PL75636B2 - - Google Patents

Download PDF

Info

Publication number
PL75636B2
PL75636B2 PL15589572A PL15589572A PL75636B2 PL 75636 B2 PL75636 B2 PL 75636B2 PL 15589572 A PL15589572 A PL 15589572A PL 15589572 A PL15589572 A PL 15589572A PL 75636 B2 PL75636 B2 PL 75636B2
Authority
PL
Poland
Prior art keywords
ropes
securing
coal
roof
ceiling
Prior art date
Application number
PL15589572A
Other languages
Polish (pl)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to PL15589572A priority Critical patent/PL75636B2/pl
Publication of PL75636B2 publication Critical patent/PL75636B2/pl

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

Pierwszenstwo: Zgloszenie ogloszono: 30.05.1973 Opis patentowy opublikowano: 17.04.1975 75636 KI. 5c,21/00 MKP E21d 21/00 C2YTELNIA Urzedu Patentowego hhkli) Izeufyiirc^ej Ludowej Twórca wynalazku: Kazimierz Krasiczynski Uprawniany z patentu tymczasowego: Akademia Górniczo-Hutnicza im. Stanislawa Staszica, Kraków (Polska) Urzadzenie do zabezpieczania stropu Przedmiotem wynalazku jest urzadzenie do zabez¬ pieczania stropu, znajdujace zastosowanie zwlaszcza w pokladach o stropie zwiezlym i trudnolamliwym, o miazszosci do 4,5 m.Znany jest komorowy oraz komorowo-filarowy sposób wybierania zlóz wegla i rud. Sposoby te po¬ legaja na wybieraniu zlóz wegla i rud komorami, pomiedzy którymi pozostawiane sa filary zloza, slu¬ zace jako podparcie stropu. Wada tych sposobów wybierania sa duze straty zloza, powstale na sku¬ tek pozostawiania filarów wegla i rud. Inny znany sposób tak zwany system scianowy, polega na wy¬ bieraniu calego zloza, przy czym strop zabezpie¬ czany jest obudowa podporowa. Sposób ten jest jednak malo ekonomiczny, gdyz obudowa podporo¬ wa nie zezwala na stosowanie wysokowydajnych maszyn samojezdnych.Celem wynalazku jest umozliwienie calkowitego wybierania zloza wegla i rud, przy równoczesnym stosowaniu wysokowydajnych maszyn samojezd¬ nych.Cel ten zostal osiagniety przez skonstruowanie urzadzenia, zabezpieczajacego strop linami, polozo¬ nymi ns^ okladzinach lub przeplecionymi przez nie i zamocowanymi do kotwi, stanowiacych obudowe wyrobisk korytarzowych. Odmiana urzadzenia za¬ wiera dodatkowo siatke, która jest nalozona na li¬ ny lub na okladziny i liny.Zaleta urzadzenia do zabezpieczania stropu jest to, ze zezwala ono na calkowite wybieranie zloza wegla lub rud a równoczesnie umozliwia stosowa¬ nie wysokowydajnych maszyn samojezdnych.Przedmiot wynalazku jest uwidoczniony w przy¬ kladzie wykonania na rysunku, który przedstawia s schematycznie urzadzenie do zabezpieczania stropu, zamocowane w wyrobisku w przekroju poziomym.Urzadzenie zawiera liny 1, na których polozone sa okladziny 2. Liny 1 sa zamocowane do kotwi 3, stanowiacych obudowe wyrobiska korytarzowego 4, 10 w ten sposób aby kazda z lin 1 po zakonczeniu eks¬ ploatacji mozna bylo wyciagnac, dla dalszego jej wykorzystania.Odmiana urzadzenia zawiera dodatkowo siatke 5, nalozona na liny 1 i okladziny 2, co umozliwia i% zwiekszenie odeglosci pomiedzy linami 1 i okladzi¬ nami 2.Skrzyzowanie ubierki z wyrobiskami korytarzo¬ wymi zabezpieczone jest stropnicami 6 i stojaka¬ mi 7 tak, aby umozliwic przejazd przez skrzyzo- 20 wanie maszynami samojezdnymi. PL PLPriority: Application announced: May 30, 1973 Patent description was published: April 17, 1975 75636 KI. 5c, 21/00 MKP E21d 21/00 C2YTELNIA Urzedu Patentowego hhkli) Izeufyiirc ^ ej Ludowej Inventor: Kazimierz Krasiczynski Entitled by a temporary patent: AGH University of Science and Technology Stanislawa Staszica, Kraków (Poland) Device for securing the ceiling The subject of the invention is a device for securing the ceiling, which is used in particular in decks with a concave and difficult-to-break ceiling, with a thickness of up to 4.5 m. coal and ores. These methods consist in the removal of coal and ore deposits with chambers between which the pillars of the deposit are placed, serving as the support of the roof. The disadvantage of these methods of mining is the large deposit losses caused by the deposition of coal pillars and ores. Another known method, the so-called wall system, consists in selecting the entire bed, with the ceiling being secured to the support casing. However, this method is not very economical, since the support casing does not allow the use of highly efficient self-propelled machines. The aim of the invention is to enable the complete extraction of the coal and ores deposits, while simultaneously using highly efficient self-propelled machines. with ropes, laid over the cladding or interlaced through them and attached to the anchors, constituting the casing of the corridor workings. A variant of the device also includes a net that is applied to the ropes or to the linings and ropes. The advantage of the device for securing the roof is that it allows the complete removal of the coal or ore deposits, and at the same time allows the use of highly efficient self-propelled machinery. The invention is shown in an example of an embodiment in the drawing, which schematically shows the device for securing the roof, mounted in the excavation in a horizontal section. The device comprises ropes 1 on which linings 2 are laid. of the corridor 4, 10 in such a way that each of the ropes 1 can be pulled out after the end of the operation, for further use. The version of the device also includes a net 5, placed on the ropes 1 and lining 2, which allows to increase the distance between the ropes 1% and cladding 2. The crossing of the garment with the corridor workings is secured with canopies 6 and stands 7 so that y allow passage through the intersection with self-propelled machines. PL PL

Claims (2)

1. Zastrzezenia patentowe 1. Urzadzenie do zabezpieczania stropu, znamien- 25 ne tym, ze ma liny (1) polozone na okladziny (2) lub przeplecione przez nie i zamocowane do kotwi (3), stanowiacych obudowe wyrobisk korytarzowych (4).1. Claims 1. A device for securing a roof, characterized in that there are ropes (1) laid on the cladding (2) or threaded through them and attached to the bolts (3), which constitute the casing of the workings (4). 2. Odmiana urzadzenia, znamienna tym, ze za¬ wiera dodatkowo siatke (5), która jest nalozona na 30 liny (1) lub na okladziny (2) i liny (1). 75636KI.5c,21/00 75636 MKP E21d 21/00 Cena 10 zl PZG Bydg. zam. 58/75, nakl. 120 egz. PL PL2. Variation of the device, characterized in that it additionally comprises a net (5) which is applied to the ropes (1) or to the linings (2) and the ropes (1). 75636KI.5c, 21/00 75636 MKP E21d 21/00 Price PLN 10 PZG Bydgoszcz. 58/75, nakl. 120 copies PL PL
PL15589572A 1972-06-06 1972-06-06 PL75636B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PL15589572A PL75636B2 (en) 1972-06-06 1972-06-06

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PL15589572A PL75636B2 (en) 1972-06-06 1972-06-06

Publications (1)

Publication Number Publication Date
PL75636B2 true PL75636B2 (en) 1974-12-31

Family

ID=19958873

Family Applications (1)

Application Number Title Priority Date Filing Date
PL15589572A PL75636B2 (en) 1972-06-06 1972-06-06

Country Status (1)

Country Link
PL (1) PL75636B2 (en)

Similar Documents

Publication Publication Date Title
PL75636B2 (en)
AT312889B (en) Fastening element for anchoring in a borehole in reinforced concrete, in particular for fastening suspended ceilings, pipes or the like.
RU185553U1 (en) MILITARY FORTIFICATION STRUCTURE FOR THE ARCTIC
SU877013A1 (en) Method of mining thick sloping coal beds
SU684142A1 (en) Method of exacavating roof-supporting ore pillars
GB560006A (en) Improvements in and relating to pre-fabricated structural elements and to buildings made therefrom
PL78760B2 (en)
SU894198A1 (en) Method of working thick ore bodies
SU825964A1 (en) Method of working thick steeply-inclined ore bodies
SU143761A1 (en) The system for the development of heavy coal seams with pillars in the fall
SU905468A1 (en) Method of working pillars
SU981617A1 (en) Method of constructing twin-layer support for mine workings
SU817262A1 (en) Method of preparing the bottom of a block
SU126451A1 (en) Continuous batching system with single-stage groove
SU105758A1 (en) Precast reinforced concrete, predominantly for trapezoidal production
SU78741A1 (en) Subsurface system using a bonded mat
Ференц The problem of ecological danger of excavations of potash mineral fertilizers
SU785508A1 (en) Flexible separating roof
SU109819A1 (en) Combined method of developing a powerful coal steeply dipping seam with two inclined layers
SU693017A1 (en) Method of mining mineral deposits
SU693024A1 (en) Combination cover for excavating thick sloping beds
PL60808B1 (en)
SU1004640A1 (en) Method of erecting man-made pillar when working sloping ore bodies and rod for erecting man-made pillar
Kraatz The construction aggregate potential of geologic deposits Storey County, Nevada.
RU1809068C (en) Method for picking-up minerals on bottom of a basin