PL78760B2 - - Google Patents

Download PDF

Info

Publication number
PL78760B2
PL78760B2 PL15943572A PL15943572A PL78760B2 PL 78760 B2 PL78760 B2 PL 78760B2 PL 15943572 A PL15943572 A PL 15943572A PL 15943572 A PL15943572 A PL 15943572A PL 78760 B2 PL78760 B2 PL 78760B2
Authority
PL
Poland
Prior art keywords
casing
wall
anchor
collapse
line
Prior art date
Application number
PL15943572A
Other languages
Polish (pl)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to PL15943572A priority Critical patent/PL78760B2/pl
Publication of PL78760B2 publication Critical patent/PL78760B2/pl

Links

Landscapes

  • Retaining Walls (AREA)

Description

Pierwszenstwo: Zgloszenie ogloszono: 30.09.1973 Opis patentowy opublikowano: 31.12.1975 78760 KI. 5c, 20/00 MKP E21d 20/00 CZYTELNIA Urzedu PoUnlowego Twórcy wynalazku: Adam Fiszer, Zbigniew Pochcial, Stanislaw Siewierski, Józef Szczerba, Kazimierz Ziaja Uprawniony z patentu tymczasowego: Politechnika Wroclawska, Wroclaw (Polska) Sposób obudowy przestrzeni roboczej w scianowym systemie eksploatacji zlóz z zawalem stropu Przedmiotem wynalazku jest sposób obudowy przestrzeni roboczej w scianowym systemie eksploatacji zlóz z zawalem stropu.Znane sposoby obudowy przestrzeni roboczej w scianowym systemie eksploatacji zlóz z zawalem stropu polegajaca na podtrzymywaniu stropu za pomoca róznego rodzaju stojaków wspólpracujacych ze stropnicami.Zasadnicza niedogodnoscia techniczna znanego sposobu obudowy przestrzeni roboczej w scianowym sy¬ stemie eksploatacji zlóz z zawalem stropu jest umieszczenie stojaków w przestrzeni roboczej, które utrudniaja wykonanie najbardziej pracochlonnych czynnosci zwiazanych z urabianiem, ladowaniem i odstawa zwlaszcza w scianowym systemie eksploatacji w górnictwie rud, gdzie postep techniczny wskazuje na zastosowanie wielko¬ gabarytowych i wieloczlonowych ladowarek zgarniakowych oraz wprowadzenie strzelania bocznego dlugimi otworami równoleglymi do czola sciany.Celem wynalazku jest uzyskanie przestrzeni roboczej wolnej od stojaków w scianowym systemie eksploa¬ tacji zlóz z zawalem stropu, a zagadnieniem technicznym jest opracowanie sposobu obudowy gwarantujacego bezpieczne prowadzenie i utrzymanie przestrzeni roboczej w tym systemie.Zagadnienie to zostalo rozwiazane w ten sposób, ze zaklada sie obudowe kotwiowa w czole urabianej sciany i buduje sie nowa linie zawalu, po czym rabuje sie ostatni rzad obudowy kotwiowej i likwiduje sie poprzednia linie zawalu. W efekcie otrzymuje sie przestrzen robocza ograniczona od strony zawalu rzedem stojaków zabezpieczenia wylacznie obudowa kotwiowa.Zasadnicza korzyscia techniczna wynikajaca ze zastosowania sposobu obudowy wedlug wynalazku jest wyeliminowanie z przestrzeni roboczej obudowy podporowej co zapewnia wydajna i bezawaryjna prace lado¬ warki zagarniakowej oraz przy strzelaniu bocznym unika sie wybijania i niszczenia stojaków.Sposób wedlug wynalazku jest przedstawiony w przykladzie wyrobiska scianowego przedstawionego na rysunku, na którym fig. 1 przedstawia sposób obudowy w przekroju poprzecznym przed rozpoczeciem cyklu roboczego, fig. 2 — sposób obudowy po urobieniu calizmy, fig. 3 — przesuwanie linii zawalu i zabezpieczenie czola sciany po zakonczeniu czynnosci zwiazanych z urabianiem, ladowaniem i odstawa urobku, a fig. 4 sposób obudowy po zakonczeniu cyklu.2 78 760 Przestrzen robocza w scianowym systemie eksploatacji zlóz z zawalem stropu zabezpieczona jest dwoma rzedami obudowy kotwiowej 1 i 2 wspólpracujacej ze stropnicami 3 i 4 oraz rzedem stojaków 5 stanowiacych linie zawalu, a po wykonaniu zabioru w nowoodslonietym polu zaklada sie fragment obudowy kotwiowej 6 wspólpracujacej ze stropnicami 7 i buduje sie rzad stojaków 8 stanowiacych nowa linie zawalu co umozliwia wyrabowanie kotwi 2, stropnic 4 i stojaków 5. Z odzyskanych elementów buduje sie dalszy odcinek obudowy kotwiowej 6 wspólpracujacej ze stropnicami 7 oraz buduje sie przedluzenie rozpoczetej nowej linii zawalu.Proces obudowy i przesuwania linii zawalu mozna rozpoczac w kilku miejscach sciany, a opisane czynnosci powtarza si£ tak dlugo az wzdluz calej sciany przestrzen robocza zabezpieczona jest dwoma rzedami obudowy 1 i 6 wspólpracujacej ze stropnicami 3 i 7 oraz rzedem stojaków 8 stanowiacych nowa linie zawalu. PL PLPriority: Application announced: September 30, 1973 Patent description was published: December 31, 1975 78760 KI. 5c, 20/00 MKP E21d 20/00 READING ROOM of the PoUnlowy Office Creators of the invention: Adam Fiszer, Zbigniew Pochcial, Stanislaw Siewierski, Józef Szczerba, Kazimierz Ziaja Authorized by a temporary patent: Wroclaw University of Technology, Wroclaw (Poland) Method of working space housing in a wall operating system The subject of the invention is a method of cladding the working space in a wall-mounted system of exploitation of deposits with a collapse of the ceiling. Known methods of cladding the working space in a wall-mining system of exploitation of collapsed ceilings consisting in supporting the ceiling with the help of various types of stands cooperating with roof rails. The main technical inconvenience of the known the method of supporting the working space in the wall exploitation system of the collapsed roof is the placement of the stands in the working space, which makes it difficult to perform the most labor-intensive activities related to mining, loading and haulage, especially in the wall mining system two ores, where technical progress indicates the use of large-size and multi-section dragline loaders and the introduction of side firing with long holes parallel to the face of the wall. The aim of the invention is to obtain a work space free from racks in the wall system of exploitation of folds with a collapse of the roof, and the technical issue is is to develop a casing method that guarantees safe guidance and maintenance of the working space in this system. This problem was solved in such a way that the anchor casing is installed in the face of the wall being cut and a new caving line is built, after which the last row of the anchor casing is robbed and liquidated. previous collapse lines. As a result, the working space is limited on the side of the collapse by a row of protection stands, only the anchor housing. The main technical advantage resulting from the use of the housing method according to the invention is the elimination of the support housing from the working space, which ensures efficient and failure-free operation of the drag line and avoiding side firing. The method according to the invention is presented in the example of the wall excavation shown in the drawing, in which Fig. 1 shows the method of the lining in cross-section before the start of the working cycle, Fig. 2 - the method of the lining after making the body, Fig. 3 - moving the line of collapsing and securing the face of the wall after completion of the activities related to excavation, loading and hauling of the excavated material, and Fig. 4 - the method of casing after completion of the cycle. 1 and 2 cooperating with the canopies 3 and 4 and the row of stands 5 constituting the collapse lines, and after the haulage has been made in the newly exposed field, a fragment of the anchor housing 6 cooperating with the canopies 7 is placed and a row of stands 8 is built, constituting a new collapse line, which enables the bolt 2 to be stolen, canopnics 4 and stands 5. The recovered elements are used to build a further section of the anchor casing 6 cooperating with the canopies 7 and to build an extension of the new collapsing line. The process of casing and shifting the collapse line can be started in several places of the wall, and the described activities are repeated as long and along the entire wall, the working space is secured with two rows of casing 1 and 6 cooperating with canopies 3 and 7 and a row of stands 8 constituting a new fold line. PL PL

Claims (1)

1. Zastrzezenie patentowe Sposób obudowy w scianowym systemie eksploatacji zlóz z zawalem stropu za pomoca obudowy kotwio¬ wej i podporowej, polegajacy na tym, ze po urobieniu calizmy zabezpiecza sie strop w nowoodslonietym polu i buduje sie nowa linie zawalu, znamienny tym, ze zaklada sie obudowe kotwiowa w czole sciany, po czym rabuje sie ostatni rzad obudowy kotwiowej i poprzednia linie zawalu w wyniku czego uzyskuje sie przestrzen robocza ograniczona od strony zawalu rzedem stojaków (8) zabezpieczona wylacznie obudowa kotwiowa (1 i 6). Prac. Poligraf. UP PRL T.P. Zam. 208/75 Naklad 120+18 Cena 10 zl. PL PL1. Patent claim A method of casing in a wall exploitation system of folds with a collapse of the ceiling by means of an anchor and support casing, consisting in the fact that after making the whole body, the ceiling is secured in a newly exposed field and a new collapse line is constructed, characterized by the fact that it is assumed an anchor casing in the face of the wall, then the last row of the anchor casing and the previous cave line are robbed, resulting in a working space limited on the side of the cave with a row of stands (8) secured only by the anchor casing (1 and 6). Wash. Typographer. UP PRL T.P. Order 208/75 Mintage 120 + 18 Price PLN 10. PL PL
PL15943572A 1972-12-11 1972-12-11 PL78760B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PL15943572A PL78760B2 (en) 1972-12-11 1972-12-11

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PL15943572A PL78760B2 (en) 1972-12-11 1972-12-11

Publications (1)

Publication Number Publication Date
PL78760B2 true PL78760B2 (en) 1975-06-30

Family

ID=19960906

Family Applications (1)

Application Number Title Priority Date Filing Date
PL15943572A PL78760B2 (en) 1972-12-11 1972-12-11

Country Status (1)

Country Link
PL (1) PL78760B2 (en)

Similar Documents

Publication Publication Date Title
SU1652592A1 (en) Method for supporting mine workings
PL78760B2 (en)
SU877013A1 (en) Method of mining thick sloping coal beds
RU2399766C1 (en) Removal method of mechanical complex of mining face
RU2078930C1 (en) Method of preservation of extraction drift
PL169853B1 (en) The method of backfilling longwall workings
SU883477A1 (en) Method of securing mine working while driving them
SU693017A1 (en) Method of mining mineral deposits
RU1788281C (en) Unit for powered support for self-igniting coal seams
SU989075A1 (en) Method of constructing large-diameter underground structures
PL137053B1 (en) Method of preparing a longwall-type working for putting it out of exploitation
SU905468A1 (en) Method of working pillars
SU1222839A1 (en) Method of driving cut-throughs
SU964154A1 (en) Method of sinking vertical mine working in unstable rock beds
SU729352A1 (en) Method of mining sloping ore bodies
SU589408A1 (en) Method of mining pillars
PL170715B1 (en) Method and device for making mining longwall surfaces
PL152254B1 (en) Deposit mining method
PL75636B2 (en)
SU960450A1 (en) Method of preventing sudden outbursts of coal, rock or gas in preparotary workings
PL159027B1 (en) A method for ventilation of the blind headings and an installation for ventilation therefor
SU1145149A1 (en) Method of supporting a longwall in areas of unsafe roof strata of rock
PL165963B1 (en) Method of exploitation of deposits
PL161121B2 (en) Method for preparation of a transporting path
PL55220B1 (en)