PL88886B1 - - Google Patents

Download PDF

Info

Publication number
PL88886B1
PL88886B1 PL14136870A PL14136870A PL88886B1 PL 88886 B1 PL88886 B1 PL 88886B1 PL 14136870 A PL14136870 A PL 14136870A PL 14136870 A PL14136870 A PL 14136870A PL 88886 B1 PL88886 B1 PL 88886B1
Authority
PL
Poland
Prior art keywords
supporting
pillar
pillars
exploitation
unit
Prior art date
Application number
PL14136870A
Other languages
Polish (pl)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to PL14136870A priority Critical patent/PL88886B1/pl
Publication of PL88886B1 publication Critical patent/PL88886B1/pl

Links

Landscapes

  • Bridges Or Land Bridges (AREA)
  • Lining And Supports For Tunnels (AREA)

Description

Przedmiotem wynalazku jest sposób eksploatacji zlóz mineralów systemem komorowo-filarowym z zawalem stropu.Dotychczasowy sposób eksploatacji systemem ko¬ morowo-filarowym* z zawalem stropu .polega na roz¬ cieciu zloza w pierwszej fazie eksploatacji chodni¬ kami na bloki, które nastepnie wybiera sie czescio¬ wo, prowadzac wyrobiska komorowe po rozciaglos¬ ci równolegle do linii zrobów, a nastepnie prosto¬ padle do tej linii. W wyniku tego utworzone zo¬ staja kostki zloza stanowiace oporowe filary, które w koncowej fazie eksploatacji rozstrzeliwuje sie w celu wywolania zawalu. Tein sposób eksploatacji jest nieekonomiczny, poniewaz nie daje mozliwosci calkowitego wybrania zloza, które w czesci zawar- ttej w oporowych filarach przeznacza sie na straty.Celem wynalazku jest wyeliminowanie tych strat lub ich zmniejszenie, .poprzez opracowanie nowego sposobu eksploatacji umozliwajacego wybieranie o- porowych filarów w systemie komorowo-filarowym z zawalem stropu. Sposób ten polega na tym, ze po rozcieciu zloza chodnikami na bloki i ich czescio¬ wym wyeksploatowaniu z pozostawieniem oporo¬ wych filarów ustawia sie otook oporowych filarów najkorzystniej najpierw obok filarów znajdujacych sie najblizej zrobów co najmniej dwa lub trzy pod¬ porowe zespoly, z których pierwszy podporowy zes¬ pól ustawia sie pomiedzy oporowym filarem, który ma byc wyeksploatowany, a calizne zloza, nato¬ miast drugi podporowy zespól ustawia sie pomie¬ lo dzy pierwszym oporowym filarem, a drugim sa¬ siednim filarem. Taki sposób ustawienia podporo¬ wych zespolów umozliwia dobry dostep dla ma¬ szyny urabiajacej oraz bezpieczne i szybkie wybra¬ nie oporowego filara.[Po wyeksploatowaniu pierwszego filara pierwszy- podporowy zespól przesuwa i ustawia sie pomie¬ dzy dwoma nastepnymi filarami oporowymi, a dru%- gi podporowy zespól przesuwa i ustawia sie pomie¬ dzy oporowym filarem sasiednim w stosunku do wyeksploatowanego uprzednio pierwszego filara, a calizne zloza celem wyeksploatowania nastepnego filara. Czynnosci te powtarza sie az do wyeksploato¬ wania wszystkich oporowych filarów w bloku, przy czym powstala po wybraniu oporowych filarów przestrzen przeznacza sie na zawal. W przypadku zastosowania trzech lub wiecej .podporowych zespo¬ lów, kafzdy nastepny z zespolów ustawia sie na przemian pomiedzy sasiednimi dwoma oporowymi filarami oraz pomiedzy oporowym filarem a caliz¬ na, dla umozliwienia jednoczesnego eksploatowania dwóch lub wiecej oporowych filarów.Taki sposób eksploatacji zlóz umozliwia calkowi¬ te wyeksploatowanie zloza, lub znaczne ogranicze¬ nie jego strat przy jednoczesnym zachowaniu nie¬ zbednych warunków bezpieczenstwa pracy.Przedmiot wynalazku wyjasniony jest blizej na rysunku na którym fig. 1 przedstawia przyklado¬ wy schemat systemu filarowo-komorowego z usta¬ wionymi podporowymi zespolami, fig. 2 — poszcze- 88 8863 88 886 4 gólne fazy eksploatacji oporowych filarów i prze- m ieszczania podporowych zespolów i fig. 3 — sche¬ mat eksploatacji oporowych filarów wiecej niz dwoma podporowymi zespolami.Jak uwidoczniono na fig. 1, po rozcieciu zloza na 'bloki 1 eksploatuje sie je czesciowo, prowadzac wy¬ robiska równolegle do linii zrobów, a nastepnie prostopadle do tej Knii. W iten sposób pozostawio¬ na zostaje nie wyeksploatowana czesc zloza stano¬ wiaca oporowe filary 2.Dla wyeksploatowania oporowych filarów 2 usta¬ wia sie obok tego filara, który ma byc wybrany, podporowe zespoly 3 w ten sposób, ze pierwszy podporowy zespól 3a ustawia sie pomiedzy oporo¬ wym filajrem 2p, a calizna 4 zloza. Natomiast dru¬ gi podporowy zespól 3b ustawia sie pomiedzy pier¬ wszym oporowym filarem 2a a sasiednim oporowym filarem 2b. Po wyeksploatowaniu oporowego filara 2a i Wycofaniu obu zespolów podporowych 3a i 3b uzyskana przestrzen przeznacza sie na zawal. Na fig. 2 pokazano kolejne fazy eksploatacji oporo¬ wych filarów 2 i przemieszczania podporowych ze¬ spolów 3.Jak przedstawiono na fig. 1 po wyeksploatowa¬ niu pierwszego oporowego filara 2a (faza I) pierw¬ szy podporowy zespól 3a przesuwa i ustawia sie pomiedzy dwoma nastepnymi oporowymi filarami 2b i 2c (faza II), natomiast drugi podporowy zes¬ pól 3b przesuwa sie i ustawia pomiedzy oporowym filarem 2b a calizna 4 zloza (faza III) co umozliwia wyeksploatowanie oporowego filara 2b. Czynnosci te powtarza sie az do wyeksploatowania wszystkich oporowych filarów 2. W przypadku zastosowania trzech lub wiecej podporowych zespolów 3, kazdy nastepny podporowy zespól 3 ustawia sie na prze¬ mian pomiedzy sasiadujacymi oporowymi filarami 2c i 2d oraz pomiedzy oporowym filarem 2e i cali¬ zna 4 co pokazano na fig. 3. i l- '^i PLThe subject of the invention is a method of exploitation of mineral deposits with a chamber and pillar system with a collapse of the roof. The previous method of exploitation with a chamber and pillar system with a collapse of the ceiling consists in cutting the deposit in the first phase of exploitation with chippers into blocks, which are then selected partially Leading the chamber pits along an extension parallel to the line of the goafs and then perpendicularly to this line. As a result, deposit cubes are formed, constituting supporting pillars, which in the final stage of exploitation are shot to cause a collapse. This method of exploitation is uneconomical because it does not make it possible to completely select the deposit, which in the part contained in the supporting pillars is spent on losses. The aim of the invention is to eliminate these losses or reduce them by developing a new method of exploitation enabling the selection of porous pillars. in a chamber and pillar system with a collapse of the ceiling. This method consists in cutting the deposit into blocks with pavements and their partial exploitation, leaving the resistance pillars, most preferably, first, next to the pillars closest to the goafs, at least two or three supporting units, of which the first support assembly is positioned between the abutment pillar to be exploited and the overall bed, and the second support assembly is positioned between the first abutment pillar and the second adjacent pillar. This way of positioning the supporting units enables good access for the cutting machine and safe and quick selection of the supporting pillar. [After the first pillar is worn out, the first-supporting unit moves and positions itself between the next two supporting pillars, and the second - The second support assembly moves and positions itself between the abutting pillar adjacent to the previously exploited first pillar, and the entire bed in order to exploit the next pillar. These activities are repeated until all the supporting pillars in the block have been ejected, and the space created after the selection of the supporting pillars is allocated to the collapse. When three or more supporting units are used, the next unit is alternately positioned between the adjacent two supporting pillars and between the supporting pillar and the body to allow simultaneous operation of two or more supporting pillars. This exploitation of the deposit, or significant reduction of its losses while maintaining the necessary safety conditions. The subject of the invention is explained in more detail in the drawing in which Fig. 1 shows an exemplary diagram of a pillar-chamber system with set support units, Fig. 2 - individual operating phases of the supporting pillars and the displacement of the supporting units, and Fig. 3 - the operating scheme of the supporting pillars more than with two supporting units. As shown in Fig. 1, after cutting the bed, for blocks 1, they are partially mined, while the pits are run parallel to the goaf line, an right perpendicular to this Knii. In this way, the part of the bed constituting the supporting pillars 2 is left unexploited. For the exploitation of the supporting pillars 2, next to the pillar to be selected, the support units 3 are positioned so that the first supporting unit 3a is positioned. between the resistance filament 2p and the entire bed. The second support unit 3b, on the other hand, is positioned between the first support pillar 2a and the adjacent support pillar 2b. After the abutment pillar 2a has been exploited and the two support units 3a and 3b withdrawn, the obtained space is allocated to the cave. Fig. 2 shows the successive phases of the operation of the supporting pillars 2 and the displacement of the supporting units 3. As shown in Fig. 1, after the first supporting pillar 2a (phase I) has been used up, the first supporting unit 3a moves and positions itself between two further supporting pillars 2b and 2c (phase II), while the second supporting set of section 3b moves and positions between the supporting pillar 2b and the entire bed (stage III) which allows the exploitation of the supporting pillar 2b. These activities are repeated until all the supporting pillars 2 are worn out. In the case of using three or more supporting units 3, each next supporting unit 3 is positioned alternately between adjacent supporting pillars 2c and 2d and between the supporting pillars 2e and the whole 4 as shown in Fig. 3. and 1- '^ and PL

Claims (1)

1. Zastrzezenie patentowe Sposób eksploatacji zlóz mineralów systemem ko¬ morowo^filarowym z zawalem stropu, polegajacy na rozcieciu zloza w pierwszej fazie eksploatacji chodnikami na prostokatne bloki, w drugiej fazie 10 na czesciowym wybraniu bloku z pozostawieniem oporowych filarów, znamienny tym, ze obok oporo¬ wych filarów (2).najkorzystniej najpierw obok fi¬ larów znajdujacych sie najblizej zrobów ustawia sie co najmniej dwa podporowe zespoly (3), z któ- 15 rych pierwszy podporowy zespól (3a) ustawia sie pomiedzy eksploatowanym oporowym filarem (2a) a calizna (4), natomiast drugi podporowy zespól (3b) pomiedzy eksploatowanym oporowym filarem (2a), a sasiednim oporowym filarem (2b), a nastep- 20 nie po wyeksploatowaniu oporowego filara (2a), pierwszy podporowy zespól (3a) przesuwa i usta¬ wia-sie pomiedzy dwoma nastepnymi oporowymi fi¬ larami (2b i 2c), natomiast drugi podporowy zespól (3b) przesuwa i ustawia sie pomiedzy sasiednim w 25 stosunku do wyeksploatowanego filara (2a) oporo¬ wym filarem (2b) a calizna (4), dla wyeksploatowa¬ nia nastepnego oporowego filara (2b), po czym czyn¬ nosci te powtarza sie, az do wyeksploatowania wszystkich oporowych filarów (2), przy czym w 30 przypadku zastosowania trzech lub wiecej podpo¬ rowych zespolów (3), kazdy nastepny z zespolów (3) ustawia sie na przemian pomiedzy sasiednimi dwo¬ ma oporowymi filarami (2) i pomiedzy oporowym filarem (2) a calizna (4) dla jednoczesnego eksplo- 35 atowania wiecej niz jednego oporowego filara (2). hB-B ? Fig. 188 886 ~Tq ? i4ei n ii Fig.Z lii CZY i -ILi-JlA f Urzedo Pai«--rt»w«go hltUs] beczw! '* PL1. Patent claim A method of exploitation of mineral deposits in a chamber and pillar system with a collapse of the roof, consisting in cutting the deposit in the first phase of exploitation with pavements into rectangular blocks, in the second phase 10 on a partial block extraction with retaining pillars remaining, characterized by Of the pillars (2). Preferably, first, next to the pillars closest to the goafs, at least two support units (3) are set up, from which the first support unit (3a) is positioned between the used supporting pillar (2a) and the whole body (4), while the second support unit (3b) between the used supporting pillar (2a) and the adjacent supporting pillar (2b), and then after the exploitation of the supporting pillar (2a), the first supporting unit (3a) moves and adjusts there is a connection between the next two supporting pillars (2b and 2c), while the second supporting unit (3b) moves and positions itself between the neighboring one in relation to the exploited pillar (2a), the plumbing pillar (2b) and the total (4), for the exploitation of the next abutment pillar (2b), then these steps are repeated until all the abutment pillars (2) are consumed, and in the case of using three or more supporting units (3), each successive unit (3) alternates between adjacent two supporting pillars (2) and between a supporting pillar (2) and the whole (4) for simultaneous operation of more than one retaining pillar (2). hB-B? Fig. 188 886 ~ Tq i4ei n ii Fig. Z lii CZY i -ILi-JlA f Urzedo Pai «- rt» w «go hltUs] bkw! '* PL
PL14136870A 1970-06-16 1970-06-16 PL88886B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PL14136870A PL88886B1 (en) 1970-06-16 1970-06-16

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PL14136870A PL88886B1 (en) 1970-06-16 1970-06-16

Publications (1)

Publication Number Publication Date
PL88886B1 true PL88886B1 (en) 1976-10-30

Family

ID=19951872

Family Applications (1)

Application Number Title Priority Date Filing Date
PL14136870A PL88886B1 (en) 1970-06-16 1970-06-16

Country Status (1)

Country Link
PL (1) PL88886B1 (en)

Similar Documents

Publication Publication Date Title
PL88886B1 (en)
RU2005125487A (en) METHOD FOR DEVELOPING STEEL-FALLING AND INCLINED DEPOSITS OF SMALL AND MEDIUM POWER
RU99113557A (en) METHOD FOR DEVELOPING SLIDING AND INCLINED COAL FORMS OF MEDIUM POWER
RU2002133710A (en) METHOD FOR THE DEVELOPMENT OF MINERAL FOSSIL LAYERS
PL152779B1 (en) A method for mining thick deposits
SU684142A1 (en) Method of exacavating roof-supporting ore pillars
SU1566024A1 (en) Method of working series of thin coal strata and strata of middle capacity
RU2090757C1 (en) Method of prevention of sudden outbursts of salt and gas
PL78635B2 (en)
SU1765408A1 (en) Method at mining steep medium-thickness mineral deposit seams
PL150826B1 (en) Method of mining very thick ore deposits
PL118532B1 (en) Method of exploiting steep deposit of minerals in particular of bariteazom baritovykh mestorozhdenijj
PL75372B2 (en)
SU1481402A1 (en) Method of winning coal at stepped-roof face
SU693017A1 (en) Method of mining mineral deposits
Brino et al. Technical-economical comparison between excavation by D&B and by roadheader in two underground gypsum quarries
RU1788256C (en) Method for mining and inclined coal seams of medium thickness
SU901529A1 (en) Method for working thick ore deposits
PL43183B1 (en)
PL189135B1 (en) Breast-and-pillar clean working method used in getting minerals from their deposits
RO112205B1 (en) Exploitation method for cemented ores recovery and of the rich embankments from old coal-faces
PL123562B1 (en) Method of mining thick ore deposits
PL146607B1 (en) Method of mining a coal longwall provided with self-advancing roof supports
RU1789021C (en) Method for mine construction
PL181519B1 (en) Method of exploitation of a thin ore deposit