WO2009082802A2 - Procédé de production et d'assemblage de modules de pièces d'habitation et de couvertures destiné à la construction de maisons et autres - Google Patents
Procédé de production et d'assemblage de modules de pièces d'habitation et de couvertures destiné à la construction de maisons et autres Download PDFInfo
- Publication number
- WO2009082802A2 WO2009082802A2 PCT/BR2009/000001 BR2009000001W WO2009082802A2 WO 2009082802 A2 WO2009082802 A2 WO 2009082802A2 BR 2009000001 W BR2009000001 W BR 2009000001W WO 2009082802 A2 WO2009082802 A2 WO 2009082802A2
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- modules
- construction
- metallic
- hydro
- sanitary
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H1/00—Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
- E04H1/005—Modulation co-ordination
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/348—Structures composed of units comprising at least considerable parts of two sides of a room, e.g. box-like or cell-like units closed or in skeleton form
- E04B1/34815—Elements not integrated in a skeleton
- E04B1/34823—Elements not integrated in a skeleton the supporting structure consisting of concrete
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/35—Extraordinary methods of construction, e.g. lift-slab, jack-block
- E04B2001/3577—Extraordinary methods of construction, e.g. lift-slab, jack-block prefabricating a building and moving it as a whole to the erection site
Definitions
- the present invention relates to a process for producing and assembling room modules and construction coverages for building houses and others, in order to drastically reduce the costs and time required to build such houses.
- PRIOR ART DESCRIPTION Especially in poor countries, many people risk their lives building houses in places with high chances of falling down.
- the Brazilian document BR9901980 describes a constructive process for obtaining modular buildings, which consist in the production of totally ready and finished modules. Such modules are pre-mounted in the plant and then are separated and carried to the place of the construction, where they are mounted again in the definitive form, over foundations which are previously prepared in the place of the construction.
- the Brazilian document BR9901947 discloses a process for the construction of prefabricated houses using light panels.
- pillars composed by metallic profiles are used.
- ceramic or wall tiles are applied in the walls of the kitchen and bathroom.
- the remaining parts are mounted, like the metallic structure for receiving the roof coverage, door and window frames, etc.
- Document BR7905647 describes industrialized modulated houses and a process for construction the same developed from constructive elements of small dimensions made of armed concrete and susceptible of production in industrial scale.
- Document BR7802248 refers to prefabricated modulated units for the formation of enclosed spaces in general. Such units comprise a structural floor frame, a structural ceiling or coverage frame, four vertical structural members or columns for intercalating among the structural frames, panels for vertical closure or smooth walls with suitable openings and metallic pipes with a threading end and another flanged end for attaching the structural members.
- the process of the present invention in comparison with the prefabricated modules of the above-mentioned prior art enables a quicker and cost-saving production of ready- to-use modules which are carried to the place of construction totally mounted and containing all sanitary and electrical installations.
- the prior art do not comprise any process able to carry the modules totally ready and finished.
- document BR9901980 refers to modules which are pre-mounted in the plant and then are separated and carried to the place of the construction, where they are mounted again in the definitive form. Such system requires the use of much more time and labor if compared with the process of the present invention.
- the present invention refers to a process for producing and assembling room modules and construction coverages for building houses and others, comprising the manufacture of standardized and finished modules corresponding to at least one room of the .construction, using the same techniques used by the mass production industry for the quick construction of residential structures .
- the modules used in the present invention comprise the walls and the roof, both made of light concrete and containing the hydro-sanitary piping (in the case of bathrooms) and electrical installations duly located and attached in their definitive places. Such modules also have the studs, coatings and painting duly applied.
- the process of the present invention allows the standardization of the modules, since the production is made in a plant with all required resources for the better working performance. Furthermore, the availability of suitable resources, materials and techniques, and also the constant presence of a civil engineer allows for each module being manufactured with high efficiency and quickness .
- the foundation which will receive the modules is concreted in the definitive place of the construction with all inlets and outlets of the hydro-sanitary piping and electrical installations suitably positioned due to the use of moulds together with guide-pins for correctly casing the concrete modules of each room.
- the process of the present invention is used preferably for the construction of one-floored residences, but can also be used for two-floored residences.
- FIG. 1 shows a schematic flowchart of the process of the present invention. Such flowchart represents the production of modules and roof structural parts, and the preparation of the foundation in the place of construction for receiving and fixing the referred modules.
- the process of the present invention comprises two stages (1) and (2) which are executed preferably simultaneously.
- stage (2) The foundation is executed in stage (2), where the inlets and outlets of the hydro-sanitary piping and electrical installations are suitably positioned in the floor, together with the guide-pins for correctly casing the modules of the rooms (4).
- stage (1) which occurs in the plant, the referred modules of the rooms (4) are manufactured in standardized moulds, assembling the metallic structures in metallic moulds (5) and placing, positioning and fixing in the referred metallic structures all the hydro-sanitary piping and electrical installations, as well as the draw-in boxes (6), as defined in the project. Then, the moulds are concreted with light concrete (7) and are demoulded after a period of quick cure (8) . Next, the coatings and sanitary ware (9) are fixed where required, the studs are directly fixed to the monolithic concrete (10) and the painting is applied to the walls and ceiling (11) . Then, the modules are lifted by steel cables using hooks concreted in the referred modules in certain locations foreseen in the project. The modules are placed in trucks to be carried (12) to the place of the construction, where the foundation was executed (3).
- the metallic modules (13) which are used for manufacturing the structure (14) for covering the modules (4) are simultaneously produced in the plant (1) .
- Such metallic modules (13) are also carried to the place of the construction, where the foundation was executed (3) .
- the modules (4) are lifted, suitably positioned (16) and then are encased in the guide-pins of the foundation (3).
- the association among the several modules is completed by using special cramps followed by the connection (17) of hydro-sanitary piping and electrical installations among the modules (4) and the foundation (3) and the connection thereof with the public hydro-sanitary and electrical networks.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Finishing Walls (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
- Automatic Assembly (AREA)
Abstract
L'invention concerne un procédé de production et d'assemblage de modules de pièces d'habitation et de couvertures destiné à la construction de maisons et autres, lequel procédé permet de réduire drastiquement le coût et le temps requis pour construire une maison.
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| BRPI0801081-1 | 2008-01-03 | ||
| BRPI0801081 BRPI0801081A (pt) | 2008-01-03 | 2008-01-03 | sistema de produção e montagem rápida de módulos de cÈmodos e cobertura de edificações para construção de casas ou outros |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| WO2009082802A2 true WO2009082802A2 (fr) | 2009-07-09 |
| WO2009082802A3 WO2009082802A3 (fr) | 2009-09-03 |
Family
ID=39924784
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/BR2009/000001 Ceased WO2009082802A2 (fr) | 2008-01-03 | 2009-01-05 | Procédé de production et d'assemblage de modules de pièces d'habitation et de couvertures destiné à la construction de maisons et autres |
Country Status (2)
| Country | Link |
|---|---|
| BR (1) | BRPI0801081A (fr) |
| WO (1) | WO2009082802A2 (fr) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2026015964A1 (fr) * | 2024-07-17 | 2026-01-22 | Borges Dos Santos Sidnei | Système modulaire monolithique de béton fabriqué à l'extérieur du chantier pour bâtiments verticaux multifamiliaux |
Family Cites Families (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| FR1566438A (fr) * | 1968-02-29 | 1969-05-09 | ||
| US5758463A (en) * | 1993-03-12 | 1998-06-02 | P & M Manufacturing Co., Ltd. | Composite modular building panel |
| US6041562A (en) * | 1998-02-17 | 2000-03-28 | Mar-Mex Canada Inc. | Composite wall construction and dwelling therefrom |
| GB2362659A (en) * | 2000-05-19 | 2001-11-28 | Madison Consult Serv Ltd | Self-contained bathroom unit construction method |
| WO2007145633A1 (fr) * | 2006-06-15 | 2007-12-21 | Zamora Raul Z | Maisons, immeubles en copropriété et appartements modulaires en béton à loyer modique |
-
2008
- 2008-01-03 BR BRPI0801081 patent/BRPI0801081A/pt not_active IP Right Cessation
-
2009
- 2009-01-05 WO PCT/BR2009/000001 patent/WO2009082802A2/fr not_active Ceased
Also Published As
| Publication number | Publication date |
|---|---|
| BRPI0801081A (pt) | 2008-11-04 |
| WO2009082802A3 (fr) | 2009-09-03 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN108779634B (zh) | 使用堆叠结构钢壁桁架来构造多层建筑物 | |
| EP2175088B1 (fr) | Procédé d'installation sur un site d'un module préfabriqué semi-résistant pour la construction | |
| US10487493B2 (en) | Building design and construction using prefabricated components | |
| MX2013003931A (es) | Sistema de construccion modular. | |
| CN101395324A (zh) | 预制钢筋混凝土独户式住宅和用于装配所述住宅的方法 | |
| CN106337500A (zh) | 模块化装配式钢结构房屋建筑体系 | |
| EP1971727B1 (fr) | Construction de batiments | |
| CN105839784A (zh) | 拼装顶升式建筑施工方法 | |
| CN103097621B (zh) | 建筑用紧凑型模块的制作方法 | |
| CN110612373A (zh) | 建筑物的预制预装饰体积建造 | |
| CN110869568B (zh) | 通用和专用工业化建筑系统中用于建筑通风的钢筋混凝土墙模块的改进 | |
| CN111411694A (zh) | 一体化装配式框架结构建筑体系 | |
| US20220154448A1 (en) | Centralized core and node system for construction projects | |
| CN109281406B (zh) | 一种交错式模块化建筑结构及其施工方法 | |
| KR20190038984A (ko) | 아파트 주상복합 오피스텔 지식산업센터 등 벽식 구조 건축물의 시공방법 | |
| WO2009082802A2 (fr) | Procédé de production et d'assemblage de modules de pièces d'habitation et de couvertures destiné à la construction de maisons et autres | |
| CN212358583U (zh) | 一体化装配式框架结构建筑体系 | |
| US20210071409A1 (en) | High-rise self-supporting formwork building system | |
| CN219548070U (zh) | 装配式陶板与石膏浇筑复合装饰一体化墙体 | |
| CN214329267U (zh) | 一种单侧主梁连接组件 | |
| Kim et al. | Productivity Analysis of the Prefabrication Stage for Layered Modular Housing Units | |
| IT202200002923U1 (it) | Modulo abitativo preassemblato (map) | |
| RU2757898C1 (ru) | Система несъемной опалубки и способ возведения здания | |
| Nikolic | New challenging approach for analysis and upgrading of massive building structure: Case study of New Belgrade post-war mega blocks | |
| KR20250157891A (ko) | 현장 벽체 마감 최소화를 위한 공장 제작형 경량 화장실 모듈 및 이의 제조 방법 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| 122 | Ep: pct application non-entry in european phase |
Ref document number: 09700133 Country of ref document: EP Kind code of ref document: A2 |