CH107360A - Method of constructing a hollow concrete body, for example a pipe. - Google Patents

Method of constructing a hollow concrete body, for example a pipe.

Info

Publication number
CH107360A
CH107360A CH107360DA CH107360A CH 107360 A CH107360 A CH 107360A CH 107360D A CH107360D A CH 107360DA CH 107360 A CH107360 A CH 107360A
Authority
CH
Switzerland
Prior art keywords
core
frame
concrete
pipe
space
Prior art date
Application number
Other languages
French (fr)
Inventor
Nose Toichi
Original Assignee
Nose Toichi
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nose Toichi filed Critical Nose Toichi
Publication of CH107360A publication Critical patent/CH107360A/en

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B21/00Methods or machines specially adapted for the production of tubular articles
    • B28B21/02Methods or machines specially adapted for the production of tubular articles by casting into moulds
    • B28B21/10Methods or machines specially adapted for the production of tubular articles by casting into moulds using compacting means
    • B28B21/18Methods or machines specially adapted for the production of tubular articles by casting into moulds using compacting means using expansible or retractable mould or core elements
    • B28B21/20Methods or machines specially adapted for the production of tubular articles by casting into moulds using compacting means using expansible or retractable mould or core elements using inflatable cores, e.g. having a frame inside the inflatable part of the core

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Moulds, Cores, Or Mandrels (AREA)

Description

  

  Procédé de construction d'un corps creux en béton, par exemple d'une conduite.    La présente invention concerne un pro  cédé de construction d'un corps creux en bé  ton, par exemple d'une conduite, procédé qui  consiste à placer un long noyau creux flexi  ble dans un châssis en laissant un espace en  tre le noyau et le châssis, à ,dilater le noyau  en y forçant un fluide, à remplir de béton  l'espace entre le noyau et le châssis, à retirer  le noyau;

   après la prise du béton introduit,  en évacuant le contenu du noyau, à établir  un châssis continuant le premier châssis, à  placer le noyau retiré du premier châssis en  position dans     1o    nouveau châssis, à remplir  de béton l'espace entre le châssis et le noyau,  de façon à former des parties de corps creux  continuant celles -déjà<B>,</B> formées, à répéter les  mêmes opérations en formant, par exemple,  une conduite de longueur désirée soit recti  ligne, soit courbe, sans aucun joint.  



  Le procédé suivant l'invention servira de  préférence à la construction de corps tubu  laires en béton, destinés à être utilisés comme  aqueducs ou comme     égoûts,    ou pour .d'autres  applications; ils peuvent être posés sous le  sol ou au-dessus du sol et peuvent être cons  truits à leur emplacement définitif, ou en un    autre endroit, en longueur et forme rectiligne  ou courbe et sans aucun joint.  



  Le dessin ci-joint montre quelques exem  ples de mise en oeuvre du procédé de la. pré  sente invention.  



  La,     fig.    1 montre en coupe verticale lon  gitudinale, un premier exemple de corps  creux obtenu par le 'procédé;  La     fig.    2 montre un autre exemple, en  coupe;  La.     fig.    3 est une coupe transversale des  exemples représentés dans les     fig.    1 et 2;  La     fig.    4 montre, en coupe transversale,  un troisième exemple;  La     fig.    5 représente, comme dernier  exemple, en coupe transversale, un corps  creux à noyau ovale.  



  Pour construire par exemple une con  duite     (fig.    1 et 2) suivant ce procédé, on se  sert d'un noyau 1, de châssis 2, de supports  de noyau 3 et d'un compresseur d'air ou  d'une pompe à eau pour forcer de l'air ou de  l'eau dans le noyau.  



  Le noyau 1 est un long sac, dont la  couche interne 4     (fig.    3) est en caoutchouc  et la. couche externe 5, par exemple en forte      toile, ou en une autre matière souple et im  perméable à l'air ou à l'eau.     r1    une de ses  extrémités, le noyau présente un trou pour  l'admission et la décharge d'un fluide, et est  pourvu d'une soupape ou d'un robinet 7. Un  tuyau 8 relie le noyau au compresseur ou à  la pompe qui refoule le fluide dans le noyau.  Le châssis 2 se compose de deux planches  latérales, avec ou sans planches supérieures  montées à charnière ou verrouillées de façon  à pouvoir être relevées ou rabattues à vo  lonté.

   Les supports 3 du noyau ont même  largeur que la. largeur externe de la conduite  à construire et comportent un trou 12 pour  recevoir le noyau 1, tandis qu'autour du trou  12, on a prévu des trous G plus petits pour  l'insertion de barres de fer 9 pour armer le  béton.     r1    l'emplacement où on doit cons  truire la conduite, soit. au-dessous, soit     au-          dessus    du sol, on enfonce d'abord des pieux  et on établit sur ces pieux une infrastructure  <B>10</B> en béton. On monte ensuite des planches  latérales 2 sur l'infrastructure, en laissant  entre ces planches un espace égal à la lar  geur externe de la, conduite à construire.

    Entre ces planches latérales, on place deux  ou plusieurs supports de noyau 3, et le noyau  enduit de graisse ou d'une substance simi  laire est inséré dans les trous 12. De l'air  ou de l'eau est forcé dans le noyau jusqu'à  ce qu'il soit parfaitement rempli. Les bar  res de fer 9 sont mises en place et l'espace  entre le noyau et les châssis est rempli de  béton 11. En remplissant l'espace de béton,  il est préférable de commencer par le milieu  ou par une extrémité et de continuer le rem  plissage de béton vers les extrémités ou vers  l'extrémité, en enlevant les supports de  noyau à volonté. Dans l'exemple représenté       (fig.    1), le travail     d@    remplissage commence  au milieu. Deux supports de noyau sont pla  cés près du milieu de la. longueur du noyau.

    l'espace entre ces supports étant tel que le  noyau ne fléchit en aucun point, et on le  remplit de béton. On enlève ensuite les sup.  ports de noyau pour les placer en des en  droits tels que 3<B>'</B> et on remplit les espaces  vides entre la partie     d-.    béton déjà formée et    les supports de noyau situés dans leurs nou  velles positions. On répète le travail jusqu'à  ce que l'ensemble de la longueur du noyau  soit couvert. On couvre ensuite le tube mou  ainsi établi, avec une planche supérieure,  qu'on fixe avec des verrous ou des éléments  similaires, et on augmente la pression à l'in  térieur du noyau dans le but de presser le  tube par l'intérieur et de rendre le béton plus  compact.  



  Lorsque le béton a pris au bout d'un cer  tain temps, on évacue le fluide du noyau, de  façon a réduire ses dimensions, on retire le  noyau, et on reconstruit 1e châssis, le noyau  étant disposé près du tube déjà construit, et  on répète le travail de remplissage de béton  jusqu'à ce que la longueur requise soit at  teinte.  



  La     fig.    2 montre un exemple de cons  truction d'une partie courbe continuant une  partie droite déjà construite comme décrit  ci-dessus.     t1    cet effet, le travail de fonda  tion et le châssis sont établis suivant la  courbe requise, les supports de noyau sont  placés à. distance appropriée entre le châssis.  Le noyau est inséré dans les trous 12 et le  noyau de la conduite déjà formé et les bar  res de fer 9 sont conduits à travers les petits  trous     G    des     supports    de noyau. Le noyau et  les barres adoptent alors une     forme    courbe et,  même au     remplissage    du noyau avec le fluide,  ils conservent cette forme.

   On remplit en  suite de béton     ë    la manière ci-dessus décrite,  et on enlève les supports dès que l'espace     cri-          tre    la conduite formée et le support. de noyau  suivant est rempli de béton. De cette ma  nière, on peut former toute partie courbe dé  sirée de la conduite.  



  La     fig.    4     montra-    un autre exemple de       formaton    d'un corps creux en béton, avec plu  sieurs tubes pour la. pose de tables électri  ques ou pour d'autres applications. Dans ce  cas, les supports de noyau présentent autant  d'ouvertures 12 que cela est nécessaire et on  se sert d'autant de noyaux. Quant au reste  du travail il est le même que ci-dessus dé  crit. Toutefois, ainsi que représenté dans la.       fig.    4, on n'établit pas le côté supérieur du      châssis et l'opération d'application de la  pression finale aux noyaux pour rendre le       corps    de béton plus compact peut être     entière-          tnE#nt    supprimé.  



  Le procédé peut aussi être utilisé dans la  construction d'un corps creux comportant une       percée    autre que     circula.ir2.     



  La fi-. 5 montre un corps creux dont la  percée est de forme ovale. Dans ce cas, on  se sert d'un noyau 1' comportant deux noyaux  internes l'un plus grand     12    et l'autre plus  petit 13. Lorsque les noyaux externes et in  ternes sont remplis de fluide, le noyau ex  terne adopte une forme ovale, comme repré  senté en     fig.    5.  



  En résumé, un corps creux continu de  longueur quelconque et ne comportant aucun  joint peut être construit par un moyen sim  ple à l'emplacement où il doit être établi.  On peut établir une partie courbe de forme  désirée avec une percée lisse. Il est évident  que le procédé suivant l'invention peut être  utilisé à la fabrication de tubes de béton de       formes    quelconques.



  Method of constructing a hollow concrete body, for example a pipe. The present invention relates to a method of constructing a hollow concrete body, for example a pipe, which method consists of placing a long flexible hollow core in a frame leaving a space between the core and the frame. , to expand the core by forcing a fluid therein, to fill the space between the core and the frame with concrete, to remove the core;

   after setting the concrete introduced, removing the content of the core, establishing a frame continuing the first frame, placing the core removed from the first frame in position in 1o new frame, filling the space between the frame and the frame with concrete core, so as to form hollow body parts continuing those already formed, to repeat the same operations by forming, for example, a pipe of the desired length either straight line or curved, without any attached.



  The process according to the invention will preferably be used for the construction of concrete tubular bodies, intended to be used as aqueducts or as sewers, or for other applications; they can be placed under the ground or above the ground and can be built in their final location, or in another location, in length and rectilinear or curved shape and without any joint.



  The accompanying drawing shows some examples of the implementation of the process. present invention.



  The, fig. 1 shows in vertical longitudinal section, a first example of a hollow body obtained by the process; Fig. 2 shows another example, in section; Fig. 3 is a cross section of the examples shown in FIGS. 1 and 2; Fig. 4 shows, in cross section, a third example; Fig. 5 shows, as a last example, in cross section, a hollow body with an oval core.



  To construct for example a duct (fig. 1 and 2) according to this process, one uses a core 1, frame 2, core supports 3 and an air compressor or an air pump. water to force air or water into the core.



  The core 1 is a long bag, the inner layer 4 (Fig. 3) of which is made of rubber and the. outer layer 5, for example in strong canvas, or in another flexible material and impermeable to air or water. r1 one of its ends, the core has a hole for the admission and discharge of a fluid, and is provided with a valve or a tap 7. A pipe 8 connects the core to the compressor or to the pump which forces the fluid back into the core. The frame 2 consists of two side boards, with or without top boards hinged or locked so that they can be raised or folded down as desired.

   The supports 3 of the core have the same width as the. external width of the pipe to be constructed and have a hole 12 to receive the core 1, while around the hole 12, smaller holes G have been provided for the insertion of iron bars 9 to reinforce the concrete. r1 the location where we must build the pipe, ie. below, or above the ground, first piles are driven and a concrete <B> 10 </B> infrastructure is established on these piles. Side boards 2 are then mounted on the infrastructure, leaving between these boards a space equal to the external width of the pipe to be built.

    Between these side boards, two or more core supports 3 are placed, and the core coated with grease or a similar substance is inserted into the holes 12. Air or water is forced into the core until 'so that it is perfectly filled. The bars of iron 9 are put in place and the space between the core and the frames is filled with concrete 11. When filling the space with concrete, it is better to start from the middle or from one end and continue on. fill in concrete towards the ends or towards the end, removing the core supports at will. In the example shown (fig. 1), the filling work begins in the middle. Two core supports are placed near the middle of the. core length.

    the space between these supports being such that the core does not flex at any point, and it is filled with concrete. We then remove the sup. kernel ports to put them into rights like 3 <B> '</B> and fill in the blanks between the d- part. concrete already formed and the core supports located in their new positions. The work is repeated until the entire length of the core is covered. The soft tube thus established is then covered with a top board, which is fixed with locks or the like, and the pressure inside the core is increased in order to press the tube from the inside and to make the concrete more compact.



  When the concrete has set after a certain time, the fluid is evacuated from the core, so as to reduce its dimensions, the core is removed, and the frame is rebuilt, the core being placed near the tube already constructed, and the concrete filling work is repeated until the required length is reached.



  Fig. 2 shows an example of the construction of a curved part continuing a straight part already constructed as described above. For this purpose, the foundation work and the frame are established according to the required curve, the core supports are placed at. appropriate distance between the frame. The core is inserted into the holes 12 and the already formed core of the pipe and the iron bars 9 are driven through the small holes G of the core holders. The core and the bars then adopt a curved shape and, even when the core is filled with the fluid, they retain this shape.

   Subsequently, concrete is filled in the manner described above, and the supports are removed as soon as the space cracks the formed pipe and the support. next core is filled with concrete. In this way, any desired curved part of the pipe can be formed.



  Fig. 4 showed another example of the formation of a hollow concrete body, with several tubes for the. installation of electric tables or for other applications. In this case, the core supports have as many openings 12 as necessary and as many cores are used. As for the rest of the work, it is the same as described above. However, as shown in. fig. 4, the upper side of the frame is not established and the operation of applying the final pressure to the cores to make the concrete body more compact can be completely omitted.



  The method can also be used in the construction of a hollow body having a breakthrough other than circula.ir2.



  The fi-. 5 shows a hollow body, the opening of which is oval in shape. In this case, a core 1 'is used having two inner cores, one larger 12 and the other smaller 13. When the outer and inner cores are filled with fluid, the outer core takes on a shape. oval, as shown in fig. 5.



  In summary, a continuous hollow body of any length and having no joints can be constructed by simple means at the location where it is to be established. A curved part of the desired shape can be established with a smooth hole. It is obvious that the process according to the invention can be used for the manufacture of concrete tubes of any shape.

 

Claims (1)

REVENDICATION Procédé de construction d'un corps creux en .béton, par exemple d'une conduite, pro cédé qui consiste à placer un long noyau creux flexible dans un châssis, en laissant un espace entre le noyau et le châssis;, à di- later le noya. CLAIM A method of constructing a hollow concrete body, for example a pipe, a method which consists in placing a long flexible hollow core in a frame, leaving a space between the core and the frame; later drowned him. en y forçant un fluide, à rem plir de béton l'espace entre le noyau et le châssis, à retirer le noyau, après la prise du béton introduit, en évacuant le contenu du noyau, à établir un châssis continuant le premier châssis, à placer le noyau retiré du premier châssis en position dans le nouveau châssis, à remplir de béton l'espace entre le châssis et le noyau, de façon à former des parties de corps creux continuant celles déjà formées, à répéter les mêmes opérations en formant une conduite de longueur désirée, soit rectiligne, soit courbe, sans aucun joint. by forcing a fluid therein, to fill the space between the core and the frame with concrete, to remove the core, after the setting of the introduced concrete, by evacuating the contents of the core, to establish a frame continuing the first frame, to place the core removed from the first frame in position in the new frame, to fill the space between the frame and the core with concrete, so as to form hollow body parts continuing those already formed, to repeat the same operations by forming a pipe of desired length, either straight or curved, without any joint. SIOUS-REVENDICATIONS 1 Procédé suivant la revendication, consis tant en outre à se servir da supports de noyaux pour supporter le noyau dans sa position à l'intérieur des châssis externes, supports comportant des ouvertures pour le noyau et des trous à travers lesquels on fait passer des barres de fer pour armer le béton. 2 Procédé suivant la revendication, suivant lequel on se sert d'un noyau constitué par au moins trois longs .sacs flexibles, dont l'un enveloppe les autres, de façon qu'on puisse obtenir des percées de forme autre que circulaire. SIOUS-CLAIMS 1 A method according to claim, further comprising using da core supports to support the core in its position within the outer frames, supports comprising openings for the core and holes through which are made. pass iron bars to reinforce the concrete. 2 A method according to claim, wherein one uses a core consisting of at least three long flexible .sacs, one of which envelops the others, so that we can obtain holes of shape other than circular.
CH107360D 1924-02-21 1924-02-21 Method of constructing a hollow concrete body, for example a pipe. CH107360A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CH107360T 1924-02-21

Publications (1)

Publication Number Publication Date
CH107360A true CH107360A (en) 1924-11-01

Family

ID=4366267

Family Applications (1)

Application Number Title Priority Date Filing Date
CH107360D CH107360A (en) 1924-02-21 1924-02-21 Method of constructing a hollow concrete body, for example a pipe.

Country Status (1)

Country Link
CH (1) CH107360A (en)

Similar Documents

Publication Publication Date Title
EP0842347B9 (en) Device and process for the lining of a pipe branch, particularly in an oil well
NO339599B1 (en) Procedure for uncollapsible expansion of well coupling
WO2002029208A1 (en) Method and system for increasing tubing resistance to pressure
FR2751374A1 (en) PROCESS FOR CREATING A CAVITY IN A LOW THICK SALT MINE
US1600353A (en) Process of constructing culverts or pipes of concrete
CH107360A (en) Method of constructing a hollow concrete body, for example a pipe.
FR2610652A1 (en) PROCESS FOR REINFORCING A PITCHED TUBULAR PIEU, PIEU OBTAINED BY THIS METHOD, DEVICE FOR CARRYING OUT THE METHOD
FR2472075A1 (en) Tunnel anchor bolt for rock - bolt is surrounded by cylindrical cover with tubes to introduce tamping material
BE897361A (en) APPARATUS FOR TERRESTRIAL DRILLING AND METHOD FOR ITS IMPLEMENTATION
EP0305259B1 (en) Process for retaining lateral walls of deep excavations
FR2889574A1 (en) TUBULAR STRUCTURE DEPLIABLE
BE898138A (en) Pile forming method and new concrete pile preparation for this process.
BE427418A (en)
CH274328A (en) Method for assembling tubular end pieces.
FR2817174A1 (en) Spray bottle for insecticides or cosmetics is fitted with flexible pipe between spray and bottle bottom
BE386896A (en)
CH112924A (en) Improved device for implementing a process for constructing, by molding, a hollow concrete body, without joints.
BE341975A (en)
BE538201A (en)
BE806494A (en) PROCESS FOR EXECUTING JOINTS ON SIDERO-CEMENT PIPES
BE347473A (en)
CH280577A (en) A method of forming malleable metal fittings for pipes, and a die for carrying out this method.
BE414850A (en)
BE546369A (en)
BE623155A (en)