WO2017145459A1 - Système de commande de connexion de système de puissance, procédé de commande de connexion de système de puissance, et programme de commande de connexion de système de puissance - Google Patents

Système de commande de connexion de système de puissance, procédé de commande de connexion de système de puissance, et programme de commande de connexion de système de puissance Download PDF

Info

Publication number
WO2017145459A1
WO2017145459A1 PCT/JP2016/084110 JP2016084110W WO2017145459A1 WO 2017145459 A1 WO2017145459 A1 WO 2017145459A1 JP 2016084110 W JP2016084110 W JP 2016084110W WO 2017145459 A1 WO2017145459 A1 WO 2017145459A1
Authority
WO
WIPO (PCT)
Prior art keywords
power
power supply
amount
consumer
connection control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/JP2016/084110
Other languages
English (en)
Japanese (ja)
Inventor
恭之 江田
一希 笠井
紘 今井
皓正 高塚
冨実二 相田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Omron Corp
Original Assignee
Omron Corp
Omron Tateisi Electronics Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Omron Corp, Omron Tateisi Electronics Co filed Critical Omron Corp
Publication of WO2017145459A1 publication Critical patent/WO2017145459A1/fr
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Images

Classifications

    • H—ELECTRICITY
    • H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02J—ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00—Circuit arrangements for AC mains or AC distribution networks
    • H—ELECTRICITY
    • H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02J—ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00—Circuit arrangements for providing remote monitoring or remote control of equipment in a power distribution network
    • H—ELECTRICITY
    • H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02J—ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00—Circuit arrangements for AC mains or AC distribution networks
    • H02J3/28—Arrangements for balancing of the load in networks by storage of energy
    • H02J3/32—Arrangements for balancing of the load in networks by storage of energy using batteries or super capacitors with converting means
    • H—ELECTRICITY
    • H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02J—ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00—Circuit arrangements for AC mains or AC distribution networks
    • H02J3/38—Arrangements for feeding a single network from two or more generators or sources in parallel; Arrangements for feeding already energised networks from additional generators or sources in parallel
    • Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E70/00—Other energy conversion or management systems reducing GHG emissions
    • Y02E70/30—Systems combining energy storage with energy generation of non-fossil origin

Definitions

  • the present invention relates to, for example, a power system connection control system, a power system connection control method, and a power system connection control program for switching connection between a customer who owns a power generation apparatus and a power system.
  • a power generation apparatus for example, a solar power generation apparatus
  • a surplus power purchase system has been established, so that electric power generated by a solar power generation device, a wind power generation device, or the like can be sold to an electric power company.
  • the generated power may not be sold to the power company.
  • output suppression a predetermined amount of power that can be purchased by an electric power company is exceeded (hereinafter referred to as output suppression). For this reason, a consumer may use a storage battery that can temporarily store power that could not be sold.
  • Patent Document 1 discloses a power management system that can easily and inexpensively notify that a distributed power source that can be connected to a system can be reconnected after being disconnected from the commercial power system. ing.
  • the conventional power management system has the following problems. That is, the power management system disclosed in the above publication does not take into account the power supply / demand situation of one consumer, and simply refers to notification of reconnection after being disconnected from the commercial power system. Just doing. For this reason, even if the power generation amount exceeds the consumption amount in one consumer, it is not possible to release the connection with the power system and reduce the power grid usage cost of the power system.
  • An object of the present invention is to provide a power system connection control system and a power system connection control capable of reducing the use cost of the power transmission network by releasing the connection with the power system according to the power supply and demand situation in one consumer.
  • a method and a power system connection control program are provided. (Means for solving the problem)
  • a power system connection control system according to a first invention is a power system connection control system that controls connection switching between a power supply device owned by a first consumer and a distribution network to which power is supplied from a power company.
  • a power amount information acquisition unit, a power supply and demand prediction unit, and a control unit. The power amount information acquisition unit acquires information on the power supply amount in the power supply device.
  • the power supply and demand prediction unit predicts the power supply and demand situation in a predetermined time zone based on the information acquired by the power amount information acquisition unit and the amount of power consumed by the first consumer.
  • the control unit controls the first switching unit that switches the connection between the power distribution network and the power supply device based on the prediction result in the power supply and demand prediction unit.
  • the 1st switching part which connects the electric power supply network which an electric power company supplies electric power, and the electric power supply apparatus which a 1st consumer owns is switched.
  • connection / disconnection of the electric power supply apparatus which a 1st consumer owns, and a power distribution network is switched.
  • the first consumer means a single consumer, and owns a power supply device that supplies power and a load that consumes power.
  • Examples of power supply devices owned by consumers include power generation devices that utilize renewable energy such as solar power generation devices, wind power generation devices, and geothermal power generation devices, generators, heat pumps, electric vehicles, and power storage devices. included.
  • the information regarding the power supply amount in the power supply device acquired in the power amount information acquisition unit includes, for example, an estimated value of the power generation amount in a predetermined time zone when the power supply device is a power generation device, If is a storage battery, the current storage amount and the like are included.
  • the power supply / demand prediction unit compares the amount of power supplied by the power supply device with the amount of power consumed by the load, and predicts the balance between the demand and supply of power in the first consumer.
  • the control unit uses the first switching unit to control whether or not to disconnect the distribution network to which power is supplied from the power company and the power supply device based on the prediction result in the power supply and demand prediction unit.
  • a 1st switching part is a connection switching means arrange
  • the power supply / demand prediction unit predicts that there is an excess supply, it means that sufficient power is supplied to the power consumption by the load in the first consumer.
  • the connection between the network and the power supply device can be disconnected. As a result, the power supplied from the distribution network can be cut off to reduce the electricity bill, and the use cost of the distribution network can be reduced.
  • the power system connection control system according to the second invention is the power system connection control system according to the first invention, wherein the power supply and demand prediction unit uses the weather forecast information to include the power generation device included in the power supply device The power generation amount in a predetermined time zone is predicted.
  • the power supply and demand prediction unit predicts the amount of power generation in the power supply device (power generation device) using information related to the weather forecast.
  • a power system connection control system is the power system connection control system according to the first or second aspect of the present invention, wherein the power supply / demand prediction unit is a current power storage amount of the power storage device included in the power supply device Is used to predict the amount of power stored in the power storage device in a predetermined time period.
  • the power storage amount of the current power storage device is used for the power supply / demand prediction in the power supply / demand prediction unit.
  • the power supply and demand in the consumer group in a predetermined time zone can be obtained using the current power storage amount of the storage battery together with the estimated value of the power generation amount and the power consumption amount of each power supply device in a predetermined time zone. Can be predicted.
  • a power system connection control system according to a fourth aspect of the present invention is the power system connection control system according to any one of the first to third aspects, wherein the power supply and demand prediction unit Based on the data which recorded the power consumption according to a lifestyle pattern, the power consumption in a 1st consumer is estimated.
  • the data which recorded the power consumption according to the lifestyle pattern of the 1st consumer is used for estimation of the power consumption in a power supply-and-demand prediction part.
  • the first consumer has a life pattern in which the amount of power consumed at night is larger than that during the day, the amount of power generated by the solar power generator is large and the amount of power consumed is low during the daytime. It can be seen that there is a high possibility of surplus power. Therefore, it is possible to detect the time zone in which surplus power is likely to be generated for each consumer, and improve the estimation accuracy of the power consumption.
  • a power system connection control system is the power system connection control system according to any one of the first to fourth aspects of the present invention, wherein the power in the power supply device acquired in the power amount information acquisition unit
  • the information processing apparatus further includes a storage unit that stores information on the supply amount and a prediction result in the power supply and demand prediction unit.
  • the information regarding the power supply amount in the power supply apparatus owned by the first consumer and the prediction result of the power supply and demand prediction unit in the first consumer are stored in the storage unit provided in the system.
  • a power system connection control system is the power system connection control system according to any one of the first to fifth aspects, wherein information relating to the power supply device is input by the first consumer. Is done.
  • the power supply / demand prediction unit predicts the power supply / demand in the first consumer using the information related to the power supply apparatus input by the first consumer.
  • the information related to the input power supply device includes information such as the type of the power supply device, the power generation capacity, the estimated power generation amount based on the weather forecast, the power storage amount of the power storage device, and the full charge capacity of the storage battery.
  • a power system connection control method is a power system connection control method for controlling connection switching between a power supply device owned by a first consumer and a distribution network to which power is supplied from a power company. , A power amount information acquisition step, a power supply / demand prediction step, and a control step. The power amount information acquisition step acquires information regarding the power supply amount in the power supply device.
  • the power supply / demand prediction step predicts the power supply / demand situation in a predetermined time zone based on the information acquired in the power amount information acquisition step and the power consumption amount of the first consumer.
  • the control step controls the first switching unit that switches the connection between the distribution network and the power supply device based on the prediction result in the power supply and demand prediction step.
  • the 1st switching part which connects the electric power supply network which an electric power company supplies electric power, and the electric power supply apparatus which a 1st consumer owns is switched.
  • connection / disconnection of the electric power supply apparatus which a 1st consumer owns, and a power distribution network is switched.
  • the first consumer means a single consumer, and owns a power supply device that supplies power and a load that consumes power.
  • Examples of power supply devices owned by consumers include power generation devices that utilize renewable energy such as solar power generation devices, wind power generation devices, and geothermal power generation devices, generators, heat pumps, electric vehicles, and power storage devices. included.
  • the information on the power supply amount in the power supply device acquired in the power amount information acquisition step includes, for example, an estimated value of the power generation amount in a predetermined time zone, when the power supply device is a power generation device, If is a storage battery, the current storage amount and the like are included.
  • the power supply / demand prediction step compares the amount of power supplied by the power supply device with the amount of power consumed by the load, and predicts the balance between the demand and supply of power in the first consumer.
  • the control step uses the first switching unit to control whether or not to disconnect the distribution network to which power is supplied from the power company and the power supply device based on the prediction result in the power supply and demand prediction step.
  • a 1st switching part is a connection switching means arrange
  • a power system connection control program is a power system connection control program for controlling connection switching between a power supply device owned by a first consumer and a distribution network to which power is supplied from a power company.
  • the computer is caused to execute a power system connection control method including a power amount information acquisition step, a power supply and demand prediction step, and a control step.
  • the power amount information acquisition step acquires information regarding the power supply amount in the power supply device.
  • the power supply / demand prediction step predicts the power supply / demand situation in a predetermined time zone based on the information acquired in the power amount information acquisition step and the power consumption amount of the first consumer.
  • the control step controls the first switching unit that switches the connection between the distribution network and the power supply device based on the prediction result in the power supply and demand prediction step.
  • the 1st switching part which connects the electric power supply network which an electric power company supplies electric power, and the electric power supply apparatus which a 1st consumer owns is switched.
  • connection / disconnection of the electric power supply apparatus which a 1st consumer owns, and a power distribution network is switched.
  • the first consumer means a single consumer, and owns a power supply device that supplies power and a load that consumes power.
  • Examples of power supply devices owned by consumers include power generation devices that utilize renewable energy such as solar power generation devices, wind power generation devices, and geothermal power generation devices, generators, heat pumps, electric vehicles, and power storage devices. included.
  • the information on the power supply amount in the power supply device acquired in the power amount information acquisition step includes, for example, an estimated value of the power generation amount in a predetermined time zone, when the power supply device is a power generation device, If is a storage battery, the current storage amount and the like are included.
  • the power supply / demand prediction step compares the amount of power supplied by the power supply device with the amount of power consumed by the load, and predicts the balance between the demand and supply of power in the first consumer.
  • the control step uses the first switching unit to control whether or not to disconnect the distribution network to which power is supplied from the power company and the power supply device based on the prediction result in the power supply and demand prediction step.
  • a 1st switching part is a connection switching means arrange
  • the control part contained in this system if it is a prediction result that the supply is excessive, it means that sufficient power is supplied to the power consumption by the load in the first consumer.
  • the connection between the network and the power supply device can be disconnected.
  • the power supplied from the distribution network can be cut off to reduce the electricity bill, and the use cost of the distribution network can be reduced. (The invention's effect)
  • According to the power system connection control system according to the present invention it is possible to release the connection with the power system and reduce the usage cost of the power transmission network according to the supply and demand situation of power in one consumer.
  • the block diagram which shows the connection relation of the power grid connection control system which concerns on one Embodiment of this invention, the power supply apparatus which a consumer owns, and a power distribution network.
  • the flowchart which shows the flow of the electric power system connection control method performed by the electric power system connection control system of FIG.
  • the graph which shows the prediction of the supply-and-demand condition of the electric power in each consumer contained in FIG.
  • the figure which shows the predicted value of the electric power supply amount after n hours in each consumer contained in FIG.
  • the block diagram which shows the connection relation of the electric power system connection control system which concerns on other embodiment of this invention, the electric power supply apparatus which a consumer owns, and a power distribution network.
  • a power system connection control system will be described below with reference to FIGS.
  • a customer (first customer) 20 that appears in the following description owns a power generation device (solar panel 21, power storage device 23, and wind power generation device 27) as a power supply device.
  • a power generation device solar panel 21, power storage device 23, and wind power generation device 27
  • a consumer is, for example, an individual, a corporation, an organization, or the like who has a contract with an electric power company and uses electric power supplied from the electric power company via the grid 40 (see FIG. 1).
  • General households detached houses, condominiums), companies (business establishments, factories, facilities, etc.), local governments, national institutions, etc. are included.
  • the consumer includes a consumer who provides power by self-power generation and a consumer who realizes ZEB (Zero Energy Building).
  • strain 40 means a part of distribution network which supplies the electric power supplied from an electric power company with respect to each consumer.
  • the load 24 means a power consumer such as an air conditioner, a refrigerator, a power range, an IH cooking heater, and a television when the consumer is a general household.
  • a power consumer such as an air conditioner, a refrigerator, a power range, an IH cooking heater, and a television when the consumer is a general household.
  • a consumer when a consumer is a company (a factory or the like), it means power consumers such as various facilities and air conditioning equipment installed in the factory.
  • an EMS (Energy Management System) 26 is installed in each consumer, and is a system provided to reduce power consumption in each consumer. I mean.
  • the EMS 26 is connected to the power system connection control system 10 via a network.
  • the smart meter 28 (see FIG. 1) is a measurement that is installed in each consumer, measures the amount of power consumption, and transmits the measurement result to an electric power company or the like using a communication function. Means equipment. By installing the smart meter 28, the electric power company can accurately grasp the real-time power status of each customer and can automate the meter reading work performed every predetermined period.
  • the power system connection control system 10 predicts the power supply / demand situation in a customer who owns a power supply device (a power generation device, a power storage device, etc.), and a plurality of switching units 41, 42a ⁇ shown in FIG.
  • the connection between the customer (first customer) 20 and the system 40 is cut while switching between 42d and 43a to 43d.
  • the power system connection control system 10 detects the power supply / demand situation in the consumer 20 at predetermined time intervals, and based on the demand / supply situation, the switching units 41, 42a to 42d, 43a to 43d. Control to switch between. That is, in the power system connection control system 10 of the present embodiment, when the power supply / demand situation is an excessive supply situation in the consumer 20, the commercial power is supplied to the consumer 20 from the power company. The connection with the system 40 is disconnected (disconnected).
  • the power supply device (solar panel 21, power storage device) owned by the customer 20 is controlled by controlling at least one of the switching units 41, 42a, and 43b to be turned off. 23, the connection between the wind power generator 27) and the distribution network (system 40) is disconnected (disconnected).
  • the 2nd switching part 41 shown in FIG. 1 is a connection switching means which switches the connection with the some customer group containing the system
  • the second switching units 42a to 42d shown in FIG. 1 are connection switching means for performing connection switching with the system 40 for each consumer group including a plurality of consumers.
  • the first switching units 43a to 43d shown in FIG. 1 are connection switching means for performing connection switching with the system 40 for each of a plurality of consumers.
  • the customer 20 transmits information on the power supply / demand situation of the customer 20 for each predetermined time zone to the power system connection control system 10 via an EMS (Energy Management System) 26.
  • EMS Electronicgy Management System
  • the consumer 20 includes a solar panel (power supply device) 21, a solar power generation power conversion device (PCS) 22, a power generation power sensor 22 a, a power storage device 23, and power for stored power.
  • a sensor 23a, a load 24, a load power sensor 24a, a distribution board 25, an EMS 26, a wind power generation device (power supply device) 27, a wind power generation power sensor 27a, and a smart meter 28 are provided.
  • the solar panel (power supply device) 21 is a power generation device that generates electricity using the photovoltaic effect using the light energy of sunlight, and is installed on the roof or the like of the customer 20. And the electric power generation amount in the solar panel 21 can be estimated based on the information regarding the sunshine time of a weather forecast.
  • a photovoltaic power generation converter (PCS (Power Conditioning System)) 22 is connected to a solar panel 21 and converts a direct current generated in the solar panel 21 into an alternating current.
  • the generated power sensor 22 a is connected to the solar power converter 22 and measures the amount of power generated by the solar panel 21.
  • the generated power sensor 22 a transmits the measurement result (power generation amount) to the EMS 26.
  • the power storage device (power supply device) 23 is provided for temporarily storing surplus power that cannot be consumed by the load 24 among the power generated by the solar panel 21 and the wind power generator 27. As a result, for example, even when the amount of power consumed by the load 24 is small during the daytime when power is generated by the solar panel 21 and the wind power generator 27, power is generated by storing excess power in the power storage device 23. Eliminating the waste of power.
  • the stored power sensor 23 a is connected to the power storage device 23 and measures the amount of power stored in the power storage device 23. Then, the power sensor 23a for stored power transmits a measurement result (amount of stored power) to the EMS 26.
  • the load 24 means a power consumer such as an air conditioner or a home appliance such as a refrigerator in a general household, equipment in a factory, or an air conditioner. The load 24 consumes any of the power supplied from the grid 40, the power generated by the solar panel 21, the wind power generator 27, and the power stored in the power storage device 23.
  • the load power sensor 24 a is connected to the load 24 and measures the amount of power consumed by the load 24. Then, the load power sensor 24 a transmits the measurement result (power consumption amount) to the EMS 26.
  • the distribution board 25 is connected to a power sensor for generated power 22a, a power sensor for stored power 23a, a power sensor for load 24a, and a power sensor for wind power generation 27a. The distribution board 25 supplies the load 24 with the power generated by the solar panel 21 and the wind power generator 27 and the power stored in the power storage device 23.
  • the EMS (Energy Management System) 26 is an energy management system provided to reduce power consumption in the consumer 20, and as shown in FIG. 1, each sensor 22a, 23a, 24a. , 27a. Further, the EMS 26 efficiently supplies the load 24 with the power generated in the solar panel 21 and the wind power generator 27 and the power stored in the power storage device 23 using the detection results received from the sensors 22a, 23a, 24a, and 27a. To do.
  • the EMS 26 transmits information (demand condition, supply condition) regarding the power supply / demand situation for each predetermined time period in the customer 20 to the power amount information acquisition unit 11 of the power system connection control system 10. Specifically, the EMS 26 receives the detection results from the sensors 22a, 23a, 24a, and 27a for each predetermined time zone, and the past power consumption according to the weather forecast information and the lifestyle pattern of the customer 20 Send data about
  • the wind power generation device (power supply device) 27 is a power generation device that generates electricity by rotating a windmill using natural wind force, and is installed in the premises of the customer 20. And the electric power generation amount in the wind power generator 27 can be estimated based on the information regarding the wind speed of a weather forecast. As shown in FIG. 1, the wind power generation power sensor 27 a is connected to the wind power generation device 27 and measures the amount of power generated by the wind power generation device 27. Then, the wind power generation power sensor 27 a transmits the measurement result (power generation amount) to the EMS 26.
  • the smart meter 28 measures the solar panel 21 owned by the customer 20, the power generation amount of the wind power generator 27, the power storage amount of the power storage device 23, and the power consumption amount of the load 24.
  • the smart meter 28 is connected to the sensors 22a, 23a, 24a, and 27a via the distribution board 25 as shown in FIG.
  • the smart meter 28 has a communication function, and transmits information on the amount of power generation, the amount of electricity stored, and the amount of power consumption in the consumer 20 to the power company.
  • the power system connection control system 10 includes a power supply device owned by the customer 20 by controlling the second switching unit 41 and the like in a time zone in which the power supply / demand situation is excessively supplied in the customer 20.
  • the connection with the distribution network (system 40) is disconnected (disconnected).
  • the power system connection control system 10 includes a power amount information acquisition unit 11, a power supply / demand prediction unit 12, a storage unit 13, and a control unit 14.
  • the power amount information acquisition unit 11 acquires information on the power supply / demand situation of the customer 20 from the EMS 26 of the customer 20.
  • the information acquired by the power amount information acquisition unit 11 includes the solar panel 21, the power generation capability of the wind power generator 27, information on weather forecast, the current power storage amount of the power storage device 23, and the like.
  • the demand information acquired by the power amount information acquisition unit 11 includes data of the power consumption amount that changes according to the type of the load 24 owned by the consumer 20, the lifestyle pattern, and the like.
  • the power supply and demand prediction unit 12 predicts the power supply and demand situation for each predetermined time zone in the customer 20 based on the information acquired by the power amount information acquisition unit 11.
  • the storage unit 13 acquires the information acquired in the power amount information acquisition unit 11 via the power supply / demand prediction unit 12, acquires the prediction result in the power supply / demand prediction unit 12, and stores these information.
  • control unit 14 may be a power supply device and distribution network (system 40) owned by the customer 20, or Any one of the switching units 41, 42a, and 43b is controlled so as to cut off the connection of the power distribution network between the customer 20 and the other customers (second customers) 30a to 30c.
  • system 40 power supply device and distribution network
  • the control unit 14 performs control so that the first switching unit 43b is turned off. As a result, the customer 20 is disconnected from the distribution network connecting the grid 40 and the other customers 30a to 30c, so that the usage cost of the distribution network can be reduced.
  • the control unit 14 turns on the first switching unit 43b and supplies surplus power from other consumers 30a to 30c, or turns on the switching units 41, 42a, and 43b and Control power to be supplied.
  • the consumer 20 can reduce the time connected with the system
  • step S ⁇ b> 11 the power amount information acquisition unit 11 acquires information necessary for supply and demand prediction for each predetermined time period in the customer 20.
  • step S12 the power supply / demand prediction unit 12 uses the information acquired in step S11 to predict the demand amount of power in the customer 20 every predetermined time.
  • step S13 the power supply / demand prediction unit 12 uses the information acquired in step S11 to predict the supply amount of power at the customer 20 every predetermined time.
  • step S14 the demand amount and supply amount of the electric power in the customer 20 for every predetermined time slot
  • step S15 when the condition of supply amount ⁇ demand amount is not satisfied, the process proceeds to step S15.
  • step S16 when the condition of supply amount ⁇ demand amount is satisfied, the process proceeds to step S16.
  • step S15 since the condition of supply quantity ⁇ demand quantity is not satisfied in the consumer 20, the demand quantity is predicted to exceed the supply quantity. Therefore, in this case, in order to receive power supply from the system 40, the control unit 14 controls the switching units 41, 42a, and 43b so as to maintain the connection with the system 40.
  • step S16 since the condition of supply amount ⁇ demand amount is satisfied in the customer 20, the supply amount is predicted to be equal to or greater than the demand amount. Therefore, in this case, since it is not necessary to receive power supply from the system 40, the control unit 14 controls the switching units 41, 42a, and 43b so as to disconnect the connection with the system 40.
  • the control unit 14 further includes the other consumers 30a.
  • the switching units 41, 42a, and 43b are controlled so as to disconnect the connection to 30c.
  • the power system connection control system 10 has the configuration shown in FIG. 1, performs power supply / demand prediction in a predetermined time zone according to the flow shown in FIG. 2, and the supply amount is equal to or greater than the demand amount. In the time zone, the connection with the system 40 is disconnected.
  • FIG. 3 shows the supply and demand prediction after n hours for a plurality of consumers.
  • the total amount of demand of the four consumers A to D exceeds the supply amount at the present time. Power supply is required.
  • the total amount of demand of the four consumers A to D is almost the same as the supply amount after n hours.
  • the power supply / demand balance is in a balanced state, and therefore power supply from the grid 40 can be made unnecessary by combining power within the consumer group.
  • the demand and the supply are balanced between the customer A and the customer B.
  • the consumer A totals the amount of power generated by the solar panel (PV) 21, the wind power generator 27 (100 kwh, 5 kwh), and the amount of power from the power storage device 23 (5 kwh).
  • the power storage device 23 5 kwh.
  • the consumer A predicts a demand of 110 kwh as the load 24 by adding up the power consumption of the air conditioner (100 kwh) and the lighting (10 kwh). Thereby, the supply-and-demand situation in the consumer A after n hours balances with the demand 110kwh and the supply 110kwh.
  • the customer B is expected to supply 10 kwh by adding up the power generation amount (5 kwh, 5 kwh) by the heat pump and the electric vehicle.
  • the demand of TV (10 kwh) is estimated as the load 24.
  • the supply-and-demand situation in the consumer B after n hours balances with the demand 10kwh and the supply 10kwh.
  • the solar panel (PV) 21 the amount of power generated by the wind power generator 27 (40 kwh, 10 kwh), and the amount of power from the power storage device 23 (60 kwh) are totaled. , 110 kwh supply is expected.
  • the demand of the washing machine (10 kwh) is predicted as the load 24.
  • surplus power is generated at 100 kwh with a demand of 10 kwh and a supply of 110 kwh.
  • the customer D does not own the power supply device, and thus is a supply 0.
  • the demand-and-supply situation in the customer D after n hours is a demand-excess situation with a demand of 100 kwh and a supply of 0 kwh.
  • the consumer D can supply surplus power generated by the consumer C, the supply and demand situation in the consumer group including the consumers A to D can be balanced.
  • the switching units 41, 42a, 43b, etc. are turned off for the consumers A to C that are in balance of supply and demand after n hours.
  • the connection with the system 40 can be disconnected.
  • the consumers A to C can reduce the cost of using the distribution network of the grid 40.
  • the control unit 14 may control the first switching units 43a to 43d and the like to allow surplus power generated in the customer C to be accommodated in the customer D that is not in balance between supply and demand.
  • the usage cost of the grid 40 cannot be reduced, the usage cost of the power can be reduced by receiving the price of surplus power from the customer D.
  • the power system connection control system 110 may be such that the power amount information acquisition unit 111 acquires information directly input by the customer 20 using the electronic terminal 128.
  • the electronic terminal 128 is a PC, a tablet terminal, a smartphone, a mobile phone, or the like owned by the consumer 120.
  • information necessary for power supply and demand prediction for each predetermined time period is input to the electronic terminal 128 by the consumer 120.
  • the electronic terminal 128 is connected to the power system connection control system 110 (power amount information acquisition unit 111) via a communication line.
  • the electric energy information acquisition part 111 can acquire the information required in order to estimate the condition of the electric power supply and demand in the consumer 20 for every predetermined time using the information directly input from the consumer 120. .
  • the consumer 20 demonstrated and demonstrated the example which owns electric power supply apparatuses, such as the solar panel 21, the electrical storage apparatus 23, and the wind power generator 27.
  • the present invention is not limited to this.
  • a power supply device owned by a consumer in this system a power generation device, a generator, a heat pump, or the like utilizing renewable energy such as a geothermal power generation device may be used.
  • a server external to the power system connection control system, a cloud service, or the like may be used as a storage unit that stores various information.
  • the power system connection control system of the present invention has an effect of reducing the usage cost of the power transmission network by releasing the connection with the power system according to the supply and demand situation of power in one consumer. It can be widely applied in communities including consumers who own power supply devices.
  • SYMBOLS 10 Electric power system connection control system 11 Electric power amount information acquisition part 12 Electric power supply-and-demand prediction part 13 Memory

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

Le système de commande de connexion de système de puissance (10) selon la présente invention est pourvu d'une unité d'acquisition d'informations de quantité de puissance (11), d'une unité de prédiction de demande et d'alimentation électrique (12) et d'une unité de commande. L'unité d'acquisition d'informations de quantité de puissance (11) acquiert des informations concernant la quantité d'alimentation électrique par des panneaux solaires (21), des dispositifs de stockage de puissance (23), etc. L'unité de prédiction de demande et d'alimentation électrique (12) prédit la situation de demande et d'alimentation électrique pendant une période de temps prescrite sur la base des informations acquises par l'unité d'acquisition d'informations de quantité de puissance (11) et de la quantité de puissance consommée par des clients de services (20). Sur la base du résultat de prédiction de l'unité de prédiction de demande et d'alimentation électrique (12), l'unité de commande (14) commande de premières unités de commutation (43a-43d) qui commutent la connexion entre le réseau de distribution de puissance et les panneaux solaires (21), les dispositifs de stockage de puissance (23), etc.
PCT/JP2016/084110 2016-02-25 2016-11-17 Système de commande de connexion de système de puissance, procédé de commande de connexion de système de puissance, et programme de commande de connexion de système de puissance Ceased WO2017145459A1 (fr)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2016033946A JP6759623B2 (ja) 2016-02-25 2016-02-25 電力系統接続制御システム、電力系統接続制御方法および電力系統接続制御プログラム
JP2016-033946 2016-02-25

Publications (1)

Publication Number Publication Date
WO2017145459A1 true WO2017145459A1 (fr) 2017-08-31

Family

ID=59685222

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2016/084110 Ceased WO2017145459A1 (fr) 2016-02-25 2016-11-17 Système de commande de connexion de système de puissance, procédé de commande de connexion de système de puissance, et programme de commande de connexion de système de puissance

Country Status (2)

Country Link
JP (1) JP6759623B2 (fr)
WO (1) WO2017145459A1 (fr)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118804441A (zh) * 2024-04-08 2024-10-18 江苏巧硕光电有限公司 一种基于节能路灯的自适应调控系统及方法

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7354657B2 (ja) * 2019-08-01 2023-10-03 住友電気工業株式会社 電力制御装置、電力制御方法、およびコンピュータプログラム

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004015882A (ja) * 2002-06-05 2004-01-15 Mitsubishi Heavy Ind Ltd 分散電源システムおよびその運用方法、並びに運用プログラム
JP2010220428A (ja) * 2009-03-18 2010-09-30 Toyota Motor Corp 電力融通システム
JP2011015501A (ja) * 2009-06-30 2011-01-20 Panasonic Electric Works Co Ltd 配電システム
JP2013186533A (ja) * 2012-03-06 2013-09-19 Yahoo Japan Corp 情報処理方法、システム及び方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004015882A (ja) * 2002-06-05 2004-01-15 Mitsubishi Heavy Ind Ltd 分散電源システムおよびその運用方法、並びに運用プログラム
JP2010220428A (ja) * 2009-03-18 2010-09-30 Toyota Motor Corp 電力融通システム
JP2011015501A (ja) * 2009-06-30 2011-01-20 Panasonic Electric Works Co Ltd 配電システム
JP2013186533A (ja) * 2012-03-06 2013-09-19 Yahoo Japan Corp 情報処理方法、システム及び方法

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118804441A (zh) * 2024-04-08 2024-10-18 江苏巧硕光电有限公司 一种基于节能路灯的自适应调控系统及方法

Also Published As

Publication number Publication date
JP2017153266A (ja) 2017-08-31
JP6759623B2 (ja) 2020-09-23

Similar Documents

Publication Publication Date Title
JP7113060B2 (ja) 電力供給システムおよび電力供給方法
JP6402731B2 (ja) 電力需給予測システム、電力需給予測方法および電力需給予測プログラム
EP3422282A1 (fr) Système de mise en correspondance de courtage d'énergie, procédé de mise en correspondance de courtage d'énergie et programme de mise en correspondance de courtage d'énergie
JP7513529B2 (ja) 電力制御システムおよび電力制御方法
US10243369B2 (en) Power allocation system
EP3054410A1 (fr) Dispositif de gestion d'énergie, procédé de gestion d'énergie et programme
JPWO2017122243A1 (ja) 電力供給装置及び制御装置
WO2014080667A1 (fr) Système de gestion d'énergie, méthode de gestion d'énergie, programme, dispositif serveur, et serveur local
JP2015112014A (ja) 電力制御装置、電力制御システム及び電力制御方法
JP2014072976A (ja) 制御システム、制御装置、及び制御方法
JP6786815B2 (ja) 電力供給制御システム、電力供給制御方法および電力供給制御プログラム
JP6189987B2 (ja) 管理システム、制御装置、及び制御方法
JP6903867B2 (ja) 電力供給経路制御システム、電力供給経路制御方法および電力供給経路制御プログラム
JP6328508B2 (ja) 集合住宅節電システム
US20120204044A1 (en) Method of controlling network system
US10734815B2 (en) Power coordination control system, power coordination control method, and non-transitory storage medium
JP6759623B2 (ja) 電力系統接続制御システム、電力系統接続制御方法および電力系統接続制御プログラム
JP5872353B2 (ja) エネルギー管理システム及びエネルギー管理方法
JP6903868B2 (ja) 電源情報推定装置、電源情報推定方法および電源情報推定プログラム
Aningo et al. Towards A Microgrid Based Residential Home Energy Management Using Genetic Algorithm
JP6199640B2 (ja) 制御装置、制御システム、分電盤及び制御方法
JP6434097B2 (ja) 制御装置、制御システム、分電盤及び制御方法
JP2022120610A (ja) 電力供給システム、管理装置、管理方法及びプログラム
WO2017053973A1 (fr) Appareil de gestion de puissance d'un dispositif d'alimentation en énergie, système et procédé associés
KR20120000010A (ko) 네트워크 시스템 및 에너지소비부

Legal Events

Date Code Title Description
NENP Non-entry into the national phase

Ref country code: DE

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 16891615

Country of ref document: EP

Kind code of ref document: A1

122 Ep: pct application non-entry in european phase

Ref document number: 16891615

Country of ref document: EP

Kind code of ref document: A1