OA10231A - Method of constructing piers of hydraulic structures made of hard using perforated bricks with indented transverse walls without formwork or clamps - Google Patents
Method of constructing piers of hydraulic structures made of hard using perforated bricks with indented transverse walls without formwork or clamps Download PDFInfo
- Publication number
- OA10231A OA10231A OANE940005A OA10231A OA 10231 A OA10231 A OA 10231A OA NE940005 A OANE940005 A OA NE940005A OA 10231 A OA10231 A OA 10231A
- Authority
- OA
- OAPI
- Prior art keywords
- bricks
- indented
- walls
- formwork
- transverse walls
- Prior art date
Links
- 238000009415 formwork Methods 0.000 title claims description 28
- 238000000034 method Methods 0.000 title claims description 21
- 239000011470 perforated brick Substances 0.000 title claims description 8
- 239000011449 brick Substances 0.000 claims description 33
- 239000004567 concrete Substances 0.000 claims description 20
- 229910000831 Steel Inorganic materials 0.000 claims description 18
- 239000010959 steel Substances 0.000 claims description 18
- 238000010276 construction Methods 0.000 claims description 17
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims description 4
- 238000005520 cutting process Methods 0.000 claims description 4
- 230000002787 reinforcement Effects 0.000 claims description 4
- 238000004140 cleaning Methods 0.000 claims description 3
- 238000011084 recovery Methods 0.000 claims description 3
- 230000035939 shock Effects 0.000 claims description 3
- 206010044625 Trichorrhexis Diseases 0.000 claims description 2
- 229910052742 iron Inorganic materials 0.000 claims description 2
- 238000009417 prefabrication Methods 0.000 description 6
- 239000002023 wood Substances 0.000 description 5
- 239000002184 metal Substances 0.000 description 4
- 229910052751 metal Inorganic materials 0.000 description 4
- 230000002411 adverse Effects 0.000 description 2
- 230000015556 catabolic process Effects 0.000 description 2
- 238000000576 coating method Methods 0.000 description 2
- 238000006731 degradation reaction Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 239000004570 mortar (masonry) Substances 0.000 description 2
- 238000003756 stirring Methods 0.000 description 2
- 239000004035 construction material Substances 0.000 description 1
- 238000002224 dissection Methods 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 239000011121 hardwood Substances 0.000 description 1
- 230000008676 import Effects 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 230000001629 suppression Effects 0.000 description 1
- 238000007669 thermal treatment Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/02—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls built-up from layers of building elements
- E04B2/14—Walls having cavities in, but not between, the elements, i.e. each cavity being enclosed by at least four sides forming part of one single element
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/02—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls built-up from layers of building elements
- E04B2/14—Walls having cavities in, but not between, the elements, i.e. each cavity being enclosed by at least four sides forming part of one single element
- E04B2/26—Walls having cavities in, but not between, the elements, i.e. each cavity being enclosed by at least four sides forming part of one single element the walls being characterised by fillings in all cavities in order to form a wall construction
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/84—Walls made by casting, pouring, or tamping in situ
- E04B2/86—Walls made by casting, pouring, or tamping in situ made in permanent forms
- E04B2/8623—Walls made by casting, pouring, or tamping in situ made in permanent forms with spacers and at least one form leaf being monolithic
- E04B2/8629—Walls made by casting, pouring, or tamping in situ made in permanent forms with spacers and at least one form leaf being monolithic with both form leaves and spacers being monolithic
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Description
1 010231 L'invention concerne un nouveau procédé de construction de piédroitsd'ouvrages hydrauliques en dur à l'aide des briques ajourées, aux paroistransversales échancrées destinées à servir de "coffrage perdu" enremplacement de nombreux procédés bien connus qui font intervenir des 5 coffrages (en bois ou métalliques), de serre-joints , des travaux auxiliaires,des machines de préfabrication, des engins de transport et/ou de manutentionetc..The invention relates to a new method of constructing rigid hydraulic piers by means of perforated bricks, with indented transverse walls intended to serve as "lost formwork", replacing many well known methods involving formwork ( wooden or metal), clamps, ancillary works, prefabrication machinery, transport and / or handling equipment and so on.
Ces procédés traditionnels très coûteux, et difficiles à mettre en œuvrecontribuent à la dégradation rapide de l'environnement par la coupe abusiveîo du bois des forêts, d'autant plus que le coffrage en bois est beaucoup moinscher que le coffrage métallique d'une part et d'autre part l'utilisation abusivedes matériaux et matériels importés contribuent à la dégradation et à l'effondrement des prix des produits de base. L'invention pallie ces inconvénients. Elle concerne un nouveau procédé dei5 construction de piédroits d'ouvrages hydrauliques en dur à l'aide des briquesajourées, aux parois transversales échancrées, destinées à servir de "coffrage perdu". Ces nouvelles briques rigides, robustes, indéformables,légères sont économiques et faciles à produire, à stocker, à monter et àmettre en œuvre pour la réalisation des éléments de maçonnerie verticaux 20 et/ou horizontaux devant contenir les aciers verticaux d'amorces de radiers,les aciers horizontaux et le béton frais avant son durcissement, constituantainsi un "coffrage perdu". Ces "coffrages perdus" donnent d'excellentsrésultats sur le plan qualité du béton. En effet ils réduisent l'exposition dubéton aux effets climatiques néfastes, améliorant ainsi le processus du 25 durcissement, qui à son tour améliore la qualité du béton. L'ensemble des briques ajourées, aux parois transversales échancréesdestinées à servir de "coffrage perdu" est constitué essentiellement : A) De la brique existante comprenant deux trous rectangulaires dérivent deuxbriques: 30 . la première comporte deux trous rectangulaires présentant trois parois transversales échancrées. . la deuxième comporte un trou rectangulaire présentant deux paroistransversales échancrées.These traditional processes, which are very expensive and difficult to implement, contribute to the rapid degradation of the environment by the excessive cutting of forest wood, especially since the wooden formwork is much less cumbersome than the metal formwork on the one hand and on the other hand, the misuse of imported materials and equipment contributes to the degradation and collapse of commodity prices. The invention overcomes these disadvantages. It relates to a new method of constructing piers of hydraulic structures in hard using brick bricks, with transverse walls indented, intended to serve as "lost formwork". These new rigid, robust, undeformable, lightweight bricks are economical and easy to produce, store, mount and implement for the realization of vertical and / or horizontal masonry elements to contain the vertical steels of riffle primer, horizontal steels and fresh concrete before hardening, thus constituting a "lost formwork". These "lost forms" give excellent results on the concrete quality plan. Indeed, they reduce the exposure of the concrete to adverse climatic effects, thereby improving the curing process, which in turn improves the quality of the concrete. The set of perforated bricks, with indented transverse walls intended to serve as "lost formwork" consists essentially of: A) Of the existing brick comprising two rectangular holes derive two bricks: 30. the first has two rectangular holes with three transverse walls indented. . the second has a rectangular hole with two transverse walls indented.
Elles s'obtiennent par moule spéciale. 010231 B) Toutefois ces deux briques peuvent aussi présenter des parties fourchuescomportant une à quatre dents. Ces parties fourchues y sont pour le besoinde mise en œuvre des points singuliers tels que des regards recevant descaniveaux. 5 Les briques présentant des parties fourchues s'obtiennent par découpage desbriques ajourées, aux parois transversales échancrées.They are obtained by special mold. 010231 B) However, these two bricks may also have forked parts with one to four teeth. These forked parts are there for the purpose of implementing singular points such as glances receiving descaniveaux. The bricks having split ends are obtained by cutting perforated bricks, with the transverse walls indented.
La mise en œuvre de toute ces briques ajourées aux parois transversales sefait de la même manière. La maçonnerie du "coffrage perdu" devant contenirles aciers verticaux d'amorces de radiers, les aciers horizontaux et le bétonio armé frais avant son durcissement doit respecter les règles de l’art:notamment éviter la superposition de deux joints verticaux .Les figures ci-dessous permettent une meilleure compréhension de l’invention à titre indicatif et non limitatif.The implementation of all these openwork bricks to the transverse walls is done in the same way. The masonry of the "lost formwork" to contain the vertical steels of riffle primer, the horizontal steels and the reinforced reinforced concrete before its hardening must respect the rules of the art: in particular to avoid the superposition of two vertical joints. below allow a better understanding of the invention as an indication and not limiting.
La figure 1 représente en vue perspective la brique existante comprenantus deux trous rectangulaires.Figure 1 shows in perspective view the existing brick comprising two rectangular holes.
Les figures 2,8 représentent des vues perspectives deux briques dérivées dela brique figure 1.Figures 2.8 show perspective views two bricks derived from the brick Figure 1.
Les figures 3, 4, 5, 6, 7, 9 représentent des vues perpectives des briquesdérivées des figures2 et 8 présentant une ou deux parties fourchues, pouvant 20 comporter une à quatre dents.Figures 3, 4, 5, 6, 7, 9 show perspective views of the derived bricks of Figures 2 and 8 having one or two forked portions, which may include one to four teeth.
La figure 10 représente la vue en plan d'un détail construction de regardrecevant des caniveaux.Figure 10 shows the plan view of a construction detail of a view of gutters.
La figure 11 représente la vue en plan d'un détail de construction d'une couped'un regard recevant des caniveaux. 25 La figure 12 représente en vue perspective sommaire, caractérisant le moded'exécution de piédroits d'ouvrages hydrauliques en dur à l'aide des briquesajourées, aux parois transversales échancrées sans coffrage ni serre-joints.Figure 11 shows the plan view of a construction detail of a shot of a look receiving gutters. FIG. 12 represents a brief perspective view, characterizing the method of executing piers of hydraulic structures made of hard using bricks fitted, with transverse walls indented without formwork or clamps.
Ces parois transversales échancrées et ces fourches sont les partiescaractérisantes de ces nouvelles briques. ?o Pour leur mise en œuvre il suffit de les enchâsser aux aciers verticaux (4)d'amorces de radiers, en les juxtaposant dans le sens des paroistransversales échancrées, rejointées par un mortier de manière à poser lesaciers horizontaux (5) sur les parois transversales échancrées et parallèlesaux parois latérales des briques maçonnées. Ainsi le procédé de construction 010231 de piédroits d'ouvrages hydrauliques en dur à l'aide de briques ajourées auxparois transversales échancrées sans coffrage ni serre-joints , du typecomprenant une pluralité de briques ajourées, juxtaposées destinées àcontenir les aciers verticaux d'amorces de radiers, les aciers horizontaux et le 5 béton frais avant son durcissement. Caractérisé: . en ce que les briques ajourées, aux parois transversales échancréesenchâssent les aciers verticaux d'amorces de radiers. . en ce que les parois transversales échancrées reçoivent les aciershorizontaux de manière à ce que les liaisons entre les armatures soient 10 exécutées. . en ce que le béton frais est coulé entre les parois latérales des briquesajourées maçonnées dans le sens des parois transversales échancrées etque son serrage autour des armatures se fait par petits chocs à l'aide d'un feren le remuant jusqu'à ce qu’il n'y ait aucune cavité dans l'élément de i5 maçonnerie devant servir de "coffrage perdu". . en ce que l'arrêt et la reprise du bétonnage se font après chaque rangée debriques ajourées maçonnées, suivant les règles de l'art notamment lenettoyage de la surface du béton avant chaque reprise etc..These indented transverse walls and these forks are the characteristic parts of these new bricks. For their implementation, it suffices to embed them in vertical steels (4) of riffle primer, by juxtaposing them in the direction of the indented transversal walls, joined by a mortar so as to lay the horizontal steel (5) on the walls. transversal indented and parallel to the side walls of brick masonry. Thus, the method of constructing 010231 of piers of hydraulic structures in hard using openwork bricks to the transversal walls indented without formwork or clamps, the typecomprenant a plurality of openwork bricks, juxtaposed for containing the vertical steels of riffle primers horizontal steels and fresh concrete before hardening. Characterized:. in that the open-worked bricks with their indented transverse walls base the vertical steels with rudder primers. . in that the indented transverse walls receive the horizontal steels so that the connections between the reinforcements are executed. . in that the fresh concrete is poured between the side walls of the bricks, which are masonized in the direction of the indented transverse walls, and that it is clamped around the reinforcements by means of small shocks using a feren stirring it until it there is no cavity in the masonry element to serve as "lost formwork". . in that the stop and the resumption of concreting are done after each row of openwork masonry, according to the rules of the art including the cleaning of the surface of the concrete before each recovery etc ..
La mise en œuvre de briques ajourées, aux parois transversales échancrées 20 en vue de réaliser des "coffrages perdus" est donc facile et économiqueévitant ainsi l'utilisation des coffrages (bois ou métallique), des serre-joints,des machines de préfabrication, des engins de transport et/ou demanutention, des travaux auxiliaires d'où une grande rapidité d'exécution.Avantageusement en pratique: 25 - Les briques ajourées, aux parois transversales échancrées destinées à servir de "coffrage perdu" des piédroits d'ouvrages hydrauliques enchâssentdirectement les aciers verticaux d'amorces de radiers en les juxtaposant dansle sens des parois transversales échancrées rejointées par un mortier demanière à poser les aciers horizontaux sur les parois transversales 30 échancrées et parallèles aux parois latérales.The implementation of openwork bricks with transverse walls indented 20 to achieve "lost formwork" is thus easy and economical thus avoiding the use of formwork (wood or metal), clamps, prefabrication machines, transport and / or handling equipment, ancillary works and hence a great speed of execution. Advantageously in practice: 25 - The openwork bricks, with transverse scalloped walls intended to serve as "lost formwork" of the piers of hydraulic structures enshrine directly the vertical steels of rudder primers by juxtaposing them in the direction of the indented transverse walls joined by a mortar in order to lay the horizontal steels on the transverse walls 30 indented and parallel to the side walls.
Les liaisons entre les armatures sont exécutées, le béton frais est coulé entreles parois latérales des briques maçonnées. Le serrage du béton frais se faità l'aide d'un fer par petits chocs en le remuant jusqu'à ce qu'il n'y ait aucunecavité dans l'élément de maçonnerie. Le béton frais assure la liaison entre les 35 piédroits et les radiers. L'arrêt du bétonnage se fait après chaque rangée de 4 0 î 0231 briques maçonnées, la reprise du bétonnage se fait selon les règles de l'art àsavoir le nettoyage de la surface du béton avant chaque reprise etc..The connections between the reinforcements are executed, the fresh concrete is poured between the side walls of the masonry bricks. Clamping of the fresh concrete is done with the aid of an iron in small shocks by stirring it until there is no cavity in the masonry element. Fresh concrete provides the connection between the 35 piers and the rafters. The concreting is stopped after each row of masonry bricks, the resumption of the concreting is done according to the rules of the art to have the cleaning of the surface of the concrete before each recovery etc ..
Ce nouveau procédé permet pratiquement la suppression des coffragesclassiques, de serre-joints, des machines de préfabrication, des engins detransport et/ou de manutention, des travaux auxiliaires. Ce "coffrage perdu",robuste, et indéformable, empêche toute perte de matière (béton frais avantson durcissement). Il garde sa forme, présente une maçonnerie tout à faitrégulière, offrant ainsi la possibilité de ne pas appliquer d'enduits.This new method practically eliminates conventional formwork, clamps, prefabrication machines, transport and / or handling equipment, auxiliary work. This "formwork lost", robust, and dimensionally stable, prevents any loss of material (fresh concrete before curing). It keeps its shape, presents a completely regular masonry, thus offering the possibility of not applying coatings.
La manière dont ces nouvelles briques peuvent être maçonnées pour servirde "coffrage perdu" et les avantages qui en découlent ressortiront mieux desexemples de réalisation, donnés à titre indicatif et non limitatif; à l'appui desfigures annexées.The way in which these new bricks can be built to serve as "lost formwork" and the advantages resulting therefrom will emerge more clearly from the exemplary embodiments, given as an indication and not a limitation; in support of the annexed figures.
En se référant aux figures, ce procédé de construction de piédroits d'ouvrageshydrauliques à l'aide des briques ajourées, aux parois transversaleséchancrées sans coffrage ni serre-joints, constitué essentiellement d’unepluralité de briques ajourées enchâssant les aciers verticaux(4) d'amorces deradiers, juxtaposées dans le sens des parois transversales échancréesdestinées à recevoir les aciers horizontaux(5) et le béton.Referring to the figures, this method of construction of piers of hydraulic structures using openwork bricks, the transverse walls notched without formwork or clamps, consisting essentially of a plurality of openwork bricks embedding the vertical steels (4) of basement primers, juxtaposed in the direction of the indented transverse walls intended to receive the horizontal steels (5) and the concrete.
Ce procédé de construction peut être utilisé avantageusement pour :This construction method can be used advantageously for:
- construire des bâtiments légers en dur sans coffrage ni serre-joints commecelui décrit dans la demande de brevet No PV 94001 NF du 28 février1994/OAPI - réduire l'utilisation de bois dans la construction; donc lutter à long termecontre la désertification vu la gravité extrême de ce problème tout effort dansle sens de la limitation des coupes des arbres sera le bien venu d'autant plusque le bois utilisé pour la construction des bâtiments devant avoir certainescaractéristiques, c'est bien d'abattage d'arbres qu'il s'agit le plus souvent dansles forêts. - relancer l'emploi, particulièrement touché dans le secteur de constructionpar l'utilisation de ce nouveau procédé de construction demandant peud'outillages mais une main d’œuvre importante; ceci est un choix délibéré carle simple fait de disposer de nouveau procédé de construction économiquepourrait être réglé par le biais de la préfabrication par exemple celui de laproduction des briques ajourées, aux parois transversales échancréesdestinées à servir de coffrage perdu. KBfcMKSiMSBNfi- to build light-weight buildings without formwork or clamps as described in patent application No. PV 94001 NF of 28 February 1994 / OAPI - to reduce the use of wood in construction; so long struggle against desertification given the extreme gravity of this problem any effort in the sense of limiting tree cutting will be welcome especially since the wood used for the construction of buildings to have some features, it is good to the felling of trees most often in forests. - boosting employment, particularly hard hit in the construction sector, through the use of this new construction process requiring few tools but a large workforce; this is a deliberate choice since the simple fact of having a new economic construction method could be regulated by means of prefabrication, for example that of the production of openwork bricks, with indented transverse walls intended to serve as lost formwork. KBfcMKSiMSBNfi
B 010231 - limiter les importations des matériaux et matériels de construction tels que lecoffrage en bois, les serre-joints, les clous, les machines de préfabrications,les engins de transport et/ou de manutention etc..B 010231 - limit imports of construction materials and equipment such as wooden formwork, clamps, nails, prefabricating machines, transport and / or handling equipment etc.
Le nouveau procédé de construction de piédroits d'ouvrages hydraulique en< dur à l'aide des briques ajourées, aux parois transversales échancrées sanscoffrage ni serre-joints selon l’invention présente de nombreux avantages parrapport aux procédés de construction des piédroits d'ouvrages hydrauliques en dur proposés à ce jour, on peut citer: - Suppression de tout coffrage (en bois ou métallique) et travaux auxiliaires,ο - Suppression de toute machine de préfabrication. - Suppression de tout engin de transport et/ou de manutention - La vue extérieure de l'ouvrage (voile en béton) présente une maçonnerietout à fait régulière offrant la possibilité de ne pas appliquer d'enduits. - Suppression des joints entre les panneaux que génèrent la préfabrication. i5 - une grande rapidité d'exécution (réduisant ainsi le temps de mise en œuvrede l'ordre de 50%). - La fabrication du moule est à la portée des artisans locaux. - Les briques ajourées, aux parois transversales échancrées peuvent êtreégalement confectionnées comme dans le cas des agglos-traditionnels enciment. - Les "coffrages perdus" réalisés à l'aide des briques ajourées, échancréesréduisent l'exposition du béton coulé aux effets climatiques néfastes,améliorant ainsi le processus du durcissement qui à son tour améliore laqualité du béton par rapport aux caractéristiques médiocres du béton dûs ... 25 au traitement thermique accéléré suivi d’une dissécation rapide qui sont lescauses de l’épaufrement des arêtes pendant les manutentions .The new method of constructing hydraulic piers made of hardwood using openwork bricks, with the transverse walls indented without formwork or clamps according to the invention has many advantages in relation to the methods of construction of the piers of hydraulic structures. now available: - Removal of all formwork (wood or metal) and ancillary work, ο - Removal of any prefabrication machine. - Removal of any transport and / or handling equipment - The external view of the structure (concrete sail) has a regular masonry with the possibility of not applying coatings. - Suppression of the joints between the panels that generate the prefabrication. i5 - a high speed of execution (thus reducing the time of implementation of the order of 50%). - The manufacture of the mold is within the reach of local craftsmen. - The openwork bricks with indented transverse walls can also be made as in the case of traditional agglos-encancy. - "Lost formwork" made using perforated bricks, indented reduce the exposure of cast concrete to adverse climatic effects, thus improving the hardening process which in turn improves the quality of concrete compared to the poor characteristics of concrete due. .. 25 accelerated thermal treatment followed by rapid dissection which are the breaks of the roughness of the edges during handling.
Claims (1)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| OANE940005 OA10231A (en) | 1994-07-28 | 1994-07-28 | Method of constructing piers of hydraulic structures made of hard using perforated bricks with indented transverse walls without formwork or clamps |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| OANE940005 OA10231A (en) | 1994-07-28 | 1994-07-28 | Method of constructing piers of hydraulic structures made of hard using perforated bricks with indented transverse walls without formwork or clamps |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| OA10231A true OA10231A (en) | 1997-09-19 |
Family
ID=19929797
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| OANE940005 OA10231A (en) | 1994-07-28 | 1994-07-28 | Method of constructing piers of hydraulic structures made of hard using perforated bricks with indented transverse walls without formwork or clamps |
Country Status (1)
| Country | Link |
|---|---|
| OA (1) | OA10231A (en) |
-
1994
- 1994-07-28 OA OANE940005 patent/OA10231A/en unknown
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| EP2582893B1 (en) | Method for constructing a building using bricks connected using dry joints | |
| OA10231A (en) | Method of constructing piers of hydraulic structures made of hard using perforated bricks with indented transverse walls without formwork or clamps | |
| FR2491977A1 (en) | Joint connection for building frame in reinforced concrete - has open reinforcement column cage retaining angled beams with connecting bars | |
| WO1993021403A1 (en) | Method for producing concrete constructions and structures therefor | |
| FR2508956A1 (en) | Prefabricated heat insulating concrete building block - incorporates cooperating grooves and ridges allowing offset assembly without use of mortar | |
| OA10230A (en) | Method of constructing lightweight buildings using split bricks without formwork or clamps | |
| BE1010092A6 (en) | Method of manufacturing and assembly of an element construction concrete. | |
| FR2835272A1 (en) | Method for making insulating wall comprises pouring concrete into horizontal mold, placing insulating panel inside mold, removing assembly from mold, pouring second concrete layer into mold and returning assembly to mold | |
| FR3057586A1 (en) | METHOD FOR MANUFACTURING BALCONY AND BALCONY OBTAINED | |
| EP0784128B1 (en) | Process for the manufacturing of a half timbered panel, panel obtained by the process and construction comprising at least one such panel | |
| FR2724681A1 (en) | Lost shuttering panel, e.g. for wall of swimming pool or water tank | |
| FR2885624A1 (en) | Base unit`s e.g. ground floor, lateral wall constructing method for prefabricated building, involves pouring and hardening cement material in molds delimited by panels, where material is penetrated into perforations and is solidified | |
| FR2641563A1 (en) | Iron hook used for the construction of formwork | |
| FR1269695A (en) | Improvements to concrete floors | |
| FR2830883A1 (en) | Lost formwork is fixed by successive male-female fitting to enclose any type of carrying element | |
| WO2006102733A1 (en) | Column-based building and round timber anchorage | |
| FR2740162A1 (en) | Modular brick sections for creating decorative, load bearing columns in buildings | |
| BE397664A (en) | ||
| FR2465847A2 (en) | House floor is supported by beams - with intermediate joists, positioned at junction between modular wall panels | |
| JP2000273882A (en) | Wooden decorative formwork | |
| FR2742463A3 (en) | Modular unit for repairing balcony on building | |
| FR2628780A1 (en) | House loft conversion system - replaces some angled timber struts in trusses with vertical and angled metal supports, followed by insulation boarding | |
| FR2604114A1 (en) | METHOD AND APPARATUS FOR PRODUCING PREFABRICATED REINFORCED CONCRETE ELEMENTS IN CONSTRUCTION | |
| FR2547849A1 (en) | Process for constructing a wall with high thermal insulating power | |
| FR2846688A1 (en) | ALUMINUM FORMWORK BENCH AND PROFILES FOR ITS PRODUCTION |