が予め設定された下限水位に達したことを検出
したときには、下限水位信号を、同様に、上限水
位に達したことを検出したときには、上限水位信
号を給水制御部3に送る。 Furthermore, regarding the water supply system, changes in the canned water level in the air-water interface in the communication pipe 1l, that is, in the water pipe 1b, are transmitted to the water level detection section 2, and the water level detection section 2 detects the canned water level set in advance. When it is detected that the lower limit water level has been reached, a lower limit water level signal is sent to the water supply control unit 3, and similarly, when it is detected that the upper limit water level has been reached, an upper limit water level signal is sent to the water supply control unit 3.
給水制御部3は、蒸気の消費により水管中の缶
水水位が降下し、水位検出部2から下限水位信号
を受けたときには、電動機4aを始動させて給水
ポンプ4でもつて下部管寄せ1cを通じて水管1
bへの給水を開始させ、給水が続行して缶水水位
が上昇し、水位検出部2から上限水位信号を受け
たときには、電動機4aを停止させて水管1bへ
の給水を断つ。 When the canned water level in the water pipe drops due to steam consumption and a lower limit water level signal is received from the water level detection unit 2, the water supply control unit 3 starts the electric motor 4a and causes the water supply pump 4 to lower the water pipe through the lower header 1c. 1
When the water supply to b is started, water supply continues, the can water level rises, and an upper limit water level signal is received from the water level detector 2, the electric motor 4a is stopped to cut off the water supply to the water pipe 1b.
而して、給水の断続制御でもつて、水管1b内
の缶水水位を上下限水位として予め設定された両
水位値の間の水位値に保つことができるものであ
る。 Thus, even with the intermittent water supply control, the water level of the canned water in the water pipe 1b can be maintained at a water level between the upper and lower limit water levels preset.
そして、かかる給水の断続制御と、前記燃焼の
断続制御は、互いに別個独立に行われるものであ
る。 The intermittent control of water supply and the intermittent control of combustion are performed separately and independently from each other.
また、缶水のブローに際してはブローコツク1
pを開くことにより、排水管1nを通じて下部管
寄せ1c及び水管1b中の缶水の一部あるいは全
部をブローすることができるものである。 Also, when blowing canned water, use blowing stick 1.
By opening p, part or all of the canned water in the lower header 1c and the water pipe 1b can be blown out through the drain pipe 1n.
なお、ブロア1g、風道1h、ノズル棒1i、
電極棒1jから成るバーナは、これに限られるも
のではなく、要すれば、水管1b中の缶水を加熱
して蒸気を発生させ得れば足りるので、一般的に
は、電気ヒータ等をも含む加熱装置であればよ
い。 In addition, blower 1g, air passage 1h, nozzle rod 1i,
The burner consisting of the electrode rod 1j is not limited to this, and if necessary, it is sufficient to heat the canned water in the water pipe 1b to generate steam, so generally an electric heater or the like is also used. Any heating device including the above may be used.
而して、同様に、燃焼制御部6も加熱装置を断
続する加熱制御部であればよい。 Similarly, the combustion control section 6 may also be a heating control section that turns on and off the heating device.
続いて、第2図〜第4図に基づいて、この発明
の一実施例の構成及び動作を説明すれば以下の通
りである。 Next, the configuration and operation of an embodiment of the present invention will be described below based on FIGS. 2 to 4.
第2図は、この発明の一実施例の構成を示すブ
ロツク図であり、図中、水位検出部2の缶水水位
WLは、連通管1lにおける水位を、それに対応
する水管中の缶水水位に置き換えて表わしたもの
であり、簡便のために、水管としては、仮想上の
単純な形状の水管1b′が示されている。 FIG. 2 is a block diagram showing the configuration of an embodiment of the present invention.
WL is expressed by replacing the water level in the communication pipe 1l with the canned water level in the corresponding water pipe, and for the sake of simplicity, a hypothetical water pipe 1b' with a simple shape is shown as the water pipe. ing.
また、水管1b′の下部に形成された拡張部1
c′は、下部管寄せ1cを仮想上の単純な形状で等
価的に表わしたものである。 In addition, an expanded portion 1 formed at the bottom of the water pipe 1b'
c' is an equivalent representation of the lower header 1c in a hypothetical simple shape.
水位検出部2は給水の断続制御における缶水の
下限位置L(以下、第一の設定位置という)にそ
の先端が位置するように配設された下限水位プロ
ーブ2a(以下、第一の水位プローブという)と、
第一の設定位置Lの下方のブロー位置B(以下、
第二の設定位置という)にその先端が位置するよ
うに配設されたブロー水位プローブ2b(以下、
第二の水位プローブという)と、缶水の上限位置
Hにその先端が位置するように配設された上限水
位プローブ2cと、缶水中に埋没した水中電極2
dと、水中電極2dにその一端が接続された交流
電源2eと、交流電源2eの他端と、第一の水位
プローブ2a、第二の水位プローブ2b、上限水
位プローブ2cのそれぞれとの間に挿入された電
流検出器2f,2g,2hとから成る。 The water level detection unit 2 is a lower limit water level probe 2a (hereinafter referred to as a first water level probe) disposed such that its tip is located at the lower limit position L (hereinafter referred to as a first setting position) of canned water in intermittent control of water supply. ) and
Blow position B below the first setting position L (hereinafter referred to as
The blow water level probe 2b (hereinafter referred to as
(referred to as a second water level probe), an upper limit water level probe 2c disposed so that its tip is located at the upper limit position H of the can water, and an underwater electrode 2 buried in the can water.
d, an AC power source 2e whose one end is connected to the underwater electrode 2d, and the other end of the AC power source 2e and each of the first water level probe 2a, the second water level probe 2b, and the upper limit water level probe 2c. It consists of inserted current detectors 2f, 2g, and 2h.
給水制御部3は、電流検出器2fの出力端子が
そのセツト端子に接続され、電流検出器2hの出
力端子がインバータ3aを通じて、そのリセツト
端子に接続されたフリツプフロツプ3bと、フリ
ツプフロツプ3bの正相出力端子がドライバ3c
を通じてその一端に接続され、その他端が電源3
dに接続されたリレー3eとから成り、リレー3
eの接点3e′は給水ポンプ4を駆動する電動機4
aの電源供給線4bに挿入される。 The water supply control section 3 includes a flip-flop 3b, in which the output terminal of the current detector 2f is connected to its set terminal, and the output terminal of the current detector 2h is connected to its reset terminal through an inverter 3a, and a positive phase output of the flip-flop 3b. The terminal is driver 3c
and the other end is connected to the power supply 3.
d, and relay 3e connected to relay 3e.
The contact 3e' of e is the electric motor 4 that drives the water supply pump 4.
It is inserted into the power supply line 4b of a.
ブロー速度検出部7は、その入力端子が電流検
出器2fの出力端子に接続された単安定マルチバ
イブレータ7aと、その入力端子が電流検出器2
gの出力端子に接続されたインバータ7bと、一
つの入力端子が単安定マルチバイブレータ7aの
正相出力端子に接続され、もう一つの入力端子が
インバータ7bの出力端子に接続されたナンドゲ
ート7cとから成る。 The blow speed detection unit 7 includes a monostable multivibrator 7a whose input terminal is connected to the output terminal of the current detector 2f, and a monostable multivibrator 7a whose input terminal is connected to the output terminal of the current detector 2f.
g, and a NAND gate 7c, one input terminal of which is connected to the positive phase output terminal of the monostable multivibrator 7a, and the other input terminal connected to the output terminal of the inverter 7b. Become.
ブロー状態検出部8は、その入力端子が給水指
令スイツチ8aに接続された単安定マルチバイブ
レータ8bと、単安定マルチバイブレータ8bの
正相出力端子にその入力端子が接続された単安定
マルチバイブレータ8cと、一つの入力端子が電
流検出器2gの出力端子に接続され、もう一つの
入力端子が単安定マルチバイブレータ8bの正相
出力端子に接続されたアンドゲート8dとから成
り、給水指令スイツチ8aに連動する給水指令ス
イツチ8a′が給水ポンプ4を駆動するための電動
機4aの電源供給線4bに挿入される。 The blow state detection unit 8 includes a monostable multivibrator 8b whose input terminal is connected to the water supply command switch 8a, and a monostable multivibrator 8c whose input terminal is connected to the positive phase output terminal of the monostable multivibrator 8b. , one input terminal is connected to the output terminal of the current detector 2g, and the other input terminal is connected to the positive phase output terminal of the monostable multivibrator 8b. A water supply command switch 8a' is inserted into the power supply line 4b of the electric motor 4a for driving the water supply pump 4.
ブロー速度記憶部9は、そのセツト端子がナン
ドゲート7cの出力端子に接続され、そのリセツ
ト端子が単安定マルチバイブレータ8cの補相出
力端子に接続されたフリツプフロツプ9aから成
る。 Blow speed storage section 9 consists of a flip-flop 9a whose set terminal is connected to the output terminal of NAND gate 7c and whose reset terminal is connected to the complementary output terminal of monostable multivibrator 8c.
間歇ブロー検出部10は、一つの入力端子がフ
リツプフロツプ9aの正相出力端子に接続され、
もう一つの入力端子がアンドゲート8dの出力端
子に接続されたナンドゲート10aから成る。 The intermittent blow detection section 10 has one input terminal connected to the positive phase output terminal of the flip-flop 9a,
It consists of a NAND gate 10a whose other input terminal is connected to the output terminal of AND gate 8d.
表示部11は、その入力端子がナンドゲート1
0aの出力端子に接続されたカウンタ11aと、
カウンタ11aに順次に後続するドライバ11
b、表示管11cとから成る。 The input terminal of the display unit 11 is the NAND gate 1.
A counter 11a connected to the output terminal of 0a,
Drivers 11 sequentially following counter 11a
b, and a display tube 11c.
第3図は缶水水位の変化Aと、電流検出器2
h,2fの出力信号B,Cと、フリツプフロツプ
3bの正相出力信号Dとを対比して示す波形図で
ある。先ず、上記構成における水位検出部2、給
水制御部3に関して、給水制御の動作を説明すれ
ば以下の通りである。 Figure 3 shows change A in can water level and current detector 2.
3 is a waveform diagram showing a comparison between output signals B and C of flip-flops h and 2f and a positive phase output signal D of a flip-flop 3b. FIG. First, the operation of water supply control with respect to the water level detection section 2 and water supply control section 3 in the above configuration will be explained as follows.
いま、第3図Aaに示すように、缶水水位が第
一の設定位置Lよりも高い位置にある場合には、
第一の水位プローブ2aが缶水中に水没して、水
中電極2dとの間が缶水を通じて導通状態とな
り、交流電源2eに対して電流検出器2f、第一
の水位プローブ2a、水中電極2dから成る負荷
回路が形成されるので、電流検出器2fに電流が
流れ、これを検出して電流検出器2fは第3図
Cbに示すように「1」を出力する。 Now, as shown in Figure 3 Aa, if the can water level is higher than the first setting position L,
The first water level probe 2a is submerged in the can water, and conduction is established between the submersible electrode 2d through the can water, and the current detector 2f, the first water level probe 2a, and the submersible electrode 2d are connected to the AC power source 2e. Since a load circuit is formed, a current flows to the current detector 2f, which is detected by the current detector 2f as shown in Fig. 3.
Outputs "1" as shown in Cb.
そして、缶水水位が降下して、第3図Acに示
すように、第一の設定位置Lに達すると、第一の
水位プローブ2aの先端が缶水水面から離れ、交
流電源2eに対する負荷回路が遮断されるので、
電流検出器2fを通過する電流が零となり、これ
を検出して、電流検出器2fは第3図Cdに示す
ように「0」を出力する。 Then, when the water level of the can water falls and reaches the first set position L as shown in FIG. is blocked, so
The current passing through the current detector 2f becomes zero, and upon detecting this, the current detector 2f outputs "0" as shown in FIG. 3 Cd.
かかる電流検出器2fの出力信号の「1」から
「0」への反転をセツト端子に受けて、フリツプ
フロツプ3bが「1」にセツトされ、その正相出
力信号は、第3図Deに示すように「0」から
「1」に反転する。この信号を受けて、ドライバ
3cが導通状態となり、リレー3eが励磁され
て、接点3e′が閉成し、この時点では閉成されて
いる給水指令スイツチ8a′を通じて電動機4aに
電源が供給されるので、水管1b′への缶水の供給
が行われる。 Upon receiving the inversion of the output signal of the current detector 2f from "1" to "0" at the set terminal, the flip-flop 3b is set to "1", and its positive phase output signal is as shown in FIG. 3 De. is reversed from "0" to "1". Upon receiving this signal, the driver 3c becomes conductive, the relay 3e is energized, the contact 3e' is closed, and power is supplied to the electric motor 4a through the water supply command switch 8a', which is closed at this point. Therefore, canned water is supplied to the water pipe 1b'.
而して、フリツプフロツプ3bが「1」になつ
ている期間中、給水が続行し、第3図Afに示す
ように缶水水位が上昇し続ける。 Thus, while the flip-flop 3b is at "1", the water supply continues and the can water level continues to rise as shown in FIG. 3Af.
やがて、第3図Agに示すように、缶水水位が
上限位置Hに達すると、上限水位プローブ2cが
水没し、いままで、これが水面から離れていたた
めに、第3図Bhに示すように、「0」を出力して
いた電流検出器2hが第3図Biに示すように、
「1」を出力するようになる。 Eventually, as shown in Fig. 3Ag, when the can water level reaches the upper limit position H, the upper limit water level probe 2c is submerged, and since it has been far from the water surface until now, as shown in Fig. 3Bh, As shown in Figure 3 Bi, the current detector 2h that was outputting "0"
It will now output "1".
かかる電流検出器2hの出力信号の「0」から
「1」への反転はインバータ3aにより、「1」か
ら「0」への反転に変換されて、フリツプフロツ
プ3bのリセツト端子に供給され、これを「0」
にリセツトする。 The inversion of the output signal of the current detector 2h from ``0'' to ``1'' is converted by the inverter 3a into an inversion from ``1'' to ``0'' and supplied to the reset terminal of the flip-flop 3b. "0"
Reset to .
而して、第3図Djに示すように、フリツプフ
ロツプ3bの正相出力信号が「0」となるので、
リレー3eが非励磁状態になり、接点3e′が開成
し、給水が停止する。 Therefore, as shown in FIG. 3Dj, the positive phase output signal of the flip-flop 3b becomes "0", so
Relay 3e becomes de-energized, contact 3e' opens, and water supply stops.
このようにして、給水ポンプが始動してから停
止するまでの給水期間T1は、フリツプフロツプ
3bが「1」になつている期間でもつて特定さ
れ、更に、給水ポンプが停止してから始動するま
での給水停止期間T2は、フリツプフロツプ3b
が「0」になつている期間でもつて特定されるも
のである。 In this way, the water supply period T 1 from when the water supply pump starts to when it stops is specified even during the period when the flip-flop 3b is set to "1", and furthermore, from when the water supply pump stops to when it starts. The water supply stop period T2 is the flip-flop 3b.
It is specified even during a period in which the value is "0".
そこで、給水を停止した後は、第3図Akに示
すように、缶水水位は蒸発量に応じた降下率でも
つて再び降下し、これが第3図Alに示すように、
第一の設定位置Lに到達するまでは、フリツプフ
ロツプ3bが「0」に留まつて、しかる後、第3
図Dmに示すように「1」に反転して、給水停止
期間T2が形成される。 Therefore, after the water supply is stopped, as shown in Figure 3Ak, the canned water level drops again at a rate of decline that corresponds to the amount of evaporation, and this, as shown in Figure 3Al,
The flip-flop 3b remains at "0" until reaching the first setting position L, and then the third
As shown in Figure Dm, it is reversed to "1" and a water supply stop period T2 is formed.
以下同様の動作が繰返し行われて、缶水水位は
上限位置Hと第一の設定位置Lの間に保たれるも
のである。 Thereafter, similar operations are repeated to maintain the can water level between the upper limit position H and the first set position L.
続いて、第4図をも参照しつつブロー作業にお
ける間歇ブロー検出のための動作を説明すれば以
下の通りである。 Next, referring to FIG. 4, the operation for detecting intermittent blowing during blowing work will be described as follows.
第4図は缶水水位の変化Aと、電流検出器2
f,2gの出力信号、すなわち、第一、第二の水
位信号B,Cと単安定マルチバイブレータ7aの
正相出力信号Dと、フリツプフロツプ9aの正相
出力信号Eと、単安定マルチバイブレータ8bの
正相出力信号Fと、アンドゲート8dの出力信号
Gと、ナンドゲート10aの出力信号Hと、単安
定マルチバイブレータ8cの正相出力信号Iとを
対比して示す波形図である。 Figure 4 shows change A in can water level and current detector 2.
The output signals of f and 2g, that is, the first and second water level signals B and C, the positive phase output signal D of the monostable multivibrator 7a, the positive phase output signal E of the flip-flop 9a, and the positive phase output signal E of the monostable multivibrator 8b. FIG. 3 is a waveform diagram showing a comparison of a positive phase output signal F, an output signal G of an AND gate 8d, an output signal H of a NAND gate 10a, and a positive phase output signal I of a monostable multivibrator 8c.
ブロー作業に際して、作業者がブローコツク1
pを開くとともに、給水指令スイツチ8a,8
a′を開成させて、給水制御部3におけるリレー接
点3e′の断続動作に係わりなく、電動機4aへの
電源供給を断つて給水ポンプ4を停止させると、
水管1b′中の缶水は、排水管1nを通じて大流量
で排泄されるので、第4図Aaに示すように、缶
水水位は急速度の降下を開始する。 When performing blowing work, the operator
p, and water supply command switches 8a, 8.
a' is opened and the water supply pump 4 is stopped by cutting off the power supply to the electric motor 4a regardless of the on/off operation of the relay contact 3e' in the water supply control unit 3.
Since the canned water in the water pipe 1b' is discharged at a large flow rate through the drain pipe 1n, the canned water level begins to fall rapidly, as shown in FIG. 4Aa.
そして、第4図Abに示すように、第一の設定
位置Lに到達すると、第一の水位プローブ2aが
水面から離れるので、電流検出器2fの出力信号
が第4図Bcに示すように、「1」から「0」に反
転して、第一の水位信号S1が出力され、この反転
信号を受けて、第4図Ddに示すように、単安定
マルチバイブレータ7aがトリガされて準安定状
態に移行する。 Then, as shown in FIG. 4Ab, when the first water level probe 2a reaches the first setting position L, the first water level probe 2a leaves the water surface, so that the output signal of the current detector 2f changes as shown in FIG. 4Bc. The first water level signal S 1 is output by inverting from "1" to "0", and in response to this inverted signal, the monostable multivibrator 7a is triggered as shown in FIG. transition to state.
この間、缶水水位は、第4図Aeに示すように、
急速度の降下を続行し、第4図Afに示すように、
第二の設定位置Bに到達すると、今度は、第二の
水位プローブ2bが水面から離れるので、電流検
出器2gの出力信号が第4図Cgに示すように、
「1」から「0」に反転して、第二の水位信号S2
が出力される。この反転信号は、インバータ7b
により「0」から「1」への反転信号に変換され
るので、ナンドゲート7cの一つの入力端子には
「1」が供給されて、単安定マルチバイブレータ
7aの正相出力信号とのナンド処理が実行され
る。 During this period, the can water level was as shown in Figure 4 Ae.
Continuing the rapid decline, as shown in Figure 4 Af,
When the second set position B is reached, the second water level probe 2b leaves the water surface, so the output signal of the current detector 2g changes as shown in FIG. 4Cg.
The second water level signal S 2 is reversed from “1” to “0”.
is output. This inverted signal is applied to the inverter 7b.
Since "0" is converted into an inverted signal to "1" by executed.
而して、第4図Dhに示すように、単安定マル
チバイブレータ7aが「1」を出力している準安
定期間中に、第4図Cgに示すように、電流検出
器2gの出力信号が「1」から「0」に反転すれ
ば、ナンドゲート7cの両入力端子に「1」が供
給されるので、ナンドゲート7cの出力信号は
「1」から「0」に反転して、ブロー速度信号S3
が出力され、この反転信号をセツト端子に受け
て、第4図Eiに示すように、フリツプフロツプ9
aが「1」にセツトされる。 Therefore, as shown in FIG. 4Dh, during the quasi-stable period when the monostable multivibrator 7a is outputting "1", the output signal of the current detector 2g changes as shown in FIG. 4Cg. When "1" is inverted to "0", "1" is supplied to both input terminals of the NAND gate 7c, so the output signal of the NAND gate 7c is inverted from "1" to "0", and the blow speed signal S 3
is output, and receiving this inverted signal at the set terminal, the flip-flop 9 is output as shown in Fig. 4 Ei.
a is set to "1".
そして、フリツプフロツプ9aはリセツトされ
るまで「1」の状態にとどまり、ブロー速度記憶
信号S4を出力する。 The flip-flop 9a remains in the "1" state until it is reset and outputs the blow speed storage signal S4 .
このようにして、ブロー速度検出部7は単安定
マルチバイブレータ7aの準安定時間として予め
設定された特定の時間内に、缶水水位が第二の設
定位置Bまで降下するか否かを判定することによ
り、ブロー作業に際して必ず現われる第二の設定
位置Bすなわち給水の断続制御における下限位置
Lを相当に下回る位置までの缶水水位の降下が発
生し、更に、缶水の蒸発に基づく缶水水位の降下
速度に比べて著しく急速度な、ブロー作業特有の
缶水水位の降下速度が発生したことを検出して、
ブロー速度信号S3を出力し、ブロー速度記憶部9
はブロー速度信号S3を記憶してブロー速度記憶信
号S4を継続的に出力するものである。 In this way, the blow speed detection unit 7 determines whether the can water level drops to the second set position B within a specific time preset as the metastable time of the monostable multivibrator 7a. As a result, the can water level drops to a position considerably below the second setting position B, that is, the lower limit position L in the intermittent control of water supply, which always appears during blowing work, and furthermore, the can water level decreases due to evaporation of the can water. detects that the can water level has fallen at a rate that is significantly faster than the rate of fall that is characteristic of blowing operations,
Outputs the blow speed signal S3 and stores it in the blow speed storage section 9.
stores the blow speed signal S3 and continuously outputs the blow speed storage signal S4 .
いま、仮りに、缶水水位が蒸発量に基づいて、
第4図Aa′,e′に示すように、緩速度で降下する
場合を仮定すれば、第二の設定位置Bに到達する
時点が第4図Af′に示すようになり、その時点ま
では第4図Cg′に示すように、電流検出器2gの
出力信号が「1」にとどまるので、第4図Eiに示
すように、単安定マルチバイブレータ7aの準安
定期間中にフリツプフロツプ9aがトリガされる
ことはなく、而して、第4図Ei′に示すように、
フリツプフロツプ9aは「0」にとどまり、ブロ
ー速度記憶信号S4は出力されない。 Now, suppose that the canned water level is based on the amount of evaporation.
As shown in Fig. 4 Aa' and e', if we assume that the descent is at a slow speed, the point at which the second set position B is reached is shown in Fig. 4 Af', and until that point, As shown in FIG. 4Cg', the output signal of the current detector 2g remains at "1", so the flip-flop 9a is triggered during the metastable period of the monostable multivibrator 7a, as shown in FIG. 4Ei. Therefore, as shown in Figure 4 Ei',
The flip-flop 9a remains at "0" and the blow speed storage signal S4 is not output.
更には、第4図Aa″に示すように、給水の断続
制御が行われて第一の設定位置Lすなわち、給水
の断続制御における下限位置から再び缶水水位が
上昇する場合には、電流検出器2gの出力信号
「0」に反転することがなく、第二の水位信号S2
が得られないので、フリツプフロツプ9aが同様
に「0」にとどまることは勿論である。 Furthermore, as shown in Fig. 4 Aa'', if the canned water level rises again from the first setting position L, that is, the lower limit position in the intermittent water supply control after the intermittent water supply control is performed, the current detection The output signal of the device 2g does not invert to "0", and the second water level signal S 2
Of course, the flip-flop 9a remains at "0" as well, since this cannot be obtained.
間歇ブローを実行した後、作業者がブローコツ
ク1pを閉じ、更に、給水指令スイツチ8a,8
a′を閉成させると、給水ポンプ4を駆動するため
の電動機4aに対する給電がリレー接点3e′の開
閉に支配されるようになり、給水の断続制御動作
が開始される。 After performing intermittent blowing, the operator closes the blowing stock 1p, and then switches the water supply command switches 8a, 8.
When a' is closed, the power supply to the electric motor 4a for driving the water supply pump 4 is controlled by the opening and closing of the relay contact 3e', and the intermittent control operation of water supply is started.
この時点では、給水の断続制御に関しては、第
一の設定位置Lすなわち下限位置を遥かに下回わ
つた缶水水位となつているので、前述の断続制御
動作が行われて、リレー接点3e′が閉成し、ボイ
ラへの缶水供給が開始される。 At this point, regarding the intermittent control of water supply, since the can water level is far below the first setting position L, that is, the lower limit position, the above-mentioned intermittent control operation is performed, and the relay contact 3e' is closed and canned water supply to the boiler begins.
このとき同時に、給水指令スイツチ8aが閉成
して、単安定マルチバイブレータ8bの入力端子
を接地することにより給水指令信号S5が与えられ
るので、第4図Fjに示すように、単安定マルチバ
イブレータ8bがトリガされて準安定状態に移行
する。 At the same time, the water supply command switch 8a is closed and the water supply command signal S5 is given by grounding the input terminal of the monostable multivibrator 8b. 8b is triggered to enter a metastable state.
一方、給水が開始されると、間歇ブローの場合
は第4図Akに示すように、缶水水位が零でない
状態、すなわち、缶水が残留する状態から給水が
開始されるので、第4図Alに示すように、下部
管寄せ1cを充満するための期間の一部若しくは
全部を欠いた状態で缶水水位が上昇することとな
り、比較的短時間でそれが第二の設定位置Bまで
到達する。 On the other hand, when water supply starts, in the case of intermittent blowing, as shown in Fig. 4 Ak, water supply starts from a state where the canned water level is not zero, that is, from a state where canned water remains. As shown in Al, the canned water level rises without part or all of the period required to fill the lower header 1c, and reaches the second set position B in a relatively short time. do.
而して、第4図Amに示すように、缶水水位が
第二の設定位置Bに到達して、第4図Cnに示す
ように、電流検出器2gの出力信号が「0」から
「1」に反転する時点では、第4図Fに示すよ
うに、単安定マルチバイブレータ8bはいまだ準
安定状態にあるので、アンドゲート8dの一つの
入力端子には、電流検出器2gからの「1」が、
そしてもう一つの入力端子には、単安定マルチバ
イブレータ8bからの「1」が供給されることと
なり、第4図Gpに示すように、アンドゲート8
dの出力信号は「0」から「1」に反転してブロ
ー状態検出信号S6が出力され、ナンドゲート10
aの一つの入力端子に「1」が供給される。 Then, as shown in Figure 4 Am, the can water level reaches the second setting position B, and the output signal of the current detector 2g changes from "0" to "0" as shown in Figure 4 Cn. 1", the monostable multivibrator 8b is still in a quasi-stable state as shown in FIG. "but,
Then, "1" from the monostable multivibrator 8b is supplied to the other input terminal, and as shown in FIG. 4 Gp, the AND gate 8
The output signal of d is inverted from "0" to "1" and the blow state detection signal S6 is output, and the NAND gate 10
"1" is supplied to one input terminal of a.
そして、このとき、前述のように、ブロー速度
が検出されていて、フリツプフロツプ9aからブ
ロー速度記憶信号S4が断続的に出力されていれ
ば、ナンドゲート10aの両入力端子に「1」が
供給されるので、ナンドゲート10aの出力信号
は第4図Hqに示すように、「1」から「0」に反
転して、間歇ブロー検出信号S7が出力される。 At this time, as described above, if the blow speed is detected and the blow speed storage signal S4 is intermittently output from the flip-flop 9a, "1" is supplied to both input terminals of the NAND gate 10a. Therefore, the output signal of the NAND gate 10a is inverted from "1" to "0" as shown in FIG. 4 Hq, and the intermittent blow detection signal S7 is output.
続いて、単安定マルチバイブレータ8bが、第
4図Frに示すように、安定状態に復帰すると、
単安定マルチバイブレータ8cが第4図Isに示す
ように、準安定状態に移行し、その補相出力信号
の「1」から「0」への反転をリセツト端子に受
けて第4図Etに示すようにフリツプフロツプ9
aが「0」にリセツトされる。 Subsequently, when the monostable multivibrator 8b returns to a stable state as shown in FIG. 4 Fr,
The monostable multivibrator 8c shifts to a quasi-stable state as shown in Fig. 4 Is, and upon receiving the inversion of its complementary output signal from "1" to "0" at the reset terminal, as shown in Fig. 4 Et. Like flipflop 9
a is reset to "0".
そして、単安定マルチバイブレータ8bの安定
状態への復帰により、第4図Guに示すように、
アンドゲート8dの出力が「1」から「0」とな
り、ブロー状態検出信号S6が消滅し、結果的に、
第4図Hvに示すようにナンドゲート10aの出
力が「0」から「1」へ反転することにより間歇
ブロー検出信号S7も消滅する。 Then, as the monostable multivibrator 8b returns to the stable state, as shown in FIG. 4 Gu,
The output of the AND gate 8d changes from "1" to "0", the blow state detection signal S6 disappears, and as a result,
As shown in FIG. 4 Hv, when the output of the NAND gate 10a is inverted from "0" to "1", the intermittent blow detection signal S7 also disappears.
いま、仮りに、ボイラの保守・点検等に際し
て、間歇ブローではなく、第4図Awに示すよう
に、缶水水位が零となつた状態、すなわち完全ブ
ローの状態から給水を開始した場合を仮定する
と、缶水水位は第4図Al′に示すように、給水流
量に応じて緩速度で上昇するのであるが、特に、
給水初期には、水管1b′の拡張部1c′として等価
的に表わされるような広い断面積を有する下部管
寄せ1cに缶水を充満させるので、その上昇速度
は極めて緩やかであり、缶水水位の上昇に長時間
を要するものである。 Now, let's assume that during boiler maintenance and inspection, water supply is started from a state where the can water level is zero, that is, from a state of complete blowing, as shown in Figure 4 Aw, rather than from intermittent blowing. Then, as shown in Figure 4 Al', the can water level rises at a slow rate according to the water supply flow rate.
In the initial stage of water supply, the lower header 1c, which has a wide cross-sectional area and is equivalently expressed as the expanded portion 1c' of the water pipe 1b', is filled with canned water, so the rate of rise is extremely slow, and the canned water level It takes a long time for the temperature to rise.
下部管寄せ1cが缶水で充満された後は、断面
積のより小さな水管1bを充満させることとなる
ので、缶水水位は、第4図Al″に示すように、比
較的速い速度で上昇する。 After the lower header 1c is filled with canned water, the water pipe 1b, which has a smaller cross-sectional area, is filled, so the canned water level rises at a relatively fast rate, as shown in Figure 4 Al''. do.
そして、缶水水位が第4図Am′に示すように、
第二の設定位置Bに到達すると、第4図Cn′に示
すように、電流検出器2gの出力信号が「0」か
ら「1」に反転して第二の水位信号S2を出力す
る。 Then, the can water level is as shown in Figure 4 Am'.
When the second set position B is reached, the output signal of the current detector 2g is inverted from "0" to "1" and outputs the second water level signal S2 , as shown in FIG. 4 Cn'.
しかるに、完全ブロー後の給水では、下部管寄
せ1cの充満に長時間を要するために缶水水位が
第二の設定位置Bに到達する以前に、給水開始に
際して、給水指令信号S5に応答して準安定状態に
移行していた単安定マルチバイブレータ8bが第
4図Frに示すように、安定状態に復帰してしま
うこととなる。 However, in the case of water supply after complete blowing, it takes a long time to fill the lower header 1c, so the water supply command signal S5 is not responded to when starting water supply before the can water level reaches the second set position B. The monostable multivibrator 8b, which had been in a quasi-stable state, returns to a stable state as shown in FIG. 4 Fr.
したがつて、このような場合には、アンドゲー
ト8dの一つの入力端子には、電流検出器2gか
ら「1」が供給されてはいるものの、もう一つの
入力端子に供給されている単安定マルチバイブレ
ータ8bの正相出力信号は「0」となつているの
で、該アンドゲート8dの出力信号は「0」に留
まり、ブロー状態検出信号S6が出力されることは
ない。 Therefore, in such a case, one input terminal of the AND gate 8d is supplied with "1" from the current detector 2g, but the monostable signal supplied to the other input terminal is Since the positive phase output signal of the multivibrator 8b is "0", the output signal of the AND gate 8d remains at "0", and the blow state detection signal S6 is not output.
而して、ナンドゲート10aの一つの入力端子
には、「0」が供給され続けるので、該ナンドゲ
ート10aの出力信号は第4図Hxに示すように、
「1」にとどまり、間歇ブロー検出信号S7も出力
されることはない。 Since "0" continues to be supplied to one input terminal of the NAND gate 10a, the output signal of the NAND gate 10a is as shown in FIG. 4 Hx.
It remains at "1" and the intermittent blow detection signal S7 is not output either.
このようにして、ブロー状態検出部8は単安定
マルチバイブレータ8bの準安定時間として予め
設定された特定の時間内に缶水水位が第二の設定
位置Bまで上昇するか否かを判定することによ
り、間歇ブロー後の給水作業に際して、缶水を充
満するための給水時間の経過を検出して、ブロー
状態検出信号S6を出力し、間歇ブロー検出部10
は前述のブロー速度記憶部9からのブロー速度記
憶信号S4と上記ブロー状態検出信号S6の論理積に
基づいて、間歇ブロー検出信号S7を出力するもの
である。 In this way, the blow state detection unit 8 determines whether the can water level rises to the second set position B within a specific time preset as the metastable time of the monostable multivibrator 8b. When performing water supply work after intermittent blowing, the elapse of the water supply time for filling the canned water is detected, and the blowing state detection signal S6 is output, and the intermittent blowing detection unit 10
The intermittent blow detection signal S 7 is output based on the AND of the blow speed storage signal S 4 from the blow speed storage section 9 and the blow state detection signal S 6 .
間歇ブロー検出信号S7が出力されると、これに
応答してカウンタ11aが間歇ブローの累積回数
を計数し、ドライバ11bを通じて表示管11c
を駆動して、間歇ブローの累積回数を目視可能に
表示する。 When the intermittent blow detection signal S7 is output, in response to this, the counter 11a counts the cumulative number of intermittent blows, and displays the display tube 11c through the driver 11b.
to visually display the cumulative number of intermittent blows.
かかる表示部11の構成としては、間歇ブロー
検出信号S7を間歇ブローの実行を表わす情報とし
てそのまま点灯表示する構成を採用してもよい
し、表示管11c等に代えて出力信号処理装置と
タイプライタを付設して間歇ブローが実行される
たびに、その累積回数に併わせて実行の日時を作
表印字する構成を採用してもよい。 The display section 11 may be configured to display the intermittent blow detection signal S7 as information indicating the execution of the intermittent blow, or alternatively, the display tube 11c may be replaced with an output signal processing device and a type. A configuration may also be adopted in which a writer is attached and the date and time of the execution is printed in a tabular form along with the cumulative number of times the intermittent blowing is executed.
更には、演算処理装置を付設して、間歇ブロー
検出信号S7の出力時点から起算した累積蒸発量を
算出してブローコツク1pの開閉、給水指令スイ
ツチ8a,8a′の開閉等を自動制御する構成とし
てもよい。 Furthermore, an arithmetic processing unit is attached to calculate the cumulative evaporation amount starting from the output point of the intermittent blow detection signal S7 , and automatically control opening/closing of the blowing tank 1p, opening/closing of the water supply command switches 8a, 8a', etc. You can also use it as
なお、上記実施例では、第一、第二の水位プロ
ーブ2a2bと水中電極2d間の電導性を利用し
て、缶水表面を検出しているが、これに限られる
ものではなく、缶水と蒸気の境界面を検出すれば
足りるので、第一、第二の水位プローブ2a2b
等の構成に代えて、第一、第二の設定位置に発光
素子と受光素子を対向配置して成る光学的水位セ
ンサ、磁気を帯びた浮子を第一、第二の設定位置
に配設された磁気センサでもつて検出する磁気的
水位センサ等を含む第一、第二の水位センサを採
用することは随意である。あるいは、唯一の圧力
センサから缶水水位に比例する水圧信号を得て、
この信号が第一、第二の設定位置に対応する値に
達したことをコンパレータでもつて検出する構成
としてもよい。 In the above embodiment, the surface of canned water is detected using the conductivity between the first and second water level probes 2a2b and the underwater electrode 2d, but this is not limited to this. Since it is sufficient to detect the boundary surface of steam, the first and second water level probes 2a2b
In place of the above configuration, an optical water level sensor is provided in which a light emitting element and a light receiving element are disposed facing each other at first and second set positions, and a magnetic float is disposed at the first and second set positions. Optionally, the first and second water level sensors may include a magnetic water level sensor that detects the water level using a magnetic sensor. Alternatively, obtain a water pressure signal proportional to the can water level from a single pressure sensor,
A comparator may be used to detect that this signal has reached a value corresponding to the first and second set positions.
上記構成のように、唯一のハードウエアでもつ
て、第一、第二の水位センサを一体に実現するこ
ともできるので、この明細書にいう第一の水位セ
ンサと第二の水位センサは必ずしも別個独立のハ
ードウエアとして実現される構成に限定されるも
のではない。 As in the above configuration, the first and second water level sensors can be integrated with a single piece of hardware, so the first and second water level sensors referred to in this specification are not necessarily separate. The present invention is not limited to a configuration implemented as independent hardware.
以上のように、この発明は、少なくとも、ボイ
ラ中の缶水のブローを制御するブローコツクと、
給水指令信号に応答してボイラに缶水を供給する
給水ポンプとを備えたボイラ系において、第一、
第二の水位センサを設けて、水位検出部を形成
し、缶水水位が第一の設定位置に到達したときに
は、第一の水位信号を出力し、缶水水位が第一の
設定位置の下方の第二の設定位置に到達したとき
には、第二の水位信号を出力し、ブロー速度検出
部を設けて、第一、第二の水位信号の時間差が特
定時間以下であることに基づいて、ブロー作業に
特有の缶水水位降下速度の発生を検出し、ブロー
速度記憶部を設けて、上記検出結果を記憶し、ブ
ロー状態検出部を設けて、給水指令信号と第二の
水位信号との時間差が間歇ブロー後の給水作業に
特有の給水期間であることに基づいてブロー状態
を検出し、更に、間歇ブロー検出部を設けて、ブ
ロー速度記憶部に、ブロー作業特有の缶水水位降
下速度を検出したことが記憶されていて、かつ、
ブロー状態検出部がブロー状態を検出したとき
に、間歇ブロー検出信号を出力するように構成さ
れているので、間歇ブローの実行を完全ブローか
ら区別して、自動的に検出することができ、而し
て、間歇ブローの累積回数を記録表示する等、ブ
ロー作業に関する履歴データの自動記録が可能と
なる。 As described above, the present invention includes at least a blowing stock for controlling the blowing of canned water in a boiler;
In a boiler system equipped with a water supply pump that supplies canned water to the boiler in response to a water supply command signal, a first,
A second water level sensor is provided to form a water level detection unit, and when the canned water level reaches the first set position, a first water level signal is output, and the canned water level is lower than the first set position. When the second water level signal reaches the second setting position, a second water level signal is output, and a blow speed detection unit is provided to detect the blow speed based on the time difference between the first and second water level signals being less than or equal to a specific time. A blow speed storage unit is provided to detect the occurrence of a can water level drop rate specific to the work, a blow speed storage unit is provided to store the detection result, and a blow state detection unit is provided to detect the time difference between the water supply command signal and the second water level signal. The blowing state is detected based on the fact that is a water supply period specific to water supply work after intermittent blowing, and furthermore, an intermittent blow detection section is provided, and the can water level lowering speed peculiar to blowing work is stored in the blow speed storage section. What was detected is remembered, and
Since the blow state detection unit is configured to output an intermittent blow detection signal when detecting a blow state, execution of an intermittent blow can be distinguished from a complete blow and automatically detected. This makes it possible to automatically record historical data regarding blowing operations, such as recording and displaying the cumulative number of intermittent blowing operations.
したがつて、この発明によれば、間歇ブローを
実行するたびに運転日誌にいちいち記録するとい
う煩わしい作業を伴うことなく、間歇ブローの回
数や時期に関する履歴データが得られるので、記
録作業の懈怠による履歴データの喪失もなく、ブ
ロー作業の時期をいつでも正確に把握することが
でき、ひいては、スケール成長やキヤリーオーバ
に起因する機器の損傷を未然に防止できるという
優れた効果がある。 Therefore, according to the present invention, historical data regarding the number and timing of intermittent blowing can be obtained without the troublesome work of recording each time in the driving log every time intermittent blowing is performed. There is no loss of historical data, and the timing of blowing operations can be accurately determined at any time, which has the excellent effect of preventing equipment damage caused by scale growth or carryover.
しかも、この発明の構成における第一の水位セ
ンサは、ボイラ系に不可欠の給水の断続制御に際
して、給水を開始するための下限水位を検出する
下限水位センサと共用できるので、構成が簡潔で
無駄がなく、低コストで実現できるという効果も
ある。 Furthermore, the first water level sensor in the configuration of the present invention can be used in common with the lower limit water level sensor that detects the lower limit water level for starting water supply during intermittent control of water supply essential to the boiler system, so the configuration is simple and wasteful. There is also the effect that it can be realized at low cost.
第1図はボイラ系の構成を示すブロツク図、第
2図〜第4図はこの発明の実施例に関するもので
あり、第2図はその構成を示すブロツク図、第3
図、第4図は要部の波形図である。
2……水位検出部、2a……第一の水位プロー
ブ、2b……第二の水位プローブ、3……給水制
御部、4……給水ポンプ、7……ブロー速度検出
部、8……ブロー状態検出部、9……ブロー速度
記憶部、10……間歇ブロー検出部、11……表
示部。
Figure 1 is a block diagram showing the configuration of the boiler system, Figures 2 to 4 are related to embodiments of the invention, Figure 2 is a block diagram showing the configuration, and Figure 3 is a block diagram showing the configuration.
4 are waveform diagrams of main parts. 2...Water level detection unit, 2a...First water level probe, 2b...Second water level probe, 3...Water supply control unit, 4...Water supply pump, 7...Blow speed detection unit, 8...Blow State detection section, 9... Blow speed storage section, 10... Intermittent blow detection section, 11... Display section.
Claims (1)
ー)を制御するブローコツク手段と、給水指令信
号に応答してボイラに缶水を供給する給水手段と
を備えたボイラ系において、ボイラ中の缶水水位
が第一の設定位置に存在することを検出して、第
一の水位信号を出力する第一の水位センサと、ボ
イラ中の缶水水位が第一の設定位置の下方の第二
の設定位置に存在することを検出して、第二の水
位信号を出力する第二の水位センサとを有する水
位検出手段と、第一の水位信号と第二の水位信号
との時間差が特定の時間以下であることを検出し
て、ブロー速度信号を出力するブロー速度検出手
段と、ブロー速度信号を記憶して、継続的にブロ
ー速度記憶信号を出力するブロー速度記憶手段
と、ブロー後の給水指令信号と第二の水位信号と
の時間差が特定の時間以下であることを検出し
て、ブロー状態検出信号を出力するブロー状態検
出手段と、ブロー速度記憶信号とブロー状態検出
信号との論理積に基づいて、間歇ブローの実行を
検出して間歇ブロー検出信号を出力する間歇ブロ
ー検出手段とを付設して成るボイラ系における間
歇ブロー検出装置。1. In a boiler system equipped with at least blowing means for controlling the discharge (blow) of canned water in the boiler and water supply means for supplying canned water to the boiler in response to a water supply command signal, the canned water level in the boiler a first water level sensor that detects that the water level in the boiler is present at a first set position and outputs a first water level signal; and a second set position where the can water level in the boiler is below the first set position. a second water level sensor that detects the presence of a water level signal and outputs a second water level signal; blow speed detection means for detecting a certain condition and outputting a blow speed signal; blow speed storage means for storing the blow speed signal and continuously outputting a blow speed storage signal; and a water supply command signal after blowing. blow state detection means that detects that the time difference with the second water level signal is less than a specific time and outputs a blow state detection signal; and a blow state detection means based on the AND of the blow speed storage signal and the blow state detection signal. An intermittent blow detection device for a boiler system, comprising an intermittent blow detection means for detecting execution of intermittent blow and outputting an intermittent blow detection signal.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP8461882A JPS58200904A (en) | 1982-05-19 | 1982-05-19 | Detector for intermittent blow in boiler system |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP8461882A JPS58200904A (en) | 1982-05-19 | 1982-05-19 | Detector for intermittent blow in boiler system |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS58200904A JPS58200904A (en) | 1983-11-22 |
| JPS631484B2 true JPS631484B2 (en) | 1988-01-13 |
Family
ID=13835672
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP8461882A Granted JPS58200904A (en) | 1982-05-19 | 1982-05-19 | Detector for intermittent blow in boiler system |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS58200904A (en) |
Families Citing this family (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE3909134A1 (en) * | 1989-03-20 | 1990-10-04 | Troester Maschf Paul | SEALING PLATE CALENDAR |
| JPH0749208Y2 (en) * | 1990-07-04 | 1995-11-13 | 三浦工業株式会社 | Boiler concentrating blow device |
-
1982
- 1982-05-19 JP JP8461882A patent/JPS58200904A/en active Granted
Also Published As
| Publication number | Publication date |
|---|---|
| JPS58200904A (en) | 1983-11-22 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| EP1861828B1 (en) | Washing device and method controlling the same | |
| CN210030124U (en) | Pipeline machine and water purifier | |
| JPH029241B2 (en) | ||
| JPH0348404B2 (en) | ||
| JPS6326282B2 (en) | ||
| JPS58200904A (en) | Detector for intermittent blow in boiler system | |
| JPS5932701A (en) | Water-level dropping device and water-level detecting end operation confirming device in boiler | |
| KR0153159B1 (en) | Water dispenser of a refrigerator | |
| JPH0254897B2 (en) | ||
| JPH0449445Y2 (en) | ||
| JPS5924101A (en) | Basic charging controller for boiler compound in boiler system | |
| JPH0364761B2 (en) | ||
| JPH0236845B2 (en) | ||
| JPS5913803A (en) | Controller for state of concentration of boiler water in boiler system | |
| JPH0749208Y2 (en) | Boiler concentrating blow device | |
| JPH0210323B2 (en) | ||
| JPS5990115A (en) | Water level controller using single electrode | |
| JPS599411A (en) | Monitor device for performance of feed pump in boiler system | |
| JPH0221481B2 (en) | ||
| JPH0210322B2 (en) | ||
| JPS5811304A (en) | Measuring device for quantity of evaporation in boiler system | |
| JPH041894Y2 (en) | ||
| JPH07293806A (en) | Method for controlling water level in boiler with pure water specification | |
| JPS5986803A (en) | Device for deciding and controlling state of concentration of boiler water in boiler system | |
| JPS5986804A (en) | Device for deciding and controlling state of concentration of boiler water in boiler system |