ATE310890T1 - Verfahren zur verbesserung von produktionszuweisung in einem integrierten reservoir und oberflächenströmungssystem - Google Patents

Verfahren zur verbesserung von produktionszuweisung in einem integrierten reservoir und oberflächenströmungssystem

Info

Publication number
ATE310890T1
ATE310890T1 AT02728833T AT02728833T ATE310890T1 AT E310890 T1 ATE310890 T1 AT E310890T1 AT 02728833 T AT02728833 T AT 02728833T AT 02728833 T AT02728833 T AT 02728833T AT E310890 T1 ATE310890 T1 AT E310890T1
Authority
AT
Austria
Prior art keywords
fluid flow
wellbores
flow system
improving production
surface flow
Prior art date
Application number
AT02728833T
Other languages
English (en)
Inventor
Usuf Middya
Original Assignee
Exxonmobil Upstream Res Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=23097232&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=ATE310890(T1) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by Exxonmobil Upstream Res Co filed Critical Exxonmobil Upstream Res Co
Application granted granted Critical
Publication of ATE310890T1 publication Critical patent/ATE310890T1/de

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/14Obtaining from a multiple-zone well
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells

Landscapes

  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • Physics & Mathematics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Feedback Control In General (AREA)
  • Acyclic And Carbocyclic Compounds In Medicinal Compositions (AREA)
  • Crystals, And After-Treatments Of Crystals (AREA)
  • General Factory Administration (AREA)
AT02728833T 2001-04-24 2002-04-19 Verfahren zur verbesserung von produktionszuweisung in einem integrierten reservoir und oberflächenströmungssystem ATE310890T1 (de)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US28613401P 2001-04-24 2001-04-24
PCT/US2002/012287 WO2002086277A2 (en) 2001-04-24 2002-04-19 Method for enhancing production allocation in an integrated reservoir and surface flow system

Publications (1)

Publication Number Publication Date
ATE310890T1 true ATE310890T1 (de) 2005-12-15

Family

ID=23097232

Family Applications (1)

Application Number Title Priority Date Filing Date
AT02728833T ATE310890T1 (de) 2001-04-24 2002-04-19 Verfahren zur verbesserung von produktionszuweisung in einem integrierten reservoir und oberflächenströmungssystem

Country Status (7)

Country Link
US (2) US7379853B2 (de)
EP (1) EP1389259B1 (de)
AT (1) ATE310890T1 (de)
CA (1) CA2442596A1 (de)
DE (1) DE60207549D1 (de)
NO (1) NO20034745L (de)
WO (1) WO2002086277A2 (de)

Families Citing this family (96)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BR0203994B1 (pt) 2001-02-05 2011-10-04 método e aparelho adaptado para continuamente otimizar sistemas de rede de reservatório, poço e superfìcie.
EA008321B1 (ru) * 2002-11-23 2007-04-27 Шлумбергер Текнолоджи Корпорейшн Способ и устройство для объединённых моделирований пластов-коллекторов и поверхностных сетей трубопроводов производственного оборудования
US7200540B2 (en) * 2003-01-31 2007-04-03 Landmark Graphics Corporation System and method for automated platform generation
US7096172B2 (en) * 2003-01-31 2006-08-22 Landmark Graphics Corporation, A Division Of Halliburton Energy Services, Inc. System and method for automated reservoir targeting
RU2006143654A (ru) * 2004-05-11 2008-06-20 Тримбл Нэвигейшн Лимитед (Us) Система анализа пути
US7627461B2 (en) * 2004-05-25 2009-12-01 Chevron U.S.A. Inc. Method for field scale production optimization by enhancing the allocation of well flow rates
US7672818B2 (en) * 2004-06-07 2010-03-02 Exxonmobil Upstream Research Company Method for solving implicit reservoir simulation matrix equation
GB2429796B (en) 2004-06-25 2008-08-06 Shell Int Research Closed loop control system for controlling production of hydrocarbon fluid from an underground formation
US7809537B2 (en) * 2004-10-15 2010-10-05 Saudi Arabian Oil Company Generalized well management in parallel reservoir simulation
US7373285B2 (en) * 2004-12-01 2008-05-13 Bp Corporation North America Inc. Application of phase behavior models in production allocation systems
US7596480B2 (en) * 2005-04-14 2009-09-29 Saudi Arabian Oil Company Solution method and apparatus for large-scale simulation of layered formations
CA2624766C (en) * 2005-10-06 2016-01-05 Schlumberger Canada Limited Method, system and apparatus for numerical black oil delumping
BRPI0520693A2 (pt) * 2005-11-21 2009-06-13 Chevron Usa Inc método para otimização de produção em escala de campo
BRPI0706580A2 (pt) 2006-01-20 2011-03-29 Landmark Graphics Corp gerenciamento dinámico de sistema de produção
US8571688B2 (en) * 2006-05-25 2013-10-29 Honeywell International Inc. System and method for optimization of gas lift rates on multiple wells
US10260329B2 (en) 2006-05-25 2019-04-16 Honeywell International Inc. System and method for multivariable control in three-phase separation oil and gas production
US8352227B2 (en) * 2006-10-30 2013-01-08 Schlumberger Technology Corporation System and method for performing oilfield simulation operations
EP2100218B1 (de) * 2006-10-31 2013-05-15 ExxonMobil Upstream Research Company Modellierung und verwaltung von reservoirsystemen mit materialausgleichsgruppen
US8078444B2 (en) * 2006-12-07 2011-12-13 Schlumberger Technology Corporation Method for performing oilfield production operations
US8190458B2 (en) * 2007-01-17 2012-05-29 Schlumberger Technology Corporation Method of performing integrated oilfield operations
US7946127B2 (en) * 2007-02-21 2011-05-24 Honeywell International Inc. Apparatus and method for optimizing a liquefied natural gas facility
US8775141B2 (en) * 2007-07-02 2014-07-08 Schlumberger Technology Corporation System and method for performing oilfield simulation operations
US8892221B2 (en) * 2007-09-18 2014-11-18 Groundswell Technologies, Inc. Integrated resource monitoring system with interactive logic control for well water extraction
US20090076632A1 (en) * 2007-09-18 2009-03-19 Groundswell Technologies, Inc. Integrated resource monitoring system with interactive logic control
MX2010003215A (es) * 2007-11-01 2010-04-30 Logined Bv Simulacion de fractura de deposito.
US7668707B2 (en) * 2007-11-28 2010-02-23 Landmark Graphics Corporation Systems and methods for the determination of active constraints in a network using slack variables and plurality of slack variable multipliers
US8437996B2 (en) * 2007-12-13 2013-05-07 Exxonmobil Upstream Research Company Parallel adaptive data partitioning on a reservoir simulation using an unstructured grid
CA2706482A1 (en) * 2007-12-21 2009-07-02 Exxonmobil Upstream Research Company Modeling in sedimentary basins
US20090198505A1 (en) * 2008-02-05 2009-08-06 Peter Gipps Interactive path planning with dynamic costing
US20110087476A1 (en) * 2008-06-16 2011-04-14 Patrick James Calvert Method and apparatus for configuring oil and/or gas production system
EP2151540A1 (de) * 2008-06-16 2010-02-10 Bp Exploration Operating Company Limited Verfahren und Vorrichtung zur Konfiguration von Öl und/oder Gasbeförderungsystem
EP2161406A1 (de) * 2008-09-03 2010-03-10 BP Exploration Operating Company Limited Verfahren und Vorrichtung zur Konfiguration eines Öl- und/oder Gasbeförderungsystems
US8670966B2 (en) * 2008-08-04 2014-03-11 Schlumberger Technology Corporation Methods and systems for performing oilfield production operations
EP2350810A4 (de) * 2008-09-30 2013-06-05 Exxonmobil Upstream Res Co Selbstanpassender iterlativer löser
CN102138146A (zh) * 2008-09-30 2011-07-27 埃克森美孚上游研究公司 使用并行多级不完全因式分解求解储层模拟矩阵方程的方法
US9228415B2 (en) 2008-10-06 2016-01-05 Schlumberger Technology Corporation Multidimensional data repository for modeling oilfield operations
US8301426B2 (en) * 2008-11-17 2012-10-30 Landmark Graphics Corporation Systems and methods for dynamically developing wellbore plans with a reservoir simulator
CA2750926A1 (en) * 2009-01-30 2010-08-05 Chevron U.S.A. Inc. System and method for predicting fluid flow in subterranean reservoirs
US8490696B2 (en) * 2009-04-20 2013-07-23 David Randolph Smith Method and apparatus to enhance oil recovery in wells
AU2014201894B2 (en) * 2009-04-20 2016-10-06 David Randolph Smith Method and apparatus to enhance oil recovery in wells
EP2465073A4 (de) * 2009-08-12 2014-09-03 Exxonmobil Upstream Res Co Optimierte richtlinien für bohrlochmanagement
BR112012025995A2 (pt) 2010-04-30 2016-06-28 Exxonmobil Upstream Res Co método e sistema para simulação de fluxo de volume finito
US8463586B2 (en) 2010-06-22 2013-06-11 Saudi Arabian Oil Company Machine, program product, and computer-implemented method to simulate reservoirs as 2.5D unstructured grids
US10087721B2 (en) 2010-07-29 2018-10-02 Exxonmobil Upstream Research Company Methods and systems for machine—learning based simulation of flow
AU2011283193B2 (en) 2010-07-29 2014-07-17 Exxonmobil Upstream Research Company Methods and systems for machine-learning based simulation of flow
CA2803315A1 (en) 2010-07-29 2012-02-02 Exxonmobil Upstream Research Company Methods and systems for machine-learning based simulation of flow
CA2803068C (en) 2010-07-29 2016-10-11 Exxonmobil Upstream Research Company Method and system for reservoir modeling
US8386227B2 (en) 2010-09-07 2013-02-26 Saudi Arabian Oil Company Machine, computer program product and method to generate unstructured grids and carry out parallel reservoir simulation
US8433551B2 (en) 2010-11-29 2013-04-30 Saudi Arabian Oil Company Machine, computer program product and method to carry out parallel reservoir simulation
CA2807300C (en) 2010-09-20 2017-01-03 Exxonmobil Upstream Research Company Flexible and adaptive formulations for complex reservoir simulations
GB2503578A (en) 2010-12-13 2014-01-01 Chevron Usa Method and system for coupling reservoir and surface facility simulations
US8972232B2 (en) * 2011-02-17 2015-03-03 Chevron U.S.A. Inc. System and method for modeling a subterranean reservoir
US20120215364A1 (en) * 2011-02-18 2012-08-23 David John Rossi Field lift optimization using distributed intelligence and single-variable slope control
CN103959233B (zh) 2011-09-15 2017-05-17 埃克森美孚上游研究公司 在执行eos计算的指令受限算法中最优化矩阵和向量运算
US20130110474A1 (en) * 2011-10-26 2013-05-02 Nansen G. Saleri Determining and considering a premium related to petroleum reserves and production characteristics when valuing petroleum production capital projects
US9946986B1 (en) 2011-10-26 2018-04-17 QRI Group, LLC Petroleum reservoir operation using geotechnical analysis
US9767421B2 (en) * 2011-10-26 2017-09-19 QRI Group, LLC Determining and considering petroleum reservoir reserves and production characteristics when valuing petroleum production capital projects
MX2014007972A (es) * 2012-02-24 2014-11-25 Landmark Graphics Corp Determinacion de parametros optimos para una operacion de fondo de pozo.
US9803457B2 (en) 2012-03-08 2017-10-31 Schlumberger Technology Corporation System and method for delivering treatment fluid
US9863228B2 (en) * 2012-03-08 2018-01-09 Schlumberger Technology Corporation System and method for delivering treatment fluid
WO2013188088A1 (en) 2012-06-15 2013-12-19 Landmark Graphics Corporation Systems and methods for optimizing facility limited production and injection in an integrated reservoir and gathering network
US9031822B2 (en) 2012-06-15 2015-05-12 Chevron U.S.A. Inc. System and method for use in simulating a subterranean reservoir
CA2874994C (en) * 2012-06-15 2017-02-07 Landmark Graphics Corporation Systems and methods for solving a multi-reservoir system with heterogeneous fluids coupled to a common gathering network
SG11201407790SA (en) * 2012-06-15 2014-12-30 Landmark Graphics Corp Methods and systems for gas lift rate management
AU2013324162B2 (en) 2012-09-28 2018-08-09 Exxonmobil Upstream Research Company Fault removal in geological models
US10012071B2 (en) 2013-07-11 2018-07-03 Laurie Sibbald Differential method for equitable allocation of hydrocarbon component yields using phase behavior process models
US20150337631A1 (en) * 2014-05-23 2015-11-26 QRI Group, LLC Integrated production simulator based on capacitance-resistance model
US10319143B2 (en) 2014-07-30 2019-06-11 Exxonmobil Upstream Research Company Volumetric grid generation in a domain with heterogeneous material properties
US10443358B2 (en) 2014-08-22 2019-10-15 Schlumberger Technology Corporation Oilfield-wide production optimization
US9951601B2 (en) 2014-08-22 2018-04-24 Schlumberger Technology Corporation Distributed real-time processing for gas lift optimization
WO2016069171A1 (en) 2014-10-31 2016-05-06 Exxonmobil Upstream Research Company Handling domain discontinuity in a subsurface grid model with the help of grid optimization techniques
AU2015339883B2 (en) 2014-10-31 2018-03-29 Exxonmobil Upstream Research Company Methods to handle discontinuity in constructing design space for faulted subsurface model using moving least squares
FR3054705B1 (fr) * 2016-07-29 2018-07-27 Veolia Environnement-VE Outil de gestion de multiples ressources en eau
US10303819B2 (en) 2016-08-25 2019-05-28 Drilling Info, Inc. Systems and methods for allocating hydrocarbon production values
US11263370B2 (en) 2016-08-25 2022-03-01 Enverus, Inc. Systems and methods for allocating hydrocarbon production values
HUE064459T2 (hu) 2016-12-23 2024-03-28 Exxonmobil Technology & Engineering Company Eljárás és rendszer stabil és hatékony tározó szimulációhoz stabilitási proxyk alkalmazásával
CN108729911A (zh) * 2017-04-24 2018-11-02 通用电气公司 用于资源生产系统的优化装置、系统和方法
US20210165124A1 (en) * 2017-06-14 2021-06-03 Landmark Graphics Corporation Modeling Geological Strata Using Weighted Parameters
US11466554B2 (en) 2018-03-20 2022-10-11 QRI Group, LLC Data-driven methods and systems for improving oil and gas drilling and completion processes
US11506052B1 (en) 2018-06-26 2022-11-22 QRI Group, LLC Framework and interface for assessing reservoir management competency
US12393992B2 (en) 2018-10-18 2025-08-19 Tyco Fire & Security Gmbh Systems and methods for assessing and controlling sustainability of an energy plant
US12007732B2 (en) 2019-07-12 2024-06-11 Johnson Controls Tyco IP Holdings LLP HVAC system with building infection control
US11960261B2 (en) 2019-07-12 2024-04-16 Johnson Controls Tyco IP Holdings LLP HVAC system with sustainability and emissions controls
US11078773B2 (en) 2018-12-03 2021-08-03 Saudi Arabian Oil Company Performing continuous daily production allocation
US12595723B2 (en) * 2019-07-02 2026-04-07 Landmark Graphics Corporation Multi-agent, multi-objective wellbore gas-lift optimization
US11714393B2 (en) 2019-07-12 2023-08-01 Johnson Controls Tyco IP Holdings LLP Building control system with load curtailment optimization
US12529490B2 (en) 2019-07-12 2026-01-20 Tyco Fire & Security Gmbh Infection control tool for HVAC system
US11226600B2 (en) * 2019-08-29 2022-01-18 Johnson Controls Tyco IP Holdings LLP Building control system with load curtailment optimization
US12264828B2 (en) 2019-07-12 2025-04-01 Tyco Fire & Security Gmbh Air quality control and disinfection system
CA3148100A1 (en) * 2019-08-07 2021-02-11 Drilling Info, Inc. Systems and methods for allocating hydrocarbon production values
US12175380B2 (en) 2020-12-15 2024-12-24 Saudi Arabian Oil Company Gas-oil separation plant virtual water cut predictor based on supervised learning framework on time series data
US12398905B2 (en) 2021-05-28 2025-08-26 Tyco Fire & Security Gmbh Building control system with multi-objective control of carbon emissions and occupant comfort
US12261434B2 (en) 2022-02-10 2025-03-25 Tyco Fire & Security Gmbh Control system with multi-factor carbon emissions optimization
JP2024534489A (ja) 2021-09-20 2024-09-20 タイコ・ファイアー・アンド・セキュリティー・ゲーエムベーハー 建物に対する持続可能性計画のためのシステム及び方法
US12332617B2 (en) 2021-09-20 2025-06-17 Tyco Fire & Security Gmbh Building management system with sustainability improvement
EP4453377A4 (de) * 2022-02-21 2025-11-05 Abu Dhabi Nat Oil Co Rückzuweisungsverfahren

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5305209A (en) * 1991-01-31 1994-04-19 Amoco Corporation Method for characterizing subterranean reservoirs
FR2742794B1 (fr) * 1995-12-22 1998-01-30 Inst Francais Du Petrole Methode pour modeliser les effets des interactions entre puits sur la fraction aqueuse produite par un gisement souterrain d'hydrocarbures
US6112126A (en) * 1997-02-21 2000-08-29 Baker Hughes Incorporated Adaptive object-oriented optimization software system
US5992519A (en) * 1997-09-29 1999-11-30 Schlumberger Technology Corporation Real time monitoring and control of downhole reservoirs
US6236894B1 (en) * 1997-12-19 2001-05-22 Atlantic Richfield Company Petroleum production optimization utilizing adaptive network and genetic algorithm techniques
US6101447A (en) * 1998-02-12 2000-08-08 Schlumberger Technology Corporation Oil and gas reservoir production analysis apparatus and method
US6266619B1 (en) * 1999-07-20 2001-07-24 Halliburton Energy Services, Inc. System and method for real time reservoir management
US6928399B1 (en) 1999-12-03 2005-08-09 Exxonmobil Upstream Research Company Method and program for simulating a physical system using object-oriented programming
US20020177955A1 (en) * 2000-09-28 2002-11-28 Younes Jalali Completions architecture
BR0203994B1 (pt) 2001-02-05 2011-10-04 método e aparelho adaptado para continuamente otimizar sistemas de rede de reservatório, poço e superfìcie.
US7627461B2 (en) * 2004-05-25 2009-12-01 Chevron U.S.A. Inc. Method for field scale production optimization by enhancing the allocation of well flow rates
BRPI0520693A2 (pt) 2005-11-21 2009-06-13 Chevron Usa Inc método para otimização de produção em escala de campo

Also Published As

Publication number Publication date
WO2002086277A2 (en) 2002-10-31
WO2002086277A3 (en) 2003-05-22
NO20034745D0 (no) 2003-10-23
DE60207549D1 (de) 2005-12-29
US7379853B2 (en) 2008-05-27
US20080065363A1 (en) 2008-03-13
EP1389259B1 (de) 2005-11-23
EP1389259A4 (de) 2004-06-09
CA2442596A1 (en) 2002-10-31
NO20034745L (no) 2003-12-23
US7752023B2 (en) 2010-07-06
EP1389259A2 (de) 2004-02-18
US20020165671A1 (en) 2002-11-07

Similar Documents

Publication Publication Date Title
DE60207549D1 (de) Verfahren zur verbesserung von produktionszuweisung in einem integrierten reservoir und oberflächenströmungssystem
Hussain et al. Water table response to rainfall and groundwater simulation using physics-based numerical model: WASH123D
ATE551679T1 (de) Verfahren zur modellierung eines zufälligen bohrlochverlaufs in einem ölreservoir unter verwendung eines adaptiven gitters
ATE483995T1 (de) Verfahren, system und programmspeichervorrichtung zur optimierung von ventileinstellungen in instrumentierten bohrlöchern unter verwendung von adjungierter gradiententechnologie und reservoirsimulation
DE602005001737D1 (de) Verfahren zur Modellierung der Ölgewinnung aus einer unterirdischen Formation
WO2006036389A3 (en) Numerical modeling evaluation of basin sedimentation properities
EA200200439A1 (ru) Способ и система моделирования углеводородсодержащего пласта
US9753181B2 (en) System and method for automatic local grid refinement in reservoir simulation systems
ATE387635T1 (de) Automatisches system zur modellierung von gestörten mehrwertigen horizonten
DE60231854D1 (de) System und Verfahren zur Erzeugung eines Zusammenbaus durch direkte Benutzung von dreidimensionellen CAD-stückdefinitionen
AU2012294775B2 (en) System and method for quantifying stimulated rock quality in a wellbore
GB2467395A (en) System and method for oilfield production operations
WO2008054610A3 (en) Modeling and management of reservoir systems with material balance groups
RU2154158C1 (ru) Способ разработки углеводородных залежей
CN106990450A (zh) 一种恢复断层形成演化历史的方法
ATE399253T1 (de) System und verfahren für mehrere bohrlöcher von einem gemeinsamen oberflächenstandort
CN1912655A (zh) 一种沉积相控制预测砂岩油藏储层属性的方法
CN111622733A (zh) 一种致密气藏区域部署加密井的方法
Rosa et al. Optimizing the location of platforms and manifolds
ATE392677T1 (de) Verfahren zur segmentierung eines dreidimensionalen datensatzes mit ermöglichung von benutzerkorrekturen
CN114764153A (zh) 一种古岩溶潜水面动态变化过程确定方法及装置
Cantisani et al. The integrated design of urban road intersections: A case study
El Messeidy Towards great streets: Sustainable design solutions
Belakehal et al. A Morphological Analysis of the French Colonial Architecture in Algeria: the Façades of Biskra
CN108643896B (zh) 一种基于断层遮挡的油藏含油高度定量评价方法

Legal Events

Date Code Title Description
RER Ceased as to paragraph 5 lit. 3 law introducing patent treaties