PL172607B1 - Method of strengthening the ceiling of the intermediate excavation on the catwalk of the exploited wall - Google Patents

Method of strengthening the ceiling of the intermediate excavation on the catwalk of the exploited wall

Info

Publication number
PL172607B1
PL172607B1 PL30250894A PL30250894A PL172607B1 PL 172607 B1 PL172607 B1 PL 172607B1 PL 30250894 A PL30250894 A PL 30250894A PL 30250894 A PL30250894 A PL 30250894A PL 172607 B1 PL172607 B1 PL 172607B1
Authority
PL
Poland
Prior art keywords
wall
sections
exploited
longwall
ceiling
Prior art date
Application number
PL30250894A
Other languages
Polish (pl)
Other versions
PL302508A1 (en
Inventor
Jan Biesek
Krystian Pietrzykowski
Original Assignee
Rybnicka Sp Weglowa Sa Kopalni
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Rybnicka Sp Weglowa Sa Kopalni filed Critical Rybnicka Sp Weglowa Sa Kopalni
Priority to PL30250894A priority Critical patent/PL172607B1/en
Publication of PL302508A1 publication Critical patent/PL302508A1/en
Publication of PL172607B1 publication Critical patent/PL172607B1/en

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

Sposób wzmacniania stropu wyrobiska pośredniego na wybiegu eksploatowanej ściany, przy pomocy kształtowników osadzonych w ociosach wyrobiska pośredniego i umieszczonych na nich kasztach podtrzymujących luki stropnicowe, znamienny tym, że kształtowniki zabudowuje się w poprzez wyrobiska pośredniego na wysokości stropu wybieranego pokładu lub górnej płaszczyzny urabiania kombajnu ścianowego, a następnie w miarę przechodzenia frontu ściany przez wyrobisko pośrednie, usuwa się łuki ociosowe jego obudowy a końce kształtowników od strony eksploatowanej ściany podpiera się odpowiednio nachylonymi stropnicami obudowy zmechanizowanej ściany jeszcze przed wycięciem kombajnem ścianowym ociosu wyrobiska pośredniego.A method of reinforcing the roof of an intermediate working on the side of an exploited longwall, using sections embedded in the side walls of the intermediate working and supporting roof support gaps placed on them, characterized in that the sections are installed in the middle of the intermediate working at the height of the roof of the seam being extracted or the upper mining plane of a longwall shearer, and then, as the wall front passes through the intermediate working, the side arches of its support are removed and the ends of the sections on the side of the exploited longwall are supported by suitably inclined roof supports of the mechanized longwall support before the side wall of the intermediate working is cut out with the longwall shearer.

Description

Przedmiotem wynalazku jest sposób wzmacniania stropu wyrobiska pośredniego, zwłaszcza chodnika w odrzwiach łukowych, na wybiegu eksploatowanej ściany, zaopatrzonej w samoprzesuwną obudowę zmechanizowaną, w czasie przechodzenia przez niego frontem ściany.The subject of the invention is a method of strengthening the ceiling of an intermediate excavation, especially a sidewalk in arched frames, on the catwalk of an exploited wall, provided with a self-moving powered support, while passing through it with the wall front.

Znany jest z polskiego opisu patentowego nr 112 093 Sposób przechodzenia frontem ściany urabianej kombajnem przez pustki poeksploatacyjne, a zwłaszcza przez przecznice, komory i inne wyrobiska korytarzowe. W tym celu przed zbliżeniem się rontu ściany na odległość od 5 do 30 m, a najkorzystniej 20 m od pustki poeksploatacyjnej lub wyrobiska korytarzowego zabezpiecza się w nim strop przez podparcie go kasztami umieszczonymi na kształtownikach osadzonych w otworach równoległych do stropu urabianego pokładu względnie przez wypełnianie całej pustej przestrzeni wyrobiska materiałem podsadzkowym o parametrach techniczych zbliżonych do właściwości węgla kamiennego i usuwa się z tego wyrobiska elementy obudowy oraz wszystkie inne przedmioty, które stanowiłyby przeszkodę dla kombajnu, po czym tak przygotowane wyrobisko przejeżdża się kombajnem urabiającym caliznę węglową ściany.It is known from the Polish patent specification No. 112 093 The method of passing the face of a longwall cut with a roadheader through post-mining voids, especially through cross-sections, chambers and other corridors. For this purpose, before the wall rim approaches at a distance of 5 to 30 m, and most preferably 20 m from the post-exploitation void or a corridor, the ceiling is secured in it by supporting it with chocks placed on sections embedded in openings parallel to the ceiling of the excavated seam, or by filling the entire roof. the empty space of the excavation with a backfilling material with technical parameters similar to the properties of hard coal, and the housing elements and all other objects that would be an obstacle for the combine are removed from the excavation, and then the excavation prepared in this way is driven by a combine cutting the wall coal.

Znany jest również z polskiego opisu patentowego nr 129 521 Sposób zabezpieczania skrzyżowania ściany z chodnikiem, zwłaszcza pośrednim o przekroju łukowym, zaopatrzonej w samoprzesuwną obudowę. W tym celu w chodniku ustawia się w odległości nie przekraczającej długości stropnicy obudowy ściany co najmniej jedną z samodzielnych sekcji obudowy zmechanizowanej, skierowaną czołem naprzeciwko przesuwającego się frontu eksploatacyjnego ściany. Stropnice pozostawionych na przeciw siebie sekcji korzystnie nachyla się, łagodząc ewentualny kąt pomiędzy stropem względnie spągiem chodnika a stropem czy spągiem wyrobiska ścianowego, wynikający z nachylenia wyrobiska. Potem nad stropnice wzdłuż chodnika zakłada się elementy, zasłaniające odkryty strop, łącząc ustawione naprzeciw siebie sekcje. Następnie w miarę przesuwania się frontu eksploatacyjnego ściany, przy pomocy własnego przymocowanego w głębi chodnika stopniowo wycofuje się tyłem sekcję w chodniku, uzupełniając stale elementy zasłaniające nad stropnicami, przy czym równocześnie prowadzi się znanym sposobem demontaż łuków obudowy chodnika.A method of securing the junction of a wall with a pavement, especially an intermediate one with an arched cross-section, provided with a self-sliding casing, is also known from the Polish patent specification No. 129 521. For this purpose, at a distance not exceeding the length of the canopy of the wall support, at least one of the independent sections of the powered support is placed in the sidewalk, facing the moving service front of the wall. The roofs of the sections left opposite to each other are preferably tilted, easing the possible angle between the roof or floor of the sidewalk and the roof or floor of the longwall working, resulting from the slope of the working. Then, over the canopies along the sidewalk, elements are installed that cover the exposed ceiling, joining the sections facing each other. Then, as the operational front of the wall moves, with the help of its own attached in the depth of the pavement, the section in the pavement is gradually withdrawn from the back, constantly supplementing the covering elements above the canopies, while simultaneously disassembling the arches of the pavement casing.

Opisane wyżej sposoby jakkolwiek w określonych warunkach spełniają swoje zadanie, to jednak w przypadku wybierania grubszych pokładów węgla albo przy przechodzeniu przez wyrobiska korytarzowe, usytuowane bardziej skośnie do frontu ścianowego są mniej skuteczne a wpływ ciśnienia eksploatacyjnego powoduje wzrost zagrożeń w prowadzonych robotach i dlatego nie znajdują szerszego zastosowania.The methods described above, although under certain conditions, fulfill their task, however, in the case of selecting thicker coal seams or when passing through corridors, located more obliquely to the longwall front, they are less effective and the impact of operational pressure increases the risks in the works carried out and therefore they do not find a wider usage.

172 607172 607

Celem wynalazku było usunięcie lub co najmniej zmniejszenie niedogodności występujących w znanych rozwiązaniach, wzmacniających strop przechodzonego wyrobiska korytarzowego na wybiegu eksploatowanej ściany,The aim of the invention was to remove or at least reduce the disadvantages present in the known solutions, strengthening the ceiling of the passage excavation on the catwalk of the exploited wall,

Zostało to rozwiązane według wynalazku przy pomocy kształtowników osadzonych w ociosach wyrobiska pośredniego i umieszczonych na nich kasztach podtrzymujących łuki stropnicowe, w ten sposób, że kształtowniki zabudowuje się w poprzek wyrobiska pośredniego na wysokości stropu wybieranego pokładu lub górnej płaszczyzny urabiania kombajnu ścianowego a następnie w miarę przechodzenia frontu ściany przez wyrobisko pośrednie, usuwa się łuki ociosowe jego obudowy a końce kształtowników od strony eksploatacyjnej ściany podpiera się odpowiednio nachylonymi stropnicami obudowy zmechanizowanej ściany jeszcze przed wycięciem kombajnem ścianowym ociosu wyrobiska pośredniego.This has been solved according to the invention by the sections embedded in the sides of the intermediate excavation and the chests supporting the canopy arches placed on them, in such a way that the sections are built across the intermediate excavation at the level of the roof of the selected deck or the upper plane of the longwall shearer cutting and then as they pass of the front of the wall through the intermediate excavation, the lateral arches of its lining are removed, and the ends of the sections from the service side of the wall are supported with appropriately inclined canopies of the powered support of the wall before cutting the wall of the intermediate excavation with a longwall shearer.

Zaletą takiego sposobu wzmacniania stropu wyrobiska pośredniego, przechodzonego frontem ściany, jest zapewnienie bezkolizyjnej ciągłości urabiania pokładu i zwiększenie bezpieczeństwa pracy przez wyeliminowanie opadania kamienia ze stropu.The advantage of this method of strengthening the ceiling of the intermediate excavation, passing through the face of the wall, is to ensure a collision-free continuity of the excavation of the seam and increase the safety of work by eliminating the fall of stone from the ceiling.

Przedmiot wynalazku jest bliżej objaśniony w przykładzie stosowania na załączonym rysunku, na którym fig. 1 przedstawia wybieranie pokładu z chodnikiem pośrednim, usytuowanym najego wybiegu, fig.2 - przekrój poprzeczny skrzyżowania ściany zaopatrzonej w obudowę zmechanizowaną z chodnikiem pośrednim a fig.3 - to samo skrzyżowanie w widoku z góry.The subject of the invention is explained in more detail in an example of application in the attached drawing, in which fig. 1 shows the excavation of a deck with an intermediate pavement situated on its runway, fig. 2 - a cross-section of the intersection of a wall provided with a powered support and an intermediate walkway, and fig. 3 - the same junction in top view.

Jak pokazano na fig. 1 rysunku, pośredni chodnik 1 usytuowany jest na wybiegu eksploatowanej ściany, częściowo skośnie a częściowo równolegle do istniejącego frontu. Jego skrzyżowanie z przyścianowym chodnikiem 2 wzmacnia się przy pomocy stabilizowanego podciągu a potem przed zbliżającym się frontem eksploatacyjnym do wylotu ściany, wzmacnia się w tym miejscu strop pośredniego chodnika 1, w tym celu na wysokości stropu wybieranego pokładu lub górnej płaszczyzny urabiania kombajnu ścianowego, w poprzek pośredniego chodnika 1 zabudowuje się, w otworach wierconych w obu ociosach, kształtowniki 3, wykonywane z elementów korytkowych i szyn, które w części środkowej chodnika 1 łączy się na zakładkę i spina dwoma kabłąkowymi śrubami. Poprzeczne kształtowniki 3 podpiera się jeszcze trzema stojakami 4, 5, 6, z których te ostatnie osadzone od strony wylotu ściany wykonane są z drewna. Na kształtownikach 3 umieszcza się drewniane kaszty 7, zrobione z drewnianych podkładów lub kontówek, bezpośrednio aż pod sam strop, który podtrzymują poprzez łuki stropnicowe.As shown in Fig. 1 of the drawings, the intermediate walkway 1 is situated on the overhang of the wall in use, partly inclined and partly parallel to the existing front. Its intersection with the longwall sidewalk 2 is reinforced with a stabilized binder and then in front of the mining front approaching the wall outlet, the ceiling of the intermediate sidewalk 1 is strengthened at this point, for this purpose at the height of the roof of the selected deck or the upper cutting plane of the longwall shearer, across of the intermediate pavement 1, in the holes drilled in both sides, sections 3 are built-in, made of trough elements and rails, which are joined in an overlap in the central part of pavement 1 and fastened with two bow-shaped screws. The transverse profiles 3 are supported by three more stands 4, 5, 6, of which the latter are made of wood, mounted on the wall outlet side. Wooden crates 7, made of wooden sleepers or contact sheets, are placed on the profiles 3, directly up to the ceiling itself, which they support through the roof arches.

Następnie w miarę przechodzenia frontu ściany przez pośredni chodnik 1 usuwa się najpierw łuki ociosowe 8, 9 jego obudowy i stojaki 4, 5, 6 a potem końce kształtowników 3 od strony eksploatowanej ściany podpiera się odpowiednio nachylonymi stropnicami obudowy zmechanizowanej 10 ściany jeszcze przed wycięciem kombajnem ścianowym ociosu chodnika pośredniego 1.Then, as the front of the wall passes through the intermediate sidewalk 1, first the lateral arches 8, 9 of its lining and stands 4, 5, 6 are removed, and then the ends of the sections 3 from the side of the wall in use are supported with appropriately inclined canopies of the powered support 10 of the wall before cutting with a longwall shearer. side of the intermediate sidewalk 1.

172 607172 607

Departament Wydawnictw UP RP. Nakład 90 egz. Cena 2,00 złPublishing Department of the UP RP. Circulation of 90 copies. Price PLN 2.00

Claims (1)

Zastrzeżenie patentowePatent claim Sposób wzmacniania stropu wyrobiska pośredniego na wybiegu eksploatowanej ściany, przy pomocy kształtowników osadzonych w ociosach wyrobiska pośredniego i umieszczonych na nich kasztach podtrzymujących łuki stropnicowe, znamienny tym, że kształtowniki zabudowuje się w poprzez wyrobiska pośredniego na wysokości stropu wybieranego pokładu lub górnej płaszczyzny urabiania kombajnu ścianowego, a następnie w miarę przechodzenia frontu ściany przez wyrobisko pośrednie, usuwa się łuki ociosowe jego obudowy a końce kształtowników od strony eksploatowanej ściany podpiera się odpowiednio nachylonymi stropnicami obudowy zmechanizowanej ściany jeszcze przed wycięciem kombajnem ścianowym ociosu wyrobiska pośredniego.The method of strengthening the ceiling of the intermediate excavation on the catwalk of the exploited wall, with the use of sections embedded in the sides of the intermediate excavation and placed on them with chests supporting the canopy arches, characterized by the fact that the sections are built into the intermediate excavation at the level of the roof of the selected deck or the upper cutting plane of the longwall shearer, and then, as the front of the wall passes through the intermediate excavation, the lateral arches of its lining are removed, and the ends of the sections from the side of the exploited wall are supported with appropriately inclined canopies of the powered wall, even before cutting the wall of the intermediate excavation with a longwall shearer.
PL30250894A 1994-03-07 1994-03-07 Method of strengthening the ceiling of the intermediate excavation on the catwalk of the exploited wall PL172607B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PL30250894A PL172607B1 (en) 1994-03-07 1994-03-07 Method of strengthening the ceiling of the intermediate excavation on the catwalk of the exploited wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PL30250894A PL172607B1 (en) 1994-03-07 1994-03-07 Method of strengthening the ceiling of the intermediate excavation on the catwalk of the exploited wall

Publications (2)

Publication Number Publication Date
PL302508A1 PL302508A1 (en) 1995-09-18
PL172607B1 true PL172607B1 (en) 1997-10-31

Family

ID=20061930

Family Applications (1)

Application Number Title Priority Date Filing Date
PL30250894A PL172607B1 (en) 1994-03-07 1994-03-07 Method of strengthening the ceiling of the intermediate excavation on the catwalk of the exploited wall

Country Status (1)

Country Link
PL (1) PL172607B1 (en)

Also Published As

Publication number Publication date
PL302508A1 (en) 1995-09-18

Similar Documents

Publication Publication Date Title
EP0795680B1 (en) Shortwall mining equipment for extraction of pillars in underground coal mines
PL172607B1 (en) Method of strengthening the ceiling of the intermediate excavation on the catwalk of the exploited wall
SU1745938A1 (en) Thick pitching coal seam exploitation method
RU2172410C2 (en) Powered tunneling and stoping complex (unit)
SU1222846A1 (en) Mechanized set for mining thick steep coal seams
RU2085738C1 (en) Method for development of steep coal seams of medium thickness
SU1624177A1 (en) Flexible canopy
SU1070318A1 (en) Power roof support unit
RU2119584C1 (en) Section of pneumatic balloon support
RU2332570C1 (en) Controllable shield roof for mining of steep seams with mined-out space filling
SU1712622A1 (en) Mounting-mining shield
SU1671871A1 (en) A method of protecting preliminary drift in working thick beds
RU2013548C1 (en) Method for mining mineral deposits at large depth
RU2018667C1 (en) Method for roof control in mounting slot
PL223966B1 (en) Manufacturing method for the elimination and exit channel, and the mechanized complex of longwall mining excavations
RU2047764C1 (en) Method for maintenance of face ends with pit-bottom workings in readily collapsible roof zones
PL151438B1 (en) Method of arranging self-advancing roof support in a longwall inclined drift
RU2097559C1 (en) Mining of gently dipping and inclined coal seams leading under overburden
PL95413B1 (en) METHOD OF USE OF COAL DECADES IN LAYERS POTENT LAYER MECHANIZED HOUSING
SU1032189A1 (en) Frame roof support for mine working
PL149367B1 (en) Self-advancing roof supports unit
PL191710B1 (en) The method of strengthening the sidewalks behind the front of the mining wall
PL138191B1 (en) Method of mining a coal deposit
PL118374B2 (en) Suspended mine roof support
PL100150B1 (en) METHOD OF PROTECTING FIELD PATHS WHEN USING STRONG SLOPES AND STEEP COAL SIDES WITH LONG CHAMBER SYSTEM