PL78908B2 - - Google Patents

Download PDF

Info

Publication number
PL78908B2
PL78908B2 PL16003372A PL16003372A PL78908B2 PL 78908 B2 PL78908 B2 PL 78908B2 PL 16003372 A PL16003372 A PL 16003372A PL 16003372 A PL16003372 A PL 16003372A PL 78908 B2 PL78908 B2 PL 78908B2
Authority
PL
Poland
Prior art keywords
chamber
pillars
thickness
upper layer
deposit
Prior art date
Application number
PL16003372A
Other languages
Polish (pl)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to PL16003372A priority Critical patent/PL78908B2/pl
Publication of PL78908B2 publication Critical patent/PL78908B2/pl

Links

Landscapes

  • Aiming, Guidance, Guns With A Light Source, Armor, Camouflage, And Targets (AREA)

Description

Pierwszenstwo: Zgloszenie ogloszono: 15.10.1973 Opis patentowy opublikowano: 10.06.1975 78908 U. 5b,41/06 MKP E21c 41/06 CZYTELNIA Urzedu Patentowego Twórcawynalazku: Kazimierz Krasiczynski Uprawniony z patentu tymczasowego: Akademia Górniczo-Hutnicza im. Stanislawa Staszica, Kraków (Polska) Sposób eksploatacji zlóz rud o miazszosci powyzej 4,5 m Przedmiotem wynalazku jest sposób eksploatacji zwiezlych zlóz rud o miazszosci powyzej 4,5 m, znajdujacy zastosowanie zwlaszcza przy eksploatacji rud miedzi.Znane sa jedno- i dwufazowe, komorowo-filarowe oraz komorowe systemy eksploatacji zlóz rud. Sposoby te polegaja na wybieraniu zlóz komorami, pomiedzy którymi pozostawione sa filary zloza, sluzace jako podparcie stropu.Wada tych sposobów jest to, ze niektóre maszyny samojezdne, stosowane do wybierania zlóz o sredniej miazszosci, nie moga byc uzyte do wybierania zlóz o duzej miazszosci, powyzej 4,5 m.Znane sa równiez systemy eksploatacji zlóz o duzej miazszosci, polegajace na wypuszczaniu odstrzelonej rudy lejami zsypowymi do chodników odstawczych.Wadami tych systemów sa znaczne straty eksploatacyjne, wynikajace z koniecznosci pozostawienia rudy wokól lejów zsypowych w przypadku, jesli chodniki odstawcze wykonywane sa w zlozu. Natomiast wykonanie chodników odstawczych pod zlozem, powoduje podwyzszenie kosztów eksploatacyjnych. Ponadto wada tych sposobów jest duze zubozenie zloza, wynikajace z mieszania sie skal, ulegajacych zawalowi, z urobkiem.Celem wynalazku jest usuniecie powyzszych wad przy wybieraniu zloza rud o miazszosci powyzej 4,5 m.Cel ten osiagnieto za pomoca sposobu, który polega na tym, ze zloze wybiera sie dwiema warstwami, przy czym warstwe górna wybiera sie znanym sposobem komorowo-filarowym jednofazowym, zas warstwe dolna wybiera sie ze spogu warstwy górnej za pomoca skarp, usytuowanych w komorze, znajdujacej sie w warstwie dolnej oraz w niewielkiej czesci zloza miedzy filarami. Skarpy z komorze prowadzi sie miedzy chodnikami, zas skarpe miedzy filarami, wybiera sie od strony zawalu w kierunku komory, zawsze z wyprzedzeniem skarpy w komorze. Wyeksploatowane^przestrzenie i chodniki odstawcze, o wysokosci równej miazszosci calego zlpza, polaczone przecinkami z chodnikami odstawczymi, o wysokosci równej miazszosci warstwy górnej, likwidowane sa w miare postepu eksploatacji w wyniku zawalu stropu wskutek rozstrzeliwania dolnych czesci filarów.Zaleta eksploatacji zlóz rud sposobem wedlug wynalazku jest mozliwosc wybierania zloza o miazszosci przekraczajacej 4,5 m oraz zastosowanie do tego celu maszyn samojezdnych.2 78 908 Sposób eksploatacji zlóz rud o miazszosci powyzej 4,5 m, wedlug wynalazku ilustruje rysunek, na którym fig. 1 przedstawia schematycznie zloze w przekroju pionowym, fig. 2 — zloze w przekroju wzdluz linii A—A, a fig. 3 — zloze w przekroju wzdluz linii B-B.Sposób wedlug wynalazku polega na tym, ze po wykonaniu polaczonych przecinkami 1 i oddzielonych filarami 2 chodników odstawczych 3, wysokich na cala miazszosc zloza oraz chodników odstawczych 4, o wysokosci równej miazszosci warstwy górnej, wybiera sie w górnej warstwie zloza, komory 5 i pozostawia filary 6. Po okotwieniu stropu 7, odwierceniu, nabiciu i odstrzeleniu otworów 8 równoleglych do skarp 9, wybiera sie warstwe dolna ze spagu 10 warstwy górnej, uzyskujac urobek 11 na spagu 12 warstwy dolnej. Skarpy 9 usytuowane sa w warstwie dolnej ponizej spagu 10 warstwy górnej w komorze 13 iw niewielkiej czesci zloza 14 miedzy filarami 6. Wybieranie komory 13 poprzedza sie wybieraniem zloza od strony zawalu niewielkich czesci 14 warstwy dolnej, znajdujacych sie ponizej spagu 10, miedzy filarami 6. Filary 6, siegajace po wybraniu warstwy górnej od spagu 10 tej warstwy do stropu 7, po zakonczeniu wybierania warstwy dolnej siegaja od spagu 12 warstwy dolnej do stropu 7. Z kolei po odwierceniu, nabiciu i odstrzeleniu otworów 15, usytuowanych w dolnych czesciach wysokich filarów 16, znajdujacych sie w najblizszym sasiedztwie zawalu, nastepuje likwidacja wybranej przestrzeni w wyniku zawalenia sie stropu na powierzchni 17.W miare postepu eksploatacji chodniki odstawcze 3 polaczone przecinkami 1 z chodnikami odstawczymi 4, sa likwidowane na skutek zawalu stropu, powstalego w wyniku rozstrzeliwania dolnych czesci filarów 2 i 16. PL PLPriority: Application announced: October 15, 1973 Patent description was published: June 10, 1975 78908 U. 5b, 41/06 MKP E21c 41/06 READING ROOM of the Patent Office of the Inventor: Kazimierz Krasiczynski Authorized by the provisional patent: Akademia Górniczo-Hutnicza im. Stanislawa Staszica, Kraków (Poland) Method of exploitation of ore deposits with a thickness of more than 4.5 m The subject of the invention is a method of exploitation of compact ore deposits with a thickness of more than 4.5 m, which is used in particular in the exploitation of copper ores. -pillar and chamber systems of ore deposit exploitation. These methods consist of selecting beds with chambers between which the bed pillars are left to support the ceiling. The disadvantage of these methods is that some self-propelled machines used to extract medium-thick beds cannot be used to select beds of large thickness. more than 4.5 m. There are also systems for the exploitation of deposits with a large thickness, consisting in releasing the blasted ore through chutes to the haulage drifts. The disadvantages of these systems are significant operational losses, resulting from the need to leave the ore around the chutes in the event that are in the deposit. On the other hand, the construction of haulage galleries under the bed causes an increase in operating costs. Moreover, the disadvantage of these methods is the great depletion of the deposit, resulting from the mixing of the collapsing rocks with the excavated material. The purpose of the invention is to eliminate the above-mentioned drawbacks when selecting an ore deposit with a thickness of more than 4.5 m. This objective was achieved by a method which consists in this that the deposit is selected in two layers, the upper layer is selected in the known single-phase chamber-pillar method, and the lower layer is selected from the bottom of the upper layer by means of slopes located in the chamber, located in the lower layer and in a small part of the bed between the pillars . The slopes with the chamber are led between the sidewalks, while the slope between the pillars is selected from the side of the hill towards the chamber, always in advance of the slope in the chamber. Worn-out spaces and retaining walkways, with a height equal to the thickness of the entire joint, connected by commas with retaining walkways, with a height equal to the thickness of the upper layer, are liquidated as the exploitation progresses as a result of the collapse of the ceiling due to the shooting of the lower parts of the pillars. it is possible to select a deposit with a thickness exceeding 4.5 m and the use of self-propelled machines for this purpose.2 78 908 The method of exploitation of ore deposits with a thickness of more than 4.5 m, according to the invention, is illustrated in the drawing, where Fig. 1 schematically shows the deposit in a vertical section Fig. 2 shows a bed along line A-A, and Fig. 3 shows a bed along a section along line BB. The method according to the invention is that after constructing a comma 1 and separated by pillar 2 holding walkways 3, inch high, the thickness of the deposit and holding walkways 4, with a height equal to the thickness of the upper layer, are selected in the upper j the bed layer, chambers 5 and leaves the pillars 6. After the roof 7 is anchored, bored, punched and holes 8 parallel to the slopes 9 are drilled, the bottom layer is selected from the spag 10 of the upper layer, obtaining the excavated material 11 on the spag 12 of the lower layer. The slopes 9 are located in the lower layer below the spag 10 of the upper layer in the chamber 13 and in a small part of the deposit 14 between the pillars 6. The selection of the chamber 13 is preceded by selecting the deposit from the side of the collapse of small parts 14 of the lower layer, located below the spag 10, between the pillars 6. The pillars 6, after selecting the upper layer, from spag 10 of this layer to the ceiling 7, after finishing the excavation of the lower layer, they extend from spag 12 of the lower layer to the ceiling 7. Then, after drilling, punching and shooting holes 15, located in the lower parts of the high pillars 16 , located in the immediate vicinity of the collapse, the selected space is liquidated as a result of the collapse of the ceiling on the surface 17. As the exploitation progresses, holding walkways 3 connected by commas 1 with holding walkways 4 are liquidated as a result of the collapse of the ceiling, resulting from the shooting of the lower parts of the pillars 2 and 16. PL PL

Claims (1)

1. Zastrzezenie patentowe Sposób eksploatacji zlóz rud, o miazszosci powyzej 4,5 m, znamienny tym, ze zloze wybiera sie dwiema warstwami, przy czym warstwe górna wybiera sie znanym sposobem komorowo-filarowym jednofazowym, zas warstwe dolna wybiera sie ze spagu warstwy górnej za pomoca skarp, usytuowanych w komorze, znajdujacej sie w warstwie dolnej oraz w niewielkiej czesci zloza miedzy filarami, przy czym skarpy w komorze prowadzi sie miedzy chodnikami, zas skarpe miedzy filarami wybiera sie od strony zawalu w kierunku komory, zawsze z wyprzedzeniem skarpy w komorze a wyeksploatowane przestrzenie i chodniki odstawcze, o wysokosci równej miazszosci calego zloza, polaczone przecinkami z chodnikami odstawczymi, o wysokosci równej miazszosci warstwy górnej, likwiduje sie w miare postepu eksploatacji w wyniku zawalu stropu wskutek rozstrzeliwania dolnych czesci filarów. figj. ty 5 Prac. Poligraf. UP PRL. Zam. 2677/75 naklad 120+18 x Cena 10 zl PL PL1. Patent claim A method of exploiting ore deposits with a thickness of more than 4.5 m, characterized in that the deposit is selected in two layers, the upper layer is selected by the known single-phase chamber-pillar method, and the lower layer is selected from the upper layer by by means of slopes located in the chamber, located in the bottom layer and in a small part of the bed between the pillars, while the slopes in the chamber are led between pavements, while the slope between the pillars is selected from the side of the collapse towards the chamber, always ahead of the slope in the chamber and depleted spaces and retaining walkways, with a height equal to the thickness of the entire deposit, connected by commas with retaining walkways, with a height equal to the thickness of the upper layer, are liquidated as the exploitation progresses as a result of the collapse of the ceiling due to the shooting of the lower parts of the pillars. fig. you 5 works. Typographer. UP PRL. Order 2677/75 edition 120 + 18 x Price PLN 10 PL PL
PL16003372A 1972-12-29 1972-12-29 PL78908B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PL16003372A PL78908B2 (en) 1972-12-29 1972-12-29

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PL16003372A PL78908B2 (en) 1972-12-29 1972-12-29

Publications (1)

Publication Number Publication Date
PL78908B2 true PL78908B2 (en) 1975-06-30

Family

ID=19961254

Family Applications (1)

Application Number Title Priority Date Filing Date
PL16003372A PL78908B2 (en) 1972-12-29 1972-12-29

Country Status (1)

Country Link
PL (1) PL78908B2 (en)

Similar Documents

Publication Publication Date Title
PL78908B2 (en)
RU2184850C1 (en) Method of underground mining of thick flat deposits of low-hardness ores
RU2790648C1 (en) Method for underground development of steeping ore bodies in descenting order with chamber system
SU1456579A1 (en) Method of mining sloping ore bodies
RU2036308C1 (en) Method for combination mining of mineral deposit
SU1765408A1 (en) Method at mining steep medium-thickness mineral deposit seams
SU1456572A1 (en) Method of mining mineral deposits
SU1765409A1 (en) Method of effectuating split openings during mining of thick flat mineral deposit seams
SU1335701A1 (en) Method of underground mining of ore deposits
PL199120B1 (en) Method of mining of compact beds
PL118532B1 (en) Method of exploiting steep deposit of minerals in particular of bariteazom baritovykh mestorozhdenijj
SU939752A1 (en) Method of working thick gently-sloping beds
Dzięgiel Podziemne trasy turystyczne w Tarnowskich Górach (Górny Śląsk)//The Underground Tourist Trails in Tarnowskie Góry (Upper Silesia, Poland)
PL200001B1 (en) Method for shortwall working of low thickness beds
PL189249B1 (en) Method of mining copper ore deposits
PL136678B1 (en) Method of getting minerals from thick deposits
PL77029B2 (en)
PL199089B1 (en) Method of mining of low seam thickness deposits
PL148681B1 (en) Method of mining thick beds of minerals
PL165963B1 (en) Method of exploitation of deposits
PL152779B1 (en) A method for mining thick deposits
PL61978B1 (en)
PL156694B1 (en) Two-layer method for mining thick or very thick copper ore deposits
PL82871B2 (en)
PL155022B1 (en) The method of exploitation with the chamber system of thick deposits, especially of chemical raw materials