PL186861B1 - Method of mining residues from a bed of useful mineral, in particular hard coal one - Google Patents

Method of mining residues from a bed of useful mineral, in particular hard coal one

Info

Publication number
PL186861B1
PL186861B1 PL98325693A PL32569398A PL186861B1 PL 186861 B1 PL186861 B1 PL 186861B1 PL 98325693 A PL98325693 A PL 98325693A PL 32569398 A PL32569398 A PL 32569398A PL 186861 B1 PL186861 B1 PL 186861B1
Authority
PL
Poland
Prior art keywords
narrow
excavation
seam
recess
longitudinal axis
Prior art date
Application number
PL98325693A
Other languages
Polish (pl)
Other versions
PL325693A1 (en
Inventor
Jerzy Kluka
Mirosław Kugiel
Andrzej Layer
Jan Skiba
Michał Stopyra
Original Assignee
Jerzy Kluka
Kugiel Miroslaw
Andrzej Layer
Jan Skiba
Stopyra Michal
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jerzy Kluka, Kugiel Miroslaw, Andrzej Layer, Jan Skiba, Stopyra Michal filed Critical Jerzy Kluka
Priority to PL98325693A priority Critical patent/PL186861B1/en
Publication of PL325693A1 publication Critical patent/PL325693A1/en
Publication of PL186861B1 publication Critical patent/PL186861B1/en

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

l.Sposób wybinrania resztek padładu zwłaszcza węgła, w którym w parceli resztki pokładu, między ograniczającymi ją chodnikami, wykonuje się kolejno równoległe względem siebie i rozdzielone filarami wyrobiska wąskoprzodkowe, które następnie z odpowiednim opóźnieniem wypełnia się materiałami odpadowymi, znamienny tym, że w co najmniej jednym ociosie (8) przebitego na całą długość (1) wyrobiska wąskoprzodkowego (4) wykonuje się kolejno równoległe względem siebie wcinki (9) przedzielone wspornikami (10) o szerokości (b) dobranej doświadczalnie do lokalnych warunków górniczo-geologicznych pokładu.l. A method of extracting the remains of the seam, especially coal, in which in the seam remains plot, between the galleries limiting it, parallel narrow-face workings are made, separated by pillars, which are then filled with waste materials with an appropriate delay, characterized in that in at least one sidewall (8) of the narrow-face working (4) penetrated along the entire length (1), successive parallel cuts (9) are made, separated by supports (10) with a width (b) selected experimentally to the local mining and geological conditions of the seam.

Description

Przedmiotem wynalazku jest sposób wybierania resztek pokładu zwłaszcza węgla znajdujący zastosowanie w górnictwie podziemnym.The subject of the invention is a method of extracting seam residues, especially coal, for use in underground mining.

Znany jest, na przykład z polskiego zgłoszenia patentowego nr P - 302409 sposób eksploatacji resztek złoża oraz wybierania i zabezpieczenia filtrów ochronnych i oporowych, polegający na tym, że resztki złoża wybiera się wyrobiskami korytarzowymi o szerokości do 10 m, prowadzonymi korzystnie w obudowie kotwiowej, z pozostawieniem między tymi wyrobiskami korytarzowymi pasów części złoża o szerokości nie mniejszej od szerokości prowadzonych wyrobisk korytarzowych. Wykonane wyrobiska korytarzowe wypełnia się następnie podsadzką i w dalszej kolejności wybiera się pozostałe między podsadzonymi chodnikami pasy części złoża, również podsadzając je po wykonaniu chodników na całej zamierzonej długości.It is known, for example, from the Polish patent application No. P - 302409, the method of mining the remains of the deposit and selecting and protecting protective and resistance filters, consisting in selecting the remains of the deposit through corridors up to 10 m wide, preferably led in an anchor housing, with leaving between these corridors the strips of the deposit part of the width not less than the width of the corridor excavations. The completed corridors are then filled with the filling and then the remaining strips of the deposit parts between the filled-in pavements are selected, also backfilling them after the construction of the pavements along the entire intended length.

Znany jest również, na przykład z polskiego zgłoszenia patentowego nr P - 312051 sposób wybierania resztek pokładów w kopalniach węgla, zgodnie z którym parcelę pokładu wybiera się przy pomocy kombajnu chodnikowego zabierkami równoległymi do osi parceli i przemiennie w dwóch skrzydłach eksploatacyjnych. W jednym skrzydle prowadzi się zabierkę, natomiast w tym czasie w drugim skrzydle podsadza się zabierkę wcześniej wykonanąThere is also known, e.g. from Polish patent application No. P-312051, a method of extracting the remains of seams in coal mines, according to which the seam parcel is selected by means of a roadheader by means parallel to the axis of the plot and alternately in two exploitation wings. In one wing, the tether is led, while at the same time in the other wing, the tether made previously

W obydwóch wyżej przedstawionych sposobach wymagane jest bardzo dobre podsadzenie pustek poeksploatacyjnych podsadzką zdolną do przejęcia obciążenia górotworu w stopniu umoż186 861 liwiającym wybieranie w bezpośrednim sąsiedztwie następnych pasów złoża. Wykonywanie zaś takiej podsadzki w zasadniczy sposób zwiększa koszty eksploatacji, co czyni wybieranie resztek zadaniem ekonomicznie nieopłacalnym.In both of the above-presented methods, it is required to fill the post-mining voids very well with a proppant capable of bearing the load on the rock mass to the extent that allows excavating in the immediate vicinity of the next strips of the deposit. On the other hand, carrying out such a proppant significantly increases operating costs, which makes picking up leftovers an economically unprofitable task.

Celem wynalazku jest opracowanie takiego sposobu wybierania resztek pokładu zwłaszcza węgla kolejnymi, równoległymi do siebie wyrobiskami wąskoprzodkowymi rozdzielonymi filarami, który przy pełnej mechanizacji i bardzo niskich kosztach stosowania umożliwi lokowanie odpadów poprodukcyjnych.The aim of the invention is to develop such a method of extracting the seam remnants, especially coal, with successive, parallel to each other narrow-leading headings separated by pillars, which, with full mechanization and very low application costs, will enable the placement of post-production waste.

Istota wynalazku polega na tym, że w co najmniej jednym ociosie przebitego na całą długość wyrobiska wąskoprzodkowego wykonuje się kolejno równoległe względem siebie wcinki przedzielone wspornikami o szerokości dobranej doświadczalnie do lokalnych warunków górniczo-geologicznych pokładu.The essence of the invention consists in the fact that in at least one side of a narrow-lane excavation pierced along its entire length, successively parallel recesses separated by brackets with a width adjusted experimentally to the local mining and geological conditions of the seam are made.

Korzystnym jest, gdy wcinki wykonuje się przemiennie w obydwóch ociosach wyrobiska wąskoprzodkowego tak, że wcinkę w jednym ociosie drąży się naprzeciw wspornika zlokalizowanego w przeciwnym ociosie tego wyrobiska wąskoprzodkowego.It is advantageous if the notches are alternately made in both sides of the narrow-lane excavation, so that the indentation in one side of the narrow-lane excavation is drilled against the support located in the opposite side of the narrow-lane excavation.

Celowym jest, dla ułatwienia lokowania odpadów takie wykonywanie sposobu, w którym wcinki wykonuje się kolejno po wniosie pokładu a czoło każdej wcinki skierowane jest zgodnie z upadem pokładu. Oś wzdłużna każdej wcinki nachylona jest w płaszczyźnie pokładu względem osi wzdłużnej wyrobiska wąskoprzodkowego pod kątem zbliżonym do 60°.It is expedient, in order to facilitate the placement of waste, to perform a method in which the notches are performed successively after the deck application and the front of each notch is directed in accordance with the deck drop. The longitudinal axis of each indentation is inclined in the deck plane with respect to the longitudinal axis of the narrow-aisle excavation at an angle close to 60 °.

Korzystnym jest również ze względów bezpieczeństwa, gdy przed rozpoczęciem drążenia kolejnej wcinki w ociosie wyrobiska wąskoprzodkowego na odcinku wspornika oddzielającego ją od poprzedniej wcinki w tym ociosie, zabudowuje się barierę podporowo-zumykająca.It is also advantageous for safety reasons when a support and cleaning barrier is built in the side of a support separating it from the previous groove in the side of the narrow-lane excavation before drilling the next recess.

W najprostszym przypadku barierę podporowo-zamykającą wykonuje się z prostopadłego do osi wzdłużnej wyrobiska wąskoprzodkowego rzędu stojaków indywidualnych podbudowanych pod okładzinę profilowaną stropu i rozstawionych wzdłuż całej jej długości.In the simplest case, the supporting-closing barrier is made of a narrow-ancestral row of individual stands perpendicular to the longitudinal axis of the excavation, supported under the profiled cladding of the ceiling and spaced along its entire length.

W korzystnej realizacji sposobu barierę podporowo-zamykającą wykonuje się z ustawionych równolegle do siebie sekcji obudowy zmechanizowanej, zwróconych stropnicami przednimi zgodnie z kierunkiem postępu wykonywania wcinek.In a preferred embodiment of the method, the supporting-closing barrier is made of the sections of the powered support arranged parallel to each other, facing the front canopies in the direction of the progress of the section.

Zasadniczą zaletą sposobu według wynalazku jest pozyskanie poprzez wykonywanie wcinek przeważającej części kopaliny zlokalizowanej w filarach rozdzielających kolejne wyrobiska wąskoprzodkowe, z zachowaniem stabilności podparcia stropu na czas niezbędny do wypełnienia przestrzeni wcinek i wydrążonego wyrobiska wąskoprzodkowego odpadami poprodukcyjnymi. Pozyskanie tego urobku jest jednocześnie zdecydowanie tańsze niż pełna eksploatacja filara przy stosunkowo niewysokich stratach kopaliny. Jest to skutkiem wykonywania wcinek za pomocą maszyny urabiającej w trakcie jej wycofywania po wydrążeniu wyrobiska wąskoprzodkowego, a także możliwości zaniechania wykonywania obudowy wcinek w sprzyjających warunkach górniczo-geologicznych, bądź też w przypadku stosowania bariery podporowo-zamykającej dodatkowo podpierającej strop i odcinającej pracowników od strefy zagrożenia.The main advantage of the method according to the invention is obtaining, by making a cutout, the majority of the mineral located in the pillars separating successive narrow-heading workings, while maintaining the stability of the roof support for the time necessary to fill the space of the cut and the narrow-lead excavation with post-production waste. Obtaining this excavated material is also much cheaper than the full exploitation of the pillar with relatively low losses of the mineral. This is the result of making the recess with a mining machine during its withdrawal after drilling a narrow-section excavation, as well as the possibility of abandoning the construction of the recess in favorable mining and geological conditions, or in the case of using a supporting and closing barrier, which additionally supports the ceiling and cuts workers off from the danger zone. .

Wynalazek został bliżej objaśniony w przykładzie wykonania na rysunku, gdzie na fig. 1 przedstawiono fragment wybieranej resztki pokładu w widoku z góry, na fig. 2 - fragment wykonanego wyrobiska wąskoprzodkowego z wcinkami do obydwóch ociosów w widoku z góry, a na fig. 3 - wycinek wyrobiska wąskoprzodkowego w rejonie nowo zaczynanej wcinki z barierą podporowo-zamykającą z sekcji obudowy zmechanizowanej.The invention is explained in more detail in the drawing, where Fig. 1 shows a fragment of the seam remainder in a plan view, Fig. 2 - a fragment of a narrow-lane excavation made with indentations to both sides in a top view, and Fig. 3 - section of the narrow-leading excavation in the area of the newly started section with a support-closing barrier from the powered support section.

W parceli 1 resztki pokładu węgla ograniczonej wykonanymi chodnikami wentylacyjnym 2 i odstawczym 3 wykonuje się kolejno, po upadzie, równoległe do siebie wyrobiska wąskoprzodkowe 4 rozdzielone filarami 5. Wyrobisko wąskoprzodkowe 4 drąży się kombajnem chodnikowym w obudowie z okładzin profilowanych 6 zakotwionych do stropu kotwiami wklejanymi 7. Po przebiciu wyrobiska wąskoprzodkowego 4 na całąjego długość 1 między chodnikami wentylacyjnym 2 i odstawczym 3 przystępuje się do wycofywania kombajnu chodnikowego w kierunku chodnika odstawczego 3. W trakcie tego wycofywania, w obydwóch ociosach 8 wyrobiska wąskoprzodkowego 4 wykonuje się kombajnem chodnikowym wcinki 9, rozdzielone między sobą wspornikami 10 o szerokości b dobranej doświadczalnie do lokalnych warunków górniczogeologicznych pokładu. Wcinki 9 wykonuje się kolejno po wniosie pokładu, przemiennie w obydwóch ociosach 8, przy czym wcinkę 9 w jednym ociosie 8 drąży się naprzeciw wspornika 10In plot 1, the remnants of the coal seam, limited by 2 ventilation and shifting walkways 3, are successively, after the fall, parallel narrow-leading excavations 4 separated by pillars 5. Narrow-leading excavation 4 is drilled with a roadheader in a casing made of profiled linings 6 anchored to the ceiling with 7 glued anchors After the narrow-leading excavation 4 has been punctured along its entire length 1, between the ventilation 2 and hauling galleries 3, the roadheader is withdrawn towards the hauling passage 3. During this withdrawal, in both sides 8 of the narrow-leading excavation 4, cuts 9 are made with a roadheader, separated between them. with each other with supports 10 of width b experimentally selected to the local mining and geological conditions of the seam. The recesses 9 are made successively after the deck's end, alternately in both sides 8, with the indent 9 in one side of the side 8 being drilled against the support 10

186 861 zlokalizowanego w przeciwnym ociosie 8 wyrobiska wąskoprzodkowego 4. Czoło 11 każdej wcinki 9 skierowane jest zgodnie z upadem, natomiast oś wzdłużna O każdej wcinki 9 nachylona jest w płaszczyźnie pokładu względem osi wzdłużnej T wyrobiska wąskoprzodkowego 4 pod kątem a zbliżonym do 60°. Głębokość c każdej z wcinek 9, mierzona po dłuższej ścianie 12, jest mniejsza od długości kombajnu chodnikowego tak, że kombajnista w trakcie drążenia wcinki 9 znajduje się cały czas w przestrzeni wyrobiska wąskoprzodkowego 4, jako że wcinka 9 nie jest zabudowywana. Przed rozpoczęciem drążenia kolejnej wcinki 9 w wyrobisku wąskoprzodkowym 4 na odcinku wspornika 10 oddzielającego ją od poprzedniej wcinki 9 wykonanej w tym samym ociosie 8 zabudowuje się barierę podporowo-zamykającą 13. Barierę podoporowo-zamykającą 13 wykonuje się z prostopadłego do osi wzdłużnej T wyrobiska wąskoprzodkowego 4 rzędu stojaków indywidualnych 14, podbudowanych pod okładzinę profilowaną 6 i rozstawionych wzdłuż jej długości k. Zamiennie w trudniejszych warunkach górniczo-geologicznych barierę podporowo-zamykającą 13 wykonuje się z przemieszczających się po wniosie pokładu za kombajnem chodnikowym sekcji obudowy zmechanizowanej 15, zwróconych stropnicami przednimi 16 w stronę zgodną z kierunkiem postępu wykonywanych wcinek 9 podczas wycofywania kombajnu chodnikowego do chodnika odstawczego 3.Located in the opposite flank 8 of narrow-lane excavation 4. The face 11 of each indentation 9 is directed in accordance with the fall, while the longitudinal axis O of each indentation 9 is inclined in the seam plane with respect to the longitudinal axis T of the narrow-leading excavation 4 at an angle α close to 60 °. The depth c of each cut 9, measured along the longer wall 12, is smaller than the length of the roadheader, so that the roadheader, while drilling the cut 9, is still in the space of the narrow cut 4, as the cut 9 is not built up. Before starting the drilling of the next trench 9 in the narrow-leading excavation 4, a support-closing barrier 13 is built in the section of the support 10 separating it from the previous trench 9 in the same shoulder 8. The supporting-closing barrier 13 is made from the narrow-leading excavation 4 perpendicular to the longitudinal axis T 4 row of individual stands 14, built under the profiled cladding 6 and spaced along its length k. Alternatively, in more difficult mining and geological conditions, the supporting-closing barrier 13 is made of sections of powered support 15 moving along the seam after the roadheader, facing the front canopy 16 in the side corresponding to the direction of progress made in section 9 when the roadheader is retracted to the hauling walkway 3.

Po wykonaniu wcinek 9 na całej długości 1 wyrobiska wąskoprzodkowego 4 przystępuje się do drążenia następnego wyrobiska wąskoprzodkowego 4. Jednocześnie przystępuje się do lokowania odpadów w uprzednio wykonanym, przedostatnim wyrobisku wąskoprzodkowym 4 z wcinkami 9. Przedstawiony cykl powtarzał się będzie do zakończenia wybierania całej parceli 1 resztki pokładu i uzupełnienia pustek odpadami poprodukcyjnymi 17.After making the section 9 along the entire length 1 of the narrow-leading heading 4, the next narrow-heading heading 4 is being drilled. At the same time, the waste is deposited in the previously made, penultimate narrow-heading heading 4 with indents 9. The presented cycle will repeat until the end of selecting the entire plot and the remainder. deck and filling the voids with post-production waste 17.

Fig 2Fig 2

186 861186 861

Fig 3Fig 3

186 861186 861

Departament Wydawnictw UP RP. Nakład 50 egz. Cena 2,00 zł.Publishing Department of the UP RP. Circulation of 50 copies. Price PLN 2.00.

Claims (6)

Zastrzeżenia patentowePatent claims 1. Sposób wybierania resztek pokładu zwłaszcza węgla, w którym w parceli resztki pokładu, między ograniczającymi ją chodnikami, wykonuje się kolejno równoległe względem siebie i rozdzielone filarami wyrobiska wąskoprzodkowe, które następnie z odpowiednim opóźnieniem wypełnia się materiałami odpadowymi, znamienny tym, że w co najmniej jednym ociosie (8) przebitego na całą długość (1) wyrobiska wąskoprzodkowego (4) wykonuje się kolejno równoległe względem siebie wcinki (9) przedzielone wspornikami (10) o szerokości (b) dobranej doświadczalnie do lokalnych warunków górniczo-geologicznych pokładu.The method of extracting the remains of the seam, especially coal, in which, in the plot, the remains of the seam, between the sidewalks delimiting it, are successively made parallel to each other and separated by pillars narrow-leading workings, which are then filled with waste materials with an appropriate delay, characterized in that at least with one side (8) of a narrow-edge excavation (4) pierced along the entire length (1), successively parallel recesses (9) separated by brackets (10) with a width (b) selected experimentally to the local mining and geological conditions of the seam. 2. Sposób według zastrz. 1, znamienny tym, że wcinki (9) wykonuje się przemiennie w obydwóch ociosach (8) wyrobiska wąskoprzodkowego (4), przy czym wcinkę (9) w jednym ociosie (8) drąży się naprzeciw wspornika (10) zlokalizowanego w przeciwnym ociosie (8) wyrobiska wąskoprzodkowego (4).2. The method according to p. A method according to claim 1, characterized in that the indentations (9) are alternately made in both sides (8) of the narrow-side excavation (4), the indentation (9) in one side (8) being drilled against the support (10) located in the opposite side (8). ) of the narrow-leading excavation (4). 3. Sposób według zastrz. 1 albo 2, znamienny tym, że wcinki (9) wykonuje się kolejno po wniosie pokładu, przy czym czoło (11) każdej wcinki (9) skierowane jest zgodnie z upadem pokładu, natomiast oś wzdłużna (O) każdej wcinki (9) nachylona jest w płaszczyźnie pokładu względem osi wzdłużnej (T) wyrobiska wąskoprzodkowego (4) pod kątem (a) zbliżonym do 60°.3. The method according to p. 3. The recesses as claimed in claim 1 or 2, characterized in that the recesses (9) are performed successively after the deck application, with the front (11) of each recess (9) directed according to the deck drop, and the longitudinal axis (O) of each recess (9) is inclined in the deck plane in relation to the longitudinal axis (T) of the narrow-aisle excavation (4) at an angle (a) close to 60 °. 4. Sposób według zastrz. 1 albo 2, znamienny tym, że przed rozpoczęciem drążenia kolejnej wcinki (9) w ociosie (8), w wyrobisku wąskoprzodkowym (4) na odcinku wspornika (10) oddzielającego ją od poprzedniej wcinki (9) wykonanej w tym ociosie (8) zabudowuje się barierę podporowo-zamykającą (13).4. The method according to p. 1 or 2, characterized in that, before drilling the next recess (9) in the side wall (8), in the narrow groove (4) on the section of the support (10) separating it from the previous recess (9) made in the side wall (8) the supporting-closing barrier (13). 5. Sposób według zastrz. 4, znamienny tym, że barierę podporowo-zamykającą (13) wykonuje się z prostopadłego do osi wzdłużnej (T) wyrobiska wąskoprzodkowego (4) rzędu stojaków indywidualnych (14) podbudowanych pod okładzinę profilowaną (6) i rozstawionych wzdłuż całej jej długości (k).5. The method according to p. 4, characterized in that the supporting-closing barrier (13) is made of a narrow-aisle excavation (4) perpendicular to the longitudinal axis (T) of individual stands (14) built under the profiled cladding (6) and spaced along its entire length (k) . 6. Sposób według zastrz. 4, znamienny tym, że barierę podporowo-zamykajacą (13) wykonuje się z ustawionych równolegle do siebie sekcji obudowy zmechanizowanej (15), zwróconych stropnicami przednimi (16) zgodnie z kierunkiem postępu wykonywania wcinek (9).6. The method according to p. 4. A method according to claim 4, characterized in that the supporting-closing barrier (13) is made of sections of the powered support (15) arranged parallel to each other, facing with the front canopies (16) in the direction of the recess (9) execution.
PL98325693A 1998-04-01 1998-04-01 Method of mining residues from a bed of useful mineral, in particular hard coal one PL186861B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PL98325693A PL186861B1 (en) 1998-04-01 1998-04-01 Method of mining residues from a bed of useful mineral, in particular hard coal one

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PL98325693A PL186861B1 (en) 1998-04-01 1998-04-01 Method of mining residues from a bed of useful mineral, in particular hard coal one

Publications (2)

Publication Number Publication Date
PL325693A1 PL325693A1 (en) 1999-10-11
PL186861B1 true PL186861B1 (en) 2004-03-31

Family

ID=20071901

Family Applications (1)

Application Number Title Priority Date Filing Date
PL98325693A PL186861B1 (en) 1998-04-01 1998-04-01 Method of mining residues from a bed of useful mineral, in particular hard coal one

Country Status (1)

Country Link
PL (1) PL186861B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109339787A (en) * 2018-09-21 2019-02-15 太原理工大学 A reasonable layout method of roadway for abandoned coal mining in the middle layer of composite caving type residual mining area

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109339787A (en) * 2018-09-21 2019-02-15 太原理工大学 A reasonable layout method of roadway for abandoned coal mining in the middle layer of composite caving type residual mining area

Also Published As

Publication number Publication date
PL325693A1 (en) 1999-10-11

Similar Documents

Publication Publication Date Title
RU2099524C1 (en) Combined method of mining of formation of steeply dipping coal seams
RU2143074C1 (en) Method of mining of thick inclined outburst-phone seam
CA2295230C (en) Method for the combined exploitation of mining fields
PL186861B1 (en) Method of mining residues from a bed of useful mineral, in particular hard coal one
SU1682568A1 (en) Method for working thick steep and inclined fire hazardous coal seams
RU2168629C1 (en) Method of mining of thick flat coal bed
RU2283430C1 (en) Method for thick steep seams mining
RU2095570C1 (en) Method for development of steep ore bodies
CN109403972A (en) Sublevel open stoping afterwards filling mining method
RU2094612C1 (en) Method for opening steep thin ore deposits
RU2187644C2 (en) Method of mining of flat coal seam
RU2115803C1 (en) Method for mining thick steep coal seams in upgrade
RU2471990C1 (en) Method to mine sloping and inclined coal beds of average capacity
Gajos et al. Experience and practical aspects of utilizing a shrinkage method of extraction at “Kazimierz-Juliusz” coal mine in Sosnowiec
RU2805691C1 (en) Method for conducting mining works in development of flat coal beds
US2896929A (en) Method of driving rock excavations
SU1446307A1 (en) Method of creating artificial roof in mining coal seams in horizontal layers in descending order
RU2229600C1 (en) Method for excavation of steep-falling ore deposits
RU2083833C1 (en) Method for development of steep coal seams with backing worked-out area
RU2133827C1 (en) Method for development of sloping and steep coal seams
PL185456B1 (en) Method of getting coal in mines characterised by difficult geological conditions
SU1439240A1 (en) Method of combined exploitation of mineral deposits
RU2047764C1 (en) Method for maintenance of face ends with pit-bottom workings in readily collapsible roof zones
RU1788256C (en) Method for mining and inclined coal seams of medium thickness
Egorov et al. Technological and geomechanical parameters of room-and-pillar system of mining a thick flat seam