NO20053896D0 - System og fremgangsmate for automatisert malretting - Google Patents
System og fremgangsmate for automatisert malrettingInfo
- Publication number
- NO20053896D0 NO20053896D0 NO20053896A NO20053896A NO20053896D0 NO 20053896 D0 NO20053896 D0 NO 20053896D0 NO 20053896 A NO20053896 A NO 20053896A NO 20053896 A NO20053896 A NO 20053896A NO 20053896 D0 NO20053896 D0 NO 20053896D0
- Authority
- NO
- Norway
- Prior art keywords
- procedure
- targeting system
- automated targeting
- automated
- targeting
- Prior art date
Links
- 230000008685 targeting Effects 0.000 title 1
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
- G01V11/00—Prospecting or detecting by methods combining techniques covered by two or more of main groups G01V1/00 - G01V9/00
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/30—Specific pattern of wells, e.g. optimising the spacing of wells
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Geochemistry & Mineralogy (AREA)
- Fluid Mechanics (AREA)
- Environmental & Geological Engineering (AREA)
- General Physics & Mathematics (AREA)
- Geophysics (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Image Processing (AREA)
- Image Analysis (AREA)
- Automatic Analysis And Handling Materials Therefor (AREA)
- Complex Calculations (AREA)
- Apparatus For Radiation Diagnosis (AREA)
Applications Claiming Priority (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US44428103P | 2003-01-31 | 2003-01-31 | |
| US10/622,976 US7096172B2 (en) | 2003-01-31 | 2003-07-18 | System and method for automated reservoir targeting |
| PCT/US2004/002508 WO2004069960A2 (en) | 2003-01-31 | 2004-01-29 | A system and method for automated reservoir targeting |
Publications (3)
| Publication Number | Publication Date |
|---|---|
| NO20053896D0 true NO20053896D0 (no) | 2005-08-19 |
| NO20053896L NO20053896L (no) | 2005-10-28 |
| NO335931B1 NO335931B1 (no) | 2015-03-23 |
Family
ID=32776221
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| NO20053896A NO335931B1 (no) | 2003-01-31 | 2005-08-19 | System og fremgangsmåte for automatisert reservoarutpeking |
Country Status (6)
| Country | Link |
|---|---|
| US (1) | US7096172B2 (no) |
| EP (1) | EP1595206B1 (no) |
| AU (1) | AU2004209418B9 (no) |
| CA (1) | CA2514029C (no) |
| NO (1) | NO335931B1 (no) |
| WO (1) | WO2004069960A2 (no) |
Families Citing this family (45)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US7835893B2 (en) * | 2003-04-30 | 2010-11-16 | Landmark Graphics Corporation | Method and system for scenario and case decision management |
| HRP20040828B1 (en) * | 2004-09-13 | 2008-06-30 | Jović Franjo | Method and procedure for determination of porosity content of hydrocarbon deposit by means of context elimination of dominant seismic signal components |
| US8209202B2 (en) | 2005-04-29 | 2012-06-26 | Landmark Graphics Corporation | Analysis of multiple assets in view of uncertainties |
| EP2100218B1 (en) * | 2006-10-31 | 2013-05-15 | ExxonMobil Upstream Research Company | Modeling and management of reservoir systems with material balance groups |
| US20100191516A1 (en) * | 2007-09-07 | 2010-07-29 | Benish Timothy G | Well Performance Modeling In A Collaborative Well Planning Environment |
| EP2223157A4 (en) | 2007-12-13 | 2016-12-07 | Exxonmobil Upstream Res Co | ITERATIVE TANK SURVEILLANCE |
| EP2245257B1 (en) | 2008-02-11 | 2014-01-15 | Landmark Graphics Corporation, A Halliburton Company | Systems and methods for improved positioning of pads |
| EP2288974A1 (en) * | 2008-04-17 | 2011-03-02 | Exxonmobil Upstream Research Company | Robust optimization-based decision support tool for reservoir development planning |
| BRPI0909446A2 (pt) * | 2008-04-18 | 2015-12-22 | Exxonmobil Upstream Res Co | métodos para planejamento do desenvolvimento de reservatório, para suporte à decisão considerando o desenvolvimento de recurso petrolíferos, para otimização do planejamento de desenvolvimento, e para produção de hidrocarbonetos. |
| WO2009131761A2 (en) * | 2008-04-21 | 2009-10-29 | Exxonmobile Upstream Research Company | Stochastic programming-based decision support tool for reservoir development planning |
| CA2717353C (en) * | 2008-04-22 | 2016-06-21 | Exxonmobil Upstream Research Company | Functional-based knowledge analysis in a 2d and 3d visual environment |
| US8706541B2 (en) * | 2008-10-06 | 2014-04-22 | Schlumberger Technology Corporation | Reservoir management linking |
| AU2009311619B2 (en) * | 2008-11-06 | 2015-10-01 | Exxonmobil Upstream Research Company | System and method for planning a drilling operation |
| AU2015268702B2 (en) * | 2008-11-17 | 2016-02-11 | Landmark Graphics Corporation | Systems and methods for dynamically developing wellbore plans with a reservoir simulator |
| US8301426B2 (en) * | 2008-11-17 | 2012-10-30 | Landmark Graphics Corporation | Systems and methods for dynamically developing wellbore plans with a reservoir simulator |
| US10060245B2 (en) * | 2009-01-09 | 2018-08-28 | Halliburton Energy Services, Inc. | Systems and methods for planning well locations with dynamic production criteria |
| US8301382B2 (en) * | 2009-03-27 | 2012-10-30 | Schlumberger Technology Corporation | Continuous geomechanically stable wellbore trajectories |
| CA2776487C (en) | 2009-11-12 | 2017-02-14 | Exxonmobil Upstream Research Company | Method and apparatus for generating a three-dimentional simulation grid for a reservoir model |
| US9286437B2 (en) * | 2010-03-15 | 2016-03-15 | Landmark Graphics Corporation | Systems and methods for positioning horizontal wells within boundaries |
| BR112012025995A2 (pt) | 2010-04-30 | 2016-06-28 | Exxonmobil Upstream Res Co | método e sistema para simulação de fluxo de volume finito |
| US10087721B2 (en) | 2010-07-29 | 2018-10-02 | Exxonmobil Upstream Research Company | Methods and systems for machine—learning based simulation of flow |
| AU2011283193B2 (en) | 2010-07-29 | 2014-07-17 | Exxonmobil Upstream Research Company | Methods and systems for machine-learning based simulation of flow |
| CA2803068C (en) | 2010-07-29 | 2016-10-11 | Exxonmobil Upstream Research Company | Method and system for reservoir modeling |
| AU2011293804B2 (en) | 2010-08-24 | 2016-08-11 | Exxonmobil Upstream Research Company | System and method for planning a well path |
| CA2807300C (en) | 2010-09-20 | 2017-01-03 | Exxonmobil Upstream Research Company | Flexible and adaptive formulations for complex reservoir simulations |
| US9229129B2 (en) * | 2010-12-10 | 2016-01-05 | Conocophillips Company | Reservoir geobody calculation |
| AU2011356658B2 (en) | 2011-01-26 | 2017-04-06 | Exxonmobil Upstream Research Company | Method of reservoir compartment analysis using topological structure in 3D earth model |
| US9874648B2 (en) | 2011-02-21 | 2018-01-23 | Exxonmobil Upstream Research Company | Reservoir connectivity analysis in a 3D earth model |
| WO2013006226A1 (en) | 2011-07-01 | 2013-01-10 | Exxonmobil Upstream Research Company | Plug-in installer framework |
| CN103959233B (zh) | 2011-09-15 | 2017-05-17 | 埃克森美孚上游研究公司 | 在执行eos计算的指令受限算法中最优化矩阵和向量运算 |
| WO2013169429A1 (en) | 2012-05-08 | 2013-11-14 | Exxonmobile Upstream Research Company | Canvas control for 3d data volume processing |
| AU2013324162B2 (en) | 2012-09-28 | 2018-08-09 | Exxonmobil Upstream Research Company | Fault removal in geological models |
| CA2889722C (en) * | 2012-12-13 | 2018-07-03 | Landmark Graphics Corporation | System, method and computer program product for evaluating and ranking geobodies using a euler characteristic |
| WO2014200685A2 (en) | 2013-06-10 | 2014-12-18 | Exxonmobil Upstream Research Company | Interactively planning a well site |
| SG11201600255YA (en) | 2013-08-16 | 2016-02-26 | Landmark Graphics Corp | Identifying and extracting fault blocks in one or more bodies representing a geological structure |
| US9864098B2 (en) | 2013-09-30 | 2018-01-09 | Exxonmobil Upstream Research Company | Method and system of interactive drill center and well planning evaluation and optimization |
| EP3072075A4 (en) * | 2014-01-24 | 2017-01-11 | Landmark Graphics Corporation | Determining appraisal locations in a reservoir system |
| US10319143B2 (en) | 2014-07-30 | 2019-06-11 | Exxonmobil Upstream Research Company | Volumetric grid generation in a domain with heterogeneous material properties |
| US10221659B2 (en) | 2014-10-08 | 2019-03-05 | Chevron U.S.A. Inc. | Automated well placement for reservoir evaluation |
| AU2015339883B2 (en) | 2014-10-31 | 2018-03-29 | Exxonmobil Upstream Research Company | Methods to handle discontinuity in constructing design space for faulted subsurface model using moving least squares |
| WO2016069171A1 (en) | 2014-10-31 | 2016-05-06 | Exxonmobil Upstream Research Company | Handling domain discontinuity in a subsurface grid model with the help of grid optimization techniques |
| HUE064459T2 (hu) | 2016-12-23 | 2024-03-28 | Exxonmobil Technology & Engineering Company | Eljárás és rendszer stabil és hatékony tározó szimulációhoz stabilitási proxyk alkalmazásával |
| US11486230B2 (en) | 2020-04-09 | 2022-11-01 | Saudi Arabian Oil Company | Allocating resources for implementing a well-planning process |
| US11815650B2 (en) | 2020-04-09 | 2023-11-14 | Saudi Arabian Oil Company | Optimization of well-planning process for identifying hydrocarbon reserves using an integrated multi-dimensional geological model |
| US11693140B2 (en) | 2020-04-09 | 2023-07-04 | Saudi Arabian Oil Company | Identifying hydrocarbon reserves of a subterranean region using a reservoir earth model that models characteristics of the region |
Family Cites Families (17)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US4249776A (en) | 1979-05-29 | 1981-02-10 | Wyoming Mineral Corporation | Method for optimal placement and orientation of wells for solution mining |
| US5517428A (en) | 1994-05-02 | 1996-05-14 | Williams; David | Optimizing a piping system |
| US6006832A (en) | 1995-02-09 | 1999-12-28 | Baker Hughes Incorporated | Method and system for monitoring and controlling production and injection wells having permanent downhole formation evaluation sensors |
| US5740342A (en) * | 1995-04-05 | 1998-04-14 | Western Atlas International, Inc. | Method for generating a three-dimensional, locally-unstructured hybrid grid for sloping faults |
| US5757663A (en) | 1995-09-26 | 1998-05-26 | Atlantic Richfield Company | Hydrocarbon reservoir connectivity tool using cells and pay indicators |
| FR2744224B1 (fr) | 1996-01-26 | 1998-04-17 | Inst Francais Du Petrole | Methode pour simuler le remplissage d'un bassin sedimentaire |
| US6236894B1 (en) | 1997-12-19 | 2001-05-22 | Atlantic Richfield Company | Petroleum production optimization utilizing adaptive network and genetic algorithm techniques |
| US6574565B1 (en) * | 1998-09-15 | 2003-06-03 | Ronald R. Bush | System and method for enhanced hydrocarbon recovery |
| US6549879B1 (en) | 1999-09-21 | 2003-04-15 | Mobil Oil Corporation | Determining optimal well locations from a 3D reservoir model |
| US6315054B1 (en) | 1999-09-28 | 2001-11-13 | Weatherford Lamb, Inc | Assembly and method for locating lateral wellbores drilled from a main wellbore casing and for guiding and positioning re-entry and completion device in relation to these lateral wellbores |
| AU2001251019A1 (en) * | 2000-03-27 | 2001-10-08 | Peter J. Ortoleva | Method for simulation of enhanced fracture detection in sedimentary basins |
| US7047170B2 (en) * | 2000-04-14 | 2006-05-16 | Lockheed Martin Corp. | Method of determining boundary interface changes in a natural resource deposit |
| CN1386200A (zh) * | 2000-06-29 | 2002-12-18 | 目标储油层公司 | 有限元模型中的特征建模方法 |
| US20020120429A1 (en) * | 2000-12-08 | 2002-08-29 | Peter Ortoleva | Methods for modeling multi-dimensional domains using information theory to resolve gaps in data and in theories |
| ATE310890T1 (de) * | 2001-04-24 | 2005-12-15 | Exxonmobil Upstream Res Co | Verfahren zur verbesserung von produktionszuweisung in einem integrierten reservoir und oberflächenströmungssystem |
| US6853922B2 (en) * | 2001-07-20 | 2005-02-08 | Tracy Joseph Stark | System for information extraction from geologic time volumes |
| US6757217B2 (en) * | 2001-08-31 | 2004-06-29 | Exxonmobil Upstream Research Company | Method for time-aligning multiple offset seismic data volumes |
-
2003
- 2003-07-18 US US10/622,976 patent/US7096172B2/en not_active Expired - Lifetime
-
2004
- 2004-01-29 AU AU2004209418A patent/AU2004209418B9/en not_active Ceased
- 2004-01-29 EP EP04706504.0A patent/EP1595206B1/en not_active Expired - Lifetime
- 2004-01-29 WO PCT/US2004/002508 patent/WO2004069960A2/en not_active Ceased
- 2004-01-29 CA CA2514029A patent/CA2514029C/en not_active Expired - Lifetime
-
2005
- 2005-08-19 NO NO20053896A patent/NO335931B1/no not_active IP Right Cessation
Also Published As
| Publication number | Publication date |
|---|---|
| EP1595206B1 (en) | 2016-06-08 |
| AU2004209418B9 (en) | 2010-04-08 |
| WO2004069960A3 (en) | 2004-10-14 |
| US20040153298A1 (en) | 2004-08-05 |
| WO2004069960A2 (en) | 2004-08-19 |
| AU2004209418A1 (en) | 2004-08-19 |
| AU2004209418B2 (en) | 2009-11-12 |
| NO20053896L (no) | 2005-10-28 |
| CA2514029C (en) | 2015-03-24 |
| US7096172B2 (en) | 2006-08-22 |
| CA2514029A1 (en) | 2004-08-19 |
| NO335931B1 (no) | 2015-03-23 |
| EP1595206A4 (en) | 2014-10-29 |
| EP1595206A2 (en) | 2005-11-16 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| NO20032220D0 (no) | Löfteverktöy II og fremgangsmåte for anvendelse av samme | |
| NO20044073D0 (no) | Informasjonsbehandlingssystem og fremgangsmate | |
| NO20040640L (no) | Anordning og fremgangsmate | |
| NO20034321D0 (no) | Fremgangsmåte for identifisering | |
| DE602004010273D1 (de) | Amplifikationsmethode | |
| DK1664746T3 (da) | Antioxidantsensor og fremgangsmåde | |
| NO20043839L (no) | Havbunnsbasert intervensjonssystem, fremgangsmate for og komponeter i dette | |
| AT500898B8 (de) | Schweissanlage | |
| NO20032112L (no) | Grensesnitt for visuale og scenegraf | |
| DK1592686T3 (da) | Gyrase-inhibitorer og anvendelser deraf | |
| DK1620551T3 (da) | Phospholipase og fremgangsmåde til fremstilling deraf | |
| EP1663810A4 (en) | CARRIER AND METHOD | |
| DE602004004063D1 (de) | Informationsverarbeitungssystem und -verfahren | |
| NO20055778D0 (no) | Folgesystem og assosiert fremgangsmate | |
| DK1601744T3 (da) | Forgasningsapparat og fremgangsmåde | |
| NO20044012D0 (no) | Fremgangsmate og et system | |
| NO20043052D0 (no) | System og fremgangsmate for elektronisk betaling | |
| DK1662867T3 (da) | Insekticid-forbindelser og fremgangsmåder til valg deraf | |
| NO20044848D0 (no) | Anordning og fremgangsmate | |
| IS8489A (is) | Umritunarstillar og aðferðir þeirra | |
| NO20050503D0 (no) | Fremgangsmate og anordning | |
| FI20030684L (fi) | Menetelmä ja järjestelmä tiedon käsittelemiseksi | |
| NO20035626D0 (no) | Metode | |
| NO20035401D0 (no) | Metode | |
| NO20042318L (no) | Siktsammenstilling og fremgangsmate for filtrering |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| MK1K | Patent expired |