WO2013164885A1 - 鋼製壁 - Google Patents

鋼製壁 Download PDF

Info

Publication number
WO2013164885A1
WO2013164885A1 PCT/JP2012/061574 JP2012061574W WO2013164885A1 WO 2013164885 A1 WO2013164885 A1 WO 2013164885A1 JP 2012061574 W JP2012061574 W JP 2012061574W WO 2013164885 A1 WO2013164885 A1 WO 2013164885A1
Authority
WO
WIPO (PCT)
Prior art keywords
steel
wall
wall body
steel pipe
sheet pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/JP2012/061574
Other languages
English (en)
French (fr)
Inventor
直也 永尾
田中 宏征
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Steel Corp
Original Assignee
Nippon Steel and Sumitomo Metal Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Steel and Sumitomo Metal Corp filed Critical Nippon Steel and Sumitomo Metal Corp
Priority to JP2014513324A priority Critical patent/JP6015751B2/ja
Priority to PCT/JP2012/061574 priority patent/WO2013164885A1/ja
Priority to CN201280072877.0A priority patent/CN104271841A/zh
Priority to IN8915DEN2014 priority patent/IN2014DN08915A/en
Priority to CN201810196043.XA priority patent/CN108330952A/zh
Priority to SG11201407027YA priority patent/SG11201407027YA/en
Priority to HK15104183.2A priority patent/HK1203580A1/xx
Priority to EP12875924.8A priority patent/EP2848739A4/en
Publication of WO2013164885A1 publication Critical patent/WO2013164885A1/ja
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/02Sheet piles or sheet pile bulkheads
    • E02D5/03Prefabricated parts, e.g. composite sheet piles
    • E02D5/04Prefabricated parts, e.g. composite sheet piles made of steel
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/06Moles; Piers; Quays; Quay walls; Groynes; Breakwaters ; Wave dissipating walls; Quay equipment
    • E02B3/066Quays
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • E02D5/28Prefabricated piles made of steel or other metals
    • E02D5/285Prefabricated piles made of steel or other metals tubular, e.g. prefabricated from sheet pile elements

Definitions

  • the present invention relates to a steel wall used for earth retaining work, deadline work, revetment, landfill, embankment and the like.
  • steel sheet piles and steel pipe sheet piles are used in various constructions such as earth retaining works, deadlines, revetments, landfills, and dikes.
  • Steel sheet piles and steel pipe sheet piles are properly used depending on the required rigidity.
  • steel sheet piles are used in scenes where rigidity may be low, and steel pipe sheet piles are used in scenes where high rigidity is required.
  • the steel pipe sheet pile has a larger joint margin than the steel sheet pile. Therefore, when waterstop is required when constructing a deadline or a revetment, a method of filling the joint space with a bagging cement mortar is generally employed. In this method, when using in a waterside environment such as a river or a port, the mortar may flow out if the bag for mortar is damaged. In addition, since the gap between the bags can become a water channel, it is not necessarily suitable for applications requiring strict water-stopping.
  • steel sheet piles are less rigid than steel pipe sheet piles, but have excellent water-stopping properties, small joint clearance, and water-stopping properties compared to steel pipe sheet piles even when no measures are taken. high.
  • the water-stopping property of a steel sheet pile can be further enhanced by previously coating the joint with a swellable water-stopping material. By this method, it is possible to exhibit the water stop performance equivalent to or better than that of the steel pipe sheet pile for which the above measures have been taken, and it is possible to eliminate the labor of field work.
  • tie rod type steel sheet pile walls such as a tie rod type steel sheet pile revetment that connects a steel sheet pile wall that serves as a revetment with a tie rod on the land side from the revetment are known. It has been.
  • the tie rod type steel sheet pile wall requires a large construction space in order to connect the steel sheet pile wall and the preparatory work with a long tie rod.
  • the tie rod can transmit a tensile force but cannot transmit a compressive force.
  • Patent Document 2 a technique using a combined steel sheet pile in which H-shaped steel is integrated and stiffened with a U-shaped (hat-shaped) steel sheet pile constituting the wall body is proposed (for example, Patent Document 2). Since the combined steel sheet pile with such a structure has a large cross-sectional area and a large resistance during driving, the construction method is limited. In particular, construction on hard ground becomes difficult.
  • the rigidity of the steel wall is higher in the steel pipe sheet pile wall than in the steel sheet pile wall.
  • the water stoppage performance in the joint is more easily enhanced in the steel sheet pile wall than in the steel pipe sheet pile wall.
  • the steel wall which has rigidity and high water stop performance can be constructed
  • a cross-sectional area becomes large by combining a steel sheet pile and a shape steel. Accordingly, as described above, usable construction methods are limited.
  • the steel sheet pile wall (wall body) made of steel sheet piles is reinforced with the shape steel in a state where the steel sheet pile and the shape steel are in contact with each other without joining the steel sheet pile and the reinforcing material such as the shape steel. It is possible to do. In this case, it is also possible to construct each separately.
  • the steel sheet pile and the reinforcing material are separately constructed, the following problems arise if the member to be constructed is placed in contact with the member that has been constructed first with respect to the member that has been constructed first. . That is, due to the sliding resistance between the steel sheet pile and the reinforcing material, a large force may be required at the time of placing, and noise and vibration may be generated.
  • the present invention has been made in view of the above circumstances, and can be easily constructed while having a structure in which a steel sheet pile or H-shaped steel is used to reinforce a wall body formed by connecting steel sheet piles that can easily have high water-stopping properties. It aims to provide a simple steel wall.
  • a steel wall according to the present invention is provided with a corrugated sheet body in which a plurality of steel sheet piles are connected by a joint and are repeatedly uneven in the longitudinal direction.
  • a plurality of reinforcement members made of H-shaped steel are provided side by side with the wall body along the longitudinal direction of the wall body, and a part of the reinforcement material enters the recess of the wall body.
  • the wall body and the reinforcing member are connected by a head.
  • the wall body and the reinforcing material are separated from each other, there are few restrictions on the construction method, and various construction methods capable of placing a steel pipe or H-shaped steel as the reinforcing material on the ground are selected according to the situation. Can be used. That is, since the wall and the reinforcing material are separated from each other, it is possible to separately perform the construction in which the steel sheet pile is placed on the ground and connected to construct the wall body, and the construction in which the reinforcing material is placed on the ground. it can. In addition, since the wall body and the reinforcing material are not in contact with each other, construction is facilitated.
  • construction by a vibro hammer construction method is possible by providing a space between the wall body and the reinforcing material.
  • the reinforcing material is a steel pipe
  • it can be constructed by a rotary press-fitting method.
  • a static press-fitting method such as a hydraulic press-fitting method is also possible.
  • the same high water stoppage performance as the conventional steel sheet pile wall can be obtained.
  • a wide construction space like a tie rod type wall structure is not required.
  • the wall width can be made smaller than the sum of the steel sheet pile height and the steel pipe diameter, and the construction space can be saved and the steel wall can be constructed. it can.
  • the distance between the reinforcing material and the wall body is short because the reinforcing material enters the concave portion of the wall body, and unlike the tie rod type steel sheet pile wall, when the reinforcing material and the wall body are connected at the head, the tensile force and The structure can transmit both compressive force and force. That is, when earth pressure or water pressure is applied to the steel wall, the head of the wall and the head of the reinforcing member are connected, so that load transmission is performed between the wall and the reinforcing member.
  • the steel wall can have a structure in which the acting earth pressure and water pressure are shared by the wall body and the reinforcing material. Further, by connecting and fixing the head portion of the wall body and the head portion of the reinforcing material, the vertical displacement between the wall body and the reinforcing material can be restricted and the shearing force can be transmitted.
  • the reinforcing material when the reinforcing material is placed every other piece or multiple sheets with respect to the steel sheet pile, if the gap between the reinforcing material and the steel sheet pile is left, the effect of the reinforcing material becomes partial.
  • a member that disperses the force in the extending direction such as an erection material, is required.
  • the reinforcing material since the reinforcing material enters the concave portion of the wall body, the reinforcing material can exert an effect even on the steel sheet pile on which the reinforcing material is not installed, and an upset material or the like is not required.
  • a corrugated acrylic simulating a steel sheet pile wall and an acrylic pipe simulating a steel pipe are fixed at the bottom with an adhesive in the center of a rigid earth tub with a width of 1957 mm, a height of 1000 mm, and a depth of 940 mm. From the state where sand No. 5 (dry sand) was installed by the air drop method, one side was dug down to the lower end, and a laboratory test was conducted to confirm the behavior of the wall.
  • the pitch of the steel pipe is 4/7 or less of the wall height
  • the reinforcing material is arranged so as to enter the concave portion of the wall body and the head is connected, so that the effect of the reinforcing material is also applied to the skipped portion.
  • the pitch L and the wall height H of the reinforcing material satisfy L ⁇ 4H / 7.
  • the wall body and the reinforcing member are connected to each other at the head portion by concrete cast over both head portions.
  • the head of the reinforcing member and the head of the wall are connected to each other by the concrete that is placed across the two, so the head (upper end) of the steel pipe or steel sheet pile is attached. It becomes possible to make the structure covered with concrete without being exposed. Thereby, the beauty of the steel wall can be enhanced. In addition, since the concrete is placed so as to straddle the reinforcing material and the wall body, there is little risk that the top end between the steel pipe and the wall body collapses.
  • the said structure of this invention WHEREIN: It is preferable that the said wall body and the said reinforcing material are connected with the head by welding the steel plate installed between both to both. According to such a configuration, since the connection between the steel plate and the reinforcing material at the head is performed by welding the steel plate to the reinforcing material and the wall body, the construction is easy and the labor for the construction is small. For example, as in the case of a tie rod type, it is not necessary to make a hole for passing a tie rod through a steel sheet pile or a steel pipe sheet pile and passing the tie rod through the hole. Moreover, when compared with the case of placing the above-mentioned concrete, the concrete curing period is unnecessary, and the construction period can be shortened.
  • the said wall body and the said reinforcing material being connected with the head by welding the steel plate installed between both to both, respectively, the said wall
  • the body and the reinforcing material may be connected at the head by concrete cast over both heads.
  • connection by welding of the steel plate and the connection by concrete are combined, the beauty and the strength can be supplemented.
  • concrete is excellent in transmitting compressive force at the connecting portion
  • a welded steel sheet is excellent in transmitting tensile force at the connecting portion, so that the strength can be supplemented.
  • the improvement of the transmission of the tensile force by the steel plate can be supplemented with the landscape improvement (landscape maintenance) and safety measures (for example, prevention of collapse of the top edge) by the concrete.
  • the said structure of this invention WHEREIN: It is preferable that the said reinforcing material is the said steel pipe. According to such a configuration, it is possible to obtain high rigidity by using a steel pipe as a reinforcing material, and it is possible to use a rotary press-fitting method and an underground digging method, and construction that suppresses noise and vibration is easy. Become.
  • interval which the said steel sheet pile of the said wall body and the said reinforcing material do not contact during construction between the said wall body and the said reinforcing material is set. Is preferred.
  • the steel sheet pile and the reinforcing material of the wall body do not contact during construction, and the above-mentioned wall body and the reinforcing material are under construction. It is possible to prevent problems caused by touching the surface.
  • the reinforcing member may be provided on the side of the wall body that receives a relatively large pressure.
  • the reinforcing material is provided on the side that receives a relatively large pressure (earth pressure or water pressure), the wall body and the reinforcing material are subjected to pressure.
  • a load acts on the wall body in a direction away from the reinforcing material.
  • the head of the wall body and the head of the reinforcing material are connected to each other so that load transmission (transmission of tensile force) is performed between the wall body and the reinforcing material.
  • the load can be shared with the reinforcing material. Therefore, even if the reinforcing material is disposed on the side of the wall that receives a relatively large pressure, the strength can be sufficiently improved by combining the reinforcing material with the wall.
  • the reinforcing material is disposed on the back side. Therefore, on the exposed side of the steel wall upper portion, only the side surface of the wall body is exposed and the reinforcing material is hidden, so that the appearance is not complicated and the appearance is excellent.
  • the reinforcing material may be provided on the side opposite to the side receiving the relatively large pressure of the wall body.
  • the reinforcing material is provided on the side opposite to the side receiving the relatively large pressure of the wall body, earth pressure or water pressure acts on the wall body.
  • the load is transmitted from the wall body to the reinforcing material (transmission of compressive force) at the connecting portion between the wall body and the reinforcing material, and the wall body and the reinforcing material can receive earth pressure and water pressure in a shared manner. it can.
  • the reinforcing material is disposed on the front side of the wall body, that is, the side where the upper part is exposed. Therefore, for example, there is no need for excavation for exposing the head portion of the reinforcing material at the time of construction, and the repaired portion of the exposed reinforcing material and the connecting portion between the reinforcing material and the wall body can be easily performed.
  • the same high water stopping performance as that of the conventional steel sheet pile wall can be obtained, and the bending moment generated in the wall body can be reduced by transmitting the load to the reinforcing material. Moreover, since it is possible to construct each separately although it is the structure which combined the steel sheet pile and the steel pipe or the H-section steel, construction can be performed easily.
  • the steel wall 3 according to the first embodiment of the present invention is configured by combining a hat-shaped steel sheet pile 1 as a steel sheet pile and a steel pipe (reinforcing material) 2.
  • a plurality of steel pipes 2 are arranged side by side in a row along a longitudinal direction of a wall body (sheet pile wall) 4 configured by connecting a plurality of hat-shaped steel sheet piles 1.
  • the hat-shaped steel sheet pile 1 extends to the left and right in parallel with the web 1a from the front end of the web 1a, a pair of flanges 1b extending obliquely so as to spread from both side edges of the web 1a, and the left and right flanges 1b.
  • a pair of arms 1c and a joint 1d provided at the tip of the arm 1c are provided.
  • the hat-shaped steel sheet pile 1 and the steel pipe 2 are not in contact with each other, and a space is provided between the hat-shaped steel sheet pile 1 and the steel pipe 2. Moreover, the diameter of the steel pipe 2 is narrower than the width (effective width) of the hat-shaped steel sheet pile 1. This steel pipe 2 is in a state where a part of the steel pipe 2 enters a concave portion that becomes a valley portion on one side surface of the wall body constituted by the hat-shaped steel sheet pile 1.
  • the plurality of hat-shaped steel sheet piles 1 are connected to each other by connecting the joints 1d so as to construct the above-described wall body 4 as a steel sheet pile wall. Moreover, the hat-shaped steel sheet pile 1 and the steel pipe 2 are driven in the ground.
  • the head of the wall body 4 made of the hat-shaped steel sheet pile 1 and the head of the steel pipe 2 are connected by a coping 5. That is, the coping 5 is provided by concrete that is wound around the head of the wall body 4 and the head of the steel pipe 2. Since the head of the wall body 4 and the head of the steel pipe 2 are inserted into the concrete that becomes the coping 5, the head of the wall body 4 and the head of the steel pipe 2 are connected and fixed. Yes. Further, the upper end opening of the steel pipe 2 is closed by the concrete of the coping 5.
  • the coping 5 is provided along the length direction of the wall body 4, and all the steel pipes 2 are connected to the wall body 4 by the coping 5 having the same length as the length of one wall body 4.
  • the steel pipe 2 is arrange
  • the steel wall 3 of this example is a revetment, for example, and the lower ground surface b side with respect to the higher ground surface a is the water side of the sea, lake, river or the like.
  • the steel wall 3 is not limited to the revetment, and can be used for earth retaining work, cut-off work, landfill, embankment and the like.
  • the wall body 4 made of the hat-shaped steel sheet pile 1 and the steel pipe 2 when the wall body 4 (hat-shaped steel sheet pile 1) and the steel pipe 2 are separately constructed, they do not contact during construction.
  • a certain degree of spacing is provided. That is, an interval is set to such a degree that the wall body 4 or the steel pipe 2 to be constructed later does not come into contact with the wall body 4 or the steel pipe 2 constructed in advance.
  • the interval between the wall body 4 and the steel pipe 2 closest to each other during construction is 50 mm or more.
  • the interval may be 60 mm or more, 70 mm or more, or 80 mm or more.
  • the overall thickness of the steel wall body, etc. irregularities (mountains and valleys) as the wall body 4
  • the structure is such that at least a part of the steel pipe 2 enters the recess on the valley side of the corrugated sheet pile wall.
  • the steel sheet pile 4 of the already constructed steel sheet pile wall or the already-placed steel pipe can be gripped and the steel pipe 2 can be hydraulically pressed or rotationally pressed.
  • the steel pipe is as close as possible to the already constructed steel sheet pile wall or steel pipe for stable construction. It is preferable to arrange in.
  • the depth of the recess (the distance between the web 1a and the arm 1c along the direction perpendicular to these) varies depending on the type of the hat-shaped steel sheet pile 1, but for example, a hat shape having a width of 900 mm
  • the depth of the recess is about 200 mm to 300 mm, it is preferable that the distance between the steel pipe 2 and the web 1a of the hat-shaped steel sheet pile 1 of the wall body 4 be less than that.
  • the construction method of the steel wall 3 will be described.
  • the hat-shaped steel sheet pile 1 constituting the wall body 4 and the steel pipe 2 serving as a reinforcing material are separately placed on the ground.
  • the hat-shaped steel sheet pile 1 may be driven on the ground first, or the steel pipe 2 may be driven on the ground first.
  • the wall body 4 is an existing steel sheet pile wall, and a steel pipe may be driven for the purpose of reinforcing the wall.
  • the step of placing the hat-shaped steel sheet pile 1 in sequence while being connected to the hat-shaped steel sheet pile 1 previously placed and the step of sequentially placing the steel pipes 2 in a row are performed in parallel. May be.
  • a hydraulic press-fitting method in which the hat-shaped steel sheet pile 1 is press-fitted by taking a reaction force from the previously-press-fitted hat-shaped steel sheet pile 1 may be used. Alternatively, excavation by an earth auger may be performed at the time of placing.
  • the same construction method as that for the hat-shaped steel sheet pile 1 can also be used for press-fitting the steel pipe 2.
  • a rotary press-fitting method or an intermediate digging method in which the ground is excavated from the steel pipe 2 and the steel pipe 2 is press-fitted may be used.
  • the steel sheet pile 1 of the already constructed steel sheet pile wall or the already-placed steel pipe may be held and the steel pipe 2 may be hydraulically pressed or rotationally pressed.
  • the position of the steel sheet pile wall or the steel pipe that takes the reaction force and the steel pipe to be constructed can be close and stable construction can be performed.
  • the wall body 4 which is a sheet pile wall and the steel pipe 2 as a reinforcing material do not contact during construction, for example, it is placed on the ground with an interval of 50 mm or more. It can suppress that the wall body 4 and the steel pipe 2 slide during construction, and a vibration, a noise, and a deformation
  • the cross-sectional area of the member to be placed on the ground becomes large, and the placement becomes difficult.
  • the wall 4 and the steel pipe 2 are driven separately in the steel wall 3 of this embodiment, construction can be facilitated.
  • the wall 4 and the steel pipe 2 are separated so as not to come into contact with each other during construction, the construction is further facilitated than when the wall 4 and the steel pipe 2 are in contact as described above.
  • the concrete to be the coping 5 is placed across the wall body 4 and the steel pipe 2. Thereby, the head of the wall body 4 and the head of the steel pipe 2 are connected.
  • the head of the wall body 4 and the head of the steel pipe 2 are connected to each other, so that the load can be transmitted between the wall body 4 and the steel pipe 2 by the connecting portion.
  • the wall body 4 and the steel pipe 2 share the earth pressure and water pressure that the steel wall 3 receives.
  • the position shift of the vertical direction of the steel pipe 2 and the wall body 4 can be prevented.
  • the bending moment generated in the wall body 4 reinforced with the steel pipe 2 can be reduced as compared with a single steel sheet pile wall.
  • the water stoppage of the steel wall 3 can be equivalent to that of the steel sheet pile wall, and the same level as that of the steel pipe sheet pile wall in which the joint portion is filled with mortar without filling the joint 1d with mortar. Water stoppage can be obtained.
  • the steel pipe 2 is disposed on the opposite side of the wall 4 to the side where the earth pressure is applied, that is, on the front side where no earth pressure is applied. Therefore, in the case of the purpose of reinforcing the existing steel sheet pile wall, even if there is an obstacle in the ground part or the underground part on the back side, the steel pipe can be installed on the front side and reinforced. Furthermore, even when reinforcing with a steel pipe of the same length, compared to the case where it is installed on the back surface, the length of driving into the soil is shortened, and it is possible to reduce construction labor and cost.
  • the steel wall 3 is used as a revetment, and the head of the steel pipe 2 and the head of the wall body 4 are connected by a coping 5. Therefore, the coping 5 is a connecting member between the head of the steel pipe 2 and the head of the wall body 4 and also has a function of closing the opening of the steel pipe 2. In this embodiment, since a dedicated connecting member such as a tie rod is not necessarily required, the cost can be reduced.
  • the length of the steel pipe 2 is made longer than the vertical length of the wall body 4 (the length of the hat-shaped steel sheet pile 1).
  • the steel pipe 2 may be longer than the wall body 4 and only the steel pipe 2 may be embedded in the support layer.
  • the length of the steel pipe 2 may be shorter than the vertical length of the wall body 4, or the vertical length of the wall body 4 and the length of the steel pipe 2 may be the same.
  • the length of the steel pipe 2 is determined from the viewpoints of rigidity and ground conditions.
  • the vertical length of the wall body 4 may be increased with respect to the steel pipe 2 when there is a concern about boiling, heaving, or arc slip.
  • the steel pipe 2 is arrange
  • the reinforcing material enters the concave portion of the wall body, the effect of the reinforcing material can be exerted on the adjacent steel sheet piles without arranging the steel pipes on all the hat-shaped steel sheet piles 1.
  • the arrangement of the steel pipes 2 is substantially uniform.
  • the steel sheet pile constituting the wall body 4 is not limited to the hat-shaped steel sheet pile 1, and various steel sheet piles such as a U-shaped steel sheet pile and a Z-shaped steel sheet pile can be used.
  • the steel wall 31 of the second embodiment includes a steel pillow 2 (for example, a steel pillow 2 and a head of a wall body 4 together with a coping 5 as a connecting member). They are connected by a steel plate or a section steel) 6 cut to a predetermined length. Moreover, the vertical length of the steel pipe 2 and the wall body 4 is made the same. Other than that, it has the structure similar to the steel wall 3 of 1st Embodiment. Therefore, the same components as those in the first embodiment are denoted by the same reference numerals, and description thereof is omitted.
  • a steel pillow 6 (steel) is provided between the head of the steel pipe 2 and the head of the wall 4 as a connecting member.
  • the pillow material 6 is fixed to the steel pipe 2 and the wall body 4 by, for example, welding, bolts, drill screws or the like. Thereby, in the state which the steel pipe 2 and the wall body 4 left
  • the length of the steel pipe 2 and the vertical length of the wall body 4 (the length of the hat-shaped steel sheet pile 1) are substantially the same.
  • the construction method of the steel wall 31 of 2nd Embodiment is as follows. First, the steel sheet pile 1 and the steel pipe 2 are driven in the same manner as in the first embodiment. Next, the steel material used as the pillow material 6 is installed between the steel sheet pile 1 (wall body 4) and the steel pipe 2, and each of the steel sheet pile 1 (wall body 4) and the steel pipe 2 is welded, bolted, drilled screw, or the like. Fix it. Thereafter, as in the first embodiment, the coping is placed across the wall 4 and the steel pipe 2.
  • the head of the steel pipe 2 and the head of the wall body 4 are connected by both the coping 5 and the pillow material 6. Thereby, the load received on the wall body 4 can be more reliably transmitted to the steel pipe 2. Except for this point and the effect based on the fact that the steel pipe 2 and the hat-shaped steel sheet pile 1 have the same length, the same operational effects as the steel wall 3 of the first embodiment can be achieved.
  • the steel wall 32 according to the third embodiment uses a pair of plate members 7 as a connecting member, not only the coping 5 but also the head of the steel pipe 2 and the head of the wall body 4. It is connected. Furthermore, the vertical length of the wall body 4 is made longer than that of the steel pipe 2. Moreover, the steel pipe 2 is arrange
  • the steel plate material 7 is provided between the head of the steel pipe 2 and the head of the wall body 4. Further, the plate material 7 is fixed to the steel pipe 2 and the wall body 4 by welding, bolts or the like, respectively. Further, the head of the steel pipe 2 and the head of the wall 4 are connected in a state where the steel pipe 2 and the wall 4 are separated. Further, the coping 5 is provided by wrapping with concrete across the head of the steel pipe 2 and the head of the wall body 4 connected by the plate material 7, so that the head of the steel pipe 2 and the wall body 4 can be provided by the coping 5. The head is connected.
  • the vertical length (length of the hat-shaped steel sheet pile 1) of the wall 4 is made longer than the length of the steel pipe 2 as mentioned above.
  • the connection by the plate member 7 can be used to increase the strength of the connection portion between the head portion of the steel pipe 2 and the head portion of the wall body 4.
  • the connection with the steel plate material 7 is more effective.
  • the steel pipe 2 can be hidden without being exposed to the front side of the wall body 4, so that the beauty of the steel wall 32 can be enhanced.
  • the same operation as that of the first embodiment is performed except for the function and effect based on the structure of the connecting portion, the length of the steel pipe 2 and the wall body 4, and the arrangement of the steel pipe 2 with respect to the wall body 4. There is an effect.
  • the steel wall 33 according to the fourth embodiment is a steel wall 9 according to the first embodiment except that the reinforcing material is replaced with the steel pipe 2 and the H-shaped steel 9 is used.
  • 3 has the same configuration. Therefore, the same components as those in the first embodiment are denoted by the same reference numerals, and description thereof is omitted.
  • the steel wall 33 according to the fourth embodiment uses H-section steel 9 as a reinforcing material.
  • the H-section steel 9 is arranged in a line at intervals similarly to the case of the steel pipe 2 of the first embodiment along the longitudinal direction of the wall body 4 to which the hat-shaped steel sheet piles 1 are connected.
  • interval is provided between the H-section steel 9 and the wall body 4 similarly to the case of the steel pipe 2 of 1st Embodiment.
  • the H-section steel 9 is in a state where a part of the H-section steel 9 enters a recess that becomes a trough portion on one side surface of the wall body constituted by the hat-shaped steel sheet pile 1. Further, the H-section steel 9 is arranged so that the web 9 a is orthogonal to the longitudinal direction of the wall body 4. Therefore, the flange 9 b is parallel to the longitudinal direction of the wall body 4.
  • the head of the wall body 4 and the head of the H-shaped steel 9 are connected.
  • the method similar to 1st Embodiment to 3rd Embodiment can be used for the connection method of the steel wall 33 and the H-section steel 9 as a reinforcing material. That is, the wall body 4 and the H-shaped steel 9 are connected by the coping 5.
  • the head of the wall 4 and the head of the H-section steel 9 can be connected by combining these connection methods.
  • the steel pipe 2 is replaced with a reinforcing material such as the relationship between the length of the wall 4 and the length of the H-shaped steel 9 and the arrangement of the H-shaped steel 9 with respect to the wall 4 (including the interval between the wall 4 and the H-shaped steel 9).
  • the configuration other than the H-section steel 9 can be the same as that of the first to third embodiments.
  • the construction method of the steel wall 33 the construction method of the steel wall according to the first to third embodiments, except that the H-section steel 9 cannot be constructed by the digging method or the rotary press-fitting method.
  • the same can be said.
  • the steel wall 33 of the fourth embodiment can achieve the same functions and effects as those of the steel wall 3 of the first to third embodiments except for the functions and effects of the steel pipe 2.
  • the connection between the head of the steel pipe 2 and the head of the wall body 4 is performed by welding the steel plate 8 in each of the above-described embodiments. .
  • Concrete is not used to connect the head of the steel pipe 2 and the head of the wall body 4.
  • the configuration other than the connection structure between the head of the steel pipe 2 and the head of the wall 4 is the same as that of the steel wall 3 of the first embodiment. Therefore, the same components are denoted by the same reference numerals, and the description thereof is omitted.
  • the steel wall 34 includes a plurality of steel pipes along the longitudinal direction of a wall body (sheet pile wall) 4 configured by connecting a plurality of hat-shaped steel sheet piles 1. 2 are arranged side by side in a row at intervals. Moreover, it arrange
  • a steel plate 8 is arranged between the hat-shaped steel sheet pile 1 and the steel pipe 2 of the wall body 4.
  • the steel plate 8 is disposed between the arm 1 c of the hat-shaped steel sheet pile 1 and the outer periphery of the steel pipe 2.
  • a pair of left and right steel plates 8 are provided for one hat-shaped steel sheet pile 1 and one steel pipe 2 corresponding to the left and right arms 1c.
  • One end of the steel plate 8 is welded to the arm 1 c of the hat-shaped steel sheet pile 1, and the other end is welded to the outer periphery of the steel pipe 2.
  • the construction of the wall body 4 and the placement of the steel pipe 2 are performed in the same manner as in the first embodiment. After the construction of the wall body 4 and the placement of the steel pipe 2 are completed, the steel plate 8 is welded to the hat-shaped steel sheet pile 1 and the steel pipe 2 of the wall body 4.
  • connection between the heads of the wall body 4 and the steel pipe 2 is performed by welding the steel plate 8, so that the construction becomes easy. Moreover, unlike the case of connecting with concrete, no curing period is required and the construction period is short.
  • the steel plate 8 may be disposed between the web 1 a of the hat-shaped steel sheet pile 1 and the outer peripheral surface of the steel pipe 2, or the outer peripheral surface of the flange 1 b and the steel pipe 2.
  • position between Moreover, the pitch of the steel pipe 2 is skipped with respect to the hat-shaped steel sheet pile 1 (for example, the steel pipe 2 is arrange
  • the head of the wall body 4 and the head of the steel pipe 2 are rolled in as in the first embodiment. You may provide the coping 5 with the concrete made. In this case, concrete is placed after the steel plate 8 is welded. Further, the wall body 4 and the steel pipe 2 are connected by concrete in addition to the welding of the steel plate 8.
  • the existing steel sheet pile wall is used as the wall body 4, and the steel walls 3, 31, 32, 33, 34 and 34 ⁇ / b> A are formed by driving the steel pipe 2 and the H-shaped steel 9 against the wall body 4. You may make it build.

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Composite Materials (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

 容易に高い止水性を持たせることができる鋼矢板を連結してなる壁体を鋼管またはH形鋼で補強し、かつ、施工が容易な鋼製壁を提供する。 複数のハット形鋼矢板1が継手により連結されて壁体4が設けられている。壁体4を補強する鋼管2が壁体4の長手方向に沿って並べて設けられている。壁体4と鋼管2との間に間隔が設けられている。壁体4は、鋼矢板壁として長手方向に凹凸を繰り返す波板状に形成されている。鋼管2は、壁体4の凹部に一部が入り込むように配置されている。壁体4の頭部と鋼管2の頭部とが連結されている。壁体4と鋼管2との連結は、コンクリートにより行われる。壁体4と鋼管2との間で荷重伝達が行われる。これにより、鋼製壁3は、作用する土圧や水圧を壁体4と鋼管2とで分担して受け持つ構造とすることができる。

Description

鋼製壁
 本発明は、土留め工、締切工、護岸、埋立、堤防等で用いられる鋼製壁に関する。
 従来、鋼矢板や鋼管矢板は、土留め工、締切工、護岸、埋立、堤防等の様々な工事で用いられている。鋼矢板と鋼管矢板は求められる剛性によって使い分けられる。一般に鋼矢板は剛性が低くてもよい場面、鋼管矢板は剛性の高いものが要求される場面で使用される。
 ここで、鋼管矢板は鋼矢板に比べて継手の余裕量が大きい。したがって、締切工や護岸などを構築する際に止水性が要求される場合には、一般に継手空間に袋詰めセメントモルタルを充填する方法が採用されている。この方法では、河川・港湾等の水辺環境で用いる場合にモルタルを詰める袋が破損するとモルタルが流出してしまう可能性がある。また、袋どうしの隙間が水みちになりうるので、厳しい止水性を求められる用途には必ずしも適さない。
 そこで、海面廃棄物処分場などの遮水性護岸等のように、処分場内部の水の漏洩防止が厳しく要求される場合の方策として以下のものが提案されている。すなわち、鋼管矢板の継手空間に漏れ防止対策が施され、この継手空間にモルタル等の充填剤が直接充填された構造が提案されている(例えば、特許文献1参照)。このようにモルタルを充填する場合は、鋼管矢板を地中に打ち込んだ後、継手内部の土砂をウォータージェット等で排土して、袋詰めモルタルやモルタルを継手内に充填するという作業を行う必要がある。したがって、鋼管矢板の現場作業に手間と時間とを要するという欠点を有している。
 これに対し、鋼矢板は、鋼管矢板に比べて剛性は低くなるものの、止水性に優れ、継手分の遊間が小さく、何も対策を行わない状態であっても鋼管矢板と比べて止水性が高い。また、予め継手に膨潤性止水材を塗装しておくことにより、鋼矢板の止水性をさらに高めることもできる。この方法により、上記対策を行った鋼管矢板と同等以上の止水性能を発揮することが可能である上、現場作業の手間の省略が可能になる。
 そこで、鋼矢板の剛性を高める技術として、護岸となる鋼矢板壁と、護岸より陸側に設けられた控え工とをタイロッドで連結するタイロッド式鋼矢板護岸等のタイロッド式の鋼矢板壁が知られている。
 タイロッド式の鋼矢板壁では、鋼矢板壁と控え工とを長いタイロッドで連結するために、大きな施工スペースを必要とする。
 また、同様にタイロッド式の鋼矢板壁では、鋼矢板壁と控え工を長いタイロッドで連結するために、タイロッドは引っ張り力を伝達できるが圧縮力を伝達できない。
 さらに、鋼矢板の剛性を高める技術として、壁体を構成するU形(ハット形)鋼矢板にH形鋼を一体化して補剛された組合せ鋼矢板を用いる技術が提案されている(例えば、特許文献2参照)。このような構造の組合せ鋼矢板は、断面積が大きくなり、打設時の抵抗が大きくなるため、施工方法が限定される。特に、硬質地盤での施工が難しくなる。
 そこで、硬質地盤での施工のために、地盤を掘削するアースオーガ(掘削装置)を用いた工法を適用することが考えられる。しかし、組合せ鋼矢板の断面形状が広い範囲に渡るため、工夫が必要になる。その工夫の一例として、特許文献2の組合せ鋼矢板に類似する構造の組合せ鋼矢板を建て込む場合に、以下のような工法を用いることが提案されている(例えば、特許文献3参照)。すなわち、前記組合せ鋼矢板の打設時にアースオーガで掘削する範囲と、この組合せ鋼矢板の前に打設された組合せ鋼矢板の建て込み時にアースオーガで掘削された範囲とに跨るように、前記組合せ鋼矢板を打設する工法が提案されている。
特許第3756755号公報 特開2002-212943号公報 特許第4074241号公報
 上述のように、鋼製壁としての剛性は、鋼矢板壁より鋼管矢板壁の方が高い。一方、継手における止水性能は、鋼管矢板壁より鋼矢板壁の方が容易に高められる。
 そこで、前記特許文献2に示されるように、止水性能を高くし易い鋼矢板壁に形鋼を組み合わせることにより、剛性と高い止水性能とを兼ね備えた鋼製壁を構築できる。
 しかし、鋼矢板と形鋼とを組み合わせることにより、断面積が大きくなる。したがって、上述のように、使用可能な施工方法が制限される。
 ここで、鋼矢板と形鋼等の補強材とを接合して一体とせずに、鋼矢板と形鋼とを接触した状態として、鋼矢板からなる鋼矢板壁(壁体)を形鋼で補強することが考えられる。この場合には、それぞれを別々に施工することも可能になる。しかし、鋼矢板と補強材とを別々に施工する場合に、先に施工した部材に対して、後から施工する部材を先に施工した部材に接触させた状態で打設すると以下の問題が生じる。すなわち、鋼矢板と補強材との摺動抵抗により、打設時に大きな力が必要になったり、また、騒音や振動が発生したりする虞がある。施工精度によっては、これら鋼矢板と補強材とのいずれかに変形が生じる可能性もある。また、後から施工する部材を先に施工した部材に接触させた状態で打設するために、後から打設する部材の施工方法が制限される。例えば、補強材としての鋼管を回転圧入することが困難になるとともに、部材を振動させて打設するバイブロ系の施工方法を用いることが困難になる。
 本発明は、上記事情に鑑みてなされたもので、容易に高い止水性を持たせることができる鋼矢板を連結してなる壁体を鋼管またはH形鋼で補強した構造としながら、施工が容易な鋼製壁を提供することを目的とする。
 前記課題を解決するために、本発明の鋼製壁は、複数の鋼矢板が継手により連結されて長手方向に凹凸を繰り返す波板状の壁体が設けられ、前記壁体を補強する鋼管またはH形鋼からなる複数の補強材が前記壁体の長手方向に沿って、前記壁体と間隔をあけて並べて設けられ、前記補強材の一部が前記壁体の凹部内に入り込んだ状態にされ、前記壁体と前記補強材とが頭部で連結されていることを特徴とする。
 本発明においては、壁体と補強材とが離れているので、施工方法の制約が少なく、補強材としての鋼管やH型鋼を地盤に打設可能な各種施工方法を状況に応じて選択して用いることができる。
 すなわち、壁体と補強材とが離れているので、鋼矢板を地盤に打設するとともに連結して壁体を構築する施工と、補強材を地盤に打設する施工とを別々に行うことができる。それに加えて、これら壁体と補強材とが接触していないので、施工が容易になる。例えば、壁体と補強材との間に間隔を設けることによって、バイブロハンマ工法での施工が可能である。また、補強材が鋼管の場合は回転圧入工法で施工することも可能である。また、言うまでもなく油圧圧入工法等の静的圧入工法も可能である。このように、施工方法の制約が少ないので、鋼管やH形鋼を地盤に打設可能な各種施工方法を状況に応じて選択して用いることができる。
 また、従来の鋼矢板壁と同様の高い止水性能を得られる。
 また、タイロッド式の壁体構造のような広い施工スペースを必要としない。特に、補強材が壁体の凹部側に入り込むことにより、鋼矢板高さと鋼管径の足し合わせよりも小さな壁幅とすることができ、施工スペースを省スペース化して鋼製壁を構築することができる。
 また、補強材が壁体の凹部側に入り込むことにより補強材と壁体の距離が短く、タイロッド式の鋼矢板壁と異なり、補強材と壁体を頭部で連結した場合に、引張力と圧縮力との両方を伝達できる構造にできる。
 すなわち、鋼製壁に土圧や水圧が作用した場合に、壁体の頭部と補強材の頭部とが連結されているので、壁体と補強材との間で荷重伝達が行われる。これにより鋼製壁は、作用する土圧や水圧を壁体と補強材とで分担して受け持つ構造とすることができる。また、壁体の頭部と、補強材の頭部とを連結して固定することにより、壁体と補強材との鉛直方向のずれを規制し、せん断力を伝達することができる。
 また、タイロッド式鋼矢板構造であれば、壁体延長方向に離散的に配置したタイロッドに作用する力を分散させて壁体を一様に挙動させるために腹起し材が必要となる。しかし、本発明では、補強材が凹部側に入り込み、短い距離での力の伝達となるため、腹起し材を必要としない。
 特に、補強材を鋼矢板に対して一枚おきまたは複数枚おきに配置した場合には、補強材と鋼矢板の間隔を空けてしまうと、補強材の効果が部分的になってしまうために、腹起し材などの延長方向に力を分散させる部材が必要となる。しかし、補強材が壁体の凹部に入り込むことで、補強材が設置されていない鋼矢板に対しても補強材が効果を及ぼすことができ、腹起し材などを必要としない。
 なお、幅1957mm×高さ1000mm×奥行き940mmの剛な土槽内の中央に、鋼矢板壁を模擬した波形のアクリルと鋼管を模擬したアクリルパイプを接着剤により下端固定し、波形の左右にケイ砂5号(乾燥砂)を空中落下法により設置した状態から、片側を下端まで掘り下げて、壁体の挙動を確認する室内試験を行った。この実験により、鋼管のピッチが壁高の4/7以下であれば、補強材を壁体の凹部に入り込むように配置して頭部を連結することで、飛ばした部分についても補強材の効果が出ることを確認している。したがって、補強材のピッチLと壁高HがL≦4H/7を満たすことが好ましい。
 本発明の上記構成において、前記壁体と前記補強材とは、両者の頭部に跨って打設されたコンクリートにより頭部で連結されていることが好ましい。
 このような構成によれば、補強材の頭部と壁体の頭部を、両者に跨って打設されるコンクリートで連結する構造としているので、鋼管や鋼矢板の頭部(上端部)を剥き出しにせずに、コンクリートで覆われた構造とすることが可能になる。これにより、鋼製壁の美観を高めることができる。また、補強材と壁体を跨るようにコンクリートが打設されるので、鋼管と壁体との間の天端が崩落する等の危険性が少ない。
 また、本発明の上記構成において、前記壁体と前記補強材とは、両者の間に設置された鋼板をそれぞれ両者に溶接接合することにより頭部で連結されていることが好ましい。
 このような構成によれば、鋼板と補強材との頭部での連結が、鋼板を補強材と壁体とに溶接することにより行われるので、施工が楽で、施工の手間が少ない。たとえば、タイロッド式の場合のように、鋼矢板や鋼管矢板にタイロッドを通す孔をあけて、その孔にタイロッドを通す手間を必要としない。また、上述のコンクリートを打設する場合と比較した場合に、コンクリートの養生期間が不要であり、施工期間の短縮を図ることができる。
 また、本発明の上記構成において、前記壁体と前記補強材とは、両者の間に設置された鋼板をそれぞれ両者に溶接接合することにより頭部で連結されていることに加えて、前記壁体と前記補強材とは、両者の頭部に跨って打設されたコンクリートにより頭部で連結されていてもよい。
 このような構成によれば、鋼板の溶接による連結とコンクリートによる連結とを組み合わせているので、美観と、強度とを補い合える。例えば、コンクリートは、連結部分における圧縮力の伝達に優れ、溶接された鋼板は、連結部分における引張力の伝達に優れるので、強度を補い合うことができる。また、鋼板による引張力の伝達の向上と、コンクリートによる修景(風景の整備)および安全対策(例えば、天端の崩落の防止)とを補い合うことができる。
 また、本発明の上記構成において、前記補強材が前記鋼管であることが好ましい。
 このような構成によれば、補強材として鋼管を用いることによって高い剛性を得ることができるとともに、回転圧入工法や中掘り工法を用いることが可能になり、騒音や振動を抑制した施工が容易になる。
 また、本発明の上記構成において、前記壁体と前記補強材との間には、前記壁体の前記鋼矢板と前記補強材とが施工中に接触することがない間隔が設定されていることが好ましい。
 このような構成によれば、壁体と補強材とを施工する際に、壁体の鋼矢板と補強材とが施工中に接触することがなく、上述の壁体と補強材とが施工中に接触することによる問題を防止できる。
 また、本発明の上記構成において、前記壁体の相対的に大きな圧力を受ける側に、前記補強材が設けられていてもよい。
 このような構成によれば、相対的に大きな圧力(土圧や水圧)を受ける面の側に補強材が設けられていることから、壁体と補強材とが圧力を受けることになる。この場合に、壁体には補強材から離れる方向に荷重が作用することになる。ここで、壁体の頭部と、補強材の頭部とが連結され、壁体と補強材との間で荷重伝達(引張力の伝達)が行われる構造になっているので、壁体と補強材とで荷重を分担して受けることができる。したがって、補強材を壁体の相対的に大きな圧力を受ける側に配置しても壁体に補強材を組み合わせることにより、十分に強度の向上を図ることができる。また、鋼製壁を、例えば護岸や土留め壁等として利用した場合に、補強材が背面側に配置されることになる。したがって、鋼製壁上部の露出する側では、壁体の側面だけが露出し、補強材が隠された状態になるので、外観が煩雑にならず、美観に優れたものになる。
 また、本発明の上記構成において、前記壁体の相対的に大きな圧力を受ける側の反対側に、前記補強材が設けられていてもよい。
 このような構成によれば、壁体の相対的に大きな圧力を受ける側の反対側に、前記補強材が設けられていることから、壁体に土圧や水圧が作用する。この場合に、壁体と、補強材との連結部分で荷重が壁体から補強材に伝達(圧縮力の伝達)され、壁体と補強材とで土圧や水圧を分担して受けることができる。また、護岸や土留め壁等として用いた場合に、補強材が壁体の前面側すなわち上部が露出する側に配置されることになる。したがって、例えば、施工時に補強材の頭部を露出するための掘削の必要がなく、露出した状態の補強材や補強材と壁体との連結部分の補修を容易に行うことができる。
 本発明によれば、従来の鋼矢板壁と同様の高い止水性能を得られるとともに、補強材に荷重が伝達されることで壁体に発生する曲げモーメントを低減することができる。また、鋼矢板と鋼管またはH形鋼を組み合わせた構造でありながら、それぞれを別に施工することが可能なので、施工を容易にできる。
本発明の第1実施形態に係る鋼製壁を示す概略平面図である。 第1実施形態の前記鋼製壁を示す要部概略平面図である。 地盤中の第1実施形態の前記鋼製壁を示す概略断面図である。 本発明の第1実施形態の変形例に係る鋼製壁を概略平面図である。 本発明の第2実施形態に係る鋼製壁を示す要部概略平面図である。 地盤中の第2実施形態の前記鋼製壁を示す概略断面図である。 本発明の第3実施形態に係る鋼製壁を示す要部概略平面図である。 地盤中の第3実施形態の前記鋼製壁を示す概略断面図である。 本発明の第4実施形態に係る鋼製壁を示す要部概略平面図である。 本発明の第5実施形態に係る鋼製壁を示す要部概略平面図である。 本発明の第5実施形態の変形例に係る鋼製壁を示す概略平面図である。 本発明の第5実施形態の他の変形例に係る鋼製壁を示す要部概略平面図である。
 以下、図面を参照しながら本発明の実施形態について説明する。
 図1から図3に示すように、本発明の第1実施形態の鋼製壁3は、鋼矢板としてのハット形鋼矢板1と鋼管(補強材)2とを組み合わせて構成されている。複数のハット形鋼矢板1を連結して構成される壁体(矢板壁)4の長手方向に沿って、複数の鋼管2が1列に互いに間隔をあけて並べて配置されている。
 ハット形鋼矢板1は、ウェブ1aと、ウェブ1aの両側縁からそれぞれ互いに広がるように斜めに延出する一対のフランジ1bと、左右のフランジ1bの先端からウェブ1aと平行に左右に延出する一対のアーム1cと、アーム1cの先端に設けられた継手1dとを備えている。
 また、ハット形鋼矢板1と、鋼管2とは接しておらず、ハット形鋼矢板1と、鋼管2との間に間隔があけられた状態になっている。また、鋼管2の径は、ハット形鋼矢板1の幅(有効幅)よりも狭くなっている。この鋼管2は、その一部がハット形鋼矢板1で構成される壁体の一方の側面の谷部分になる凹部に入り込んだ状態になっている。
 複数のハット形鋼矢板1は、その継手1dどうしを連結して一列に並べられて鋼矢板壁としての上述の壁体4を構築している。また、ハット形鋼矢板1および鋼管2は地盤に打設されている。
 この鋼製壁3では、図2および図3に示すようにハット形鋼矢板1からなる壁体4の頭部と、鋼管2の頭部とがコーピング5により連結されている。すなわち、壁体4の頭部と、鋼管2の頭部とを巻き込んで打設されるコンクリートによりコーピング5が設けられている。このコーピング5になるコンクリート内に壁体4の頭部と、鋼管2の頭部とが入り込んでいることにより、壁体4の頭部と、鋼管2の頭部とが連結して固定されている。
 また、コーピング5のコンクリートにより、鋼管2の上端開口が閉塞されている。コーピング5は、壁体4の長さ方向に沿って設けられており、一つの壁体4の長さと同様の長さのコーピング5により、全ての鋼管2が壁体4に連結されている。
 また、壁体4に対して、鋼管2が、土圧がかかる側の反対、すなわち、土圧がかからない側になる前面側に配置されている。
 また、この例の鋼製壁3は、例えば、護岸になっており、高い側の地盤面aに対して低い側の地盤面b側が海、湖、河川等の水側になっている。なお、鋼製壁3は、護岸に限られるものではなく、土留め工、締切工、埋立、堤防等で用いることができる。
 ハット形鋼矢板1からなる壁体4と、鋼管2との間には、壁体4(ハット形鋼矢板1)と、鋼管2とを別々に施工した際に、これらが施工中に接触しない程度の間隔が設けられている。すなわち、先に施工された壁体4もしくは鋼管2に対して、後から施工する壁体4もしくは鋼管2が施工中に接触しない程度の間隔が設定されている。具体的には、施工時に壁体4と鋼管2との最も互いに接近する部分における間隔が50mm以上になっていることが好ましい。なお、前記間隔が、60mm以上や、70mm以上や、80mm以上であってもよい。但し、壁体4の頭部と、鋼管2の頭部のとの連結にかかるコストや、鋼製壁体の全体の厚さ等を考慮し、壁体4としての凹凸(山と谷と)を繰り返す波板状の矢板壁の谷側の凹部内に鋼管2の少なくとも一部が入り込んだ構成としている。
 壁体の凹部内に鋼管が入りこんだ構成とすることで、既に構築された鋼矢板壁の鋼矢板4や既に打設された鋼管を把持して鋼管2を油圧圧入または回転圧入することができる。既に構築された鋼矢板壁や鋼管から反力をとって油圧圧入または回転圧入する場合、安定して施工するためには、鋼管は可能な限り既に構築された鋼矢板壁や鋼管に対して近くに配置することが好ましい。
 この場合、例えば、ハット形鋼矢板1の型式等によって、凹部の深さ(ウェブ1aとアーム1cとの間のこれらに直交する方向に沿った距離)が異なるが、例えば、900mm幅のハット形鋼矢板の場合、凹部の深さは200mmから300mm程度なので、鋼管2と壁体4のハット形鋼矢板1のウェブ1aとの間隔をそれ以下とすることが好ましい。
 次に、鋼製壁3の施工方法について説明する。
 鋼製壁3の施工においては、壁体4を構成するハット形鋼矢板1と、補強材になる鋼管2とをそれぞれ別々に地盤に打設する。
 この際にハット形鋼矢板1を先に地盤に打設してもよいし、鋼管2を先に地盤に打設してもよい。また、壁体4が既設の鋼矢板壁であって、これを補強する目的等で鋼管を打設してもよい。
 また、ハット形鋼矢板1を順次、先に打設されたハット形鋼矢板1に連結しながら打設する工程と、鋼管2を一列に並べて順次打設していく工程とを並行して行ってもよい。
 また、ハット形鋼矢板1の打設においては、先に圧入したハット形鋼矢板1から反力を取ってハット形鋼矢板1を圧入する油圧圧入工法を用いてもいいし、バイブロハンマ工法を用いてもよいし、打設に際してアースオーガによる掘削を行ってもよい。
 鋼管2の圧入においても、ハット形鋼矢板1と同様の施工方法を用いることができる。さらに、鋼管2の場合には、回転圧入工法や、鋼管2内から地盤を掘削して鋼管2を圧入する中掘り工法を用いてもよい。
 また、既に構築された鋼矢板壁の鋼矢板1や既に打設された鋼管を把持して鋼管2を油圧圧入または回転圧入してもよい。その際、鋼管が壁体の凹部分に入り込んでいることで、反力を取る鋼矢板壁や鋼管と施工する鋼管との位置が近くなり、安定して施工することができる。
 この鋼製壁3にあっては、矢板壁である壁体4と補強材としての鋼管2とが施工中に接触しない間隔、例えば、50mm以上の間隔をあけて地盤に打設されるので、壁体4と鋼管2が施工中に摺動して振動、騒音や変形が生じるのを抑制することができる。
 また、壁体4と鋼管2とが施工中に接触している場合には、例えば、打設時に打設する部材を振動させるバイブロ系の工法や回転圧入工法を採用すると、上述の騒音、振動や変形の可能性が高くなってしまう。それによって、使用可能な施工方法が制限されることになる。それに対して、この実施形態では、施工中に壁体4と鋼管2とが離れているので、施工方法の選択肢が広い。
 また、鋼矢板と補強材とを接合して一体化した場合には地盤に打設される部材の断面積が大きくなり、打設が難しくなる。それに対して、この実施形態の鋼製壁3は、壁体4と鋼管2とが別々に打設されるので、施工を容易にすることができる。また、壁体4と鋼管2とが施工中に接触しないように離れているので、上述のように壁体4と鋼管2とが接触している場合よりさらに施工が容易になる。
 鋼矢板1(壁体4)と鋼管2とを打設した後、壁体4と鋼管2とに跨ってコーピング5になるコンクリートを打設する。これにより、壁体4の頭部と鋼管2の頭部とが連結される。
 この鋼製壁3においては、壁体4の頭部と、鋼管2の頭部とが連結されているので、連結部分により、壁体4と鋼管2との間で荷重伝達が可能であり、鋼製壁3が受ける土圧や水圧を、壁体4と鋼管2とが分担して受けることになる。また、壁体4の頭部と、鋼管2の頭部とが連結されているので、鋼管2と壁体4との鉛直方向の位置ずれを防止することができる。以上のことから、鋼製壁3では、鋼管2で補強された壁体4に発生する曲げモーメントを単独の鋼矢板壁よりも減少させることができる。また、鋼製壁3の止水性は、鋼矢板壁と同等とすることができ、継手1dへのモルタルの充填等を行わなくても継手部分にモルタルが充填された鋼管矢板壁と同等レベルの止水性を得られる。
 この実施形態では、図3に示すように、鋼製壁3において、壁体4の土圧のかかる側の反対、すなわち、土圧のかからない前面側に鋼管2が配置されている。したがって、既設の鋼矢板壁の補強目的の場合、背面側の地上部または地中部に障害物があったとしても、前面側に鋼管を設置して補強することができる。さらに、同じ長さの鋼管で補強する場合であっても、背面に設置する場合に比べて、土中に打ち込む長さが短くなり、施工手間とコストを削減することが可能となる。
 この実施形態では、鋼製壁3が護岸として用いられ、コーピング5によって、鋼管2の頭部と、壁体4の頭部とが連結されている。したがって、コーピング5は、鋼管2の頭部と壁体4の頭部との連結材であるとともに、鋼管2の開口部を塞ぐという機能も備える。この形態では、タイロッドのような専用の連結部材を必ずしも必要としないことから、コストの低減を図ることができる。
 この実施形態の鋼製壁3においては、壁体4の上下長さ(ハット形鋼矢板1の長さ)より鋼管2の長さを長くしている。相対的に剛性の高い鋼管2の長さを長くすることによって、鋼管2で土圧を受け持ち、壁体4で土砂の流出を防ぐ役割を持たせるといった自由な設計が可能となる。これにより、鋼重や施工コストを低減する事が可能になる。例えば、鋼管2を壁体4より長くし、鋼管2だけを支持層に根入れするものとしてもよい。
 なお、後述のように壁体4の上下長さより鋼管2の長さを短くしてもよいし、壁体4の上下長さと鋼管2の長さと同じとしてもよい。鋼管2の長さは、剛性と地盤条件の観点から決められる。また、壁体4の上下長さが鋼管2の長さと同程度ではボイリング、ヒービングや円弧すべりが懸念される場合は、壁体4の上下長さを、鋼管2に対して長くすればよい。また、地下水の止水のために、壁体4を鋼管2より長くしてもよい。
 この実施形態では、図1に示すように、壁体4の各ハット形鋼矢板1毎(壁体4の凹部毎)に、鋼管2が配置されている。しかし、求められる耐力によっては、全てのハット形鋼矢板1に鋼管2を配置する必要はない。例えば、図4に示すように鋼管2を一枚おきのハット形鋼矢板1毎(一つおきの凹部毎)に配置するものとしてもよく、二枚おきのハット形鋼矢板1毎(二つおきの凹部毎)に、配置するものとしてもよい。補強材が壁体の凹部に入り込んでいるために、全てのハット形鋼矢板1に鋼管を配置させなくても隣の鋼矢板に対して補強材の効果を及ぼすことができる。但し、鋼管2が壁体4の長手方向に沿って並べられた状態で、鋼管2の配置が略均等になっていることが好ましい。
 壁体4を構成する鋼矢板は、ハット形鋼矢板1に限られるものではなく、U形鋼矢板、Z形鋼矢板等の各種鋼矢板を用いることができる。
 次に、本発明の第2実施形態を説明する。
 図5および図6に示すように、第2実施形態の鋼製壁31は、鋼管2の頭部と壁体4の頭部とをコーピング5とともに、連結部材として鋼製の枕材(例えば、所定長さに切断された鋼板や形鋼)6により連結されている。また、鋼管2と壁体4の上下長さを同じにしている。それ以外は、第1実施形態の鋼製壁3と同様の構成を有する。そこで、第1実施形態と同様の構成要素には、同一の符号を付してその説明を省略する。
 第2実施形態においては、連結部材として鋼製の枕材6(鋼材)が鋼管2の頭部と壁体4の頭部との間に挟まれた状態に設けられている。この枕材6が鋼管2と壁体4とに、例えば溶接、ボルト、ドリルねじ等で固定されている。これにより、鋼管2と壁体4とが離れた状態で、鋼管2の頭部と壁体4の頭部とが連結されている。
 また、第2実施形態においては、上述のように鋼管2の長さと壁体4の上下長さ(ハット形鋼矢板1の長さ)とが略同じとされている。
 第2実施形態の鋼製壁31の施工方法は、次のとおりである。
 まず、鋼矢板1及び鋼管2を第1実施形態と同様に打設する。次に、枕材6となる鋼材を、鋼矢板1(壁体4)と鋼管2との間に設置し、溶接、ボルト、ドリルねじ等で鋼矢板1(壁体4)と鋼管2にそれぞれ固定する。その後、第1実施形態と同様に、壁体4と鋼管2に跨ってコーピングを打設する。
 第2実施形態の鋼製壁31においては、鋼管2の頭部と壁体4の頭部とがコーピング5と枕材6との両方で連結されている。これにより、壁体4に受ける荷重をより確実に鋼管2に伝達することができる。この点と、鋼管2とハット形鋼矢板1とが同じ長さになっていることに基づく効果以外は、第1実施形態の鋼製壁3と同様の作用効果を奏することができる。
 次に、本発明の第3実施形態を説明する。
 図7および図8に示すように、第3実施形態の鋼製壁32は、鋼管2の頭部と壁体4の頭部とをコーピング5だけではなく連結部材として一対の板材7を用いて連結している。さらに、鋼管2より壁体4の上下長さを長くしている。また、鋼管2を壁体4の土圧がかかる背面側に配置している。これら以外は、第1実施形態の鋼製壁3と同様の構成を有する。そこで、第1実施形態と同様の構成要素には、同一の符号を付してその説明を省略する。
 第3実施形態においては、鋼製の板材7が鋼管2の頭部と壁体4の頭部との間に挟まれた状態に設けられている。また、板材7が鋼管2と壁体4とにそれぞれ溶接やボルト等で固定されている。また、鋼管2と壁体4とが離れた状態で、鋼管2の頭部と壁体4の頭部とが連結されている。さらに、板材7で連結された鋼管2の頭部と壁体4の頭部とに跨って、コンクリートで巻き込んでコーピング5を設けることにより、コーピング5によっても鋼管2の頭部と壁体4の頭部とを連結している。
 また、第3実施形態においては、上述のように鋼管2の長さより壁体4の上下長さ(ハット形鋼矢板1の長さ)を長くしている。このことにより、ボイリング、ヒービングや円弧すべりの防止を図ったり、地下水の止水を図ったりすることができる。また、コーピング5による連結に加えて板材7による連結を行うことによって、鋼管2の頭部と、壁体4の頭部との連結部分の強度を高めることができる。特に、この構造では、壁体4と鋼管2との間には引張荷重が働くので、鋼製の板材7による連結がさらに有効である。
 また、壁体4の背面側に鋼管2を設けることによって、鋼管2を壁体4の前側に露出させずに隠すことができるので、鋼製壁32の美観を高めることができる。
 第3実施形態の鋼製壁32では、連結部分の構造、鋼管2と壁体4の長さ、壁体4に対する鋼管2の配置に基づく作用効果を除いて、第1実施形態と同様の作用効果を奏することができる。
 次に、本発明の第4実施形態を説明する。
 図9に示すように、第4実施形態の鋼製壁33は、補強材を鋼管2に代えてH形鋼9としたものであり、それ以外の構成は、第1実施形態の鋼製壁3と同様の構成になっている。そこで、第1実施形態と同様の構成要素には、同一の符号を付してその説明を省略する。
 第4実施形態の鋼製壁33は、補強材としてH形鋼9を用いたものである。H形鋼9は、ハット形鋼矢板1が連接された壁体4の長手方向に沿って、第1実施形態の鋼管2の場合と同様に間隔をあけて一列に並んで配置されている。また、H形鋼9と壁体4との間には、第1実施形態の鋼管2の場合と同様に間隔が設けられている。
 また、H形鋼9は、その一部がハット形鋼矢板1で構成される壁体の一方の側面の谷部分になる凹部に入り込んだ状態になっている。また、H形鋼9は、壁体4の長手方向に対して、ウェブ9aが直交するように配置されている。したがって、フランジ9bは、壁体4の長手方向に平行になっている。
 この壁体4の頭部と、H形鋼9の頭部とが連結されている。鋼製壁33と補強材としてのH形鋼9との連結方法は、第1実施形態から第3実施形態と同様の方法を用いることができる。すなわち、コーピング5より壁体4とH形鋼9とを連結する。なお、壁体4とH形鋼9とを鋼材を介して溶接やボルトによる締結で連結してもよい。また、これらの連結方法を組み合わせて、壁体4の頭部とH形鋼9の頭部とを連結することができる。
 壁体4の長さとH形鋼9の長さとの関係、壁体4に対するH形鋼9の配置(壁体4とH形鋼9の間隔を含む)等の補強材を鋼管2に代えてH形鋼9とした以外の構成は、第1実施形態から第3実施形態と同様とすることができる。
 鋼製壁33の施工方法においては、H形鋼9を中掘り工法や回転圧入工法で施工することができないことを除いて、第1実施形態から第3実施形態の鋼製壁の施工方法と同様とすることができる。
 第4実施形態の鋼製壁33は、鋼管2による作用効果以外は、第1実施形態から第3実施形態の鋼製壁3と同様の作用効果を奏することができる。
 次に、本発明の第5実施形態を説明する。
 図10に示すように、第5実施形態の鋼製壁34は、上述の各実施形態において、鋼管2の頭部と壁体4の頭部との連結が鋼板8の溶接により行われている。鋼管2の頭部と壁体4の頭部との連結にコンクリートが用いられていない。この鋼管2の頭部と壁体4の頭部との連結の構造以外の構成は、第1実施形態の鋼製壁3と同様の構成になっている。そこで、同様の構成要素には、同一の符号を付してその説明を省略する。
 第5実施形態の鋼製壁34は、第1実施形態と同様に、複数のハット形鋼矢板1を連結して構成される壁体(矢板壁)4の長手方向に沿って、複数の鋼管2が1列に互いに間隔をあけて並べて配置されている。また、凹凸を繰り返す波状の鋼矢板1の凹部に鋼管2の一部が入り込んだ状態に配置されている。
 壁体4のハット形鋼矢板1と鋼管2との間には、鋼板8が配置されている。この実施形態では、鋼板8が、ハット形鋼矢板1のアーム1cと鋼管2の外周との間に配置されている。鋼板8は、左右のアーム1cに対応して、1つのハット形鋼矢板1と1つの鋼管2に対して左右一対ずつ設けられている。
 また、鋼板8の一方の端部は、ハット形鋼矢板1のアーム1cに溶接され、他方の端部は鋼管2の外周に溶接されている。
 鋼製壁34の施工においては、壁体4の構築および鋼管2の打設は、第1実施形態と同様に行われる。壁体4の構築と鋼管2の打設が終了した後に、鋼板8を壁体4のハット形鋼矢板1と鋼管2とに溶接する。
 第5実施形態の鋼製壁34においては、壁体4と鋼管2との頭部どうしの連結が鋼板8の溶接により行われるので、施工が容易になる。また、コンクリートで連結する場合のように、養生期間を必要とせず、工期が短い。
 なお、この実施形態において、図11に示すように、鋼板8をハット形鋼矢板1のウェブ1aと鋼管2の外周面との間に配置してもよいし、フランジ1bと鋼管2の外周面との間に配置してもよい。
 また、ハット形鋼矢板1に対して鋼管2のピッチを飛ばして(例えば、一つまたは複数おきのハット形鋼矢板1に鋼管2を配置するようにして)、ハット形鋼矢板1の有効幅よりも大きな径の鋼管2を用いてもよい。
 また、鋼管2を壁体4の相対的に大きな圧力を受ける側に配置してもよいし、その反対側に配置してもよい。
 また、図12に示す鋼製壁34Aのように、鋼板8の溶接による連結に加えて、第1実施形態と同様に、壁体4の頭部と鋼管2の頭部とを巻き込んで打設されるコンクリートによりコーピング5を設けてもよい。この場合に、鋼板8の溶接後にコンクリートを打設することになる。
 また、壁体4と鋼管2とが、鋼板8の溶接に加えてコンクリートによっても連結されることになる。
 この場合に、例えば、壁体4と鋼管2との間の圧縮力の伝達を主にコンクリートが行い、引張力の伝達を主に鋼板8が行うように、補い合う構造とすることができる。また、上述のコンクリートによる鋼管2の上端開口の閉塞や、天端の崩壊の防止などを図ることができる。
 なお、既設の鋼矢板壁を壁体4とし、この壁体4に対して、鋼管2やH形鋼9を打設することによって、鋼製壁3,31,32,33,34,34Aを構築するようにしてもよい。
1   ハット形鋼矢板(鋼矢板)
1d  継手
2   鋼管(補強材)
3   鋼製壁
5   コーピング
8   鋼板
9   H形鋼(補強材)
31  鋼製壁
32  鋼製壁
33  鋼製壁
34  鋼製壁
34A 鋼製壁

Claims (9)

  1.  複数の鋼矢板が継手により連結されて長手方向に凹凸を繰り返す波板状の壁体が設けられ、
     前記壁体を補強する鋼管またはH形鋼からなる複数の補強材が前記壁体の長手方向に沿って、前記壁体と間隔をあけて並べて設けられ、
     前記補強材の一部が前記壁体の凹部内に入り込んだ状態にされ、
     前記壁体と前記補強材とが頭部で連結されていることを特徴とする鋼製壁。
  2.  前記補強材が前記鋼矢板に対して一枚おきまたは複数枚おきに設置されていることを特徴とする請求項1に記載の鋼製壁。
  3.  前記壁体と前記補強材とは、両者の頭部に跨って打設されたコンクリートにより頭部で連結されていることを特徴とする請求項1に記載の鋼製壁。
  4.  前記壁体と前記補強材とは、両者の間に設置された鋼板をそれぞれ両者に溶接接合することにより頭部で連結されていることを特徴とする請求項1に記載の鋼製壁。
  5.  前記壁体と前記補強材とは、両者の頭部に跨って打設されたコンクリートにより頭部で連結されていることを特徴とする請求項4に記載の鋼製壁。
  6.  前記補強材が前記鋼管であることを特徴とする請求項1から請求項5のいずれか1項に記載の鋼製壁。
  7.  前記壁体と前記補強材との間には、前記壁体の前記鋼矢板と前記補強材とが施工中に接触することがない間隔が設定されていることを特徴とする請求項1から請求項5のいずれか1項に記載の鋼製壁。
  8.  前記壁体の相対的に大きな圧力を受ける側に、前記補強材が設けられていることを特徴とする請求項1から請求項5のいずれか1項に記載の鋼製壁。
  9.  前記壁体の相対的に大きな圧力を受ける側の反対側に、前記補強材が設けられていることを特徴とする請求項1から請求項5のいずれか1項に記載の鋼製壁。
PCT/JP2012/061574 2012-05-01 2012-05-01 鋼製壁 Ceased WO2013164885A1 (ja)

Priority Applications (8)

Application Number Priority Date Filing Date Title
JP2014513324A JP6015751B2 (ja) 2012-05-01 2012-05-01 鋼製壁および鋼製壁の施工方法
PCT/JP2012/061574 WO2013164885A1 (ja) 2012-05-01 2012-05-01 鋼製壁
CN201280072877.0A CN104271841A (zh) 2012-05-01 2012-05-01 钢制墙
IN8915DEN2014 IN2014DN08915A (ja) 2012-05-01 2012-05-01
CN201810196043.XA CN108330952A (zh) 2012-05-01 2012-05-01 钢制墙的制造方法
SG11201407027YA SG11201407027YA (en) 2012-05-01 2012-05-01 Steel wall
HK15104183.2A HK1203580A1 (en) 2012-05-01 2012-05-01 Steel wall
EP12875924.8A EP2848739A4 (en) 2012-05-01 2012-05-01 STEEL WALL

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2012/061574 WO2013164885A1 (ja) 2012-05-01 2012-05-01 鋼製壁

Publications (1)

Publication Number Publication Date
WO2013164885A1 true WO2013164885A1 (ja) 2013-11-07

Family

ID=49514295

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2012/061574 Ceased WO2013164885A1 (ja) 2012-05-01 2012-05-01 鋼製壁

Country Status (7)

Country Link
EP (1) EP2848739A4 (ja)
JP (1) JP6015751B2 (ja)
CN (2) CN108330952A (ja)
HK (1) HK1203580A1 (ja)
IN (1) IN2014DN08915A (ja)
SG (1) SG11201407027YA (ja)
WO (1) WO2013164885A1 (ja)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2021134655A (ja) * 2020-02-27 2021-09-13 日本製鉄株式会社 岸壁構造および岸壁構造の構築方法
JP2021167518A (ja) * 2020-04-10 2021-10-21 日本製鉄株式会社 岸壁構造および岸壁構造の構築方法
JP2021167523A (ja) * 2020-04-10 2021-10-21 日本製鉄株式会社 岸壁補強構造および岸壁構造の補強方法
CN114991187A (zh) * 2022-06-28 2022-09-02 安徽省公路桥梁工程有限公司 一种深水钢板桩和钢管桩组合式围堰结构及其施工方法
JP2023076734A (ja) * 2018-11-02 2023-06-01 日鉄エンジニアリング株式会社 岸壁構造および岸壁構造の構築方法

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017089144A (ja) * 2015-11-05 2017-05-25 株式会社琉球技研 鋼矢板による護岸構造体
CN110863473B (zh) * 2019-11-27 2024-06-25 中国电建集团贵阳勘测设计研究院有限公司 一种埋藏式压力钢管的联合阻水结构

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH074241B2 (ja) 1987-05-07 1995-01-25 三菱重工業株式会社 微生物菌体の固定化法
JP2002212943A (ja) 2001-01-19 2002-07-31 Sumitomo Metal Ind Ltd 地中連続壁用鋼材および地中連続壁
JP2005299202A (ja) * 2004-04-12 2005-10-27 Nippon Steel Corp 鋼矢板とそれを用いた土留め構造及び土留め構造の構築方法
JP3756755B2 (ja) 2000-11-29 2006-03-15 新日本製鐵株式会社 鋼製矢板の継ぎ手構造と止水方法
JP2009249959A (ja) * 2008-04-09 2009-10-29 Nippon Steel Corp 地中連続壁及びその構築方法

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101024955B (zh) * 2002-10-31 2010-05-26 住友金属工业株式会社 钢板桩
JP4074241B2 (ja) * 2003-12-15 2008-04-09 住友金属工業株式会社 鋼材の建込み方法
WO2011142047A1 (ja) * 2010-05-10 2011-11-17 住友金属工業株式会社 鋼製壁および鋼製壁の施工方法
CN102116031A (zh) * 2011-01-17 2011-07-06 东南大学 一种钢板桩管桩组合基坑支护结构及其支护方法
CN202164596U (zh) * 2011-06-30 2012-03-14 董荣进 钢管板桩组合构造

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH074241B2 (ja) 1987-05-07 1995-01-25 三菱重工業株式会社 微生物菌体の固定化法
JP3756755B2 (ja) 2000-11-29 2006-03-15 新日本製鐵株式会社 鋼製矢板の継ぎ手構造と止水方法
JP2002212943A (ja) 2001-01-19 2002-07-31 Sumitomo Metal Ind Ltd 地中連続壁用鋼材および地中連続壁
JP2005299202A (ja) * 2004-04-12 2005-10-27 Nippon Steel Corp 鋼矢板とそれを用いた土留め構造及び土留め構造の構築方法
JP2009249959A (ja) * 2008-04-09 2009-10-29 Nippon Steel Corp 地中連続壁及びその構築方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP2848739A4 *

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2023076734A (ja) * 2018-11-02 2023-06-01 日鉄エンジニアリング株式会社 岸壁構造および岸壁構造の構築方法
JP7654028B2 (ja) 2018-11-02 2025-03-31 日鉄エンジニアリング株式会社 岸壁構造および岸壁構造の構築方法
JP2021134655A (ja) * 2020-02-27 2021-09-13 日本製鉄株式会社 岸壁構造および岸壁構造の構築方法
JP7516197B2 (ja) 2020-02-27 2024-07-16 日本製鉄株式会社 岸壁構造および岸壁構造の構築方法
JP2021167518A (ja) * 2020-04-10 2021-10-21 日本製鉄株式会社 岸壁構造および岸壁構造の構築方法
JP2021167523A (ja) * 2020-04-10 2021-10-21 日本製鉄株式会社 岸壁補強構造および岸壁構造の補強方法
JP7364526B2 (ja) 2020-04-10 2023-10-18 日本製鉄株式会社 岸壁構造および岸壁構造の構築方法
JP2023168596A (ja) * 2020-04-10 2023-11-24 日本製鉄株式会社 岸壁構造および岸壁構造の構築方法
JP7628594B2 (ja) 2020-04-10 2025-02-10 日本製鉄株式会社 岸壁構造および岸壁構造の構築方法
CN114991187A (zh) * 2022-06-28 2022-09-02 安徽省公路桥梁工程有限公司 一种深水钢板桩和钢管桩组合式围堰结构及其施工方法
CN114991187B (zh) * 2022-06-28 2023-09-26 安徽省公路桥梁工程有限公司 一种深水钢板桩和钢管桩组合式围堰结构及其施工方法

Also Published As

Publication number Publication date
JP6015751B2 (ja) 2016-10-26
CN104271841A (zh) 2015-01-07
EP2848739A4 (en) 2016-04-13
IN2014DN08915A (ja) 2015-05-22
EP2848739A1 (en) 2015-03-18
JPWO2013164885A1 (ja) 2015-12-24
CN108330952A (zh) 2018-07-27
SG11201407027YA (en) 2014-12-30
HK1203580A1 (en) 2015-10-30

Similar Documents

Publication Publication Date Title
JP6015751B2 (ja) 鋼製壁および鋼製壁の施工方法
JP5321741B2 (ja) 鋼製壁および鋼製壁の施工方法
JP5464370B2 (ja) 盛土の補強構造
KR20100068597A (ko) 아치형 강판파일과 H-Pile을 이용한 흙막이공법
JP4856779B2 (ja) 擁壁装置
JP3701280B2 (ja) 山留支保工
JP2012102497A (ja) 鋼製壁および鋼製壁の施工方法
JP2003138558A (ja) 連結鋼管矢板とそれを用いた鋼管連結構造および鋼管矢板壁およびソイルセメント連続壁
JP3905776B2 (ja) 護岸構造
JP6826820B2 (ja) 挿入杭式土留め壁
JP4358792B2 (ja) 通水性を有する土留め壁
KR20100068350A (ko) 비대칭 h―시트 파일 및 그를 이용한 시공구조
JP2005256571A (ja) 連続壁体とその構築方法
JP2003113608A (ja) 遮水壁構造及び該遮水壁を用いた遮水護岸構造
JP5769594B2 (ja) 鋼製壁
KR200459483Y1 (ko) 강관 병행 h?시트 파일을 이용한 시공구조
TWI554665B (zh) Steel wall
JPH03147908A (ja) 水域矢板壁構造物
KR101352429B1 (ko) 파형 강판 세그먼트를 이용한 방수형 가설 흙막이 공법
HK1251273A1 (zh) 钢制墙的制造方法
KR101045663B1 (ko) 이중 연속벽
JP5407644B2 (ja) 地盤の側方流動の影響を受け難くした構造の地中連続壁基礎、及び、その構築方法
JP2003213670A (ja) 遮水構造
JP2007051435A (ja) 鋼管矢板の継手方法および継手構造
JP2005344448A (ja) 鋼矢板

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 12875924

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 2012875924

Country of ref document: EP

ENP Entry into the national phase

Ref document number: 2014513324

Country of ref document: JP

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE