PL68475Y1 - Straight rail - Google Patents

Straight rail

Info

Publication number
PL68475Y1
PL68475Y1 PL122624U PL12262413U PL68475Y1 PL 68475 Y1 PL68475 Y1 PL 68475Y1 PL 122624 U PL122624 U PL 122624U PL 12262413 U PL12262413 U PL 12262413U PL 68475 Y1 PL68475 Y1 PL 68475Y1
Authority
PL
Poland
Prior art keywords
flat bar
section
attached
handle
shelf
Prior art date
Application number
PL122624U
Other languages
Polish (pl)
Other versions
PL122624U1 (en
Inventor
Andrzej Witosławski
Original Assignee
Zakłady Produkcyjnohandlowe Stalpol Spółka Z Ograniczoną
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zakłady Produkcyjnohandlowe Stalpol Spółka Z Ograniczoną filed Critical Zakłady Produkcyjnohandlowe Stalpol Spółka Z Ograniczoną
Priority to PL122624U priority Critical patent/PL68475Y1/en
Publication of PL122624U1 publication Critical patent/PL122624U1/en
Publication of PL68475Y1 publication Critical patent/PL68475Y1/en

Links

Landscapes

  • Details Of Rigid Or Semi-Rigid Containers (AREA)
  • Warehouses Or Storage Devices (AREA)

Claims (2)

Opis wzoru Przedmiotem wzoru użytkowego jest szyna prosta stanowiąca element składowy toru jezdnego kolejki podwieszanej. Z opisu ochronnego nr PL 33068 Y1 znany jest dwuteownik przeznaczony do produkcji szyn trasy jezdnej kolejki podwieszanej do transportu ludzi i materiałów w podziemiach kopalń. Dwuteownik ten charakteryzuje się szczególnymi proporcjami wymiarów przekroju. Z kolei z praktyki znana jest szyna prosta, która składa się z odcinka dwuteownika, do którego zewnętrznej powierzchni górnej półki zamocowane są dwa uchwyty połączone prostopadłym do górnej półki żebrem, zaś do zewnętrznej powierzchni dolnej półki przyspawany jest płaskownik o szerokości nieco mniejszej niż szerokość półki. Dodatkowo oba końce dwuteownika zaopatrzone są włączniki śrubowe. Istota szyny prostej składającej się z odcinka dwuteownika, którego końce zaopatrzone są w dolne łączniki śrubowe i górne łączniki śrubowe, zaś do zewnętrznej powierzchni dolnej półki zamocowany jest pierwszy płaskownik, a do zewnętrznej powierzchni górnej półki zamocowane są dwa uchwyty, które jednocześnie są połączone, polega na tym, że do zewnętrznej powierzchni górnej półki pomiędzy pierwszym uchwytem, a drugim uchwytem zamocowany jest drugi płaskownik, zaś do pierwszego uchwytu i do zewnętrznej powierzchni górnej półki, od strony pierwszego końca, zamocowany jest trzeci płaskownik, a do drugiego uchwytu i do zewnętrznej powierzchni górnej półki, od strony drugiego końca, zamocowany jest czwarty płaskownik. Zarówno drugi płaskownik, trzeci płaskownik jak i czwarty płaskownik ułożone są równolegle do górnej półki, przy czym ich szerokość jest korzystnie nieco mniejsza od szerokości górnej półki. Przedmiot wzoru użytkowego przedstawiony jest na schematycznym rysunku, na którym fig. 1 przedstawia szynę prostą w widoku z boku, zaś fig. 2 przedstawia przekrój poprzeczny przez szynę w miejscach zaznaczonych na fig. 1. Szyna prosta składa się z odcinka dwuteownika (1), w którym wyróżnia się dolną półkę (2) oraz górną półkę (3). Odcinek dwuteownika (1) posiada także pierwszy koniec (4) i drugi koniec (5). Do zewnętrznej powierzchni (6) dolnej półki (2), od strony pierwszego końca (4) przyspawany jest pierwszy, dolny łącznik śrubowy (7a), natomiast od strony drugiego końca (5) przyspawany jest drugi, dolny łącznik śrubowy (7b), zaś pomiędzy nimi przyspawany jest pierwszy płaskownik (8), o szerokości nieco mniejszej niż szerokość dolnej półki (2) i o długości mniejszej niż długość odcinka dwuteownika (1). Z kolei do zewnętrznej powierzchni (10) górnej półki (3), wzdłuż dwuteownika (1) przyspawane są dwa uchwyty (11 a, 11 b) pomiędzy którymi znajduje się drugi płaskownik (12). Natomiast do pierwszego uchwytu (11 a) i do zewnętrznej powierzchni (10) górnej półki (3), od strony pierwszego końca (4), zamocowany jest trzeci płaskownik (13). Odpowiednio do drugiego uchwytu (11 b) i do zewnętrznej powierzchni (10) górnej półki (3), od strony drugiego końca (5), zamocowany jest czwarty płaskownik (14). Nadto do zewnętrznej powierzchni (10) górnej półki (3), w obrębie pierwszego końca (4) przyspawany jest pierwszy, górny łącznik śrubowy (15a), zaś w obrębie drugiego końca (5) drugi, górny łącznik śrubowy (15b). Drugi płaskownik (12), trzeci płaskownik (13) i czwarty płaskownik (14) ułożone są równolegle do górnej półki (3). Figura 2 przedstawia przekrój poprzeczny przez szynę w płaszczyźnie A-A, wskazanej na fig. 1, który odpowiada wymiarowo także przekrojom w płaszczyznach B-B i C-C. Do dolnej półki (2) dwuteownika (1) zamocowany jest pierwszy płaskownik (8), zaś do górnej półki (3) zamocowany jest trzeci płaskownik (13). Zastrzeżenia ochronneDescription of the model The subject of the utility model is a straight rail constituting a component element of the suspended monorail track. From the protection description no. PL 33068 Y1, an I-section is known for the production of suspension track rails for transporting people and materials in the underground of mines. This I-section is characterized by special proportions of the cross-section dimensions. On the other hand, a straight rail is known from practice, which consists of a section of an I-section, to the outer surface of the upper flange, two holders are attached, connected by a rib perpendicular to the upper flange, and a flat bar with a width slightly smaller than the flange width is welded to the external surface of the lower flange. Additionally, both ends of the I-beam are equipped with screw switches. The essence of a straight rail consisting of a section of an I-section, the ends of which are provided with lower screw connectors and upper screw connectors, and the first flat bar is attached to the outer surface of the lower shelf, and two holders are attached to the outer surface of the upper shelf, which are connected at the same time, is in that a second flat bar is attached to the outer surface of the upper shelf between the first handle and the second handle, and a third flat bar is attached to the first handle and to the outer surface of the upper shelf from the first end side, and to the second handle and the outer surface of the upper shelf, a fourth flat bar is attached from the side of the other end. Both the second flat bar, the third flat bar and the fourth flat bar are arranged parallel to the upper flange, and their width is preferably slightly smaller than the width of the upper flange. The object of the utility model is shown in a schematic drawing, in which Fig. 1 shows a straight rail in a side view, and Fig. 2 shows a cross-section through the rail in the places marked in Fig. 1. The straight rail consists of a section of an I-section (1), with a lower shelf (2) and an upper shelf (3). The I-section (1) also has a first end (4) and a second end (5). To the outer surface (6) of the lower shelf (2), the first, lower bolt (7a) is welded from the side of the first end (4), while the second, lower bolted (7b) is welded from the side of the second end (5), and between them, the first flat bar (8) is welded, slightly smaller than the width of the lower flange (2) and less than the length of the I-section (1). In turn, to the outer surface (10) of the upper flange (3), along the I-beam (1), two holders (11a, 11b) are welded between which there is a second flat bar (12). On the other hand, a third flat bar (13) is attached to the first handle (11a) and to the outer surface (10) of the upper shelf (3) from the side of the first end (4). Corresponding to the second handle (11b) and to the outer surface (10) of the upper shelf (3), a fourth flat bar (14) is attached from the side of the second end (5). In addition, a first upper screw fitting (15a) is welded to the outer surface (10) of the upper shelf (3) within the first end (4) and a second upper screw fitting (15b) within the second end (5). The second flat bar (12), the third flat bar (13) and the fourth flat bar (14) are arranged parallel to the upper shelf (3). Figure 2 shows a cross-section through the rail in the plane A-A indicated in fig. 1 which also corresponds dimensionally to the cross-sections in planes B-B and C-C. The first flat bar (8) is attached to the lower flange (2) of the I-bar (1), and the third flat (13) is attached to the upper flange (3). Protective reservations 1. Szyna prosta składająca się z odcinka dwuteownika, którego końce zaopatrzone są w dolne łączniki śrubowe i górne łączniki śrubowe, zaś do zewnętrznej powierzchni dolnej półki zamocowany jest pierwszy płaskownik, a do zewnętrznej powierzchni górnej półki zamocowane są dwa uchwyty, które jednocześnie są połączone, znamienna tym, że do zewnętrznej powierzchni (10) górnej półki (3) pomiędzy pierwszym uchwytem (11 a), a drugim uchwytem (11 b) zamocowany jest drugi płaskownik (12), zaś do pierwszego uchwytu (11 a) i do zewnętrznej powierzchni (10) górnej półki (3), od strony pierwszego końca (4), zamocowany jest trzeci płaskownik (13), a do drugiego uchwytu (11 b) i do zewnętrz-1. A straight rail consisting of a section of an I-section, the ends of which are provided with lower screw connectors and upper screw connectors, and the first flat bar is attached to the outer surface of the lower shelf, and two holders are attached to the outer surface of the upper shelf, which are simultaneously connected, characterized in that a second flat bar (12) is attached to the outer surface (10) of the upper shelf (3) between the first handle (11a) and the second handle (11b), and to the first handle (11a) and to the outer surface (10) of the upper shelf (3), from the side of the first end (4), a third flat bar (13) is attached, and to the second handle (11b) and to the outside
PL122624U 2013-12-07 2013-12-07 Straight rail PL68475Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PL122624U PL68475Y1 (en) 2013-12-07 2013-12-07 Straight rail

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PL122624U PL68475Y1 (en) 2013-12-07 2013-12-07 Straight rail

Publications (2)

Publication Number Publication Date
PL122624U1 PL122624U1 (en) 2015-01-05
PL68475Y1 true PL68475Y1 (en) 2016-07-29

Family

ID=52126457

Family Applications (1)

Application Number Title Priority Date Filing Date
PL122624U PL68475Y1 (en) 2013-12-07 2013-12-07 Straight rail

Country Status (1)

Country Link
PL (1) PL68475Y1 (en)

Also Published As

Publication number Publication date
PL122624U1 (en) 2015-01-05

Similar Documents

Publication Publication Date Title
WO2012075282A3 (en) Articles and methods related to the formation of nanostructure reinforced structures
WO2014193228A3 (en) Drilling vessel
CN203799586U (en) Signboard mounting support for power transmission line steel tube tower
WO2017129214A8 (en) Maintenance vehicle
PH12016501856A1 (en) Moving crane
PL68475Y1 (en) Straight rail
MY167089A (en) Modular pallet
KR101879357B1 (en) handrail having adaptive type horizontal rod
CN203033357U (en) Hanging type conveying rail
PL68191Y1 (en) Straight rail
HRP20161392T1 (en) Reinforced metallic shelf for modular shelves structure
PL68189Y1 (en) Straight rail
PL68190Y1 (en) Straight rail
PL68784Y1 (en) Running rail
PL65088Y1 (en) Double-tee bar
RU2011112750A (en) DEVICE FOR PROTECTING CYLINDRICAL DESIGNS AND PROTECTIVE RACK FOR IT
PL121693U1 (en) Support for the transport of rails
HRP20140359T1 (en) ASSEMBLY FOR CABLING ON OUTDOOR SURFACES CIRCUIT STRUCTURE
PL122310U1 (en) Expansion joint filling system for floors, preferably industrial floors
BR102012010009A2 (en) MONOVIA SYSTEM
UA87338U (en) Unit for connection of vertical and horizontal reinforced-concrete elements of three-dimensional spatial framework of a house/construction
ES2613874T3 (en) Method for manufacturing a double guide rail and a guide rail manufactured according to the method
CN202265375U (en) Support frame for sling of hanging basket
WO2014033512A8 (en) Rail points
PL402636A1 (en) Passable mounting platform