PL410528A1 - Method for preventing relocation of impurities from the excavations after exploitation of mineral material to ground waters - Google Patents
Method for preventing relocation of impurities from the excavations after exploitation of mineral material to ground watersInfo
- Publication number
- PL410528A1 PL410528A1 PL410528A PL41052814A PL410528A1 PL 410528 A1 PL410528 A1 PL 410528A1 PL 410528 A PL410528 A PL 410528A PL 41052814 A PL41052814 A PL 41052814A PL 410528 A1 PL410528 A1 PL 410528A1
- Authority
- PL
- Poland
- Prior art keywords
- excavations
- exploitation
- gangue
- impurities
- mineral material
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D31/00—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
- E02D31/002—Ground foundation measures for protecting the soil or subsoil water, e.g. preventing or counteracting oil pollution
- E02D31/006—Sealing of existing landfills, e.g. using mining techniques
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Environmental & Geological Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- Hydrology & Water Resources (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Processing Of Solid Wastes (AREA)
- Soil Conditioners And Soil-Stabilizing Materials (AREA)
Abstract
Sposób zapobiegania przemieszania się zanieczyszczeń z wyrobisk po eksploatacji surowców mineralnych do wód gruntowych polega na tym, że na uformowaną 50 cm warstwę utworzoną ze skały płonnej zrasza się 10% zawiesiną popiołu ze spalania węgla kamiennego, korzystnie brunatnego 5 - cio krotnie przez okres co 10 dni w ilości 0,3 m3 zawiesiny na 1 m2 utworzonej powierzchni, następnie po 50 dniach utworzoną powierzchnię ugniata się walcem i tak ukształtowaną powierzchnię przykrywa się co najmniej 50 cm warstwą skały płonnej, po czym wyrobisko wypełnia się skałą płonną do wysokości poniżej 2 metrów od plantowanej powierzchni, zaś górną 2 metrową warstwę wypełnia się mieszaniną ziemi z nakładu i osadów pofermentacyjnych z biogazowni rolniczych w stosunku wagowym 9 : 1.The method of preventing the mixing of pollutants from excavations after the exploitation of mineral resources into groundwater consists in the fact that the 50 cm formed layer of gangue is sprayed with a 10% suspension of ash from coal combustion, preferably brown coal, 5 times for every 10 days. in an amount of 0.3 m3 of suspension per 1 m2 of formed surface, then after 50 days the formed surface is kneaded with a roller and the surface formed in this way is covered with at least 50 cm of gangue, after which the pit is filled with gangue up to a height of less than 2 meters from the planted surface, while the upper 2-meter layer is filled with a mixture of soil from input and digestate sludge from agricultural biogas plants in a 9: 1 weight ratio.
Priority Applications (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| PL410528A PL225616B1 (en) | 2014-12-12 | 2014-12-12 | Method for preventing relocation of impurities from the excavations after exploitation of mineral material to ground waters |
| EP15164291.5A EP3031986A1 (en) | 2014-12-12 | 2015-04-20 | Method of protection of ground waters |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| PL410528A PL225616B1 (en) | 2014-12-12 | 2014-12-12 | Method for preventing relocation of impurities from the excavations after exploitation of mineral material to ground waters |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| PL410528A1 true PL410528A1 (en) | 2016-06-20 |
| PL225616B1 PL225616B1 (en) | 2017-04-28 |
Family
ID=53488113
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PL410528A PL225616B1 (en) | 2014-12-12 | 2014-12-12 | Method for preventing relocation of impurities from the excavations after exploitation of mineral material to ground waters |
Country Status (2)
| Country | Link |
|---|---|
| EP (1) | EP3031986A1 (en) |
| PL (1) | PL225616B1 (en) |
Families Citing this family (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109264863B (en) * | 2018-11-27 | 2021-03-09 | 魏星 | Water treatment percolation filler prepared from coal gangue and application method thereof |
| CN109438116B (en) * | 2018-11-30 | 2022-01-07 | 山西大学 | Method for preparing soil conditioner by modifying coal gangue and plant ash |
| CN111066406A (en) * | 2019-12-31 | 2020-04-28 | 王伟光 | Well-engineering mine subsidence area reclaimed soil configuration and reclamation method based on machine-made sand |
| CN111944533A (en) * | 2020-08-18 | 2020-11-17 | 辽宁三谷农业科技有限公司 | Method for harmless production of soil improvement conditioner by excrement, domestic garbage and coal gangue |
Family Cites Families (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| NL8301818A (en) | 1983-05-20 | 1984-12-17 | Wavin Bv | METHOD FOR PROCESSING WASTE AND WASTE COLLECTION WITH MEMBRANE FILTRATION UNIT. |
| DE58903050D1 (en) * | 1989-06-30 | 1993-01-28 | Kuegler Jost Ulrich Dipl Ing | METHOD FOR THE PRODUCTION OF A SEAL WITH DESTINATIONS OR THE LIKE. |
| SK7096A3 (en) | 1996-01-17 | 1997-09-10 | Anton Myslik | Insulation of landfill with waste plastic consolidated layer of foilic character |
| PL209589B1 (en) | 2005-07-11 | 2011-09-30 | Inst Chemii Nieorganicznej | Subsoil sealing system for the waste lagoon and method for making subsoil sealing system for the waste lagoon |
-
2014
- 2014-12-12 PL PL410528A patent/PL225616B1/en unknown
-
2015
- 2015-04-20 EP EP15164291.5A patent/EP3031986A1/en not_active Withdrawn
Also Published As
| Publication number | Publication date |
|---|---|
| PL225616B1 (en) | 2017-04-28 |
| EP3031986A1 (en) | 2016-06-15 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103461084B (en) | Afforesting matrix for improving stone-pit waste muck and preparation method and application of afforesting matrix | |
| CN102726187A (en) | Surface ecological management method for mining subsidence area of coal mine | |
| PL410528A1 (en) | Method for preventing relocation of impurities from the excavations after exploitation of mineral material to ground waters | |
| PL408999A1 (en) | Method for recultivation of excavations after exploitation of mineral raw materials | |
| Gophen et al. | Seasonal and spatial distribution of N & P substances in the Hula Valley (Israel) subterranean | |
| Toomik et al. | Oil shale mining and processing impact on landscapes in north-east Estonia | |
| PL408947A1 (en) | Method for producing the soil substitute serving rehabilitation of excavations using used drilling fluids | |
| CN105557109A (en) | Method for reforming saline-alkali land with desulfurization gypsum | |
| JP6631945B2 (en) | Purification promoting material for oil-contaminated soil and purification treatment method using the same | |
| Taylor et al. | Geotechnical and hydrogeological evaluation of artificial soils to remediate acid mine drainage and improve mine rehabilitation–An Australian case study | |
| KR101683842B1 (en) | Manufacturing method of blocks for ecological restoration by using algae | |
| PL410745A1 (en) | Method for recultivation of excavations after exploitation of raw materials for road building | |
| Yang et al. | The study on land reclamation technology and ecological control for coal mining subsidence area | |
| RU2728223C1 (en) | Method of disturbed lands restoration at open development of mineral deposits | |
| FI20175393A1 (en) | Method for handling of ash classified as waste, product accomplished by the method, and use of the product | |
| RU2016144492A (en) | The method of restoring quarries for the construction of a cemetery | |
| MORIKIYO et al. | The genesis of phosphatic and carbonate rocks in the Toyoma Formation, Northeastern Japan | |
| PL402077A1 (en) | Method for natural reclamation of mineral landfills | |
| PL407533A1 (en) | Method for producing artificial soil | |
| Sobocka | Position of technosols in the Slovak Soil Classification system and their correlation | |
| Chen et al. | Reclamation of an abandoned surface coal mined land using a dry flue gas desulfurization product | |
| Ozgeldinova et al. | The present-day geoecologic situation of Kenghir River basin geosystem | |
| Chen et al. | Physio-chemical Properties and Hydraulic Characteristics of Reconstruction Soil Filling with Fly Ash | |
| Fomin et al. | The ecological negative influence reduction ways on mining regions | |
| PL410743A1 (en) | Mixture of mining processing wastes for the application to light soils |