BRPI0919207A2 - método e sistema implementado por computador para uso na modelagem de um sistema de reservatório geomecânico, e , método implementado por computador para uso na modelagem de uma ruptura. - Google Patents

método e sistema implementado por computador para uso na modelagem de um sistema de reservatório geomecânico, e , método implementado por computador para uso na modelagem de uma ruptura.

Info

Publication number
BRPI0919207A2
BRPI0919207A2 BRPI0919207A BRPI0919207A BRPI0919207A2 BR PI0919207 A2 BRPI0919207 A2 BR PI0919207A2 BR PI0919207 A BRPI0919207 A BR PI0919207A BR PI0919207 A BRPI0919207 A BR PI0919207A BR PI0919207 A2 BRPI0919207 A2 BR PI0919207A2
Authority
BR
Brazil
Prior art keywords
modeling
implemented method
computer implemented
rupture
geomechanical reservoir
Prior art date
Application number
BRPI0919207A
Other languages
English (en)
Inventor
Joseph Henry Schmidt
Ricky Howard Dean
Original Assignee
Chevron U S A I N C
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chevron U S A I N C filed Critical Chevron U S A I N C
Publication of BRPI0919207A2 publication Critical patent/BRPI0919207A2/pt
Publication of BRPI0919207B1 publication Critical patent/BRPI0919207B1/pt

Links

Classifications

    • G—PHYSICS
    • G06—COMPUTING OR CALCULATING; COUNTING
    • G06F—ELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00—Computer-aided design [CAD]
    • G06F30/20—Design optimisation, verification or simulation
    • G06F30/28—Design optimisation, verification or simulation using fluid dynamics, e.g. using Navier-Stokes equations or computational fluid dynamics [CFD]
    • G—PHYSICS
    • G01—MEASURING; TESTING
    • G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
    • G01V99/00—Subject matter not provided for in other groups of this subclass
    • G—PHYSICS
    • G06—COMPUTING OR CALCULATING; COUNTING
    • G06F—ELECTRIC DIGITAL DATA PROCESSING
    • G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
    • G06F17/10—Complex mathematical operations
    • G06F17/11—Complex mathematical operations for solving equations, e.g. nonlinear equations, general mathematical optimization problems
    • G06F17/13—Differential equations
    • E—FIXED CONSTRUCTIONS
    • E21—EARTH OR ROCK DRILLING; MINING
    • E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25—Methods for stimulating production
    • E21B43/26—Methods for stimulating production by forming crevices or fractures
    • G—PHYSICS
    • G01—MEASURING; TESTING
    • G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
    • G01V2210/00—Details of seismic processing or analysis
    • G01V2210/60—Analysis
    • G01V2210/64—Geostructures, e.g. in 3D data cubes
    • G01V2210/646—Fractures
    • G—PHYSICS
    • G01—MEASURING; TESTING
    • G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
    • G01V2210/00—Details of seismic processing or analysis
    • G01V2210/60—Analysis
    • G01V2210/66—Subsurface modeling

Landscapes

  • Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Mathematical Physics (AREA)
  • Mathematical Analysis (AREA)
  • Mathematical Optimization (AREA)
  • Pure & Applied Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Computational Mathematics (AREA)
  • Algebra (AREA)
  • Data Mining & Analysis (AREA)
  • General Engineering & Computer Science (AREA)
  • Software Systems (AREA)
  • Fluid Mechanics (AREA)
  • Operations Research (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geophysics (AREA)
  • Computing Systems (AREA)
  • Databases & Information Systems (AREA)
  • Computer Hardware Design (AREA)
  • Evolutionary Computation (AREA)
  • Geometry (AREA)
  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Manipulator (AREA)
BRPI0919207-7A 2008-09-19 2009-09-17 método e sistema implementado por computador para uso na modelagem de um sistema de reservatório geomecânico, e, método implementado por computador para uso na modelagem de uma fratura BRPI0919207B1 (pt)

Applications Claiming Priority (5)

Application Number Priority Date Filing Date Title
US9860408P 2008-09-19 2008-09-19
US61/098604 2008-09-19
US16476609P 2009-03-30 2009-03-30
US61/164766 2009-03-30
PCT/US2009/057331 WO2010033710A2 (en) 2008-09-19 2009-09-17 Computer-implemented systems and methods for use in modeling a geomechanical reservoir system

Publications (2)

Publication Number Publication Date
BRPI0919207A2 true BRPI0919207A2 (pt) 2015-12-08
BRPI0919207B1 BRPI0919207B1 (pt) 2020-08-18

Family

ID=42038538

Family Applications (1)

Application Number Title Priority Date Filing Date
BRPI0919207-7A BRPI0919207B1 (pt) 2008-09-19 2009-09-17 método e sistema implementado por computador para uso na modelagem de um sistema de reservatório geomecânico, e, método implementado por computador para uso na modelagem de uma fratura

Country Status (8)

Country Link
US (1) US8204727B2 (pt)
EP (1) EP2342668B1 (pt)
CN (1) CN102203638B (pt)
AU (1) AU2009293209B2 (pt)
BR (1) BRPI0919207B1 (pt)
CA (1) CA2738122C (pt)
EA (1) EA201170472A1 (pt)
WO (1) WO2010033710A2 (pt)

Families Citing this family (148)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9208270B2 (en) 2000-08-02 2015-12-08 Comsol Ab System and method for establishing bidirectional links between multiphysics modeling and design systems
US9323503B1 (en) * 2009-12-29 2016-04-26 Comsol Ab System and method for accessing settings in a multiphysics modeling system using a model tree
US20110029293A1 (en) * 2009-08-03 2011-02-03 Susan Petty Method For Modeling Fracture Network, And Fracture Network Growth During Stimulation In Subsurface Formations
EP2507738B1 (en) 2009-11-30 2019-05-01 Exxonmobil Upstream Research Company Adaptive newton's method for reservoir simulation
US11610037B2 (en) 2009-12-29 2023-03-21 Comsol Ab System and method for accessing settings in a multiphysics modeling system using a model tree
US8626475B1 (en) 2009-12-29 2014-01-07 Comsol Ab System and method for accessing a multiphysics modeling system via a design system user interface
US8688415B2 (en) * 2010-02-03 2014-04-01 Kellogg Brown & Root Llc Systems and methods for performing stress intensity factor calculations using non-singular finite elements
US8731872B2 (en) 2010-03-08 2014-05-20 Exxonmobil Upstream Research Company System and method for providing data corresponding to physical objects
US8731887B2 (en) * 2010-04-12 2014-05-20 Exxonmobile Upstream Research Company System and method for obtaining a model of data describing a physical structure
US8727017B2 (en) 2010-04-22 2014-05-20 Exxonmobil Upstream Research Company System and method for obtaining data on an unstructured grid
US8731873B2 (en) * 2010-04-26 2014-05-20 Exxonmobil Upstream Research Company System and method for providing data corresponding to physical objects
BR112012025995A2 (pt) 2010-04-30 2016-06-28 Exxonmobil Upstream Res Co método e sistema para simulação de fluxo de volume finito
US8682628B2 (en) * 2010-06-24 2014-03-25 Schlumberger Technology Corporation Multiphase flow in a wellbore and connected hydraulic fracture
US9390204B2 (en) 2010-06-24 2016-07-12 Schlumberger Technology Corporation Multisegment fractures
US9540911B2 (en) * 2010-06-24 2017-01-10 Schlumberger Technology Corporation Control of multiple tubing string well systems
EP2588952A4 (en) 2010-06-29 2017-10-04 Exxonmobil Upstream Research Company Method and system for parallel simulation models
CN102339325A (zh) * 2010-07-16 2012-02-01 中国石油化工股份有限公司 一种分析离散裂缝性油藏流体流动的方法
CN102339326B (zh) * 2010-07-16 2014-01-15 中国石油化工股份有限公司 一种分析模拟缝洞型油藏流体流动的方法
CN102339339B (zh) * 2010-07-23 2014-01-15 中国石油化工股份有限公司 一种分析缝洞型油藏剩余油分布的方法
US9418180B2 (en) * 2010-07-26 2016-08-16 Exxonmobil Upstream Research Company Method and system for parallel multilevel simulation
EP2599023B1 (en) 2010-07-29 2019-10-23 Exxonmobil Upstream Research Company Methods and systems for machine-learning based simulation of flow
CA2803068C (en) 2010-07-29 2016-10-11 Exxonmobil Upstream Research Company Method and system for reservoir modeling
EP2599029A4 (en) 2010-07-29 2014-01-08 Exxonmobil Upstream Res Co METHODS AND SYSTEMS FOR AUTOMATIC LEARNING FLOW SIMULATION
US8731875B2 (en) 2010-08-13 2014-05-20 Exxonmobil Upstream Research Company System and method for providing data corresponding to physical objects
CN102383783B (zh) * 2010-09-03 2015-06-17 中国石油化工股份有限公司 一种分析缝洞型油藏孔洞间油水流动特征的方法
WO2012039811A1 (en) 2010-09-20 2012-03-29 Exxonmobil Upstream Research Company Flexible and adaptive formulations for complex reservoir simulations
WO2012071090A1 (en) 2010-11-23 2012-05-31 Exxonmobil Upstream Research Company Variable discretization method for flow simulation on complex geological models
CA2820942C (en) * 2010-12-10 2016-12-20 Baker Hughes Incorporated A method to improve reservoir simulation and recovery from fractured reservoirs
BR112014005794A2 (pt) 2011-09-15 2017-03-28 Exxonmobil Upstream Res Co operações matriciais e vetoriais otimizadas em algoritmos de instrução limitada que executam cálculos de equação de estado
CN103034743A (zh) * 2011-09-30 2013-04-10 鸿富锦精密工业(深圳)有限公司 曲面距离计算系统及方法
CA2852044C (en) 2011-10-11 2020-05-12 Schlumberger Canada Limited System and method for performing stimulation operations
US9366121B2 (en) 2012-02-06 2016-06-14 Halliburton Energy Services, Inc. Modeling fracturing fluid leak-off
US9208268B2 (en) * 2012-02-14 2015-12-08 Saudi Arabian Oil Company Giga-cell linear solver method and apparatus for massive parallel reservoir simulation
MX340326B (es) 2012-03-06 2016-07-05 Ion Geophysical Corp Modelo que predice la facturacion del esquisto.
US9753180B2 (en) 2012-03-28 2017-09-05 Exxonmobil Upstream Research Company Method for multiphase flow upscaling
AU2012375233B2 (en) * 2012-03-30 2015-12-03 Landmark Graphics Corporation System and method for automatic local grid refinement in reservoir simulation systems
CN102621594B (zh) * 2012-03-31 2014-01-08 中国海洋石油总公司 一种层理构造识别方法及系统
US8949094B2 (en) * 2012-04-02 2015-02-03 Honda Motor Co., Ltd. Thermal deflection analysis
AU2013274734B2 (en) * 2012-06-15 2016-08-25 Landmark Graphics Corporation Methods and systems for non-physical attribute management in reservoir simulation
GB2503903B (en) * 2012-07-11 2015-08-26 Schlumberger Holdings Fracture monitoring and characterisation
AU2013324162B2 (en) 2012-09-28 2018-08-09 Exxonmobil Upstream Research Company Fault removal in geological models
US9171109B2 (en) 2012-11-09 2015-10-27 International Business Machines Corporation Method to couple fluid-flow and geomechanical models for integrated petroleum systems using known triggering events
NO345808B1 (no) * 2012-12-27 2021-08-16 Geoquest Systems Bv Flersegmentsprekker
US9217318B2 (en) * 2013-03-14 2015-12-22 Halliburton Energy Services, Inc. Determining a target net treating pressure for a subterranean region
US9297250B2 (en) 2013-03-14 2016-03-29 Halliburton Energy Services, Inc. Controlling net treating pressure in a subterranean region
US10808521B2 (en) 2013-05-31 2020-10-20 Conocophillips Company Hydraulic fracture analysis
US20140358444A1 (en) * 2013-05-31 2014-12-04 Conocophillips Company Method of hydraulic fracture identification using temperature
CN105474272A (zh) * 2013-07-02 2016-04-06 兰德马克绘图国际公司 2.75d网格划分算法
CA2913898C (en) * 2013-07-02 2017-03-28 Landmark Graphics Corporation 3d stadia algorithm for discrete network meshing
EP3017429A4 (en) * 2013-07-02 2017-05-10 Landmark Graphics Corporation 2.5d stadia meshing
MX2015017867A (es) * 2013-07-08 2016-11-18 Logined B V * Determinacion de la calidad de terminacion geomecánica.
US10001000B2 (en) * 2013-07-22 2018-06-19 Halliburton Energy Services, Inc. Simulating well system fluid flow based on a pressure drop boundary condition
CN103390108B (zh) * 2013-07-25 2016-08-31 中国石油大学(北京) 一种基于压裂地质体可压性的井型设计方法及装置
WO2015030837A1 (en) * 2013-08-27 2015-03-05 Halliburton Energy Services, Inc. Simulating fluid leak-off and flow-back in a fractured subterranean
CN105593909A (zh) * 2013-08-16 2016-05-18 界标制图有限公司 创建用于确定储层的储量估计的厚度网格
US9677393B2 (en) * 2013-08-28 2017-06-13 Schlumberger Technology Corporation Method for performing a stimulation operation with proppant placement at a wellsite
AU2013399120B2 (en) 2013-08-29 2017-06-22 Landmark Graphics Corporation Static earth model calibration methods and systems
WO2015095557A1 (en) 2013-12-18 2015-06-25 Conocophillips Company Method for determining hydraulic fracture orientation and dimension
CA2934902C (en) 2014-02-03 2018-08-14 Halliburton Energy Services, Inc. Geomechanical and geophysical computational model for oil and gas stimulation and production
US10571603B2 (en) * 2014-02-19 2020-02-25 Repsol, S.A. Method implemented in a computer for the numerical simulation of a porous medium
CN104747180B (zh) * 2014-02-26 2016-09-14 中国石油化工股份有限公司 一种用于注水开发的缝洞型油藏分析方法及其应用
US10319143B2 (en) 2014-07-30 2019-06-11 Exxonmobil Upstream Research Company Volumetric grid generation in a domain with heterogeneous material properties
CA2963092C (en) 2014-10-31 2021-07-06 Exxonmobil Upstream Research Company Methods to handle discontinuity in constructing design space for faulted subsurface model using moving least squares
CA2963416A1 (en) 2014-10-31 2016-05-06 Exxonmobil Upstream Research Company Handling domain discontinuity in a subsurface grid model with the help of grid optimization techniques
US20160131800A1 (en) * 2014-11-07 2016-05-12 Schlumberger Technology Corporation Modeling fluid-conducting fractures in reservoir simulation grids
GB2545608B (en) * 2014-11-12 2020-06-17 Halliburton Energy Services Inc Reservoir mesh creation using extended anisotropic, geometry-adaptive refinement of polyhedra
CA2961562C (en) 2014-11-19 2018-07-31 Halliburton Energy Services, Inc. Formation fracture flow monitoring
US10190406B2 (en) * 2014-12-23 2019-01-29 Baker Hughes, A Ge Company, Llc Formation fracturing potential using surrounding pore pressures
US10030497B2 (en) 2015-02-10 2018-07-24 Statoil Gulf Services LLC Method of acquiring information of hydraulic fracture geometry for evaluating and optimizing well spacing for multi-well pad
US9933535B2 (en) * 2015-03-11 2018-04-03 Schlumberger Technology Corporation Determining a fracture type using stress analysis
US10344204B2 (en) 2015-04-09 2019-07-09 Diversion Technologies, LLC Gas diverter for well and reservoir stimulation
US10012064B2 (en) 2015-04-09 2018-07-03 Highlands Natural Resources, Plc Gas diverter for well and reservoir stimulation
CN104929624B (zh) * 2015-04-22 2018-04-17 中国地质大学(武汉) 一种超压驱动下原油二次运移速率的计算方法
CN105089595B (zh) * 2015-05-27 2019-04-12 中国石油天然气股份有限公司 水平压裂裂缝导流作用下的油藏数值模拟方法及装置
CN105089582B (zh) * 2015-05-28 2017-12-05 中国石油天然气股份有限公司 基于井下流量控制设备的油藏数值模拟方法及装置
US10846445B2 (en) * 2015-06-18 2020-11-24 M-I L.L.C. Method of waste distribution and formation pressure profile determination
US9988900B2 (en) 2015-06-30 2018-06-05 Statoil Gulf Services LLC Method of geometric evaluation of hydraulic fractures by using pressure changes
CN105114065A (zh) * 2015-08-06 2015-12-02 中国石油天然气股份有限公司 水力压裂裂缝延伸过程的模拟方法
US11578568B2 (en) 2015-08-07 2023-02-14 Schlumberger Technology Corporation Well management on cloud computing system
US10794154B2 (en) 2015-08-07 2020-10-06 Schlumberger Technology Corporation Method of performing complex fracture operations at a wellsite having ledged fractures
WO2017027433A1 (en) 2015-08-07 2017-02-16 Schlumberger Technology Corporation Method of performing integrated fracture and reservoir operations for multiple wellbores at a wellsite
WO2017027340A1 (en) * 2015-08-07 2017-02-16 Schlumberger Technology Corporation Method integrating fracture and reservoir operations into geomechanical operations of a wellsite
US10685086B2 (en) * 2015-09-15 2020-06-16 Conocophillips Company Avoiding water breakthrough in unconsolidated sands
CN106547938B (zh) * 2015-11-09 2019-10-01 中国地质大学(北京) 裂隙-孔隙结构双重介质煤储层气水两相流数值模拟方法
CA2914348C (en) * 2015-12-10 2018-03-06 Fanhua Zeng Method of modelling hydrocarbon production from fractured unconventional formations
US10049172B2 (en) * 2015-12-10 2018-08-14 Saudi Arabian Oil Company Predicting and modeling changes in capillary pressure and relative permeabilities in a porous medium due to mineral precipitation and dissolution
US10890058B2 (en) 2016-03-09 2021-01-12 Conocophillips Company Low-frequency DAS SNR improvement
FR3048801A1 (pt) * 2016-03-11 2017-09-15 Services Petroliers Schlumberger
US10303827B2 (en) * 2016-04-05 2019-05-28 Rolls-Royce Corporation Predicting cracking in cooled metal or alloy components
US10982520B2 (en) 2016-04-27 2021-04-20 Highland Natural Resources, PLC Gas diverter for well and reservoir stimulation
EP3475734B1 (en) 2016-06-24 2023-06-14 Services Pétroliers Schlumberger Implementing free advection in basin modeling
CN106640027B (zh) * 2016-09-28 2019-05-07 中国石油化工股份有限公司 缝洞型油藏暗河型岩溶储集体空间结构井网的构建方法
US10753181B2 (en) 2016-11-29 2020-08-25 Conocophillips Company Methods for shut-in pressure escalation analysis
HUE064459T2 (hu) 2016-12-23 2024-03-28 Exxonmobil Technology & Engineering Company Eljárás és rendszer stabil és hatékony tározó szimulációhoz stabilitási proxyk alkalmazásával
US11028679B1 (en) 2017-01-24 2021-06-08 Devon Energy Corporation Systems and methods for controlling fracturing operations using monitor well pressure
US11365617B1 (en) 2017-01-24 2022-06-21 Devon Energy Corporation Systems and methods for controlling fracturing operations using monitor well pressure
US11255997B2 (en) 2017-06-14 2022-02-22 Conocophillips Company Stimulated rock volume analysis
CA3062569A1 (en) 2017-05-05 2018-11-08 Conocophillips Company Stimulated rock volume analysis
GB2565034B (en) * 2017-05-24 2021-12-29 Geomec Eng Ltd Improvements in or relating to injection wells
US12228026B2 (en) 2017-09-14 2025-02-18 Saudi Arabian Oil Company Modeling reservoir permeability through estimating natural fracture distribution and properties
US10607043B2 (en) 2017-09-14 2020-03-31 Saudi Arabian Oil Company Subsurface reservoir model with 3D natural fractures prediction
AU2018352983B2 (en) 2017-10-17 2024-02-22 Conocophillips Company Low frequency distributed acoustic sensing hydraulic fracture geometry
CA3084971C (en) * 2018-01-16 2023-07-18 Halliburton Energy Services, Inc. Modeling fracture closure processes in hydraulic fracturing simulators
US11126762B2 (en) 2018-02-28 2021-09-21 Saudi Arabian Oil Company Locating new hydrocarbon fields and predicting reservoir performance from hydrocarbon migration
CA3094528A1 (en) 2018-03-28 2019-10-03 Conocophillips Company Low frequency das well interference evaluation
CN108825217B (zh) * 2018-04-19 2021-08-20 中国石油化工股份有限公司 适用于油藏数值模拟的综合井指数计算方法
CA3097930A1 (en) 2018-05-02 2019-11-07 Conocophillips Company Production logging inversion based on das/dts
US12291943B2 (en) 2018-05-02 2025-05-06 Conocophillips Company Production logging inversion based on LFDAS/DTS
WO2019217763A1 (en) 2018-05-09 2019-11-14 Conocophillips Company Ubiquitous real-time fracture monitoring
US11668162B2 (en) 2018-12-31 2023-06-06 Halliburton Energy Services, Inc. Predicting downhole mechanical cleaning efficiency in wellbore walls during wellbore fluids displacements
AU2018456067B2 (en) * 2018-12-31 2021-05-20 Halliburton Energy Services, Inc. Predicting downhole fluid mixing and channeling in wellbores
WO2020149824A1 (en) * 2019-01-14 2020-07-23 Halliburton Energy Services, Inc. Azimuthal borehole rendering of radioelement spectral gamma data
CA3075373A1 (en) 2019-03-12 2020-09-12 Chevron U.S.A. Inc. Coupling a simulator and at least one other simulator
US10983233B2 (en) 2019-03-12 2021-04-20 Saudi Arabian Oil Company Method for dynamic calibration and simultaneous closed-loop inversion of simulation models of fractured reservoirs
WO2020198194A1 (en) 2019-03-26 2020-10-01 Drilling Info, Inc. Determining a landing zone in a subterranean formation
CN110263382B (zh) * 2019-05-27 2020-04-17 中国石油大学(北京) 垂向注气裂缝油气水微观渗流规律的预测方法及系统
US11608730B2 (en) 2019-09-17 2023-03-21 ExxonMobil Technology and Engineering Company Grid modification during simulated fracture propagation
US12117582B2 (en) 2019-10-01 2024-10-15 ExxonMobil Technology and Engineering Company Model for coupled porous flow and geomechanics for subsurface simulation
CN110714756A (zh) * 2019-11-21 2020-01-21 西南石油大学 一种高温高压x-ct扫描缝洞物理模型
US11098582B1 (en) * 2020-02-17 2021-08-24 Saudi Arabian Oil Company Determination of calibrated minimum horizontal stress magnitude using fracture closure pressure and multiple mechanical earth model realizations
CN111911140B (zh) * 2020-07-16 2023-10-27 中国石油天然气股份有限公司 陆相沉积储层的模拟方法
CN111734380B (zh) * 2020-07-30 2022-03-11 西南石油大学 一种水平井多级压裂裂缝扩展形态的快速预测方法
US12189072B2 (en) 2020-10-05 2025-01-07 Saudi Arabian Oil Company System and method to identify high-impact discrete fracture model realizations for accelerated calibration of reservoir simulation models
US11767751B2 (en) * 2020-11-04 2023-09-26 Reveal Energy Services, Inc. Determining a characteristic associated with a reservoir
US11579334B2 (en) 2021-04-07 2023-02-14 Enverus, Inc. Determining a wellbore landing zone
CA3225345A1 (en) 2021-07-16 2023-01-19 Conocophillips Company Passive production logging instrument using heat and distributed acoustic sensing
US11859490B2 (en) 2021-08-19 2024-01-02 Devon Energy Corporation Systems and methods for monitoring fracturing operations using monitor well flow
WO2023034875A1 (en) 2021-08-31 2023-03-09 Saudi Arabian Oil Company Quantitative hydraulic fracturing surveillance from fiber optic sensing using machine learning
US11525935B1 (en) 2021-08-31 2022-12-13 Saudi Arabian Oil Company Determining hydrogen sulfide (H2S) concentration and distribution in carbonate reservoirs using geomechanical properties
EP4177644B1 (en) * 2021-11-05 2025-01-01 MATRIX JVCO LTD trading as AIQ Method and system for determining geomechanical parameters of a well
CN114154303B (zh) * 2021-11-09 2025-03-14 北京航空航天大学 流固耦合仿真过程中流体域与固体域间数据传递的方法
US12025589B2 (en) 2021-12-06 2024-07-02 Saudi Arabian Oil Company Indentation method to measure multiple rock properties
US12536431B2 (en) 2021-12-09 2026-01-27 Saudi Arabian Oil Company Managing training wells for target wells in machine learning
US12085687B2 (en) 2022-01-10 2024-09-10 Saudi Arabian Oil Company Model-constrained multi-phase virtual flow metering and forecasting with machine learning
CN114547998B (zh) * 2022-02-28 2024-03-22 西南石油大学 一种通过耦合储层流动确定水平井压裂改造体积的方法
CN114580315B (zh) * 2022-03-04 2024-11-01 西南石油大学 一种水力压裂裂缝延伸与多相流体流动模拟方法
US11921250B2 (en) 2022-03-09 2024-03-05 Saudi Arabian Oil Company Geo-mechanical based determination of sweet spot intervals for hydraulic fracturing stimulation
CN114638137B (zh) * 2022-03-31 2023-03-28 王永亮 一种基于热-流-固-损伤耦合的干热岩产热预测方法
US12560741B2 (en) 2022-04-04 2026-02-24 Saudi Arabian Oil Company System and method to develop naturally fractured hydrocarbon reservoirs using a fracture density index
US20240328293A1 (en) * 2023-04-03 2024-10-03 Saudi Arabian Oil Company Well Completion for Unconventional Subsurface Reservoirs
US20240378814A1 (en) * 2023-05-09 2024-11-14 Ansys, Inc. Cohesive zone-based criteria for adaptivity driven debonding analysis
US12655831B2 (en) * 2023-10-23 2026-06-16 Element Technical Services Inc. Slurry and use thereof for enhancing geothermal energy production from heat reservoir and method for producing same
US12656514B2 (en) 2023-11-15 2026-06-16 Saudi Arabian Oil Company Determination of in-situ stress perturbation using potential fields data
US12312951B1 (en) 2024-04-26 2025-05-27 Saudi Arabian Oil Company Fracture reactivation index (FRI) for seal integrity analysis in carbon capture and storage (CCS)
US12493137B1 (en) 2024-06-11 2025-12-09 Saudi Arabian Oil Company Building natural fractures model using 3D stacked geological models
CN119939948B (zh) * 2025-02-07 2026-03-03 郑州大学 一种混杂纤维增强地聚合物混凝土动态增长因子的预测方法及系统
CN120411392B (zh) * 2025-03-11 2025-12-26 山东省地矿工程勘察院(山东省地质矿产勘查开发局八〇一水文地质工程地质大队) 一种地质变形三维观测系统及方法
CN120667096B (zh) * 2025-07-09 2026-02-24 长江大学 一种裂缝型潜山储层表皮系数系统分解方法

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100590637C (zh) * 2003-09-30 2010-02-17 埃克森美孚上游研究公司 使用最小阻力路径来特征化储层模型中的连通性
US7877246B2 (en) * 2006-09-22 2011-01-25 Schlumberger Technology Corporation System and method for performing oilfield simulation operations

Also Published As

Publication number Publication date
CA2738122A1 (en) 2010-03-25
US20100076738A1 (en) 2010-03-25
WO2010033710A2 (en) 2010-03-25
AU2009293209A1 (en) 2010-03-25
EA201170472A1 (ru) 2011-10-31
EP2342668A4 (en) 2016-11-02
CA2738122C (en) 2020-02-11
CN102203638A (zh) 2011-09-28
CN102203638B (zh) 2013-07-17
AU2009293209B2 (en) 2015-07-09
WO2010033710A3 (en) 2010-07-01
EP2342668B1 (en) 2019-03-13
BRPI0919207B1 (pt) 2020-08-18
EP2342668A2 (en) 2011-07-13
US8204727B2 (en) 2012-06-19

Similar Documents

Publication Publication Date Title
BRPI0816349A2 (pt) sistema, sistema para uso em um poço, e método
BR112013019329A2 (pt) método e sistema para implementar um simulador de reservatório, e, meio legível por computador.
BRPI0918937A2 (pt) sistema de gerenciamento de iluminação, método para implementar o sistema de gerenciamento de iluminação e módulo executivo para o uso em um sistema de gerenciamento de iluminação
BRPI0912426A2 (pt) método executado por computador, computador, e sistema para uso com poço
BRPI0909002A2 (pt) aparelho para uso em um poço, sistema, e método para uso em um poço
BRPI0910976A2 (pt) método de ampliar para simulação de reservatório, dispositivo de armazenamento de programa legível por uma máquina, programa de computador adaptado para ser executado por um processador, sistema adaptado para ampliar para simulação de reservatório, e método pra ampliar um modelo de reservatório
BRPI0920442A2 (pt) sistema de computador para modelar um campo de petróleo tendo uma formação subterrânea e um reservatório subterrâneo no mesmo, e método para modelar um campo de petróleo tendo uma formação subterrânea e um reservatório subterrâneo no mesmo.
BRPI0821334A2 (pt) método utilizável em um poço, e sistema utilizável com um poço.
BRPI0919556A2 (pt) método, sistema para perfurar um poço, e, meio legível por computador
BRPI0913461A2 (pt) sistema e método para atuar seletivamente de uma localização remota múltiplas ferramentas de poço dentro do poço em um poço
BRPI0919572A2 (pt) método implementado por computador em múltipla escala, sistema implementado por computador, e, método para operar um reservatório de subsuperfície
BRPI0811763A2 (pt) Método para completar uma transação, meio legível por computador, servidor, e, telefone
BRPI0815844A2 (pt) dispensador, sistema de válvula, e, método para prender uma válvula em um recipiente.
BRPI0823080A2 (pt) Sistema para a utilização de uma interface de usuário baseada em gestos, método para a utilização de uma interface de usuário baseada em gestos e meio legível por computador
BRPI0917120A2 (pt) método, e, meio legível por computador.
BRPI0921124A2 (pt) sistema para autenticar um consumidor, método implementado por computador, meio legível por computador, e, computador servidor.
BRPI0818772A2 (pt) Dispositivo, método, e, meio legível por computador.
CL2007002965A1 (es) Metodo y sistema para entregar y ejecutar las mejores practicas en proyectos de desarrollo de yacimiento petrolifero.
BRPI0818423A2 (pt) Sistema, método, e, mídia legível por computador
BRPI0922312A2 (pt) método, e, meio legível por computador
BRPI0822100A2 (pt) Método e sistema para administrar automaticamente processos no desenvolvimento paralelo de um aplicativo por uma interface de usuário gráfica, sistema de desenvolvimento de aplicativo de computador, e, meio legível por computador de instruções
BRPI1012891A2 (pt) método, meio de armazenamento legível por computador, e, computador servidor.
BRPI0921594A2 (pt) sistema de controle de fluxo para uso em um poço.
BRPI0906086A2 (pt) Método, sistemas e meio legível por computador.
BRPI0821199A2 (pt) dispositivo e métodos para recuperar unidade presente na atmosfera, e, método para adicionar meios antibacterianos a um reservatório.

Legal Events

Date Code Title Description
B06F Objections, documents and/or translations needed after an examination request according [chapter 6.6 patent gazette]
B06T Formal requirements before examination [chapter 6.20 patent gazette]
B06A Patent application procedure suspended [chapter 6.1 patent gazette]
B09A Decision: intention to grant [chapter 9.1 patent gazette]
B16A Patent or certificate of addition of invention granted [chapter 16.1 patent gazette]

Free format text: PRAZO DE VALIDADE: 10 (DEZ) ANOS CONTADOS A PARTIR DE 18/08/2020, OBSERVADAS AS CONDICOES LEGAIS.

B21F Lapse acc. art. 78, item iv - on non-payment of the annual fees in time

Free format text: REFERENTE A 15A ANUIDADE.

B24J Lapse because of non-payment of annual fees (definitively: art 78 iv lpi, resolution 113/2013 art. 12)

Free format text: EM VIRTUDE DA EXTINCAO PUBLICADA NA RPI 2792 DE 09-07-2024 E CONSIDERANDO AUSENCIA DE MANIFESTACAO DENTRO DOS PRAZOS LEGAIS, INFORMO QUE CABE SER MANTIDA A EXTINCAO DA PATENTE E SEUS CERTIFICADOS, CONFORME O DISPOSTO NO ARTIGO 12, DA RESOLUCAO 113/2013.