OA10230A - Method of constructing lightweight buildings using split bricks without formwork or clamps - Google Patents

Method of constructing lightweight buildings using split bricks without formwork or clamps Download PDF

Info

Publication number
OA10230A
OA10230A OANE940001A OA10230A OA 10230 A OA10230 A OA 10230A OA NE940001 A OANE940001 A OA NE940001A OA 10230 A OA10230 A OA 10230A
Authority
OA
OAPI
Prior art keywords
bricks
masonry
split
concrete
stiffeners
Prior art date
Application number
Other languages
French (fr)
Inventor
Abou Moussa
Original Assignee
Abou Moussa
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Abou Moussa filed Critical Abou Moussa
Priority to OANE940001 priority Critical patent/OA10230A/en
Publication of OA10230A publication Critical patent/OA10230A/en

Links

Classifications

    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/02—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls built-up from layers of building elements
    • E04B2/14—Walls having cavities in, but not between, the elements, i.e. each cavity being enclosed by at least four sides forming part of one single element
    • E04B2/24—Walls having cavities in, but not between, the elements, i.e. each cavity being enclosed by at least four sides forming part of one single element the walls being characterised by fillings in some of the cavities forming load-bearing pillars or beams

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Moulds, Cores, Or Mandrels (AREA)

Description

1 01023( L'invention concerne un nouveau Procédé de construction de bâtimentslégers en dur à l'aide de briques fourchues destinées à servir de "coffrageperdu", en remplacement de la méthode conventionnelle, où les linteauxet/ou chaînages, les poteaux et/ou raidisseurs, sont construits à l'aide decoffrages et de serre-joints (méthode qui s'avère onéreuse).Par coffrage,on entend des éléments que l'on décoffre et que l'on peut réutiliser.The invention relates to a new method for the construction of hard-light buildings using split bricks intended to serve as "lost formwork", replacing the conventional method, where the lintels and / or chaining, the posts and / or stiffeners, are built using formwork and clamps (method that is expensive) .By formwork, we hear elements that are offered and that can be reused.

Dans un document intitulé CONSTRUCTION DE BATIMENTS "Quelquesapproches simplifiées" écrit par SOLOMON ATIASE RESO/WCA,Abidjan février 1992, il a été décrit des nouvelles méthodes deconstruction, utilisant deux briques (figures 1 et 5). C'est ainsi qu'auNiger, le Laboratoire National de Travaux Publics (LNTP) a utilisé cesdeux briques particulières pour construire un mur de 15 cm d'épaisseur etd'une hauteur d'environ 1,50 m, malheureusement cette méthode estrestée au stade expérimentale, d'une part et d'autre part, nous avonsremarqué qu'il y a des difficultés dans la mise en oeuvre:In a document entitled CONSTRUCTION OF BUILDINGS "Some Simplified Approaches" written by SOLOMON ATIASE RESO / WCA, Abidjan February 1992, new construction methods were described using two bricks (Figures 1 and 5). Thus, in Niger, the National Public Works Laboratory (LNTP) used these two particular bricks to build a wall 15 cm thick and about 1.50 m high, unfortunately this method is strained at the stadium. experimental, on the one hand and on the other hand, we have noticed that there are difficulties in the implementation:

Ces difficultés se situent à deux niveaux : 1) La nécessité de faire passer les ferraillages à travers le trou de labrique (figurel) cela rend fastidieux sa mise en place et constitue undésavantage par rapport aux briques traditionnelles. 2) La brique (figure 5) ne peut pas être maçonnée au niveau desferraillages des poteaux et/ou raidisseurs. Elle ne peut non plus constituerde "coffrages perdus" devant recevoir le ferraillage et le béton deslinteaux et/ou chaînages au niveau des points singuliers (poteaux et/ouraidisseurs). L'invention pallie ces inconvénients. Elle concerne notamment unnouveau Procédé de construction de bâtiments légers en dur à l'aide debriques fourchues destinées à servir de "coffrage perdu". Ces nouvellesbriques fourchues, rigides, indéformables, légères, sont économiques etfaciles à produire, à stocker, à monter et à mettre en oeuvre pour laréalisation des éléments de maçonnerie verticaux et/ou horizontauxdevant servir de "coffrage perdu". Ces "coffrages perdus" donnemd'excellents résultats sur le plan qualité du béton. En effet, ces "coffragesperdus" réduisent l'exposition du béton aux effets climatiques néfastesaméliorant ainsi, le processus du durcissement, qui à son tour améliore lequalité du béton. L'ensemble de ces briques fourchues destinées à servir de "coffrage perdu" est constitué essentiellement : 2 010230 A/ De la brique mère existante comprenant une partie creuse et un trourectangulaire, dérivent trois autres briques similaires présentant chacuneun simple ou un double décrochement latéral de la partie trouée parrapport à la partie creuse. 5 Elles interviennent dans le cas où la dimension du poteau et/ou raidisseurdans la structure de la maçonnerie est plus grande que l'épaisseur dumur.These difficulties are at two levels: 1) The need to pass the reinforcement through the hole of labrique (figurel) that makes tedious its establishment and is disadvantage compared to traditional bricks. 2) The brick (Figure 5) can not be bricked at the level of the posts and / or stiffeners. Nor can it constitute "lost formwork" to receive the reinforcement and the concrete of the lintels and / or chaining at the singular points (posts and / or aids). The invention overcomes these disadvantages. In particular, it concerns a new process for constructing light-weight buildings using forked blanks intended to serve as "lost formwork". These new forked, rigid, non-deformable, lightweight, are economical and easy to produce, store, mount and implement for the realization of vertical and / or horizontal masonry elementsdevant used as "lost formwork". These "lost forms" give excellent results in terms of concrete quality. Indeed, these "caissesperdus" reduce the exposure of concrete to adverse climatic effects thus improving the hardening process, which in turn improves the quality of the concrete. All of these split bricks intended to serve as "lost formwork" consist essentially of: 2 010230 A / From the existing parent brick comprising a hollow portion and a trurectangular, derive three other similar bricks each having a single or a double lateral recess of the perforated part in relation to the hollow part. They intervene in the case where the dimension of the post and / or stiffener in the structure of the masonry is greater than the thickness of the roof.

De chacune de ces quatre briques ( la brique existante et ses troisdérivées), on obtient trois sortes de briques fourchues comportant une ou ίο deux dents : a) Les trois premières sont obtenues à partir de la brique existantecomprenant une partie creuse et un trou rectangulaire sont du type : - la première brique fourchue comporte deux dents parallèles et unepartie creuse. Elle décrit sommairement un A majuscule ; i5 - les deux autres briques fourchues comportent chacune une dentorientée à droite et/ou à gauche et parallèle à la partie creuse, dont l'unecomporte une dent orientée à droite et parallèle à la partie creuse,décrivant sommairement un B majuscule Russe et l'autre comporte unedent orientée à gauche et parallèle à la partie creuse, décrivant 2o sommairement un B majuscule Russe renversé ;From each of these four bricks (the existing brick and its three derivatives), we obtain three kinds of split bricks having one or two teeth: a) The first three are obtained from the existing brick having a hollow part and a rectangular hole are of the type: - the first forked brick has two parallel teeth and one hollow part. It briefly describes a capital A; i5 - the other two forked bricks each have a dentorientée on the right and / or left and parallel to the hollow part, one of which has a tooth oriented to the right and parallel to the hollow part, summarily describing a Russian capital B and the the other has a left-hand side, parallel to the hollow part, roughly describing an uppercase Russian capital B;

Elles s'obtiennent par moule spéciale ou par découpage de la briquemère. b) Les trois autres sortes de briques fourchues comportant une ou deuxdents qu'on peut obtenir à partir de trois briques dérivées de la brique 25 existante comportant un trou et une partie creuse. Elles sont similaires àcelles décrites ci-dessus. Toutefois, la partie fourchue peut présenter unsimple ou double décrochement latéral par rapport à la partie creuse.Elles sont utilisées au cas où les dimensions des poteaux et/ouraidisseurs présentent un simple ou double décrochement latéral par 3o rapport à l'épaisseur de la maçonnerie.They are obtained by special mold or by cutting the briquemère. b) The other three kinds of split bricks having one or two teeth that can be obtained from three bricks derived from the existing brick having a hole and a hollow portion. They are similar to those described above. However, the forked portion may have a single or double lateral recess with respect to the hollow portion. They are used in the case where the dimensions of the columns and / or aids have a single or double lateral recess in relation to the thickness of the masonry.

La mise en oeuvre de toutes ces briques fourchues se fait de la mêmemanière. La maçonnerie du "coffrage perdu" des poteaux et/ouraidisseurs doit respecter les règles de l'art : notamment, éviter lasuperposition de deux joints verticaux. 35 B/ Les trois autres sont des dérivées de la brique existante qui a la forme d'un U ou d'un canal rectangulaire : 3 010230 - la première fourchue comporte deux dents parallèles de manière àenfourcher les ferraillages des poteaux et/ou raidisseurs noyés dans lamaçonnerie. - les deux autres briques fourchues à une dent, dérivent de la première à5 deux dents, de manière à obtenir une brique en U à une dent à droite et/ou à une dent à gauche.The implementation of all these forked bricks is done the same way. The masonry of the "lost formwork" of the poles and / or aids must respect the rules of the art: in particular, avoid the superposition of two vertical joints. B / The other three are derived from the existing brick which has the shape of a U or a rectangular channel: The first fork has two parallel teeth so as to support the reinforcement of the posts and / or flooded stiffeners. in lamaçonnerie. the other two split bricks with a tooth, derive from the first to two teeth, so as to obtain a U-shaped brick with a right tooth and / or a left tooth.

Ces trois briques fourchues, s'obtiennent par découpage uniquement dela brique mère en forme de U. Une partie de la base du U est découpée,de manière à obtenir une brique fourchue à deux dents ; à chaque foisio qu'on découpe une des dents, nous obtenons deux briques fourchues à une dent à droite et/ou à gauche.These three forked bricks are obtained by cutting only the U-shaped mother block. A part of the base of the U is cut out, so as to obtain a forked brick with two teeth; each time we cut one of the teeth, we obtain two bricks with one tooth on the right and / or on the left.

La figurel représente en vue perspective la brique existante comprenantune partie creuse et un trou rectangulaire.The figurel is a perspective view of the existing brick comprising a hollow portion and a rectangular hole.

Les figures 16,17,18 représentent en vue perspective trois briques1? dérivées de la brique figure 1, présentant chacune un simple ou undouble décrochement latéral de la partie trouée rectangulaire par rapport à la partie creuse.Figures 16,17,18 show in perspective three bricks1? derived from the brick Figure 1, each having a single or double lateral recess of the rectangular perforated portion relative to the hollow portion.

Les figures 2,3,4, représentent en vue perspective sommaire des briquesfourchues (3) (une ou deux dents) obtenues à partir de la brique existante 2o comprenant un trou rectangulaire (1) et une partie creuse (2) figure 1.FIGS. 2, 4, 4 are a perspective view of the bricks (3) (one or two teeth) obtained from the existing brick 2o comprising a rectangular hole (1) and a hollow portion (2) FIG.

De chacune des briques (figures 16,17,18) on peut obtenir une série detrois briques fourchues présentant une ou deux dents similaires auxbriques fourchues (figures 2,3,4). Toutefois, la partie fourchue peutprésenter un simple ou double décrochement latéral par rapport à la 2? partie creuse. Ces décrochements y sont pour les besoins d'architectureet de structure.From each of the bricks (Figures 16,17,18) one can obtain a series of three split bricks with one or two similar teeth auxbric split (Figures 2,3,4). However, the forked part can present a single or double lateral recess with respect to the 2? hollow part. These recesses are there for the needs of architecture and structure.

La figure 5 représente en vue perspective sommaire, la brique existantequi a la forme d'un U ou d'un canal rectangulaire.Figure 5 shows a perspective view, the existing brick which has the shape of a U or a rectangular channel.

Les figures 6,7,8, représentent en vue perspective sommaire des briques3o fourchues (3) (une ou deux dents) dérivées de la brique existante qui a la forme d'un U ou d'un canal rectangulaire (figure 5).FIGS. 6, 7, 8 are a perspective view of the split bricks (3) (one or two teeth) derived from the existing brick in the shape of a U or a rectangular channel (FIG. 5).

Ces fourches et ces décrochements sont les parties caractérisantes deces briques.These forks and these recesses are the characterizing parts of these bricks.

Pour leur mise en œuvre, il suffit de les enfourcher aux ferraillages des 35 poteaux et/ou raidisseurs. Ainsi, le Procédé de construction de bâtiments légers en dur à l'aide de briques fourchues sans coffrage ni serre-joints, du type comprenant des éléments de maçonnerie verticaux, comportantun fourreau rectangulaire et des éléments de maçonnerie horizontauxayant la forme d'un canal rectangulaire destinés à servir de "coffrageperdu" rigides, robustes, et indéformables empêchant toute perte de 5 matière (béton frais avant son durcissement) caractérisé : . en ce que le premier type de briques fourchues, est destiné à réaliser lamaçonnerie des éléments verticaux "coffrages perdus" devant contenirles ferraillages et le béton des poteaux et/ou raidisseurs. . en ce que le premier type de briques enfourche les ferraillages desίο poteaux et/ou raidisseurs ;de façon à assurer la continuité del’appareillage, au lieu de les enchâsser au ferraillage pour leur mise en œuvre comme c’est le cas de la brique existante. . en ce que le deuxième type de briques fourchues est destiné àcompléter la maçonnerie des éléments horizontaux "coffrages perdus"ns devant recevoir les ferraillages et le béton aux points d’intersection des poteaux et/ou raidisseurs et chaînages et/ou linteaux. . en ce que le deuxième type de briques enfourche les ferraillages despoteaux et/ou raidisseurs, tout en assurant la continuité de la maçonneriedes éléments horizontaux devant recevoir le ferraillage et le béton des 2o linteaux et/ou chaînages au niveau des points singuliers (poteaux et/ouraidisseurs).For their implementation, it is sufficient to ride on the reinforcement of the 35 poles and / or stiffeners. For example, the method of constructing light-weight buildings using split bricks without formwork or clamps, of the type comprising vertical masonry elements, having a rectangular sheath and horizontal masonry elements in the form of a rectangular channel intended to serve as "formwork lost" rigid, robust, and dimensionally stable preventing any loss of material (fresh concrete before curing) characterized:. in that the first type of split bricks, is intended to realize the lamaçonnerie vertical elements "formwork lost" to contain the reinforcement and concrete posts and / or stiffeners. . in that the first type of brick straddles the reinforcement of the posts and / or stiffeners, so as to ensure the continuity of the apparatus, instead of setting them to reinforcement for their implementation as is the case of the existing brick . . in that the second type of split bricks is intended to complete the masonry of the horizontal "lost formwork" elements ns to receive reinforcement and concrete at the intersection points of the posts and / or stiffeners and chaining and / or lintels. . in that the second type of brick straddles the reinforcement beams and / or stiffeners, while ensuring the continuity of the masonry of horizontal elements to receive the reinforcement and concrete of the 2o lintels and / or chaining at the singular points (posts and / or ouraidisseurs).

La mise en œuvre de ces briques fourchues en vue de réaliser des "coffrages perdus" est donc facile et économique, évitant ainsi l’utilisationdes coffrages (en bois ou métalliques) et les travaux auxiliaires, d’où une 25 grande rapidité d’exécution.The implementation of these split bricks to achieve "lost formwork" is thus easy and economical, thus avoiding the use of formwork (wood or metal) and ancillary work, hence a high speed of execution .

Avantageusement en pratique : - les briques fourchues destinées à servir de "coffrage perdu" des poteauxet/ou raidisseurs enfourchent directement les ferraillages d’amorce dessemelles et/ou radiers, au lieu de les enchâsser comme c’est le cas de la 30 brique existante dont elles dérivent. Au niveau des fondations, cesbriques fourchues sont posées de manière à ce que la partie creuse soitremplie de mortier. Après l’exécution des fondations, elles sont hourdéessuivant la méthode conventionnelle.Advantageously in practice: the forked bricks intended to serve as "lost formwork" of the columns and / or stiffeners directly load the reinforcements of primer and / or riffle, instead of embedding them as is the case of the existing brick from which they derive. At the level of the foundations, these forked bricks are laid so that the hollow part is filled with mortar. After the execution of the foundations, they are next to the conventional method.

Les ferraillages se trouvent ainsi coffrés dans les éléments de 35 maçonnerie verticaux comprenant un fourreau rectangulaire. Le béton est ensuite coulé après chaque rangée de briques maçonnées. Cette maçonnerie de briques fourchues est exécutée au fur et à mesure que les maçonneries des soubassements et/ou celles des élévations. Le serrage 5 010230 du béton autour des armatures est obtenu en le remuant à l'aide d'un ferjusqu'à ce qu'il n'y ait plus aucune cavité dans l'élément à construire.The reinforcement is thus formed into the vertical masonry elements comprising a rectangular sheath. The concrete is then poured after each row of masonry bricks. This masonry of split bricks is executed as and when masonry basements and / or elevations. The tightening of the concrete around the reinforcements is obtained by stirring it with the aid of a iron until there is no cavity left in the element to be built.

- Les briques fourchues dérivées de la brique existante ayant la formed'un U 5 enfourchent les ferraillages des poteaux et/ou raidisseurs de manière àassurer la continuité de la maçonnerie réalisée essentiellement à l’aidedes briques mères. Cette maçonnerie ayant la forme d'un canalrectangulaire, recevra le ferraillage et le béton des linteaux et /ouchaînages. Elle servira ainsi de "coffrage perdu". Le béton est coulé entreio les parois du canal rectangulaire, son serrage autour des armatures sefait par petits chocs à l'aide d'un fer en le remuant comme il est décrit pour les poteaux et/ou raidisseurs.- The split bricks derived from the existing brick having the shape of a U 5 struts the reinforcement of the posts and / or stiffeners so as to ensure the continuity of the masonry carried out essentially with the help of bricks mothers. This masonry having the shape of a rectangle canal, will receive the reinforcement and the concrete of lintels and / or chaining. It will thus serve as "lost formwork". The concrete is poured between the walls of the rectangular channel, its tightening around the reinforcements is made by small shocks using an iron stirring as it is described for the posts and / or stiffeners.

Ce nouveau procédé permet pratiquement la suppression des coffragesclassiques. Ce "coffrage perdu", robuste et indéformable, empêche toutei5 perte de matières (béton frais avant son durcissement). Il garde sa forme,présente une maçonnerie tout à fait régulière, offrant ainsi la possibilité de ne pas appliquer d'enduits.This new process virtually eliminates conventional forms. This "formwork lost", robust and indeformable, prevents any5 loss of materials (fresh concrete before hardening). It keeps its shape, presents a masonry quite regular, thus offering the possibility of not applying coatings.

La manière dont ces nouvelles briques peuvent être maçonnées pourservir de "coffrage perdu" et les avantages qui en découlent ressortiront 2o mieux des exemples de réalisation qui suivent, donnés à titre indicatif etnon limitatif, à l'appui des figures annexées.The manner in which these new bricks can be built to serve as "lost formwork" and the advantages that derive therefrom will emerge more clearly from the following exemplary embodiments, given by way of nonlimiting indication, in support of the appended figures.

La figure 9 représente une vue en plan d’un détail de construction decoffrage perdu d’un poteau et/ou raidisseur à l’aide des briques fourchues(figure 2) contenant le Béton armé (4) noyé dans la maçonnerie . 25 La figure 10 représente des vues en plan d’un détail de construction decoffrage perdu d’un poteau et/ou raidisseur d’intersection à l’aide desbriques fourchues (figure3,4) contenant du béton armé.Figure 9 shows a plan view of a construction detail lost formwork of a post and / or stiffener using split bricks (Figure 2) containing the reinforced concrete (4) embedded in the masonry. Figure 10 shows plan views of a lost formwork construction detail of a post and / or intersection stiffener using the forked blanks (Figure 3, 4) containing reinforced concrete.

La figure 11 représente des vues en plan de deux détails de constructionde " coffrage perdu" des poteaux et/ou raidisseurs d’angles (droit et 3o gauche) à l’aide des briques fourchues (figures3,4) contenant le bétonarmé (4).FIG. 11 shows plan views of two details of "lost formwork" construction of posts and / or corner stiffeners (right and left 3o) using split bricks (FIGS. 3, 4) containing reinforced concrete (4). .

La figure 12 représente la vue en plan d’un détail de construction de" coffrage perdu" à l’aide des briques figure 5 et la brique fourchue figure6 devant contenir le béton armé (4) des linteaux et / ou chaînages au 35 niveau d’un poteau et / ou raidisseur noyé dans la maçonnerie .FIG. 12 shows the plan view of a construction detail of "lost formwork" using the bricks FIG. 5 and the forked brick FIG. 6 to contain the reinforced concrete (4) of the lintels and / or chainstays at the level of a post and / or stiffener embedded in the masonry.

La figure 13 représente la vue en plan d’un détail de construction de " coffrage perdu" à l’aide des briques figure 5 et la brique fourchue figure 6 010230 7 devant contenir le béton armé (4) des linteaux et / ou chaînages au niveau d’un poteau et / ou raidisseur d’intersection .FIG. 13 represents the plan view of a construction detail of "lost formwork" using the bricks FIG. 5 and the forked brick FIG. 6 010230 7 to contain the reinforced concrete (4) of the lintels and / or chainings at the level of a post and / or intersection stiffener.

La figure 14 représente la vue en plan d’un détail de construction de" coffrage perdu” à l'aide des briques figure 5 et les briques fourchuess figure 7 figure 8 devant contenir le béton armé (4) des linteaux et / ou chaînages au niveau d’un poteau et/ou raidisseur d’angle.FIG. 14 represents the plan view of a construction detail of "lost formwork" using the bricks FIG. 5 and the forked bricks FIG. 7, FIG. 8, to contain the reinforced concrete (4) of the lintels and / or chainings at the level of a post and / or corner stiffener.

La figure 15 représente en vue perpective sommaire, caractérisant lemode d’exécution des coffrages perdus à l’aide des briques fourchues etdes briques de type figure 5 des poteaux et/ou raidisseurs (8) et des o linteaux et /ou chaînages (7)FIG. 15 is a perspective view, briefly characterizing the method of execution of formwork lost using split-bricks and type 5 bricks, poles and / or stiffeners (8) and lintels and / or chaining (7).

En se référant aux figures, le procédé de construction de bâtiments légersen dur à l’aide des briques fourchues sans coffrage ni serre-joints,constitué essentiellement : - des éléments verticaux comprenant un fourreau rectangulaire (8); ilsi5 sont construit à l’aide des briques fourchues (figures 2,3,4) contenant du béton.armé (figures 9,10, 11) - des éléments de maçonnerie horizontaux ayant la forme d’un canalrectangulaire (7) ; ils sont construit à l’aide des briques fourchues (figures 2o 5,6,7, 8 ) devant contenir le ferraillage et le béton des linteaux et / ouchaînages.Referring to the figures, the method of building lightweight buildings using split bricks without formwork or clamps, consisting essentially of: - vertical elements comprising a rectangular sheath (8); they are constructed using split bricks (Figures 2,3,4) containing reinforced concrete (Figures 9,10,11); horizontal masonry elements in the form of a rectangular channel (7); they are built using forked bricks (Figures 2o 5,6,7, 8) to contain the reinforcement and concrete lintels and / or chaining.

Ce procédé de construction peut être utilisé avantageusement pour : a) réduire l’utilisation de bois dans la construction ; donc lutter à longterme contre la désertification vu la gravité extrême de ce problème tout 25 effort dans le sens de la limitation des coupes des arbres sera le bienvenu d’autant plus que le bois utilisé pour la construction des bâtimentsdevant avoir certaines caractéristiques , c’est bien d’abattage d’arbresqu’il s’agit le plus souvent dans les forêts . b) relancer l’emploi, particulièrement touché dans le secteur de 50 construction par l’utilisation de ce nouveau procède de construction, demandant peu d’outillages mais une main d’œuvre importante ; ceci est un choix délibéré car le simple fait de disposer d’un nouveau procédé de construction économique pourrait être réglé par le biais de la préfabrication par exemple celui de la production des briques fourchues 55 destinées à servir de coffrage perdu. 7 010230 c) limiter les importations des matériaux et matériels de construction telsque le coffrage en bois, les serre-joints, les clous, etc.This construction method can be advantageously used to: a) reduce the use of wood in the construction; So long struggle against desertification given the extreme gravity of this problem, every effort in the sense of limiting the cutting of trees will be welcome, especially since the wood used for the construction of buildings having certain characteristics is tree felling, which is most often in forests. b) revive employment, particularly affected in the construction sector by the use of this new construction process, requiring few tools but a large workforce; this is a deliberate choice because the mere fact of having a new economical construction process could be regulated by means of prefabrication for example that of the production of split bricks 55 intended to serve as lost formwork. 7 010230 c) Limit imports of construction materials and materials such as wooden formwork, clamps, nails, etc.

La construction de bâtiments légers en dur sans coffrage ni serre-jointsselon l'invention présente de nombreux avantages par rapport aux 5 constructions en dur proposées à ce jour On peut citer : - suppression de tout coffrage ( en bois ou métallique ) et travauxauxiliaires. - une grande rapidité d’exécution . - la fabrication du moule est à la portée des artisans locaux ίο - les nouvelles briques peuvent également être confectionnées de lamême manière que les agglos traditionnels en ciment. - la vue extérieur du bâtiment présente une maçonnerie tout à faitrégulière offrant ainsi la possibilité de ne pas appliquer d’enduits . - l’adhérence au mortier de ciment est uniforme sur l’ensemble desi5 façades , réduisant ainsi les fissures couramment constatées sur la jonction des maçonneries et des bétons armés. - les coffrages perdus réalisés à l’aide des briques fourchues réduisentl’exposition du béton coulé aux effets climatiques néfastes, améliorantainsi le processus du durcissement qui à son tour, améliore la qualité du ίο béton . - la rigidité est nécessaire au niveau des chaînages pour permettre larépartition uniforme du poids de la maçonnerie et la liaison des mursextérieurs avec les linteaux pour qu’ils ne fléchissent pas sous le poids dela toiture . Le ferraillage normal (code français ) de ces chaînages et 25 linteaux est de 0,9% de la surface du béton sur la largeur de la section dumur pour les aciers doux (minimum de 3,0 cm2) et de 0,5 % pour lesaciers de haute adhérence (minimum 1,6 cm2)The construction of light-weight buildings without formwork or clamps according to the invention has many advantages over the hard-surfaced constructions proposed to date. The following can be mentioned: - removal of all formwork (wood or metal) and ancillary works. - a high speed of execution. - mold making is within the reach of local artisans ίο - new bricks can also be made the same way as traditional cement agglos. - The external view of the building has a masonry quite regular thus offering the possibility of not applying coatings. adhesion to the cement mortar is uniform on all facades, thus reducing the cracks commonly found on the junction of masonry and reinforced concrete. - Lost forms made using split bricks reduce the exposure of cast concrete to adverse weather effects, thereby improving the hardening process which in turn improves the quality of concrete. - Rigidity is necessary at the level of chaining to allow the uniform distribution of the weight of the masonry and the connection of the outer walls with the lintels so that they do not bend under the weight of the roof. The normal reinforcement (French code) of these connections and 25 lintels is 0.9% of the concrete surface over the width of the section of the steel for soft steels (minimum of 3.0 cm2) and 0.5% for high adhesion steels (minimum 1.6 cm2)

Claims (3)

010230 REVENDICATIONS010230 CLAIMS 1)- Procédé de construction de bâtiments légers en dur à l'aide de briquesfourchues sans coffrage ni serre-joints, du type comprenant des élémentsde maçonnerie verticaux comportant un fourreau rectangulaire, et des 5 éléments de maçonnerie horizontaux ayant la forme d’un canalrectangulaire destinés à servir de "coffrage perdu" rigides, robustes , etindéformables empêchant toute perte de matière (béton frais avant sondurcissement), caractérisé : . en ce que le premier type de briques fourchues (figures 2,3,4 et cellesin dérivées des briques 16,17,18), est destiné à réaliser la maçonnerie deséléments verticaux "coffrages perdus" devant contenir les ferraillages (10) et le béton (13) des poteaux et/ou raidisseurs (figures 9,10,11). . en ce que le premier type de briques enfourche les ferraillages despoteaux et/ou raidisseurs ;de façon à assurer la continuité dei5 l'appareillage, au lieu de les enchâsser au ferraillage pour leur mise er œuvre comme c'est le cas de la brique existante (figure 1). . en ce que le deuxième type de briques fourchues (figure 6,7,8) estdestiné à compléter la maçonnerie des éléments horizontaux "coffragesperdus" devant recevoir les ferraillages (10) et le béton (13) aux points 2o d'intersection des poteaux et/ou raidisseurs et chaînages et/ou linteaux (11) (figures 12,13,14). . en ce que le deuxième type de briques enfourche les ferraillages despoteaux et/ou raidisseurs (figures 12,13,14,15), tout en assurant lacontinuité de la maçonnerie des éléments horizontaux devant recevoir le 25 ferraillage et le béton des linteaux et/ou chaînages au niveau des pointssinguliers (poteaux et/ou raidisseurs).1) - Method for constructing light-weight buildings using bricks without formwork or clamps, of the type comprising vertical masonry elements having a rectangular sheath, and horizontal masonry elements in the form of a rectangular channel intended to serve as "rigid formwork" rigid, robust, and deformable preventing any loss of material (fresh concrete before hardening), characterized:. in that the first type of split bricks (figures 2,3,4 and those derived from the bricks 16,17,18) is intended to produce the masonry of the vertical elements "lost forms" to contain the reinforcement (10) and the concrete (13) posts and / or stiffeners (Figures 9,10,11). . in that the first type of bricks straddles the reinforcement beams and / or stiffeners, so as to ensure the continuity of the apparatus, instead of setting them to the reinforcement for their implementation as is the case of the existing brick (figure 1). . in that the second type of forked bricks (Figure 6, 7, 8) is intended to complement the masonry of the horizontal elements "formagesperdus" to receive the reinforcement (10) and the concrete (13) at the intersection points 2o of the columns and / or stiffeners and chaining and / or lintels (11) (Figures 12,13,14). . in that the second type of brick straddles the reinforcement beams and / or stiffeners (FIGS. 12, 13, 14, 15), while ensuring the continuity of the masonry of the horizontal elements to receive the reinforcement and the concrete of the lintels and / or chaining at points (poles and / or stiffeners). 2)- Procédé de construction selon la revendication 1, caractérisé : . en ce que les parties creuses (2) des briques fourchues sont bourréesde mortier pendant la maçonnerie de soubassement. su .en ce que les jonctions entre murs (d’angle et d’intersection) doivent êtreréalisées par harpage de façon à assurer la continuité de l’appareillaqe(8)(figures 9,10,11,15). .en ce que les liaisons entre les armatures des poteaux et/oi raidisseurs(9) et celles(10) des linteaux et/ou des chaînages soien 35 exécutées. 9 010230 .en ce que les briques fourchues liaisonnent les maçonneries et lesbétons armés (figures9,10,11,15). .en ce qui concerne le coulage et le serrage du béton : le béton est couleaprès chaque rangée de briques maçonnées et son serrage autour de^ 5 armatures se fait par petits chocs à l’aide d’un fer en le remuant jusqu'àce qu’il n’y ait aucune cavité dans l’élément de maçonnerie servant decoffrage perdu.2) - Construction method according to claim 1, characterized:. in that the hollow portions (2) of the split bricks are filled with mortar during the basement masonry. in that the junctions between walls (angle and intersection) must be carried out by harpassing so as to ensure the continuity of the apparatus (8) (Figures 9,10,11,15). in that the connections between the reinforcements of the posts and / or the stiffeners (9) and those (10) of the lintels and / or the links are executed. 9 010230. In that the forked bricks link the masonry and armed lesbétons (figures 9,10,11,15). With regard to the pouring and tightening of concrete: the concrete is poured after each row of masonry bricks and its tightening around 5 armatures is made by small shocks with the aid of an iron, stirring it until There is no cavity in the masonry element serving as a lost formwork. 3)- Procédé de construction selon l’une des revendications 1 et 2caractérisé : îo . en ce que l’ensemble des nouvelles briques fourchues comportent uneou deux dents (3) , toutes fois les parties fourchues peuvent présentéesun simple ou un double décrochement latérale par rapport à la partiecreuse (2), ces décrochements y sont pour le besoin d’architecture et destructure . i5 .en ce que les briques fourchues comprenant une partie creuse (2) sonobtenues à l’aide des moules spéciales ou par découpage des briques(figures 1, 16, 17, 18) , tandis que celles dérivées de la brique existante(figure 5) ne s’obtiennent que par découpage de la brique mère. . en ce qui concernent leur dosage et l’épaisseur de leur parois : leίο dosage doit être compris entre 350 et 400 kg / m3 et que l’épaisseur des parois fourchues doit être comprise entre 2.5 et 3 centimètres .3) - Construction method according to one of claims 1 and 2characterized: Io. in that the set of new split bricks comprise one or two teeth (3), all the split ends can present a single or a double lateral offset with respect to the partiker (2), these recesses are there for the need of architecture and destructure. i5. in that the split bricks comprising a hollow part (2) are obtained by means of special molds or by cutting the bricks (FIGS. 1, 16, 17, 18), whereas those derived from the existing brick (FIG. ) are only obtained by cutting the parent brick. . as regards their dosage and the thickness of their walls: the dosage must be between 350 and 400 kg / m3 and the thickness of the split walls must be between 2.5 and 3 centimeters.
OANE940001 1994-02-28 1994-02-28 Method of constructing lightweight buildings using split bricks without formwork or clamps OA10230A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
OANE940001 OA10230A (en) 1994-02-28 1994-02-28 Method of constructing lightweight buildings using split bricks without formwork or clamps

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
OANE940001 OA10230A (en) 1994-02-28 1994-02-28 Method of constructing lightweight buildings using split bricks without formwork or clamps

Publications (1)

Publication Number Publication Date
OA10230A true OA10230A (en) 1997-09-19

Family

ID=19929796

Family Applications (1)

Application Number Title Priority Date Filing Date
OANE940001 OA10230A (en) 1994-02-28 1994-02-28 Method of constructing lightweight buildings using split bricks without formwork or clamps

Country Status (1)

Country Link
OA (1) OA10230A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2804998A1 (en) * 2011-12-23 2014-11-26 Cantiere Tri Plok Srl Monoblock construction component with load bearing structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2804998A1 (en) * 2011-12-23 2014-11-26 Cantiere Tri Plok Srl Monoblock construction component with load bearing structure

Similar Documents

Publication Publication Date Title
EP2582893B1 (en) Method for constructing a building using bricks connected using dry joints
EP3310973A1 (en) Construction of the prefabricated column and beam type
FR2555630A1 (en) Method for producing insulating floors using elements, as well as the elements and floors produced by the said method
FR2491977A1 (en) Joint connection for building frame in reinforced concrete - has open reinforcement column cage retaining angled beams with connecting bars
FR2608496A1 (en) Method for building a wall or portion of a wall out of exposed stones or similar materials, and wall thus built
WO1993021403A1 (en) Method for producing concrete constructions and structures therefor
EP2148019A2 (en) Wall building block
BE1030172B1 (en) A PREFABRICATED REINFORCED CONCRETE WALL FOR USE IN FORMWORK FOR THE CONSTRUCTION OF A CONCRETE WALL
BE1031238B1 (en) PREFABRICATED REINFORCED CONCRETE SHEET INTENDED FOR USE IN FORMWORK TO CONSTRUCT A CONCRETE WALL
OA19731A (en) "Improved method for constructing buildings and piers of hydraulic structures (gutters, culverts) in solid form using forked bricks with notched transverse walls without laying mortars, formwork or clamps"
FR2461784A1 (en) Composite insulating structural floor - uses precast cellular concrete slab as permanent form reinforced concrete beam and slab
OA10231A (en) Method of constructing piers of hydraulic structures made of hard using perforated bricks with indented transverse walls without formwork or clamps
EP0784128B1 (en) Process for the manufacturing of a half timbered panel, panel obtained by the process and construction comprising at least one such panel
BE475735A (en)
FR2604114A1 (en) METHOD AND APPARATUS FOR PRODUCING PREFABRICATED REINFORCED CONCRETE ELEMENTS IN CONSTRUCTION
CH212826A (en) Construction element, such as beam, pillar, pylon, slab, wall, partition, and method of establishing this element.
FR3148050A1 (en) Formwork for the construction of a building structure and building structure element comprising such formwork
FR2885624A1 (en) Base unit`s e.g. ground floor, lateral wall constructing method for prefabricated building, involves pouring and hardening cement material in molds delimited by panels, where material is penetrated into perforations and is solidified
FR1269695A (en) Improvements to concrete floors
BE455338A (en)
CH150842A (en) Process for establishing public works works, in particular those comprising masonry blocks. especially dams.
BE458180A (en)
FR2742463A3 (en) Modular unit for repairing balcony on building
BE448626A (en)
FR2542341A1 (en) Industrial floor and method for the production thereof