TWI678306B - 時刻表作成裝置及自動列車控制系統 - Google Patents
時刻表作成裝置及自動列車控制系統 Download PDFInfo
- Publication number
- TWI678306B TWI678306B TW107136164A TW107136164A TWI678306B TW I678306 B TWI678306 B TW I678306B TW 107136164 A TW107136164 A TW 107136164A TW 107136164 A TW107136164 A TW 107136164A TW I678306 B TWI678306 B TW I678306B
- Authority
- TW
- Taiwan
- Prior art keywords
- timetable
- train
- information
- station
- change
- Prior art date
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/40—Business processes related to the transportation industry
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L27/00—Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
- B61L27/10—Operations, e.g. scheduling or time tables
- B61L27/12—Preparing schedules
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L27/00—Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
- B61L27/10—Operations, e.g. scheduling or time tables
- B61L27/14—Following schedules
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L27/00—Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
- B61L27/10—Operations, e.g. scheduling or time tables
- B61L27/16—Trackside optimisation of vehicle or train operation
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Human Resources & Organizations (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Tourism & Hospitality (AREA)
- Marketing (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Physics & Mathematics (AREA)
- Mechanical Engineering (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Development Economics (AREA)
- Educational Administration (AREA)
- Game Theory and Decision Science (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Train Traffic Observation, Control, And Security (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2017-200250 | 2017-10-16 | ||
| JP2017200250A JP7066365B2 (ja) | 2017-10-16 | 2017-10-16 | ダイヤ作成装置および自動列車制御システム |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| TW201922550A TW201922550A (zh) | 2019-06-16 |
| TWI678306B true TWI678306B (zh) | 2019-12-01 |
Family
ID=66174419
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| TW107136164A TWI678306B (zh) | 2017-10-16 | 2018-10-15 | 時刻表作成裝置及自動列車控制系統 |
Country Status (6)
| Country | Link |
|---|---|
| US (1) | US11803930B2 (fr) |
| EP (1) | EP3699060B1 (fr) |
| JP (1) | JP7066365B2 (fr) |
| AU (1) | AU2018353633B2 (fr) |
| TW (1) | TWI678306B (fr) |
| WO (1) | WO2019078025A1 (fr) |
Families Citing this family (27)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP7399627B2 (ja) * | 2019-04-25 | 2023-12-18 | 株式会社日立製作所 | ダイヤ作成装置、ダイヤ作成方法、及び自動車両制御システム |
| CN110688982B (zh) * | 2019-10-14 | 2022-07-01 | 重庆邮电大学 | 基于目标检测技术和aco-bp算法的智能轨道交通时间控制方法 |
| WO2021106042A1 (fr) * | 2019-11-25 | 2021-06-03 | 日本電気株式会社 | Dispositif de détermination d'opération, procédé de détermination d'opération, et support d'enregistrement |
| JP7200085B2 (ja) | 2019-12-02 | 2023-01-06 | 株式会社日立製作所 | ダイヤ作成システム、及びダイヤ作成方法 |
| JP7332524B2 (ja) * | 2020-04-02 | 2023-08-23 | トヨタ自動車株式会社 | 自律走行車両の運行管理装置及び運行管理方法 |
| JP7376413B2 (ja) * | 2020-04-02 | 2023-11-08 | トヨタ自動車株式会社 | 自律走行車両の運行管理装置及び運行管理方法 |
| JP7315510B2 (ja) * | 2020-04-02 | 2023-07-26 | トヨタ自動車株式会社 | 自律走行車両の運行管理装置及び運行管理方法 |
| WO2021220425A1 (fr) * | 2020-04-28 | 2021-11-04 | 日本電気株式会社 | Dispositif de sortie de risque de correction, procédé de sortie de risque de correction et programme de sortie de risque de correction |
| JP7416680B2 (ja) * | 2020-10-21 | 2024-01-17 | 株式会社日立製作所 | 運行計画変更支援装置、運行計画変更支援方法、および運行計画変更支援プログラム |
| WO2022097207A1 (fr) * | 2020-11-04 | 2022-05-12 | 三菱電機株式会社 | Système ferroviaire, dispositif de gestion d'exploitation, procédé de gestion d'exploitation et programme de gestion d'exploitation |
| JP7520706B2 (ja) * | 2020-12-17 | 2024-07-23 | 株式会社日立製作所 | 運行支援システムおよび運行支援方法 |
| CN112793631B (zh) * | 2021-01-07 | 2021-07-06 | 北京交通大学 | 一种列车退出正线运营条件下的地铁行车调整方法及系统 |
| CN112874586B (zh) * | 2021-01-28 | 2022-10-21 | 浙江众合科技股份有限公司 | 一种城市轨道交通智能列车时刻表匹配方法及电子设备 |
| CN113033978A (zh) * | 2021-03-10 | 2021-06-25 | 北京嘀嘀无限科技发展有限公司 | 停车风险确定方法、位置推荐方法、装置和电子设备 |
| JP7629332B2 (ja) * | 2021-04-12 | 2025-02-13 | 株式会社日立製作所 | ダイヤ変更支援システム、交通システム及びダイヤ変更支援方法 |
| JP7632044B2 (ja) * | 2021-05-12 | 2025-02-19 | 日産自動車株式会社 | デマンド型交通システムの配車車両選定方法及びデマンド型交通システムの配車車両選定装置 |
| JP7693430B2 (ja) * | 2021-07-15 | 2025-06-17 | 株式会社日立製作所 | 運行提案システム、及び運行提案作成方法 |
| CN113658429B (zh) * | 2021-08-11 | 2022-06-07 | 青岛海信网络科技股份有限公司 | 一种公交廊道的协同调度方法及相关装置 |
| CN113442974B (zh) * | 2021-08-19 | 2022-08-02 | 湖南中车时代通信信号有限公司 | 基于平高峰转换算法的列车运行图编制方法及装置 |
| JP7666251B2 (ja) * | 2021-09-07 | 2025-04-22 | 株式会社オートネットワーク技術研究所 | 車載システム、車載装置、及びソフトウェア切替方法 |
| EP4152225A1 (fr) * | 2021-09-21 | 2023-03-22 | Siemens Rail Automation S.A.U. | Intelligence artificielle pour opération sensible de gestion de parc de véhicules |
| JP2023063844A (ja) * | 2021-10-25 | 2023-05-10 | 日本電気株式会社 | 制御システム、制御方法およびプログラム |
| US20240359716A1 (en) * | 2021-11-11 | 2024-10-31 | Mitsubishi Electric Corporation | Automatic train operation assistance device, automatic train operation assistance system, and automatic train operation assistance method |
| CN113968264B (zh) * | 2021-12-08 | 2023-10-31 | 卡斯柯信号有限公司 | 多场段协调的城市轨道交通出入库运行线编制方法 |
| JP7657165B2 (ja) * | 2022-02-10 | 2025-04-04 | 三菱電機株式会社 | 運行調整装置、運行管理装置、運行調整方法および運行調整プログラム |
| JP2024063396A (ja) | 2022-10-26 | 2024-05-13 | 株式会社日立製作所 | 運行計画作成装置、運行計画作成システム及び運行計画作成方法 |
| EP4557188A1 (fr) * | 2023-11-16 | 2025-05-21 | Hitachi, Ltd. | Procédé et système de prédiction de flux de passagers dans un système de transport |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103732471A (zh) * | 2011-09-27 | 2014-04-16 | 株式会社日立制作所 | 资源运用计划制作装置及其方法、以及程序 |
| CN105270446A (zh) * | 2014-07-17 | 2016-01-27 | 株式会社日立制作所 | 列车管理系统 |
| CN105377664A (zh) * | 2013-06-14 | 2016-03-02 | 株式会社日立制作所 | 交通需要控制装置 |
| CN105984478A (zh) * | 2015-03-17 | 2016-10-05 | 株式会社日立制作所 | 交通系统模拟器和交通系统模拟方法 |
| EP3100930A1 (fr) * | 2014-01-31 | 2016-12-07 | Hitachi, Ltd. | Système et procédé de fourniture d'informations |
Family Cites Families (39)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS5945546B2 (ja) * | 1976-11-02 | 1984-11-07 | 川崎重工業株式会社 | 列車群運転調整方式 |
| JPH04107635A (ja) * | 1990-08-29 | 1992-04-09 | Hitachi Ltd | 調整方法 |
| JPH09123913A (ja) | 1995-10-27 | 1997-05-13 | Toshiba Corp | 輸送管理システム |
| US6799097B2 (en) * | 2002-06-24 | 2004-09-28 | Modular Mining Systems, Inc. | Integrated railroad system |
| US7188057B2 (en) * | 2002-08-02 | 2007-03-06 | Kennebec, Inc. | Systems and methods for designing, simulating and analyzing transportation systems |
| US9950722B2 (en) * | 2003-01-06 | 2018-04-24 | General Electric Company | System and method for vehicle control |
| US8538611B2 (en) * | 2003-01-06 | 2013-09-17 | General Electric Company | Multi-level railway operations optimization system and method |
| US7725249B2 (en) * | 2003-02-27 | 2010-05-25 | General Electric Company | Method and apparatus for congestion management |
| US8154227B1 (en) * | 2003-11-26 | 2012-04-10 | Liontech Trains Llc | Model train control system |
| JP4448363B2 (ja) | 2004-03-31 | 2010-04-07 | 三菱電機株式会社 | 列車運行管理システム |
| US8700438B1 (en) * | 2005-04-28 | 2014-04-15 | Southwest Airlines Co. | Constraint-based schedule generation for transportation resources |
| JP2006327239A (ja) | 2005-05-23 | 2006-12-07 | Toshiba Corp | 列車ダイヤ作成支援装置、プログラム及び方法 |
| JP4670081B2 (ja) * | 2005-07-05 | 2011-04-13 | 株式会社日立製作所 | 運転整理案作成装置 |
| JP4727459B2 (ja) | 2006-03-09 | 2011-07-20 | 公益財団法人鉄道総合技術研究所 | プログラム及び列車ダイヤ作成装置 |
| US9376971B2 (en) * | 2006-03-20 | 2016-06-28 | General Electric Company | Energy management system and method for vehicle systems |
| JP2008184032A (ja) | 2007-01-30 | 2008-08-14 | Mitsubishi Electric Corp | ダイヤ作成装置 |
| EP2093698A1 (fr) * | 2008-02-19 | 2009-08-26 | British Telecommunications Public Limited Company | Analyse de congestion des foules |
| EP2453041B1 (fr) | 2010-11-10 | 2014-02-12 | Atotech Deutschland GmbH | Solution et procédé pour le prétraitement de surfaces de cuivre à l'aide d'un composé N-alcoxylé qui favorise l'adhésion |
| JP5618857B2 (ja) * | 2011-02-15 | 2014-11-05 | 株式会社日立製作所 | 資源運用計画作成装置および資源運用計画作成方法 |
| US9205851B2 (en) * | 2011-10-19 | 2015-12-08 | Mitsubishi Electric Corporation | Speed profile creation device and automatic train operation apparatus |
| US20140012498A1 (en) * | 2012-03-19 | 2014-01-09 | Thomas F. Gustafson | Informed Traveler Program and Application |
| JP5882831B2 (ja) | 2012-05-22 | 2016-03-09 | 株式会社日立製作所 | 列車及び移動体の表示方法、運行把握装置、及び運行管理システム |
| JP2014040161A (ja) * | 2012-08-22 | 2014-03-06 | Hitachi Ltd | 運転整理業務支援装置及び方法 |
| US20140088865A1 (en) * | 2012-09-27 | 2014-03-27 | Siemens Industry, Inc. | Apparatus and method for predicting arrival times in a transportation network |
| WO2014061111A1 (fr) * | 2012-10-17 | 2014-04-24 | 株式会社日立製作所 | Système d'analyse de transport |
| US9171345B2 (en) * | 2013-02-15 | 2015-10-27 | Norfolk Southern Corporation | System and method for terminal capacity management |
| JP6062790B2 (ja) | 2013-04-19 | 2017-01-18 | 株式会社日立製作所 | ダイヤ修正案生成システム、ダイヤ修正案生成方法、およびダイヤ修正案生成プログラム |
| JP6096596B2 (ja) * | 2013-05-30 | 2017-03-15 | 三菱重工業株式会社 | 運行管理装置、運行管理方法、車両、車両交通システム及びプログラム |
| JP5972829B2 (ja) * | 2013-05-30 | 2016-08-17 | 三菱重工業株式会社 | 運行管理装置、運行管理方法、車両、車両交通システム及びプログラム |
| JP2014237345A (ja) | 2013-06-06 | 2014-12-18 | 三菱電機株式会社 | 旅客案内システム |
| US20150066558A1 (en) * | 2013-08-29 | 2015-03-05 | Thales Canada Inc. | Context aware command and control system |
| WO2015063823A1 (fr) | 2013-10-28 | 2015-05-07 | 株式会社 日立製作所 | Système d'aide à la préparation de programmation de train, et procédé d'aide à la préparation de programmation de train |
| SG11201606294RA (en) * | 2014-01-30 | 2016-08-30 | Gen Electric | A method and system for timetable optimization utilizing energy consumption factors |
| EP4270296B1 (fr) * | 2014-07-14 | 2025-12-10 | Gerrit Böhm | Prédiction de capacité pour véhicules de transport public |
| US10572847B2 (en) * | 2014-10-10 | 2020-02-25 | Conduent Business Services, Llc | Dynamic space-time diagram for visualization of transportation schedule adherence |
| EP3251917B1 (fr) * | 2015-01-27 | 2023-11-15 | Mitsubishi Electric Corporation | Système et procédé de gestion d'informations de train |
| JP6596750B2 (ja) * | 2015-11-25 | 2019-10-30 | 三菱重工エンジニアリング株式会社 | 車両制御システム、走行管理装置、リソース管理装置、車両制御方法、プログラム |
| US20180082586A1 (en) * | 2016-09-21 | 2018-03-22 | Conduent Business Services, Llc | Method and system for real-time prediction of crowdedness in vehicles in transit |
| US10040464B2 (en) * | 2016-10-21 | 2018-08-07 | Westinghouse Air Brake Technologies Corporation | System and method for providing location and navigation services using positive train control data |
-
2017
- 2017-10-16 JP JP2017200250A patent/JP7066365B2/ja active Active
-
2018
- 2018-10-04 WO PCT/JP2018/037266 patent/WO2019078025A1/fr not_active Ceased
- 2018-10-04 EP EP18869344.4A patent/EP3699060B1/fr active Active
- 2018-10-04 US US16/640,875 patent/US11803930B2/en active Active
- 2018-10-04 AU AU2018353633A patent/AU2018353633B2/en active Active
- 2018-10-15 TW TW107136164A patent/TWI678306B/zh active
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103732471A (zh) * | 2011-09-27 | 2014-04-16 | 株式会社日立制作所 | 资源运用计划制作装置及其方法、以及程序 |
| CN105377664A (zh) * | 2013-06-14 | 2016-03-02 | 株式会社日立制作所 | 交通需要控制装置 |
| EP3100930A1 (fr) * | 2014-01-31 | 2016-12-07 | Hitachi, Ltd. | Système et procédé de fourniture d'informations |
| CN105270446A (zh) * | 2014-07-17 | 2016-01-27 | 株式会社日立制作所 | 列车管理系统 |
| CN105984478A (zh) * | 2015-03-17 | 2016-10-05 | 株式会社日立制作所 | 交通系统模拟器和交通系统模拟方法 |
Also Published As
| Publication number | Publication date |
|---|---|
| JP7066365B2 (ja) | 2022-05-13 |
| US20200357091A1 (en) | 2020-11-12 |
| EP3699060A8 (fr) | 2020-11-25 |
| EP3699060C0 (fr) | 2025-09-17 |
| AU2018353633B2 (en) | 2021-07-01 |
| EP3699060B1 (fr) | 2025-09-17 |
| EP3699060A4 (fr) | 2021-07-14 |
| US11803930B2 (en) | 2023-10-31 |
| TW201922550A (zh) | 2019-06-16 |
| JP2019073146A (ja) | 2019-05-16 |
| EP3699060A1 (fr) | 2020-08-26 |
| WO2019078025A1 (fr) | 2019-04-25 |
| AU2018353633A1 (en) | 2020-03-19 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| TWI678306B (zh) | 時刻表作成裝置及自動列車控制系統 | |
| JP5986641B2 (ja) | 交通分析システム | |
| Eberlein et al. | The holding problem with real–time information available | |
| JP6675860B2 (ja) | データ処理方法およびデータ処理システム | |
| JP2019177760A (ja) | 輸送機関混雑予測システム及び混雑予測方法 | |
| Lüthi | Improving the efficiency of heavily used railway networks through integrated real-time rescheduling | |
| JP2019008689A (ja) | 交通需要予測装置、交通需要予測方法、及び交通需要予測プログラム | |
| JP2002187551A (ja) | シミュレーション装置 | |
| CN116842284A (zh) | 无拥堵出行的起始时段确定方法、装置、电子设备及介质 | |
| CN109523064B (zh) | 一种基于多网融合的智能微枢纽 | |
| JP2022098823A (ja) | データ処理方法、データ処理システム | |
| Carrel et al. | A framework for evaluating operations control on a metro line: Integrating multiple perspectives and automatically collected train and passenger movement data | |
| JP2022006482A (ja) | ナビゲーション装置、及びナビゲーション方法 | |
| JP2022502777A (ja) | マルチモーダル交通ネットワークの調整方法 | |
| Sánchez-Martínez | Real-time operations planning and control of high-frequency transit | |
| Rau et al. | Planning and Design of a New Dynamic Autonomous Public Transport System: The DART System in Singapore | |
| Shi et al. | Optimization method of urban rail train operational plan based on OD time-varying demand | |
| JP2020138684A (ja) | 運行計画生成装置、及び運行計画生成方法 | |
| Dobre | Dynamic Management of Traffic and Public Transport at the level of an Integrated Management Center of Urban Mobility | |
| Carrasco et al. | Operational stability and reliability of urban bus routes in Zurich, Switzerland | |
| Das et al. | International Journal of Transportation Science and Technology | |
| Zhu et al. | Integrated Metro Train Scheduling and Passenger Flow Control Under Oversaturated Conditions | |
| Ravichandran | Evaluating the robustness of crew schedules for rail transit systems | |
| Hu et al. | Design and optimisation of emergency bus shuttle services under urban rail transit disruptions | |
| Liang et al. | Elderly-oriented demand-responsive bus route optimisation for multiple vehicle types |