JPS647958B2 - - Google Patents
Info
- Publication number
- JPS647958B2 JPS647958B2 JP3152784A JP3152784A JPS647958B2 JP S647958 B2 JPS647958 B2 JP S647958B2 JP 3152784 A JP3152784 A JP 3152784A JP 3152784 A JP3152784 A JP 3152784A JP S647958 B2 JPS647958 B2 JP S647958B2
- Authority
- JP
- Japan
- Prior art keywords
- mast
- climbing
- lifting frame
- lifting
- fixed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
- 230000009194 climbing Effects 0.000 claims description 32
- 238000001514 detection method Methods 0.000 claims description 8
- 230000003028 elevating effect Effects 0.000 claims description 4
- 238000006243 chemical reaction Methods 0.000 claims description 2
- 238000010586 diagram Methods 0.000 description 4
- 230000001174 ascending effect Effects 0.000 description 2
- 238000004804 winding Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 1
- 230000006698 induction Effects 0.000 description 1
- 238000004904 shortening Methods 0.000 description 1
Landscapes
- Jib Cranes (AREA)
Description
【発明の詳細な説明】
(産業上の利用分野)
本発明は、地上せり上げ式のクライミングクレ
ーンにおけるワイヤロープ使用のマストせり上げ
装置に関する。DETAILED DESCRIPTION OF THE INVENTION (Field of Industrial Application) The present invention relates to a mast raising device using a wire rope in a climbing crane of the ground raising type.
(背景技術)
地上せり上げ式のクライミングクレーンにおい
て、ワイヤロープによるマストせり上げ装置を有
するものの一例を第1図ないし第7図により説明
する。第1図に示すように、クレーン本体10を
搭載するマスト1は複数本の単位マスト1a〜1
nを地上のマストせり上げ装置11を利用して継
足すことにより構成される。マストせり上げ装置
11は、第2図、第3図に示すように、支持マス
ト2と、該支持マスト2に設けたガイドレール1
2に沿つて転動するガイドレール13を有する昇
降フレーム4とを有する。該昇降フレーム4の昇
降装置は、第4図にも示されているように、クラ
イミングウインチ3により巻取り繰出しされるワ
イヤーロープ5を前記支持マスト2の頂部の上枠
2Aに取付けたシーブブロツク14,16と昇降
フレーム4に取付けたシーブブロツク15,17
との間に掛け回わすことにより構成される。第5
図ないし第7図に示すように、昇降フレーム4に
装着されているかんぬきピン6を単位マスト1i
に設けてあるかんぬき穴18に挿入すればマスト
1を昇降フレーム4に固定することができる。(Background Art) An example of a ground-lifting type climbing crane having a mast-lifting device using a wire rope will be described with reference to FIGS. 1 to 7. As shown in FIG. 1, the mast 1 on which the crane body 10 is mounted includes a plurality of unit masts 1a to 1.
It is constructed by adding n using the mast raising device 11 on the ground. As shown in FIGS. 2 and 3, the mast raising device 11 includes a support mast 2 and a guide rail 1 provided on the support mast 2.
The lift frame 4 has a guide rail 13 that rolls along the lift frame 2. As shown in FIG. 4, the elevating device for the elevating frame 4 includes a sheave block 14 on which a wire rope 5, which is wound and let out by a climbing winch 3, is attached to an upper frame 2A at the top of the support mast 2. , 16 and sheave blocks 15, 17 attached to the lifting frame 4.
It is constructed by passing it between Fifth
As shown in FIGS. 7 to 7, the bolt pin 6 attached to the lifting frame 4 is
The mast 1 can be fixed to the lifting frame 4 by inserting it into the bolt hole 18 provided in the.
マスト1のせり上げは、最下部の単位マスト1
iのかんぬき穴18にかんぬきピン6を挿入して
マスト1を昇降フレーム4に固定し、クライミン
グウインチ3によりワイヤーロープ5を巻取つて
マスト1を昇降フレーム4と共に上昇させる。第
2図および第3図に示すように、昇降フレーム4
が十分上昇してマスト1の下に継足し用単位マス
ト1jが入る空間ができたらその単位マスト1j
を挿入して昇降フレーム4に固定れている単位マ
スト1iと連結する。このようにして次の単位マ
スト1jが連結されてクレーン本体10がマスト
1により支えられるようになつたらかんぬきピン
6を引き抜いてマスト1と昇降フレーム4とを切
り離す。次に昇降フレーム4を空荷のまま下降さ
せ、最下端まで降りたら再びかんぬきピン6を次
の単位マストのかんぬき穴に差し込む。この動作
を繰辺してクライミングを続ける。 The rise of mast 1 is the lowest unit mast 1
The mast 1 is fixed to the lifting frame 4 by inserting the bolt pin 6 into the bolt hole 18 of i, and the mast 1 is raised together with the lifting frame 4 by winding the wire rope 5 with the climbing winch 3. As shown in FIGS. 2 and 3, the lifting frame 4
When the unit mast 1j rises enough to create a space under the mast 1 for the additional unit mast 1j, the unit mast 1j
is inserted and connected to the unit mast 1i fixed to the lifting frame 4. When the next unit mast 1j is connected in this way and the crane body 10 is supported by the mast 1, the bolt pin 6 is pulled out to separate the mast 1 and the lifting frame 4. Next, the lifting frame 4 is lowered with no load, and when it reaches the lowest point, the bolt pin 6 is again inserted into the bolt hole of the next unit mast. Continue climbing by repeating this motion.
このようなマストせり上げ装置11において
は、クライミングウインチ3として、従来より1
速のものが用いられている。従つてマスト1をせ
り上げる状態、即ち積荷状態においても、また、
マスト1のせり上げが完了して第2図および第3
図に示す次の単位マスト1jを取付けるために昇
降フレーム4を下降させてくる状態、即ち空荷状
態においてもクライミングウインチ3を同一の速
度でしか運転できず、マストせり上げ(クライミ
ング)に要する時間が長くなるという問題があつ
た。また、1速のクライミングウインチ3を使用
してせり上げの時間を短縮しようとすると、該ク
ライミングウインチ3駆動用のモータの容量を大
きくしなければならず、不経済である。 In such a mast raising device 11, as a climbing winch 3, a conventional climbing winch 3 is used.
The fastest one is used. Therefore, even when the mast 1 is raised, that is, when it is loaded,
After the raising of mast 1 is completed, Figures 2 and 3
Even when the lifting frame 4 is lowered to attach the next unit mast 1j shown in the figure, that is, when it is unloaded, the climbing winch 3 can only be operated at the same speed, and the time required to raise (climb) the mast is shorter. There was a problem with the length of time. Furthermore, if a one-speed climbing winch 3 is used to shorten the climbing time, the capacity of the motor for driving the climbing winch 3 must be increased, which is uneconomical.
一方、前記クライミングウインチ3の出力状態
を見ると、昇降フレーム4にマスト1を固定して
いる時(積荷時)は定格出力に近い状態となつて
いるが、昇降フレーム4にマスト1を固定してい
ない時は定格出力よりはるかに小さい仕事しかし
ておらず、効率が悪い。 On the other hand, looking at the output status of the climbing winch 3, when the mast 1 is fixed to the lifting frame 4 (when loaded), the output is close to the rated output, but when the mast 1 is fixed to the lifting frame 4, the output is close to the rated output. When it is not working, it is doing far less work than its rated output and is inefficient.
(本発明の目的)
本発明の目的は、上記の問題点に鑑み、クライ
ミングに要する時間を短縮することができ、かつ
クライミングウインチの駆動用モータの容量を小
さくすることのできる構成のクライミングクレー
ンのマストせり上げ装置を提供することを目的と
する。(Object of the present invention) In view of the above-mentioned problems, the object of the present invention is to provide a climbing crane having a structure capable of shortening the time required for climbing and reducing the capacity of the driving motor of the climbing winch. The purpose of the present invention is to provide a mast raising device.
(本発明の要旨)
この目的を達成するため、本発明によるクライ
ミングクレーンのマストせり上げ装置は、クライ
ミングウインチの駆動装置として極数変換モータ
を備え、マストせり上げ用昇降フレームには、昇
降フレームにマストを固定したか否かを検出する
状態検出スイツチを設け、前記極数変換モータの
操作回路に該状態検出スイツチを組込み、該状態
検出スイツチが昇降フレームにマストを固定して
いる状態を検出している場合は低速昇降のみが可
能で、反対に非固定状態を検出している場合は高
速、低速の選択が可能となるように回路構成した
ことを特徴とする。(Summary of the present invention) In order to achieve this object, the mast raising device for a climbing crane according to the present invention is equipped with a pole number changing motor as a driving device of the climbing winch, and the lifting frame for lifting the mast is equipped with a pole number changing motor. A state detection switch is provided to detect whether or not the mast is fixed, and the state detection switch is incorporated into the operation circuit of the pole number conversion motor, and the state detection switch detects a state in which the mast is fixed to the lifting frame. The circuit is configured in such a way that only low-speed elevation is possible when the vehicle is in the fixed state, and on the other hand, it is possible to select between high and low speeds when the non-fixed state is detected.
(実施例)
以下本発明を第8図ないし第10図に示す実施
例により説明する。7は本発明により昇降フレー
ム4に取付けたリミツトスイツチであり、第8図
に実線で示すように、単位マスト1iのかんぬき
穴18に昇降フレーム4に取付けられているかん
ぬきピン6を挿入してマスト1を昇降フレーム4
に固定している場合には、該リミツトスイツチ7
の作動杆7aは不作動状態にあつて、該リミツト
スイツチ7の接点は開であり、一方、仮想線で示
すように、かんぬきピン6を引き抜いてマスト1
を昇降フレーム4に固定していない場合には、該
リミツトスイツチ7の作動杆7aはかんぬきピン
6に押されて作動状態となり、該リミツトスイツ
チ7の接点は閉じるように構成されている。(Example) The present invention will be explained below with reference to an example shown in FIGS. 8 to 10. Reference numeral 7 denotes a limit switch attached to the lifting frame 4 according to the present invention, and as shown by the solid line in FIG. The lifting frame 4
If the limit switch 7 is fixed to
The actuating rod 7a is in an inoperative state, and the contact of the limit switch 7 is open, while the bolt pin 6 is pulled out and the mast 1 is closed, as shown by the phantom line.
When the limit switch 7 is not fixed to the lifting frame 4, the operating rod 7a of the limit switch 7 is pushed by the bolt pin 6 into the operating state, and the contact point of the limit switch 7 is configured to close.
第10図は該リミツトスイツチ7を組み込んだ
クライミングウインチ3駆動用電気モータ9の操
作回路であり、該電気モータ9は極数切換えによ
つて速度が高速、低速に切換えられる極数変換モ
ータである。図中、8は操作スイツチであり、モ
ータ9をワイヤーロープ5の巻取り方向、繰出し
方向(即ちそれぞれ昇降フレーム4の上昇方向、
下降方向)に回転させることを指令するための操
作スイツチPB1,PB2と、それぞれ高速回転、
低速回転を指令するための操作スイツチPB3,
PB4とからなる。CF1,CR1,CX,C1,
CF,CR,CFX,CRXはリレー、これらのアル
フアベツトの小文字である符号およびこれらにa
またはbを付した符号は各リレーの接点である。 FIG. 10 shows an operating circuit of an electric motor 9 for driving the climbing winch 3 incorporating the limit switch 7, and the electric motor 9 is a pole number changing motor whose speed can be switched between high speed and low speed by changing the number of poles. In the figure, reference numeral 8 denotes an operation switch, which controls the motor 9 in the winding direction and unwinding direction of the wire rope 5 (that is, in the ascending direction of the lifting frame 4, respectively).
Operation switches PB1 and PB2 are used to command rotation in the downward direction), high-speed rotation,
Operation switch PB3 for commanding low speed rotation,
Consists of PB4. CF1, CR1, CX, C1,
CF, CR, CFX, CRX are relays, their lowercase alphanumeric characters and a
Or, the symbol with b indicates the contact point of each relay.
この回路において、前記かんぬきピン6を差み
込んでマスト1を昇降フレーム4に固定してマス
ト1のせり上げを行なう場合、前記リミツトスイ
ツチ7の作動杆7aは不作動状態にあつて、該リ
ミツトスイツチ7の接点は開であるから、リレー
CXは高速回転指令用の操作の如何に拘らず励磁
されず、そのa接点cxaは開いたままであるか
ら、高速上昇、高速下降用リレーCFX、CRXは
励磁されることはなく、モータ9の高速回転を行
なうことはできない。一方、リレーC1は、低速
回転指令用操作スイツチPB4を操作することに
より、リレーCXのb接点cxbを介して通電され
励磁されるため、該リレーC1のa接点claは閉
じ、この状態で操作スイツチPB1またはPB2を
操作すれば、リレーCF1またはCR1は励磁され
てこれらのa接点cflaまたはcrlaが閉じ、リレー
CFまたはCRが励磁されて接点cfまたはcrが閉じ
るので、モータ9は低速で昇降フレーム4の上昇
方向または下降方向に回転する。即ち、昇降フレ
ーム4にマスト1が固定されている場合には昇降
フレーム4は低速でしか昇降させることはできな
い。 In this circuit, when the mast 1 is raised by inserting the bolt pin 6 and fixing the mast 1 to the lifting frame 4, the operating rod 7a of the limit switch 7 is in an inoperative state, and the limit switch 7 Since the contact of is open, the relay
CX is not energized regardless of the operation for high-speed rotation command, and its a contact cxa remains open. Rotation is not possible. On the other hand, the relay C1 is energized and energized via the b contact cxb of the relay CX by operating the low-speed rotation command operation switch PB4, so the a contact cla of the relay C1 is closed, and in this state, the operation switch is When PB1 or PB2 is operated, relay CF1 or CR1 is energized, these a contacts cfla or crla close, and the relay
Since CF or CR is excited and the contact cf or cr is closed, the motor 9 rotates at low speed in the direction of raising or lowering the lifting frame 4. That is, when the mast 1 is fixed to the lifting frame 4, the lifting frame 4 can only be moved up and down at a low speed.
一方、かんぬきピン6が引き抜かれている場合
には、リミツトスイツチ7の作動杆7aは作動状
態にあつて、該リミツトスイツチ7の接点は閉で
ある。この状態で低速回転指令用の操作スイツチ
PB4を操作して上昇用または下降用の操作スイ
ツチPB1またはPB2を操作した時の動作は前述
の通りである。高速回転指令用の操作スイツチ
PB3を操作すると、リレーCXが励磁されてその
a接点cxaは閉じ、この状態で操作スイツチPB
1またはPB2を操作すれば、リレーCF1または
CR1は励磁されてこれらのa接点cflaまたcrla
が閉じ、リレーCFXまたはCRXが励磁されて接
点cfxまたはcrxが閉じるので、モータ9は高速
で昇降フレーム4の上昇方向または下降方向に回
転する。即ち、昇降フレーム4にマスト1が固定
されていない時、即ち空荷の場合には、高速、低
速のいずれも選択できる。 On the other hand, when the bolt pin 6 is pulled out, the operating rod 7a of the limit switch 7 is in an operating state, and the contact of the limit switch 7 is closed. In this state, press the operation switch for low speed rotation command.
The operation when operating PB4 and operating the ascending or descending operating switch PB1 or PB2 is as described above. Operation switch for high-speed rotation command
When PB3 is operated, relay CX is energized and its a contact cxa is closed, and in this state, operating switch PB is
If you operate 1 or PB2, relay CF1 or
CR1 is energized and these A contacts cfla or crla
is closed, relay CFX or CRX is energized and contact cfx or crx is closed, so motor 9 rotates at high speed in the direction of raising or lowering lifting frame 4. That is, when the mast 1 is not fixed to the lifting frame 4, that is, when there is no cargo, either high speed or low speed can be selected.
従つて、空荷状態である昇降フレーム4の下降
動作ではクライミングウインチ3を高速で運転し
てクライミング時間の短縮を達成することがで
き、しかもこのためのクライミングウインチ駆動
用モータ9の容量を必要最小限に選ぶことができ
る。単位マストを順次分離し引き抜いてクレーン
を下降させる場合には、丁度この逆の作業にな
り、やはり昇降フレーム4の空荷巻上げの時間が
短縮できる。 Therefore, during the lowering operation of the unloaded lifting frame 4, the climbing winch 3 can be operated at high speed to shorten the climbing time, and the capacity of the climbing winch drive motor 9 for this purpose can be reduced to the necessary minimum. You can choose only. When the crane is lowered by sequentially separating and pulling out the unit masts, the operation is just the opposite, and the time required for hoisting the empty load of the lifting frame 4 can be shortened.
なお、昇降フレーム4に対してマスト1が固定
されているか否かを検出する状態検出スイツチと
しては、前記リミツトスイツチのみならず、磁気
式、電磁式、光電式、静電誘導式等、他の方式の
ものを用いることも可能である。また、第10図
において、例えば低速回転指令用操作スイツチ
PB4と、リレーCXに接続されたリレーC1のb
接点clbとを無くしてこれらを設けていた部分を
短絡すれば、高速昇降を行なわせる場合にのみ操
作スイツチPB3を押せばよく、低速昇降の場合
には速度選択用の操作スイツチを押す必要を無く
することができる等、具体的な操作回路に構成に
ついては、本発明の要旨を逸脱しない範囲で種々
に変更可能であることは言うまでもない。 Note that the state detection switch for detecting whether or not the mast 1 is fixed to the lifting frame 4 is not limited to the limit switch described above, but may also be of other types such as magnetic type, electromagnetic type, photoelectric type, electrostatic induction type, etc. It is also possible to use one. In addition, in FIG. 10, for example, the operation switch for low speed rotation command is
PB4 and b of relay C1 connected to relay CX
If you eliminate the contact point clb and short-circuit the parts where these were provided, you only need to press the operating switch PB3 for high-speed lifting and lowering, and you do not need to press the operating switch for speed selection for low-speed lifting. It goes without saying that the specific configuration of the operating circuit can be changed in various ways without departing from the gist of the present invention.
(本発明の効果)
本発明によれば、昇降フレームの空荷状態では
高速昇降を行なうことができるから、クライミン
グ時間および空荷巻下げの時間が短縮できる。ま
た、本発明においては、空荷状態でのみ高速昇降
が可能となるようにしたから、クライミングウイ
ンチ駆動用モータの容量が増大させる必要なく、
必要最小限の容量ですむ。(Effects of the Present Invention) According to the present invention, since high-speed lifting and lowering can be performed when the lifting frame is in an empty state, the climbing time and the time for lowering the empty load can be shortened. In addition, in the present invention, since high-speed lifting is possible only in an unloaded state, there is no need to increase the capacity of the climbing winch drive motor.
Only the minimum required capacity is required.
第1図は地上せり上げ式クライミングクレーン
の一例を示す全体図、第2図は第1図のクレーン
のマストせり上げ装置を示す正面図、第3図は第
2図のA―A矢視図、第4図は該マストせり上げ
装置のワイヤリングの一例を示す図、第5図は該
マストせり上げ装置の昇降フレームとマストとの
連結構造を示す平面図、第6図は第5図のB―B
矢視図、第7図は第6図のC―C断面図、第8図
は本発明における状態検出スイツチの取付け構造
の一例を示す図、第9図は第8図のD―D矢視
図、第10図は本発明におけるクライミングウイ
ンチ駆動用モータの操作回路の一例図である。
1…マスト、2…支持マスト、3…クライミン
グウインチ、4…昇降フレーム、5…ワイヤーロ
ープ、6…かんぬきピン、7…リミツトスイツ
チ、8…操作スイツチ、9…クライミングウイン
チ駆動用モータ。
Figure 1 is an overall view showing an example of a ground climbing crane, Figure 2 is a front view showing the mast lifting device of the crane in Figure 1, and Figure 3 is a view taken along arrow A-A in Figure 2. , FIG. 4 is a diagram showing an example of the wiring of the mast raising device, FIG. 5 is a plan view showing the connection structure between the lifting frame of the mast raising device and the mast, and FIG. 6 is a diagram showing B of FIG. 5. -B
7 is a sectional view taken along the line C--C in FIG. 6, FIG. 8 is a diagram showing an example of the mounting structure of the state detection switch according to the present invention, and FIG. 9 is a view taken along the line D--D in FIG. 8. 10 are diagrams showing an example of an operating circuit for a climbing winch drive motor according to the present invention. 1... Mast, 2... Support mast, 3... Climbing winch, 4... Lifting frame, 5... Wire rope, 6... Bolt pin, 7... Limit switch, 8... Operation switch, 9... Climbing winch drive motor.
Claims (1)
インチによりワイヤロープを介して昇降される昇
降フレームを取付け、該昇降フレームにクライミ
ングクレーンのマストを固定してマストせり上げ
を行なうクライミングクレーンのマストせり上げ
装置において、クライミングウインチの駆動装置
として極数変換モータを備え、マストせり上げ用
昇降フレームには、昇降フレームにマストを固定
したか否かを検出する状態検出スイツチを設け、
前記極数変換モータの操作回路に該状態検出スイ
ツチを組込み、該状態検出スイツチが昇降フレー
ムにマストを固定している状態を検出している場
合は低速昇降のみが可能で、反対に非固定状態を
検出している場合は高速、低速の選択が可能とな
るように回路構成したことを特徴とするクライミ
ングクレーンのマストせり上げ装置。1. A climbing crane mast raising device in which a lifting frame that is lifted and lowered by a climbing winch via a wire rope is attached to a support mast installed on the ground, and the mast of the climbing crane is fixed to the lifting frame to raise the mast. The climbing winch is equipped with a motor that changes the number of poles as a driving device, and the elevating frame for lifting the mast is equipped with a status detection switch that detects whether the mast is fixed to the elevating frame.
If the state detection switch is incorporated into the operation circuit of the pole number conversion motor, and the state detection switch detects that the mast is fixed to the lifting frame, only low-speed lifting is possible; conversely, the mast is not fixed. A climbing crane mast raising device characterized by having a circuit configuration that allows selection of high speed or low speed when detecting
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP3152784A JPS60178187A (en) | 1984-02-23 | 1984-02-23 | Push-up device for mast of climbing crane |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP3152784A JPS60178187A (en) | 1984-02-23 | 1984-02-23 | Push-up device for mast of climbing crane |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS60178187A JPS60178187A (en) | 1985-09-12 |
| JPS647958B2 true JPS647958B2 (en) | 1989-02-10 |
Family
ID=12333659
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP3152784A Granted JPS60178187A (en) | 1984-02-23 | 1984-02-23 | Push-up device for mast of climbing crane |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS60178187A (en) |
-
1984
- 1984-02-23 JP JP3152784A patent/JPS60178187A/en active Granted
Also Published As
| Publication number | Publication date |
|---|---|
| JPS60178187A (en) | 1985-09-12 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CA1144114A (en) | Double masted warehouse crane | |
| KR970026838A (en) | Automated warehouse | |
| WO2003011739A1 (en) | Hoisting aparatus using a counterweight technology | |
| CN112677829A (en) | Lifting type mobile contact net supporting device, mobile contact net and operation method | |
| JPS647958B2 (en) | ||
| US2778506A (en) | Hoist mechanisms | |
| JPS647959B2 (en) | ||
| US3144137A (en) | Stacker crane | |
| GB2290281A (en) | Telescopic mast order picker truck | |
| CN213356618U (en) | Construction elevator | |
| JPS62280196A (en) | Mast push-up device for climbing crane | |
| JPH0352790Y2 (en) | ||
| KR102330529B1 (en) | Simple removable hoist | |
| JP2707942B2 (en) | Elevator rope tension balancer | |
| EP0953539A2 (en) | Electric winch | |
| KR200167348Y1 (en) | Stacker-type parking apparatus | |
| SU1212918A1 (en) | Lift | |
| SU1234336A1 (en) | Cargo-bearing member of building hoist | |
| SU148888A1 (en) | Rope hoist | |
| SU787329A1 (en) | Construction hoist | |
| JPS62264188A (en) | Balanced-weight lifting mechanism | |
| KR0161566B1 (en) | Hoist speed buffer control device of tower crane | |
| CN210483179U (en) | Three-dimensional parking device | |
| RU2041155C1 (en) | Tower crane | |
| JP3233387B2 (en) | Joint mast take-in device for electric climbing crane |