JPS6366332A - Sliver exchanging method and device therefor in spinning machine - Google Patents
Sliver exchanging method and device therefor in spinning machineInfo
- Publication number
- JPS6366332A JPS6366332A JP20386886A JP20386886A JPS6366332A JP S6366332 A JPS6366332 A JP S6366332A JP 20386886 A JP20386886 A JP 20386886A JP 20386886 A JP20386886 A JP 20386886A JP S6366332 A JPS6366332 A JP S6366332A
- Authority
- JP
- Japan
- Prior art keywords
- bobbin
- bobbins
- spinning machine
- pair
- hangers
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000009987 spinning Methods 0.000 title claims abstract description 73
- 238000000034 method Methods 0.000 title claims description 33
- 238000000151 deposition Methods 0.000 abstract description 2
- 238000006073 displacement reaction Methods 0.000 description 12
- 230000007246 mechanism Effects 0.000 description 10
- 238000010586 diagram Methods 0.000 description 4
- 238000004804 winding Methods 0.000 description 4
- 230000003028 elevating effect Effects 0.000 description 2
- 230000003213 activating effect Effects 0.000 description 1
- 239000003086 colorant Substances 0.000 description 1
- 238000007796 conventional method Methods 0.000 description 1
- 210000005069 ears Anatomy 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
Classifications
-
- D—TEXTILES; PAPER
- D01—NATURAL OR MAN-MADE THREADS OR FIBRES; SPINNING
- D01H—SPINNING OR TWISTING
- D01H9/00—Arrangements for replacing or removing bobbins, cores, receptacles, or completed packages at paying-out or take-up stations ; Combination of spinning-winding machine
- D01H9/005—Arrangements for replacing or removing bobbins, cores, receptacles, or completed packages at paying-out or take-up stations ; Combination of spinning-winding machine for removing empty packages or cans and replacing by completed (full) packages or cans at paying-out stations; also combined with piecing of the roving
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Textile Engineering (AREA)
- Spinning Or Twisting Of Yarns (AREA)
Abstract
Description
【発明の詳細な説明】
〔産業上の利用分野〕
本発明は精紡機における篠交換方法とその方法を実施す
るのにより好ましい篠交換機に関する。DETAILED DESCRIPTION OF THE INVENTION [Industrial Field of Application] The present invention relates to a method for replacing a wire in a spinning machine and a wire exchanger more preferable for carrying out the method.
より詳しくは、精紡機のクリールの前後2列のボビンハ
ンガーに吊下されているM巻ボビンが空又は小玉ボビン
になったときに、これらボビンを精紡機のクリール上の
交換されるべきボビンの数と同じ数のボビンハンガーを
有する予備レール上のボビンハンガーに吊下されている
満ボビンと交換する方法とその方法を実施するのにより
好ましい篠交換機に関する。More specifically, when the M-volume bobbins suspended from the front and rear two rows of bobbin hangers on the creel of a spinning machine become empty or become small bobbins, these bobbins are replaced with the bobbins to be replaced on the creel of the spinning machine. The present invention relates to a method for exchanging a full bobbin suspended from a bobbin hanger on a spare rail having the same number of bobbin hangers as the number of bobbin hangers, and a more preferable exchanger for carrying out the method.
〔従来の技術と発明が解決しようとする問題点〕精紡機
のボビンハンガーに吊下げられている篠巻ボビンが空に
なったり、小玉ボビンになったときに、その篠をボビン
を満ボビンに交換することが必要である。[Problems to be solved by the conventional technology and invention] When the Shinomaki bobbin hanging on the bobbin hanger of the spinning machine becomes empty or becomes a small bobbin, it is difficult to replace the Shinomaki bobbin with a full bobbin. It is necessary to replace it.
紡績工程の省力化を進めるために、精紡機の篠交換工程
についても自動化が要請され、各種の提案がなされてい
る。例えば特公昭61−1533号公報に開示された篠
交換方法では精紡機のクリールの前列および後列毎にそ
れぞれ同じ大きさの篠巻を仕掛けて紡出し、前列のボビ
ンが小玉ボビンになったときにその小玉ボビンを予備レ
ール上の満ボビンと交換している。一方特開昭61−1
02428号公報および特開昭61−119728号公
報には精紡機のクリールの手前上方に予備レールを1本
又は2本配置し、この予備レール上のボビンハンガーに
吊下された満ボビンと精紡機のクリールの前後2列のボ
ビンハンガーに吊下された小玉ボビンを前後一対づつ交
換する方法が提案されている。In order to save labor in the spinning process, automation of the spinning machine replacement process is also required, and various proposals have been made. For example, in the Shino exchange method disclosed in Japanese Patent Publication No. 61-1533, Shino windings of the same size are installed in each of the front and rear rows of the creel of a spinning machine, and when the bobbin in the front row becomes a small bobbin, The small bobbin is being replaced with a full bobbin on the spare rail. On the other hand, JP-A-61-1
No. 02428 and Japanese Patent Application Laid-Open No. 61-119728 disclose that one or two spare rails are arranged above the creel of the spinning machine, and a full bobbin and the spinning machine are suspended from a bobbin hanger on the spare rail. A method has been proposed in which small bobbins suspended from two rows of bobbin hangers, front and rear, of a creel are replaced in pairs.
これら従来の篠交換方法では最初に精紡機から外された
空又は小玉ボビン(以下総称して小玉ボビンという)を
吊下するための予備のボビンハンガーを予備レールを走
行するボビンキャリッジに設けておかなければならない
。すなわち精紡機1台の片側で交換される小玉ボビンの
数をN個とすれば少くとも1個の予備のボビンハンガー
、したがって全体でN+1個のボビンハンガーをボビン
キャリッジに設けておかなければならず、又前後一対づ
つ2偏量時に篠交換する場合には2個の予備のボビンハ
ンガー、したがって全体でN+2個のボビンハンガーを
ボビンキャリッジに設けておかなければならない。第1
8図(A)に後者の特開昭61−119728の場合に
おける篠交換する以前でのボビンキャリッジ14上のボ
ビンハンガー15の配置状態を示す。図において矢印X
は篠交換機の篠交換進行方向を示す。したがってボビン
キャリッジに満ボビンを吊下して篠交換を開始するとき
には予備のボビンハンガー(第18図(A)における1
5.、15□)はボビンキャリッジの先端側、すなわち
篠交換機で最初の1個又は2個の交換する側になければ
ならないが、篠交換が終ったとき、すなわち空ボビンが
吊下されたときにはボビンキャリッジの後端側が予備の
ボビンハンガー(第18図(B)におけるに15.、、
.157.2)になる。そのために篠交換前と篠交換後
では予備のボビンハンガーが精紡機に向って反対側の位
置となる。そのために篠交換後の空ボビンが吊下された
キャリッジを精紡機の上方へ搬送し、例えば特開昭61
−119730号等に開示された粗紡機の自動管替装置
によって粗紡機で巻き上った満ボビンと交換し、再び満
ボビンを吊下したボビンキャリッジを精紡機へ搬送する
際にボビンキャリッジを反転させなければならない。す
なわち精紡機と粗紡機間をボビンキャリフジで搬送する
途中でほぼ精紡機の機台全長に相当する長いボビンキャ
リッジをUターンさせなければならないので複数の粗紡
機と多数の精紡機間をボビンキャリッジによって自動的
に搬送し、且つ制御することが困難であった。さらに近
年来ロング精紡機が実用化され、2台(又は2回)の粗
紡機で玉揚げされた満ボビンのボビンキャリッジを連結
して精紡機へ供給するとその連結部に1個又は2個の予
備のボビンハンガーがあるため連結部に対応する満ボビ
ンの供給が不可能となり自動交換ができなくなる。In these conventional Shino replacement methods, a spare bobbin hanger is first installed on the bobbin carriage running on a spare rail to hang the empty or small bobbin (hereinafter collectively referred to as small bobbin) that has been removed from the spinning machine. There must be. In other words, if the number of small bobbins to be replaced on one side of a spinning frame is N, at least one spare bobbin hanger must be provided on the bobbin carriage, so a total of N+1 bobbin hangers must be provided on the bobbin carriage. In addition, when replacing the threads in two pairs of front and rear bobbins, two spare bobbin hangers, therefore a total of N+2 bobbin hangers, must be provided on the bobbin carriage. 1st
FIG. 8(A) shows the arrangement of the bobbin hanger 15 on the bobbin carriage 14 before the wire is replaced in the latter case of JP-A-61-119728. Arrow X in the figure
indicates the direction of Shino exchange progress of the Shino exchange machine. Therefore, when you hang a full bobbin on the bobbin carriage and start replacing the bobbin, prepare a spare bobbin hanger (1 in Figure 18 (A)).
5. , 15□) must be on the tip side of the bobbin carriage, that is, on the side where the first one or two bobbins are replaced in the Shino exchange machine, but when the Shino exchange is finished, that is, when the empty bobbin is suspended, the bobbin carriage There is a spare bobbin hanger on the rear end side (15. in Fig. 18(B)).
.. 157.2). For this reason, the spare bobbin hanger is located on the opposite side facing the spinning machine before and after the Shino replacement. For this purpose, the carriage with the empty bobbin suspended after Shino replacement is transported to the upper part of the spinning machine.
-The automatic tube changing device of the roving frame disclosed in No. 119730 etc. is used to replace the full bobbin wound up by the roving frame, and the bobbin carriage is reversed when the bobbin carriage with the full bobbin suspended is conveyed to the spinning frame again. I have to let it happen. In other words, the long bobbin carriage, which is approximately equivalent to the entire length of the spinning frame, must be made a U-turn while being transported between the spinning frame and the roving frame using the bobbin carriage. It was difficult to automatically transport and control the materials. Furthermore, in recent years, long spinning frames have been put into practical use, and when bobbin carriages full of bobbins doffed by two (or twice) roving frames are connected and fed to the spinning frame, one or two bobbin carriages are connected to the spinning frame. Since there is a spare bobbin hanger, it is impossible to supply a full bobbin corresponding to the connecting part, and automatic replacement is impossible.
本発明はかかる問題点を解決して、篠交換される精紡機
の空ボビンの数Nと同し数だけのボビンハンガーを予備
レールのボビンキャリッジに設けて篠交換する方法と、
その方法を実施するための篠交換機を提供することを目
的とする。The present invention solves such problems and provides a method for replacing the bobbins by providing the same number of bobbin hangers on the bobbin carriage of the spare rail as the number N of empty bobbins of the spinning machine to be replaced;
The purpose of the present invention is to provide a Shino switching device for carrying out the method.
〔問題点を解決するための手段〕
本発明の目的は精紡機のクリールの前後2列のボビンハ
ンガーに吊下されているボビンと、クリールの手前上方
に設けた予備レールのボビンキャリッジのボビンハンガ
ーに吊下されている満ボビンとを、も1紡機機台に沿っ
て走行する篠交換機によって前後一対毎に篠換えする篠
交換方法であって、前記篠交換機に一対のボビン保持具
を設け、最初の交換すべき一対の小玉ボビン又は満ボビ
ンを一時ボビン保持具に預け、預けたまま順次精紡機に
沿って一連の篠換えを行い、最後の篠換えを行うに際し
てボビン保持具上の一対の小玉ボビン又は満ボビンを所
定の予備レールのボビンハンガー又は前後一対のボビン
ハンガーに移し換えて精紡機の一端から他端に向けての
篠換えを完了する篠交換方法によって達成される。[Means for Solving the Problems] The object of the present invention is to improve the bobbin hangers of the bobbin carriages of the bobbin carriages of the spare rail provided above the creel of the spinning machine. A bobbin exchange method in which full bobbins suspended from a spinning machine are exchanged in pairs, front and rear, by a bobbin exchanger running along a spinning machine stand, the bobbin exchanger being provided with a pair of bobbin holders, The first pair of small bobbins or full bobbins to be replaced are temporarily deposited in the bobbin holder, and while they are being deposited, a series of thread changes are carried out sequentially along the spinning machine. This is accomplished by a thread change method that completes the thread change from one end of the spinning machine to the other end by transferring a small bobbin or a full bobbin to a bobbin hanger on a predetermined spare rail or a pair of front and rear bobbin hangers.
前記篠交換方法を実施するだめの篠交換機は篠交換機本
体に最初の交換すべき一対の小玉ボビン又は満ボビンを
一時預けする2個のボビン保持具を設けることを特徴と
する。A second Shino exchanger for carrying out the above Shino exchange method is characterized in that the main body of the Shino exchanger is provided with two bobbin holders for temporarily holding a pair of small bobbins or full bobbins to be exchanged first.
以下添付図面に示した実施例に基づいて本発明を詳述す
る。The present invention will be described in detail below based on embodiments shown in the accompanying drawings.
本発明による精紡機の篠交換方法およびその方法を実施
するための篠交換機を精紡機の手前上方に配置した予備
レールが1木である場合を第゛1実施例として最初に説
明する。First, a first embodiment will be described in which a method for replacing a spinning frame in a spinning machine according to the present invention and a case where a spare rail for carrying out the method is arranged above the front of the spinning machine is one piece.
第1図に示すように、精紡機の機台3の中央部に機台長
手方向に適宜な間隔で精紡クリールのクリールピラー4
が樹立され、精紡機の牽伸部5上方には予備レール13
が前記クリールピラー4の上端に取着されたレールブラ
ケット7の先端に支持されて機台長手方向に沿って配設
されている。As shown in Fig. 1, creel pillars 4 of the spinning creel are placed at appropriate intervals in the longitudinal direction of the spinning machine in the center of the spinning frame 3.
is established, and a spare rail 13 is installed above the drafting section 5 of the spinning machine.
is supported by the tip of a rail bracket 7 attached to the upper end of the creel pillar 4 and is disposed along the longitudinal direction of the machine.
この予備レール13は断面形状口形の下部が開口した中
空柱状体に形成されており、その開口側にボビンキャリ
ッジ14が走行可能に嵌装され、ボビンキャリッジ14
にはクリールのボビンハンガー12と同じ間隔で前列の
ボビンハンガーの数Nと同じ数Nのボビンハンガーが設
けである。篠交換前には、ボビンキャリッジ14に前列
のボビンハンガーの数Nと同じ数Nの満ボビン1が吊持
され、その際第11図の平面図に示す如く、クリールの
ボビンハンガー12列の中間に満ボビンlが位置するよ
うにボビンキャリッジが停止している。This spare rail 13 is formed into a hollow columnar body with a mouth-shaped cross-section and an open lower part, and a bobbin carriage 14 is fitted to the open side so that the bobbin carriage 14 can run.
The number N of bobbin hangers equal to the number N of bobbin hangers in the front row are provided at the same intervals as the bobbin hangers 12 of the creel. Before replacement, the bobbin carriage 14 suspends the same number N of full bobbins 1 as the number N of bobbin hangers in the front row, and as shown in the plan view of FIG. The bobbin carriage is stopped so that the full bobbin 1 is located at .
一方クリールピラー4の中央部上方に取着された支持ブ
ラケット8と前記レールブラケット7の先端を連結して
配置されたし形状の支持バー9には3本の支持パイプI
la 、 Ilb 、 Ilcが配設され、支持パイプ
lla、IIcには所定の間隔で紡出用の篠巻ボタン用
のボビンハンガー12が配置され、支持パイプllbに
はロービングガイドIOが配置される。前記ボビンハン
ガー12に吊持される篠、巻ボビン2F、2Bは予備レ
ールが1本である場合に篠交換を実施するに際しては、
機台長手方向に交互に満ボビンと中玉ボビンを吊持して
紡出しく前後一対は同一径)、前後一対の中玉ボビンが
空ボビン2F、2Bになったときに前後一対の篠巻ボビ
ンが同時に篠交換される。On the other hand, a support bracket 8 attached above the central part of the creel pillar 4 and a support bar 9 in the shape of a tape, which is arranged to connect the tip of the rail bracket 7, have three support pipes I.
bobbin hangers 12 for spinning buttons are arranged at predetermined intervals on the support pipes lla and llc, and a roving guide IO is arranged on the support pipe llb. In the case where there is only one spare rail for the winding bobbins 2F and 2B suspended on the bobbin hanger 12, when replacing the winding,
Full bobbins and medium bobbins are hung alternately in the longitudinal direction of the machine for spinning (the front and rear pairs have the same diameter), and when the front and rear pair of medium bobbins become empty bobbins 2F and 2B, the front and rear pairs of shinomaki are spun. The bobbin is replaced at the same time.
本発明による篠交換方法は精紡機の機台前面に沿って、
すなわちスピンドル20の列に沿って移動する篠交換機
30を用いて実施される。篠交換機300零体31の下
側には第1図および第2図に示すように、車輪32、本
体31の精紡機に対向する側面にガイドローラ24が設
けられ、さらに本体31内には本体走行用モータ(図示
せず)と走行用モータと協働するスクロールカムが設け
られている。−力積紡機のスピンドルレール21には取
付ブラケット22を介してガイドレール23が付設され
、そのガイドレール23の外側表面には精紡機のボビン
ハンガー12のピッチ間隔と等しい間隔を置いてガイド
ピン25が多数植設されている。前記ガイドローラ24
はガイドレール23上を回転可能であり、したがって前
記スクロールカムにガイドピン25を係合させながらス
クロールカムを回転させることによって、篠交換機30
を精紡機のスピンドル列に沿って移動させ、且つ篠交換
作業を行うのに適した所定位置に停止させることができ
る。The Shino exchange method according to the present invention includes:
That is, it is carried out using a Shino exchanger 30 that moves along a row of spindles 20. As shown in FIGS. 1 and 2, a wheel 32 is provided on the lower side of the zero body 31 of the Shino exchanger 300, and a guide roller 24 is provided on the side of the main body 31 facing the spinning machine. A traction motor (not shown) and a scroll cam cooperating with the traction motor are provided. - A guide rail 23 is attached to the spindle rail 21 of the impulse spinning machine via a mounting bracket 22, and guide pins 25 are provided on the outer surface of the guide rail 23 at intervals equal to the pitch interval of the bobbin hanger 12 of the spinning machine. are planted in large numbers. The guide roller 24
is rotatable on the guide rail 23, therefore, by rotating the scroll cam while engaging the guide pin 25 with the scroll cam, the Shino exchanger 30 is rotated.
can be moved along the spindle row of the spinning machine and stopped at a predetermined position suitable for carrying out the wire replacement work.
次に篠交換機30の構成について説明する。篠交換機3
0には、精紡機のクリール上の前後一対のボビンハンガ
ー12に吊持された小玉ボビン2を予備レール13上の
隣接する2本のボビンハンガー15に吊持された満ボビ
ンlと交換する作業を所定の順序で行うための各種装置
とこれら装置の駆動機構が装備されている。すなわち第
1図および第2図に示すように、篠交換機30には最初
に交換すべき一対の小玉ボビン又は満ボビンを一時預け
する2個のボビン保持具150と、一対のペッグを有し
、その一対のベツグ間の間隔を、テレスコピック機構を
作動してクリールの前後のボビンハンガーの間隔すと予
備レールのボビンハンガーの間隔aに変更されるように
構成したベツグユニット40と、ベツグユニット40の
テレスコピック機構を作動してペッグユニット40中の
スライダを前後進させる前後動装置60と、ペッグユニ
ット40を昇降させる昇降装置70と、一対のベツグが
予備レールの空のボビンハンガーの直下位置と予備レー
ルの満ボビンの直下位置に対応するようにペッグユニッ
ト40を移動させる変位装置90が装備されている。Next, the configuration of the Shino switch 30 will be explained. Shino exchange machine 3
In step 0, a small bobbin 2 suspended from a pair of front and rear bobbin hangers 12 on a creel of a spinning machine is replaced with a full bobbin L suspended from two adjacent bobbin hangers 15 on a spare rail 13. It is equipped with various devices and drive mechanisms for these devices to perform the steps in a predetermined order. That is, as shown in FIGS. 1 and 2, the Shino exchanger 30 has two bobbin holders 150 for temporarily holding a pair of small bobbins or full bobbins to be exchanged first, and a pair of pegs. A bed unit 40 configured such that the distance between the pair of bed is changed to the distance a between the bobbin hangers of the spare rail by operating a telescopic mechanism to change the distance between the bobbin hangers before and after the creel, and a telescopic mechanism of the bed unit 40. a back-and-forth moving device 60 that moves the slider in the peg unit 40 back and forth; a lifting device 70 that raises and lowers the peg unit 40; A displacement device 90 is provided to move the peg unit 40 to a position directly below the bobbin.
ボビン保持具150は篠交換機30上に固設され、上方
に延びるピラー151によって支えられる。このボビン
保持具150はペソグユニッ)40の移動可能な範囲で
、ペッグユニット40が篠交換のために満ボビン又は小
玉ボビンをベツグに載置して移動する際に干渉しない位
置に設置されている本実施例のボビン保持具150は第
3図のように弧状の連結部161の両側にベツグユニッ
トの旋回中心に向いて開口したU形状の保持部150a
を有する平板状の保持部材でU形状保持部150aに満
ボビン又は小玉ボビンの鍔部を吊下げて保持する。そし
て2個の保持部150a 、 150aの間隔Cは予備
レールのボビンハンガーの間隔aと同一になっている。The bobbin holder 150 is fixedly installed on the Shino exchanger 30 and supported by a pillar 151 extending upward. This bobbin holder 150 is installed within the movable range of the peg unit 40 in a position where it does not interfere when the peg unit 40 places a full bobbin or a small bobbin on the bed for replacement. As shown in FIG. 3, the bobbin holder 150 of the embodiment has U-shaped holding parts 150a that are open on both sides of an arc-shaped connecting part 161 toward the center of rotation of the begging unit.
The flange of a full bobbin or a small bobbin is suspended and held from the U-shaped holding part 150a by a flat holding member having a shape. The interval C between the two holding parts 150a, 150a is the same as the interval a between the bobbin hangers of the spare rail.
ボビン保持具150は小玉ボビン2又は満ポビンlを一
時的に保持することができるものであればどのような形
状又は機構を採用してもよい。第4図にボビン保持具1
50の異なるタイプの例を示す。第4図に平面図で示し
たボビン保持具152はグリッパ−タイプのボビン保持
具であり、その内側にそれぞれ小玉ボビン2の粗糸ボビ
ンの中間部を把持する把持面154a 、154bをそ
れぞれ有するL形状の把持部材153a 、 153b
をボビン保持具本体159に植設したピン155a 、
155bを中心として揺動可能に配置し、把持部材1
53a 、 153bの他端にマグネット157の作動
によって第4図において上下動するピン156に係合さ
せている。このボビン保持具152はマグネット157
に通電することにより粗糸ボビンの把持およびその解放
を行うことができる。なお2個のボビン保持具152間
の距離Cは予備レール上のボビンハンガーの間隔aに合
せて定められて連結バー158で連結され、その連結バ
ー158をピラー151が支える。第5(A)に平面図
で、第5図(B)に正面図で示した他のボビン保持具1
60は片側に開口部162を有し断面形状が満ボビンの
底部形状に合せた円錐形状のボビン保持具であり、開口
部162を一点鎖線で示した満ボビン1を側方から挿入
することにより、満ボビンlを下方から支えて保持する
ことができる。この場合も2個の161によって連結さ
れる。The bobbin holder 150 may have any shape or mechanism as long as it can temporarily hold the small bobbin 2 or the full bobbin 1. Figure 4 shows bobbin holder 1.
Examples of 50 different types are shown. The bobbin holder 152 shown in plan view in FIG. 4 is a gripper type bobbin holder, and has gripping surfaces 154a and 154b inside thereof for gripping the intermediate portion of the roving bobbin of the small bobbin 2, respectively. shaped gripping members 153a, 153b
a pin 155a implanted in the bobbin holder main body 159,
The gripping member 1 is arranged so as to be swingable about 155b.
The other ends of 53a and 153b are engaged with a pin 156 that moves up and down in FIG. 4 by the operation of a magnet 157. This bobbin holder 152 has a magnet 157
By applying electricity to the roving bobbin, the roving bobbin can be gripped and released. Note that the distance C between the two bobbin holders 152 is determined according to the interval a of the bobbin hangers on the spare rail, and they are connected by a connecting bar 158, and the pillar 151 supports the connecting bar 158. Another bobbin holder 1 shown in a plan view in FIG. 5(A) and in a front view in FIG. 5(B)
60 is a bobbin holder having an opening 162 on one side and a conical cross-sectional shape matching the bottom shape of the full bobbin. , can support and hold a full bobbin l from below. In this case as well, they are connected by two 161s.
第1図、第2図に示すように、篠交換機30の本体31
内の支持プレート72に昇降装置70が取付けられる。As shown in FIGS. 1 and 2, the main body 31 of the Shino exchanger 30
A lifting device 70 is attached to a support plate 72 inside.
すなわち支持プレート72の下側に昇降装置70用のモ
ータ(以下第1モータと称す)71が固定され、上側に
は下側ピラーブラケフt−73aが固定される。本体3
1の天井に上側ピラーブラケッl−73bが固定され、
前記下側ピラーブラケット73aとの間に2本のピラー
75a、75bが垂直に立設され、2本のピラー75a
、75bには摺動可能にスライダー77が嵌装されてい
る。前記第1モータ71に取付けたチェノホイール74
aと上側ピラーブラケット73bに植設したピンに回動
自在に遊嵌されているチェノホイール74bにチェノ7
6を懸回し、そのチェーン76をスライダー77にチェ
ーンホルダ78a、78bによって固定されている。ス
ライダー77には2本のサポートロンドア9a、79b
が垂直に固着され、そのサポートロンドア9a、79b
の上端にペッグユニット40を支持する支持体96が固
定されている。従って昇降装置70は第1モータ71に
通電するとチェーン76を介してスライダー77を昇降
し、それにともなってペッグユニット40を支持してい
るペッグユニット支持体96が昇降する。That is, a motor 71 for the lifting device 70 (hereinafter referred to as a first motor) is fixed to the lower side of the support plate 72, and a lower pillar bracket t-73a is fixed to the upper side. Main body 3
The upper pillar bracket l-73b is fixed to the ceiling of 1.
Two pillars 75a and 75b are vertically arranged between the lower pillar bracket 73a, and the two pillars 75a
, 75b are slidably fitted with a slider 77. Cheno wheel 74 attached to the first motor 71
The cheno wheel 74b is rotatably fitted loosely to a pin installed in the upper pillar bracket 73b and the cheno wheel 74b.
6 is suspended, and its chain 76 is fixed to a slider 77 by chain holders 78a and 78b. The slider 77 has two support doors 9a and 79b.
is fixed vertically, and its support Ron door 9a, 79b
A support 96 that supports the peg unit 40 is fixed to the upper end of the peg unit 40 . Therefore, when the first motor 71 is energized, the elevating device 70 moves the slider 77 up and down via the chain 76, and the peg unit support 96 supporting the peg unit 40 moves up and down accordingly.
第6図および第7図に示すように、支持体96には軸受
97a、97bを介して中空軸94が軸支され、さらに
変位装置90のモーター91が固定されている。中空軸
94の上部は駆動軸64を軸受66aを介して回転可能
に支承し、中空軸94の下部には駆動軸下方支持ブラケ
ット93が固定されていて前記駆動軸64の下部が軸受
け66bを介して支持ブラケット93に回転可能に支承
されている。支持ブラケット93の下方には前後動装置
60用のモーター(以下第2モータと称す)81がボル
トを用いて固定されている。第2モータ81のモータシ
ャフト67に取付けた駆動ギヤー68と駆動軸64の下
端に固定されたギヤーが噛合し駆動軸64の上方部分に
ペッグユニット駆動用歯車65が固定される。As shown in FIGS. 6 and 7, a hollow shaft 94 is rotatably supported on the support 96 via bearings 97a and 97b, and a motor 91 of the displacement device 90 is further fixed thereto. The upper part of the hollow shaft 94 rotatably supports the drive shaft 64 via a bearing 66a, and a lower drive shaft support bracket 93 is fixed to the lower part of the hollow shaft 94. It is rotatably supported by a support bracket 93. A motor (hereinafter referred to as a second motor) 81 for the longitudinal movement device 60 is fixed below the support bracket 93 using bolts. A drive gear 68 attached to the motor shaft 67 of the second motor 81 and a gear fixed to the lower end of the drive shaft 64 mesh with each other, and the peg unit drive gear 65 is fixed to the upper part of the drive shaft 64.
中空軸94の上部は大径の歯車98に形成され、その歯
車98にスライドベース41がボルト締めされている。The upper part of the hollow shaft 94 is formed into a large diameter gear 98, and the slide base 41 is bolted to the gear 98.
そしてペッグユニット40は第7図第8図に示すように
、中空軸94に固定されたスライドベース41とスライ
ドベース41上を摺動する第1スライダー42と更に第
1スライダー上を摺動する第2スライダーによって構成
されている。、即ちスライドベース41は断面口字状に
成形されていて前後方向の両端部(第7図の左右端)を
外側に折曲げた耳部41aの上面に第10ツド44がボ
ルト締めされている。そして前側の1本のボルトだけが
上方に突出していてストッパーピン57を兼ねている。As shown in FIGS. 7 and 8, the peg unit 40 includes a slide base 41 fixed to a hollow shaft 94, a first slider 42 sliding on the slide base 41, and a first slider 42 sliding on the first slider. It consists of 2 sliders. That is, the slide base 41 has a cross-sectional shape, and a tenth bolt 44 is bolted to the upper surface of an ear portion 41a with both ends in the front and back direction (left and right ends in FIG. 7) bent outward. . Only one bolt on the front side protrudes upward and also serves as a stopper pin 57.
スライドベース4Iの上面にはカラー52a 、52b
(第8図)を介して第2ラツク52が固着されている
。第1スライダー42もスライドベース同様に断面口字
状に形成され前後方向の両端の耳部に第20ソド45が
ボルト締めされている。第1スライダー41の両側に突
設した軸受部47が前記スライドベース41の第10ツ
ド44に摺動自在に遊嵌されている。第1スライダー4
2の下面に前記駆動軸の歯車65と噛合っている第1ラ
ツク51を固着し、上面にはピニオン54を回動自在に
軸支し、そのピニオン54が第7図のように前記の第2
ラツク52と第2スライダー43の下面に固着した第3
ラツク53に噛合されている。そして第1スライダー4
2の下面には前記の第2ラツク52が移動したときに干
渉しないように長い長孔42aが成形されている。第2
スライダー43も断面口字状に形成され、その両側に突
設した軸受部48が前記第1スライダーの第20ツド4
5に摺動自在に嵌っている。第2スライダー43の前端
部にベツグ35を固着し、ペッグ36は第2スライダー
43の底板の上面に取付けである第30ンド46に摺動
自在に遊嵌されている。そして第9図、第10図のよう
に第2スライダ43内に巻ばね59によってワイヤー6
1を巻取る方向に付勢されているワイヤードラム58を
設け、ワイヤー61はガイドローラ62を経てその先端
がペッグ36の前側面に取付けであるワイヤーフック6
1aに結着されている。従って第30ツド36に摺動可
能なペッグ36は前方へ引張られていて、第2スライダ
ー43に固着しである第30ツド43の取付台座用のス
トッパー63に当接して位置定めされている。Colors 52a and 52b are provided on the top surface of the slide base 4I.
A second rack 52 is secured via the (FIG. 8). Like the slide base, the first slider 42 is also formed in a cross-sectional shape, and a 20th rod 45 is bolted to the ears at both ends in the front and back direction. Bearing portions 47 protruding from both sides of the first slider 41 are slidably fitted into the tenth prong 44 of the slide base 41. 1st slider 4
A first rack 51 meshing with the gear 65 of the drive shaft is fixed to the lower surface of the drive shaft 2, and a pinion 54 is rotatably supported on the upper surface of the drive shaft. 2
The third slider fixed to the lower surface of the rack 52 and the second slider 43
It is engaged with the rack 53. And the first slider 4
A long slot 42a is formed in the lower surface of the rack 2 so as not to interfere with the movement of the second rack 52. Second
The slider 43 is also formed in a cross-sectional shape, and the bearing portions 48 protruding from both sides of the slider 43 are connected to the 20th protrusion 4 of the first slider.
5 so that it can slide freely. A peg 35 is fixed to the front end of the second slider 43, and the peg 36 is slidably fitted into a 30th node 46 attached to the upper surface of the bottom plate of the second slider 43. Then, as shown in FIGS. 9 and 10, the wire 6 is inserted into the second slider 43 by a coiled spring 59.
A wire drum 58 is provided which is biased in the direction of winding up the wire 61, and the wire 61 passes through a guide roller 62, and the wire hook 6 whose tip is attached to the front side of the peg 36 is provided.
It is bound to 1a. Therefore, the peg 36 which is slidable on the 30th sleeve 36 is pulled forward and positioned against the stopper 63 for the mounting base of the 30th sleeve 43, which is fixed to the second slider 43.
このときベツグ35と36の間隔aは予備レールのボビ
ンハンガーの間隔aと一致している。ペッグ36の側面
に第1スライダーの軸受部47と第2スライダの軸受部
48の間から突出するように係止片56が取付けである
。At this time, the distance a between the legs 35 and 36 matches the distance a between the bobbin hangers of the spare rail. A locking piece 56 is attached to the side surface of the peg 36 so as to protrude from between the bearing part 47 of the first slider and the bearing part 48 of the second slider.
このようにペッグユニット40はテレスコピック機構に
よって第1スライダ42、第2スライダ43が前後進す
るように構成されている。即ち第2モータ81を作動す
るとその回転はギヤー68゜69を経て駆動軸64に伝
達され、駆動ギヤー65を回転し第1ラツク51を移動
させその結果第1スライダー42がスライドベース41
上を摺動して前進する。その際第1スライダー42上の
ピニオン54も第1スライダー42と共に移動しながら
スライドベース41に固着された第2ラツク52と噛合
って回転する。そのためにピニオン54の周速度は、ピ
ニオン54の中心自体が移動しながらその中心の周りを
回転するので第1スライダー42の線速度の2倍になる
。第2スライダー43に固定された第3ラツク53にこ
のピニオン54が噛合っているので第2スライダー43
は2倍速度で第1スライダ42上を摺動して前進する。In this way, the peg unit 40 is configured such that the first slider 42 and the second slider 43 move back and forth using the telescopic mechanism. That is, when the second motor 81 is operated, its rotation is transmitted to the drive shaft 64 through the gears 68 and 69, which rotates the drive gear 65 and moves the first rack 51, so that the first slider 42 moves toward the slide base 41.
Slide on top to move forward. At this time, the pinion 54 on the first slider 42 also moves together with the first slider 42 and rotates while meshing with the second rack 52 fixed to the slide base 41. Therefore, the circumferential speed of the pinion 54 is twice the linear speed of the first slider 42 because the center of the pinion 54 rotates around the center itself while moving. Since this pinion 54 is meshed with the third rack 53 fixed to the second slider 43, the second slider 43
slides on the first slider 42 at twice the speed and moves forward.
この前進の途中でペッグ36の係止片がスライドベース
のストッパーピン57に当接してペッグ36の前進が阻
止される。更に第1スライダ42、第2スライダ43の
前進を続け、このときには巻ばね58の付勢力に抗して
ペッグ36が第2スライダ43内に相対的に後方へ移動
することにより、前進端に達すると、第1、第2スライ
ダ42 、43は第7図、第9図の仮想線で図示した状
態となってペッグ35と36の間隔すは精紡機のクリー
ル間隔すと一敗する。後退するときにはその途中で第2
スライダ43のストッパ63がペッグ36に当接し、そ
の後はベツグ35とペッグ36の間隔aを保って後退し
、第6図の実線で示す待機位置に戻る。During this forward movement, the locking piece of the peg 36 comes into contact with the stopper pin 57 of the slide base to prevent the peg 36 from moving forward. Further, the first slider 42 and the second slider 43 continue to move forward, and at this time, the peg 36 moves relatively backward into the second slider 43 against the biasing force of the coil spring 58, and thus reaches the forward end. As a result, the first and second sliders 42 and 43 are in the state shown by the imaginary lines in FIGS. 7 and 9, and the distance between the pegs 35 and 36 is equal to the creel distance of the spinning machine. When retreating, a second
The stopper 63 of the slider 43 comes into contact with the peg 36, and then moves back while maintaining the distance a between the begs 35 and the pegs 36, returning to the standby position shown by the solid line in FIG.
次に前述の篠交換機30によって行われる篠交換方法を
第12図および第13図の略示平面図に基いて説明する
。Next, the Shino exchange method performed by the aforementioned Shino exchange machine 30 will be explained based on the schematic plan views of FIGS. 12 and 13.
前述の如く篠交換するときには、精紡機のクリールのボ
ビンハンガー12には中エボビン120F。As mentioned above, when replacing the thread, the medium elongated bobbin 120F is attached to the bobbin hanger 12 of the creel of the spinning machine.
120Bと小玉ボビン2F、2Bが交互に吊持され、1
本の予備レールには交換されることになる精紡機のクリ
ール上の小玉ボビンの数に対応する数の満ボビンlが吊
持されて第11図の状態になっている。機台に沿って第
11図の矢印Xで示す方向で走行してきた篠交換機は最
初の空ボビン2F。120B and small bobbin 2F, 2B are suspended alternately, 1
A number of full bobbins 1 corresponding to the number of small bobbins on the creel of the spinning machine to be replaced are suspended on the spare rail, as shown in FIG. 11. The Shino exchanger, which was traveling along the machine base in the direction shown by arrow X in Figure 11, was the first empty bobbin 2F.
2Bにペッグユニット40が対向する位置で停止する(
第11図、第12図(1))。It stops at the position where the peg unit 40 faces 2B (
Figures 11 and 12 (1)).
先づ前後動位置を作動させるとテレスコピンク機構によ
ってペッグユニット40上のペッグ35および36が前
進すると共に相互間の間隔を拡げて、ペッグ35が小玉
ボビン2Bの直下に、ペッグ36が小玉ボビン2Fの直
下に達する(第12図(2))。次いで昇降装置70が
作動してペッグユニット40を上昇させ精紡機のクリー
ルのボビンハンガー12から小玉ボビン2B、2Fを外
して下降する。次いでペッグ35およびペッグ36は後
退すると共に相互間の間隔を縮少し元の位置に戻る(第
12図(3))。其後ペッグユニット40は変位装置9
0を作動することによって90°回転させるとともにペ
ッグ35上の小玉ボビン2Bがボビン保持具150と干
渉しないように僅か前進させた後(第13図(4))ボ
ビン保持具150に対向する位置迄回転しく第12図(
5))、其後ペソグユニッ)40が僅か上昇すると共に
前進させて小玉ボビン保持具150に小玉ボビン2B、
2Fを装入した後ペッグユニット40を下降することに
よりペッグ35 、36に載置されていた小玉ボビン2
B。First, when the forward and backward movement position is activated, the telescopic pink mechanism moves the pegs 35 and 36 on the peg unit 40 forward and widens the distance between them, so that the peg 35 is placed directly below the small bobbin 2B, and the peg 36 is placed directly below the small bobbin 2F. (Fig. 12 (2)). Next, the lifting device 70 is operated to raise the peg unit 40, remove the small bobbins 2B and 2F from the bobbin hanger 12 of the creel of the spinning machine, and lower the peg unit 40. Next, the pegs 35 and 36 move back, reduce the distance between them, and return to their original positions (FIG. 12(3)). After that, the peg unit 40 is a displacement device 9
0, the small bobbin 2B on the peg 35 is moved forward slightly so as not to interfere with the bobbin holder 150 (FIG. 13 (4)), and then reaches a position facing the bobbin holder 150. Figure 12 (
5)) Then, the pesog unit) 40 is slightly raised and moved forward to attach the small bobbin 2B to the small bobbin holder 150.
After loading 2F, by lowering the peg unit 40, the small bobbin 2 placed on the pegs 35 and 36 is removed.
B.
2Fはボビン保持具150に吊下される。(第12図(
6))。かくしてフリーになったペッグ35 、36を
存するペッグユニット40は後退した後変位装置の作動
によって矢印で示すように反時計方向に回転すると共に
2個の満ボビンIB、IFの直下迄イ1かに前進させる
。その位置で昇降装置70が作動してペッグユニット4
0が上昇して満ボビンIB、1Fを外してペッグ35
、36に満ボビンIB。2F is suspended from the bobbin holder 150. (Figure 12 (
6)). After the peg unit 40 containing the pegs 35 and 36, now free, is moved back, it is rotated counterclockwise as shown by the arrow by the operation of the displacement device, and the two full bobbins IB and IF are moved directly under the two full bobbins IB and IF. advance. At that position, the lifting device 70 operates and the peg unit 4
0 rises, full bobbin IB, remove 1F and peg 35
, 36 full bobbin IB.
IFを載置した状態で下降する(第12図(7))。It is lowered with the IF placed thereon (FIG. 12 (7)).
次いでペッグ35 、36は僅かに後退した後に矢印で
示すように時計方向に90”回転する(第12図(8)
)。それからペッグ35 、36は前進しながら相互間
のボビン間隔を拡げてそれぞれの満ボビンIB。Next, the pegs 35 and 36 are slightly retracted and then rotated 90'' clockwise as shown by the arrows (Fig. 12 (8)).
). Then, the pegs 35 and 36 move forward and widen the distance between the bobbins to fill each full bobbin IB.
1Fが先に小玉ボビン2F、2Bが外されて空になって
いる精紡機のクリール上のボビンハンガー12の直下に
達する。次いで昇降装置70を作動させてペッグユニッ
トを上昇させ、ペッグ35 、36上の満ボビンIB、
IFをボビンハンガー12に装着する(第12 (9)
)。次いでペッグユニット40を下降させるとともに後
退させて元位置に戻す(第12図(10))、かくして
篠交換の第1サイクルが終了し、この時には予備レール
13のボビンキャリッジ14上には満ボビンが取外され
て空になっているボビンハンガー15..15□があり
、次サイクルの篠交換機はこの空になっているボビンハ
ンガー15..15□に対して精紡機のクリール上の小
玉ボビンを移すことによって行われる。その作業手順は
第12図(1)〜第12図(4)で示した前記篠交換第
1サイクルと同じであり、第12図(4)で示したペッ
グユニット40が90”回転し予備レールの長手軸方向
に向けられた位置において、予備レール上の空のボビン
ハンガー15+ 、 15□の直下に対応させられる。1F first reaches directly below the bobbin hanger 12 on the creel of the spinning machine, which is empty after the small bobbins 2F and 2B have been removed. Next, the lifting device 70 is operated to raise the peg unit, and the full bobbin IB on the pegs 35 and 36 is lifted.
Attach the IF to the bobbin hanger 12 (12th (9)
). Next, the peg unit 40 is lowered and retracted to return to its original position (FIG. 12 (10)), thus completing the first cycle of replacement, and at this time the bobbin carriage 14 of the spare rail 13 is fully loaded. Removed and empty bobbin hanger 15. .. 15□, and the next cycle's Shino exchange machine will use this empty bobbin hanger 15. .. This is done by transferring the small bobbin on the creel of the spinning machine to 15□. The work procedure is the same as the first cycle of wire replacement shown in FIG. 12(1) to FIG. 12(4), and the peg unit 40 shown in FIG. 12(4) rotates 90" to replace the spare rail. in the longitudinally oriented position corresponds directly below the empty bobbin hangers 15+, 15□ on the spare rail.
従って、この第12図(4)の位置でベツグユニット4
0の昇降装置7oを作動にさせることによってペッグ3
5 、36上の小玉ボビン2B、2Fが前記ボビンハン
ガー15□15□に吊持される。次いでペッグユニット
40を下降させた後、第12図(7)〜第12 (10
)に示す作動手順にしたがって行われ、次のサイクルの
篠交換作業が終了する。以後この作業が精紡機の他端迄
繰返えして行われ、その最終段階では第13図(1)に
示す如く予備レール13のボビンキャリッジ14の終端
部のボビンハンガー15N−+ 、 15.が空になっ
た状態となる。Therefore, in the position shown in FIG. 12 (4), the bed unit 4
By activating the lifting device 7o of peg 3
The small bobbins 2B and 2F on 5 and 36 are suspended by the bobbin hanger 15□15□. Next, after lowering the peg unit 40, FIGS. 12(7) to 12(10)
), and the next cycle of replacement work is completed. Thereafter, this operation is repeated until the other end of the spinning machine is reached, and at the final stage, as shown in FIG. 13(1), the bobbin hangers 15N-+, 15. becomes empty.
従って最後にボビン保持具150に一時預けられている
小玉ボビンをボビンハンガー15N−、、15,に移し
変えることによって1台分の篠換えが完了する。その作
業手順を第1:3図(1)〜(5)に基づいて説明する
。先ずペッグユニット40は変位装置90の作動によっ
て時計方向に回転し、次いで僅か前進した上で上昇して
ベツグ35 、36がボビン保持具150に一時預けら
れている小玉ボビン2B。Therefore, finally, by transferring the small bobbins temporarily stored in the bobbin holder 150 to the bobbin hangers 15N-, , 15, the replacement for one machine is completed. The work procedure will be explained based on FIGS. 1:3 (1) to (5). First, the peg unit 40 rotates clockwise by the operation of the displacement device 90, and then moves forward slightly and then rises to temporarily hold the pegs 35 and 36 in the bobbin holder 150 to hold the small bobbin 2B.
2Fに係合する(第13図(2))。次いでペッグユニ
ット40は僅か後退してペッグ35 、36上の小玉ボ
ビン2B、2Fがボビン保持具150より外され、其後
下降する(第13図(3))。次いでベツグユニット4
0は変位装置90の作動によって反時計方向に回転して
小玉ボビン2B、2Fが予備レールに吊下されている小
玉ボビンの直下に位置させる。2F (Fig. 13 (2)). Next, the peg unit 40 moves back slightly, and the small bobbins 2B and 2F on the pegs 35 and 36 are removed from the bobbin holder 150, and then lowers (FIG. 13(3)). Next, Betsu unit 4
0 is rotated counterclockwise by the operation of the displacement device 90, and the small bobbins 2B and 2F are positioned directly below the small bobbins suspended from the spare rail.
(第13図(4))。この状態で篠交換機30が予61
)iレール13のボビンキャリッジエ4のボビンハンガ
ーの2本分だけ前進し、(篠交換機30の1回の移動分
)ペッグユニット40のベツグ35 、36に載置され
た小玉ボビン2B、2Fがボビンハンガー15. 、1
5□1の直下に移動され、其後ペノグユニソト40の上
下動運動によって小玉ボビン22がボビンハンガー15
N、 15.、に吊持される(第14図(5))。かく
して精紡機1台の片側の篠交換作業が終了する。(Figure 13 (4)). In this state, the Shino exchange machine 30 is
) The small bobbins 2B and 2F placed on the begs 35 and 36 of the peg unit 40 move forward by two bobbin hangers of the bobbin carriage 4 of the i-rail 13 (one movement of the Shino exchanger 30). Bobbin hanger 15. ,1
5□1, and then the small bobbin 22 is moved to the bobbin hanger 15 by the vertical movement of the penog unit 40.
N, 15. , (Fig. 14 (5)). In this way, the wire replacement work on one side of one spinning machine is completed.
向上記実施例においては篠交換機30を小型にするため
に第12図(8)工程でベツグユニット40に載置した
満ボビンを90°回転したときボビン保持具150に吊
下されている小玉ボビンが干渉しない範囲でボビン保持
具150をペッグユニット40の旋回中心に近づけて設
置している。そのために小玉ボビンをボビン保持具15
0に装着する際に第12図(5) 、 (6)工程のよ
うにベツグユニット40を回転と前進の作業を行ってい
るがボビン保持具150を遠ざけて設置すればペッグユ
ニット40の回転動作だけで小玉ボビンをボビン保持具
150に保持さセることができる。そして上記実施例に
おける第12図(4)〜(8)におけるベツグユニット
40の前後進量は僅かであるからペッグ35 、36の
間隔aは変化しない。又篠交換機30を機台から離して
走行させると第13図(5)工程において篠交換機を移
動する代りにベツグユニット40を180°反転させる
こともできるし、(第12図(4)から(7)に変位さ
せる)或いは篠交換[30の移動と第13図(1)〜(
4)の作業を平行して行うようにしてもよい。In the improved embodiment, in order to make the Shino exchanger 30 smaller, when the full bobbin placed on the begging unit 40 is rotated 90 degrees in the step (8) in FIG. 12, the small bobbin suspended from the bobbin holder 150 The bobbin holder 150 is installed close to the center of rotation of the peg unit 40 within a range where it does not interfere. For that purpose, hold the small bobbin with the bobbin holder 15.
0, the peg unit 40 is rotated and moved forward as shown in steps (5) and (6) in FIG. The small bobbin can be held by the bobbin holder 150. In the above embodiment, the distance a between the pegs 35 and 36 does not change since the amount of forward and backward movement of the bed unit 40 in FIGS. 12(4) to 12(8) is small. Also, if the Shino exchanger 30 is moved away from the machine base, the Betsu unit 40 can be reversed by 180 degrees instead of moving the Shino exchanger in the step (5) in FIG. ) or Shino exchange [movement of 30 and Figure 13 (1) to (
The work 4) may be performed in parallel.
次に精紡機のクリールの前列のボビン列の手前に2本の
予備レールを配設した場合における本発明による精紡機
の篠換方法およびその方法を実施するための篠交換機の
一例を第2実施例として説明する。Next, a second example of a spinning machine changing method according to the present invention in a case where two spare rails are arranged in front of the bobbin row in the front row of the creel of a spinning machine and an example of a spinning machine for carrying out the method will be explained. This will be explained as an example.
この実施例の場合には第16図のように精紡機のクリー
ルの手前に設けた2本の予備レールに精紡機のクリール
に吊持されている小玉ボビンと同数の満ボビンが夫々前
後一対の小玉ボビンに向い合った位置に一対の満ボビン
が前後間隔aで吊持されている。最初の一対の小玉ボビ
ン2B、2Fに対向する位置には満ボビンは配置されず
、機台に沿って走行してきた篠交換4a30はベツグユ
ニット40のペッグ35 、36が満ボビンが配置され
ていない位置で停止し、その位置で篠交換が行われる。In the case of this embodiment, as shown in Fig. 16, the same number of full bobbins as the small bobbins suspended on the creel of the spinning machine are placed on two spare rails provided in front of the creel of the spinning machine. A pair of full bobbins are suspended at a position facing the small bobbin with a distance a from front to back. A full bobbin is not placed in the position opposite to the first pair of small bobbins 2B and 2F, and the Shino exchange 4a30 that has traveled along the machine base has pegs 35 and 36 of the bed unit 40 in a position where a full bobbin is not placed. The train will stop at that point, and the Shino exchange will take place at that location.
この篠交換機30は、最初に交換すべき一対の小玉ボビ
ン又は満ボビンを一時預けする2個のボビン保持具15
0と、一対のベツグ35 、36の間隔をテレスコピン
ク機構によってクリールの前後のボビンハンガーの間隔
すと予備レール、ボビンハンガーの間隔aに変更される
ベツグユニット40、ペッグユニット40を前後動させ
る前後動装置60、ペッグユニット40を昇降させる昇
降装置70は前記第1実施例と略同−である。予備レー
ルの空のボビンハンガーの直下位置と予備レールの満ボ
ビンの直下位置に対応するようにペッグユニット40を
移動させる変位装置100が異なるので以下それらの異
なる部分についてのみ説明する。This Shino exchanger 30 has two bobbin holders 15 for temporarily storing a pair of small bobbins or full bobbins to be exchanged first.
0, and when the distance between the pair of begs 35 and 36 is changed between the bobbin hangers before and after the creel using a telescopic pink mechanism, the spacing between the spare rail and the bobbin hanger is changed to a. The device 60 and the lifting device 70 for lifting and lowering the peg unit 40 are substantially the same as those in the first embodiment. Since the displacement device 100 that moves the peg unit 40 to correspond to the position directly below the empty bobbin hanger on the spare rail and the position directly below the full bobbin on the spare rail is different, only the different parts will be explained below.
第14図および第15図に示すように、スライドベース
41の底板下面に4個のピン連結部材113を前後左右
に取付け、スライダー77の前面を後面の左右に夫々支
軸167を植設し、等長の4本のサポートロッド105
a 、 105b 、 106a 、 106bを支軸
107とピン連結部材113のピン108と回動可能に
連結する。即ち4本のサポートロッド105a 。As shown in FIGS. 14 and 15, four pin connecting members 113 are attached to the lower surface of the bottom plate of the slide base 41 on the front, back, left and right, and support shafts 167 are implanted on the left and right sides of the front and rear surfaces of the slider 77, respectively. Four equal length support rods 105
a, 105b, 106a, and 106b are rotatably connected to the support shaft 107 and the pin 108 of the pin connection member 113. That is, four support rods 105a.
IC)5b 、 106a 、 106bとスライドベ
ース41、スライダー77によって平行リンク機構を構
成しペソグユニッ)40は水平に支持された状態で支軸
107を中心にして左右方向(精紡機の機台方向)に揺
動自在に支持される。スライダー77の後面(第14図
の左側面)にモータ取付用ブラケットlO9を固着しそ
の上に変位装置用モータ(以下第4モータと称す)が取
付けられる。第4モータの軸に取付けたスウィングレバ
ー1真lに長孔を削設シ、1本のサポートロッド106
aに植設したピン112が前記スウィングレバー111
の長孔に係合していて第4モータ110の正逆回転によ
ってペッグユニット40を所定量を揺動させる。このよ
うに第2実施例では、ペッグユニット40のスライドベ
ース41が4本のサポートロッドによって支持されてい
るので第1実施例におけるペッグユニットの支持台96
、中空軸94−、等は不要となる。それ故に前後動装置
用の第2モータ81も直接スライドベース41の底面に
取付け、第2モータの軸にテレスコピック機構作動用の
駆動歯車65を取付ければ良い。The IC) 5b, 106a, 106b, the slide base 41, and the slider 77 constitute a parallel link mechanism, and the Pesog unit) 40 is horizontally supported and rotates in the left-right direction (toward the machine frame of the spinning machine) around the spindle 107. Supported so that it can swing freely. A motor mounting bracket lO9 is fixed to the rear surface of the slider 77 (left side surface in FIG. 14), and a displacement device motor (hereinafter referred to as the fourth motor) is mounted on the motor mounting bracket lO9. An elongated hole is cut in the swing lever 1 which is attached to the shaft of the 4th motor, and one support rod 106 is formed.
The pin 112 implanted in a is the swing lever 111.
The peg unit 40 is engaged with the elongated hole, and the peg unit 40 is oscillated by a predetermined amount by forward and reverse rotation of the fourth motor 110. In this way, in the second embodiment, the slide base 41 of the peg unit 40 is supported by the four support rods, so that the support base 96 of the peg unit in the first embodiment is
, hollow shaft 94-, etc. are no longer necessary. Therefore, the second motor 81 for the longitudinal movement device may also be attached directly to the bottom surface of the slide base 41, and the drive gear 65 for operating the telescopic mechanism may be attached to the shaft of the second motor.
第2実施例における篠交換機30も第1実施例と同様な
手順で行われる。以下第17図の略示平面図に基づいて
説明する。The Shino exchange 30 in the second embodiment also follows the same procedure as in the first embodiment. The following description will be made based on the schematic plan view of FIG. 17.
第2実施例の場合の場合は前述のようにぺ・7グ35
、3Gが満管ボビンの配置されている位置の手前の位置
に停止し、(第17図(1))、ペッグユニット40を
前進させて小玉ボビン2B、2Fを取外した後(第17
図(2))、後退して元位置に戻り(第17図(3))
、ペッグユニット40を第17図において右側、すなわ
ち満ボビンの配置位置の反対側に変位装置100によっ
て揺動し、ペッグユニット40を僅か上昇させて小玉ボ
ビン2B、2Fをボビン保持具150に一時預けする(
第17図(4))。In the case of the second embodiment, as mentioned above,
, 3G stops in front of the position where the full bobbin is placed (Fig. 17 (1)), and after moving the peg unit 40 forward and removing the small bobbins 2B and 2F (Fig. 17 (1)),
Figure (2)), retreat and return to the original position (Figure 17 (3))
, the peg unit 40 is swung to the right side in FIG. 17, that is, to the opposite side of the full bobbin placement position by the displacement device 100, the peg unit 40 is slightly raised, and the small bobbins 2B and 2F are temporarily deposited in the bobbin holder 150. do(
Figure 17 (4)).
次いでペソグユニッ1−40は逆の方向に変位装置10
0によって揺動させて満ボビンの直下位置に移動し、満
ボビンIB、IFを取外した後(第17図(5))、ペ
ッグユニット40を元位置に戻しく第17図(6))、
次いでペッグユニットを前進させて満ボビンを取外した
後精紡機のクリールのボビンハンガー12に満ボビンを
装着した後(第17図(7))、ペッグユニット40を
元位置に戻す(第17図(8))、この時には予備レー
ル13のボビンキャリッジ14上には空になっている一
対のボビンハンガーがあり、其後の篠交換はこの空にな
っている予備レール13のボビンキャリッジ14上のボ
ビンハンガーに精紡機のクリール上の一対の小玉ボビン
を移すことによって繰返えして行われる。其の結果、篠
交換の最終サイクルが終了した時には予備レール13の
ボビンキャリッジ14の最終端には空のボビンハンガー
が一対残り、したがってこの空のボビンハンガーに篠交
換機30上のボビン保持具150に預けられている小玉
ボビンをペッグユニット40を用いて移換えることによ
って精紡J!1台の片側の篠交換を終了する。The pesog unit 1-40 then moves the displacement device 10 in the opposite direction.
0 to the position directly below the full bobbin, and after removing the full bobbin IB and IF (FIG. 17 (5)), return the peg unit 40 to its original position (FIG. 17 (6)),
Next, the peg unit is moved forward, the full bobbin is removed, the full bobbin is attached to the bobbin hanger 12 of the creel of the spinning machine (Fig. 17 (7)), and the peg unit 40 is returned to its original position (Fig. 17 (7)). 8)) At this time, there are a pair of empty bobbin hangers on the bobbin carriage 14 of the spare rail 13, and after that, the bobbin hangers on the bobbin carriage 14 of the empty spare rail 13 will be replaced. This is done repeatedly by transferring a pair of small bobbins on the creel of the spinning machine to the hanger. As a result, a pair of empty bobbin hangers remain at the final end of the bobbin carriage 14 of the spare rail 13 when the final cycle of the thread exchange is completed, and therefore, a pair of empty bobbin hangers is attached to the bobbin holder 150 on the thread exchanger 30. By transferring the deposited small bobbin using the peg unit 40, spinning J! Completed replacement of one side of one car.
前記第1実施例および第2実施例の篠交換方法の作業手
順の説明において、小玉ボビンを篠交換機のボビン保持
具に預ける手順として説明した。In the description of the working procedure of the Shino exchange method of the first and second embodiments, the procedure was described as a procedure for depositing a small bobbin into the bobbin holder of the Shino exchange machine.
しかし篠交換を開始するに先立ち一対の満ボビンをボビ
ン保持具に預けることによって予備レールのボビンキャ
リッジの最先端の一対のボビンハンガーを空にし、この
空になるボビンハンガーに対して篠交換を続け、最終の
篠交換サイクルにおいてボビン保持具に預けである満ボ
ビンを精紡機の最終端部のクリール上のボビンハンガー
に吊持させ、精紡機の片側の篠交換を終了させてもよい
。However, before starting the bobbin exchange, the pair of full bobbins is placed in the bobbin holder to empty the pair of bobbin hangers at the most extreme end of the bobbin carriage on the spare rail, and the bobbin exchange continues with these empty bobbin hangers. In the final thread exchange cycle, the full bobbin deposited in the bobbin holder may be suspended from a bobbin hanger on a creel at the final end of the spinning machine, thereby completing the thread exchange on one side of the spinning machine.
尚、上記実施例では一対のベツグ35 、36によって
篠交換を行う篠交換機30について説明したが既知の篠
交換機のように満ボビン[f用の一対のベツグを空ボビ
ン載置用の一対のベツグによって篠交換機を行う篠交換
機においても2個・ボビン保持具を篠交換機に設は同様
に実施し得ることは云うまでもない。Incidentally, in the above embodiment, a Shino exchanger 30 that performs Shino exchange using a pair of bets 35 and 36 has been described, but as in the known Shino exchanger, a pair of Begs for a full bobbin [f] are used as a pair of Begs for placing an empty bobbin. It goes without saying that the installation of two bobbin holders in a Shino exchange machine that performs a Shino exchange can be carried out in the same manner.
〔発明の効果〕
本発明による篠交換方法は篠交換機に一対の小玉ボビン
又は満ボビンを篠交換作業を開始するに先立って一時預
けて行うように構成されているので篠交換に先立って容
易される予備レールのボビンキャリッジ上のボビンハン
ガーの数を交換されることによる小玉ボビンの数と同数
にすることができる。その結果精紡機の自動管替装置と
連動して篠交換作業を行う際に、ボビンキャリッジをU
ターンさせる必要がなく、したがって複数の粗紡機と精
紡機間でのボビンキャリフジでの自動搬送を容易且つ筒
便な設備で行うことができる。又2台(又は2個)の粗
紡機で玉揚げされた満ボビンを一列に連結して用いるロ
ング精紡機に対しても自動的に満ボビンをボビンキャリ
ッジによって搬送することが可能となる。[Effects of the Invention] The Shino exchange method according to the present invention is configured such that a pair of small bobbins or full bobbins is temporarily deposited in the Shino exchange machine prior to starting the Shino exchange work, so it is easy to carry out the Shino exchange prior to the Shino exchange work. The number of bobbin hangers on the bobbin carriage of the spare rail can be made equal to the number of small bobbins to be replaced. As a result, when performing thread replacement work in conjunction with the automatic pipe changing device of the spinning machine, the bobbin carriage
There is no need to turn the bobbin, and therefore automatic conveyance between a plurality of roving frames and fine spinning machines using a bobbin carriage can be easily and conveniently carried out using convenient equipment. Further, it becomes possible to automatically convey full bobbins by the bobbin carriage even to a long spinning machine in which full bobbins doffed by two (or two) roving frames are connected in a row.
図面は本願の実施例を示すものであって、第1図〜第1
3図は本願の第1実施例を示し、第1図は篠交換機と精
紡機との関係を示す断面図、第2図は篠交換機の略示正
面図、第3図はボビン保持具の一実施例を示す篠交換機
の略示平面図、第4図はボビン保持具の他の実施例を示
す平面図、第5図は前記保持具のさらに他の実施例を示
す平面図と正面図、第6図は篠交換機のベツグユニット
全体を示す平面図、第7図は第6図の%i A −Aに
よる篠交換機のベツグ前後進、変位装置を示す一部断面
正面図、′M8図はベツグ前進倍速機構を示す略示平面
図、第9図は第2スライダーの全体を示す図面であって
第9A図は正面図、第9B図は側面図、第10図は第2
スライダにおける第2ベツグを第1ペツグに向けて付勢
する機構を示す図面であって第10Δ図は平面図、第1
0B図は側面図、第11図は第1実施例を実施する際の
篠交換機 −−と精紡
機のクリールおよび予備レール上のボビンとの関係、を
示す略示平面図、第12図および第13図は篠交換の作
業手順を示す説明図であり、第14図〜第17図は本願
の第2実施例を示し、第14図は篠交換機の縦断面図、
第15図は篠交換機の略示正面図、第16図は第2実施
例を実施する際の篠交換機と精紡機のクリールおよび予
備レール上のボビンとの関係を示す略示平面図、第17
図は篠交換の作業手順を示す説明図、第18図は従来の
篠交換方法を行った場合の予備レールのボビンキャリッ
ジ上の予備のボビンハンガーの発生手順を示す正面図で
ある。
1 、IF、IB・・・満ボビン、
2B、2F・・・小玉ボビン、
12・・・精紡機のクリール上のボビンハンガー、13
・・・予備レール、
15・・・予備レール上のボビンハンガー、30・・・
篠交換機、 40・・・ペソグユニント、41・
・・スライダベース、42・・・第1スライダー、43
・・・第3スライダー、70・・・昇降装置、90 、
100・・・変位装置、 150・・・ボビン保持具。The drawings show embodiments of the present application, and include Figures 1 to 1.
3 shows the first embodiment of the present application, FIG. 1 is a sectional view showing the relationship between the Shino exchanger and the spinning machine, FIG. 2 is a schematic front view of the Shino exchanger, and FIG. 3 is a diagram showing one of the bobbin holders. FIG. 4 is a plan view showing another example of the bobbin holder; FIG. 5 is a plan view and a front view showing still another example of the holder; Fig. 6 is a plan view showing the entire bed unit of the Shino exchanger, Fig. 7 is a partial cross-sectional front view showing the betsu movement and displacement device of the Shino exchanger according to %i A-A in Fig. 6, and Fig. 'M8 is a front view of the betsu FIG. 9 is a diagram showing the entire second slider; FIG. 9A is a front view, FIG. 9B is a side view, and FIG. 10 is a diagram showing the second slider.
FIG. 10A is a plan view showing a mechanism for biasing the second peg toward the first peg in the slider, and FIG.
0B is a side view, FIG. 11 is a schematic plan view showing the relationship between the Shino exchanger and the creel of the spinning machine and the bobbin on the spare rail when carrying out the first embodiment, and FIGS. Fig. 13 is an explanatory diagram showing the work procedure of Shino exchange, Figs. 14 to 17 show the second embodiment of the present application, and Fig. 14 is a longitudinal sectional view of the Shino exchange machine;
FIG. 15 is a schematic front view of the Shino exchange machine, FIG. 16 is a schematic plan view showing the relationship between the Shino exchange machine and the creel of the spinning machine and the bobbin on the spare rail when implementing the second embodiment.
FIG. 18 is an explanatory view showing the procedure for replacing the thread, and FIG. 18 is a front view showing the procedure for generating a spare bobbin hanger on the bobbin carriage of the spare rail when the conventional method for replacing the thread is performed. 1, IF, IB...Full bobbin, 2B, 2F...Small bobbin, 12...Bobbin hanger on the creel of spinning machine, 13
...Spare rail, 15...Bobbin hanger on spare rail, 30...
Shino Exchange, 40...Pesog unit, 41.
...Slider base, 42...First slider, 43
...Third slider, 70...Elevating device, 90,
100...Displacement device, 150...Bobbin holder.
Claims (1)
下されているボビンと、クリールの手前上方に設けた予
備レールのボビンキャリッジのボビンハンガーに吊下さ
れている満ボビンとを、精紡機機台に沿って走行する篠
交換機によって前後一対毎に篠換えする篠交換方法であ
って、 前記篠交換機に一対のボビン保持具を設け、最初の交換
すべき一対の小玉ボビン又は満ボビンを一時ボビン保持
具に預け、預けたまま順次精紡機に沿って一連の篠換え
を行い、最後の篠換えを行うに際してボビン保持具上の
一対の小玉ボビン又は満ボビンを所定の予備レールのボ
ビンハンガー又は前後一対のボビンハンガーに移し換え
て精紡機の一端から他端に向けての篠換えを完了する篠
交換方法。 2、精紡機の機台に沿って走行し、精紡機の前後2列の
ボビンハンガーに吊下されている小玉ボビンと、クリー
ルの手前上方に設けた予備レールのボビンキャリッジの
ボビンハンガーに吊下されている満ボビンとを前後一対
毎に交換する篠交換機において、篠交換機本体に最初の
交換すべき一対の小玉ボビン又は満ボビンを一時預けす
る2個のボビン保持具を設けたことを特徴とする篠交換
機。 3、2個のボビン保持具が予備レールのボビンハンガー
と同一の間隔で設けてあることを特徴とする特許請求の
範囲第2項記載の篠交換機。[Claims] 1. Bobbins suspended from two rows of bobbin hangers in front and rear of the creel of a spinning machine, and bobbins suspended from bobbin hangers of a bobbin carriage on a spare rail provided above the front of the creel. A bobbin exchange method in which the bobbins are exchanged pair by pair, front and rear, by a bobbin exchanger running along a spinning machine frame, the bobbin exchanger is provided with a pair of bobbin holders, and the first pair of small bobbins to be exchanged are The bobbin or full bobbin is temporarily deposited in the bobbin holder, and while it is kept there, a series of thread changes are carried out sequentially along the spinning machine, and when performing the final thread change, the pair of small bobbins or full bobbin on the bobbin holder are placed in the specified position. A bobbin exchange method that completes the bobbin change from one end of the spinning machine to the other end by transferring to a bobbin hanger on a spare rail or a pair of front and rear bobbin hangers. 2. The small bobbins run along the frame of the spinning machine and are suspended from the two rows of bobbin hangers in the front and back of the spinning machine, and are suspended from the bobbin hangers of the bobbin carriage on the spare rail provided above the creel. In the Shino exchange machine, which exchanges full bobbins in front and rear pairs, the main body of the Shino exchange machine is provided with two bobbin holders for temporarily storing the first pair of small bobbins or full bobbins to be exchanged. Shino exchange machine. 3. The machine exchanger according to claim 2, wherein the two bobbin holders are provided at the same spacing as the bobbin hangers of the spare rail.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP61203868A JP2562436B2 (en) | 1986-09-01 | 1986-09-01 | How to replace the spinning machine |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP61203868A JP2562436B2 (en) | 1986-09-01 | 1986-09-01 | How to replace the spinning machine |
Related Child Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP14364493A Division JPH07103497B2 (en) | 1993-06-15 | 1993-06-15 | Spinning machine switching machine |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS6366332A true JPS6366332A (en) | 1988-03-25 |
| JP2562436B2 JP2562436B2 (en) | 1996-12-11 |
Family
ID=16481035
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP61203868A Expired - Lifetime JP2562436B2 (en) | 1986-09-01 | 1986-09-01 | How to replace the spinning machine |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP2562436B2 (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH0274635A (en) * | 1988-09-07 | 1990-03-14 | Howa Mach Ltd | Sliver-stretching method for full bobbin |
| US9638238B2 (en) | 2011-10-21 | 2017-05-02 | Chuo Hatsujo Kabushiki Kaisha | Terminal supporting apparatus for control cable |
Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS62223328A (en) * | 1986-03-25 | 1987-10-01 | Toyota Autom Loom Works Ltd | Roving changing machine in spinning machine |
-
1986
- 1986-09-01 JP JP61203868A patent/JP2562436B2/en not_active Expired - Lifetime
Patent Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS62223328A (en) * | 1986-03-25 | 1987-10-01 | Toyota Autom Loom Works Ltd | Roving changing machine in spinning machine |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH0274635A (en) * | 1988-09-07 | 1990-03-14 | Howa Mach Ltd | Sliver-stretching method for full bobbin |
| US9638238B2 (en) | 2011-10-21 | 2017-05-02 | Chuo Hatsujo Kabushiki Kaisha | Terminal supporting apparatus for control cable |
| US9915284B2 (en) | 2011-10-21 | 2018-03-13 | Chuo Hatsujo Kabushiki Kaisha | Terminal supporting apparatus for control cable |
Also Published As
| Publication number | Publication date |
|---|---|
| JP2562436B2 (en) | 1996-12-11 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP2517712B2 (en) | Shino exchange method and spinning machine | |
| US5099641A (en) | Method and apparatus for exchanging roving bobbins | |
| JPS6366332A (en) | Sliver exchanging method and device therefor in spinning machine | |
| JPH0663150B2 (en) | Rover replacement device | |
| JPH0377291B2 (en) | ||
| JPH07103497B2 (en) | Spinning machine switching machine | |
| JPS6257945A (en) | Doffing method in roving machine | |
| JP2503963B2 (en) | Shining machine for spinning machines | |
| JPH07103496B2 (en) | Shinobing machine in spinning machine | |
| JPH0585658B2 (en) | ||
| JPS6353300B2 (en) | ||
| JPH0585659B2 (en) | ||
| JP2002285435A (en) | Cop-changing apparatus in roving frame | |
| JPS642693B2 (en) | ||
| JPH1121020A (en) | Method and system for carrying roving bobbin | |
| JPH0657558A (en) | Device for exchanging roving of fine spinning frame | |
| JPH086045Y2 (en) | Rover replacement device | |
| JPH0115609B2 (en) | ||
| JPH08113834A (en) | Method for changing bobbin in roving frame and apparatus for changing bobbin | |
| JPH0754300Y2 (en) | Bobbin carriage positioning device | |
| JPS61102429A (en) | Bobbin changing in speed frame | |
| JPS642692B2 (en) | ||
| JPH02127530A (en) | Roving exchanger of spinning machine | |
| JPH0325525B2 (en) | ||
| JPS642691B2 (en) |