|
GB2354852B
(en)
*
|
1999-10-01 |
2001-11-28 |
Schlumberger Holdings |
Method for updating an earth model using measurements gathered during borehole construction
|
|
US6826486B1
(en)
|
2000-02-11 |
2004-11-30 |
Schlumberger Technology Corporation |
Methods and apparatus for predicting pore and fracture pressures of a subsurface formation
|
|
AU2001247576A1
(en)
*
|
2000-03-17 |
2001-10-03 |
Optim, L.L.C. |
Optimization apparatus, system, and method of use doing business
|
|
US6954745B2
(en)
*
|
2000-06-02 |
2005-10-11 |
Canon Kabushiki Kaisha |
Signal processing system
|
|
US20020026253A1
(en)
*
|
2000-06-02 |
2002-02-28 |
Rajan Jebu Jacob |
Speech processing apparatus
|
|
US7072833B2
(en)
*
|
2000-06-02 |
2006-07-04 |
Canon Kabushiki Kaisha |
Speech processing system
|
|
US7010483B2
(en)
*
|
2000-06-02 |
2006-03-07 |
Canon Kabushiki Kaisha |
Speech processing system
|
|
US7035790B2
(en)
*
|
2000-06-02 |
2006-04-25 |
Canon Kabushiki Kaisha |
Speech processing system
|
|
US7003439B2
(en)
|
2001-01-30 |
2006-02-21 |
Schlumberger Technology Corporation |
Interactive method for real-time displaying, querying and forecasting drilling event and hazard information
|
|
US7526413B2
(en)
*
|
2001-01-31 |
2009-04-28 |
Exxonmobil Upstream Research Company |
Volumetric laminated sand analysis
|
|
FR2823877B1
(fr)
*
|
2001-04-19 |
2004-12-24 |
Inst Francais Du Petrole |
Methode pour contraindre par des donnees dynamiques de production un modele fin representatif de la repartition dans le gisement d'une grandeur physique caracteristique de la structure du sous-sol
|
|
US6581198B1
(en)
|
2001-06-13 |
2003-06-17 |
Cadence Design Systems, Inc. |
Method and arrangement for extracting capacitance in integrated circuits having non Manhattan wiring
|
|
US6892366B1
(en)
*
|
2001-08-28 |
2005-05-10 |
Cadence Design Systems, Inc. |
Method and apparatus for performing extraction using a model trained with Bayesian inference via a Monte Carlo method
|
|
US7051293B1
(en)
|
2001-08-28 |
2006-05-23 |
Cadence Design Systems, Inc. |
Method and apparatus for creating an extraction model
|
|
US7103524B1
(en)
|
2001-08-28 |
2006-09-05 |
Cadence Design Systems, Inc. |
Method and apparatus for creating an extraction model using Bayesian inference implemented with the Hybrid Monte Carlo method
|
|
GB0125713D0
(en)
|
2001-10-26 |
2001-12-19 |
Statoil Asa |
Method of combining spatial models
|
|
US6961914B1
(en)
|
2002-01-31 |
2005-11-01 |
Cadence Design Systems, Inc. |
Method and apparatus for selecting input points to train a machine learning model for extraction
|
|
FR2837947B1
(fr)
*
|
2002-04-02 |
2004-05-28 |
Inst Francais Du Petrole |
Methode pour quantifier les incertitudes liees a des parametres continus et discrets descriptifs d'un milieu par construction de plans d'experiences et analyse statistique
|
|
GB2404988B
(en)
*
|
2002-04-10 |
2006-04-12 |
Schlumberger Technology Corp |
Method,apparatus and system for pore pressure prediction in presence of dipping formations
|
|
US7899657B2
(en)
|
2003-01-24 |
2011-03-01 |
Rockwell Automoation Technologies, Inc. |
Modeling in-situ reservoirs with derivative constraints
|
|
US6810332B2
(en)
*
|
2003-01-31 |
2004-10-26 |
Chevron U.S.A. Inc. |
Method for computing complexity, confidence and technical maturity indices for reservoir evaluations
|
|
MXPA04003024A
(es)
*
|
2003-04-03 |
2004-10-06 |
Schlumberger Technology Bv |
Metodos y aparato para predecir presiones de poro y fractura de una formacion subsuperficial.
|
|
US7835893B2
(en)
|
2003-04-30 |
2010-11-16 |
Landmark Graphics Corporation |
Method and system for scenario and case decision management
|
|
US20050004833A1
(en)
*
|
2003-07-03 |
2005-01-06 |
Reaction Design, Llc |
Method and system for integrated uncertainty analysis
|
|
EP1642194A2
(fr)
*
|
2003-07-03 |
2006-04-05 |
Reaction Design |
Procede du systeme d'analyse d'incertitudes integrees
|
|
US20050004969A1
(en)
*
|
2003-07-03 |
2005-01-06 |
Reaction Design, Llc |
System for information exchange for integration of multiple data sources
|
|
US7286214B2
(en)
*
|
2003-08-25 |
2007-10-23 |
University Of South Florida |
Method and program product for determining a radiance field in an optical environment
|
|
NL1024444C2
(nl)
*
|
2003-10-03 |
2005-04-08 |
J O A Beheer B V |
Werkwijze, inrichting, computerprogramma en gegevensdrager voor het met een digitale verwerkingseenheid modelleren van een meerdimensionale heterogene structuur.
|
|
GB2410550B8
(en)
*
|
2003-12-04 |
2008-10-01 |
Schlumberger Holdings |
Fluids chain-of-custody
|
|
US7379819B2
(en)
*
|
2003-12-04 |
2008-05-27 |
Schlumberger Technology Corporation |
Reservoir sample chain-of-custody
|
|
US7359844B2
(en)
|
2004-01-20 |
2008-04-15 |
Saudi Arabian Oil Company |
Real time earth model for collaborative geosteering
|
|
US20050171700A1
(en)
*
|
2004-01-30 |
2005-08-04 |
Chroma Energy, Inc. |
Device and system for calculating 3D seismic classification features and process for geoprospecting material seams
|
|
CN1898675A
(zh)
|
2004-01-30 |
2007-01-17 |
埃克森美孚上游研究公司 |
储层模型建立方法
|
|
EP1763737B1
(fr)
*
|
2004-01-30 |
2013-09-04 |
ExxonMobil Upstream Research Company |
Procedes d'evaluation de reservoirs
|
|
US7054750B2
(en)
*
|
2004-03-04 |
2006-05-30 |
Halliburton Energy Services, Inc. |
Method and system to model, measure, recalibrate, and optimize control of the drilling of a borehole
|
|
CN1299127C
(zh)
*
|
2004-03-26 |
2007-02-07 |
中国石油天然气集团公司 |
地震观测系统优化设计的层状介质双聚焦方法及其应用
|
|
AU2005330698B2
(en)
*
|
2004-07-07 |
2010-01-07 |
Exxonmobil Upstream Research Company |
Bayesian network applications to geology and geophysics
|
|
MX2007000363A
(es)
*
|
2004-07-07 |
2008-03-05 |
Exxonmobil Upstream Res Co |
Prediccion de la composicion de arena-grano y textura de la arena.
|
|
US20060025969A1
(en)
*
|
2004-07-30 |
2006-02-02 |
Conocophillips Company |
Method for converting a geologic panel into a simulator format
|
|
FR2874706B1
(fr)
*
|
2004-08-30 |
2006-12-01 |
Inst Francais Du Petrole |
Methode de modelisation de la production d'un gisement petrolier
|
|
EP1812811A2
(fr)
*
|
2004-11-18 |
2007-08-01 |
ExxonMobil Upstream Research Company |
Procede destine a quantifier et a attenuer d'une variation d'amplitude avec decalage (avo) azimut induite par inclinaison
|
|
US8209202B2
(en)
|
2005-04-29 |
2012-06-26 |
Landmark Graphics Corporation |
Analysis of multiple assets in view of uncertainties
|
|
FR2886740B1
(fr)
*
|
2005-06-03 |
2007-09-28 |
Inst Francais Du Petrole |
Methode pour mettre a jour un modele geologique par des donnees sismiques et de production
|
|
CA2613817C
(fr)
*
|
2005-07-27 |
2015-11-24 |
Exxonmobil Upstream Research Company |
Modelisation de puits associee a l'extraction d'hydrocarbures a partir de formations souterraines
|
|
CN101238465B
(zh)
|
2005-07-27 |
2010-10-27 |
埃克森美孚上游研究公司 |
与从地下岩层抽取碳氢化合物相关的井建模
|
|
CA2616816A1
(fr)
*
|
2005-07-27 |
2007-02-15 |
Exxonmobil Upstream Research Company |
Modelisation de puits associee a l'extraction d'hydrocarbures dans des formations souterraines
|
|
GB0524134D0
(en)
*
|
2005-11-26 |
2006-01-04 |
Univ Edinburgh |
Improvements in and relating to hydrocarbon recovery from a hydrocarbon reservoir
|
|
US7366616B2
(en)
*
|
2006-01-13 |
2008-04-29 |
Schlumberger Technology Corporation |
Computer-based method for while-drilling modeling and visualization of layered subterranean earth formations
|
|
US7486589B2
(en)
|
2006-02-09 |
2009-02-03 |
Schlumberger Technology Corporation |
Methods and apparatus for predicting the hydrocarbon production of a well location
|
|
ES2652413T3
(es)
|
2006-09-28 |
2018-02-02 |
Exxonmobil Upstream Research Company |
Inversión iterativa de datos a partir de fuentes geofísicas simultáneas
|
|
EP2118738A4
(fr)
*
|
2006-12-28 |
2014-07-02 |
Chevron Usa Inc |
Procédé, système et dispositif de stockage de programmes destinés à la comparaison d'historiques et la prévision relatives aux roches réservoirs piégeant des hydrocarbures utilisant des approximations pour des fonctions de ressemblances
|
|
US7467044B2
(en)
*
|
2007-01-15 |
2008-12-16 |
Chevron U.S.A. Inc |
Method and system for assessing exploration prospect risk and uncertainty
|
|
US7636275B2
(en)
*
|
2007-02-06 |
2009-12-22 |
Conocophillips Company |
Direct time lapse inversion of seismic data
|
|
US7529624B2
(en)
*
|
2007-02-21 |
2009-05-05 |
Geomechanics International, Inc. |
Method and apparatus for remote characterization of faults in the vicinity of boreholes
|
|
US8768672B2
(en)
*
|
2007-08-24 |
2014-07-01 |
ExxonMobil. Upstream Research Company |
Method for predicting time-lapse seismic timeshifts by computer simulation
|
|
US8548782B2
(en)
*
|
2007-08-24 |
2013-10-01 |
Exxonmobil Upstream Research Company |
Method for modeling deformation in subsurface strata
|
|
US8265915B2
(en)
*
|
2007-08-24 |
2012-09-11 |
Exxonmobil Upstream Research Company |
Method for predicting well reliability by computer simulation
|
|
US8423337B2
(en)
*
|
2007-08-24 |
2013-04-16 |
Exxonmobil Upstream Research Company |
Method for multi-scale geomechanical model analysis by computer simulation
|
|
CA2705319C
(fr)
*
|
2007-11-10 |
2019-01-15 |
Laurence Reid |
Systemes et procedes pour l'automatisation, l'adaptation et l'integration des processus
|
|
US7886844B2
(en)
*
|
2007-11-12 |
2011-02-15 |
Schlumberger Technology Corporation |
Borehole survey method and apparatus
|
|
GB0722469D0
(en)
*
|
2007-11-16 |
2007-12-27 |
Statoil Asa |
Forming a geological model
|
|
FR2923855B1
(fr)
*
|
2007-11-21 |
2009-12-11 |
Inst Francais Du Petrole |
Methode pour optimiser la trajectoire d'un forage par mise a jour d'une interpretation structurale.
|
|
US8547783B2
(en)
*
|
2007-12-12 |
2013-10-01 |
Exxonmobil Upstream Research Company |
Method and apparatus for evaluating submarine formations
|
|
US9638830B2
(en)
|
2007-12-14 |
2017-05-02 |
Westerngeco L.L.C. |
Optimizing drilling operations using petrotechnical data
|
|
US8417497B2
(en)
*
|
2008-01-18 |
2013-04-09 |
Westerngeco L.L.C. |
Updating a model of a subterranean structure using decomposition
|
|
US7869955B2
(en)
*
|
2008-01-30 |
2011-01-11 |
Chevron U.S.A. Inc. |
Subsurface prediction method and system
|
|
BRPI0908156A2
(pt)
*
|
2008-03-21 |
2015-08-11 |
Exxonmobil Upstream Company |
Métodos para invesão de dados geofísicos medidos e para produzir hidrocarbonetos de uma região de subsuperfície
|
|
US8527248B2
(en)
*
|
2008-04-18 |
2013-09-03 |
Westerngeco L.L.C. |
System and method for performing an adaptive drilling operation
|
|
US8793111B2
(en)
*
|
2009-01-20 |
2014-07-29 |
Schlumberger Technology Corporation |
Automated field development planning
|
|
WO2009137181A1
(fr)
*
|
2008-05-05 |
2009-11-12 |
Exxonmobil Upstream Research Company |
Systèmes, procédés et produits de programme informatique pour modéliser des systèmes dynamiques en visualisant un espace de paramètres et en réduisant cet espace de paramètres
|
|
US8527203B2
(en)
|
2008-05-27 |
2013-09-03 |
Schlumberger Technology Corporation |
Method for selecting well measurements
|
|
GB2474157B
(en)
*
|
2008-07-01 |
2012-10-17 |
Schlumberger Holdings |
Effective hydrocarbon reservoir exploration decision making
|
|
AU2009282330B2
(en)
*
|
2008-08-11 |
2013-10-10 |
Exxonmobil Upstream Research Company |
Estimation of soil properties using waveforms of seismic surface waves
|
|
BRPI0914510B1
(pt)
|
2008-10-14 |
2019-07-16 |
Prad Research And Development Limited |
Métodos para automatizar ou parcialmente automatizar a otimização de uma operação de perfuração automatizada ou parcialmente automatizada, sistema para automatizar ouparcialmente automatizar um processo, método para operar um equipamento de perfuração automatizado, método para controlar um processo automatizado para perfurar um furo de poço, e sistema de controle de perfuração
|
|
US8849640B2
(en)
*
|
2008-11-06 |
2014-09-30 |
Exxonmobil Upstream Research Company |
System and method for planning a drilling operation
|
|
BRPI0923412A2
(pt)
*
|
2008-12-16 |
2016-05-24 |
Exxonmobil Upstream Res Co |
método, e, produto de programa de computador.
|
|
EP2376955B1
(fr)
*
|
2008-12-18 |
2020-12-16 |
Exxonmobil Upstream Research Company |
Transport de sédiments par écoulements turbulents parfaitement développés
|
|
US8914268B2
(en)
|
2009-01-13 |
2014-12-16 |
Exxonmobil Upstream Research Company |
Optimizing well operating plans
|
|
GB0905261D0
(en)
*
|
2009-03-27 |
2009-05-13 |
Geco Technology Bv |
Processing seismic data
|
|
US20100257004A1
(en)
*
|
2009-04-01 |
2010-10-07 |
Chervon U.S.A. Inc. |
Method and system for conducting geologic basin analysis
|
|
US8341984B2
(en)
*
|
2009-05-27 |
2013-01-01 |
Westerngeco L.L.C. |
Estimating velocities with uncertainty
|
|
US8494827B2
(en)
*
|
2009-09-25 |
2013-07-23 |
Exxonmobil Upstream Research Company |
Method of predicting natural fractures and damage in a subsurface region
|
|
NO20101371A1
(no)
*
|
2009-10-05 |
2011-04-06 |
Logined Bv |
Fremgangsmate, system og apparat for modellering av usikkerhet i produksjonssystemnettverk
|
|
US8234073B2
(en)
*
|
2009-10-23 |
2012-07-31 |
Chevron U.S.A. Inc. |
System and method for estimating geological architecture of a geologic volume
|
|
US20110098996A1
(en)
*
|
2009-10-26 |
2011-04-28 |
David Nichols |
Sifting Models of a Subsurface Structure
|
|
US8930170B2
(en)
*
|
2009-11-18 |
2015-01-06 |
Conocophillips Company |
Attribute importance measure for parametric multivariate modeling
|
|
CA2776764A1
(fr)
|
2009-11-30 |
2011-06-03 |
Exxonmobil Upstream Research Company |
Procede adaptatif de newton pour simulation de gisements
|
|
CA2785569A1
(fr)
*
|
2010-02-02 |
2011-08-11 |
Hector Klie |
Resolveur d'agregation-percolation multi-niveau pour simulations de reservoir de petrole
|
|
US8931580B2
(en)
|
2010-02-03 |
2015-01-13 |
Exxonmobil Upstream Research Company |
Method for using dynamic target region for well path/drill center optimization
|
|
US8537638B2
(en)
*
|
2010-02-10 |
2013-09-17 |
Exxonmobil Upstream Research Company |
Methods for subsurface parameter estimation in full wavefield inversion and reverse-time migration
|
|
US9594186B2
(en)
|
2010-02-12 |
2017-03-14 |
Exxonmobil Upstream Research Company |
Method and system for partitioning parallel simulation models
|
|
EP2545461A4
(fr)
|
2010-03-12 |
2017-09-27 |
Exxonmobil Upstream Research Company |
Groupage dynamique d'objets de domaine au moyen de groupes intelligents
|
|
US8223587B2
(en)
*
|
2010-03-29 |
2012-07-17 |
Exxonmobil Upstream Research Company |
Full wavefield inversion using time varying filters
|
|
US9134454B2
(en)
|
2010-04-30 |
2015-09-15 |
Exxonmobil Upstream Research Company |
Method and system for finite volume simulation of flow
|
|
US8694299B2
(en)
*
|
2010-05-07 |
2014-04-08 |
Exxonmobil Upstream Research Company |
Artifact reduction in iterative inversion of geophysical data
|
|
US8756042B2
(en)
|
2010-05-19 |
2014-06-17 |
Exxonmobile Upstream Research Company |
Method and system for checkpointing during simulations
|
|
CA2805446C
(fr)
|
2010-07-29 |
2016-08-16 |
Exxonmobil Upstream Research Company |
Procedes et systemes de simulation d'ecoulement basee sur un apprentissage machine
|
|
US10087721B2
(en)
|
2010-07-29 |
2018-10-02 |
Exxonmobil Upstream Research Company |
Methods and systems for machine—learning based simulation of flow
|
|
AU2011283196B2
(en)
|
2010-07-29 |
2014-07-31 |
Exxonmobil Upstream Research Company |
Method and system for reservoir modeling
|
|
US8767508B2
(en)
|
2010-08-18 |
2014-07-01 |
Exxonmobil Upstream Research Company |
Using seismic P and S arrivals to determine shallow velocity structure
|
|
US8855986B2
(en)
|
2010-09-03 |
2014-10-07 |
Chevron U.S.A. Inc. |
Iterative method and system to construct robust proxy models for reservoir simulation
|
|
BR112013002114A2
(pt)
|
2010-09-20 |
2016-05-17 |
Exxonmobil Upstream Res Co |
formulações flexíveis e adaptáveis para simulações de reservatório complexas
|
|
BR112013002842A2
(pt)
*
|
2010-09-27 |
2016-06-07 |
Exxonmobil Upstream Res Co |
codificação de fonte e separação de fonte simultâneas como uma solução prática para inversão de campo de onda completa
|
|
US8437998B2
(en)
|
2010-09-27 |
2013-05-07 |
Exxonmobil Upstream Research Company |
Hybrid method for full waveform inversion using simultaneous and sequential source method
|
|
WO2012071090A1
(fr)
|
2010-11-23 |
2012-05-31 |
Exxonmobil Upstream Research Company |
Procédé de discrétisation variable pour la simulation d'écoulement sur des modèles géologiques complexes
|
|
SG189850A1
(en)
|
2010-12-01 |
2013-06-28 |
Exxonmobil Upstream Res Co |
Simultaneous source inversion for marine streamer data with cross-correlation objective function
|
|
BR112013012866A2
(pt)
*
|
2010-12-16 |
2016-09-06 |
Landmark Graphics Corp |
sistema de computador, método, e, meio legível por computador não transitório
|
|
GB201022128D0
(en)
|
2010-12-31 |
2011-02-02 |
Foster Findlay Ass Ltd |
Active contour segmentation
|
|
US9026420B2
(en)
|
2011-01-13 |
2015-05-05 |
Landmark Graphics Corporation |
Method and system of updating a geocellular model
|
|
EP2668641B1
(fr)
|
2011-01-26 |
2020-04-15 |
Exxonmobil Upstream Research Company |
Procédé d'analyse des compartiments d'un réservoir en utilisant la structure topologique d'un modèle de terre 3d
|
|
US9146330B2
(en)
|
2011-03-29 |
2015-09-29 |
Westerngeco L.L.C. |
Selecting a survey setting for characterizing a target structure
|
|
CN103703391B
(zh)
|
2011-03-30 |
2017-05-17 |
埃克森美孚上游研究公司 |
使用频谱整形的全波场反演的系统和计算机实施的方法
|
|
CA2825469C
(fr)
|
2011-03-31 |
2017-06-13 |
Exxonmobil Upstream Research Company |
Procede d'estimation d'ondelettes et predictions multiples lors d'une inversion d'un champ d'ondelettes complet
|
|
US8749549B2
(en)
*
|
2011-06-10 |
2014-06-10 |
Schlumberger Technology Corporation |
Prospect assessment and play chance mapping tools
|
|
US8902221B2
(en)
*
|
2011-06-10 |
2014-12-02 |
Schlumberger Technology Corporation |
Prospect assessment and play chance mapping tools
|
|
US9846256B2
(en)
*
|
2011-08-09 |
2017-12-19 |
Schlumberger Technology Corporation |
Interactive display of results obtained from the inversion of logging data
|
|
US8694262B2
(en)
*
|
2011-08-15 |
2014-04-08 |
Chevron U.S.A. Inc. |
System and method for subsurface characterization including uncertainty estimation
|
|
ES2640824T3
(es)
|
2011-09-02 |
2017-11-06 |
Exxonmobil Upstream Research Company |
Utilización de la proyección sobre conjuntos convexos para limitar la inversión del campo de onda completa
|
|
BR112014005794A2
(pt)
|
2011-09-15 |
2017-03-28 |
Exxonmobil Upstream Res Co |
operações matriciais e vetoriais otimizadas em algoritmos de instrução limitada que executam cálculos de equação de estado
|
|
RU2014120155A
(ru)
*
|
2011-10-20 |
2015-11-27 |
Шлюмбергер Текнолоджи Б.В. |
Оптимизация модели с несколькими периодами для экономического оценивания регуляторов расхода
|
|
US20130223187A1
(en)
*
|
2011-11-11 |
2013-08-29 |
International Geophysical Company, Inc. |
Geological Structure Contour Modeling and Imaging
|
|
US9176930B2
(en)
*
|
2011-11-29 |
2015-11-03 |
Exxonmobil Upstream Research Company |
Methods for approximating hessian times vector operation in full wavefield inversion
|
|
US10030499B2
(en)
|
2011-12-06 |
2018-07-24 |
Bp Corporation North America Inc. |
Geological monitoring console
|
|
MY170622A
(en)
|
2012-03-08 |
2019-08-21 |
Exxonmobil Upstream Res Co |
Orthogonal source and receiver encoding
|
|
EP2831647A4
(fr)
*
|
2012-03-28 |
2016-02-24 |
Geco Technology Bv |
Fourniture d'une fonction objective sur la base d'une variation de données prédites
|
|
US20130261981A1
(en)
*
|
2012-04-03 |
2013-10-03 |
Westerngeco L.L.C. |
Covariance estimation using sparse wavelet representation
|
|
US9595129B2
(en)
|
2012-05-08 |
2017-03-14 |
Exxonmobil Upstream Research Company |
Canvas control for 3D data volume processing
|
|
NO342738B1
(no)
*
|
2012-12-06 |
2018-08-06 |
Roxar Software Solutions As |
Fremgangsmåte og et system for å presentere seismisk informasjon
|
|
US20130341093A1
(en)
*
|
2012-06-21 |
2013-12-26 |
Stuart Inglis Jardine |
Drilling risk avoidance
|
|
RU2598003C1
(ru)
|
2012-08-10 |
2016-09-20 |
Хэллибертон Энерджи Сервисиз, Инк. |
Способы и системы для прямого моделирования скважинного изображения свойств пласта
|
|
EP2901363A4
(fr)
|
2012-09-28 |
2016-06-01 |
Exxonmobil Upstream Res Co |
Suppression des failles dans des modèles géologiques
|
|
CN102937724B
(zh)
*
|
2012-11-20 |
2016-06-08 |
中国神华能源股份有限公司 |
一种露天煤矿采场底部岩层的探测方法
|
|
CA2892041C
(fr)
|
2012-11-28 |
2018-02-27 |
Exxonmobil Upstream Research Company |
Tomographie fondee sur le facteur de qualite q de donnees sismiques de reflexion
|
|
NO20121473A1
(no)
*
|
2012-12-06 |
2014-06-09 |
Roxar Software Solutions As |
System for modellering av geologiske strukturer
|
|
US9575205B2
(en)
*
|
2013-01-17 |
2017-02-21 |
Pgs Geophysical As |
Uncertainty-based frequency-selected inversion of electromagnetic geophysical data
|
|
WO2014134655A1
(fr)
*
|
2013-03-05 |
2014-09-12 |
Technological Resources Pty Ltd |
Estimation des propriétés d'un matériau
|
|
US20140257700A1
(en)
*
|
2013-03-08 |
2014-09-11 |
The Government Of The United States Of America, As Represented By The Secretary Of The Navy |
System and method for estimating uncertainty for geophysical gridding routines lacking inherent uncertainty estimation
|
|
RU2639613C2
(ru)
*
|
2013-04-22 |
2017-12-21 |
Статойл Петролеум Ас |
Способ усовершенствованного определения подповерхностной температуры
|
|
CA2909105C
(fr)
|
2013-05-24 |
2018-08-28 |
Ke Wang |
Inversion multiparametrique par fwi elastique dependante au decalage
|
|
US10459117B2
(en)
|
2013-06-03 |
2019-10-29 |
Exxonmobil Upstream Research Company |
Extended subspace method for cross-talk mitigation in multi-parameter inversion
|
|
WO2014197156A2
(fr)
|
2013-06-03 |
2014-12-11 |
Exxonmobil Upstream Research Company |
Estimation d'incertitude de solutions de résistivité de subsurface
|
|
EP3008281A2
(fr)
|
2013-06-10 |
2016-04-20 |
Exxonmobil Upstream Research Company |
Planification interactive d'un site de puits
|
|
US9702998B2
(en)
|
2013-07-08 |
2017-07-11 |
Exxonmobil Upstream Research Company |
Full-wavefield inversion of primaries and multiples in marine environment
|
|
DK3036566T3
(en)
|
2013-08-23 |
2018-07-23 |
Exxonmobil Upstream Res Co |
SIMILAR SOURCE APPLICATION DURING BOTH SEISMIC COLLECTION AND SEISMIC INVERSION
|
|
DE112013007359T5
(de)
*
|
2013-08-23 |
2016-05-25 |
Landmark Graphics Corporation |
Lokales Aktualisieren eines geozellulären 3D-Modells
|
|
US10036818B2
(en)
|
2013-09-06 |
2018-07-31 |
Exxonmobil Upstream Research Company |
Accelerating full wavefield inversion with nonstationary point-spread functions
|
|
US9864098B2
(en)
|
2013-09-30 |
2018-01-09 |
Exxonmobil Upstream Research Company |
Method and system of interactive drill center and well planning evaluation and optimization
|
|
US10400570B2
(en)
*
|
2013-11-13 |
2019-09-03 |
Schlumberger Technology Corporation |
Automatic wellbore condition indicator and manager
|
|
US9910189B2
(en)
|
2014-04-09 |
2018-03-06 |
Exxonmobil Upstream Research Company |
Method for fast line search in frequency domain FWI
|
|
EP3140675A1
(fr)
|
2014-05-09 |
2017-03-15 |
Exxonmobil Upstream Research Company |
Procédés efficaces de recherche du pas optimal pour inversion de champ d'ondes complet à paramètres multiples
|
|
US10185046B2
(en)
|
2014-06-09 |
2019-01-22 |
Exxonmobil Upstream Research Company |
Method for temporal dispersion correction for seismic simulation, RTM and FWI
|
|
MX362753B
(es)
|
2014-06-17 |
2019-02-07 |
Exxonmobil Upstream Res Co |
Inversion rapida de campo de ondas completo viscoacustico y viscoelastico.
|
|
GB2528129A
(en)
|
2014-07-11 |
2016-01-13 |
Total E&P Uk Ltd |
Method for obtaining estimates of a model parameter so as to characterise the evolution of a subsurface volume
|
|
GB2528130A
(en)
*
|
2014-07-11 |
2016-01-13 |
Total E&P Uk Ltd |
Method of constraining an inversion in the characterisation of the evolution of a subsurface volume
|
|
US10838092B2
(en)
|
2014-07-24 |
2020-11-17 |
Exxonmobil Upstream Research Company |
Estimating multiple subsurface parameters by cascaded inversion of wavefield components
|
|
CA2948667A1
(fr)
|
2014-07-30 |
2016-02-04 |
Exxonmobil Upstream Research Company |
Procede de generation de maillage volumetrique dans un domaine ayant des proprietes de materiau heterogenes
|
|
US10422899B2
(en)
|
2014-07-30 |
2019-09-24 |
Exxonmobil Upstream Research Company |
Harmonic encoding for FWI
|
|
US10359523B2
(en)
|
2014-08-05 |
2019-07-23 |
Exxonmobil Upstream Research Company |
Exploration and extraction method and system for hydrocarbons
|
|
US10386511B2
(en)
|
2014-10-03 |
2019-08-20 |
Exxonmobil Upstream Research Company |
Seismic survey design using full wavefield inversion
|
|
US9977141B2
(en)
|
2014-10-20 |
2018-05-22 |
Exxonmobil Upstream Research Company |
Velocity tomography using property scans
|
|
WO2016067111A1
(fr)
*
|
2014-10-27 |
2016-05-06 |
Cgg Services Sa |
Mise en correspondance d'énergies sur plusieurs époques
|
|
US11598195B2
(en)
|
2014-10-27 |
2023-03-07 |
Baker Hughes, A Ge Company, Llc |
Statistical approach to incorporate uncertainties of parameters in simulation results and stability analysis for earth drilling
|
|
US10803534B2
(en)
|
2014-10-31 |
2020-10-13 |
Exxonmobil Upstream Research Company |
Handling domain discontinuity with the help of grid optimization techniques
|
|
US10107938B2
(en)
|
2014-10-31 |
2018-10-23 |
Exxonmobil Upstream Research Company |
Managing discontinuities in geologic models
|
|
CA2963092C
(fr)
|
2014-10-31 |
2021-07-06 |
Exxonmobil Upstream Research Company |
Procedes de gestion de discontinuite dans la construction d'espace de conception de modele de subsurface faillee a l'aide de moindres carres mobiles
|
|
US11163092B2
(en)
|
2014-12-18 |
2021-11-02 |
Exxonmobil Upstream Research Company |
Scalable scheduling of parallel iterative seismic jobs
|
|
US10190406B2
(en)
*
|
2014-12-23 |
2019-01-29 |
Baker Hughes, A Ge Company, Llc |
Formation fracturing potential using surrounding pore pressures
|
|
US10379244B2
(en)
|
2015-01-06 |
2019-08-13 |
Total S.A. |
Method for obtaining estimates of a model parameter so as to characterise the evolution of a subsurface volume over a time period
|
|
US10520618B2
(en)
|
2015-02-04 |
2019-12-31 |
ExxohnMobil Upstream Research Company |
Poynting vector minimal reflection boundary conditions
|
|
EP3256886B1
(fr)
|
2015-02-13 |
2020-01-29 |
Exxonmobil Upstream Research Company |
Condition de limite d'absorption efficace et stable dans des calculs à différence finie
|
|
AU2015383134B2
(en)
|
2015-02-17 |
2018-01-25 |
Exxonmobil Upstream Research Company |
Multistage full wavefield inversion process that generates a multiple free data set
|
|
US10416327B2
(en)
|
2015-06-04 |
2019-09-17 |
Exxonmobil Upstream Research Company |
Method for generating multiple free seismic images
|
|
US10838093B2
(en)
|
2015-07-02 |
2020-11-17 |
Exxonmobil Upstream Research Company |
Krylov-space-based quasi-newton preconditioner for full-wavefield inversion
|
|
RU2693495C1
(ru)
|
2015-10-02 |
2019-07-03 |
Эксонмобил Апстрим Рисерч Компани |
Полная инверсия волнового поля с компенсацией показателя качества
|
|
US20170103144A1
(en)
*
|
2015-10-08 |
2017-04-13 |
Schlumbeger Technology Corporation |
Well trajectory adjustment
|
|
US10520619B2
(en)
|
2015-10-15 |
2019-12-31 |
Exxonmobil Upstream Research Company |
FWI model domain angle stacks with amplitude preservation
|
|
FR3043227A1
(fr)
*
|
2015-11-04 |
2017-05-05 |
Services Petroliers Schlumberger |
|
|
CN105653808A
(zh)
*
|
2016-01-05 |
2016-06-08 |
成都阳光铝制品有限公司 |
一种基于蒙特卡洛的规定塑性延伸强度不确定度评定方法
|
|
US10768324B2
(en)
|
2016-05-19 |
2020-09-08 |
Exxonmobil Upstream Research Company |
Method to predict pore pressure and seal integrity using full wavefield inversion
|
|
US10605937B2
(en)
*
|
2016-05-26 |
2020-03-31 |
Cgg Services Sas |
Device and method for smart picking surface waves dispersion curves
|
|
GB2556621B
(en)
*
|
2016-09-30 |
2020-03-25 |
Equinor Energy As |
Improved structural modelling
|
|
US11249208B2
(en)
|
2016-10-14 |
2022-02-15 |
Schlumberger Technology Corporation |
Geologic structural model generation
|
|
WO2018118374A1
(fr)
|
2016-12-23 |
2018-06-28 |
Exxonmobil Upstream Research Company |
Procédé et système de simulation de réservoir stable et efficace à l'aide d'indicateurs de stabilité
|
|
US11644589B2
(en)
|
2017-05-23 |
2023-05-09 |
Schlumberger Technology Corporation |
Analogue facilitated seismic data interpretation system
|
|
US11041976B2
(en)
|
2017-05-30 |
2021-06-22 |
Exxonmobil Upstream Research Company |
Method and system for creating and using a subsurface model in hydrocarbon operations
|
|
WO2019005908A1
(fr)
|
2017-06-27 |
2019-01-03 |
Schlumberger Technology Corporation |
Inférence de processus de construction de puits en temps réel par fusion de données probabilistes
|
|
CN110412530B
(zh)
*
|
2018-04-27 |
2021-09-17 |
深圳市优必选科技有限公司 |
一种识别充电桩的方法、装置及机器人
|
|
US10557345B2
(en)
|
2018-05-21 |
2020-02-11 |
Saudi Arabian Oil Company |
Systems and methods to predict and inhibit broken-out drilling-induced fractures in hydrocarbon wells
|
|
US10753203B2
(en)
|
2018-07-10 |
2020-08-25 |
Saudi Arabian Oil Company |
Systems and methods to identify and inhibit spider web borehole failure in hydrocarbon wells
|
|
RU2718137C1
(ru)
*
|
2018-12-05 |
2020-03-30 |
Общество с ограниченной ответственностью "Газпромнефть Научно-Технический Центр" (ООО "Газпромнефть НТЦ") |
Способ оценки параметра затухания волнового поля для определения углеводородного насыщения пласта в межскважинном пространстве при построении геологической модели
|
|
CA3123941A1
(fr)
|
2019-02-05 |
2020-08-13 |
Magnetic Variation Services, Llc |
Procedes et systemes de geoguidage pour des performances de forage ameliorees
|
|
US11162356B2
(en)
|
2019-02-05 |
2021-11-02 |
Motive Drilling Technologies, Inc. |
Downhole display
|
|
RU2720859C1
(ru)
*
|
2019-05-29 |
2020-05-13 |
Общество с ограниченной ответственностью "Газпром добыча Кузнецк" |
Способ выбора конструкции горизонтальной метаноугольной скважины
|
|
US12247484B2
(en)
|
2019-06-28 |
2025-03-11 |
Schlumberger Technology Corporation |
Field data acquisition and virtual training system
|
|
CN110322563B
(zh)
*
|
2019-07-09 |
2020-11-10 |
吉林大学 |
构建地质模型的补充钻孔选址方法及系统
|
|
WO2021046385A1
(fr)
|
2019-09-04 |
2021-03-11 |
Schlumberger Technology Corporation |
Opérations de travail au câble autonome dans des champs de pétrole et de gaz
|
|
WO2021046366A1
(fr)
*
|
2019-09-04 |
2021-03-11 |
Schlumberger Technology Corporation |
Opérations autonomes dans des champs de pétrole et de gaz
|
|
US11348218B2
(en)
*
|
2020-03-30 |
2022-05-31 |
Halliburton Energy Services, Inc. |
Hybrid interpretation approach for borehole imaging
|
|
US11572785B2
(en)
|
2021-01-26 |
2023-02-07 |
Saudi Arabian Oil Company |
Drilling uncertainty real time updates for accurate well placement
|
|
US12486755B2
(en)
*
|
2021-03-03 |
2025-12-02 |
Landmark Graphics Corporation |
Predicting a drill string packoff event
|
|
WO2022228701A1
(fr)
*
|
2021-04-30 |
2022-11-03 |
Zed Depth Exploration Data Gmbh |
Exploration d'espace de données géophysiques à l'aide d'un algorithme trans-dimensionnel
|
|
US12421829B2
(en)
|
2021-09-21 |
2025-09-23 |
Saudi Arabian Oil Company |
Combined carbon dioxide disposal and freshwater production from a saline aquifer
|
|
US20230114935A1
(en)
*
|
2021-10-07 |
2023-04-13 |
Exxonmobil Upstream Research Company |
Method for determining and implementing a data collection program for one or more phases of hydrocarbon extraction based on sequential subsurface uncertainty characterization
|
|
CN114137612B
(zh)
*
|
2021-11-30 |
2024-05-28 |
沈阳建筑大学 |
一种考虑谱型相关性的竖向地震动的条件均值谱生成方法
|
|
KR20250035501A
(ko)
*
|
2022-03-29 |
2025-03-12 |
콜로마, 인크. |
지하 유체의 발견 및 회수를 위한 시스템 및 방법과 지하 저장 유체의 검증
|
|
WO2023214196A1
(fr)
*
|
2022-05-02 |
2023-11-09 |
Abu Dhabi National Oil Company |
Procédé et système d'exploitation d'un réservoir souterrain
|
|
US12509981B2
(en)
|
2022-09-09 |
2025-12-30 |
Saudi Arabian Oil Company |
Parametric attribute of pore volume of subsurface structure from structural depth map
|
|
EP4705808A2
(fr)
*
|
2023-05-25 |
2026-03-11 |
Services Pétroliers Schlumberger |
Mise en oeuvre d'intelligence artificielle générative dans des opérations de champ pétrolifère
|