JPS63268507A - Control method for outer diameter of metal pipe - Google Patents
Control method for outer diameter of metal pipeInfo
- Publication number
- JPS63268507A JPS63268507A JP62312100A JP31210087A JPS63268507A JP S63268507 A JPS63268507 A JP S63268507A JP 62312100 A JP62312100 A JP 62312100A JP 31210087 A JP31210087 A JP 31210087A JP S63268507 A JPS63268507 A JP S63268507A
- Authority
- JP
- Japan
- Prior art keywords
- outer diameter
- gap
- sizing
- stand
- vertical
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000002184 metal Substances 0.000 title claims description 7
- 229910052751 metal Inorganic materials 0.000 title claims description 7
- 238000000034 method Methods 0.000 title claims description 7
- 238000004513 sizing Methods 0.000 claims abstract description 43
- 238000004033 diameter control Methods 0.000 claims abstract description 18
- 238000005259 measurement Methods 0.000 claims description 12
- 238000004364 calculation method Methods 0.000 claims description 9
- 230000008602 contraction Effects 0.000 abstract 1
- 238000010586 diagram Methods 0.000 description 9
- 229910000831 Steel Inorganic materials 0.000 description 6
- 239000010959 steel Substances 0.000 description 6
- 238000004519 manufacturing process Methods 0.000 description 4
- 238000005096 rolling process Methods 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 2
- 230000003287 optical effect Effects 0.000 description 2
- RYGMFSIKBFXOCR-UHFFFAOYSA-N Copper Chemical compound [Cu] RYGMFSIKBFXOCR-UHFFFAOYSA-N 0.000 description 1
- 239000003795 chemical substances by application Substances 0.000 description 1
- 229910052802 copper Inorganic materials 0.000 description 1
- 239000010949 copper Substances 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B37/00—Control devices or methods specially adapted for metal-rolling mills or the work produced thereby
- B21B37/78—Control of tube rolling
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Control Of Metal Rolling (AREA)
Abstract
Description
【発明の詳細な説明】 [産業上の利用分野] 本発明は、金属管の外径制御方法に関する。[Detailed description of the invention] [Industrial application field] The present invention relates to a method for controlling the outer diameter of a metal tube.
[従来の技術]
従来、−it縫銅鋼管製造ラインには、管状成形された
素管の外径を調整するため、複数のサイジングスタンド
を連続配置し、各サイジングスタンドに横ロール対と縦
ロール対を設けてなる外径制御装置が用いられている。[Conventional technology] Conventionally, in a -IT stitched copper steel pipe production line, a plurality of sizing stands were arranged in succession in order to adjust the outer diameter of the tube formed into a tubular shape, and each sizing stand was equipped with a pair of horizontal rolls and a vertical roll. A pair of outer diameter control devices are used.
ところで、鍛接鋼管製造ラインに用いられる外径制御9
F11として、特開昭53−25259号公報に記載さ
れるように、複数のサイジングスタンドを連続配置し、
各サイジングスタンドに相対する20−ルからなるロー
ル対を設け、隣接するロール対をパスラインまわりに8
0度ずらして配置する状態下で、最終サイジングスタン
ドの出側に設けられる外径測定装置によって什丘かり管
の外径を測定し、上記外径の測定結果と目標外径とから
、各スタンドのロール対ギャップをフィードバック制御
するものが提案されている。By the way, the outer diameter control 9 used in the forge welded steel pipe manufacturing line
As F11, as described in Japanese Patent Application Laid-Open No. 53-25259, a plurality of sizing stands are arranged in succession,
Each sizing stand is provided with a roll pair consisting of 20 rolls facing each other, and adjacent roll pairs are arranged around the pass line by 8 rolls.
The outer diameter of the sizing pipe is measured with an outer diameter measuring device installed on the exit side of the final sizing stand under the condition that the sizing stand is shifted by 0 degrees, and each stand is determined based on the above outer diameter measurement result and the target outer diameter. Feedback control of roll vs. gap has been proposed.
そこで、横ロール対と縦ロール対の40−ルによって各
サイジングスタンドを構成している前述の電縫鋼管等の
製造用外径制御装置に、上記特開昭53−25259号
公報に係る制御技術を応用すること(が考えられる。Therefore, the control technology according to the above-mentioned Japanese Patent Application Laid-Open No. 53-25259 has been applied to the above-mentioned outer diameter control device for manufacturing electric resistance welded steel pipes, etc., in which each sizing stand is constituted by 40 rolls of a pair of horizontal rolls and a pair of vertical rolls. It is possible to apply
[発明が解決しようとする問題点]
しかしながら、特開昭53−252513号公報に記載
される外径制御装置にあっては、最終サイジングスタン
ドの出側で測定した測定値により、各サイジングスタン
ドのロール対ギャップをフィードバック制御するもので
あるため、出側外径測定装置から最先のサイジングスタ
ンドまでの距離に相当する長さの素管先端側部分につい
ては完全な制御を施されず、外径不良を生じ、歩留りを
低下する。[Problems to be Solved by the Invention] However, in the outer diameter control device described in Japanese Patent Application Laid-Open No. 53-252513, the measurement value of each sizing stand is determined based on the measured value on the exit side of the final sizing stand. Since the roll vs. gap is feedback controlled, the tip side of the raw tube, which has a length corresponding to the distance from the exit outside diameter measuring device to the furthest sizing stand, is not completely controlled, and the outside diameter This results in defects and lower yields.
本発明は、素管の略全長にわたって高精度の外径制御を
施し、歩留りを向上することを目的とする。An object of the present invention is to perform high-precision outer diameter control over substantially the entire length of a raw pipe and to improve yield.
[問題点を解決するための手段]
本発明は、複数のサイジングスタンドを連続配りし、各
サイジングスタンドに設けられる横ロール対と縦ロール
対によって素管の外径を調整する金属管の外径制御方法
において、最先のサイジングスタンドの入側に設けられ
る外径測定装置によって素管の横外径と縦外径を測定し
、外径測定装置の横外径測定結果とサイジング後の管の
目標横外径とから、各サイジングスタンドの横ロール対
ギャップが相互に同一絞り率となるようにそれらの横ロ
ール対ギャップ設定値を演算するとともに、外径測定装
置の縦外径測定結果とサイジング後の管の目標縦外径と
から、各サイジングスタンドの縦ロール対ギャップが相
互に同一絞り率となるようにそれらの縦ロール対ギャッ
プ設定値を演算し、各サイジングスタンドの横ロール対
ギャップと縦ロール対ギャップのそれぞれを上記演算結
果に基づいて制御するようにしたものである。[Means for Solving the Problems] The present invention provides an outer diameter of a metal pipe in which a plurality of sizing stands are arranged in succession and the outer diameter of the raw pipe is adjusted by a pair of horizontal rolls and a pair of vertical rolls provided on each sizing stand. In the control method, the outer diameter measuring device installed at the entrance of the first sizing stand measures the horizontal outer diameter and vertical outer diameter of the raw pipe, and the results of measuring the horizontal outer diameter of the outer diameter measuring device and the pipe after sizing are compared. From the target horizontal outer diameter, calculate the horizontal roll pair gap setting value of each sizing stand so that the horizontal roll pair gap has the same drawing ratio, and also calculate the vertical outer diameter measurement result of the outer diameter measuring device and sizing. Based on the target vertical outer diameter of the subsequent pipe, calculate the vertical roll vs. gap setting values of each sizing stand so that the vertical roll vs. gap has the same drawing ratio, and then calculate the horizontal roll vs. gap of each sizing stand. Each of the vertical rolls and gaps is controlled based on the above calculation results.
[作用]
本発明によれば、最先のサイジングスタンドの入側で測
定した測定値により、各サイジングスタンドのロール対
ギャップをフィードフォワード制御するものであるため
、素管の先端部〜後端部の略全長にわたって完全な外径
制御を施すことができる。[Function] According to the present invention, the roll-to-gap of each sizing stand is feedforward controlled based on the measurement value measured at the entrance side of the first sizing stand, so that The outer diameter can be completely controlled over almost the entire length.
また、外径測定装置の横外径測定結果を横ロール対ギャ
ップの制御に反映し、縦外径測定結果を縦ロール対ギャ
ップの制御に反映しているから。In addition, the results of measuring the horizontal outer diameter of the outer diameter measuring device are reflected in the control of the horizontal roll versus gap, and the results of measuring the longitudinal outer diameter are reflected in the control of the vertical roll versus gap.
測定値とギャップ設定値との対応が良く、ギャップ制御
の精度が良い。There is good correspondence between the measured value and the gap setting value, and the gap control accuracy is good.
また、各サイジングスタンドのロール対ギャップがスタ
ンド間で同一絞り率となるように演算されているから、
一部のスタンドでの絞りが過大となって素管に割れを生
ずるようなことがない。Also, since the roll-to-gap of each sizing stand is calculated so that the drawing ratio is the same between the stands,
There is no possibility that the aperture in some stands becomes excessive and causes cracks in the raw tube.
したがって、素管の略全長にわたって高精度の外径制御
を施し1歩留りを向上することができる。Therefore, the outer diameter can be controlled with high accuracy over substantially the entire length of the raw pipe, and the yield can be improved.
[実施例]
第1図は本発明が適用される外径制御装置を示す模式図
、第2図はサイジングスタンドを示す模式図、第3図は
外径測定装置を示す模式図である。[Example] FIG. 1 is a schematic diagram showing an outer diameter control device to which the present invention is applied, FIG. 2 is a schematic diagram showing a sizing stand, and FIG. 3 is a schematic diagram showing an outer diameter measuring device.
外径制御装置10は、電縫鋼管製造ラインに設けられる
スクイズロールの下波側に設置され、スクイズロールで
高周波抵抗加熱溶接された素管11の外径を制御する。The outer diameter control device 10 is installed on the lower wave side of a squeeze roll provided in an electric resistance welded steel pipe manufacturing line, and controls the outer diameter of a raw pipe 11 that is high-frequency resistance heat welded by the squeeze roll.
外径制御装2tlOは、例えば第1〜第4の各サイジン
グスタンド12A〜120をi1!続配置し、各スタン
ド12A−120に設けられる横ロール対13と縦ロー
ル対14によって素管11の外径を調整する(第2図参
照)。For example, the outer diameter control device 2tlO controls each of the first to fourth sizing stands 12A to 120 to i1! The outer diameter of the raw pipe 11 is adjusted by a pair of horizontal rolls 13 and a pair of vertical rolls 14 provided on each stand 12A-120 (see FIG. 2).
外径制御型2110は、第1スタンド12Aの入側に入
側外径測定装置15を配置している。入側外径測定装置
15は、上役光器16Aと下受光器16Bにより素管1
1の入側横外径Dwxを測定し、右投光器17Aと左受
光器17Bにより素管11の入側縦外径Dhxを測定す
る(第3図参照)。In the outer diameter control type 2110, the entry side outer diameter measuring device 15 is disposed on the entry side of the first stand 12A. The inlet outer diameter measuring device 15 measures the raw tube 1 by using an upper optical device 16A and a lower optical receiver 16B.
1, and the vertical inlet outer diameter Dhx of the blank tube 11 is measured using the right emitter 17A and the left receiver 17B (see FIG. 3).
また、外径制御装置21Oは、:54スタンド!2Dの
出側に出側外径測定装gl18を配置している。出側外
径測定装M18は、上役光器19Aと下受光器19Bに
より素管11の出側横外径Dwzを測定し、右投光器2
0Aと左受光器20Bにより素管11の出側縦外径Dh
zを測定する。Also, the outer diameter control device 21O is: 54 stands! An outlet outer diameter measuring device gl18 is placed on the outlet side of the 2D. The exit outer diameter measuring device M18 measures the exit side outer diameter Dwz of the blank tube 11 using the upper light transmitter 19A and the lower light receiver 19B, and
0A and the left receiver 20B, the output side vertical outer diameter Dh of the blank tube 11
Measure z.
さらに、外径制御装置10は、演算制御装置21を備え
ている。Further, the outer diameter control device 10 includes an arithmetic and control device 21 .
演IX i制御装置21は、入側外径測定装置W15が
測定した素管先端部の測定結果Dwx、Dhxと、目標
外径設定器22に設定されている素管の目標外径D(こ
の実施例では目標横外径=目標縦外径とする)とに基づ
き、
■各スタンド12A−120の横ロール対ギャップが相
互に同一絞り率となるようにそれらの横ロール対ギャッ
プ設定値D wi (i=1〜0を下記(1)式に基づ
いて演算するとともに、■各スタンド12A−12Dの
縦ロール対ギャップが相互に同一絞り率となるようにそ
れらの縦ロール対ギャップ設定値D hi (+−1〜
4)を下記(2)式に基づいて演算する。Performance IX The i control device 21 uses the measurement results Dwx and Dhx of the tip of the raw pipe measured by the entry side outer diameter measuring device W15 and the target outer diameter D of the raw pipe set in the target outer diameter setting device 22 (this In the embodiment, the target horizontal outer diameter = target vertical outer diameter), (2) The horizontal roll pair gap setting value D wi of each stand 12A-120 is set so that the horizontal roll pair gap of each stand 12A-120 has the same drawing ratio. (Calculate i=1 to 0 based on the following formula (1), and set the vertical roll-to-gap setting value D hi so that the vertical roll-to-gap of each stand 12A-12D has the same drawing ratio. (+-1~
4) is calculated based on the following equation (2).
Dwi=Dwx+(D−Dvx)X(i/n) −(
1)Dhi=Dhx+CD−Dhx)X(f/n)
・”(2)また、演算量W装置21は、各スタンド12
A〜120における横ロール対ギャップの測定値Gwi
(i・1〜4)と、縦ロール対ギャップの測定値G h
i (iml〜4)を伝達され、(争各スタンド12A
〜120の横ロール対ギャップ制御10ui(i・1〜
0を下記(3)式に基づいて演算し。Dwi=Dwx+(D-Dvx)X(i/n)-(
1) Dhi=Dhx+CD-Dhx)X(f/n)
・”(2) In addition, the calculation amount W device 21 is connected to each stand 12.
Measured value Gwi of lateral roll vs. gap at A~120
(i・1~4) and the measured value of the vertical roll versus gap G h
i (iml~4) is transmitted, (each stand 12A
~120 lateral roll vs. gap control 10ui (i・1~
0 is calculated based on the following formula (3).
(→各スタンド12A−120の縦ロール対ギャップ制
mFIMOhi (i−1〜0を下記(4)式に基づい
て演算する。(→ Vertical roll vs. gap control mFIMOhi of each stand 12A-120 (i-1 to 0 are calculated based on the following equation (4).
Owi= D vi −G wi
−(3)Ohi−D hi −G hi
・・・(4)演算制御装置21は、上記演算結果
であるOwiを各スタンド12A〜120の横ロール対
の圧下制御モータに対する起動信号として出力し、Oh
iを縦ロール対の圧下制御モータに対する起動信号とし
て出力する。Owi=Dvi−Gwi
-(3) Ohi-D hi -G hi
(4) The arithmetic and control device 21 outputs Owi, which is the above calculation result, as a start signal to the lowering control motor of the horizontal roll pair of each stand 12A to 120, and
i is output as a starting signal to the vertical roll pair rolling down control motor.
ここで、上記演算量u4装Fi21が各スタンド12A
−12Dの横ロール対と縦ロール対の圧下制御モータを
制御するタイミングは、素管11の先端部が当該スタン
ドに噛込んだ直後に行ない、結果として、横ロール対と
縦ロール対それぞれの素管噛込時における弾性たわみ量
(スプリングバック量)の影響を排除した状態で各ロー
ル対のキャップを制御することが望ましい。Here, the above calculation amount u4 equipment Fi21 is calculated for each stand 12A.
The timing for controlling the rolling down control motors for the pair of horizontal rolls and the pair of vertical rolls in -12D is carried out immediately after the tip of the raw tube 11 is bitten into the stand, and as a result, the lowering control motors for the pair of horizontal rolls and the pair of vertical rolls are controlled. It is desirable to control the caps of each pair of rolls while eliminating the influence of the amount of elastic deflection (springback amount) when the pipe is bitten.
なお、この実施例において、rfNrL制御装置21は
、出側外径測定装置18の測定結果D wz、 D h
zをも得て、これらのDvx、Dhzと前記目標外径り
との偏差量を演算し、この偏差量が0となるように第4
スタンド120の横ロール対ギャップと縦ロール対ギャ
ップをフィードバック制御することとしている。In this embodiment, the rfNrL control device 21 uses the measurement results D wz, D h of the outlet outer diameter measuring device 18.
z is also obtained, the deviation amount between these Dvx and Dhz and the target outer diameter is calculated, and the fourth
The horizontal roll pair gap and the vertical roll pair gap of the stand 120 are feedback-controlled.
以下、上記第1図の〃制御システムを用いた具体的実施
結果について説明する。この具体的実施例は、外径20
”×肉厚12.7t (STK41)の電縫鋼管につい
て上記実施例を適用したものである。実施結果は表1に
示すとおりであった0表1によれば、本発明の実施によ
り、最終の第4スタンド120の出側で測定した仕上が
り管の横外径Dwz、縦外径Dhzともに、目標外径に
対して±0 、1mmと良好な結果が得られた。tた、
仕上がり管は割れの発生もなく、表面性状も良好であっ
た。Hereinafter, specific implementation results using the control system shown in FIG. 1 will be described. This specific example has an outer diameter of 20
The above example is applied to an electric resistance welded steel pipe with a wall thickness of 12.7t (STK41).The results are as shown in Table 1. According to Table 1, by implementing the present invention, the final Good results were obtained for both the horizontal outer diameter Dwz and vertical outer diameter Dhz of the finished tube measured at the exit side of the fourth stand 120 of ±0.1 mm with respect to the target outer diameter.
The finished tube had no cracks and had good surface quality.
以上のように、上記実施例によれば、最先のサイジング
スタンド12Aの入側で測定した外径測定値により、各
サイジングスタンド12A〜12Dのロール対ギャップ
をフィードフォワード制御するものであるため、素管1
1の先端部〜後端部の略全長にわたって完全な外径制御
を施すことが表 l
できる。As described above, according to the above embodiment, the roll-to-gap of each sizing stand 12A to 12D is feedforward controlled by the outer diameter measurement value measured at the entrance side of the first sizing stand 12A. Base pipe 1
It is possible to completely control the outer diameter over substantially the entire length from the leading end to the trailing end.
また、外径測定装置15の横外径測定結果を横ロール対
ギャップの制御に反映し、縦外径測定結果を縦ロール対
ギャップの制御に反映しているから、測定値とギャップ
設定値との対応が良く、ギャップ制御の精度が良い。In addition, since the horizontal outer diameter measurement result of the outer diameter measuring device 15 is reflected in the horizontal roll versus gap control, and the vertical outer diameter measurement result is reflected in the vertical roll versus gap control, the measured value and the gap setting value are The gap control accuracy is good.
また、各サイジングスタンド12A〜12Dのロール対
ギャップがスタンド間で同一絞り率となるように演算さ
れているから、一部のスタンドでの絞りが過大となって
素管11に割れを生ずるようなことがない。In addition, since the roll-to-gap of each sizing stand 12A to 12D is calculated so that the drawing ratio is the same between the stands, there is no possibility that the drawing ratio of some stands may become excessive and cause cracks in the raw pipe 11. Never.
したがって、素管11の略全長にわたって高精度の外径
制御を施し、歩留りを向上することができる。Therefore, the outer diameter can be controlled with high accuracy over substantially the entire length of the raw tube 11, and the yield can be improved.
第4図は外径制御装置の他の実施例を示す模式図である
。この第4図の実施例が前記第1図の実施例と異なる点
は、以下のとおりである。FIG. 4 is a schematic diagram showing another embodiment of the outer diameter control device. The embodiment shown in FIG. 4 differs from the embodiment shown in FIG. 1 in the following points.
すなわち、外径制御装置10は、各サイジングスタンド
12A−12Dにおける横ロール対と縦ロール対それぞ
れの素管噛込時における弾性たゎみ量(スプリングバッ
ク量)δW+、δhi(t=1〜4)を、素管11の外
径、板厚、規格に応じて予め定め、テーブルの如くして
たわみ置設定器31に記憶させている。このたわみ置設
定器31が記憶しているデータは演算制御装置21に転
送されて以下の如く用いられる。That is, the outer diameter control device 10 controls the elastic deflection amount (springback amount) δW+, δhi (t=1 to 4 ) is determined in advance according to the outer diameter, plate thickness, and standard of the raw pipe 11, and is stored in the deflection position setting device 31 like a table. The data stored in the deflection position setter 31 is transferred to the arithmetic and control unit 21 and used as described below.
ri4′a制御装置21は、前記(1) 、 (2)式
で演算した横ロール対ギャップ設定値Dw+と縦ロール
対ギャップ設定値Dhiの演算結果のそれぞれを、上記
弾性たわみ罎δIll、 δhiにて下記(5) 、
(8)式に基づいて補正し、横ロール対ギャップ予設
定値Fwi(i=1〜4)と縦ロール対ギャップ予設定
値Fhi(i=1〜4)を演算する。The ri4'a control device 21 converts the calculation results of the horizontal roll gap setting value Dw+ and the vertical roll gap setting value Dhi calculated using the equations (1) and (2) into the elastic deflections δIll and δhi, respectively. (5) below,
A preset horizontal roll gap value Fwi (i=1 to 4) and a preset vertical roll gap value Fhi (i=1 to 4) are calculated based on equation (8).
Fwi=Dwi−δwj ・・(5
)Fhi=Dhi−δhi ・・・
(6)また、演算制御装置21は、各スタンド12A〜
12Dにおける横ロール対ギャップの測定値Gwiと、
縦ロール対ギャップの測定値Ghiを伝達され、各スタ
ンド12A−12Dの横ロール対ギャップ予制W@Pw
i(i=1〜4)と縦ロール対ギャップ予制御量Ph1
(i=1〜4)を下記(7) 、 (8)式に基づいて
演算する。Fwi=Dwi−δwj...(5
)Fhi=Dhi−δhi...
(6) In addition, the arithmetic and control unit 21 is configured to control each stand 12A to
12D lateral roll-to-gap measurement Gwi;
The measured value Ghi of the vertical roll vs. gap is transmitted, and the horizontal roll vs. gap pre-control W@Pw of each stand 12A-12D is transmitted.
i (i=1 to 4) and vertical roll to gap pre-control amount Ph1
(i=1 to 4) is calculated based on the following equations (7) and (8).
P vi= F wi −G wi
−(7)P hi= F hi −G hi
・・・(8)tA算量制御装置21.各ス
タンド12A−12Dへの素管1の噛込開始前に、上記
演算結果であるPwiを当該スタンド12A−12I)
の横ロール対の圧下制御モータに対する起動信号として
出力し、Phiを当該スタンド12A〜120の縦ロー
ル対の圧下制御モー夕に対する起動信号として出力し、
各ロール対ギャップのそれぞれを予設定する。P vi = F wi − G wi
−(7)P hi=F hi −G hi
...(8) tA calculation control device 21. Before starting to insert the raw pipe 1 into each stand 12A-12D, calculate Pwi, which is the above calculation result, to the stand 12A-12I).
Outputting Phi as a starting signal to the rolling down control motor of the pair of horizontal rolls, outputting Phi as a starting signal to the rolling down controlling motor of the pair of vertical rolls of the stands 12A to 120;
Preset each roll-to-gap.
したがって、上記第4図の制御方法によれば、各スタン
ドのロール対に素管先端部が噛込開始する前(オフロー
ド時)から、各ロール対のギャップは噛込時(オフロー
ド時)に生ずるであろう弾性たわみ着を考慮して予設定
されることとなる。Therefore, according to the control method shown in FIG. 4 above, the gap between each pair of rolls changes from before the end of the raw tube starts biting into the pair of rolls of each stand (during off-loading). This will be preset in consideration of the elastic flexure that will occur.
したがって、素管11の噛込時(オンロード時)の各ロ
ール対のギャップが、素管11の先端部から全長にわた
って適正値に設定され、歩留りを向表 2
Lできる。Therefore, the gap between each pair of rolls when the raw tube 11 is bitten (on-load) is set to an appropriate value over the entire length from the tip of the raw tube 11, and the yield can be improved by 2L.
以下、上記第4図の制御システムを用いた具体的実施結
果について説明する。この具体的実施例は、外径20″
×肉厚!2.7t (STK41)の電縫鋼管について
上記実施例を適用したものである。実施結果は表2に示
すとおりであった0表2によれば、本発明の実施により
、最終の第4スタンド12Dの出側で測定した仕上がり
管の横外径Dwz、縦外t’1Dhzともに、素管最先
端部の100信層程度部分から全長にわたり良好な結果
が得られた。また、仕上がり管は割れの発生もなく1表
面性状も良好であった。Hereinafter, specific implementation results using the control system shown in FIG. 4 will be described. This specific example has an outer diameter of 20"
× Thick! The above embodiment is applied to a 2.7t (STK41) electric resistance welded steel pipe. The implementation results are as shown in Table 2. According to Table 2, by implementing the present invention, both the horizontal outside diameter Dwz and the vertical outside diameter t'1Dhz of the finished pipe measured at the exit side of the final fourth stand 12D Good results were obtained over the entire length, starting from the 100 layer layer at the tip of the tube. Furthermore, the finished tube had no cracks and had good surface quality.
[発明の効果]
以上のように、本発明によれば、素管の略全長にわたっ
て高精度の外径制御を施し、歩留りを向上することがで
きる。[Effects of the Invention] As described above, according to the present invention, highly accurate outer diameter control can be performed over substantially the entire length of the raw pipe, and the yield can be improved.
第1図は本発明が適用される外径制御装置を示 ′す模
式図、第2図はサイジングスタンドを示す模式図、第3
図は外径測定装置を示す模式図、第4図は本発明の他の
実施例を示す模式図である。
10・・・外径制御装置、
11・・・素管、
12A〜120・・・サイジングスタンド、13・・・
横ロール対、
14・・・縦ロール対、
15・・・入側外径測定装置。
21・・・演算制御装置。
22・・・目標外径設定器、
31・・・たわみ置設定器。
代理人 弁理士 塩 川 修 治
第2 図Fig. 1 is a schematic diagram showing an outer diameter control device to which the present invention is applied, Fig. 2 is a schematic diagram showing a sizing stand, and Fig. 3 is a schematic diagram showing a sizing stand.
The figure is a schematic diagram showing an outer diameter measuring device, and FIG. 4 is a schematic diagram showing another embodiment of the present invention. DESCRIPTION OF SYMBOLS 10... Outer diameter control device, 11... Base pipe, 12A-120... Sizing stand, 13...
Horizontal roll pair, 14... Vertical roll pair, 15... Entry side outer diameter measuring device. 21... Arithmetic control device. 22...Target outer diameter setting device, 31...Deflection position setting device. Agent Patent Attorney Osamu Shiokawa Figure 2
Claims (2)
ジングスタンドに設けられる横ロール対と縦ロール対に
よって素管の外径を調整する金属管の外径制御方法にお
いて、最先のサイジングスタンドの入側に設けられる外
径測定装置によって素管の横外径と縦外径を測定し、外
径測定装置の横外径測定結果とサイジング後の管の目標
横外径とから、各サイジングスタンドの横ロール対ギャ
ップが相互に同一絞り率となるようにそれらの横ロール
対ギャップ設定値を演算するとともに、外径測定装置の
縦外径測定結果とサイジング後の管の目標縦外径とから
、各サイジングスタンドの縦ロール対ギャップが相互に
同一絞り率となるようにそれらの縦ロール対ギャップ設
定値を演算し、各サイジングスタンドの横ロール対ギャ
ップと縦ロール対ギャップのそれぞれを上記演算結果に
基づいて制御することを特徴とする金属管の外径制御方
法。(1) In a metal pipe outer diameter control method in which a plurality of sizing stands are arranged in succession and the outer diameter of the raw pipe is adjusted by a pair of horizontal rolls and a pair of vertical rolls provided on each sizing stand, the first sizing stand is The horizontal and vertical outside diameters of the raw pipe are measured using the outside diameter measuring device installed on the side, and the lateral outside diameter of each sizing stand is determined from the results of the outside diameter measurement of the outside diameter measuring device and the target horizontal outside diameter of the pipe after sizing. Calculate the horizontal roll pair gap setting values so that the horizontal roll pair gaps have the same drawing ratio, and from the vertical outer diameter measurement results of the outer diameter measuring device and the target vertical outer diameter of the pipe after sizing, Calculate the vertical roll-to-gap setting values so that the vertical roll-to-gap of each sizing stand has the same drawing ratio, and apply the above calculation results to the horizontal roll-to-gap and vertical roll-to-gap of each sizing stand. A method for controlling the outer diameter of a metal tube, characterized in that the outer diameter of the metal tube is controlled based on the following:
タンドの横ロール対と縦ロール対それぞれの素管噛込時
における弾性たわみ量を素管の外径、板厚、規格に応じ
て予め定めておき、前記横ロール対ギャップ設定値と縦
ロール対ギャップ設定値の演算結果のそれぞれを上記弾
性たわみ量にて補正した横ロール対ギャップ予設定値と
縦ロール対ギャップ予設定値を演算し、各サイジングス
タンドの横ロール対ギャップと縦ロール対ギャップのそ
れぞれを素管の噛込開始前に上記予設定値に基づいて予
設定する金属管の外径制御方法。(2) In claim 1, the amount of elastic deflection of each pair of horizontal rolls and vertical rolls of each sizing stand when the raw tube is bitten is determined in advance according to the outer diameter, plate thickness, and standard of the raw tube. Then, calculate a horizontal roll gap preset value and a vertical roll gap preset value by correcting the calculation results of the horizontal roll gap setting value and the vertical roll gap setting value by the elastic deflection amount, respectively, A method for controlling the outer diameter of a metal tube, in which each of the horizontal roll pair gap and the vertical roll pair gap of each sizing stand is preset based on the above preset values before starting biting of the raw tube.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP62312100A JPS63268507A (en) | 1986-12-15 | 1987-12-11 | Control method for outer diameter of metal pipe |
Applications Claiming Priority (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP61-296795 | 1986-12-15 | ||
| JP29679586 | 1986-12-15 | ||
| JP62312100A JPS63268507A (en) | 1986-12-15 | 1987-12-11 | Control method for outer diameter of metal pipe |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| JPS63268507A true JPS63268507A (en) | 1988-11-07 |
Family
ID=26560854
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP62312100A Pending JPS63268507A (en) | 1986-12-15 | 1987-12-11 | Control method for outer diameter of metal pipe |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS63268507A (en) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH05285508A (en) * | 1992-04-06 | 1993-11-02 | Nippon Steel Corp | Manufacturing method of ERW steel pipe with excellent roundness |
| JP2002035818A (en) * | 2000-07-28 | 2002-02-05 | Sumitomo Metal Ind Ltd | Apparatus for rolling seamless tube and method for controlling seamless tube rolling |
| JP2002346612A (en) * | 2001-05-29 | 2002-12-03 | Kawasaki Steel Corp | Steel pipe manufacturing method |
| CN109016425A (en) * | 2018-06-28 | 2018-12-18 | 云南联塑科技发展有限公司 | A kind of PE plumbing dimensions production control method |
-
1987
- 1987-12-11 JP JP62312100A patent/JPS63268507A/en active Pending
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH05285508A (en) * | 1992-04-06 | 1993-11-02 | Nippon Steel Corp | Manufacturing method of ERW steel pipe with excellent roundness |
| JP2002035818A (en) * | 2000-07-28 | 2002-02-05 | Sumitomo Metal Ind Ltd | Apparatus for rolling seamless tube and method for controlling seamless tube rolling |
| JP2002346612A (en) * | 2001-05-29 | 2002-12-03 | Kawasaki Steel Corp | Steel pipe manufacturing method |
| CN109016425A (en) * | 2018-06-28 | 2018-12-18 | 云南联塑科技发展有限公司 | A kind of PE plumbing dimensions production control method |
| CN109016425B (en) * | 2018-06-28 | 2020-10-20 | 云南联塑科技发展有限公司 | PE pipe fitting size production control method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US4397169A (en) | Rolling mill | |
| KR100240985B1 (en) | Apparatus for measuring telescope of steel coil and its method | |
| WO2006106938A1 (en) | Drawing/rolling control method | |
| JP4661370B2 (en) | ERW steel pipe manufacturing method | |
| JP2003260514A (en) | Automatic measuring method for bending amount of electric resistance welded tube and automatic straightening method for the same | |
| JP4288757B2 (en) | Seamless steel pipe manufacturing method | |
| JP3205118B2 (en) | Automatic thickness control method for wrought steel pipe | |
| JP2825428B2 (en) | Strip crown control method in rolling mill | |
| JP2550897Y2 (en) | Rolling control device for steel pipe | |
| SU1488044A1 (en) | Method of reduction in cross-sectional area of tubes with tension | |
| JPH0417984A (en) | Welding heat input control method for electro-resistance-welded tube | |
| JP3329214B2 (en) | Edge wave measurement method when manufacturing welded pipes | |
| JP3240202B2 (en) | Hot continuous rolling method | |
| JPH04313416A (en) | Automatic wall thickness control method for butt welded steel tube | |
| JPS5938876B2 (en) | Manufacturing method for forge-welded pipes | |
| JPS6043805B2 (en) | Outer diameter control method for pipe forming machine | |
| JPH0373365B2 (en) | ||
| JPH0372390B2 (en) | ||
| JPS62224413A (en) | Control method for plate crown in hot rolling mill | |
| CN120619080A (en) | An online control method for hot rolling laminar cooling coiling temperature | |
| HU186501B (en) | Method and apparatus for originating given permanent set on stretching-straightening machines | |
| SU1338919A1 (en) | Method of producing tubes by pressure welding | |
| JPH03169409A (en) | Wall thickness control method of reducing mill | |
| JPS59197308A (en) | Setting method of roll gap | |
| JPS60257912A (en) | Automatic screw down control method for reeling mill |